Overview
beas SCM process / 21.09.2007
Organisation Event Information Other processFunctionexpand SCM
Quotation
process
Customer
request
PrecalculationEngineering
Material and
Ressource
Planning
Purchase
order / receipt /
invoice
Quality control
goods in progress
Pick and
pack
Sales
delivery
invoice
Sales
Order Entry
Current
calculation
Quality control
raw material
Quality check
finished products
beas PPC
XOR XOR
Production
Order
Production
Detail planningProduction
XOR
Post
calculation
tour texttexttour
text
text
text
text
text
text
texttour tour tour
tourtour
tour
tour text
tourtour text tour text
tour text
tour text
15.05.2008 be.as mechanical engineering process Page 1
Customer
Requirement of
new product /
change request
Definition of new
productSales
Product defined
Master data
Bill of materials
Routing
Precalculation
All costs
calculated
Quotation
Sales
XOR
Order entry
Precalculation
Engineering
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 2
Requirement of
new quotation
Entry quotation Sales
Quotation
entered
Customer
Order entry
Precalculation
Quotation Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 3
Requirement of
new customer
order
Entry customer
orderSales
Customer order
entered
Engineering
Quotation
entry
V
Production
order
Quotation
Sales Order Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 4
Engineering Engineering
Engineering
closed
Production
order
Precalculation
Order entry
Master data
Bill of materials
Routing
V
Release for
production
VMaterial and
capacity
planning
Engineering
Quotation
Requirement of
new product /
change request
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 5
Start MRP
Material and
capacity
planning
Planning
department
Stock
XOR
Production
planning
Result MRP
Forecast
Customer orders
Finished
workorders
Entry work
orders for
assembly
Entry purchase
orders for raw
materails
Warehouse
Management
Material and capacity planning
Planning
departmentPlanning
department
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 6
Order entry
Entry work
orders
Planning
department
Work orders
entered to
planned costs
Production
detail planning
PrecalculationCalculation
Requirement of
new production
order
Production order Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 7
Purchase order Organisation Event Information Other processFunction
texttour
Requirement of
new purchase
order
Purchasing
Purchase order
entered
Goods receipt
(Quality
control)
MRP Wizard
Entry purchase
orders for raw
materails
Draft purchase
order
15.05.2008 be.as mechanical engineering process Page 8
Production
Order
Incomming work
orders
capacity leveling
Production
planning
Capacity of
ressources
Work orders
planned
Production
Stock
information
Scheduling /
Prioritization
material
availability
Purchase orders
Production detail planning Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 9
Production
detail planning
Start production
Material issued /
production timeProductionActual costs
Production
finished
Warehouse
Management
Current and
poast
calculation
Production
Finished goods
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 10
Material
issued /
production
time
Production
completed?
Product costing
analysis / Post
calculation
Controlling
Standard costs
(planned costs)Calculation
Result costing
analysis
Actual costs
Cost
accounting
Current and post calculation
Current
calculation
Completed Not completed
V
Production
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 11
Release for
shipment
Pick and pack
Logistic
Customer order
Pick and pack
completed
Shipment
Create shipping
documentsCustomer order
V
Issuing invoice
Pick and pack Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 12
Goods receipt
for purchase
orders
Booking LogisticsPurchase order
Booked in the
store
Quality
instruction
Quality control goods receipt for purchase orders
Incomming
goods
Purchasing
V
Item with quality
flag?
Booked in the
quarantine store
No Yes
Warehouse
Management Quality control
V
Released and
booking in the
store (automatic)
Yes
Reshipment
No
Purchasing
Quality control
successful?
Quality
management
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 13
Work in
progress
Quality control goods in progress
Production
Next operation
Quality
instruction
V
Quality control
operation?
Preparation for
quality control
No Yes
Quality control
finished goods Quality control
V
Rework
No
Production
Quality control
successful?
Quality
management
Yes
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 14
Finished goods
Quality control finished goods
Production
Booked in the
store
Quality
instruction
V
Item with quality
flag?
Booked in the
quarantine store
No Yes
Warehouse
Management Quality control
V
Released and
booking in the
store (automatic)
Yes
Rework
No
Production
Quality control
successful?
