parliamentary service commission final strategic plan rev july 2012

78
STRATEGIC PLAN 2008 - 2018 REPUBLIC OF KENYA PARLIAMENT Revised 2012 PARLIAMENTARY SERVICE COMMISSION

Upload: independent

Post on 30-Nov-2023

0 views

Category:

Documents


0 download

TRANSCRIPT

STRATEGIC PLAN

2008 - 2018

REPUBLIC OF KENYA

PARLIAMENT

Revised 2012

PARLIAMENTARY

SERVICE

COMMISSION

Strategic Plan2008 - 2018

Revised 2012

i

TTable of Contents

Page Table of Contents ....................................................................................................................... i List of tables ................................................................................................................................ ii List of figures ............................................................................................................................... ii List of Acronyms ...................................................................................................................... iii Foreword by the Speaker of the National Assembly ........................................................... iv Commitment by the Clerk of the National Assembly and the Board of Management ... vi

CHAPTER 1: INSTITUTIONAL REVIEW ......................................................................................... 1

1.1 Historical Evolution of the Kenya Parliament .................................................................. 1 1.2 Role of Parliament ............................................................................................................... 3 1.3 Establishment and responsibilities of PARLSCOM ........................................................... 4 1.4 Vision .................................................................................................................................... 4 1.5 Mission .................................................................................................................................. 5 1.6 Core Values .......................................................................................................................... 5 1.7 Justification for the Revision of the Strategic Plan .......................................................... 5 1.8 Methodology of Developing the Strategic Plan. ............................................................. 6

CHAPTER 2: SITUATIONAL ANALYSIS ......................................................................................... 8

2.1 The new Constitutional Dispensation and impact on Strategic Plan ............................ 8 2.2 Review of implementation of the 2nd Strategic Plan (2008 – 2018) .......................... 10 2.4 SWOT Analysis .................................................................................................................. 17 2.5 Stakeholder Analysis ......................................................................................................... 18 2.6 Global Partnerships ........................................................................................................... 18 2.7 PESTLE Analysis ................................................................................................................. 21 2.8 Structural and Staffing Issues ............................................................................................ 23

CHAPTER 3: EMERGING ISSUES AND STRATEGIC OBJECTIVES ........................................... 25

3.1 Emerging Strategic Issues ................................................................................................... 25 3.2 Customer value proposition ............................................................................................ 27 3.3 Strategic issues, objectives, strategies and expected outputs ....................................... 27

CHAPTER 4: IMPLEMENTATION, RESOURCE MOBILIZATION AND RISK MANAGEMENT .............................................................................................................................. 35

4.1 Resource Mobilization ............................................................................................... 35 4.2 Financial trends and projected resource requirements ................................................. 35 4.3 Risk Management ............................................................................................................. 37

CHAPTER 5: MONITORING AND EVALUATION FRAMEWORK ......................................... 39

CHAPTER 6: IMPLEMENTATION OF THE PLAN ..................................................................... 41

APPENDICES .................................................................................................................................... 52

APPENDIX I: Strategy matrix ................................................................................................ 52 APPENDIX II: Overview of the Parliamentary Service Commission ................................ 57 APPENDIX III: The Current Structure of the Parliamentary Service (October 2008) ..... 62

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

ii

List of tables Table 1: SWOT analysis ..................................................................................................... 17 Table 2: Stakeholder analysis ............................................................................................. 19 Table 3: PESTLE Analysis ................................................................................................... 21 Table 4: Analysis of the staff complement ......................................................................... 23 Table 5: Financial trends for 2005 to 2010 (Ksh Million) ................................................... 36 Table 6: Projected resources required for implementing the Revised Strategic Plan (Ksh million) ............................................................................................................................. 36 Table 7: Risk management matrix ..................................................................................... 37 List of figures Figure 1: Monitoring and evaluation framework ............................................................... 40

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

iii

LList of Acronyms ACP– EU African Caribbean Pacific – European Union ACU AIDS Control Unit AG Attorney General AGOA African Growth Opportunities Act A-I-A Appropriation-in-Aid ASK Agricultural Society of Kenya APU African Parliamentary Union AU African Union BOM Board of Management CNA Clerk of the National Assembly CSR Corporate Social Responsibility CPA Commonwealth Parliamentary Association DAS Director, Administrative Services DFA Director, Finance and Accounting DFID UK Department for International Development DIRS Director, Information and Research Services DLCS Director, Legislative and Committee Services DC-P Deputy Clerk- Projects EALA East African Legislative Assembly ERS Economic Recovery Strategy HACU Head, AIDS Control Unit HOD Head of Department HOLC Head, Office of Legal Counsel HR Human Resource ICE Information, Communications and Education ICT Information Communication Technology IPU Inter-Parliamentary Union KNA Kenya National Assembly KPU Kenya People’s Union LEGCO Legislative Council M & E Monitoring and Evaluation MP Member of Parliament OLC Office of Legal Counsel PARLSCOM Parliamentary Service Commission HPBO Head Parliamentary Budget Officer PBU Parliamentary Broadcasting Unit PESTLE Political, Economic, Social, Technological, Legal and Environmental PSR Public Social Responsibility SCU Strategy Coordination Unit SDC Senior Deputy Clerk SPIC Strategic Plan Implementation Committee SWOT Strengths, Weaknesses, Opportunities and Threats USAID United States Agency for International Development

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

iv

FForeword by the Speaker of the National Assembly

The 27th August 2010 will remain an important date for current and future generations. This date heralded the birth of a new Republic; the Second Republic, with the resounding approval by the people of Kenya of a new Constitution, in a referendum. The Parliament of Kenya is proud of its role is this landmark development. The passing of the Constitution of Kenya, 2010 ushered in new structures and institutions in Government, not least in the Legislature which, beginning after the General Election due in 2013will consist of two Houses namely: the National Assembly and the Senate. The myriad changes and developments in the constitutional dispensation call for a review the Parliamentary Service Commission Strategic Plan 2008 – 2018.

It is noted that the current Strategic Plan was launched in October 2008 to guide the operations and long term vision of the Third Parliamentary Service Commission of the Tenth Parliament. The Third Commission is faced with the challenges of a highly informed public that demands a much higher level of service delivery. This is in addition to Members of Parliament who are young, highly professional and eager to serve the public more efficiently and effectively. It is against this background that the Commission had to rethink its strategic direction. The Second Strategic Plan, 2008 – 2018, could not have, therefore, come at a more opportune time in the rapid evolution of our Legislature. Notably, within the first two years of implementing the Plan, the Commission commenced the extensive renovation of the National Assembly chamber,. in order to provide modern facilities and a good working environment for Members of Parliament.

In reviewing the Strategic Plan, we have taken into consideration the demands on Parliament in the new constitutional dispensation. There will be need to prepare various facilities and services for a larger increased National Assembly and for the new Senate House.

Our Parliament must play its rightful role in the implementation of the Constitution. It must also be in the forefront in the implementation of Vision 2030, which is our country’s long-term development blueprint. Vision 2030 is motivated by a collective aspiration for a better Kenyan society by the year 2030. It envisions a country that is “globally competitive and prosperous with a high quality of life.” This Strategic Plan is founded, and addresses the goals that must be achieved in line with the Vision 2030.

The launch of Vision 2030, the establishment of the Grand Coalition Government, and the successful implementation of the Economic Recovery Strategy (2003 - 2007) have created high expectations from the people of Kenya in the governance of institutions in general and in the Legislature in particular. Parliament has, therefore, remained under special focus as it discharges its functions of oversight and legislation. It is expected to play its role in furthering democratization of the

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

v

country. I have no doubt that the Tenth Parliament will continue to be equal to this challenge.

The Parliamentary Service Commission has the primary responsibility of facilitating Members of Parliament to effectively and efficiently execute their responsibilities. In this revised Strategic Plan, a clear focus has been established on the role of Parliament in ensuring that the Constitution is fully implemented. A number of Bills have been passed to anchor the Constitution. Others are pending before the House. In addition, a lot of focus has been placed on service delivery for both our internal and external customers. Providing high quality ICT capacity, enhancing the image of Parliament and delivering adequate office infrastructure will be key indicators of success of this Plan. In this regard, I am particularly pleased to note the continued enthusiasm of the public in our live broadcast of parliamentary proceedings, which we have been running since 2008. It is our desire to ensure that Kenyans have access to the activities in the Houses of Parliament and in their Committees.

This Strategic Plan is as a result of an extensive participatory and consultative process in which views of all stakeholders have been taken into account. It is therefore a shared statement of the way forward and the goals we must achieve in the planning period.

We take this opportunity to salute our development partners who have been with us in the development of this Strategic Plan. Of notable mention are the USAID and DFID who, through their implementing agency the State University of New York (Kenya) Parliamentary Strengthening Programme have provided resources that have supplemented the Parliament of Kenya’s effort in developing the Strategic Plan and its revision. We look forward to even more support as we implement the Plan.

The achievement of the goals set out in this Strategic Plan is the responsibility of all of us. All efforts and resources shall be focused on realizing these achievements. In so doing, you are assured of my support and that of the entire Commission.

We look forward, with confidence, to the realization of all the milestones we have set for ourselves in this Strategic Plan.

Hon. Kenneth Marende,EGH, MP Speaker of the National Assembly/ Chairman, Parliamentary Service Commission

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

vi

CCommitment by the Clerk of the National Assembly

In the year 2000, the Parliamentary Service Commission took the bold step of planning for the National Assembly for a period of 12 years through the Strategic Plan covering the period 2000 - 2012. For the first three years or so of the life of the Eighth Parliament, the Commission concentrated on improving the organisational structure and providing a good working environment for Members of Parliament and staff. The renovation of Continental House to provide office space for Members of Parliament was a major achievement of the First Commission. The Second Commission (2003 – 2007) put considerable effort in establishing a sound organizational structure for the Parliamentary Service, leading to the creation of directorates as centres of excellence in service delivery. The Second Commission was also able to recruit highly competent staff for the Parliamentary Service, acquire computer facilities and provide additional office space for both Members and staff.

This second Strategic Plan is as a result of a long participatory and consultative process. It is notable that within the last 2 years of the Strategic Plan 2008 – 2018 implementation, significant achievements have been realized. These include renovation of the National Assembly chamber, revision of the Standing Orders that have made the Members to be more vibrant in their work, increased ICT services, enhanced staff performance, the establishment of a working organizational structure and enhanced capacity of staff, and the improvement of services and facilities for the welfare of MPs and staff. However, there were also areas where targets were not achieved, challenges were encountered and lessons learnt in the process of its implementation.

The process of reviewing the Strategic Plan has provided all of us with the opportunity to be heard, it has clarified what must be done to play our roles in the achievement of the core mandate of the Commission and live up to the expectations of Constitution. It has also clarified many issues and areas that need to be addressed and allowed us to form a common understanding of the way forward. In addition to building ownership by all organs of the Commission, the process has demonstrated unity of purpose between the Commission and its employees, which unity is critical to the successful implementation of the Plan.

This Strategic Plan re-emphasizes our Vision and Mission, which we must always maintain in our focus. Our core values must always be our guiding principles in all that we do. The Plan provides strategic objectives and serves as the process framework of how we shall achieve our Vision and Mission. The Strategic Plan is a clear statement of what we wish and are committed to achieving during the next ten years. The Plan calls for progressive streamlining and enhancement of our organizational structures and capacities, additional facilities and for other resources necessary to effectively achieve these objectives. The Commission is committed to providing the resources necessary for the implementation of this Plan.

This Strategic Plan is a home-grown solution. We have formulated it through involvement of staff and the Commission. It is our belief that there will be higher acceptance and enthusiastic implementation. Management will dedicate all efforts

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

vii

and resources in its jurisdiction to the achievement of this Strategic Plan, while closely monitoring performance in its implementation as a core management responsibility. To support this, performance benchmarks will be directly linked to the Strategic Plan and performance of all staff evaluated accordingly.

Briefly, the six Chapters of the Strategic Plan contain the following:

� CChapter 1 is dedicated to the IInstitutional Review focussing on the historical evolution and role of the Parliament, core functions, Vision and Mission and core values of the Parliamentary Service.

� Chapter 2 focuses on SSituational Analysis and reviews the second Strategic Plan and analyses the internal and external environment while identifying the stakeholders of the Commission. The chapter also discusses the achievements, challenges of implementing the Strategic Plan for the period 2008 – 2010.

� Chapter 3 delves into the EEmerging Issues from which Strategic Objectives are derived.

� Chapter 4 covers the Implementation process, RResource Mobilisation and Risk Management.

� Chapter 5 provides the MMonitoring and Evaluation Framework for the Strategic Plan.

� Chapter 6 gives a detailed AAction Plan providing an implementation framework.

I take this opportunity to appreciate the efforts of the members of the Strategic Plan Implementation Committee who have spearheaded the revision of the Plan and who are also involved in its implementation. These are Clement Nyandiere, Jeremiah Nyegenye, Shadia Faryd, Joel Irungu, Margaret Igane and Perpetual Muiga.

The Clerk, the Board of Management and all staff of the Parliamentary Service undertake to work to realize the goals set forth in this Strategic Plan. It is a living document that must take cognizance of changing realities. We will continue adapting to these realities while making our best effort to play our role in realizing our Vision and Mission to make Parliament an institution of excellence.

Patrick G. Gichohi, CBS Clerk of the National Assembly/ Secretary, Parliamentary Service Commission

CPA 56th Plenary Conference 10 – 19 September 2010

Delegates pose for a group photo with H.E. President Mwai Kibaki during the of�icial opening of the CPA Conference held at KICC, Nairobi.

President Mwai Kibaki chats with the Speaker of the National Assembly, Hon. Kenneth Marende, during the of�icial opening of the CPA Conference.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

1

CCHAPTER 1: INSTITUTIONAL REVIEW

This Chapter focuses on the historical evolution of the Parliament of Kenya, the role of Parliament, core functions, Vision and Mission and the core values of the Parliamentary Service. The Chapter also provides the justification and methodology applied in developing the Strategic Plan.

1.1 Historical Evolution of the Kenya Parliament

At independence, in 1963, the Parliament of Kenya was modelled along the Westminster parliamentary system with the exception of an Executive President. It was therefore, a mixture of both the presidential and parliamentary systems of government.

The advent of the present Parliament of Kenya began with the agitation by white settlers who, in 1906, petitioned the Secretary of State for Colonies demanding to be represented in the administration of Kenya. The British Government responded by issuing an Order in Council in 1906 that established an Executive Council chaired by the Governor and later the setting up of a Legislative Council (LEGCO).

The first Legislative Council sitting took place on 17th August 1907 in a corrugated iron sheet building situated along the then White House Road (now Haile Selassie Avenue), a location which today hosts the Railway Golf Club. This was composed of seven Members and was chaired by the Governor. The Governor made all nominations to the all–white LEGCO. Direct representation of African interests in the Council did not begin until October 1944 when Mr. Eliud Mathu was nominated to the Council.

The LEGCO was re-constituted in 1958 to comprise thirty-six constituency elected Members of whom fourteen were Africans, fourteen were Europeans, six Asians, one Arab and a number of others were nominated but so as to maintain a Government majority. In the previous year (1957) the election of the first African Members of the LEGCO had taken place.

Kenya attained Independence in 1963 with a bicameral Legislature, consisting of the House of Representatives with 129 Members and the Senate with 41 Members. In 1964 it became a Republic with Mzee Jomo Kenyatta as the first President. A constitutional amendment effected in 1967 saw the amalgamation of the two Houses to form the National Assembly of Kenya.

Today the National Assembly comprises 210 constituency elected members, 12 nominated members and two ex-officio members, that is, the Speaker, and the Attorney-General. The banning of Kenya People’s Union (KPU) in 1969 turned the country into a de facto one-party state but later, a constitutional amendment in 1982 saw Kenya become a de jure one-party state. The country saw the re-

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

2

introduction of multiparty politics in 1991 following a constitutional amendment that resulted from a clamour for increased democratic space. Ever since the re-introduction of multi-partyism, the National Assembly has remained a vibrant institution and has reclaimed its rightful place in the governance of the country.

