sr-15-19 speedway # 6987 preliminary site review
TRANSCRIPT
CIRCULATION PLAN6987-CR
SIGNAGE PLAN AND DETAILS6987-SS
PIPING AND UTILITIES NOTES6987-CU1
PIPING AND UTILITIES PLAN6987-CU
CUT\ FILL PLAN6987-CF
POST DEVELOPMENT WATERSHED6987-CG2
PRE DEVELOPMENT WATERSHED6987-CG1
GRADING PLAN6987-CG
PLOT PLAN NOTES6897-CS1
PLOT PLAN6987-CS
COVER SHEET6987-CV
DATE: 12/12/19LANDSCAPE DETAILSL2.0
DATE: 12/12/19LANDSCAPE PLANL1.0
LANDSCAPE PLANS PREPARED BY SEAMON WHITESIDE
DATE: 10/25/18ALTA/NSPS LAND TITLE SURVEY2861-ALTA
SURVEY PREPARED BY Powers Land Surveying
LJB Inc.
$D
AT
E$
$TI
ME
$$
FI
LE
S$
OWNER AND PROJECT MANAGEMENT:
937-864-3000
ENON, OH 45323
500 SPEEDWAY DRIVE
ENGINEERING:
919-594-6710
GARNER, NC 27529
1401 AVERSBORO ROAD
SITE SPECIFIC
THIRD PARTY ENGINEERING SUPPORT
CIVIL SUPPORT
RALEIGH, NC
WAKE COUNTY
2600 S. SAUNDERS STREET
C4600-RIGHT HAND QUIK-BRIK C2.0
REBUILD STORE #6987
P. BATTAGLIA
P. BATTAGLIA
J. HENSLEY
####
10-02-18
10-02-18
10-04-18
6987-CVDRWG. NO.
RVWR.
P.MGR.
DGNR.
DESIGN TEAM DATE
SCALE
PROJECT ID
VERSION OR
BLDG NO.
STORE OR
DE
SIG
NE
R
DA
TE
PR
OJ.
MG
R.
DA
TE
RE
VIE
WE
R
DA
TE
RE
VISIO
NS
NO.
VICINITY MAP
LOCATION
#6987
SPEEDWAY
WA
KE C
OU
NT
Y
RA
LEIG
H,
NO
RT
H C
AR
OLIN
A
2600 S
OU
TH S
UA
ND
ER
S S
TR
EE
T
CO
VE
R S
HE
ET
6987
LJBIN
C.C
OM
(919) 594-6
700
GA
RN
ER,
NC 27529
SUIT
E 2
15
1400 A
VE
RS
BO
RO R
OA
D
LJB I
NC.
Pre
pare
d
For:
Enon,
OH 4
5323
Engin
eering a
nd C
onstruction D
ept.
Speed
way
R
OR R
EP
RO
DU
CE
D W
ITH
OU
T E
XP
RE
SS
ED W
RIT
TE
N C
ON
SE
NT O
F S
PE
ED
WA
Y.
THIS D
RA
WIN
G IS T
HE P
RO
PE
RT
Y O
F S
PE
ED
WA
Y A
ND IS N
OT T
O B
E U
SE
D
R
TYPICAL ISLAND AND CONCRETE SLAB DETAILSSTD-CIS-A
YARD EQUIPMENT DETAILS - OTHERSTD-CYE-O
YARD EQUIPMENT DETAILS - AUTOSTD-CYE-A
TYPICAL SERVICE STATION DRAINAGE & UTILITY DETAILS & SPECIFICATIONSSTD-CUD-1
PAVEMENT & CURBING DETAILSSTD-CPC-1
FE S
UB
MIT
TA
L0
02-1
3-1
902-1
3-1
902-1
3-1
9
$D
AT
E$
$TI
ME$
$FI
LE
S$
NO.
RE
VISIO
NS
D
AT
E
RE
VIE
WE
RP
ROJ.
MG
R.
DA
TE
DA
TE
DE
SIG
NE
R
SCALE 0
DESIGN TEAM
P.MGR.
DGNR.
RVWR.
DATE
BLDG NO.
STORE OR
DRWG. NO.
