lcac roofing system replacement phase 1 - lane county
TRANSCRIPT
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Title Sheet
G000
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/9/2
020
4:58
PM
by
Moy
, Glo
ria
File
Nam
e: P
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
G00
0 Ti
tle S
heet
.dw
g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
N
1
SCALE: NTS
Site Plan
CLIENT:
Lane County Contract No.
ARCHITECTS AND ENGINEERS:
WJEWJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
LANE COUNTY ADULT CORRECTIONS FACILITY
ROOFING SYSTEM REPLACEMENT PHASE 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration Department
Division of Operations
125 East 8th Avenue
Eugene, Oregon 97401
January 13, 2020
GOOGLE MAPS
PROJECT SITE
WJE Job Number: 2019.3197.0
Sheet List Table
Sheet Number Sheet Title
G000 Title Sheet
G100 General Notes
A100 Overall Roof Plan
A101 Enlarged Roof Plans - 5, 6, 7, & 15
A102 Enlarged Roof Plans - 10, 15, & 16
A500 Roof 5, 6, 7, and 15 Details
A501 Roof 5, 7, and 15 Details
A502 Roof 6 Details
A503 Roof 10 and 16 Details
A504 Sheet Metal Details
A505 Sheet Metal Details
S100 Roof 16 Framing Plan & General Notes
S101 Roof 16 Structural Details
P100 Overall Roof Plan - Plumbing Demolition
P200 Overall Roof Plan - Plumbing
P201 Storm Drain Piping Plan - Plumbing
P202 Storm Drain Piping Plan - Plumbing
MAZZETTI | BHEGroup
121 SW Salmon Street, Suite 1000
Portland, Oregon 97204
MECHANICAL CONSULTANTS:
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
General Notes
G100
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/3/2
020
11:2
8 PM
by
Moy
, Glo
ria
File
Nam
e: p
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
G10
0 G
ener
al N
otes
.dw
g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
GENERAL NOTES
1. DIMENSIONS ON DRAWINGS ARE FOR GENERAL REFERENCE ONLY, AND WERE DEVELOPED FROM OBSERVATIONS MADE IN THE FIELD OF
AS-BUILT CONSTRUCTION AND LIMITED ORIGINAL DRAWINGS. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.
2. CONTRACTOR SHALL PROMPTLY SUBMIT VERBAL AND WRITTEN NOTICE TO ARCHITECT/ENGINEER OF OBSERVED VARIANCE OF THE
CONTRACT DOCUMENTS FROM ACTUAL ON-SITE CONDITIONS.
3. PRIOR TO SUBMITTING A BID, VISIT THE PROJECT SITE TO LOCATE, SURVEY, AND VERIFY EXISTING CONDITIONS, INCLUDING (BUT NOT
LIMITED TO) ROOF ACCESS CONDITIONS, FALL ARREST CONDITIONS, SCUPPERS, DRAINS, MECHANICAL EQUIPMENT, AND COMPONENT
INTERFACES.
4. PROVIDE ALL EQUIPMENT, INCLUDING HYDRAULIC LIFT EQUIPMENT, LADDERS, PLATFORMS, LABOR, SUPERVISION, AND MATERIALS AS
REQUIRED TO ACCESS THE ROOF AREAS AND PERFORM THE WORK.
5. ROOF OPENINGS MUST BE PROTECTED DURING THE WORK TO PREVENT ENTRY OF FOREIGN DEBRIS, FUMES, AND WATER INTO EXISTING
CONSTRUCTION AND INTERIOR OF BUILDING.
6. UNLESS OTHERWISE INDICATED BY THE CONTRACT DOCUMENTS OR THE MATERIALS MANUFACTURER'S WRITTEN INSTALLATION
INSTRUCTIONS, FOLLOW THE LATEST EDITION OF INSTALLATION PROCEDURES AND RECOMMENDED PRACTICES OF, INCLUDING BUT NOT
LIMITED TO, THE NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA) AND SHEET METAL AND AIR CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION (SMACNA).
7. TARGETED NOTES ON THE PLAN ARE INTENDED TO IDENTIFY EITHER TYPICAL OR SIMILAR DETAILING. IN THE EVENT THAT THE
CONDITIONS ENCOUNTERED ARE SUBSTANTIALLY DISSIMILAR TO THOSE SHOWN ON THE DRAWINGS, PROMPTLY NOTIFY THE
ARCHITECT/ENGINEER IN WRITING.
8. ALL NOTES SHALL INDICATE NEW CONSTRUCTION AND ARE PART OF THE SCOPE OF WORK UNLESS NOTED OTHERWISE.
9. CONSTRUCTION SHALL BE IN ACCORDANCE WITH LOCAL CODES APPLICABLE TO THE CITY OF EUGENE AND THE STATE OF OREGON,
INCLUDING THE 2014 EDITION OF THE OREGON STRUCTURAL SPECIALTY CODE, 2014 OREGON MECHANICAL SPECIALTY CODE, 2017
OREGON PLUMBING SPECIALTY CODE, 2014 OREGON ENERGY EFFICIENCY CODE, 2014 OREGON FIRE CODE, AND OTHER LOCAL AND
NATIONAL CONSENSUS CODES AND STANDARDS.
10. UNLESS SPECIFICALLY STATED OTHERWISE, THE MOST RECENT EDITION OF ALL CODES AND STANDARDS SHALL APPLY.
11. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE LATEST EDITION OF THE
WILLIAM STEIGER OCCUPATION SAFETY AND HEALTH ACT (OSHA).
12. CONTRACTOR SHALL SUPPLY THE OWNER WITH MATERIAL SAFETY DATA SHEETS (MSDS) FOR EACH SUBSTANCE THAT WILL BE BROUGHT
ONTO THE JOB SITE AND SHALL COMPLY WITH THE REQUIREMENTS OF THE OSHA HAZARD COMMUNICATION STANDARD.
13. CONTRACTOR IS RESPONSIBLE FOR WAYS AND MEANS OF ALL WORK.
14. CONTRACTOR MUST SUBMIT A DEMOLITIONS SCHEDULE TO OWNER AND ARCHITECT/ENGINEER FOR REVIEW PRIOR TO DEMOLITION
INITIATION.
15. CONTRACTOR SHALL SUBMIT A COMPLETE CONSTRUCTION SEQUENCE FOR EXECUTION OF THE PROJECT PRIOR TO COMMENCING THE
WORK.
16. SHOULD CONDITIONS OF WORK OR SCHEDULE INDICATE CHANGE OF MATERIALS OR METHODS, SUBMIT RECOMMENDATIONS INCLUDING:
A. CONDITION INDICATING CHANGE.
B. RECOMMENDATION FOR ALTERNATIVE MATERIALS OR METHODS.
C. SUBMITTAL AS REQUIRED FOR SUBSTITUTIONS. NO WORK SHALL PROCEED UNTIL ARCHITECT/ENGINEER'S APPROVAL IS RECEIVED.
17. WJE ENGINEERS & ARCHITECTS, P.C. (WJE) SHALL NOT HAVE CONTROL OVER OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND SAFETY
PROGRAMS IN CONNECTION WITH THE PROJECT, SINCE THESE ARE THE RESPONSIBILITY OF THE CONTRACTOR(S). WJE SHALL NOT BE
RESPONSIBLE FOR THE CONTRACTOR'S SCHEDULES OR FAILURE TO CARRY OUT THE PROJECT IN ACCORDANCE WITH CONTRACT
DOCUMENTS. WJE SHALL NOT HAVE CONTROL OVER OR CHARGE OF ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS, OR
THEIR AGENTS OR EMPLOYEES, OR OF ANY OTHER NON-WJE PERSONS PERFORMING PORTIONS OF THE PROJECT.