Since independence, there have been ten uninterrupted Parliaments, the current one having been sworn-in on the first sitting held on 15thJanuary 2008. Within the same period, there have been six Speakers with the current Speaker, Hon. Kenneth Marende, MP, having been elected in the 10th Parliament’s first sitting.

In its quest to attain an autonomous and independent status from the Executive, the Eighth Parliament enacted the Constitution of Kenya (Amendment) Act No. 3 of 1999, which established the Parliamentary Service Commission (PARLSCOM) and the Parliamentary Service. In 2000, the Parliamentary Service Act was enacted to operationalize the Constitution of Kenya (Amendment) Act No. 3 of 1999. Parliamentary reforms started in 1991 have acquired greater momentum, enabling Parliament to reassert its authority and expand parliamentary democracy.

The Kenya Parliament, in line with its global peers, has been evolving as a democratic and transparent institution that consistently responds to the changing political environment. Developing and executing legislative agenda and promoting a cohesive, peaceful, and progressive society have been overriding policies and strategic objective of the Parliament since Independence. During the early post-independence phase, emphasis was placed primarily on achieving nationhood and its attendant features but successive Parliaments have asserted their representative mandate and developed oversight roles and accelerated the transformation of Kenya into a dynamic, prosperous and vibrant society. At the same time, significant emphasis has been placed on public participation and involvement in parliamentary processes. This has been consistent with the continuing trend of democratic pluralism in the country.

On August 27th 2010, the new Constitution of Kenya was promulgated with Parliament playing a central role in the process. The new constitutional dispensation establishes a bicameral legislature known as the Parliament of Kenya, consisting of the National Assembly and the Senate and composed of 350 and 68 members, respectively. This is the single most significant change for the Parliament since independence.

Members of Parliament will be called upon to make their contribution in addressing the challenge of fully implementing the new Constitution in letter and spirit, consolidating Parliament’s role in strengthening political stability, national reconciliation, social harmony and expansion of democratic space, which are the foundations of Kenya’s socio-economic development and stability. As the supreme legislative body, Parliament will continue to play a critical role in ensuring that the national agenda of maintaining political stability, so necessary for achieving a prosperous nation in the medium-term, is achieved.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

3

1.2 Role of Parliament

Article 93 in Chapter Eight of the Constitution establishes the Parliament of Kenya consisting of the National Assembly and the Senate. The Chapter further spells out the roles, functions and other matters relating to the membership and operations of Parliament.

It should however, be observed that the operation of Chapter Eight of the Constitution is suspended until the holding of the first elections under it, due in early 2013. The National Assembly acts as the Parliament of Kenya until the election of the Senate.

The National Assembly

The National Assembly will consist of 350 members, who include 290 members,each elected by the registered voters of single member constituencies; 47 women,, each elected by the registered voters of the counties, each county constituting a single member constituency, 12 members nominated by parliamentary political parties according to their proportion of members of the National Assembly, to represent special interests including the youth, persons with disabilities and workers and the Speaker.Among the key roles of the National Assembly include: Representing the people of the constituencies and special interests, deliberating on and resolving issues of concern to the people, enacting legislation, determining the allocation of national revenue between levels of government, exercising oversight over national revenue and expenditure, reviewing the conduct in Office of the President, Deputy President and other state officers and approval of declarations of war and of states of emergency.

The Senate

The Senate will consist of 68 members of whom 47 are elected by the registered voters of the counties, each county constituting a single member constituency, 16 are women members nominated by political parties according to their proportion of county members of the Senate elected in terms of Article 90 of the Constitution, 2 being one man and one woman, representing the youth, 2 being one man and one woman, representing persons with disabilities and the Speaker. The key roles of the Senate are: To represent the counties and the interests of the counties and their governments; participate in law making by considering, debating and approving Bills concerning counties; determine allocation of national revenue among counties exercise oversight over national revenue allocated to county governments and participate in the oversight of State officers by considering and determining any resolution to remove the President or Deputy President from office.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

4

11.3Establishment and responsibilities of PARLSCOM

Members of Parliament are facilitated to discharge their mandates by staff employed by the Parliamentary Service Commission (PARLSCOM).

PARLSCOM is established under section 45B of the former Constitution of Kenya and Chapter Eight of the (new) Constitution. Under Article 127 of the Constitution, PARLSCOM will now consist of the Speaker of the National Assembly, as the chairperson, seven Members appointed by Parliament among its Members (of whom one shall be elected by the Commission as the vice-chairperson), and two Members, one man and one woman appointed by Parliament from among persons who are experienced in public affairs but are not Members of Parliament. The Clerk of the Senate is to be the Secretary to the Commission.

Article 127(6) of the Constitution sets out the responsibilities of the Commission. Clause (6) of the Constitution of Kenya stipulates the responsibilities of the Commission to be the following:

a) provide services and facilities to ensure the efficient and effective functioning of Parliament;

b) constitute offices in the Parliamentary Service, and appointing and supervising office holders;

c) prepare annual estimates of expenditure of the Parliamentary Service and submitting them to the National Assembly for approval, and exercising budgetary control over the Service;

d) undertake, singly or jointly with other relevant organisations or programmes to promote the ideals of Parliamentary democracy, and;

e) perform other functions necessary for the wellbeing of the Members and staff of Parliament, or prescribed by national legislation.

Clerks and staff of Parliament

Article 128 of the Constitution provides that there shall be a Clerk for each House of Parliament appointed by PARLSCOM with the approval of the relevant House and that the offices of the Clerks and of members of the staff of the Clerks shall be officers in the Parliamentary Service.

1.4 Vision

To be a supreme, effective, efficient and self-sustaining Parliament as a major participant in the process of good governance

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

5

11.5 Mission

To facilitate the Members of Parliament to efficiently and effectively fulfil their constitutional mandate in a representative system of Government by upholding and ensuring the autonomy of Parliament in its corporate relationship with other arms of Government.

1.6 Core Values

The Parliamentary Service is committed to upholding the following core values:

� Professionalism

We shall strive to maintain a high level of competence while promoting teamwork and professionalism.

� Impartiality

We shall be objective and impartial in delivery of service.

� Integrity

We shall maintain the highest level of accountability, transparency and integrity in the discharge of our duties.

� Efficiency

We shall be efficient, provide quality services and be responsive to the needs of all our stakeholders.

� Courtesy

We shall be customer-focused, courteous and accord respect to everyone.

1.7 Justification for the Revision of the Strategic Plan

The Strategic Plan 2008 – 2018 was launched in October 2008 with the aim of addressing the long-term needs of the third Parliamentary Service Commission which took office in May 2008. It was found necessary to develop a long-term plan to both implement the activities envisioned in the Third Phase of the previous Strategic Plan and develop a framework for Parliament’s response to the increased demand for improved governance and development of the country up to 2018. The current Plan is now in its second year of implementation.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

6

However, the promulgation of the new Constitution has considerably affected the current Strategic Plan of Parliament and has necessitated its review and re-orientation. Substantial work is expected to be accomplished by the present Parliament in formulating and passing the Bills necessary to bring the new Constitution fully into effect. In addition, the new constitutional dispensation requires significant changes to the institution of Parliament itself. These changes particularly centre on the establishment of a bicameral House with a big increase in the number of members and new and enhanced roles for Parliament. These changes call for among other things, the provision of enhanced physical facilities, restructuring of PARLSCOM in line with the new changes, enhancement of staff capacity and reviewing of House rules and procedures.

This Revised Strategic Plan is aimed at clarifying the goals to be achieved by PARLSCOM in implementing the requirements of the new constitutional dispensation, providing for the planning period, and aligning these with Vision 2030 while ensuring a shared understanding of the requirements of the new Constitution across PARLSCOM.

11.8 Methodology of Developing the Strategic Plan.

This Strategic Plan has been developed through a participatory and consultative process, which involved consultative meetings, retreats for senior management and other staff with the leadership of PARLSCOM, and workshops for directorates. The process was aimed at ensuring that there was ownership of the Plan, and commitment and leadership that is necessary for its implementation.

A committee was constituted to steer the reviewing of the Strategic Plan. In the process of revising the Strategic Plan, the committee reviewed the following documents:-

� The 2nd Strategic Plan 2008 – 2018

� The Constitution of Kenya, 2010

� The First Strategic Plan (2002 to 2012)

� The Constitution of Kenya (Amendment) Act, No.3 of 1999

� Vision 2030

� Vision 2030, first Medium-Term Plan (2008 to 2012)

� Presidential Circular No. 1/2008: Organization of the Government of the Republic of Kenya

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

7

The committee used information gathered from these documents, retreats, workshops and submissions by various directorates and departments to carry out Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis, political, economic, social, technological, legal and environmental (PESTLE) analysis, a stakeholder analysis as well as writing other sections of this Plan. The institutional bottlenecks that may be undermining the effectiveness of various departments and the need to embrace a results-oriented management approach that leads to efficient delivery of services guided the proposals made on the development of new structures and the need for recruitment of staff.

The resource requirements for implementing the Plan have been worked out from the estimated costs of the proposed programmes and activities.

Parliament Live Broadcastand Renovations

The broadcasting team at their work at the Parliamentary Studios. House broadcasts have been on since July 2008.

The National Assembly debating chamber under renovation. Upon competition, the chamber will accommodate 350 MPs Inside the renovated National Assembly Chamber

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

8

CCHAPTER 2: SITUATIONAL ANALYSIS

This chapter captures the situation leading to the development of the 2008 – 2018 Strategic Plan and reviews the status of implementation of the Strategic Plan 2008 – 2018 for the period 2008 – 2011. The chapter then presents analyses of the internal and external environments and new developments necessitating the revision of the Plan under which the revised Strategic Plan is envisaged.

2.1 The new Constitutional Dispensation and Impact on Strategic Plan

The adoption of the Constitution of Kenya, 2010 with stringent time limits for its implementation has created new challenges and opportunities faced by PARLSCOM. The new constitutional dispensation has far reaching implications on the structure, roles and functions of Parliament. It is the responsibility of PARLSCOM to facilitate the current Parliament in enacting the forty-nine (49) legislations necessary to implement the new Constitution and to provide the facilities needed to accommodate the significantly increased number of members of Parliament. This will entail availing all the infrastructure including, offices and other amenities required for the two Houses of Parliament in time for the new Parliament expected to be in place early in the year 2013. PARLSCOM must develop the staff capacity necessary to support the operations of the two Houses of Parliament.

2.1.1 Implementation Management and Oversight

The overall responsibility for the implementation of this Strategic Plan lies with the Commission. However, Strategic Plan Implementation Committee (SPIC) will continue with its delegated role as overseer of the Strategic Plan implementation. SPIC reports to Board of Management and PARLSCOM.

2.1.2 Staffing and Organisational Structure

The new Constitutional Order has implications on the staffing of Parliament. The increase in the total number of members from 224 to 418 requires enhanced capacity to provide them with the necessary technical support and facilitation to perform their Constitutional mandate. In revising the organisational structure, the PARLSCOM took into account the roles defined in the new Constitutional Order, the need to address gaps identified earlier, create efficiencies and reduce duplication. The detailed structures and staffing levels will be worked out and appended to this Plan.

Capacity building for current and new staff is required to ensure they are adequately prepared to handle their roles in the new Constitutional dispensation competently. This will be done through a series of workshops to fully prepare the staff on their roles in the new Order.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

9

22.1.3 Physical Infrastructure

As discussed in earlier chapters, Parliament needs facilities to support two chambers of Parliament: Senate with sixty-eight (68) Members, and National Assembly with three hundred and fifty members. In addition, staff should be employed to support the significantly expanded number of members of Parliament. These require the following physical facilities:

1. Two chambers of Parliament.

2. Offices for the four hundred and eighteen (418) members of both Houses of Parliament.

3. Offices for additional staff and to meet the gaps that already existed.

4. Expanded catering, gym and health facilities.

5. Expansion of facilities for Parliamentary Studies and Training.

6. Parking facilities for both Members and staff.

These facilities will be accommodated in the Main Parliament Building, Harambee Plaza, Continental House, County Hall and Protection House.

2.1.4 Information and Communications Technology (ICT)

A number of ICT requirements were identified for the implementation of the new Constitutional Order. These include upgrading ICT infrastructure with additional hardware, network extensions, extension of digital display unit, multi-media digital congress system, and the upgrading of the current internet bandwidth. Software required includes integrated computer-based system, legislative business processing system, catering management system and the upgrade to the Library management system.

2.1.5 Legislative and Committee Services

The new Constitutional dispensation significantly affects the legislative and committee services of Parliament. This will require the following activities to be undertaken to ensure a smooth transition:

a) Compilation of Standing Orders for the Senate and National Assembly.

b) Compilation of Rules for public and media access to the Senate, National Assembly and Committees of the two houses.

c) Compilation of procedures for public hearings in committees.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

10

d) Compilation of a manual on legislative and committee services for the National Assembly and the Senate.

e) Capacity building of staff on new Rules, Procedures and Standing Orders.

22.1.6 Procedural and Legal Matters

The new Constitutional Order is founded on the enactment of a minimum of forty-nine (49) new statutes and the revision of some existing ones to comply with the new Order. Most Bills relating to implementation of the Constitution were enacted in 2011 and a few are pending finalization by the House. To facilitate this process of implementing the Constitution, the following activities are necessary:

1. Establish collaborative mechanisms of working with the other key institutions involved in the implementation of the new Constitution, which include the Commission for the Implementation of the Constitution, the Attorney General and the Kenya Law Reform Commission.

2. Facilitate the process of enacting the required statutes.

3. Formulate guidelines for approval by the National Assembly, for persons nominated for appointment to various offices under the new Constitutional dispensation.

4. Provide technical assistance in the implementation of the Constitution.

2.1.7 The Senate: Mace, Regalia and Colour Schemes

A mace for the Chamber, regalia for the Speaker and Clerk and colour schemes for the Senate are required in readiness for Senate sittings. The colours will be done so as to differentiate the two Houses of Parliament. The items subject to colour schemes include the regalia of the speakers and clerks of both Houses, carpeting and seats, stationary, gowns for officers and uniform for staff.

2.2Review of Implementation of the 2ndStrategic Plan (2008 – 2018)

The Strategic Plan 2008 – 2018 (that is hereby reviewed) was launched in October 2008 and various activities have since been implemented in support of the set objectives as discussed below.

2.2.1 Achievements

The following is a highlight of the achievements in the implementation of the Strategic Plan for the three years from its launch in October 2008 to December 2011.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

11

OObjective 1: Strengthening the Capacity of Members to Make Laws

PARLSCOM has achieved the following in support of this objective:

� Facilitated Members to pass various Bills relating to implementation of the Constitution of Kenya, 2010.

� Facilitated Members to undertake vetting processes for panels appointed to various Commissions.

� Facilitated the drafting of new Standing Orders for both Houses of Parliament;

� Prepared Procedural Manuals to be in tandem with the provision of the New Standing Orders;

� Recruited additional Legal Officers (5) and Clerk Assistants (20) to support MPs work;

� Implemented the Hansard Production System to improve Hansard production, and;

� Trained legal counsel, clerk assistants and Hansard staff on House procedures.

Objective 2: Strengthening Capacity of MPs to Oversee Budget

PARLSCOM achieved the following in support of this objective:

� Inducted MPs and staff on the Budget process;

� Facilitated enactment of Fiscal Management Act, 2009;

� Developed guidelines for scrutiny of the Budget; Undertook continuous policy reviews to inform Parliament on economic and cost implications of policies, and;

� Sensitized MPs on the process of budget scrutiny.

� Recruited eight (8) additional staff for the Budget Office.

Objective 3: Strengthening Parliamentary Research Services

The following were achieved in support of this objective:

� Recruited 5 additional staff and designated 2 staff for Research Department, hence new number of 10 (70% increase);

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

12

� Deployed researchers in the relevant specialized Departmental Committees;

� Organized capacity building workshops/seminars for Members and staff;

� Provided enhanced library and ICT services to MPs and staff.

OObjective 4: Improved Utilization of Allocated Funds

PARLSCOM achieved the following in support of this objective:

� Operationalized the Integrated Financial Management Information System (IFMIS);

� Sensitized Directorates in budgetary processes and procurement plans, and;

� Strengthened the Project Implementation Committee to implement projects.