PROJECT ID
VERSION OR
P. BATTAGLIA
J. HENSLEY
#####
P. BATTAGLIA
OR R
EP
RO
DU
CE
D W
ITH
OU
T E
XP
RE
SS
ED W
RIT
TE
N C
ON
SE
NT O
F S
PE
ED
WA
Y.
THIS D
RA
WIN
G IS T
HE P
RO
PE
RT
Y O
F S
PE
ED
WA
Y A
ND IS N
OT T
O B
E U
SE
D
6987
02-13-19
02-13-19
02-13-19
WA
KE C
OU
NT
Y
RA
LEIG
H,
NO
RT
H C
AR
OLIN
A
2600 S
OU
TH S
UA
ND
ER
S S
TR
EE
TPre
pare
d F
or:
Enon,
OH 4
5323
Engineering a
nd C
onstruction D
ept.
Speed
way
R
LJBIN
C.C
OM
(919) 5
94-6
700
GA
RN
ER,
NC 27529
SUIT
E 2
15
1400 A
VE
RS
BO
RO R
OA
D
LJB I
NC.
20'
1" = 20'-0"
FE
ASIBILIT
Y P
LA
N/ S
TO
RE R
EB
UIL
D
0F
E S
UB
MIT
TA
L02-1
3-1
902-1
3-1
902-1
3-1
9
30' CIT
Y O
F R
ALEIG
H U
TILIT
Y E
AS
EM
EN
T - D
B 3
088, P
G 3
50
30' CIT
Y O
F R
ALEIG
H U
TILIT
Y E
AS
EM
EN
T - D
B 2
649, P
G 3
54
AIR
AIR
RUL
20,000 G
AL
12,000 G
AL
DSL
RUL
20,000 G
AL
6,000 G
AL
PUL
FLE
X6,000 G
AL
ES
ES
PL
9 9
12
B1
B2 B2
B3
B3
B3
C1
C1
C2
TYP.
D1 D2 D3 D4 D5 D6 D7
E1
E2
E4
E4
E4
E5
E3
E3
E6
E6
E7
TYP.
E8
E8
E9
E9
E9
E9
E9
E10
E10
E10
E11
E12
E12
F1
F2
F2
F2
F3
F5
F5
F7
F7
F10
LP
LP
LP
LP
LP
LP
PARKING
VENT LINES
DISPENSERS
TANKS
SIGNS
DUMPSTER
CANOPY
BUILDING
10'
TBD
25'
TBD
0
N/A
25'
5'
10'
TBD
25'
TBD
0'
6'
6'
6'
3'
TBD
6'
TBD
0'
6'
6'
6'
REQUIRED PROVIDED
SETBACK REQUIREMENTS
FRONT SIDE REAR FRONT SIDE REAR
117.50'
TBD
67.50'
TBD
0
N/A
59.50'
142.50'
39.50'
TBD
51.43'
TBD
10'
6'
39'
107.50'
26.54'
TBD
143.54'
TBD
0'
68.54'
135.39'
33.18'
5' BUILDING SETBACK
10' PARKING SETBACK
25' SETBACK
*
*
SEE SHEET 6987-CS1
CODED NOTE DESCRIPTION
37.81'
S 35°36'24" E
N 04°19'51" E 98.16'
19.31'
S 87°00'28" E
N 01°34'32" W ~ 247.65'S 8
8°26'4
4"
W ~ 223.0
4'
S 00°51'28" E ~ 62.66'S 01°33'16" E ~ 224.99'
S 8
3°2
5'0
7"
E ~ 175.1
8'
LEGEND
12
XX
CANOPY, AND DISPENSER SETBACK
PROPOSED BOLLARD
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE SIDEWALK
PROPOSED CONCRETE PAVEMENT
NUMBER OF PARKING SPOTS
NOTE CALLOUT
EXISTING UTILITY EASEMENT
SETBACK
PROPOSED CONCRETE CURB AND GUTTER
PROPOSED CONCRETE CURB
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY LINE
PROPERTY LINE
F5
THESE FACILITIES CAUSED BY HIS WORK FORCE.
SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO
PRIOR TO STARTING CONSTRUCTION. NO ADDITIONAL COMPENSATION
THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIES
IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO CONTACT
ARE BASED ON FIELD SURVEYS AND LOCAL UTILITY COMPANY RECORDS.
THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN ON THIS PLAN
NOTE:
D1 D2 D3 D4 D5 D6 D7
NOT FOR CONSTRUCTION
N
F11
US 70 & US 401 - 116' R/W (92' PAVEMENT WIDTH)
70' R/W (
44' P
AV
EM
EN
T W
IDT
H)
FF= 260.50
BUILDING C4600-R V2.0
96'-0" x 48'-0"
S. SAUNDERS ST.
CA
RO
LIN
A PIN
ES A
VE.
PL
OT P
LA
N
6987-CS
AIR
AIR
RUL
20,000 G
AL
12,000 G
AL
DSL
RUL
20,000 G
AL
6,000 G
AL
PUL
FLE
X6,000 G
AL
ES
ES
DSL
3+1
DSL
3+1
DSL
3+1
DSL
3+1
FLEX
3+1
DSL
3+1
US 70 & US 401 - 116' R/W (92' PAVEMENT WIDTH)
70' R/W (
44' P
AV
EM
EN
T W
IDT
H)
FF= 260.50
BUILDING C4600-R V2.0
96'-0" x 48'-0"
DSL
3+1
DSL
3+1
DSL
3+1
DSL
3+1
S. SAUNDERS ST.
CA
RO
LIN
A PIN
ES A
VE.
$D
AT
E$
$TI
ME$
$FI
LE
S$
NO.
RE
VISIO
NS
D
AT
E
RE
VIE
WE
RP
ROJ.
MG
R.
DA
TE
DA
TE
DE
SIG
NE
R
SCALE 0
DESIGN TEAM
P.MGR.
DGNR.
RVWR.
DATE
BLDG NO.
STORE OR
DRWG. NO.
PROJECT ID
VERSION OR
P. BATTAGLIA
J. HENSLEY
#####
P. BATTAGLIA
OR R
EP
RO
DU
CE
D W
ITH
OU
T E
XP
RE
SS
ED W
RIT
TE
N C
ON
SE
NT O
F S
PE
ED
WA
Y.
THIS D
RA
WIN
G IS T
HE P
RO
PE
RT
Y O
F S
PE
ED
WA
Y A
ND IS N
OT T
O B
E U
SE
D
6987
MM-DD-YY
MM-DD-YY
MM-DD-YY
WA
KE C
OU
NT
Y
RA
LEIG
H,
NO
RT
H C
AR
OLIN
A
2600 S
OU
TH S
AU
ND
ER
S S
TR
EE
TPre
pare
d F
or:
Enon,
OH 4
5323
Engineering a
nd C
onstruction D
ept.
Speed
way
R
LJBIN
C.C
OM
(919) 5
94-6
700
GA
RN
ER,
NC 27529
SUIT
E 2
15
1400 A
VE
RS
BO
RO R
OA
D
LJB I
NC.
20'
1" = 20'-0"
FE
ASIBILIT
Y P
LA
N/ S
TO
RE R
EB
UIL
D
N
CB#
MH#
CO
CB
CO COCOCOCOCOCOCOCOCO
6987-CU
PL
AN
PIPIN
G A
ND U
TILITIE
S
LEGEND
SHEET 2861-CU1
NOTES, REFER TO
FOR PIPING AND UTILITY
EXISTING OVERHEAD ELECTRIC LINE
EXISTING SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED WATER LINE
PROPOSED SANITARY LINE
PROPOSED UNDERGROUND ELECTRIC
PROPOSED GAS LINE
EXISTING STORM SEWER
EXISTING EASEMENT
SETBACK LINE
RIGHT OF WAY LINE
PROPERTY LINE
SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE.
COMPLETED PRIOR TO INSTALLATION OF NE UTILITIES. ANY SIGNIFICANT DISCREPANCIES
ON THESE DRAWINGS WHERE UTILITY TIE INS ARE TO BE MADE.VERIFICATION SHALL BE
CONTRACTOR SHALL VERIFY INVERT ELEVATIONS AND OTHER CRITICAL DIMENSIONS LISTED
1
2
3
4
56
7
89
A1 A2 A3 A4
A6 A7 A8 A9
A12
A13
A11A11
A10
B2
B2
B3
B4
B5
B7
B8
B9
C1
(TYP.)