18. THE CONTRACTOR SHALL LEAVE INTACT AND UNDISTURBED ELEMENTS THAT ARE TO REMAIN. EXISTING BUILDING AND ALL SERVICE
SHALL REMAIN IN USE DURING THE REROOFING AND REPAIR WORK.
19. REPAIR INTERIOR FINISHES DAMAGED DURING INSTALLATION OF NEW COMPONENTS. PROVIDE NEW INTERIOR SUBSTRATE TO MATCH
ADJACENT SUBSTRATES AT LOCATIONS WHERE INCREASED HEIGHT TO CURBS REQUIRES NEW INTERIOR FINISH.
20. THE EXISTING BUILDING MUST REMAIN IN OPERATION 100 PERCENT OF THE TIME. DEMOLITION REQUIRED SHALL PROCEED ONLY AT THE
DIRECTION OF THE OWNER ACCORDING TO SCHEDULES MUTUALLY AGREED UPON. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY
CONTROLS AS NECESSARY TO ALLOW FOR BUILDING OPERATIONS.
21. THE CONTRACTOR SHALL PROVIDE PROTECTION TO BUILDING COMPONENTS AND SYSTEMS AS REQUIRED IN THE AREA OF WORK OR AS
REQUIRED FOR ACCESS AREAS TO THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE
EXISTING STRUCTURE CAUSED BY THE WORK. ANY SUCH DAMAGE SHALL BE REPORTED TO THE OWNER AND ARCHITECT/ENGINEER
PRIOR TO REPAIRING DAMAGE.
22. CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SHEETING, AND WEATHER PROTECTION AS REQUIRED FOR SAFETY AND PROPER
EXECUTION OF THE WORK.
23. CONTRACTOR SHALL PROVIDE PROTECTIVE BARRIERS, FENCES, WALKWAY ENCLOSURES WITH LIGHTING, ETC. TO ENSURE THE SAFETY
OF PEDESTRIANS, BUILDING OCCUPANTS, VEHICULAR TRAFFIC, SITE FEATURES, ETC. AS APPROVED BY THE OWNER AND IN
ACCORDANCE WITH THE REQUIREMENTS OF LOCAL AUTHORITIES.
24. THE CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER PROJECT SITE WITH MATERIALS OR EQUIPMENT. THE MATERIALS AND
EQUIPMENT SHALL BE CONFINED TO THE AREAS INDICATED IN THE CONTRACT DOCUMENTS OR BY THE DIRECTION OF THE OWNER. DO
NOT LOAD STRUCTURE WITH WEIGHT THAT WILL ENDANGER STRUCTURE. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR THE
PROTECTION AND SAFEKEEPING OF PRODUCTS STORED ON PREMISES. MOVE ANY STORED MATERIAL PRODUCTS THAT INTERFERE WITH
OPERATIONS OF OWNER OR OTHER CONTRACTORS. STORE MATERIAL ONLY IN AREAS PROVIDED BY OWNER.
25. DRAINS, SUMPS, AND SEWERS: THE CONTRACTOR SHALL NOT PERMIT DEBRIS OR OTHER CONTAMINANTS DELETERIOUS TO THE SEWER
SYSTEM TO BE WASHED DOWN DRAINS WITHIN THE BUILDING OR OTHERWISE DISCHARGED INTO THE SEWER SYSTEM. PRIOR TO THE
START OF WORK, THE CONTRACTOR SHALL INSPECT THE CONDITION OF THE MAIN ROOF DRAINS IN AREAS AFFECTED BY THE
CONTRACTOR'S WORK TO DETERMINE THAT THEY ARE CLEAN AND IN PROPER WORKING ORDER. THE OWNER SHALL BE NOTIFIED OF
ANY ELEMENTS THAT ARE NOT IN PROPER WORKING ORDER. AT THE COMPLETION OF THE PROJECT, THE DRAINS SHALL BE TESTED TO
VERIFY THAT THEY ARE IN SIMILAR CONDITION AND WORKING ORDER AS OBSERVED IN THE INITIAL INSPECTION.
26. THE CONTRACTOR SHALL PROVIDE TEMPORARY FIRE PROTECTION AS REQUIRED BY FEDERAL AND LOCAL LAWS AND ORDINANCES.
27. CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION AS REQUIRED TO CONTROL DUST AND FUMES IN WORK AREA.
28. ALL ROOF ACCESS LADDERS MUST REMAIN SECURED AT ALL TIMES, AND NOT LEFT UNATTENDED UNLESS LOCATED IN A SECURED
GATED AREA AND AS APPROVED BY THE FACILITY.
29. CLEAN UP AND DEBRIS REMOVAL SHALL BE UNDERTAKEN DAILY AND SHALL BE SATISFACTORY TO THE ARCHITECT/ENGINEER AND
OWNER.
30. THE PROJECT MANUAL ENTITLED "LANE COUNTY ADULT CORRECTIONS FACILITY (LCAC), ROOFING SYSTEM REPLACEMENT PHASE 1" IS A
PART OF THE CONSTRUCTION DOCUMENTS.
31. THE PRODUCTS NOTED AND SPECIFIED ARE BELIEVED TO HAVE PROPERTIES ADEQUATE FOR SUCCESSFUL COMPLETION OF THE WORK.
IF CONTRACTOR HAS FOUND THESE PRODUCTS TO BE UNACCEPTABLE OR HAS HAD DIFFICULTY USING THESE MATERIALS, CONTRACTOR
SHALL IMMEDIATELY INFORM ARCHITECT/ENGINEER AND OWNER IN WRITING.
32. IN THE EVENT OF CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT AND BETTER
QUALITY SHALL GOVERN UNLESS WRITTEN NOTIFICATION IS PROVIDED BY THE ARCHITECT/ENGINEER.
33. THE ARCHITECT/ENGINEER MAY PERFORM QUALITY CONTROL TESTS ON A RANDOM BASIS FROM TIME TO TIME TO EVALUATE
INSTALLATION OF THE NEW CONSTRUCTION FOR CONFORMANCE TO THE DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL
MAKE ACCESS AVAILABLE TO INSPECT AND TEST THE SPECIFIED AREAS AND MAKE APPROPRIATE REPAIRS AFTER COMPLETION OF
ARCHITECT/ENGINEER'S INSPECTION. ANY DEFECTIVE WORK WILL BE REPAIRED AT NO COST TO THE OWNER.
34. THESE CONSTRUCTION DOCUMENTS (DRAWINGS AND SPECIFICATIONS) APPLY TO THE ROOFING SYSTEM REPLACEMENT AT THE LANE
COUNTY ADULT CORRECTIONS FACILITY AND SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE EXPRESSED WRITTEN
CONSENT OF WJE.
EXISTING CONDITIONS
INFORMATION SHOWN THAT WAS USED IN DEVELOPMENT OF THE REPAIR DOCUMENTS HAS BEEN BASED UPON LIMITED VISUAL EXAMINATION
OF EXPOSED CONDITIONS. CONTRACTOR SHALL MEASURE AND FIELD VERIFY ALL NECESSARY AND REQUIRED DIMENSIONS AND
INFORMATION, AND SHALL DETERMINE ALL EXISTING CONDITIONS REQUIRED TO PERFORM WORK PRIOR TO PROCEEDING WITH THE WORK
OR FABRICATION OF COMPONENTS. CONTRACTOR SHALL REPORT ANY SIGNIFICANT VARIATIONS FROM THE DIMENSIONS AND CONDITIONS
SHOWN ON THESE DRAWINGS TO THE ARCHITECT/ENGINEER IN WRITING. CONTRACTOR PROCEEDING WITH WORK SHALL INDICATE THAT THE
CONTRACTOR HAS MEASURED AND VERIFIED ALL REQUIRED INFORMATION FOR ACCURACY. ANY CONCEALED CONDITIONS ADVERSELY
AFFECTING THE SPECIFIED WORK SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT/ENGINEER.