Objective 5: Enhance the Public Image of Parliament

Under this objective, the following were achieved:

� Live broadcast of House proceedings continued;

� Established a modern Media Centre;

� Published Parliamentary Magazine (4 issues);

� Implemented outreach programmes by participation in National events including the Public Service Week;

� Enhanced coverage of Parliament in Media;

� Recruited 2 professionals in Media and Public Relations.

Objectives6, 7 & 8: Staff Performance, Capacity & Service Delivery

PARLSCOM has achieved the following in support of these three objectives:

� Undertook review of the Parliamentary Service organisation structure and staff schemes of service;

� Organized local and external courses, attachments, workshops and seminars for staff development;

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

13

� Undertook promotions, re-designation and management of discipline cases;

� Established Akiwumi Tribunal to review terms and conditions of service for Members and staff;

� Developed/ reviewed schemes of service for all cadres; recruited professional staff in various departments;

� Established Centre for Parliamentary Studies & Training for training and capacity building.

OObjectives 9 & 10: Strengthen the Office of the Speaker and Other Parliamentary Offices and Office of the Clerk

PARLSCOM achieved the following in support of these two objectives:

� Developed a structure for the Office of the Speaker and is in process of implementing it;

� Deployed one officer to support the Speaker in research, and;

� Deployed one staff to work as Personal Assistant to the Clerk.

Object 11: Improve the Working Environment

The Commission is undertaking the following in support of this objective:

� Undertook refurbishment of the National Assembly chamber to make it modern and user friendly;

� Designs for construction of a modern office block completed and ground breaking expected any time;

� Acquired Protection House;

� Rehabilitated car parks.

� Plans to renovate Senate Chamber

� Plans to expand the Kitchen and Dining area

� Acquire additional office space in the vicinity of Parliament

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

14

OObject 12: Enhance ICT Services

The following were achieved under this objective:

� Increased Internet capacity by acquiring high speed internet connection; Improved network and reduced failures of service;

� Refurbished computer training room and provided new computers;

� Set-up an ICT training facility at Centre for Parliamentary Studies and Training;

� Acquired computers and printers for MPs and staff;

� Upgraded website;

� Improved speed of solving ICT related problems;

� Recruited two members of staff- System and Network administrators.

2.2.2 Projects Not Successfully Implemented

However, some projects were not successfully implemented. These include:

� Security system project completion and handover;

� Acquisition of office space for staff;

� Setting up of the National Assembly Fund;, and;

� Institutionalisation of Performance Management system.

2.2.3 Challenges faced in implementation

Challenges in implementation of the Strategic Plan included:

� Limited awareness of the Strategic Plan among some staff in some departments;

� Some departments set unrealistic work plans with targets they could not achieve;

� Poor inter and intra-communication and coordination among/within Directorates/Departments;

� Inertia from some of the staff to embrace the strategic plan;

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

15

� Inadequate internal capacity to undertake specialized capital projects leading to implementation delays and over dependence on consultants and Ministry of Public Works.

22.2.4 Lessons learnt

Arising from the experience of implementing the Strategic Plan so far, the PARLSCOM drew a number of lessons that would be important in the implementation of this Revised Strategic Plan (2008-2018). The lessons include:

� Departments are eager to implement their mandate, when well guided.

� It is important to have a grass root approach to crafting a strategic plan as this involves more stakeholders and increases wider ownership.

� There is need to set up Strategy Coordination Unit to concentrate on following up issues of the Strategic Plan Implementation on a daily basis.

� Kenya Parliament needs in its ranks specialised personnel, especially an architect, a quantity surveyor and an electrical engineer to manage its capital projects.

� Staff matters remain a key component of successful implementation of the Strategic Plan, thus, there is need for the Commission to put in place mechanisms to ensure staff matters such as promotions, redesignations, and salary reviews are expedited. This calls for an efficient staff management system.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

16

22.3 Role of PARLSCOM in Vision 2030 and Medium Term Plan 2008-12

Vision 2030 is the new long-term development strategy for Kenya. It aims to “transforming Kenya into a newly industrialized middle-income country providing a high quality life to all its citizens by the year 2030”. The strategy has three Pillars:

a) The Economic Pillar, which aims at creating a vibrant economy with an average economic growth rate of 10% annually;

b) The Social Pillar, whose objective is to ensure that there is a cohesive society with social equity in a clean environment; and

c) The Political Pillar, whose objective is to realize a democratic political system founded on issue-based politics that respects the rule of law and protects the rights and freedoms of every individual.

All the above pillars cannot be achieved unless there is an effective Parliament that plays its roles of representation, legislation, and oversight adequately. The PARLSCOM should identify the need to create a viable environment for the Members of Parliament to play their roles efficiently and effectively. Parliament is expected to make laws which ensure that the country enjoys peace, justice is upheld and that the core values of human dignity and equity are achieved and maintained.

Indeed, one of the flagship projects for the political Pillar is “to build a non-partisan professional research centre for Parliamentarians”. The PARLSCOM recognizes the need for the legislators to make informed decisions as they make laws and scrutinize policies introduced to the House by the Executive and, in this Strategic Plan, has included a programme that supports capacity building for both Members and staff.

The objectives and targets of Vision 2030 will require an efficient and effective Parliament that makes laws as required; to create an enabling environment for its achievement. The PARLSCOM will be playing a major role in ensuring that the country attains the goals of Vision 2030. The PARLSCOM is committed to attain strategic objectives, which include building a quality process of scrutinizing and overseeing executive actions, ensuring that a people’s Parliament is achieved, that is responsive to the needs of the public.

This Strategic Plan has taken into consideration the contents of the First Five-Year Medium-Term Plan for 2008 to 2012 and the proposed programmes and identified targets.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

17

22.4 SWOT Analysis

The following table presents the SWOT (Strengths, Weaknesses, Opportunities and Threats) of the Commission.

Table 1: SWOT analysis

Internal capabilities audit Environmental Scan

Strengths

1. PARLSCOM is already established with the capacity to tackle the forthcoming challenges of implementing the new Constitution

2. Reliable Budgetary provision.

3. Ability to attract competent and professional staff.

4. A stable and predictable environment.

5. One core client within the precincts

6. External attachment and training

7. Security at the workplace.

Opportunities

1. To bring the new Constitutional Dispensation into full effect

2. Public prestige for working in Parliament.

3. Additional resources from development partners and other sources.

4. Increased enthusiasm to engage with Parliament by development partners, NGOs and Civil Society.

5. Opportunity to interact with other associations/institutions.

6. Core clients always attract public attention.

Weaknesses

1. Slow process of recruitment of skilled staff.

2. Inadequate physical facilities.

3. Low absorption capacity of resources and slow implementation of programmes.

4. Lack of monitoring and evaluation systems.

5. Weak human resource management systems.

6. Slow institutional response to change.

7. Low staff morale.

8. Diminishing professionalism.

Threats

1. Very high public and international expectations of Parliament for its critical role of creating the necessary legal framework for the new Constitution.

2. Dynamic political system.

3. Advancement of technology.

4. Possible staff mobility (after investing in them).

5. Possibility of political interference.

6. Increased focus on Parliament from the public and other stakeholders.

7. Hard budget constraints.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

18

22.5 Stakeholder Analysis

The core business of PARLSCOM is to provide an enabling environment and services to Members of Parliament to allow them to perform their mandates effectively; hence Members of Parliament are key stakeholders of PARLSCOM.

PARLSCOM has strong linkages with all Ministries and Government Departments as it facilitates Parliament to play its two major roles of making laws and oversight. It also has other links with the public, as the MPs are representatives of the people. The following are the stakeholders who have a direct or indirect relationship with PARLSCOM:

� Members of Parliament.

� Staff of PARSLCOM.

� Ministries and Government Departments.

� County governments

� Parastatals/other quasi-Governmental bodies.

� The Attorney-General.

� The Judiciary.

� The constitutional commissions.

� The Kenya National Audit Office.

� The Media.

� Civil society.

� Other Parliaments of the world.

� Development partners.

� The general public.

2.6 Global Partnerships

The Parliament of Kenya, as an institution representing the people, finds itself in a fast-changing global environment. Political and economic relations and co-operation with other countries are conducted on continental and regional platforms and the Kenya Parliament actively participates in all this drama. Yet it cannot ignore and, indeed, many times, it is guided by Kenya’s foreign policy.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

19

The major organizations that the Kenya National Assembly is a member of or is affiliated to include:-

� The African Union

� The African Caribbean Pacific-European Union (ACP-EU)

� The Commonwealth Parliamentary Association (CPA)

� The East African Legislative Assembly (EALA)

� The Inter-Parliamentary Union (IPU)

� The Pan-African Parliament

� African Parliamentary Union (APU) and

� Other Parliaments

TTable 2: Stakeholder analysis

Stakeholder Stakeholder Expectation PARLSCOM Expectation

Members of Parliament

� Efficient services, technical as well as administrative support.

� Conducive working environment, offices.

� Capacity building.

� Increased passage of laws.

� Enhanced quality of bills.

� Improved quality of debate in the house.

Staff � Adequate remuneration.

� Staff welfare.

� Training and development.

� Security.

� Office accommodation/environment.

� Career path development, retention and exit plan.

� Improved performance/service delivery.

� Staff loyalty/pride

� Timely implementation of PARLSCOM programmes.

� Adherence to PARLSCOM rules and regulations.

Ministries and other public institutions

Including counties

� Debate and scrutiny of policies and budgets on a timely basis.

� Better and effective communication on all issues.

� Implement debated policies and laws.

� Efficient and effective utilization of resources, efficient and effective feedback on all issues.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

20

SStakeholder Stakeholder Expectation PARLSCOM Expectation

The Media � Free access to information.

� Facilitation in the House.

� Timely information on Parliament.

� Responsible journalism.

The civil society

� Inclusiveness in the legislation process.

� Positive criticism.

� Contribution to the legislative process.

Development partners

� Effective implementation of the new Constitutional order.

� Good governance.

� Growth in democracy.

� Appropriate utilization of resources.

� Enhanced support for the implementation of the new Constitution.

� Partnership.

The public � Parliament plays its role of enacting the laws for the implementation of the new Constitution effectively.

� The Senate comes into being and plays its role of overseeing the counties and other matters effectively.

� Effective representation.

� Good governance.

� Improved legislation.

� Appropriate utilization of resources.

� High quality service provision.

� Participation in democratization process.

� Feedback.

Global partners

� Active participation in international meetings.

� Implementation of resolutions/domestication of relevant statutes.

� Capacity building for members of Parliament and staff of PARLSCOM in the effective implementation of two chambers of Parliament.

� Best practices.

� Contribution in global matter/issues.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

21

22.7 PESTLE Analysis

The following is an analysis of the Political, Economic, Social, Technological, Legal and Environmental issues impacting on the Strategic Plan. These are issues that may occur during the Strategic Plan implementation period. They have been analyzed according to the issue and its effect, in general terms, both positive and negative.

Table 3: PESTLE Analysis

Category Issue Effect

Political � Promulgation of the new constitutional dispensation on August 27th 2010.

� Stringent requirements for its implementation with Parliament playing a key role in creating the necessary legal instruments

� Significant changes in the structure of Parliament with the introduction of the Senate

� High national and international expectations for its effective implementation

� Heightened political awareness among Kenyans.

� Informed electorate that increases the chances of election of competent leaders.

� Emerging and dynamic political structures, coalitions, status of official opposition.

� Government of National Unity.

� Global terrorism. � Increased insecurity that may lead to lower investments.

� Increased political cooperation and alliances, EALA, Pan African Parliament, CPA, IPU etc.

� Creation of larger markets and formation of economic unions.

� Increased democratization. � Political stability and effective leadership.

� Political instability of Kenya’s neighbours.

� Insecurity due to proliferation of small arms through the porous borders.

� High turnover of elected MPs � Increased workload in orientation of new members.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

22

CCategory IIssue EEffect

Economic � Higher focus under Vision 2030.

� All sectoral plans aligned to the Vision.

� Wider global outreach. � Global markets.

� Endemic unemployment among the youth.

� Increased crime and unrests by the youth.

� Poor infrastructure. � Increased cost of doing business.

� Macro economic instability and high inflation rates.

� Low economic growth and rising poverty.

� Perceived or real corruption. � Non-delivery of services.

� Formation of regional trading blocs.

� New opportunities for exports.

� AGOA policy. � Opportunity to revamp indigenous industries.

Social � Increased awareness of Human Rights

� Observance of Human Rights. � More pressure on petitions.

� High population growth rate � A strain on available resources.

� High levels of poverty among the citizenry.

� Need for new strategies to revamp the economy.

� Increased awareness of social equity.

� Agitation for equity in distribution of resources.

� Increased movement of skilled human resources worldwide.

� Attraction of highly qualified personnel to work in Parliament.

Technological � Growing use of ICT.

� Need to leverage ICT in operations and communications.

Legal � Enhanced role of Parliament in creating new legislation.

� Enhanced participation by Members in House proceedings and legislative process.

� Revised Standing Orders. � Enhanced process and entrenchment of Parliament in its legislative and oversight process.

� Coming into effect of the new Constitution

� Better laws for the country � Establishment of new laws and

structures.

Environmental � Increased environmental awareness.

� New legislations on environmental issues.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

23

22.8 Structural and Staffing Issues

This section addresses the overall staff (non-partisan) and organizational issues and presents a number of challenges being experienced in this area.

2.8.1 Staffing levels analysis

As at January, 2012, the complement control indicated that there is 532(non-partisan) staff. This number is continuing to rise mainly due to the need to fully establish the newly created units and especially offices to be established for Senate. Staff in the Parliamentary Service is distributed as shown in table 4 below:

Table 4: Analysis of the staff complement as at January 2012

PARLSCOM Scales Establishment In post Vacancy

16 1 1 0

15 1 2* 0

14 8 4 4

13 15 7 8

12 24 13 11

11 36 17 19

10 60 32 28

9 76 51 25

8 106 77 29

7 85 58 27

6 97 68 29

5 95 82 13

4 90 77 13

3 100 43 57

Grand total 795 532 263

* One officer in PSC Scale 15 holds the post personal to themselves.

Source: HR Department

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

24

22.8.2 Challenges

The following are the challenges being experienced in the organizational and staff complement of PARLSCOM:

a) New Constitutional dispensation: New structures and additional staff capacities necessary for the implementation of the new Constitutional dispensation, including that required to support the Senate.

b) Bottom-heavy: The current staff complement poses a challenge for the future as it is bottom heavy. There will be need to retrain many staff at middle and lower levels to take up new responsibilities.

c) Lack of opportunities for upward mobility: There is the challenge of lack of vertical opportunities for technical staff. There will be need for adoption of a new grading structure that recognizes experience and competencies instead of the number of years one has served in a cadre as per schemes of service and also to cater for high fliers as one way of motivating staff.

d) Rationalization of staff deployment: There is need for rationalization and deployment of staff according to their qualifications and experience.

e) Performance management: There is need to institutionalize performance management and embrace employment on contract terms for senior management.

f) Exit window: There is need to create an exit window for professional staff who will have served the Service for a given period. There is need to develop a secondment policy of parliamentary staff who need to join other institutions. CPST should form one exit window for staff willing to offer consultancy services

g) High wage bill: There will be need to leverage on information technology and to embrace modern techniques of management that promote outsourcing of some of the services. The First Strategic Plan had estimated that the complement control for the National Assembly was to reach a peak of 472 members of staff by 2012. As depicted in the table above, this has been surpassed and it will, therefore, pose a challenge for the Commission. The major challenge for the next phase shall be to re-align and streamline the structure to ensure optimum effectiveness and efficiency in service delivery.

h) Capacity building: There is need for capacity building in technical areas within the Parliamentary Service.

i) Weak intra and inter-departmental communication: There is need to enhance the internal communications across departments and directorates and also with other offices within the parliamentary service.

Parliament Buildings

A perspective view of the Kenya Parliament main buildings

Continental House County Hall

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

25

CCHAPTER 3: EMERGING ISSUES AND STRATEGIC OBJECTIVES

This Chapter delves into the emerging issues of the planning environment and from which strategic objectives are derived.

