solution blueprint - hubspot

29
Overview beas SCM process / 21.09.2007 Organisation Event Information Other process Function expand SCM Quotation process Customer request Precalculation Engineering Material and Ressource Planning Purchase order / receipt / invoice Quality control goods in progress Pick and pack Sales delivery invoice Sales Order Entry Current calculation Quality control raw material Quality check finished products beas PPC XOR XOR Production Order Production Detail planning Production XOR Post calculation tour text text tour text text text text text text text tour tour tour tour tour tour tour text tour tour text tour text tour text tour text 15.05.2008 be.as mechanical engineering process Page 1

Upload: khangminh22

Post on 05-Apr-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

Overview

beas SCM process / 21.09.2007

Organisation Event Information Other processFunctionexpand SCM

Quotation

process

Customer

request

PrecalculationEngineering

Material and

Ressource

Planning

Purchase

order / receipt /

invoice

Quality control

goods in progress

Pick and

pack

Sales

delivery

invoice

Sales

Order Entry

Current

calculation

Quality control

raw material

Quality check

finished products

beas PPC

XOR XOR

Production

Order

Production

Detail planningProduction

XOR

Post

calculation

tour texttexttour

text

text

text

text

text

text

texttour tour tour

tourtour

tour

tour text

tourtour text tour text

tour text

tour text

15.05.2008 be.as mechanical engineering process Page 1

Customer

Requirement of

new product /

change request

Definition of new

productSales

Product defined

Master data

Bill of materials

Routing

Precalculation

All costs

calculated

Quotation

Sales

XOR

Order entry

Precalculation

Engineering

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 2

Requirement of

new quotation

Entry quotation Sales

Quotation

entered

Customer

Order entry

Precalculation

Quotation Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 3

Requirement of

new customer

order

Entry customer

orderSales

Customer order

entered

Engineering

Quotation

entry

V

Production

order

Quotation

Sales Order Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 4

Engineering Engineering

Engineering

closed

Production

order

Precalculation

Order entry

Master data

Bill of materials

Routing

V

Release for

production

VMaterial and

capacity

planning

Engineering

Quotation

Requirement of

new product /

change request

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 5

Start MRP

Material and

capacity

planning

Planning

department

Stock

XOR

Production

planning

Result MRP

Forecast

Customer orders

Finished

workorders

Entry work

orders for

assembly

Entry purchase

orders for raw

materails

Warehouse

Management

Material and capacity planning

Planning

departmentPlanning

department

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 6

Order entry

Entry work

orders

Planning

department

Work orders

entered to

planned costs

Production

detail planning

PrecalculationCalculation

Requirement of

new production

order

Production order Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 7

Purchase order Organisation Event Information Other processFunction

texttour

Requirement of

new purchase

order

Purchasing

Purchase order

entered

Goods receipt

(Quality

control)

MRP Wizard

Entry purchase

orders for raw

materails

Draft purchase

order

15.05.2008 be.as mechanical engineering process Page 8

Production

Order

Incomming work

orders

capacity leveling

Production

planning

Capacity of

ressources

Work orders

planned

Production

Stock

information

Scheduling /

Prioritization

material

availability

Purchase orders

Production detail planning Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 9

Production

detail planning

Start production

Material issued /

production timeProductionActual costs

Production

finished

Warehouse

Management

Current and

poast

calculation

Production

Finished goods

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 10

Material

issued /

production

time

Production

completed?

Product costing

analysis / Post

calculation

Controlling

Standard costs

(planned costs)Calculation

Result costing

analysis

Actual costs

Cost

accounting

Current and post calculation

Current

calculation

Completed Not completed

V

Production

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 11

Release for

shipment

Pick and pack

Logistic

Customer order

Pick and pack

completed

Shipment

Create shipping

documentsCustomer order

V

Issuing invoice

Pick and pack Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 12

Goods receipt

for purchase

orders

Booking LogisticsPurchase order

Booked in the

store

Quality

instruction

Quality control goods receipt for purchase orders

Incomming

goods

Purchasing

V

Item with quality

flag?

Booked in the

quarantine store

No Yes

Warehouse

Management Quality control

V

Released and

booking in the

store (automatic)

Yes

Reshipment

No

Purchasing

Quality control

successful?

Quality

management

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 13

Work in

progress

Quality control goods in progress

Production

Next operation

Quality

instruction

V

Quality control

operation?