THE SCOPE OF WORK INCLUDES ROOF AREAS 5, 6, 7, 10, 15, AND 16 AS SHOWN IN THE PROJECT DRAWINGS.
1. THE EXISTING ROOFING SYSTEM AT ROOF AREAS 5, 6, 7, AND 15 GENERALLY CONSISTS OF THE FOLLOWING FROM BOTTOM TO
TOP: CONCRETE DECK, BITUMINOUS VAPOR RETARDER, VARYING THICKNESS OF PERLITE AND POLYISOCYANURATE
INSULATION (ASSUME AN AVERAGE OF 5”), BUILT-UP ROOFING MEMBRANE SYSTEM, AND A FLOOD COAT AND GRAVEL SURFACING.
2. THE EXISTING ROOFING SYSTEM AT ROOF AREAS 10 AND 16 GENERALLY CONSISTS OF THE FOLLOWING FROM BOTTOM TO TOP: METAL
DECKING SUPPORTED ON STEEL FRAMING, LIGHTWEIGHT INSULATING FILL, BUILT-UP ROOFING MEMBRANE, AND A FLOOD COAT AND
GRAVEL SURFACING.
SUMMARY OF WORK
THIS PROJECT WILL GENERALLY INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING ITEMS:
1. GENERAL
A. REMOVE AND DISPOSE OF EXISTING ROOFING MEMBRANE SYSTEM, INCLUDING BUT NOT LIMITED TO THE VAPOR RETARDER
MEMBRANE, BUILT-UP ROOFING MEMBRANES AND FLASHINGS, RIGID INSULATION, SHEET METAL AND RELATED COMPONENTS, AND
ACCESSORIES DOWN TO THE SUBSTRATE.
B. TEMPORARILY REMOVE OR SUPPORT EXISTING ROOF TOP MECHANICAL AS REQUIRED FOR INSTALLATION OF NEW CURBS OR
NON-PENETRATING EQUIPMENT SUPPORTS.
C. PROVIDE AND INSTALL NEW WOOD BLOCKING AS REQUIRED.
D. PROVIDE AND INSTALL NEW PREMANUFACTURED NON-PENETRATING CONDUIT AND DUCT SUPPORTS.
E. PROVIDE AND INSTALL NEW SELF-ADHERED MEMBRANES, SHEET METAL COMPONENTS AND FLASHING, FASTENERS AND SEALANTS,
FOR WEATHER TIGHT INSTALLATION.
F. PROVIDE AND INSTALL NEW MEMBRANE CLAD METAL SCUPPER, TRANSITION FLASHING AND ALL ACCESSORIES.
G. REMOVE ALL EXISTING DRAINS AND REPLACE WITH NEW DRAIN BODIES AND CAST IRON STRAINERS, INCLUDING ALL RELATED
DRAIN COMPONENTS FOR COMPLETE INSTALLATION AND AS INDICATED ON THE DRAWINGS. FURNISH AND INSTALL NEW DRAIN
BOWLS, CLAMPING RINGS AND STRAINERS, AND MODIFY DRAINS TO BE SET AT ELEVATION INDICATED IN THE DRAWINGS.
H. FURNISH AND INSTALL SILICONE TAPE SEALS AT JOINTS IN EXISTING COPING SECTIONS THAT ARE TO REMAIN.
2. ROOFS AREAS 5, 6, 7 AND 15
A. CLEAN AND PROPERLY PREPARE SUBSTRATE AS REQUIRED FOR INSTALLATION OF VAPOR RETARDER/AIR BARRIER/TEMPORARY
ROOFING.
B. INSTALL SELF-ADHERING MEMBRANE AS VAPOR RETARDER / TEMPORARY ROOFING.
C. PROVIDE AND INSTALL A FULLY ADHERED SINGLE PLY TPO THERMOPLASTIC ROOFING MEMBRANE SYSTEM INCLUDING TAPERED
INSULATION, ADHESIVES, COVER BOARD, FLASHING, AND RELATED ANCILLARY ACCESSORIES.
D. RAISE ALL SMOKE VENTS AS REQUIRED TO ACHIEVE PROPER FLASHING HEIGHTS, INCLUDING WOOD BLOCKING.
E. INSTALL NEW SUPPLEMENTAL DRAINS AS INDICATED ON THE DRAWINGS INCLUDING CREATING OPENINGS IN DECK, ALL
ACCESSORY COMPONENTS, SUPPLEMENTAL DRAIN LINES AND CONNECTING NEW SUPPLEMENTAL DRAIN LINES TO STORM SYSTEM.
F. FURNISH AND INSTALL PREFABRICATED RETRO SCUPPER DRAIN ASSEMBLY AT ROOF AREA 6.
G. FURNISH AND INSTALL NEW SHEET METAL COUNTERFLASHINGS INTO EXISTING REGLETS OR AS SURFACE MOUNTED AS INDICATED
ON THE DRAWINGS.
H. FURNISH AND INSTALL SHOP FABRICATED PREFINISHED AND GALVANIZED SHEET METAL SADDLES BELOW COPING BETWEEN ROOF
AREAS 6 AND 7 FULLY WITH SOLDERED OR WELDED SEAMS. GALVANIZED SADDLES TO HAVE FULLY SOLDERED OR WELDED SEAMS.
COLOR OF PREFINISHED SECTIONS TO MATCH EXISTING COPING SECTIONS TO REMAIN AS CLOSELY AS POSSIBLE.
I. REMOVE METAL PANELS AT DOGHOUSE IN AREA 6 WHERE EXISTING DRAIN IS LOCATED, INSTALL DENSDECK LAYER AND
MEMBRANE ON DOGHOUSE WALLS.
J. MODIFY EXISTING SCUPPER OPENINGS AT AREAS 5 AND15 AS INDICATED ON THE DRAWINGS.
K. CREATE NEW SCUPPER OPENING IN WALL AT AREA 5 AS INDICATED ON THE DRAWINGS.
3. ROOF AREA 10
A. CLEAN AND PROPERLY PREPARE METAL DECKING AFTER REMOVAL OF LIGHTWEIGHT INSULATING FILL AS REQUIRED FOR
INSTALLATION OF SUBSTRATE BOARD AND VAPOR RETARDER/AIR BARRIER/TEMPORARY ROOFING.
B. PROVIDE AND INSTALL NEW MECHANICALLY ATTACHED SUBSTRATE BOARDS AT ALL LOCATIONS OF EXPOSED METAL DECKING.
C. PROVIDE AND INSTALL A FULLY ADHERED SINGLE PLY TPO THERMOPLASTIC ROOFING MEMBRANE SYSTEM INCLUDING TAPERED
INSULATION, ADHESIVES, COVER BOARD, FLASHING, AND RELATED ANCILLARY ACCESSORIES.
D. CREATE OPENING IN EXISTING WALL FOR NEW OVERFLOW DRAIN LINE.
4. ROOF AREA 16
A. REMOVE ALL EXISTING ROOFING COMPONENTS INCLUDING LIGHTWEIGHT INSULATING FILL AND EXISTING METAL DECKING.
B. FURNISH AND INSTALL NEW DRAINS AND SUPPLEMENTAL DRAIN LINES TO CONNECT TO EXISTING LEADER SYSTEM, INCLUDING ALL
ACCESSORIES AND COMPONENTS FOR A COMPLETED WATERTIGHT SYSTEM.