C2
C2
C3
C3
B3
C3
C3
C3
C3
C3
C3
C3
C5
C5
C5
C5
C5
C5C5
C6
C6
C6
C6
C10
C11
C12
B11 B11 B11
B11
B10
CB1 CB2
CB3
CB4
CB5
CB6
CB7
MH1 MH2
MH3
MH4
SS1
SS2SS3
OS
IS
156' ~ 36" @ 1.23%
107' ~ 3
6" @
1.0
0%
@ 1.08%
23' ~ 18"
77' ~ 3
6" @
1.0
0%
@ 2.16%
DRAIN
SLOTTED
37' ~ 12"
@ 1.00%
21' ~ 15"
43' ~ 15" @ 1.16%
23' ~ 15" @ 4.00%
IS1
IS2@ 0.50%
48' ~ 12"
@ 0.50%
35' ~ 12"
80' ~ 1
2"
@ 1.0
0%
NOT FOR CONSTRUCTION
THESE FACILITIES CAUSED BY HIS WORK FORCE.
SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO
PRIOR TO STARTING CONSTRUCTION. NO ADDITIONAL COMPENSATION
THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIES
IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO CONTACT
ARE BASED ON FIELD SURVEYS AND LOCAL UTILITY COMPANY RECORDS.
THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN ON THIS PLAN
NOTE:
EXISTING GAS METER
EXISTING SANITARY CLEANOUT
EXISTING SANITARY MANHOLE
PROPOSED STORM MANHOLE
EXISTING STORM MANHOLE
PROPOSED CLEANOUT
PROPOSED CATCH BASIN
EXISTING CATCH BASIN
PROPOSED POWER POLE
PROPOSED HEADWALL
EXISTING TELEPHONE MANHOLE
EXISTING METAL POLE W/ MAST ARM
EXISTING UTILITY POLE
FIRE HYDRANT
WATER VALVE
WATER METER
PROPOSED GAS METER
EPEP
EPEP
EPEP
EPEP
EPEP
EPEP
EPEP
EPEP
EPEP
EP
EP
EP
EP
EP
EPEP
EPEP
EPEP
EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP
EP EP EP EP EP EP EP EP
EPEP
EPEP
EP
XX
XX
XX X X X X X
ESES
ESES
ESES
ESES
ESES
ESES ES ES ES ES ES ES ES
ESES
ESES ES ES ES ES ES ES ES ES ES ES ES ES ES
ED
ED
ED
ED
ED
ED
ED
ED
ED
EDED
EDED
WS WS WS
WS
WSWS
WSWS
WSWS
WSWS
WSWS
WS
WS
WS
WS
WS
DD
DD
DDD
DD
DD
DD
DD
DD
DD
DDDDDDDDDDDD
DD
DD
DD
D
DD
DD
DD
D
D D D
D
DD
D
D
D
DD
D
D D D
DDDDDDDDDDDDDDDD
GG
GG
GG
GG
GG
G
G G G G G G
G
G
GG
GG
GG
GG
G
S S S S S
SS
SS
SS
SS
SS
S
S S S S S
SS
SS
HYDL - 5
ILEB - 37
ILEB - 79
HYDL - 62,360 sf SOD2,195 sf SOD
540 sf SOD
6 ILEB106 sf SOD
42 sf SOD
12,591 sf SOD
426 JUNC
5 QUES
13 PRUB
3 QUEB
12 CERC
2,025 sf SOD
6 ILEB
1 CERC
1,018 sf SOD
247 sf SOD
67 LIRS
171 LIRS
0 10 20 40SCALE: 1" = 20'
L1.0
S
EW
N
SIGN BY OTHERS
MULCH ALL SHRUB BEDS, TYP,
REQUIRED STREET TREES AT40' O.C. PER THE CITY STREETSCAPEORDINANCE.
5' DIAMETER MULCH RING, ALLTREES IN SOD (TYP). SEE TREEDETAIL FOR MULCH REQUIREMENTS
SIGN, BY OTHERS
DUMPSTER ENCLOSURESCREENING, SEE PLANTSCHEDULE FOR DETAILS
MULCH THIS ISLAND
JUNCUS IN BOTTOM OF RETENTIONBASIN, TYP. SOD SLOPES OF BASIN
UNDERSTORY TREES @ 20' O.C.DUE TO OVERHEAD POWER LINES
STREET TREES SUBJECT TONCDOT REVIEW AND APPROVAL