Quality
management
Organisation Event Information Other processFunction
texttour
15.05.2008 be.as mechanical engineering process Page 15
The Pre-Calculation function allows users to perform “Engineering Adjustments”
to any chosen item. This adjustment will remain with the Quote and/or Order and
will further be used to issue unique Work Orders once issues.
1. In the pre-calculation sub-process form the user can see the default settings
and related cost information from the BOM and Route related to the chosen
item (finished good or sub-assembly).
2. From this calculation screen adjustments to a specific item BOM and Route
can be made through right mouse clicks to add/remove/edit information in the
default calculation rollup.
3. The adjusted item is then saved as a numbered Pre-Calculation template in
the Pre-Calculation module, and can be used for Quotations and Sales (NOTE:
if adjusted in the Quotation or Sales documents, the adjusted information
with be automatically attached).
4. All cost rollups are re-calculated based on the changes made and reflected
in the pre-calculation template
5. From this position – the new pre-calculation can be
Precalculation
15.05.2008 be.as mechanical engineering process Page 16
Quotation
This process flow describes the Engineer to Order Sub-Process
supported within the Quotation process within SAP B1. This will allow,
at time of Quotation, a user to customize the quotation to the customer’s
specific engineering changes. This will also control the versioning of all
unique changes so that they can be used again as required and are
available as reference.
1. The customer requests a sales quotation
2. In sap b1 the sales quotation is raised and an item selected
– then saved
3. The pre-calculation screen is initiated by clicking
the “calculation” button
4. The pre-calculation process is performed (see details
in this presentation)
5. Once a pre-calculation is determined and saved, it is applied
to the specific quotation
6. Costs to produce are updated
15.05.2008 be.as mechanical engineering process Page 17
Sales order
This process flow describes the Engineer to Order Sub-Process supported
within the Customer (Sales Order) process within SAP B1. This will allow, at
time of Customer Order, a user to customize the customize or select an
available customization based on the customer’s specific engineering changes.
This will also control the versioning of all unique changes so that they can be
used again as required and are available as reference.
1. The customer requests a sales order
2. In sap b1 the sales quotation can be chosen as the base document
if available or a unique sales order can be entered.
3. The pre-calculation screen is initiated by clicking the “calculation” button
if a previous pre-calculation is not determined during quotation.
4. If required, the pre-calculation process is performed (see
details in this presentation)
5. Once a pre-calculation is determined and saved, it is applied to
the specific sales order
6. Costs to produce are updated
15.05.2008 be.as mechanical engineering process Page 18
Engineering
This process flow describes the Engineer to Order Sub-Process supported within
a traditional Engineer to Order organization. This will describe the common steps
performed in an engineering department to support engineer to order. Either at
the time of Quotation or Sales Order, a user can allow for customization of the
item to be produced to the customer’s specific engineering changes. This is
usually performed by members of the engineering department within an
organization.
1. The customer requests an engineering change
2. In sap b1 the sales quotation or sales order is raised and an item selected
– then saved
3. The Engineering department is notified using internal workflow within SAP
Business One that an engineering change is required (usually via an alert
or approval based on a UDF flag).
4. The assigned engineer will open the quote or order document and click
the calculation button.
5. The pre-calculation process is performed (see details in this presentation)
a. Items from inventory can be added/removed/edited
b. Route operations can be added/removed/edited
c. Items currently not in inventory can be added/removed/edited
d. Version control is maintained automatically upon save
6. Once a pre-calculation is determined and saved, it is applied to the specific
quotation or order document
a. Production costs are updated based on the unique calculation template
7. Engineering will then approve the associated document (quotation or order)
and notification will be sent via normal SAP Business One workflow.
8. MRP will be run for normal production management
a. Work Orders generated from MRP will utilize the engineered calculation
template attached to the specific sales order
9. NOTE: this process can also be used to update existing templates
15.05.2008 be.as mechanical engineering process Page 19
Material and capacity planning
This process flow describes the Engineer to Order Sub-Process supported within
the beas MRP calculation. Configuration settings of MRP to utilize engineering
changes at the order level must be made to enable this function. This
configuration setting allows the standard MRP functions in beas to take into
account all unique engineering changes made and applied to any sales orders in
the system. The MRP will calculate the demand based on the multi-level BOM
requirements applied against the route cycle times. MRP can utilize demand
from available stock, forecasts, customer orders, and finished work orders.