C. PROVIDE AND INSTALL NEW MECHANICALLY ATTACHED INSULATION AND COVER BOARDS OVER NEW METAL DECKING.
D. PROVIDE AND INSTALL A FULLY ADHERED SINGLE PLY TPO THERMOPLASTIC ROOFING MEMBRANE INCLUDING MEMBRANE CLAD
METAL SECTIONS, ADHESIVES AND RELATED ANCILLARY ACCESSORIES.
E. FURNISH AND INSTALL NEW SHEET METAL COPING AT ROOF AREA 16 AND BETWEEN AREAS 15 AND 16.
F. FURNISH AND INSTALL NEW MEMBRANE CLAD METAL FASCIA SECTION AT ROOF AREA 16.
G. FURNISH AND INSTALL SHOP FABRICATED PREFINISHED AND GALVANIZED SHEET METAL SADDLES BELOW COPING BETWEEN ROOF
AREAS 15 AND 16. GALVANIZED SADDLES TO HAVE FULLY SOLDERED OR WELDED SEAMS. COLOR OF PREFINISHED SECTIONS TO
MATCH EXISTING COPING SECTIONS TO REMAIN AS CLOSELY AS POSSIBLE.
H. MODIFY EXISTING STEEL ANGLE AT NORTH ROOF EDGE TO FACILITATE INSTALLATION OF ROOF EDGE SCUPPERS.
5. STRUCTURAL MEMBER WORK IN AREA 16
A. PROPERLY CLEAN AND PRIME PORTIONS OF EXISTING STEEL FRAMING TO REMAIN THAT IS PART OF THE ROOF SYSTEM IN THE
AREA OF WORK AS INDICATED ON THE DRAWINGS .
B. FURNISH AND INSTALL NEW METAL DECKING INCLUDING CONNECTIONS AS INDICATED ON THE DRAWINGS THAT IS PART OF THE
ROOF SYSTEM IN THE AREA OF WORK.
C. FINISH AND PAINT STEEL THAT IS PART OF THE ROOF SYSTEM IN THE AREA OF WORK AS INDICATED ON THE DRAWINGS.
PERFORMANCE REQUIREMENTS
1. PROVIDE ROOFING SYSTEM THAT IS IDENTICAL TO SYSTEMS THAT HAVE BEEN SUCCESSFULLY TESTED BY QUALIFIED TESTING AGENCY
TO RESIST THE FOLLOWING UNFACTORED SERVICE WIND UPLIFT PRESSURE (LISTED BELOW) CALCULATED ACCORDING TO THE
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE 7-10) WITH A FACTOR OF SAFETY OF 2.0.
H. FIELD-OF-ROOF UPLIFT PRESSURE: 16 POUNDS PER SQUARE FOOT.
I. PERIMETER UPLIFT PRESSURE: 23 POUNDS PER SQUARE FOOT.
J. CORNER UPLIFT PRESSURE: 35 POUNDS PER SQUARE FOOT.
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
RD
DS
VS
RD
RD
VSVS
SS
S
S
VS
RD
VS
VS
RD
RD RD RD
SSS
S
S
ROOF 15
107'-4"±
16'-0"±
7'-11"±
63'-4"±
27'-0"±
32'-6"±
14'-0"±
92'-2
3
4
"±
59'-3"±
27'-0
3
4
"±
32'-1
1
4
"±
63'-11"±
36'-1"±
40'-4"±
ROOF 16
ROOF 7
ROOF 5
ROOF 6
RD
RD
RD
ROOF 10
VS
RD
S
NOT IN CONTRACT
VENT STACK, SEE DETAIL 6/A500
ROOF DRAIN, SEE DETAIL 4/A500,
2/A502, AND 5 AND 6/A503
OVERFLOW SCUPPER, SEE DETAIL
5/A500 AND 1/A502
EQUIPMENT SUPPORT, SEE DETAIL
9/A500
TROUGH FORMED IN THE INSULATION
LAYER AT AN ELEVATION OF +4" (2"
ABOVE DRAIN ELEVATION) AND
EXTENDING TO THE WALL SCUPPER,
SEE DETAIL 3A/A500 (NOTE: AREA 6
THROUGH IS SET AT +5")
LEGEND
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Overall Roof Plan
A100
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 12
:41
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\A
100
Ove
rall
Roo
fPl
an.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 1/16" = 1'-0"
Overall Roof Plan
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
RD
DS
VS
RD
RD
VSVS
S
S
S
S
VS
RD
VS
VS
RD
S
S
7'-11"±
ROOF 10
SEE DETAIL 1 AND 2 / A503
ROOF 15
SEE DETAIL 2 AND 3 / A500
ONE WAY VENT TO
BE REMOVED, TYP.
63'-4"±
27'-0"±
32'-6"±
14'-0"±
92'-2
3
4
"±
59'-3"±
27'-0
3
4
"±
32'-1
1
4
"±
63'-11"±
36'-1"±
ROOF 7
SEE DETAIL 1 AND 3 / A500
ROOF 5
SEE DETAIL 1 AND 3 / A500
ROOF 6
SEE DETAIL 1 AND 3 / A500
A500
7
A500
7
EQUIPMENT
SUPPORT, TYP.
SEE DETAIL 9 /
A500
DRAIN
SEE DETAIL 4 / A500
DRAIN
SEE DETAIL 4 /
A500, TYP. U.N.O.
DRAIN
SEE DETAIL 2 / A502
VENT STACK
SEE DETAIL 6 / A500
A501
1
A501
1
A501
2
A501
2
LOWER
A501
3
A501
4
A501
5
A501
6
OVERFLOW SCUPPER, TYP.
SEE DETAIL 5 /A500
OVERFLOW
SCUPPER, TYP.
SEE DETAIL 5 /A500,
MODIFY SCUPPER
TO BE 4" ABOVE
DECK
OVERFLOW SCUPPER
SEE DETAIL 1/A502,
SCUPPER +5" ABOVE
DECK
A502
6
A502
5
LOWER
A503
7
A503
9
A502
5
A502
5
LADDER
LADDER
LADDER
PLACE SPLASH BLOCK AT
THE BASE OF DOWNSPOUT
A501
2
RD
RD
RD
A501
7
HP +6"
LP +2"
HP +5"
HP +6"
LP +2"
HP +5
1
4
"
HP +8"
HP +5"
HP +5"
LP +2"
HP +4"
LP +2"
HP +3"
HP +6
1
2
"
HP +7"
HP +7"
HP +7"
LP +2" LP +2"
HP +7"
LP +2"
HP +3
1
2
"
HP +8"
HP +8"
NOTE: INSULATION
SLOPE IS
1
4
" PER FOOT IN
THIS AREA
HP +5
1
2
"
NEW DRAIN
NEW DRAIN
NEW DRAIN
HP +8
1
4
"
NOTE: INSULATION
SLOPE IS
1
4
" PER
FOOT IN THIS AREA
LP +2"
A504
1
A500
8
NEW OVERFLOW
SCUPPER, DETAIL
SIM. TO 5/A500,
SCUPPER OPENING
TO BE W=7 AND H=3
AND 4 IN. ABOVE
THE DECK
SCUPPER, SEE
DETAIL 4/A503
OVERFLOW
SCUPPER, TYP.
