nitin pise abhijitjagap - aigetoa
TRANSCRIPT
Districr PresidentNitin Pise9423s79988
District SecretaryVaibhav Bhangare
9423884343
District TreasurerAbhijitJagap
9869071538
To,
Shri. A.N.Dhanorkar,
Pr. General Manager,
Sanchar Bhavan, BSNL,
Pune BA, Pune 41 1009
Sub.: - Submission for Justified man power requirement in Pune BA aS per operational norms &
guidelines for organisational restructuring of business areas issued by BSNL, New Delhi-reg
Ref.No.:- 1) File No. 4-212014- Restg. Vol V(Pt)Dated: 27.08.2020 byBSNLCO, New Delhi
2) File No. 4-212021- Restg. Dated: 17.11.2021 byBSNLCO' New Delhi.
Res Sir,
This is in context of above captioned subject & references, we being a representative
recognised association would like to submit our .justification for the number of executives' posts
in pune BA as per operational norms & guidelines for organisational restructuring issued by
BSNL CO, New Delhi vide above even dated referred letters.
ln post vRS-2019 era, every unit of BSNL, Pune is facing an acute manpower shortage.
lnterestingly, the claim of management about outsourcing of various activities like, outdoor plant
maintenance through cluster partners, BTS Maintenance, cscs, encouraging payment through
online mode & others have proved very futile as none of these hired agencies have stopped the
churning of the customer base. Hence, the revenue generation is not showing any
improvement. Moreover, during these nearly last 2 years of period, ownership of BSNL brand &
its associated services become questionable amongst the all customers. lt is imperative that'
everyone needs to come out from the illusion that, after VRS-2019' work load on executives has
reduced. But in veracity, every executive is carrying the work load which is increased manifold
as all the activities which are appears to be outsourced but in past same were performed by
non-executive staff. so, therefore, due to tender & vendor clauses, poor workmanship, non-
professional approach by vendors, erratic & irresponsible behaviour of vendor appointed staff,
our executives are compelled to face aggravated & furious customers'
From BSNL point of view, Pune BA forms the backbone for core network of western region
catering connectivity to& from all directions of Maharashtra aggregating. data & mobile traffic'
Pune BA is also hosting Billing, vAS including sMSC which is presently delivering monthly
average 500 Million bulk messages & lN network consisting customer base of Gujarat, MP,
chhattisgarh & Maharashtra of cM vertical. BSNL's ambitious project of migrating customers
from old & obsolete electronic switches to NGN switching is also being operational in Pune. DR-
NoC of our data customers including ADSL & FTTH services is available in Pune & being
Regd. Office: Flat No. A-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-12L005
managed by BBNW circle. Providing necessary uninterrupted power supply & media
connectivity to all these units being done by executives of Pune BA'
Below table depicts the comparison of BSNL',s two metlo circles & 5 very large business areas
on the different parameters viz. Geographical area covered by each metro circle, BAs, &
revenue billed during last 3 financial years
Sr.No Name of MetroDistricUlarge BA
PopulationincludingDist. inMillion
Areaservedin Sq,KM
BSNL Annual Revenue in Cr.
2018-1 I 2019-20 2021-21
1 Pune BA 7.8 15642 435.26 435.17 450.79
2 Ahrnedabad BA 7.5 7170 252.98 222.1 '188.8
J Bangalore BA 10.3 2196 607.06 508.53 487.51
4 Hyderabad BA I 7257 318.2 239.1 262.99
5 Ernakulam BA s063 312.43 26A.13 204.11
t) Rolkati Telecom Circle 14 1887 372.20 458.92 429.89
7 Chennai Telecom Circle I J-J 8452 563.18 534.46 480.0'l
As per restructuring norms circulated, Pune BA is ranked in category-1 very large area
i.e. having annual revenue more than Rs.250 Cr. Above details show that, Pune BA is having
Ligger op-eration area than other 4 large BAs as well as 2 metro circles. Hence, keeping vision &
mis-sion ior at least next 5 years, executive strength exclusively for Pune BA shall be maintained
at par witn metro circles. ti is to oe emphasised that, Pune BA is futfilling the connectivity need
of iwo separate & large Municipal Corporations, 3 Cantonment areas which are now covered by
pune Meiropolitan Regional Development Authority (PMRDA) along with 13 tehsils even though
it is not a state capital;s like other similar very large BAs. Future business growth in wireline as
well as wireless segment considering advent of technology & its associated challenges may be
considered before drawing any conclusion.