1. Production Planner will start the MRP Process
a. Select from the available MRP templates
i. Highlight the MRP template
b. Create a new MRP template
i. Choose parameters
ii. Choose demand sources
iii. Choose stock locations to be nettable
2. Calculate MRP
a. Click the calculate button on the MRP main screen
b. System will run calculation sequence
c. Calculation time/date will update automatically
d. NOTE: calculation can be set to run automatically
3. View Results
a. Once calculated – the resulting shortages are viewed by clicking
the View button
b. The results screen auto-filters to show all shortages in materials
based on the calculation template.
4. Create PO/WO documents
a. From the results screen the use can identifiy all items to be produced
or purchased – and see the associated demand leading to the negative
available quantities.
b. Filling the ordered quantity fields with a number will allow creation of
PO or WO documents.
i. Purchased items are shown with a bin icon
1. Requires selection of supplier if no default is assigned
2. If applicable, the price will fill automatically
ii. Produced items are shown with a folder icon.
c. Purchase Orders and/or Work Orders are generated by clicking the
appropriate button at the bottom of the screen.
i. System will generate multiple PO documents (one per vendor selected)
and multiple WO documents (one per item selected)
15.05.2008 be.as mechanical engineering process Page 20
Production order
This process flow describes the Engineer to Order Sub-Process supported within
the Work Order (Production Order) within beas. This process allows entry of a
Work Order in production – along with all multi-level BOM and Route information
carried to the Work Order.
1. A Sales Order (or other “demand” such as forecast) is entered into the system
2. The order generates a requirement for a new Work Order
3. If an engineering change has been generated – it is recorded through
the pre-calculation process as described earlier.
4. The Work Order is produced (either manually via the Sales Order /
Work Order screen or via the MRP results screen described earlier)
5. Work Orders are entered into the Production Plan – for the shop floor.
6. Work Orders are now subject to Ruff Cut Capacity Planning functions
within beas.
15.05.2008 be.as mechanical engineering process Page 21
Production detail planning
In the beas Capacity Planning and Production Detail Planning, It calculates the
latest possible start date for a work order on the basis of priority, resource
capacities, factory calendar and many other factors. Calculation is done
automatically. The work start date is determined for the entire work order, for
each production position and for each individual routing Operation.
The machines, work centers, personnel groups and tools are reserved and the
utilization can be displayed graphically to aid in re-planning and capacity
adjustments.
With Resource planning, future utilization can also be planned, simulated and
booked with the help of forecasts.
The pool control uses the result of the capacity planning and informs the worker
in the shop which operations must be completed. It is automatically updated and
can be recalculated through Pool generation/Scheduling.
1. The Production Order (Work Order) once generated, is entered into the
beas production plan and visible under the Production menu within the
beas module.
2. All open Production Orders are visable via the Production menu in beas.
3. The beas Production Planning functions allow users to review the following
information:
a. Capacity Planning
i. Resource capacity by Work Center
ii. Pool allocation
b. Materials Availability
i. In Stock Quantities
ii. Purchased Quantities
4. The information above allows users to Re-Plan Work Orders in production
based on the identified variables.
15.05.2008 be.as mechanical engineering process Page 23
Production
beas is equipped with production control for all types of production
Once planned, Work Orders are available for processing in the system. Work
order tasks can be processed from the Work Order menu within Production via a
structure view and task confirmation is displayed.
1. Work Orders are planned and released.
2. Work Order operations are driven by the associated Route and are
distributed and scheduled across the associated Work Centers on the
production floor.
3. Materials to be issued are defined by the BOM and allocated to the
appropriate Operation as defined in the BOM and Route associated with the
item to be produced.
4. Materials are issued to the Work Order in production and Operation time
is recorded against the Work Order in production.
a. Time and Data collection can be done via a Terminal View function in beas
or via the Work Order screen in the menu.
b. If Terminal View is used – the user will log in via a security code and see
all allocated Work Centers. There they can open a Work Order, Issue
Materials, and Record Time based on the Operation being performed.
c. If the Work Order screen is being used, the Work Order can be expanded
to show all Materials and Operations to be updated. Users can use right
mouse clicks to issue materials and record time against the Work Order.