Preparation for

quality control

No Yes

Quality control

finished goods Quality control

V

Rework

No

Production

Quality control

successful?

Quality

management

Yes

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 14

Finished goods

Quality control finished goods

Production

Booked in the

store

Quality

instruction

V

Item with quality

flag?

Booked in the

quarantine store

No Yes

Warehouse

Management Quality control

V

Released and

booking in the

store (automatic)

Yes

Rework

No

Production

Quality control

successful?

Quality

management

Organisation Event Information Other processFunction

texttour

15.05.2008 be.as mechanical engineering process Page 15

The Pre-Calculation function allows users to perform “Engineering Adjustments”

to any chosen item. This adjustment will remain with the Quote and/or Order and

will further be used to issue unique Work Orders once issues.

1. In the pre-calculation sub-process form the user can see the default settings

and related cost information from the BOM and Route related to the chosen

item (finished good or sub-assembly).

2. From this calculation screen adjustments to a specific item BOM and Route

can be made through right mouse clicks to add/remove/edit information in the

default calculation rollup.

3. The adjusted item is then saved as a numbered Pre-Calculation template in

the Pre-Calculation module, and can be used for Quotations and Sales (NOTE:

if adjusted in the Quotation or Sales documents, the adjusted information

with be automatically attached).

4. All cost rollups are re-calculated based on the changes made and reflected

in the pre-calculation template

5. From this position – the new pre-calculation can be

Precalculation

15.05.2008 be.as mechanical engineering process Page 16

Quotation

This process flow describes the Engineer to Order Sub-Process

supported within the Quotation process within SAP B1. This will allow,

at time of Quotation, a user to customize the quotation to the customer’s

specific engineering changes. This will also control the versioning of all

unique changes so that they can be used again as required and are

available as reference.

1. The customer requests a sales quotation

2. In sap b1 the sales quotation is raised and an item selected

– then saved

3. The pre-calculation screen is initiated by clicking

the “calculation” button

4. The pre-calculation process is performed (see details

in this presentation)

5. Once a pre-calculation is determined and saved, it is applied

to the specific quotation

6. Costs to produce are updated

15.05.2008 be.as mechanical engineering process Page 17

Sales order

This process flow describes the Engineer to Order Sub-Process supported

within the Customer (Sales Order) process within SAP B1. This will allow, at

time of Customer Order, a user to customize the customize or select an

available customization based on the customer’s specific engineering changes.

This will also control the versioning of all unique changes so that they can be

used again as required and are available as reference.

1. The customer requests a sales order

2. In sap b1 the sales quotation can be chosen as the base document

if available or a unique sales order can be entered.

3. The pre-calculation screen is initiated by clicking the “calculation” button

if a previous pre-calculation is not determined during quotation.

4. If required, the pre-calculation process is performed (see

details in this presentation)

5. Once a pre-calculation is determined and saved, it is applied to

the specific sales order

6. Costs to produce are updated

15.05.2008 be.as mechanical engineering process Page 18

Engineering

This process flow describes the Engineer to Order Sub-Process supported within

a traditional Engineer to Order organization. This will describe the common steps

performed in an engineering department to support engineer to order. Either at

the time of Quotation or Sales Order, a user can allow for customization of the

item to be produced to the customer’s specific engineering changes. This is

usually performed by members of the engineering department within an

organization.

1. The customer requests an engineering change

2. In sap b1 the sales quotation or sales order is raised and an item selected

– then saved

3. The Engineering department is notified using internal workflow within SAP

Business One that an engineering change is required (usually via an alert

or approval based on a UDF flag).

4. The assigned engineer will open the quote or order document and click

the calculation button.

5. The pre-calculation process is performed (see details in this presentation)

a. Items from inventory can be added/removed/edited

b. Route operations can be added/removed/edited

c. Items currently not in inventory can be added/removed/edited

d. Version control is maintained automatically upon save

6. Once a pre-calculation is determined and saved, it is applied to the specific

quotation or order document

a. Production costs are updated based on the unique calculation template

7. Engineering will then approve the associated document (quotation or order)

and notification will be sent via normal SAP Business One workflow.