l.DetailsofstaffstrengthcalculationaSpercirculatednormsatBAlevelAs per organisation chart following no of executives proposed
i) For HQ Unit:
No. of SDES No. of AGMS No. of DGMS
11 2 1
ii) For Vigilance Unit,
No. of SDES No. of AGMS
3 1
Regd. Office: Flat No. 4-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-L21006
iii) For Marketing Unit,
No. of SDES No. of DGMS
IJ J
iv) For Networking Unit,
No. of SDEs No. of DGMs
13 3
v) For finance Unit,No. of JAO/AOs No. of CAOs No. of DGMS
'18 8 4
) Total Manpower for Business area office,
For Telecom wing (i+ii+iii+iv)
No. of SDEs No. of AGMS No. of DGMS
40 J 7
or Finance wiNo. of JAO/AOs No. of CAOs No. of DGMs
18 8 4
2. Details of staff strength calculation as per circulated norms at area office:-
i) cFA Outdoor (OSP):-
Operational norms are DEL=1* Landline+1.5 Broadband+3.1C including PRI for cluster with
last pillar to customer outsourced.
For CFA Outdoor (OSP)
Sr.No.
Area No. ofSDCAS
WorkingDELS
No. ofSDEs/JTOs
No. ofAGMs
1 Rural19
17774 1
2 Urban 161 579 27 t)
ii) Number of BSNL executives in indoor area.
Operational norms in Urban area for equipped capacity of exchanges are 3 SDEs/JTOs for>10K Lines, 2 SDEs/JTOs for 2k to10K. 1 AGM for 5 SDES
Operational norms in Rural area for equipped capacity of exchanges are 5 SDEs/JTOs for>10K Lines, 4 SDEs/JTOs for 5K to10K. & 3 SDEs/JTOs for 5K to 2K.1 AGM for 5 SDEs.
Regd. Office: Flat No. A-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-121006
Area No. ofSDCAs
Total No ofExchanges
Totalequippedcapacitv
No. ofSDEs/JTOs
No. ofAGMs
Rural19
166 587'10 38 8Urban 134 392739 124 25
For lndoor (lSP)
Consumer Mobility operational Work (BTS Maintenance)
Sr. No. Area No of BTS(2G+3G)
No. ofSDEs/JTOs
No. of AGMS
1 Rural 664 17
2 Urban 1043 15 4
iv) Tx Circle/BA :-Transmission OFC Route maintenance non SLA Based Operational norms in non-SLAbased non terrain condition, 1 SDE/JTO for every per 300 RKM.
Total OFCLenqth
No. of SDES/JTOSrequired
No. ofAGMs
5497.5 RKM 19 5
Sales & Marketing (franchisee manager) & CSC work:-CSC NormsCategory ACategory BCategory C
a)7.
2.
3.
Sr. No. Type ofCSCs
No. ofCSCs workingby BSNL
No. of SDE(JTOs
No. of AGMs
1 Type -l 5 52 Type-ll 14 7
Type-lll 14 4
Regd. office: Flat No. 4-302, Life style Residency, Plot no: GH 41-42, sector,65, Faridabad, Haryana-j.21006
b) No. of S&M territoryNorms per Franchisee Manager1. One Territory2. Two Territory3. Three Territory
No.Type ofTerritory
Total TerritoryNo. ofSDEs/JTOs
No. of AGMs
1 Nil Nit
22 B 1 1
(- 22 7
As per norms, 1 AGM shall be posted in each area for every 50Cr' revenue'
vi) Core Network(Txn) lndoor PlantAs per norms shared for core network indoor work for I hours working,l SDE/JTO shall
be posted for every 4 stations along with non-executive staff. But, for 41 type station
where 24 hours working is required, 6 SDEs/JTOs are sanctioned'
Sr. No, Type ofStation
Total no. ofstations
No. ofSDEs/JTOs
No. of AGMS
1 A1 24 Hrs Nit Nil Nil
2 (24 Hrs) Nil Nit Nil
3 B (12 Hrs) Nil Nil Nit
4 C (8 Hrs) Nil 15 4
3 SDES/JTOS in every DGM area in Pune Urban & 3 SDE$iJTOS in Rural area'
vii) Two SDEs/JTOs for each area office to coordinate with other units (As per Point
No.7 (iii) as per above referred letter at 2).
viii) one SDE/JTo for RF optimization, coverage each as BA & Area (As per Point
No.7 (ii) as per above referred letter at 2).