3.1Emerging Strategic Issues

The following are emerging issues that inform this Strategic Plan.

a) New demands and high expectations on Parliament following the adoption of the new Constitution. The enactment of the new Constitution has placed new demands on the institution of Parliament. Notably,

(i) Parliament is playing a pivotal role in the implementation of the new Constitution with the need to enact the forty-nine (49) legislations necessary to put the new Constitution into effect within stringent legal requirements in terms of the timeframe. This has placed high expectations on Parliament both from the public and other stakeholders nationally and from the international community.

(ii) The new Constitution has created two chambers, namely; the National Assembly and the Senate and has therefore significantly increased the numbers of Members. This requires additional staff capacity, facilities, rules, procedures and processes to support them.

(iii) The electorate becomes more informed, so do its demands on the Legislature increase. Parliament must, therefore, strive to improve its performance. This calls for capacity building for the Members of Parliament and the Senate to effectively perform their roles under the new Constitutional dispensation.

(iv) The new public financial management architecture that calls for more involvement of the Members of Parliament in the mobilization, allocation and utilization of public resources.

b) Need for improved image of Parliament

There is need to improve the public image of Parliament. While improved performance will have impact on its image, there is need to engage the public directly through interventions such as public awareness campaigns.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

26

cc) Need for effective organizational structure and enhanced staff capacity

With the coming of the new Constitutional dispensation, the organisational structures will change and be enhanced to support the Senate and increased number of Members. This is in additional to addressing the weaknesses identified in the reviewed Strategic Plan. There is also need to enhance staff capacity in terms of numbers and skills to meet the demands of the new Parliament and improve their terms of service to attract and retain the best people.

d) Need to provide a conducive working environment

With Continental House, Parliament was able to provide each MP with an office and additional committee meeting rooms. And currently, the New Chamber of Parliament is being renovated to accommodate the 350 members of the National Assembly stipulated by the new Constitution.

However, existing facilities are inadequate to meet the needs of the Senate, the significantly increased Members of both Houses under the new Constitution and the additional staff necessary to support them.

Additional facilities required include a chamber for the Senate, offices and committee rooms for Members, office facilities including computers, and hospitality facilities including catering and health and fitness centres. There is also need to create more office space and facilities for staff.

There is also need for Parliament to consider social and moral issues including facilities for people with disabilities

e) Need to leverage on ICT for improved performance and communication

ICT presents a significant opportunity to improve operations of PARLSCOM and also to help open up Parliamentary business to the public. Leveraging on ICT will be one of the critical aspects of this Strategic Plan.

f) Need for enhanced resource base and improved resource management

The demands of the new Constitution require significantly enhanced resource base and improved resource management.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

27

33.2 Customer value proposition

Our key clients are the Members of Parliament, Government Ministries and agencies, the civil society, media and development partners. A clear vision of what these Members need to properly facilitate their work will guide PARLSCOM in delivering its main constitutional mandate. This is spelt out below as a guide in formulating what needs to be done.

PARLSCOM promises to deliver the following customer value proposition to Members of both Houses of Parliament.

a) Modern chambers that will facilitate debate and allow for openness and transparency.

b) Efficient access to technical/legal support in drafting, understanding and researching on Bills brought before the Houses and matters to do with the national budget, county budgets and the national economy.

c) A modern office for each Member with the necessary office facilities including adequate furniture, ICT equipment, internet connectivity and efficient administrative support.

d) Efficient administrative services.

e) Adequate catering and health facilities.

f) Efficient delivery of services to all stakeholders.

3.3 Strategic issues, objectives, strategies and expected outputs

Arising from the emerging issues, the following are the objectives to be achieved in the period 2012 to 2018.

STRATEGIC ISSUE 1: NEW DEMANDS AND HIGH EXPECTATIONS ON PARLIAMENT

FOLLOWING THE ADOPTION OF THE CONSTITUTION

OBJECTIVE 1: TO STRENGTHEN THE CAPACITY OF MEMBERS TO EFFECTIVELY PLAY THEIR ROLES IN THE NEW CONSTITUTIONAL DISPENSATION

This objective will encompass the improvement of the capacity of MPs to introduce Bills and be able to effectively review and scrutinize Government Bills. It shall also involve orientating the MPs on procedures of the House, in particular, the proposed new Standing Orders so as to make them more effective in debating.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

28

EExpected Output/Outcome:

� Strengthen the capacity for Members of Parliament to execute their constitutional mandate.

Strategies:

The following strategies will be pursued to achieve this objective:-

� Build capacity of Members of both Houses of Parliament in legislation, representation and deliberations.

� Build the capacity of Members and staff on oversight of governance issues.

� Develop Standing Orders and Rules for both Houses of Parliament.

� Sensitize Members of both Houses of Parliament on Standing Orders.

� Improve the process of scrutiny and making of laws.

� Provide sufficient support for Members of both Houses of Parliament in the process of making laws.

� Provide efficient and timely access to the Hansard.

� Ensure efficient management of Parliamentary Papers and processes.

� Provide adequate resources to implement the Constitution.

� Enhance the Office of the Speaker to facilitate MPs.

OBJECTIVE 2: TO STRENGTHEN THE CAPACITY OF MEMBERS IN THE OVERSIGHT ROLE OVER THE PUBLIC FINANCIAL MANAGEMENT

The aim of this objective is to build an oversight process that ensures effective scrutiny and oversight of the National Budget and its appropriations.

Expected Output: Ensuring there is adherence to the principles of public finance as outlined in the Constitution.

Expected outcome: Equitable distribution, efficient utilization and transparency in allocation of public resources.

Strategies:

� Facilitate the enactment of appropriate laws.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

29

� Build capacity of Members of Parliament to effectively oversee public financial management.

� Facilitate access to professional expertise on public finance.

OOBJECTIVE 3: TO STRENGTHEN THE PARLIAMENTARY RESEARCH SERVICES

The aim of this objective is to fully establish a professional non-partisan research centre that undertakes research work in an integrated approach tapping competencies in key departments of Legal Counsel, Clerk’s Chambers, Budget Office and Library and Research Department, among others.

Expected Output: Enhanced quality of legislation and oversight role of both Houses of Parliament.

Strategies:

� Institutionalize and strengthen research capacity in Parliament.

� Formalize and strengthen the role of researchers in value addition of Parliamentarians’ engagement in Parliamentary discourse.

� Forge and maintain strong network with research institutions at national, regional and international levels.

� Establish a knowledge and information management system.

� Establish library infrastructure, including archival services.

� Enhance reprographic services within Parliament.

STRATEGIC ISSUE 2: NEED FOR ENHANCED PUBLIC ENGAGEMENT WITH

PARLIAMENT

OBJECTIVE 4: TO ENHANCE THE PUBLIC ENGAGEMENT WITH PARLIAMENT

The aim of this objective is to build a peoples’Parliament that allows for the involvement of the public through promotion of transparency and democracy.

Expected Output: Improved public image of Parliament.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

30

SStrategies:

� Strengthen the capacity of the Public Relations Department.

� Enhance public relations activities both within and outside Parliament.

� Improve use ofinformation and communications technology for public information dissemination.

� Enhance the live broadcast of House proceedings.

� Actively engage in media and communication.

� Improve protocol and reception in Parliament.

� Take an active role in Public Social Responsibility activities.

� Provide facilities for public access and engagement.

� Sensitize Members on media and image management.

� Facilitate the Speaker’s office to enhance the public image of Parliament.

� Develop an effective communication strategy.

OBJECTIVE 5: TO ENHANCE SERVICE DELIVERY

Efficient service deliveries for Members of both houses of Parliament enables them perform their constitutional mandates effectively and efficiently. It also covers efficient service delivery to other stakeholders including the general public in line with Service Delivery Charter.

Expected Output: Efficient and effective service delivery.

Expected Outcome: increased levels of (internal and external) customer satisfaction.

Strategies:

� Understand key stakeholders and the services provided to them. These include service to Members and staff of PARLSCOM.

� Regularly obtain feedback from clients, especially Members and staff on the level of quality of service provided.

� Continuously improve internal processes to deliver quality service and bridge identified service gaps.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

31

� Increasingly automate processes, use ICTs.

SSTRATEGIC ISSUE 3: AN EFFECTIVE ORGANIZATIONAL STRUCTURE AND

ENHANCED STAFF CAPACITY

OBJECTIVE 6: TO ENHANCE STAFF PERFORMANCE

This objective aims at improving the performance of staff in their respective workstations. It is also aimed at improving the human resource capacity for enhanced service delivery.

Expected Output: Enhanced staff output

Expected outcome: Enhanced service delivery to clients.

Strategies:

� Develop organisational structure for PARLSCOM.

� Develop functional relationships within Directorates and Departments.

� Fully operationalise Directorates and Departments.

� Manage staff performance.

� Recruit additional requisite staff to fill vacancies with special focus to the entire professional and administrative staff complement necessary to support the Senate and strengthen the structures as indicated above.

� Formulate and adopt appropriate HR Strategies and policies.

� Develop the capacity of the Centre for Parliamentary Studies and Training and use it extensively

� Work with development partners to provide training opportunities locally and abroad.

� Mainstream HIV/AIDS activities in the Parliamentary Service

OBJECTIVE 7: STRENGTHEN COORDINATION AND TEAMWORK BETWEEN THE COMMISSION, DIRECTORATES AND DEPARTMENTS

This objective aims at improving teamwork, coordination and synergies between all units of PARLSCOM to achieve higher organisational performance.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

32

EExpected Output: Improved communication and synergies between units.

Expected outcome is enhanced performance in service delivery and improved rating on teamwork.

Strategies:

o Regular team building activities/initiatives.

o Multi-unit task forces formed to implement specific aspects of the new Constitution and beyond.

o Entrench the Board of Management and other standing committees such as the Advisory Committee and Training Committee in the Commission regulations.

o Establish a secretariat for the Board of Management.

STRATEGIC ISSUE 4: NEED TO PROVIDE A CONDUCIVE WORKING ENVIRONMENT

FOR MEMBERS AND STAFF

OBJECTIVE 8: TO IMPROVE THE WORKING ENVIRONMENT

The aim of this objective is to ensure availability of modern and secure facilities for both Members of Parliament and staff. This includes chambers for both Houses of Parliament, offices for the 350 Members of the National Assembly and the 68 Members of the Senate, offices for staff, office facilities such as computers and furniture, a modern library, adequate hospitality facilities such as catering, health, fitness, and security.

Expected Output: Provision of modern physical facilities

Strategies:

� Refurbishment of the two chambers of Parliament to accommodate the National Assembly (already in the process of refurbishment) and the Senate.

� Building a new multi-story office block next to Continental House.

� Leasing and acquisition of buildings for the period up to when the new office block will be ready.

� Refurbishment of any buildings already acquired by Parliament.

� Reorganization of offices at Parliament Buildings.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

33

� Renting of parking space to provide for the extra parking required.

� Development of new Chambers of debate and committee rooms with time.

� Put in place effective security and infrastructure.

� Need to develop a strategy for planning other facilities in Parliament in view of the expansion.

SSTRATEGIC ISSUE 5: NEED TO LEVERAGE ON ICT FOR IMPROVED PERFORMANCE

AND COMMUNICATION

OBJECTIVE 9: TO ENHANCE USE OF ICT IN OPERATIONS AND COMMUNICATIONS

The main thrust of this objective is the use of ICT to modernise operations of the Commission and facilitate efficient communication in the entire institution of Parliament.

Expected Output: Efficient service delivery.

Strategies:

� Institutionalize ICT services in Parliament.

� Build ICT capacity for Members of Parliament and staff.

� Develop and upgrade ICT infrastructure. These include fitting both chambers of Parliament with ultra modern ICT equipment.

� Automate processes, including:

o Digitize the Hansard Production System.

o Computerize the management of Parliamentary Papers.

o Electronic voting and attendance register system.

STRATEGIC ISSUE 6: NEED FOR ENHANCED RESOURCE BASE AND

IMPROVED RESOURCE MANAGEMENT

OBJECTIVE 10: ENHANCED RESOURCE BASE AND IMPROVED MANAGEMENT OF RESOURCES

The aim of this objective is to ensure that adequate resources are available to meet the capital and operational expenditures for the full establishment of the Senate,

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

34

increased Members of National Assembly and increased demand for performance under the new constitutional dispensation.

EExpected Output: Improved mobilization, allocation and efficiency in resource utilization.

Expected Outcome: Improved efficiency in service delivery.

Strategies:

� Resource mobilization (internal and external)

� Enhance efficiency in the procurement of goods and services.

� Improve project management.

� Improve quality of financial reporting and management.

� Restructure the casting of the internal budgeting process.

� Improve monitoring and evaluation.

Promulgation of the Constitution 2010

Cabinet Ministers take their oath of allegiance to the new Constitution at the State House gardens on 27th August 2010

H.E. President Mwai Kibaki promulgates the Constitution on the 27th August, 2010.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

35

CCHAPTER 4: IMPLEMENTATION, RESOURCE MOBILIZATION AND RISK MANAGEMENT

4.1 Resource Mobilization

Resources are critical in the implementation of the Strategic Plan. It is of essence to mobilize adequate resources to enable the successful realization of the stated strategic objectives. Parliament’s activities and programmes are largely funded from public resources. This invariably means that it competes for scarce resources with other public organisations. This calls for prudence in resource utilization and underscores the importance of prioritization of projects and activities to achieve maximum benefits, while contributing towards realization of Vision 2030. Though Parliament is funded through the tax-payers, other stakeholders including Development Partners are critical and all efforts should be sustained to attract their funding in a more systemic approach.

It is noted that resource mobilization is not sorely about securing additional resources but also about making judicious or better utilization of available resources. In the context of Strategic Planning, the term resource is implied to mean Human Resources, Financial Resources and Goods and Services. Appropriate deployment of these resources will determine the success of the strategy and smooth implementation of the Strategic Plan. It is expected that the Government will continue to finance the operations of the Parliamentary Service to enable Parliament discharge its constitutional mandate.

4.2 Financial trends and projected resource requirements

The following tables give an in depth analysis of the financial performance of PARLSCOM since 2005 through 2010, and then projects the resource requirements.

In projecting the resource requirements, the following factors have been taken into account:-

� The phenomenal changes occasioned by the Constitution of Kenya 2010, that creates a Bicameral House

� The cost of various programmes as given in the implementation matrix.

� Absorptive capacity of the institution.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

36

� The hard Budget constraints as given or assumed in the Vision 2030 strategy of ensuring a prudent fiscal management that is necessary to create a viable private sector-led economic growth.

TTable 5: Financial trends for 2005 to 2010 (Kshs. in Millions)

Category 2005/06

Actual

2006/07

Actual

2007/08

Actual

2008/09

Actual

2009/10

Actual

Gross 4,764.3 4,483 5,629 6,536 6,776

A-I-A 1.5 1.0 3.0 3.0 3.0

Net 4,762.8 4,533.9 5,626 6,533 6,773

Table 6: Projected resources required for implementing the Revised Strategic Plan (Kshs in millions)

Category 2010/11

Printed

2011/2012

Projected

2012/2013

Projected

2013/2014

Projected

2014/2015

Projected

Gross 7,776 9,130 16,474 16,120 14,945

A-I-A 3.0 3.0 3.0 3.0 3.0

Net 7,773 9,9127 16,471 16,117 14,942

Parliament has since the establishment of the Parliamentary Service Commission, developed a consistent and gradual development path towards greater modernization and provision of facilities to cope with the increased mandate. It is essential to note that modern physical facilities will be required to cater for the increased parliamentary representation occasioned Constitution of Kenya. This will inevitably call for huge capital outlays and other necessary resources to move Parliament towards achieving its expanded mandate of oversight, representation and legislation. The proposed construction of an office block and creation of parliamentary square will require substantial capital outlay. The envisaged growth of the Parliament will require capital to finance the anticipated staff complement to cater for both the National Assembly and the Senate. The projected capital outlay is as indicated in the above table.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

37

44.3 Risk Management

As indicated in earlier Chapters to this Plan, there are several risks to the implementation of this Strategic Plan. The matrix below gives a list of possible risks to this Plan including ranking and suggested mitigation strategies.