SEE DETAIL 5 /A500,
MODIFY SCUPPER
TO BE 4" ABOVE
DECK
OVERFLOW
SCUPPER, TYP.
SEE DETAIL 5 /A500,
MODIFY SCUPPER
TO BE 4" ABOVE
DECK
A502
5
A501
2
LOWER
A501
8
A504
4
A504
5
A504
5
OH
A504
6
A504
5
A502
4
UPPER
DOGHOUSE
VS
RD
S
NOT IN CONTRACT
VENT STACK, SEE DETAIL 6/A500
ROOF DRAIN, SEE DETAIL 4/A500,
2/A502, AND 5 AND 6/A503
OVERFLOW SCUPPER, SEE DETAIL
5/A500 AND 1/A502
EQUIPMENT SUPPORT, SEE DETAIL
9/A500
TROUGH FORMED IN THE INSULATION
LAYER AT AN ELEVATION OF +4" (2"
ABOVE DRAIN ELEVATION) AND
EXTENDING TO THE WALL SCUPPER,
SEE DETAIL 3A/A500 (NOTE: AREA 6
THROUGH IS SET AT +5")
LEGEND
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Enlarged Roof Plans - 5,
6, 7, & 15
A101
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 12
:41
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\A
101
Enla
rged
Roo
f Pla
ns- 5
, 6, 7
, & 1
5.dw
g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 1/8" = 1'-0"
Enlarged Roof Plans - 5 6 7 & 15
NOTE:
ALL DRAIN BOWL ELEVATIONS ASSUMED TO
BE 2" ABOVE DECK UNLESS OTHERWISE
NOTED (+2")
ALL INSULATION ELEVATIONS ARE ASSUMED
TO INCLUDE THERMAL INSULATION AND
1
2
"
COVERBOARD (+2")
MA
TC
H L
IN
EM
AT
CH
L
IN
E
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
RD
VSVS
S
VS
RD
RD RD RD
SSS
S
7'-11"±
ROOF 10
SEE DETAIL 1 AND 2 / A503
ROOF 15
SEE DETAIL 2 AND 3 / A500
107'-4"±
16'-0"±
ONE WAY VENT TO
BE REMOVED, TYP.
27
'-0
3
4
"±
63'-11"±
36'-1"±
40'-4"±
A501
1
A501
1
A501
2
A503
4
DRAIN
SEE DETAIL 5 / A503
NEW DRAIN AND
SUPPLEMENTAL
PIPING, TYP.
SEE DETAIL 6 / A503
A503
7
A503
9
LADDER
LADDER
A501
2
RECREATION YARD
N.I.C.
EXISTING LIGHTWEIGHT
INSULATING FILL AND
METAL DECKING TO BE
REMOVED
RD
HP +7"
HP +7"
HP +7"
LP +2" LP +2"
HP +7"
LP +2"
LP +0" LP +0" LP +0"
HP +3
1
2
"HP +3
1
2
"
HP +4
1
2
" HP +4
1
2
"
LP +2"
LP +2"
LP +2"
LP +2"
LP +2"
LP +2"
A503
8
NOTE: INSULATION
SLOPE IS
1
4
" PER FOOT IN
THESE AREAS
HP +8"
HP +8"
NOTE: INSULATION
SLOPE IS
1
4
" PER FOOT IN
THIS AREA
HP +5
1
2
"
NEW DRAIN
A504
1
A500
8
NEW OVERFLOW
DRAIN OUTLET WITH
COW'S TONGUE
FIXTURE, REFER TO
DETAIL XX/MXX
ROOF 16
SEE DETAIL 1 AND 3 / A503
SCUPPER, SEE
DETAIL 4/A503
NEW OVERFLOW DRAIN
WITH PIPING TO SOUTH
WALL, REFER TO M
DRAWINGS AND FOR
ROOF FLASHING REFER
TO 5/A503 SIM.
OVERFLOW
SCUPPER, TYP.
SEE DETAIL 5 /A500,
MODIFY SCUPPER
TO BE 4" ABOVE
DECK
OVERFLOW
SCUPPER, TYP.
SEE DETAIL 5 /A500,
MODIFY SCUPPER
TO BE 4" ABOVE
DECK
A504
4
A504
5
OH
A504
5
A504
3
VS
RD
S
NOT IN CONTRACT
VENT STACK, SEE DETAIL 6/A500
ROOF DRAIN, SEE DETAIL 4/A500,
2/A502, AND 5 AND 6/A503
OVERFLOW SCUPPER, SEE DETAIL
5/A500 AND 1/A502
EQUIPMENT SUPPORT, SEE DETAIL
9/A500
TROUGH FORMED IN THE INSULATION
LAYER AT AN ELEVATION OF +4" (2"
ABOVE DRAIN ELEVATION) AND
EXTENDING TO THE WALL SCUPPER,
SEE DETAIL 3A/A500 (NOTE: AREA 6
THROUGH IS SET AT +5")
LEGEND
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Enlarged Roof Plans - 10,
15, & 16
A102
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 12
:41
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\A
102
Enla
rged
Roo
f Pla
ns- 1
0 &
16.
dwg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 1/8" = 1'-0"
Enlarged Roof Plans - 10 & 16
NOTE:
ALL DRAIN BOWL ELEVATIONS ASSUMED TO
BE 2" ABOVE DECK UNLESS OTHERWISE
NOTED (+2")
ALL INSULATION ELEVATIONS ARE ASSUMED
TO INCLUDE THERMAL INSULATION AND
1
2
"
COVERBOARD (+2")
MA
TC
H L
IN
EM
AT
CH
L
IN
E
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
MULTIPLE PLY BUILT UP MEMBRANE
GRAVEL
PERLITE
CONCRETE DECK
VAPOR RETARDER/TEMPORARY
ROOFING
POLYISOCYANURATE INSULATION
MULTIPLE PLY BUILT UP MEMBRANE
GRAVEL
POLYISOCYANURATE INSULATION
CONCRETE DECK
VAPOR RETARDER/TEMPORARY
ROOFING
PERLITE
POLYISOCYANURATE INSULATION
PERLITE
COVER BOARD ADHERED W/
ADHESIVE
FULLY ADHERED TPO MEMBRANE
TWO LAYERS OF 2 INCH
POLYISOCYANURATE INSULATION SET
IN LOW RISE FOAM ADHESIVE
EXISTING CONCRETE DECK CLEANED
AND PREPARED TO ACCEPT NEW
VAPOR RETARDER/TEMPORARY ROOF
SELF-ADHERED VAPOR
RETARDER/TEMPORARY ROOFING
AND PRIMER
TAPERED POLYISOCYANURATE
INSULATION SET IN LOW RISE FOAM
ADHESIVE
MULTIPLE PLY BUILT UP MEMBRANE
APPLY SEALANT TO DRAIN BODY BELOW
LEADING EDGE OF TPO FLASHING SHEET
TPO FLASHING SHEET
NEW CLAMPING RING, BOLTS AND CAST IRON
STRAINER.
CUT MEMBRANE 1 IN. FROM INSIDE OF
CLAMPING RING. THE DIAMETER OF THE HOLE
IN THE MEMBRANE MUST BE LARGER THAN
THE DIAMETER OF THE DRAIN PIPE
HOT AIR WELD TPO FLASHING TO FIELD
MEMBRANE
TAPERED INSULATION SUMP. TRIM
INSULATION AND COVER BOARDS TO
PROVIDE A SMOOTH TRANSITION INTO THE
DRAIN BODY
EXTEND VAPOR BARRIER INTO ROOF DRAIN
CUT FIELD MEMBRANE AT EDGE OF TAPERED
INSULATION SUMP
HAMMER-IN FASTENERS WITH PLATES
(FASTEN EACH BOARD WITHIN 6 INCHES OF A
SUMP CORNER)
SE
E D
ET
AIL
3
, T
HIS
S
HE
ET
2'-0"
5"
INSULATION AND COVER BOARD AT SUMP
EDGE IS 3" U.N.O.