8. MRP will be run for normal production management

a. Work Orders generated from MRP will utilize the engineered calculation

template attached to the specific sales order

9. NOTE: this process can also be used to update existing templates

15.05.2008 be.as mechanical engineering process Page 19

Material and capacity planning

This process flow describes the Engineer to Order Sub-Process supported within

the beas MRP calculation. Configuration settings of MRP to utilize engineering

changes at the order level must be made to enable this function. This

configuration setting allows the standard MRP functions in beas to take into

account all unique engineering changes made and applied to any sales orders in

the system. The MRP will calculate the demand based on the multi-level BOM

requirements applied against the route cycle times. MRP can utilize demand

from available stock, forecasts, customer orders, and finished work orders.

1. Production Planner will start the MRP Process

a. Select from the available MRP templates

i. Highlight the MRP template

b. Create a new MRP template

i. Choose parameters

ii. Choose demand sources

iii. Choose stock locations to be nettable

2. Calculate MRP

a. Click the calculate button on the MRP main screen

b. System will run calculation sequence

c. Calculation time/date will update automatically

d. NOTE: calculation can be set to run automatically

3. View Results

a. Once calculated – the resulting shortages are viewed by clicking

the View button

b. The results screen auto-filters to show all shortages in materials

based on the calculation template.

4. Create PO/WO documents

a. From the results screen the use can identifiy all items to be produced

or purchased – and see the associated demand leading to the negative

available quantities.

b. Filling the ordered quantity fields with a number will allow creation of

PO or WO documents.

i. Purchased items are shown with a bin icon

1. Requires selection of supplier if no default is assigned

2. If applicable, the price will fill automatically

ii. Produced items are shown with a folder icon.

c. Purchase Orders and/or Work Orders are generated by clicking the

appropriate button at the bottom of the screen.

i. System will generate multiple PO documents (one per vendor selected)

and multiple WO documents (one per item selected)

15.05.2008 be.as mechanical engineering process Page 20

Production order

This process flow describes the Engineer to Order Sub-Process supported within

the Work Order (Production Order) within beas. This process allows entry of a

Work Order in production – along with all multi-level BOM and Route information

carried to the Work Order.

1. A Sales Order (or other “demand” such as forecast) is entered into the system

2. The order generates a requirement for a new Work Order

3. If an engineering change has been generated – it is recorded through

the pre-calculation process as described earlier.

4. The Work Order is produced (either manually via the Sales Order /

Work Order screen or via the MRP results screen described earlier)

5. Work Orders are entered into the Production Plan – for the shop floor.

6. Work Orders are now subject to Ruff Cut Capacity Planning functions

within beas.

15.05.2008 be.as mechanical engineering process Page 21

Purchase Order

___

15.05.2008 be.as mechanical engineering process Page 22

Production detail planning

In the beas Capacity Planning and Production Detail Planning, It calculates the

latest possible start date for a work order on the basis of priority, resource

capacities, factory calendar and many other factors. Calculation is done

automatically. The work start date is determined for the entire work order, for

each production position and for each individual routing Operation.

The machines, work centers, personnel groups and tools are reserved and the

utilization can be displayed graphically to aid in re-planning and capacity

adjustments.

With Resource planning, future utilization can also be planned, simulated and

booked with the help of forecasts.

The pool control uses the result of the capacity planning and informs the worker

in the shop which operations must be completed. It is automatically updated and

can be recalculated through Pool generation/Scheduling.

1. The Production Order (Work Order) once generated, is entered into the

beas production plan and visible under the Production menu within the

beas module.

2. All open Production Orders are visable via the Production menu in beas.

3. The beas Production Planning functions allow users to review the following

information:

a. Capacity Planning

i. Resource capacity by Work Center

ii. Pool allocation

b. Materials Availability

i. In Stock Quantities

ii. Purchased Quantities

4. The information above allows users to Re-Plan Work Orders in production

based on the identified variables.

15.05.2008 be.as mechanical engineering process Page 23

Production

beas is equipped with production control for all types of production

Once planned, Work Orders are available for processing in the system. Work

order tasks can be processed from the Work Order menu within Production via a

structure view and task confirmation is displayed.

1. Work Orders are planned and released.

2. Work Order operations are driven by the associated Route and are

distributed and scheduled across the associated Work Centers on the

production floor.

3. Materials to be issued are defined by the BOM and allocated to the

appropriate Operation as defined in the BOM and Route associated with the

item to be produced.