ix) Finance Stream operation norms:-i) One CAO for each area office having revenue Rs' 10Cr'
ii; ttorms for JAO/AOs:- No of DELs=1* Landline+1 5 Broadband+1 5 *FTTH+
a*t /\
Up to DELs 1,20,000:- 8 JAO/AOs
For every additional 25K, 1 AOiJAO
Total DELs=21 1947Therefore, total AO/JAOs required= 12 excluding LC billing'
Regd. Office: Flat No. A-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-121006
No. of SDES No. of AGMs No. of DGMS
290 6'l 4
> Total Manpower for area offices,For Telecom wing (i+ii+iii+iv+v+vi+vii+viii)
For Finance wing (ix)
Gross total of Manpower for Pune BA (A+B)
Finance wiorNo. of JAO/AOS No. of CAOs No. of DGMs
30 10 A
Manpower shall be considered/norms to be given for below units.A) Planning & MM
1 . For Central Store Depot activity.2. For Land Monetisation/Building leasing ouusale.3. lnstallation (Switching/Power planUBattery).
B) EB at BA Level'1. CRM Activity (Feasibility/ Execution of new work) at BA level for incoming
cases.2. Persuasion for expeditiously commissioning of work at different
circles/BAs regarding centrally issued work orders for PAN lndia & PAN
Maharashtra EB Projects.3. Persuasion for expeditiously restoration of services at different
circles/BAs for PAN lndia & PAN Maharashtra EB projects.
4. Deployment of manpower for specific projects viz. CCTNS,CCTV
C) One Network staff at NIB Level of CFA as well as CM vertical as now
activities of both units need to be integrated as per BSNL CO, New Delhi
instructions. Iolal22 nos of man power need to be deployed for this activity
fot 24X7 centrally monitoring purpose.
D) For Liaoning & co-ordinating with other agencies, & customers a dedicated
DGM cadre officer as a Public Relation Officer shall be provisioned'
E) i) ln S&M, clarification shalt be issued regarding manpower norms for CSCs
& Franchisee Manager (FM). As activities of both posts.are totally different &
cannot be clubbed with each other.
No. of JAO/AOs No. of CAOs No. of DGMS
tz 2 1
No. of SDEs No. of AGMs No. of DGMS
330 64 11
Regd. Office: Flat No. A-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-121006
ii) Moreover, FM & EB posts are marked for activity related to CM & LCverticals, separate manpower may be earmarked for CFA vertical to carryS&M activities.iii) Manpower shall need to be provisioned for Retailer Manager Co-ordinator
(RMC), Mobile Provisioning Customer Centre (MPCC), Approval &preservation of CAFs.
F) Core Network (lndoor plant)i) SDH/DWDM equipments have become obsolete & are not fulfilling the
requirement of ever-growing data demand.ii) Due to linear OFC routes, many of BSNL's PoPs are vulnerable to
frequent outages. Therefore, migration of services through various otherroutes by rearranging bandwidth becomes a top priority for core networkindoor staff(PCM).
iii) PCM units in large BAs form the interface between transmission team &teams of all other verticals during commissioning, testing, operation &
Maintenance work of any BSNL services.iv) These teams shall be deployed at every location of edge
router/BNGs/MSC/BSC/TMGA//TR stations/Pols/Main Exchanges.v) ln view of proposed 4Gl5G services as well as popularity of TIP business
module for FTTH services, PCM teams will have larger role to play.
G) lvlanpower for billing of leased circuits (LC),
Pune BA is having an exclusive account & billing unit for LCs. Averageannual amount billed for (ABF) is more than Rs.55 Cr. for more than 350
numbers of EB Customer having nearly 7000 circuits spread across PAN
lndia. However, it is seems that, there is no provision of man power for this
activity. Hence, a dedicated & exclusive TR unit for LC with one CAO & 4AO/JAOS is required.
Projected manpower is require to smoothly run this mammoth organisation which spread
across the nook & corner of this district covering almost all the strategic sectors as well as
locations. The proposed executive staff strength in the executive cadre is essential to deliver &
maintain the satisfactory level of services to our esteemed customers including all Govt Deptts,
PSUS, autonomous bodies, BFSI sector & other prominent entities to which BSNL has been
exclusively mandated to provide uninterrupted connectivity as per the direction of Govt. of lndia.
It is kindly requested to consider this as our feedback before finalisation of restructuring
of executives' strength in Pune BA.
District Secretary,AIGETOA, Pune
Yours truly,
Regd. Office: Flat No. 4-302, Life Style Residency, Plot no: GH 41-42, Sector-65, Faridabad, Haryana-12j.006