REPAIR CONCRETE AS NECESSARY AFTER
INSTALLATION OF NEW DRAIN BOWL
TPO WALKWAY PAD SECTION
BENEATH BASE PLATE HEAT
WELDED TO TPO MEMBRANE
REMOVE AND REPLACE
EQUIPMENT SUPPORT WITH
NON-PENETRATING
PRE-MANUFACTURED
EQUIPMENT SUPPORT
SE
E D
ET
AIL
3
, T
HIS
S
HE
ET
NON-PENETRATING
EQUIPMENT SUPPORT,
REFER TO SECTION 075423
SE
E D
ET
AIL
3, T
HIS
S
HE
ET
CLAD METAL THROUGHWALL SCUPPER; ALL
SEAMS SEALAED WITH HEAT WELDED
PATCHES. FASTENED TO WALL AND WOOD
BLOCKING 12 IN. ON CENTER
EXISTING COPING TO REMAIN,
COUNTERFLASHING TO BE REMOVED AND
REINSTALLED IF NOT DAMAGED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
HOT AIR WELD TPO FLASHING STRIP TO TPO
FIELD MEMBRANE AND SHEET METAL
SCUPPER
FIELD MEMBRANE TO EXTEND TO THE END OF
WALL, ADHERE WITH BONDING ADHESIVE AT
WALL OPENING
TOOLED BEAD OF SEALANT ON TOP AND SIDES
WOOD BLOCKING FASTENED TO CONCRETE
SLAB WITH
1
4
" DIAMETER S.S. ANCHORS AT
24" O.C.
TAPER INSULATION AND TRIM INSULATION
AND COVER BOARDS TO PROVIDE A SMOOTH
TRANSITION TO TRHOUGHWALL SCUPPER
SEE DETAIL 2 SHEET
A504 FOR CLARITY
MODIFY OPENING AS NECESSARY,
APPROXIMATELY 4-5 IN. ABOVE DECK.
REPAIR SURFACES AFTER MODIFYING WITH
CEMENTITOUS MATERIAL
4"
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF WALL
S.S. METAL SHROUD; SOLDER ALL SEAMS
WATERTIGHT FASTENED AND SEALED TO
SUBSTRATE, SEE DETAIL 7 / A504
PRIMARY AND
SECONDARY
SEALANT AND
BACKER ROD AT
PERIMETER
1
2
" M
IN
, T
YP
.
3
4
"
BUTYL SEALANT
APPLY SEALANT OVER TERMINATION BAR
SE
E D
ET
AIL
3, T
HIS
S
HE
ET
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
NAIL-IN CONCRETE ANCHORS WITH WASHERS
AT 12" CENTERS
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
FLASHING MEMBRANE INSTALLED UP AND OVER
TOP OF PARAPET EXTENDED BELOW NAILER AND
SECURED 12" O.C.
EXISTING COPING TO BE REMOVED TO INSTALL
FLASHING MEMBRANE AND REINSTALLED WITHOUT
DAMAGE. NEW COPINGS ONLY AT LOCATIONS
INDICATED ON THE DRAWINGS
EXISTING BLOCKING
EXISTING REGLETED RECEIVER SET BACK
AGAINST WALL, APPLY SEALANT IN REGLET BODY
AND ALUMINUM TAPE OVER REGLET
5"
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
8" M
IN
3" M
IN
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 2 PIECE SURFACE-MOUNTED 24 GA
PREFINISHED GALVANIZED COUNTERFLASHING
WITH NAIL-DRIVE ANCHORS AT 12" O.C.
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
TOOLED BEAD OF SEALANT
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
APPLY SEALANT OVER TERMINATION BAR
4" M
IN
EXTEND EXISTING STACK TO 8 MIN.
FLASHING HEIGHT. FIELD FABRICATE A
TPO FLASHING SLEEVE WITH 1 INCH HOT
AIR WELDED SEAMS HOT AIR WELD
SLEEVE TO FIELD MEMBRANE
SE
E D
ET
AIL
3, T
HIS
S
HE
ET
EXISTING CAST IRON VANDAL FLASH
HOOD, REMOVE AND REINSTALL WHERE
PRESENT
CLEAN EXISTING STACK AND WRAP WITH
ALUMINUM TAPE
TPO TARGET SHEET HOT AIR WELDED TO
FIELD MEMBRANE
TPO MEMBRANE CAP HOT AIR WELDED TO
TPO FLASHING SLEEVE
4 HAMMER-IN CONCRETE ANCHORS WITH
PLATE WASHERS
PRIME SUBSTRATE AND FLASH VENT STACK
WITH AIR/VAPOR BARRIER
CUT FIELD MEMBRANE TIGHT TO STACK
BACKER ROD AND SEALANT
2"
5"
4"
VA
RIE
S IN
H
EIG
HT
SE
E D
ET
AIL
3, T
HIS
S
HE
ET
ANGLE COVER BOARD AND CHAMFER
INSULATION TO PROVIDE A SMOOTH
TRANSITION
TROUGH FORMED AT INSULATION
LAYER. ELEVATION AT 4"
NOTE: TAPER ENDS TO FORM
TRANSITION TO ADJACENT
INSULATION ELEVATIONS.
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Roof 5, 6, 7, and 15
Details
A500
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/3/2
020
12:4
2 PM
by
Moy
, Glo
ria
File
Nam
e: p
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
A50
0 N
ew D
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 3" = 1'-0"
Existing Roofing System
Roof 5, 6, and 7
2
SCALE: 3" = 1'-0"
Existing Roofing System
Roof 15
3
SCALE: 3" = 1'-0"
New Roofing System
Roof 5,6,7, and 15
4
SCALE: 3" = 1'-0"
Drain at Concrete Deck
9
SCALE: 3" = 1'-0"
Equipment Support
NOTE: ADJUST MECHANICAL EQUIPMENT ANGLE LEGS AS REQUIRED
TO STRADDLE TRENCHES IN INSULATION WHERE REQUIRED AND
ACCOMMODATE NEW TOP OF ROOF MEMBRANE ELEVATION
5
SCALE: 3" = 1'-0"
Overflow Scupper
NOTE: FIELD MOCK UP REQUIRED
7
SCALE: 3" = 1'-0"
Parapet
8
SCALE: 3" = 1'-0"
Typical Flashing
6
SCALE: 3" = 1'-0"
Vent Stack
3A
SCALE: 3" = 1'-0"
Trough
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
SE
E D
ET
AIL
3
S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
5"
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
3" M
IN
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 2 PIECE SURFACE-MOUNTED 24 GA
PREFINISHED GALVANIZED COUNTERFLASHING
WITH NAIL-DRIVE ANCHORS AT 12" O.C.
TOOLED BEAD OF SEALANT
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
ADJACENT TO BRICK WALL LOCATIONS
SE
E D
ET
AIL
3 S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
1"
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
3" M
IN
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW SURFACE-MOUNTED 24 GA PREFINISHED
GALVANIZED COUNTERFLASHING WITH
NAIL-DRIVE ANCHORS AT 12" O.C.