4. Materials are issued to the Work Order in production and Operation time

is recorded against the Work Order in production.

a. Time and Data collection can be done via a Terminal View function in beas

or via the Work Order screen in the menu.

b. If Terminal View is used – the user will log in via a security code and see

all allocated Work Centers. There they can open a Work Order, Issue

Materials, and Record Time based on the Operation being performed.

c. If the Work Order screen is being used, the Work Order can be expanded

to show all Materials and Operations to be updated. Users can use right

mouse clicks to issue materials and record time against the Work Order.

5. Production Finish is recorded against the Work Order by the user

6. The Finished Good is then Received into the appropriate Warehouse

within SAP Business One.

15.05.2008 be.as mechanical engineering process Page 24

Current and post calculation

beas has many different calculation options where the Production Cost

calculation is structured and available for use throughout the system. The

Calculation concept is to allow users to define the structures to be used for Cost

Calculations within the system.

The following calculation types are available:

1. Precalculation

a. Used to calculate cost of an existing item or to set up a completely new

calculation for a unique item. BOM and Route information is pulled from

the Item Master automatically and all associated costs are displayed.

b. This can also be used to perform a proposal calculation from SAP BO. The

calculation can be opened directly from an SAP Quote. After configuration

and calculation of the offered item, the price can be determined and entered

in the SAP Quote. If an order should result, a Work Order can be created

directly from the calculation.

c. Precalculation calculates at full and marginal costs and allows the

calculation of up to 5 lot sizes at the same time.

2. Batch calculation

3. Post calculation (incl. batch post calculation)

a. The post calculation offers the following calculation types

i. Valuation of the assembly to be produced based on the actual values

ii. Determination of the accumulated actual values

iii. Comparison of actual values against plan values

b. The actual value is the sum of

i. Material entries at the valuation price

ii. Reported times multiplied by the hour or minute rate stored in the work

center

iii. Incoming invoices from external operations

c. In addition, the standard surcharges are shown.

d. The result is stored in the item master and in the work order position.

e. The post calculation can be directly accessed through a work order or

position or through calculation / post calculation.

15.05.2008 be.as mechanical engineering process Page 25

Pick and pack

This process flow describes the Engineer to Order Sub-Process Pick & Pack

supported within SAP B1. This is a standard SAP B1 function and is described in

SAP B1 documentation.

15.05.2008 be.as mechanical engineering process Page 26

Quality control goods receipt for purchase orders

This process flow describes the Engineer to Order Sub-Process for QC - Goods

Reciept. QC is a functional module within beas allowing the creation of Quality

Control Plans. QC Plans can be created based upon the Goods receipt of an

item

An inspection plan is always created automatically when one of the actions is

performed and a QC plan is stored for the item.

Once an inspection plan is created, the Items associated are considered

“Blocked” until they are released by QC. Release can be effected by

1. Reposting from a QC inventory to a primary inventory

2. Releasing the batch (with or without reposting)

3. Just closing the QC order.

The QC module allows for calculation of Samples, and Measurement Value Input

by QC test.

15.05.2008 be.as mechanical engineering process Page 27

Quality control goods in progress

This process flow describes the Engineer to Order Sub-Process for QC - Goods

Finished Goods. QC is a functional module within beas allowing the creation of

Quality Control Plans. QC Plans can be created based upon the Production

issue, or Manually via batch or automatically if the batch shelf life date has

passed

An inspection plan is always created automatically when one of the actions is

performed and a QC plan is stored for the item.

Once an inspection plan is created, the Items associated are considered

“Blocked” until they are released by QC. Release can be effected by

1. Reposting from a QC inventory to a primary inventory

2. Releasing the batch (with or without reposting)

3. Just closing the QC order.

The QC module allows for calculation of Samples, and Measurement Value Input

by QC test.

15.05.2008 be.as mechanical engineering process Page 28

Quality control finished goods

This process flow describes the Engineer to Order Sub-Process for QC – Goods

In Progress. QC is a functional module within beas allowing the creation of

Quality Control Plans. QC Plans can be created based upon the Inspection plan

stored in work sequence, or Manually via batch or automatically if the batch shelf

life date has passed

An inspection plan is always created automatically when one of the actions is

performed and a QC plan is stored for the item or Route Operation of an Item.

Once an inspection plan is created, the Items associated are considered

“Blocked” until they are released by QC. Release can be effected by

1. Reposting from a QC inventory to a primary inventory

2. Releasing the batch (with or without reposting)

3. Just closing the QC order.

The QC module allows for calculation of Samples, and Measurement Value Input

by QC test.

15.05.2008 be.as mechanical engineering process Page 29