Table 7: Risk management matrix

S/N Risk Factor Rank Risk Management

1 That, Parliament will not be ready in time for the requirements of the new Constitution

High � Early and thorough planning and follow-up at all levels of Parliament.

� Efficient project management and procurement processes and personnel

2 That, resources will not be available on time to meet the capital and operational costs of implementation of the requirements of the new Constitution

High � Engage and obtain early commitment from Treasury for the necessary resources to be available.

� Engage development partners with a clear plan on how they can support Parliament

3 Political dynamism High � Institutional capacity building.

� Maintaining professionalism

4 New constitutional dispensation

Medium � Inclusive consultation.

5 Staff capacity Medium � Recruitment of additional professional staff; retraining.

� Capacity building through training.

6 Negative perception of Parliament by the public

Medium � Positive publicity and opening up of Parliament through broadcasting and other outreach programmes.

7 Partisan staff High � Integration and training.

Parliament staffand Commissioners

The Speaker of the National Assembly addresses Commissioners and staff at his of�ice on the occasion of the awarding of a presidential medal to Absalom Wendo (seated to left of Speaker) for his long service to the National Assembly.

Hon. Walter Nyambati, the Parliamentary Service Commission’s Vice Chairman, confers with Commissioners Hon. Chris Okemo, MP and Hon. Jamleck Kamau during a Commission meeting.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

39

CCHAPTER 5: MONITORING AND EVALUATION FRAMEWORK

Monitoring and Evaluation (M&E) is a key component of the implementation of this Strategic Plan.

The Strategic Plan Implementation Committee (SPIC) under the Office of the Clerk of the National Assembly will continue taking a lead role in ensuring that there is regular evaluation and reporting of all programmes and strategies that will be implemented during the planning period.

SPIC will closely monitor and oversee all matters related to the implementation of initiatives necessary to have Parliament ready for the new Constitution.

The monitoring and evaluation framework outlined below shall aim at ensuring that:-

� The mechanisms for collecting financial data on all activities and programmes are enhanced.

� Information on all indicators is available bi-annually.

� A databank is established on all activities, projects and programmes which include costs, period and actual expenditures.

� An evaluation exercise takes place annually on the impact of the strategies.

� Responsibilities are assigned on collection, analysis and evaluationof performance information.

� A mid-term review is carried out after five years so as to update the second half of the Strategic Plan and, as may be deemed necessary, start the projections for next phase or the Third Strategic Plan.

Below is a pictorial presentation of the Monitoring and Evaluation frameworkwhich has been drawn after taking cognizance of the need to identify indicators and also the need to ensure that the M&E process regularly informs the management on the status of the objectives and the need for updating of the annual workplans.

The SPIC will develop the M&E logical framework that will show the vertical and logical linkages of this Strategic Plan. This will assist in monitoring and evaluating the implementation of the Plan in line with figure 1 below.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

40

Identification of Objectives, Strategies and outputs; (included

in chapter 4). Identification of

performance Indicators, time frames, roles and

responsibilities (as

Annual work plan based on the

strategies and finances allocated

Annual assessment/Audit

through collection of data on indicators

and appraisal

Communication of outcomes of assessment and way forward to

BOM and Commission.

Updated work plans and

adjustments on indicators.

FFigure 11:: Monitoring and evaluation framework

Activities in and outside Parliament

Members of Parliament in session

Bunge FC posing for a group photoBunge FC members: From left standing: Hon. Charles Keter, MP, Hon. Fredrick Outa, MP, Hon. Mohammed Gabbow,

MP, Hon. George Khaniri, MP, Hon. Joseph Lekuton, MP, Hon. Richard Onyonka, MP, Hon. David Koech and

MP, Sylvester Ocholla, From left squatting: Leonard Nyapere, Yeziel Jillo, Naman Ageng’o, Stephen Mutungi

and Hon. Ababu Namwamba, MP

Members of Parliament in a sitting with the President, Hon. Mwai Kibaki, CGH, MP and

Prime Minister, Hon. Raila Odinga, EGH, MP (seated front row to the right of Speaker)

in attendance in their capacity as members of their respective constituencies

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

41

CCH

APT

ER 6

: IM

PLEM

ENTA

TIO

N O

F TH

E PL

AN

Th

is C

hapt

er d

iscus

ses

the

impl

emen

tatio

n o

f th

e St

rate

gic

Plan

, ide

ntify

ing

stra

tegi

es a

nd a

ctio

ns t

hat

need

to

be

take

n an

d th

e tim

elin

es.

The

deta

iled

anal

ysis

is pr

esen

ted

belo

w:

O

bjec

tive

1: T

o s

tren

gthe

n th

e ca

paci

ty o

f M

embe

rs t

o e

ffec

tivel

y pl

ay t

heir

ro

les

in t

he n

ew C

ons

titut

iona

l disp

ensa

tion

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

//Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 Bu

ild c

apac

ity o

f M

embe

rs o

f bo

th

Hou

ses

of P

arlia

men

t

Con

duct

wor

ksho

ps a

nd s

tudy

tou

rs

2013

M

embe

rs o

f bo

th h

ous

e w

ell i

nduc

ted

HO

LC

2 Se

nsiti

ze M

embe

rs o

f bo

th h

ouse

s of

Pa

rlia

men

t on

Sta

ndin

g O

rder

s

Con

duct

sen

sitiz

atio

n w

orks

hops

20

13

Mem

bers

con

vers

ant

with

th

e St

andi

ng o

rder

s H

OLC

3

Impr

ove

the

proc

ess

of

scru

tiny

and

mak

ing

of

law

s

Dev

elo

pmen

t o

f St

andi

ng O

rder

s fo

r th

e Se

nate

20

12

Sena

te S

tand

ing

Ord

ers

deve

lope

d D

L&C

S/H

OLC

Rev

iew

of

the

Nat

iona

l Ass

embl

y St

andi

ng

Ord

ers

Nat

iona

l Ass

embl

y St

andi

ng O

rder

s re

view

ed

Dev

elo

pmen

t o

f Sp

eake

r’s

Rul

es f

or

The

Nat

iona

l Ass

embl

y an

d th

e Se

nate

R

ules

dev

elo

ped

Dev

elo

pmen

t o

f co

de o

f co

nduc

t fo

r M

embe

rs

of P

arlia

men

t

Cod

e A

vaila

ble

Dev

elo

pmen

t o

f m

embe

rs H

and

boo

k fo

r th

e N

atio

nal A

ssem

bly

and

Sena

te

Han

d bo

ok a

vaila

ble

Dev

elo

pmen

t o

f R

ules

of

enga

gem

ent

betw

een

the

two

Ho

uses

(pr

oce

dura

lly a

nd

adm

inist

rativ

ely)

Rul

es a

vaila

ble

Upd

ate

Co

mm

ittee

and

pro

cedu

ral m

anua

ls

2012

C

om

mitt

ee a

nd

proc

edur

al m

anua

ls

upda

ted

DL&

CS

Att

achm

ents

of

rele

vant

off

icer

s to

oth

er

Parl

iam

ents

20

12-2

013

Num

ber

of

atta

chm

ents

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

42

4 Pr

ovi

de e

ffic

ient

and

tim

ely

acce

ss t

o t

he

Han

sard

Upd

ate

the

Han

sard

gui

de t

o co

nfor

m w

ith t

he

Co

nstit

utio

n an

d St

andi

ng O

rder

s 20

12

Upd

ated

gui

de

HE

Fully

com

miss

ion

the

Han

sard

Pro

duct

ion

Syst

em r

ecru

it ad

ditio

nal t

echn

ical

sta

ff a

nd

acqu

ire

mod

ern

equi

pmen

t

2012

-201

3 Fu

lly o

pera

tiona

l sys

tem

H

E

5 En

sure

eff

icie

nt

man

agem

ent

of

Parl

iam

enta

ry p

aper

s

Dig

italiz

e co

mm

ittee

pap

ers

and

reco

rds

2012

-201

3 Ef

fect

ive

and

Effic

ient

re

cord

s sy

stem

in p

lace

D

L&C

S

Obj

ectiv

e 2:

To

str

engt

hen

the

capa

city

of

Mem

bers

in t

he o

vers

ight

ro

le o

ver

the

publ

ic f

inan

ce o

f th

e co

untr

y.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1

Entr

ench

Par

liam

ent

in t

he

Nat

iona

l bud

get

mak

ing

pro

cess

Faci

litat

e th

e en

actm

ent

of

appr

opr

iate

law

s

2012

-201

3

Law

ena

cted

H

PBO

Entr

ench

impr

ove

men

t o

f pr

oce

dure

s o

n bu

dget

sc

rutin

y in

the

new

Sta

ndin

g O

rder

s 20

12

R

evie

w o

f th

e ne

w

Stan

ding

Ord

ers

com

plet

ed

Dev

elo

p gu

idel

ines

on

pro

cedu

re o

f sc

rutin

y o

f th

e Bu

dget

by

both

ho

uses

of

Parl

iam

ent

2012

A g

uide

line

pro

duce

d an

d di

ssem

inat

ed

Sens

itize

Mem

bers

on

the

pro

cess

of

scru

tiny

of

the

budg

et

2012

Wo

rksh

ops

hel

d o

n bu

dget

iss

ues

Set

up a

mac

ro e

cono

mic

fo

reca

stin

g m

ode

l 20

12

A m

acro

eco

nom

ic m

ode

l in

pla

ce

Polic

y re

view

s to

info

rm P

arlia

men

t o

n ec

ono

mic

an

d co

st im

plic

atio

ns o

f po

licy

2012

N

umbe

r o

f Bi

lls a

nd

sess

iona

l pap

ers

anal

yzed

Ec

ono

mic

and

Fisc

al P

erfo

rman

ce A

naly

sis

2012

Q

uart

erly

rep

ort

on

budg

et

and

eco

nom

y 2

Faci

litat

e ac

cess

to

pr

ofe

ssio

nal e

xper

tise

on

publ

ic f

inan

ce

Esta

blish

acc

ess

exte

rnal

pro

fess

iona

l adv

ice

on

the

Budg

et

2012

N

umbe

r o

f ex

tern

al

pro

fess

iona

l in

touc

h H

PBO

Esta

blish

a B

udge

t In

stitu

te /

thi

nk t

ank

2012

Bu

dget

Inst

itute

in P

lace

H

PBO

3 C

reat

e ad

equa

te c

apac

ity

on

Budg

et is

sues

St

udy

tour

s fo

r bo

th M

Ps a

nd s

taff

20

12

Num

ber

of

stud

y to

urs

org

anise

d H

PBO

Sho

rt t

erm

tra

inin

g fo

r st

aff

2012

N

umbe

r o

f st

aff

trai

ned

Reg

ular

wo

rksh

ops

/bri

efin

g se

ssio

ns f

or

Mem

bers

20

12

Num

ber

of

wo

rksh

ops

hel

d C

arry

out

stu

dies

on

them

atic

are

as

2012

N

umbe

r o

f st

udie

s he

ld

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

43

O Obj

ectiv

e 3:

To

Str

engt

hen

the

Parl

iam

enta

ry r

esea

rch

serv

ices

.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 In

stitu

tiona

lize

and

stre

ngth

en r

esea

rch

capa

city

in P

arlia

men

t

Cre

ate

a vi

able

str

uctu

re f

or

the

Res

earc

h D

epar

tmen

t 20

12

Ope

ratio

nal s

truc

ture

in

plac

e D

IRS

Es

tabl

ish a

n op

timal

sta

ffin

g le

vel f

or t

he

Res

earc

h D

epar

tmen

t 20

12

Rec

ruit

the

rele

vant

sta

ff

Dev

elo

p an

inte

grat

ed r

esea

rch

serv

ice

and

oper

atio

nal f

ram

ewor

k ac

ross

var

ious

Se

ctio

ns/D

epar

tmen

ts

2012

N

umbe

r of

sta

ff t

rain

ed in

re

sear

ch s

kills

acr

oss

Dep

artm

ents

M

ains

trea

m o

utpu

ts f

rom

Res

earc

h as

a b

asis

for

deci

sion-

mak

ing

2012

N

umbe

r o

f re

sear

ch

repo

rts

diss

emin

ated

2

Form

aliz

e an

d st

reng

then

th

e ro

le o

f re

sear

cher

s in

va

lue

addi

tion

of

Parl

iam

enta

rian

s’

enga

gem

ent

in

Parl

iam

enta

ry d

iscou

rse

Sens

itize

Mem

bers

on

the

rang

e o

f se

rvic

es a

nd

expe

rtise

at

thei

r di

spos

al

2012

A

ll M

embe

rs s

ensit

ized

DIR

S

Dev

elo

p o

pera

tiona

l gui

delin

es f

or

Res

earc

hers

’ pa

rtic

ipat

ion

and

enga

gem

ent

in r

elev

ant

com

mitt

ee w

ork

2012

Inte

rnal

do

cum

ent

for

enga

gem

ent

DLC

S

Dep

loy

rese

arch

ers

in t

he r

elev

ant

spec

ializ

ed

Dep

artm

enta

l Co

mm

ittee

s 20

12

R

esea

rche

r pe

r co

mm

ittee

de

plo

yed

Enha

nce

capa

city

fo

r an

ticip

ato

ry r

esea

rch

wor

k an

d pu

blish

ing

of r

esea

rch

outp

uts

2012

Publ

icat

ions

and

Br

ochu

res

DIR

S

3

Forg

e an

d m

aint

ain

stro

ng

netw

ork

with

res

earc

h in

stitu

tions

at

natio

nal,

regi

ona

l and

inte

rnat

iona

l le

vels

Iden

tify

and

regi

ster

with

rel

evan

t re

sear

ch

inst

itutio

ns

Bi a

nnua

l

Num

ber

of

peer

mee

tings

he

ld

DIR

S

Hav

e jo

int

pro

ject

or

pro

gram

me

with

oth

er

rese

arch

inst

itutio

ns

Net

wor

k es

tabl

ished

Org

aniz

e an

d pa

rtic

ipat

e in

res

earc

h se

min

ars

and

wo

rksh

op

Cat

alog

ue o

f re

sear

ch

wor

k 4

Esta

blish

a k

now

ledg

e an

d in

form

atio

n m

anag

emen

t sy

stem

Aut

omat

e Li

brar

y se

rvic

es

2012

Li

brar

y m

anag

emen

t sy

stem

in p

lace

D

IRS

D

igiti

ze a

ll pa

pers

/ d

ocu

men

ts

Dig

itize

d sy

stem

in p

lace

Bu

ild in

form

atio

n sy

stem

s ne

twor

ks w

ith

rela

ted

inst

itutio

ns

Net

wo

rk in

pla

ce

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

44

5 En

hanc

e re

pro

grap

hic

serv

ices

with

in P

arlia

men

t Pu

rcha

se o

f di

gita

l pho

toco

pyin

g an

d sh

redd

ing

mac

hine

s 20

12

H

igh

effic

ienc

y ac

hiev

ed

DIR

S

Ret

rain

cur

rent

sta

ff o

n m

ode

rn m

achi

ne

oper

atio

ns

2012

Num

ber

of

staf

f re

trai

ned

Co

ntra

ct f

irm

s to

reg

ular

ly s

ervi

ce m

achi

nes

2012

M

aint

enan

ce c

ont

ract

s in

pl

ace

6 Es

tabl

ish L

ibra

ry

infr

astr

uctu

re in

clud

ing

Parl

iam

enta

ry a

rchi

ve

Iden

tify

appr

opr

iate

libr

ary

and

arch

ives

lo

catio

n 20

12

Mod

ern

libra

ry in

pla

ce

DIR

S

Inst

itutio

naliz

e Pa

rlia

men

tary

rec

ords

m

anag

emen

t an

d ar

chiv

e se

rvic

es

All

parl

iam

enta

ry

mat

eria

ls p

ut in

pla

ce

Form

ulat

e re

cord

s m

anag

emen

t se

rvic

e, p

olic

y an

d gu

idel

ines

Po

licy

in p

lace

Rev

iew

libr

ary

regu

latio

ns in

line

with

the

new

co

nstit

utio

n N

ew li

brar

y ru

les

and

regu

latio

ns

Mai

nten

ance

of

parl

iam

enta

ry m

ater

ials

tha

t ar

e ar

chiv

al in

nat

ure

Num

ber

of m

ater

ials

co

llect

ed

Co

llect

ion

of r

esea

rch

pape

rs, f

ilms,

vid

eos

and

othe

r no

n bo

ok m

ater

ials

M

ater

ials

col

lect

ed

O

bjec

tive

4: T

o E

nhan

ce t

he p

ublic

imag

e o

f Pa

rlia

men

t.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 En

hanc

e pu

blic

rel

atio

ns

activ

ities

bo

th w

ithin

and

ou

tsid

e Pa

rlia

men

t

Dev

elo

p o

utre

ach

pro

gram

mes

201

2

Out

reac

h pr

ogra

mm

es

deve

lope

d D

IRS

Trai

ning

and

cap

acity

bui

ldin

g fo

r al

l sta

ff in

pu

blic

rel

atio

ns

2012

Num

ber

of s

taff

tra

ined

Publ

icat

ion

of n

ewsl

ette

rs, b

roch

ures

and

ot

her

Parl

iam

enta

ry d

ocum

ents

20

12

N

umbe

r of

pub

licat

ions

Und

erta

ke o

utre

ach

pro

gram

mes

, i.e

., pa

rtic

ipat

ion

in n

atio

nal e

vent

s su

ch a

s th

e A

SK

show

s an

d th

e Pu

blic

Ser

vice

Wee

k

2012

Part

icip

atio

n in

out

reac

h pr

ogra

mm

es

D

evel

op

an in

form

atio

n, c

om

mun

icat

ion

and

educ

atio

n (I

CE)