TOOLED BEAD OF SEALANT, NO SEALANT ON
ANGLE ABOVE
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
5"
8" M
IN
TOOLED BEAD OF SEALANT
3" M
IN
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 2 PIECE SURFACE-MOUNTED 24 GA
PREFINISHED GALVANIZED COUNTERFLASHING
WITH NAIL-DRIVE ANCHORS AT 12" O.C.
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
SE
E D
ET
AIL
3
S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
APPLY SEALANT OVER TERMINATION BAR
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 24 GA PREFINISHED GALVANIZED
COUNTERFLASHING WITH NAIL-DRIVE
ANCHORS AT 12" O.C.
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING RECEIVER TO BE CLEANED
REMOVE AND REPLACE SEALANT AND
BACKER ROD
3" M
IN
SE
E D
ET
AIL
3
S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
APPLY SEALANT OVER TERMINATION BAR
REMOVE LOUVER AND INSTALL 24 GA. S.S. SILL
PAN WITH END DAMS AND BACK DAMS
SOLDERED WATERTIGHT. SET PAN IN BUTYL
SEALANT, DO NOT PENETRATE HORIZONTAL
SURFACE OF PAN. REINSTALL LOUVER AFTER
SILL PAN AND MEMBRANE INSTALLATION
1" END AND BACK DAM
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 24 GA S.S. (AT LOUVER ONLY) 2 PIECE
COUNTERFLASHING WITH NAIL-DRIVE
ANCHORS AT 12" O.C.
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C., APPLY SEALANT OVER
TERMINATION BAR
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
SE
E D
ET
AIL
3
S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
1
1
2
"
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
NEW 24 GA PREFINISHED GALVANIZED
COUNTERFLASHING WITH NAIL-DRIVE
ANCHORS AT 12" O.C.
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING RECEIVER TO BE CLEANED
3" M
IN
SE
E D
ET
AIL
3 S
HE
ET
A
50
0
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
APPLY SEALANT OVER TERMINATION BAR
6
1
2
"
3" M
IN
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
SLIP METAL COUNTERFLASHING, CLEAN AND
REUSE, OR REPLACE AS NEEDED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING METAL CLADDING SYSTEM
EXISTING CONCRETE STUB TO REMAIN
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
SE
E D
ET
AIL 3
S
HE
ET
A
500
FIELD MEMBRANE CLAD METAL
SEALANT AT
ALL EDGES OF
CLAD METAL
AGAINST
SUBSTRATE
(CONCEALED)
FLASHING MEMBRANE
OVER CLAD METAL
NEW COUNTERFLASHING
REINSTALL
PARAPET CAP
AND
COUNTERFLASHING
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Roof 5, 7, and 15 Details
A501
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/3/2
020
12:4
2 PM
by
Moy
, Glo
ria
File
Nam
e: p
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
A50
1 N
ew D
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 3" = 1'-0"
Concrete Wall
Roof 5 and 15
2
SCALE: 3" = 1'-0"
Masonry Wall
Roof 5 and 15
4
SCALE: 3" = 1'-0"
Concrete Wall
Roof 7
5
SCALE: 3" = 1'-0"
Door Detail
Roof 7
6SCALE: 3" = 1'-0"
Louver Detail
NOTE: INSTALL NEW BACKER ROD AND SEALANT AT
PERIMETER SEALANT JOINT BETWEEN LOUVER AND STUCCO
3
SCALE: 3" = 1'-0"
Stucco Wall
Roof 7
7SCALE: 3" = 1'-0"
Column Stub
8
SCALE: 3" = 1'-0"
Corner Detail
NOTE: FIELD MOCK UP REQUIRED
Roof 7
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
3" M
IN
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
SE
E D
ET
AIL 3
, S
HE
ET
A
500
8" M
IN
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
SLIP METAL COUNTERFLASHING, CLEAN AND
REUSE, OR REPLACE AS NEEDED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING METAL CLADDING SYSTEM
EXISTING MASONRY WALL CONSTRUCTION TO
REMAIN
APPLY SEALANT OVER TERMINATION BAR
SE
E D
ET
AIL
3
, S
HE
ET
A
50
0
REMOVE AND REPLACE EXISTING DRAIN ASSEMBLY WITH
SCUPPER RETRODRAIN BY OMG. DRAIN FASTENED TO
WOOD BLOCKING AND EQUIPMENT CURB. INSTALL SEALANT
AT THE PERIMETER OF THE DRAIN FLANGE
HOT AIR WELD TPO
FLASHING TO FIELD
MEMBRANE
TAPERED INSULATION SUMP. TRIM INSULATION
AND COVER BOARDS AT A 30 TO 45 DEGREE
ANGLE TO PROVIDE A SMOOTH TRANSITION INTO
THE DRAIN BODY
FIELD MEMBRANE TO
EXTEND TO THE WALL
OPENING, ADHERE
WITH BOND ADHESIVE
HAMMER-IN FASTENERS
WITH PLATES (FASTEN
EACH BOARD WITHIN 6
INCHES OF A SUMP
CORNER)
TPO FLASHING SHEET, EXTEND ONTO DRAIN
FLANGE, APPLY SEALANT AT LEADING EDGE
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C., APPLY SEALANT OVER
TERMINATION BAR
ELASTOMERIC SEALANT TAPE BEHIND LEADING EDGE OF
TPO FLASHING
TPO DRAIN FLASHING, HOT AIR WELDED AT PERIMETER
REMOVE EXISTING METAL CLADDING ON ALL
SIDES FOR THIS EQUIPMENT UNIT ONLY
NEW SLIP METAL COUNTERFLASHING ATTACHED TO
EXISTING EQUIPMENT SHEET METAL CAP FASTENED 12" O.C.
1
2
" COVER BOARD FASTENED 12" O.C., CHAMFER
LEADING EDGE TO PROVIDE SMOOTH TRANSITION
TPO WALL FLASHING ADHERED TO COVER BOARD,
TERMINATED ON EXISTING SUBSTRATE
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
WOOD BLOCKING FASTENED TO
CONCRETE SLAB WITH
1
4
" DIAMETER
S.S. ANCHORS AT 24" O.C.
3" M
IN
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
SE
E D
ET
AIL
3, S
HE
ET
A
50
0
6" M
IN
ADHERE TPO FIELD MEMBRANE INTO PLACE
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
SLIP METAL COUNTERFLASHING, CLEAN AND
REUSE, OR REPLACE AS NEEDED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
METAL CLADDING TO REMAIN
EXISTING MASONRY WALL CONSTRUCTION TO
REMAIN
APPLY SEALANT OVER TERMINATION BAR
SE
E D
ET
AIL
3
, S
HE
ET
A
50
0
CLAD METAL THROUGHWALL SCUPPER; ALL
SEAMS SEALAED WITH HEAT WELDED
PATCHES. FASTENED TO WALL AND WOOD
BLOCKING 12 IN. ON CENTER
WOOD BLOCKING FASTENED TO
CONCRETE SLAB WITH
1
4
" DIAMETER S.S.
ANCHORS AT 24" O.C.
SLIP METAL COUNTERFLASHING, CLEAN AND
REUSE, OR REPLACE AS NEEDED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C., APPLY SEALANT OVER
TERMINATION BAR
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING METAL CLADDING SYSTEM
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE AND SHEET METAL SCUPPER
FIELD MEMBRANE TO EXTEND TO THE END OF
WALL, ADHERE WITH BONDING ADHESIVE AT
WALL OPENING
TPO WALL FLASHING STRIP, HOT AIR WELDED
SEE DETAIL 2 SHEET A504
FOR CLARITY
4"
(5
" A
T A
RE
A 6
)
S.S. SHROUD; SOLDER ALL SEAMS
WATERTIGHT FASTENED AND SEALED TO
SUBSTRATE, SEE DETAIL 7 / A504
MODIFY OPENING
TO BE 4 IN.