5. Production Finish is recorded against the Work Order by the user
6. The Finished Good is then Received into the appropriate Warehouse
within SAP Business One.
15.05.2008 be.as mechanical engineering process Page 24
Current and post calculation
beas has many different calculation options where the Production Cost
calculation is structured and available for use throughout the system. The
Calculation concept is to allow users to define the structures to be used for Cost
Calculations within the system.
The following calculation types are available:
1. Precalculation
a. Used to calculate cost of an existing item or to set up a completely new
calculation for a unique item. BOM and Route information is pulled from
the Item Master automatically and all associated costs are displayed.
b. This can also be used to perform a proposal calculation from SAP BO. The
calculation can be opened directly from an SAP Quote. After configuration
and calculation of the offered item, the price can be determined and entered
in the SAP Quote. If an order should result, a Work Order can be created
directly from the calculation.
c. Precalculation calculates at full and marginal costs and allows the
calculation of up to 5 lot sizes at the same time.
2. Batch calculation
3. Post calculation (incl. batch post calculation)
a. The post calculation offers the following calculation types
i. Valuation of the assembly to be produced based on the actual values
ii. Determination of the accumulated actual values
iii. Comparison of actual values against plan values
b. The actual value is the sum of
i. Material entries at the valuation price
ii. Reported times multiplied by the hour or minute rate stored in the work
center
iii. Incoming invoices from external operations
c. In addition, the standard surcharges are shown.
d. The result is stored in the item master and in the work order position.
e. The post calculation can be directly accessed through a work order or
position or through calculation / post calculation.
15.05.2008 be.as mechanical engineering process Page 25
Pick and pack
This process flow describes the Engineer to Order Sub-Process Pick & Pack
supported within SAP B1. This is a standard SAP B1 function and is described in
SAP B1 documentation.
15.05.2008 be.as mechanical engineering process Page 26
Quality control goods receipt for purchase orders
This process flow describes the Engineer to Order Sub-Process for QC - Goods
Reciept. QC is a functional module within beas allowing the creation of Quality
Control Plans. QC Plans can be created based upon the Goods receipt of an
item
An inspection plan is always created automatically when one of the actions is
performed and a QC plan is stored for the item.
Once an inspection plan is created, the Items associated are considered
“Blocked” until they are released by QC. Release can be effected by
1. Reposting from a QC inventory to a primary inventory
2. Releasing the batch (with or without reposting)
3. Just closing the QC order.
The QC module allows for calculation of Samples, and Measurement Value Input
by QC test.
15.05.2008 be.as mechanical engineering process Page 27
Quality control goods in progress
This process flow describes the Engineer to Order Sub-Process for QC - Goods
Finished Goods. QC is a functional module within beas allowing the creation of
Quality Control Plans. QC Plans can be created based upon the Production
issue, or Manually via batch or automatically if the batch shelf life date has
passed
An inspection plan is always created automatically when one of the actions is
performed and a QC plan is stored for the item.
Once an inspection plan is created, the Items associated are considered
“Blocked” until they are released by QC. Release can be effected by
1. Reposting from a QC inventory to a primary inventory
2. Releasing the batch (with or without reposting)
3. Just closing the QC order.
The QC module allows for calculation of Samples, and Measurement Value Input
by QC test.
15.05.2008 be.as mechanical engineering process Page 28
Quality control finished goods
This process flow describes the Engineer to Order Sub-Process for QC – Goods
In Progress. QC is a functional module within beas allowing the creation of
Quality Control Plans. QC Plans can be created based upon the Inspection plan
stored in work sequence, or Manually via batch or automatically if the batch shelf
life date has passed
An inspection plan is always created automatically when one of the actions is
performed and a QC plan is stored for the item or Route Operation of an Item.
Once an inspection plan is created, the Items associated are considered
“Blocked” until they are released by QC. Release can be effected by
1. Reposting from a QC inventory to a primary inventory
2. Releasing the batch (with or without reposting)
3. Just closing the QC order.
The QC module allows for calculation of Samples, and Measurement Value Input
by QC test.
15.05.2008 be.as mechanical engineering process Page 29