po

licy

2012

IC

E po

licy

in p

lace

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

45

2

Act

ualiz

e th

e liv

e br

oadc

ast

of H

ouse

pr

oce

edin

gs

Esta

blish

a P

arlia

men

tary

Bro

adca

stin

g U

nit

20

12

Equi

pmen

t in

pla

ce

Stru

ctur

e of

Uni

t de

velo

ped

DIR

S

Rec

ruit

pers

onne

l fo

r th

e Br

oad

cast

ing

Uni

t N

umbe

r of

Sta

ff r

ecru

ited

DA

S M

anag

e th

e br

oad

cast

co

nten

t 20

12

Man

agem

ent

syst

em in

pl

ace

DIR

S

3

Act

ivel

y en

gage

med

ia

and

com

mun

icat

ion

Rec

ruit

pers

onne

l to

man

age

the

Med

ia C

entr

e 20

12

Num

ber

of s

taff

rec

ruite

d D

AS

Incr

ease

reg

ular

med

ia b

rief

ings

20

12

Num

ber

of

med

ia

brie

fings

hel

d

4 Im

prov

e pr

otoc

ol a

nd

rece

ptio

n in

Par

liam

ent

Set

up P

arlia

men

tary

Rec

eptio

n D

esk

2012

R

ecep

tion

desk

set

up

DIR

S R

ecru

it/de

ploy

off

icer

s to

the

rec

eptio

n 20

12

Num

ber

of s

taff

indu

cted

D

AS

Esta

blish

a g

ift s

hop

2012

-201

3 G

ift s

hop

in p

lace

D

IRS

5 Ta

ke a

n ac

tive

role

in

Publ

ic S

ocia

l R

espo

nsib

ility

act

iviti

es

Esta

blish

PSR

pol

icy

2012

PS

R p

olic

y in

pla

ce

DIR

S Pa

rtic

ipat

e in

ann

ual c

hari

ty a

ctiv

ities

A

nnua

l N

umbe

r of

cha

rita

ble

activ

ities

und

erta

ken

6 Pr

ovi

de f

or

phys

ical

in

fras

truc

ture

in

Parl

iam

ent

build

ings

tha

t fa

cilit

ate

publ

ic

inte

ract

ions

Pro

vide

fo

r pu

blic

wai

ting

and

vett

ing

shel

ter

in a

ll re

cept

ions

2012

-201

3 Fa

cilit

ies

to b

e in

pla

ce

DIR

S

Prov

ide

for

a pu

blic

res

ourc

e ce

ntre

for

pi

ctur

es, p

ublic

atio

ns, r

eplic

as o

f sy

mbo

ls a

nd

late

r a

mus

eum

Pu

t up

and

pub

lic e

duca

tion

hall

/ A

udito

rium

fo

r le

ctur

ers

and

talk

s

7 Se

nsiti

ze M

embe

rs o

f Pa

rlia

men

t on

mat

ters

of

med

ia a

nd p

ublic

imag

e m

anag

emen

t

Enha

nce

and

stre

ngth

en M

embe

rs o

rien

tatio

n Pr

ogra

mm

e fo

r ne

w M

embe

rs

Co

ntin

ous

N

umbe

r o

f ev

ents

hel

d D

IRS

Reg

ular

sen

sitiz

atio

n w

ork

sho

ps

8 En

hanc

e th

e O

ffic

e o

f th

e Sp

eake

r to

pla

y ro

le o

f Sp

oke

sper

son

for

Parl

iam

ent

Staf

f ad

equa

tely

the

SN

A O

ffic

e

2012

St

aff

allo

cate

d an

d se

rvin

g.

SNA

/ PA

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

46

Obj

ectiv

e 5:

To

enh

ance

ser

vice

del

iver

y.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 U

nder

stan

d ke

y st

akeh

olde

rs a

nd t

heir

ne

eds

Car

ry o

ut c

usto

mer

sat

isfac

tion

surv

eys

on a

n an

nual

bas

is an

d im

plem

ent

reco

mm

enda

tions

Ann

ually

Su

rvey

s co

nduc

ted

%

age

of

reco

mm

enda

tions

act

ed

on

CN

A

2 Im

prov

e In

tern

al P

roce

sses

to

deliv

er

qual

ity s

ervi

ce t

o M

embe

rs a

nd s

taff

D

epar

tmen

ts t

o p

repa

re s

ervi

ce c

hart

ers

and

annu

al w

ork

plan

s 20

12

Se

rvic

e ch

arte

rs a

nd

oper

atio

nal m

anua

ls

publ

ished

DA

S

Acq

uire

app

ropr

iate

equ

ipm

ent

to f

acili

tate

se

rvic

e de

liver

y R

elev

ant

equi

pmen

t av

aila

ble

3 Fo

rmul

ate

and

ado

pt a

ppro

pria

te H

R

stra

tegy

and

pol

icy

Impr

ove

Sch

emes

of

Serv

ice

2012

Sc

hem

es o

f Se

rvic

e in

Pl

ace

DA

S

Rec

ruit

appr

opri

ate

staf

f 20

12-2

013

Prof

essio

nal S

taff

re

crui

ted

DA

S

Des

ign

HR

Str

ateg

y an

d Po

licy

20

12

HR

po

licy

in p

lace

D

AS

O Obj

ectiv

e 6:

To

enh

ance

sta

ff p

erfo

rman

ce

S//N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 In

stitu

tiona

lise

perf

orm

ance

co

ntra

ctin

g

Key

sta

ff n

egot

iate

and

sig

n pe

rfor

man

ce

cont

ract

s

Ann

ually

Fr

om 2

012

%ag

e o

f key

sta

ff w

ith

perf

orm

ance

co

ntra

cts

CN

A

2 En

hanc

e th

e ro

le o

f st

aff

appr

aisa

ls in

m

anag

ing

perf

orm

ance

W

orks

hops

on

staf

f ap

prai

sals

20

12

%

age

of s

taff

app

raisa

ls

done

C

NA

3 Es

tabl

ish a

ppro

pria

te s

truc

ture

s Es

tabl

ish s

uppo

rt s

truc

ture

s fo

r th

e Se

nate

20

12-2

013

A

ppro

pria

te s

truc

ture

s in

pl

ace

D

AS

Rev

iew

str

uctu

res

for

Off

ice

of

Spea

ker

and

Cle

rk o

f N

atio

nal A

ssem

bly

and

Sena

te

Esta

blish

str

uctu

re f

or a

ll D

irec

tora

tes

and

Dep

artm

ents

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

47

4 Im

prov

e te

rms

of s

ervi

ce

Rev

iew

ter

ms

of

serv

ice

for

all c

adre

s 20

12

Impr

ove

d te

rms

of

serv

ice

in p

lace

D

AS

5 R

ecru

it ad

ditio

nal s

taff

to

fill

vac

anci

es

Adv

ertis

e, in

terv

iew

and

rec

ruit

pro

fess

iona

l st

aff

2012

-201

3

%ag

e of

req

uisit

e st

aff

recr

uite

d

DA

S

6 D

evel

op

capa

city

fo

r Pa

rlia

men

tary

Tr

aini

ng In

stitu

te.

Iden

tify

appr

opri

ate

stru

ctur

es f

or t

he

inst

itute

2012

Stru

ctur

es in

pla

ce

C

NA

7 Fa

cilit

ate

atta

chm

ents

to

two-

cham

ber

Parl

iam

ents

Id

entif

y st

aff a

cros

s th

e di

rect

orat

es/

depa

rtm

ents

and

fac

ilita

te t

he a

ttac

hmen

ts

2012

-201

3 O

ffic

ers

atta

ched

SD

C

8 M

ains

trea

m H

IV/

AID

S ac

tiviti

es in

the

Se

rvic

e D

evel

op

a 3-

year

str

ateg

ic p

lan

for

the

unit

20

13

Stra

tegi

c Pl

an in

pla

ce

HA

CU

Form

ulat

e a

wor

kpla

ce p

olic

y on

HIV

/AID

s

Polic

y fo

rmul

ated

Inte

grat

e H

IV/A

IDs

activ

ities

in t

he a

nnua

l sp

orts

wee

k Pr

ogra

mm

e of

act

iviti

es

Dev

elo

p an

d di

ssem

inat

e pu

blic

ity m

essa

ges

on

HIV

/AID

s Pu

blic

ity m

essa

ges

publ

ished

Obj

ectiv

e 7:

Str

engt

hen

team

wo

rk a

nd c

oo

rdin

atio

n be

twee

n th

e C

om

miss

ion,

Dir

ecto

rate

s an

d D

epar

tmen

ts.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 Bu

ild s

yner

gies

acr

oss

di

rect

orat

es a

nd

depa

rtm

ents

Bi-a

nnua

l PSC

ret

reat

s w

ith t

eam

bui

ldin

g se

ssio

ns

2012

-201

3 Te

am w

ork

PS

C S

ecre

tari

at

Qua

rter

ly m

eetin

gs b

etw

een

PSC

and

D

irec

tora

tes

and

depa

rtm

ents

Q

uart

erly

rep

orts

PS

C S

ecre

tari

at

Ann

ual s

port

s da

y Sp

orts

day

D

AS

Ann

ual s

taff

par

ty

Staf

f pa

rty

DA

S 2

Impr

ove

d C

om

mun

icat

ion

mec

hani

sms

Prom

pt c

omm

unic

atio

n of

PSC

res

olut

ions

C

ont

inuo

us

R

egul

ar c

om

mun

icat

ion

PSC

Sec

reta

riat

R

egul

ar c

ircu

lars

to

dir

ecto

rate

s o

n po

licy

deci

sions

D

ecisi

ons

impl

emen

ted

Mon

thly

rep

orts

fro

m d

irec

tora

tes

Rep

ort

ava

iled

Ann

ual P

SC r

epor

t A

nnua

l rep

ort

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

48

O Obj

ectiv

e 8:

To

impr

ove

the

wo

rkin

g en

viro

nmen

t S/

N

Stra

tegi

es

Act

ivity

Ti

me

Line

/ /P

erio

d

Indi

cato

r /T

arge

ts

Res

pons

ibili

ty

1 Pr

ovid

e ad

equa

te

phys

ical

fac

ilitie

s C

ons

truc

t a

mo

dern

off

ice

blo

ck n

ext

to

Co

ntin

enta

l Ho

use

2012

-201

3

Co

mpl

etio

n of

off

ice

bloc

k D

C-P

2 R

efur

bish

men

t of

the

ne

w a

nd o

ld C

ham

bers

C

arry

out

the

ref

urbi

shm

ent

of

the

New

C

ham

ber

2012

Th

e ch

ambe

r re

furb

ished

D

C-P

Car

ry o

ut r

efur

bish

men

t of

the

old

cha

mbe

r an

d re

-org

anisa

tion

of m

ain

Parl

iam

ent

to

crea

te o

ffic

es fo

r th

e Sp

eake

rs, C

lerk

s an

d ot

her

seni

or o

ffic

ers

of

the

two

ho

uses

2012

-201

3 C

ham

ber

refu

rbish

ed a

nd

off

ices

cre

ated

D

C-P

Le

ase

and

refu

rbish

H

aram

bee

Plaz

a N

ego

tiate

and

sig

n le

ase

agre

emen

t

2012

-201

3 Le

ase

agre

emen

t in

pla

ce

DC

-P/H

OLC

R

efur

bish

men

t an

d re

part

ition

ing

to c

reat

e ad

ditio

nal o

ffic

es f

or

Mem

bers

20

12 -

201

3 M

embe

rs o

ffic

es c

reat

ed

DC

-P

Rem

ode

lling

of

Pr

otec

tion

Hou

se

Alte

ratio

n of

som

e of

the

flo

ors

to c

usto

mise

th

e of

fices

for

use

by P

arlia

men

t 20

12

Prot

ectio

n H

ouse

rea

dy

for

occ

upat

ion

D

C-P

Alte

ratio

ns a

nd

rem

ode

lling

of

Co

ntin

enta

l Ho

use

Alte

ratio

ns a

nd r

emod

ellin

g of

Con

tinen

tal

Ho

use

to im

pro

ve M

embe

rs’ o

ffic

es in

C

ont

inen

tal H

ous

e

2012

M

embe

rs o

ffic

es r

eady

fo

r o

ccup

atio

n D

C-P

Cre

ate

and

equi

p a

mod

ern

Libr

ary

in t

he

first

flo

or

of

Co

ntin

enta

l Ho

use

2012

– 2

013

Mo

dern

Lib

rary

rea

dy f

or

use

DC

-P

3 A

cqui

sitio

n o

f Bui

ldin

gs

with

in t

he p

ropo

sed

Parl

iam

enta

ry S

quar

e

Fast

tra

ck n

egot

iatio

ns t

o a

cqui

re p

rope

rtie

s ar

ound

Par

liam

ent

2012

– 2

013

Prop

ertie

s ac

quir

ed

DC

-P

4 En

hanc

emen

t o

f se

curi

ty

with

in P

arlia

men

t pr

ecin

cts

Co

mpl

ete

and

com

miss

ion

the

inte

grat

ed

secu

rity

sys

tem

2012

Secu

rity

sys

tem

com

plet

ed

and

com

miss

ione

d SD

C

Rec

ruit

and

trai

n se

curi

ty s

taff

in m

oder

n se

curi

ty r

elat

ed s

yste

ms

and

polic

ies

2012

Staf

f re

crui

ted

and

trai

ned

Esta

blish

a P

arlia

men

tary

Po

lice

Uni

t

acco

unta

ble

to P

arlia

men

t 20

12

Parl

iam

enta

ry P

olic

e U

nit

in p

lace

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

49

O Obj

ectiv

e 9:

To

enh

ance

use

of

ICT

in o

pera

tions

and

co

mm

unic

atio

ns.

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 In

stitu

tiona

lize

ICT

serv

ices

in P

arlia

men

t Es

tabl

ish a

n or

gani

zatio

nal s

truc

ture

for

ICT

Dep

artm

ent

2012

ICT

Dep

artm

ent

stru

ctur

e in

pla

ce

DIR

S

Rec

ruit

and

trai

n IC

T pr

ofes

siona

ls

2012

Num

ber

of

staf

f re

crui

ted

and

trai

ned

DA

S

Dev

elo

p IC

T St

rate

gy a

nd p

olic

y

2012

-201

3 IC

T St

rate

gy a

nd p

olic

y do

cum

ents

in p

lace

D

IRS

2

Build

ICT

capa

city

fo

r M

embe

rs o

f Pa

rlia

men

t an

d st

aff

Org

aniz

e in

duct

ion

and

trai

ning

ses

sions

2012

N

umbe

r of

Mem

bers

and

st

aff

trai

ned

DIR

S

Ho

ld IC

T w

orks

hops

, co

nfer

ence

s an

d se

min

ars

for

Mem

bers

and

sta

ff

2012

A

num

ber

of W

orks

hops

, C

onf

eren

ces

and

sem

inar

s he

ld

3 U

pgra

de a

nd d

evel

op

ICT

infr

astr

uctu

re

Cen

tral

ICT

serv

ice

mo

del

20

12

In

tegr

ated

ICT

syst

em

D

IRS

Stan

dard

ize

ICT

Serv

ices

2012

Har

mo

nize

d IC

T En

viro

nmen

t/pl

atfo

rm

Esta

blish

ICT

pro

ject

man

agem

ent

fram

ewo

rk

2012

D

ocu

men

ted

ICT

pro

ject

m

anag

emen

t gu

idel

ines

4

Aut

omat

e pr

oces

ses

usin

g IC

T Im

prov

e th

e Pa

rlia

men

tary

web

site

Im

prov

ed w

ebsit

e D

IRS

Enha

nce

e-m

ail a

nd In

tran

et s

ervi

ces

En

hanc

ed e

-mai

l and

In

tran

et s

ervi

ces

in p

lace

En

hanc

e do

cum

ent

man

agem

ent

syst

ems

New

sys

tem

s fo

r do

cum

ent

man

agem

ent

Esta

blish

link

ages

with

con

stitu

enci

es w

ith

VSA

T co

nnec

tion

VSA

T lin

k to

Con

stitu

enci

es

Dig

itize

Leg

islat

ive

Man

agem

ent

Syst

em

Dig

itize

d Le

gisl

ativ

e M

anag

emen

t Sy

stem

in

plac

e C

om

pute

rize

man

agem

ent

of

Parl

iam

enta

ry

pape

rs

Parl

iam

enta

ry p

aper

s co

mpu

teri

sed

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

50

O

bjec

tive

10:

To in

crea

se r

eso

urce

bas

e an

d im

pro

ve m

anag

emen

t o

f re

sour

ces

S/N

St

rate

gies

A

ctiv

ity

Tim

e Li

ne

/ /Per

iod

In

dica

tor

/Tar

gets

R

espo

nsib

ility

1 R

eso

urce

mob

iliza

tion

Fully

eng

age

Tre

asur

y fo

r fu

nds

20

12-2

013

Budg

etar

y pr

ovisi

on

D

FA/

DC

-P

Prof

ile a

ll th

e de

velo

pmen

t pa

rtne

rs

C

oo

rdin

ated

do

nor

fund

ing

2 Im

pro

ve in

tern

al

budg

etin

g pr

oce

ss

Cre

ate

inte

rdep

artm

enta

l bud

get

com

mitt

ee

2012

-201

3 Pa

rtic

ipat

ory

and

real

istic

bu

dget

D

FA

Hol

d Pr

e an

d po

st b

udge

t w

orks

hop

En

hanc

e ef

ficie

ncy

in

proc

urem

ent

Tr

aini

ng o

n th

e re

quir

emen

ts o

f th

e Pu

blic

Pr

ocu

rem

ent

and

disp

osa

l Act

200

5 20

12

Num

ber

of

off

icer

s tr

aine

d

DFA

Wor

ksho

ps o

n pr

ocur

emen

t pl

anni

ng

2012

-201

3 N

umbe

r tr

aine

d

Trai

n H

eads

of

Dep

artm

ent

to p

repa

re

proc

urem

ent

plan

s 20

12

All

depa

rtm

ents

hav

e a

proc

urem

ent

plan

D

evel

op

a co

mm

unic

atio

n t

oo

l on

advi

sing

on

pro

cure

men

t 20

12

Tool

ava

ilabl

e to

de

part

men

ts

DFA

Im

prov

e m

onito

ring

and

ev

alua

tion

Trac

k ex

pend

iture

tre

nds

for

appr

opri

ate

polic

y de

cisio

ns

2011

-201

2

Prud

ent

appl

icat

ion

of

reso

urce

s

DFA

M

axim

ize

ICT

usag

e Im

prov

e qu

ality

of

finan

cial

rep

ortin

g 20

12

Qua

lity

repo

rts

D

FA

Ava

il fin

anci

al r

epor

ts o

nlin

e 20

12-2

013

Key

fin

anci

al r

epo

rts

avai

labl

e on

line

DFA

Cre

ate

linka

ge w

ithin

the

dir

ecto

rate

fo

r ea

se

of c

omm

unic

atio

n

Link

age

crea

ted

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

51

O Obj

ectiv

e 11

: To

str

engt

hen

Off

ice

of

the

Cle

rk o

f th

e Se

nate

and

Nat

iona

l Ass

embl

y.

S/

N

Stra

tegi

es

Act

ivity

Ti

me

L Line

/Per

iod

Indi

cato

r/Ta

rget

s R

espo

nsib

ility

1 Es

tabl

ish a

n op

erat

iona

l Se

cret

aria

t fo

r th

e o

ffic

e s

of

Cle

rk

of

each

H

ous

e

Secr

etar

iat

esta

blish

ed

20

11/2

012

A

wor

king

st

ruct

ure

deve

lope

d D

AS

D

eplo

y st

aff

to t

he t

wo

offic

es o

f th

e C

lerk

s 20

12

Ade

quat

e st

aff

depl

oye

d

2 D

evel

op

capa

city

o

f st

aff

for

the

two

off

ices

o

f C

lerk

s

Stud

y to

urs

and

atta

chm

ent

to

othe

r Pa

rlia

men

ts

2012

N

umbe

r o

f st

aff

sent

on

stud

y to

urs

and

atta

chm

ents

DA

S

3 St

reng

then

coo

rdin

atio

n be

twee

n th

e O

ffic

es o

f C

lerk

s,

Join

t se

rvic

es

and

the

dire

cto

rate

s an

d de

part

men

ts

Dev

elop

an

in

tern

al

com

mun

icat

ion

fram

ewo

rk

2012

In

tern

al

com

mun

icat

ion

fram

ewo

rk d

evel

ope

d C

NA

Sec

reta

riat

Dev

elo

p ch

anne

l to

co

mm

unic

ate

BOM

re

solu

tions

to

staf

f

C

hann

el

of

com

mun

icat

ion

deve

lope

d D

evel

op

a fo

rum

fo

r ef

fect

ive

enga

gem

ent/

feed

back

with

sta

ff

2012

A

fo

rum

fo

r en

gage

men

t de

velo

ped

Num

ber

of

annu

al

enga

gem

ents

be

twee

n C

lerk

and

Sta

ff

Dev

elo

p co

mm

unic

atio

n fr

amew

ork

bet

wee

n th

e o

ffic

es o

f C

lerk

s o

f th

e tw

o ho

uses

and

be

twee

n o

ffic

es o

f C

lerk

s an

d o

ffic

es o

f th

e Sp

eake

rs

2012

C

om

mun

icat

ion

fram

ewo

rk d

evel

ope

d Ef

fect

ive

com

mun

icat

ion

betw

een

the

two

offic

es

of

Cle

rks

and

betw

een

the

off

ices

of

Cle

rks

and

the

Off

ices

of

Spea

ker

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

52

AAPP

END

ICES

APP

END

IX I:

Str

ateg

y m

atri

x M

issio

n:

To f

acili

tate

the

Mem

bers

of

Parl

iam

ent

to e

ffic

ient

ly a

nd

effe

ctiv

ely

fulfi

l th

eir

cons

titut

iona

l m

anda

te

in

a re

pres

enta

tive

syst

em o

f G

ove

rnm

ent

by u

phol

ding

and

en

suri

ng

the

auto

nom

y o

f Pa

rlia

men

t in

its

co

rpo

rate

re

latio

nshi

p w

ith o

ther

arm

s of

Gov

ernm

ent

Visi

on:

To

be

a su

prem

e, e

ffec

tive,

eff

icie

nt

and

self-

sust

aini

ng

Parl

iam

ent

as

a m

ajo

r pa

rtic

ipan

t in

the

pro

cess

of

goo

d go

vern

ance

Co

re v

alue

s:

1.

Prof

essio

nalis

m a

nd T

eam

wor

k 2.

O

bjec

tivity

and

Impa

rtia

lity

3.

Acc

oun

tabi

lity,

Tra

nspa

renc

y an

d In

tegr

ity

4.

Cou

rtes

y 5.

Ef

ficie

ncy

and

Res

pons

iven

ess

Stra

tegi

c iss

ue

Obj

ectiv

e O

utco

me/

out

put

Stra

tegi

es

1) N

ew d

eman

ds a

nd

high

exp

ecta

tions

on

Parl

iam

ent

follo

win

g th

e ad

opt

ion

of C

ons

titut

ion

of

Ken

ya 2

010

1) T

o s

tren

gthe

n th

e ca

paci

ty

of M

embe

rs t

o m

ake

law

s to

ef

fect

ivel

y pl

ay t

heir

ro

les.

� In

crea

sed

capa

city

of

mem

bers

of

bot

h ho

uses

of

Parl

iam

ent

to

intr

odu

ce, d

ebat

e an

d pa

ss b

ills

� Bu

ild c

apac

ity o

f M

embe

rs o

f bo

th H

ouse

s of

Par

liam

ent

in le

gisl

atio

n �

Sens

itize

M

embe

rs

of

both

ho

uses

of

Pa

rlia

men

t on

Sta

ndin

g O

rder

s �

Impr

ove

the

pro

cess

of

scru

tiny

and

mak

ing

of la

ws

� Pr

ovid

e su

ffic

ient

sup

port

fo

r M

embe

rs o

f bo

th H

ous

es o

f Pa

rlia

men

t in

the

pro

cess

of

mak

ing

law

s �

Pro

vide

eff

icie

nt a

nd t

imel

y ac

cess

to

the

Han

sard

Ensu

re

effic

ient

m

anag

emen

t o

f Pa

rlia

men

tary

Pap

ers

2)To

str

engt

hen

the

capa

city

an

d pr

oce

ss o

f o

vers

eein

g th

e N

atio

nal B

udge

t

Out

put

is Ef

fect

ive

invo

lvem

ent

of

the

Mem

bers

of

Parl

iam

ent

in t

he

Nat

iona

l Bud

getin

g pr

oces

s Ex

pect

ed

out

com

e is

the

impr

ove

men

t in

th

e eq

uita

ble

dist

ribu

tion

of,

utili

zatio

n of

, an

d ac

coun

tabi

lity

in t

he u

se o

f pu

blic

re

sour

ces

� En

tren

ch P

arlia

men

t in

the

Nat

iona

l Bud

get-

mak

ing

proc

ess

� Bu

ild c

apac

ity o

f M

embe

rs o

f bo

th H

ouse

s o

f Pa

rlia

men

t to

ef

fect

ivel

y o

vers

ee

the

Nat

iona

l Bud

get

pro

cess

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

53

3)

To S

tren

gthe

n th

e Pa

rlia

men

tary

Res

earc

h Se

rvic

es

Enha

nced

qua

lity

legi

slat

ion

and

ove

rsig

ht r

ole

of

both

Ho

uses

of

Parl

iam

ent

� In

stitu

tiona

lize

and

stre

ngth

en

rese

arch

ca

paci

ty in

Par

liam

ent

� Fo

rmal

ize

and

stre

ngth

en

the

role

o

f re

sear

cher

s in

va

lue

addi

tion

of

Parl

iam

enta

rian

s’

enga

gem

ent

in

Parl

iam

enta

ry d

iscou

rse

� Fo

rge

and

mai

ntai

n st

rong

net

wo

rk w

ith

rese

arch

in

stitu

tions

at

na

tiona

l, re

gio

nal

and

inte

rnat

iona

l lev

els

� Es

tabl

ish

a kn

owle

dge

and

info

rmat

ion

man

agem

ent

syst

em

� En

hanc

e re

pro

grap

hic

serv

ices

w

ithin

Pa

rlia

men

t 2)

Nee

d fo

r en

hanc

ed

imag

e of

Par

liam

ent

4) T

o en

hanc

e th

e pu

blic

im

age

of P

arlia

men

t En

hanc

ed p

ublic

imag

e o

f Pa

rlia

men

t �

Enha

nce

publ

ic r

elat

ions

act

iviti

es b

oth

with

in a

nd o

utsid

e Pa

rlia

men

t �

Impr

ove

use

of

inf

orm

atio

n an

d co

mm

unic

atio

ns t

echn

olo

gy

� A

ctua

lize

the

live

bro

adca

st o

f H

ous

e pr

oce

edin

gs

� A

ctiv

ely

enga

ge in

Med

ia a

nd

com

mun

icat

ion

� Im

prov

e pr

otoc

ol a

nd r

ecep

tion

in

Parl

iam

ent

� Ta

ke a

n ac

tive

role

in P

ublic

So

cial

R

espo

nsib

ility

act

iviti

es

5)

To

enha

nce

serv

ice

deliv

ery

An

impr

oved

str

uctu

re t

hat

allo

ws

for

prof

essio

nalis

m

and

inst

itutio

naliz

atio

n of

a

Hum

an

Res

our

ce

man

agem

ent

plan

th

at

ensu

res

the

inst

itutio

n at

trac

ts a

nd

reta

ins

prof

essio

nals

� U

nder

stan

d ke

y st

akeh

olde

rs

and

the

serv

ices

pr

ovi

ded

to

them

; th

ese

incl

ude

inte

rnal

and

ext

erna

l sta

keho

lder

s �

Con

tinuo

usly

im

prov

e in

tern

al p

roce

sses

to

deliv

er q

ualit

y se

rvic

e �

Incr

easin

gly

auto

mat

e pr

oces

ses

usin

g IC

T (i

nclu

ding

el

ectr

oni

c m

edia

an

d th

e in

tern

et)

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

54

3) N

eed

for

effe

ctiv

e or

gani

zatio

nal s

truc

ture

an

d im

pro

ved

HR

ca

paci

ty

6) E

nhan

ced

staf

f pe

rfor

man

ce

Expe

cted

O

utpu

t:

En

hanc

ed

staf

f ou

tput

th

roug

h pe

rfor

man

ce

cont

ract

ing

of s

taff

as

part

of

the

Res

ults

Ba

sed

Man

agem

ent

appr

oac

h em

brac

ed

in

the

mai

nstr

eam

Civ

il Se

rvic

e

Expe

cted

out

com

e is

enha

nced

se

rvic

e de

liver

y to

clie

nts

� In

stitu

tiona

lizin

g pe

rfor

man

ce c

ontr

actin

g,

and,

Perf

orm

ance

app

raisa

ls

Res

truc

ture

PA

RLS

CO

M w

ith r

egar

d to

the

fo

llow

ing

area

s:

� Es

tabl

ishm

ent

of t

he s

uppo

rt s

truc

ture

for

th

e Se

nate

. Th

is w

ill in

clud

e th

e es

tabl

ishm

ent

of t

he O

ffic

e of

the

Spe

aker

o

f th

e Se

nate

, Off

ice

of

the

Cle

rk o

f Se

nate

an

d ot

her

supp

ort

staf

f. �

Stre

ngth

en t

he O

ffic

e of

the

Spe

aker

and

th

e C

lerk

of

the

Nat

iona

l Ass

embl

y, t

he

Han

sard

and

the

Off

ice

of L

egal

Co

unse

l. �

Esta

blish

men

t o

f th

e Pa

rlia

men

tary

Tra

inin

g In

stitu

te.

� Fu

ll es

tabl

ishm

ent

of

Libr

ary

and

Res

our

ce

Cen

tre

Serv

ices

. �

Impr

ove

ter

ms

of

serv

ice

for

the

diff

eren

t ca

dres

. �

Rec

ruit

addi

tiona

l req

uisit

e st

aff

to f

ill

vaca

ncie

s w

ith s

peci

al f

ocu

s to

the

ent

ire

prof

essio

nal a

nd a

dmin

istra

tive

staf

f co

mpl

emen

t.

� Fo

rmul

ate

and

ado

pt a

n ap

pro

pria

te H

R

Stra

tegy

and

pol

icy.

Dev

elo

p ca

paci

ty o

f Pa

rlia

men

tary

Tra

inin

g In

stitu

te a

nd u

tiliz

e it

exte

nsiv

ely.

Att

ach

staf

f in

oth

er P

arlia

men

ts w

ith t

wo

ch

ambe

rs.

� W

ork

with

Dev

elo

pmen

t pa

rtne

rs t

o p

rovi

de

trai

ning

opp

ort

uniti

es lo

cally

and

abr

oad

7)

Str

engt

hen

team

wo

rk a

nd

coo

rdin

atio

n be

twee

n th

e O

utpu

t is

impr

ove

d co

mm

unic

atio

n an

d sy

nerg

ies

betw

een

units

Reg

ular

tea

m b

uild

ing

activ

ities

/ini

tiativ

es.

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

55

Co

mm

issio

n, D

irec

tora

tes

and

Dep

artm

ents

O

utco

me

is en

hanc

ed p

erfo

rman

ce

in s

ervi

ce d

eliv

ery

and

impr

ove

d ra

ting

on t

eam

wor

k cr

iteri

a

� M

ulti-

unit

task

fo

rces

fo

rmed

to

im

plem

ent

spec

ific

aspe

cts

of

the

new

Co

nstit

utio

n an

d be

yond

.

4) N

eed

to p

rovi

de a

co

nduc

ive

wor

king

en

viro

nmen

t fo

r de

liver

y o

f qu

ality

ser

vice

s

8) T

o im

pro

ve t

he w

ork

ing

envi

ronm

ent

Expe

cted

Out

put:

th

e tw

o H

ouse

s o

f Pa

rlia

men

t,th

at i

s, t

he N

atio

nal

Ass

embl

y an

d th

e Se

nate

will

eac

h ha

ve

a m

ode

rn

stat

e o

f th

e ar

t ch

ambe

r, c

omm

ittee

mee

ting

room

s an

d of

fices

for

all

the

Mem

bers

of

both

hou

ses

and

staf

f of

Par

lsco

m.

Ade

quat

e pa

rkin

g an

d ho

spita

lity

faci

litie

s su

ch a

s ca

teri

ng,

heal

th a

nd

fitne

ss w

ill a

lso

be a

vaila

ble

� R

efur

bish

men

t o

f th

e tw

o

cham

bers

o

f Pa

rlia

men

t to

acc

omm

odat

e th

e N

atio

nal

Ass

embl

y an

d th

e Se

nate

.

� Bu

ildin

g a

new

mul

ti-st

ory

off

ice

bloc

k ne

xt

to C

ont

inen

tal H

ous

e.

� Le

asin

g H

aram

bee

Sacc

o f

or

the

peri

od

up

to w

hen

the

new

off

ice

blo

ck w

ill b

e re

ady

� R

efur

bish

men

t o

f th

e al

read

y ac

quir

ed

Prot

ectio

n H

ouse

.

� R

eorg

aniz

atio

n o

f of

fices

at

Pa

rlia

men

t bu

ildin

gs.

� R

entin

g of

pa

rkin

g sp

ace

at

KIC

C

to

pro

vide

fo

r th

e ex

tra

park

ing

requ

ired

.

5) N

eed

to le

vera

ge o

n IC

T fo

r im

prov

ed

perf

orm

ance

and

co

mm

unic

atio

n

9) E

nhan

ced

use

of IC

T in

op

erat

ions

and

co

mm

unic

atio

ns

Enha

nced

eff

icie

ncy

in s

ervi

ce

deliv

ery

and

redu

ced

cost

s ac

ross

all

Dir

ecto

rate

s an

d de

part

men

ts.

� In

stitu

tiona

lize

ICT

serv

ices

in P

arlia

men

t

� Bu

ild

ICT

capa

city

fo

r M

embe

rs

of

Parl

iam

ent

and

staf

f.

� D

evel

op

and

upgr

ade

ICT

infr

astr

uctu

re.

Thes

e in

clud

e fit

ting

both

ch

ambe

rs

of

Parl

iam

ent

with

ul

tra

mod

ern

ICT

equi

pmen

t.

Aut

omat

e pr

oces

ses,

inc

ludi

ng: C

ompu

teri

ze

the

man

agem

ent

of

Parl

iam

enta

ry P

aper

s.

6) N

eed

for

enha

nced

re

sour

ce b

ase

and

impr

ove

reso

urce

m

anag

emen

t

10)

Ade

quat

e re

sour

ce b

ase

and

man

agem

ent

of r

esou

rces

O

utpu

t:

adeq

uate

re

sour

ces

are

avai

labl

e to

mee

t bo

th c

apita

l an

d re

curr

ent

cost

s re

late

d to

th

e im

plem

enta

tion

of

the

new

� En

gage

the

Tre

asur

y to

incr

ease

res

our

ces

in

line

with

the

req

uire

men

ts o

f im

plem

entin

g th

is St

rate

gy.

� W

ork

ing

clo

sely

with

dev

elo

pmen

t pa

rtne

rs

Revi

sed

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

– 2

018

56

Con

stitu

tion

to

opt

imise

th

eir

cont

ribu

tion

to

the

impl

emen

tatio

n of

the

new

Con

stitu

tiona

l di

spen

satio

n in

Par

liam

ent.

� En

hanc

e ef

ficie

ncy

in t

he p

rocu

rem

ent

of

goo

ds a

nd s

ervi

ces.

� Em

pow

er t

he D

irec

tora

te o

f Fi

nanc

e an

d A

cco

untin

g th

roug

h ca

paci

ty b

uild

ing

and

effe

ctiv

e st

ruct

ures

.

� En

hanc

e pa

rtic

ipat

ion

in

the

budg

etin

g pr

oce

ss.

� Im

prov

e qu

ality

of

finan

cial

rep

ortin

g.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

57

AAPPENDIX II: Overview of the Parliamentary Service Commission The Parliamentary Service Commission

The Parliamentary Service Commission was established through the Constitution of Kenya (Amendment) Act, No.3 of 1999, which was passed by the House on November 11, assented to by the President on November 17 and came into effect on November 19, 1999. The Commission was re-established and continued by Article 127 as read with sections 7 and 31 of the Sixth Schedule of the new Constitution

The Mission of the PARLSCOM is to: Efficiently and effectively fulfil the constitutional function of parliament in a representative system of Government by upholding and ensuring the autonomous status of Parliament in its corporate relationship with other arms of the government.

a.) Composition of the Commission

Until the first elections to be held under the new Constitution, the Commission consists of three appointed and seven elected Members as indicated here below:-

� The Speaker is the Chairman and a mandatory Member – by virtue of his position and office;

� The Leader of Government Business in the National Assembly or a Member deputed by him as a mandatory Member;

� The Leader of the Official Opposition or a Member deputed by him as a mandatory Member; and

� Seven Back Bench Members four of whom are from the party or parties in the Government and three from the party or parties in the Opposition. The Vice-Chairman is elected from among the Members from the Back Bench.

The Clerk of the National Assembly is the Secretary.

In the new dispensation, the Commission is constituted as follows;

(a) the Speaker of the National Assembly, as chairperson;

(b) a vice-chairperson elected by the Commission from the members appointed under paragraph (c);

(c) seven members appointed by Parliament from among its members of whom—

(i) four shall be nominated equally from both Houses by the party or coalition of parties forming the

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

58

national government, of whom at least two shall be women; and,

(ii) three shall be nominated by the parties not forming the national government, at least one of whom shall be nominated from each House and at least one of whom shall be a woman; and

(d) one man and one woman appointed by Parliament from among persons who are experienced in public affairs, but are not members of Parliament.

The Clerk of the Senate shall be the Secretary to the Commission.

bb.) Mandate

Section 45B of the former Constitution gives the mandate of the Commission as follows:

� The constitution and abolition of offices in the Parliamentary Service;

� The recruitment, appointments, deployment, disciplining, setting of terms and conditions of the service and the termination of service of all staff;

� Provision of facilities and services to Members of Parliament and staff and the supervision of the administrative mechanisms;

� The preparation of the budget for the National Assembly and the audit of the expenditure;

� The review of the remuneration of the Members through an independent body; and,

� The promotion of the ideals of Parliamentary democracy.

Under the new Constitution, the Commission is responsible for:

� providing services and facilities to ensure the efficient and effective functioning of Parliament;

� constituting offices in the parliamentary service, and appointing and supervising office holders;

� preparing annual estimates of expenditure of the parliamentary service and submitting them to the National Assembly for approval, and exercising budgetary control over the service;

� undertaking, singly or jointly with other relevant organisations, programmes to promote the ideals of parliamentary democracy; and

� performing other functions—

o Necessary for the well-being of the members and staff of Parliament; or prescribed by National legislation.

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

59

cc.) Committees of the Commission

In order to facilitate the proper discharge of the Commission’s mandate, the Commission works through the following five committees which include:-

� Committee on Finance: Oversees all financial transactions of PARLSCOM; controls; evaluates and monitors the PARLSCOM budget; negotiates for all funding for the National Assembly; ensures there is adherence to prudent financial management and establishes priorities and goals of development for the National Assembly.

� Committee on Staff Welfare: Oversees recruitment; appointments; promotions; terms and conditions of service of the staff of the National Assembly, including dealing with disciplinary issues.

� Committee on Tender and Procurement: Ensures that the procurement process in the National Assembly adheres to the procurement procedures, rules and regulations as provided under the Public Procurement and Disposal Act of 2005.

� Committee on Members’ Welfare: Ensures that the necessary and appropriate policies are put in place regarding the provision of facilities and services for Members. It also facilitates the review of the terms and conditions of service for Members including ensuring that Members have access to appropriate training and exposure visit programmes to other Parliamentary jurisdictions.

� Committee on Security and Development: Ensures that there is adequate /appropriate security within the precincts of the National Assembly.

d.) Office of the Speaker

The office of the Speaker exercises procedural, administrative and Managerial roles and functions vested by law, procedure and tradition necessary to operationalize the role and functions of Parliament. The Speaker of each House is the Presiding Officer of the respective house and its Chief Spokesperson. The Speaker of the National Assembly chairs the Parliamentary Service commission and is responsible for both policy and operations within the precincts of Parliament.

e.) Office of the Clerk

The Clerk of each House is the Principal Procedural Advisor to the Speaker, Deputy Speaker, other presiding officers and to all Members on parliamentary procedures, practices, conventions and traditions. The role of Secretary to the Parliamentary

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

60

Service Commission will move from the Clerk of the National Assembly to the Clerk of the Senate. The Clerk of the Senate will therefore be responsible for implementation of all policy matters approved by the Commission.

ff.) Office of the Senior Deputy Clerk

The Senior Deputy Clerk of the National Assembly has been the overall link between the Directorates and the Parliamentary Service Commission, the Speaker and the Clerk of the National Assembly. He/she has been the Vice-Chair of the Board of Management overseeing the general supervision of all Directorates, external relations including inter-parliamentary relations and conferences. He/she also provides advice to the Speaker of the National Assembly and other presiding officers, including Members, on parliamentary procedures. He/she coordinates the preparation and presentation of orientation programmes for newly elected Members of the National Assembly. The office has also been responsible for coordinating the administration, planning and operation of the National Assembly.

In the new dispensation, each House shall have its own Senior Deputy Clerk who shall undertake these functions in relation to the respective House.

g.) Board of Management

The Board of Management (BOM), which is chaired by the Clerk of the National Assembly, has been the implementing agency for the policies and directives of the Parliamentary Service Commission. It has consisted of the Clerk, Senior Deputy Clerk, and Directors.

The Board performs the following duties:

� Reviews and assesses all estimates of the National Assembly.

� Reviews and recommends to the Commission all policy proposals.

� Reviews and recommends all schemes of service for staff.

� Reviews and recommends all proposals on terms and conditions of service for staff.

� Monitors the implementation of directives by the Parliamentary Service Commission.

� Reviews and recommends staff establishment, promotion and discipline.

� Reviews and considers recruitment of staff.

In the new dispensation, each House shall have its own Board of Management responsible for the affairs of the respective House. Additionally,

Revised Strategic Plan for Parliamentary Service Commission 2008 - 2018

61

it may be necessary to establish a Board of Directors drawn from both Hosues to take responsibility for the affairs of Parliament as a whole.

hh.) The Commission Secretariat

The Commission Secretariat gives support services to the Commission. Its duties include: -

� Preparation and circulation of the Commission agenda and minutes.

� Follow–up action on the implementation of Commission decisions.

� Preparation and coordination of Commission retreats with Directors and Heads of Departments.

� Coordination of all the Commission activities on behalf of the Secretary.

� Preparation of the Commission’s Annual Report.

� Any other duties that the Commission may direct through the Clerk of the National Assembly.

i.) Services provided by the Parliamentary Service

� Legislative and Committee Services.

� Finance and Accounting Services.

� Administrative Services.

� Information and Research Services.

� Legal Services

The Service has different directorates and departments with specific functions.

The new organisation structure of the Parliamentary Service Commission establishes national position of;

� the Clerk of the Senate to head the House of Senate

� the Clerk of the National Assembly to head the National Assembly

� the Director General to head the Parliamentary Service Commission Common services

� in addition to the Director in charge of Centre for Parliamentary Studies and Training and Director in charge of Parliamentary Budget Office

The organisation structure is outlined on appendix III

Stra

tegi

c Pl

an fo

r Par

liam

enta

ry S

ervi

ce C

omm

issi

on

2008

- 20

18

62

APP

END

IX II

I: S

truc

ture

of

the

Parl

iam

enta

ry S

ervi

ce

OV

ERA

LL S

TRU

CTU

RE

OF

TH

E PA

RLI

AM

ENTA

RY

SER

VIC

E (A

ppro

ved

Apr

il, 2

012)

Parli

amen

t

Spea

ker,

N/A

ssem

bly

Parli

amen

tary

Ser

vice

Co

mm

issio

n Sp

eake

r, Se

nate

Cler

k N

/Ass

embl

y

Dire

ctor

Gen

eral

Pa

rliam

enta

ry Jo

int

Serv

ices

Seni

or D

eput

y Cl

erk

Cler

k-

Sena

te

Dire

ctor

, Le

gisla

tive

&

Proc

edur

al

Head

CPS

T Di

rect

or,

Budg

et

Dire

ctor

, In

form

atio

n &

Re

sear

ch

Dire

ctor

, Ad

min

istra

tive

Serv

ices

Dire

ctor

, Fi

nanc

e &

Ac

coun

ting

Serv

ices

Dire

ctor

, Le

gal

serv

ices

Dire

ctor

, Co

mm

ittee

Se

rvic

es

Dire

ctor

, Sp

eake

r’s

Offi

ce

Dire

ctor

, Sp

eake

r’s

Offi

ce

Dire

ctor

, Co

mm

ittee

Se

rvic

es

Dire

ctor

, Le

gisla

tive

&

Proc

edur

al

Serv

ices

Chie

f Ser

gean

t at

Arm

s Ha

nsar

d Ed

itor

Chie

f Se

rgea

nt a

t Ar

ms

Hans

ard

Edito

r

Seni

or D

eput

y Cl

erk

Depu

ty D

irect

or In

tern

al

Audi

t

Secr

etar

y to

the

Com

miss

ion

Dire

ctor

, Le

gal

serv

ices

Dire

ctor

, Le

gal

Serv

ices

Depu

ty D

irect

or

PSC

Secr

etar

iat

CPST

Boa

rd o

f M

anag

emen

t

Hon. Kenneth Marende, EGH, MP Chairman

Hon. Adan Keynan, MP Wajir West- Vice Chairman

Hon. Wilson Litole, OGW, MP Sigor - Member

Hon. Joseph Lekuton, OGW, MPLaisamis - Member

Hon. Zakayo Cheruiyot, MGH MP Kuresoi - Member

Hon. Aluoch Olago, MP Kisumu Town W. - Member

Hon. Chris Okemo, EGH, MPNambale - Member

THE THIRD PARLIAMENTARY SERVICE COMMISSION

Patrick G Gichohi. CBSClerk/Secretary

Hon. Walter Nyambati , MP Kitutu Masaba - Member

Hon. Peter Mwathi, MP Limuru - Member

Kenya National Assembly

P O Box 41842-00100

Nairobi

Tel: 2221291

Email: [email protected]

Website: www.parliament.go.ke