ABOVE DECK
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
PRIMARY AND
SECONDARY
SEALANT AND
BACKER ROD AT
PERIMETER
1
2
" M
IN
, T
YP
.
3
4
"
TOOLED BEAD OF SEALANT ON TOP AND SIDES
BUTYL SEALANT
5"
3" M
IN
PRIME SUBSTRATE AND
TURN AIR/VAPOR BARRIER
UP BASE OF WALL
SE
E D
ET
AIL
3, S
HE
ET
A
50
0
ADHERE TPO FIELD MEMBRANE INTO PLACE
HOT AIR WELD TPO FLASHING TO TPO FIELD
MEMBRANE
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
SLIP METAL COUNTERFLASHING, CLEAN AND
REUSE, OR REPLACE AS NEEDED
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C.
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
EXISTING METAL CLADDING SYSTEM
EXISTING MASONRY WALL CONSTRUCTION TO
REMAIN
6
" M
IN
APPLY SEALANT OVER TERMINATION BAR
REMOVE EXISTING METAL CLADDING SYSTEM
AND PERIMETER ANGLES SUPPORTING DUCT
AT DRAIN UNIT ONLY. PROVIDE ADDITIONAL
SUPPORT FOR DUCT AS NECESSARY
EXISTING CIP MECHANICAL
CHASE COVER REMOVE AND
REINSTALL AS NECESSARY TO
INSTALL WALL FLASHING
TERMINATION BAR WITH
NAIL-IN CONCRETE ANCHORS
AT 8" O.C., APPLY SEALANT
OVER TERMINATION BAR
ELASTOMERIC SEALANT TAPE
BEHIND LEADING EDGE OF TPO
FLASHING
1
2
" COVER BOARD FASTENED 12"
O.C., CHAMFER LEADING EDGE
TO PROVIDE SMOOTH
TRANSITION
TPO WALL FLASHING ADHERED
TO COVER BOARD AND HEAT
WELD ONTO CLAD METAL FRAME
CUT AND REMOVE CLAD METAL
FROM EXISTING MECHANICAL
DUCT CAP, REMOVE AND
REINSTALL CAP AS NECESSARY
TO INSTALL CLAD METAL FRAME.
INSTALL SEALANT AT EDGE OF
CAP AFTER REINSTALLATION
CLAD METAL SHROUD EMBEDDED
IN SEALANT AND FASTENED INTO
COVER BOARD 12" O.C. SEE
DETAIL ABOVE
V
A
R
I
E
S
3
"
3
"
2
1
2
±
1" HEMMED EDGE
TYP. AT ALL SIDES
24 GA MEMBRANE
CLAD STEEL METAL;
ALL SEAMS PATCHED
WITH MEMBRANE FOR
WATERTIGHT
INSTALLATION
VERIFY ALL
DIMENSION IN
FIELD
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Roof 6 Details
A502
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/3/2
020
12:4
2 PM
by
Moy
, Glo
ria
File
Nam
e: p
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
A50
2 N
ew D
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
4
SCALE: 3" = 1'-0"
Baseflashing at Wall
2
SCALE: 3" = 1'-0"
Drain at Unit
NOTES: FIELD MOCK UP REQUIRED
5
SCALE: 3" = 1'-0"
Low Flashing
1
SCALE: 3" = 1'-0"
Overflow Scupper
NOTES: FIELD MOCK UP REQUIRED
6
SCALE: 3" = 1'-0"
Equipment Flashing
3
SCALE: 3" = 1'-0"
Flashing at Drain Unit (Doghouse)
NOTE : FIELD MOCK UP REQUIRED
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
5"
ADHERED TPO WALL FLASHING PRESS INTO
PLACE WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD FLASHING TO FIELD
MEMBRANE
CAST IN PLACE CONCRETE WALL TO REMAIN
8"
3"
EXISTING METAL DECK
TERMINATION BAR WITH NAIL-IN CONCRETE
ANCHORS AT 8" O.C., APPLY SEALANT OVER
TERMINATION BAR
ELASTOMERIC SEALANT TAPE BEHIND
LEADING EDGE OF TPO FLASHING
TOOLED BEAD OF SEALANT
SE
E D
ET
AIL 2, T
HIS
S
HE
ET
NEW 2 PIECE SURFACE-MOUNTED 24 GA
PREFINISHED GALVANIZED COUNTERFLASHING
WITH NAIL-DRIVE ANCHORS AT 12" O.C.
ADHERED TPO WALL FLASHING OVER
WALL. PRESS INTO PLACE WITH A HAND
ROLLER AND HOT AIR WELD LAP SEAMS
PRIME SUBSTRATE AND TURN
AIR/VAPOR BARRIER UP BASE OF
WALL
PERIMETER FASTENERS AT 12" O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO
FIELD MEMBRANE
CAST IN PLACE CONCRETE WALL TO
REMAIN
NEW 24 GA PREFINISHED GALVANIZED
CAP FASTENED AT 18 IN. O.C. STAGGERED
SIDE TO SIDE AND SLOTTED HOLES.
COPING SPLICES SHALL CONSIST OF
1
2
IN.
JOINTS WITH CONCEALED PLATES SET IN
SEALANT - 2 CONTINUOUS BEADS PER
SIDE, 1 IN. FROM EDGES AND APART. SEE
SPLICE PLATE DETAIL ON 1 / A505
PREPARE STEEL FRAMING SURFACE
AND APPLY NEW COATING, TYP.
NEW METAL DECK (REFER TO
SHEETS S100 AND S101)
EXISTING CONCRETE DECK
BASE FLASHING NOTES SIM. TO
ROOF 16
SE
E D
ET
AIL 3
, T
HIS
S
HE
ET
SE
E D
ET
AIL 3
S
HE
ET
A
500
SELF-ADHERED MEMBRANE SEPARATOR
BETWEEN WOOD AND CONCRETE
INSTALL WOOD BLOCKING SLOPE OF
1:12, FASTEN TO MASONRY WITH WOOD
TO MASONRY ANCHORS AT 2 FT. O.C.
WITH
1
4
IN. DIA. EXPANSION ANCHORS
ELASTOMERIC SEALANT TAPE AT
FASTENER LOCATIONS, TYP.
SE
E D
ET
AIL
2
, T
HIS
S
HE
ET
APPLY SEALANT TO DRAIN BODY BELOW
LEADING EDGE OF TPO FLASHING SHEET
TPO FLASHING SHEET
NEW DRAIN BODY, CLAMPING RING, BOLTS,
AND CAST IRON STRAINER AT EXISTING
DRAIN. NEW OVERFLOW DRAIN SIM. REFER
TO M DRAWINGS
CUT MEMBRANE 1 IN. FROM INSIDE OF
CLAMPING RING. THE DIAMETER OF THE
HOLE IN THE MEMBRANE MUST BE LARGER
THAN THE DIAMETER OF THE DRAIN PIPE
HOT AIR WELD TPO FLASHING TO
FIELD MEMBRANE
TAPERED INSULATION SUMP. TRIM
INSULATION AND COVER BOARDS TO
PROVIDE A SMOOTH TRANSITION INTO THE
DRAIN BODY
EXTEND VAPOR BARRIER INTO ROOF DRAIN
CUT FIELD MEMBRANE AT EDGE OF
TAPERED INSULATION SUMP
HAMMER-IN FASTENERS WITH PLATES
(FASTEN EACH BOARD WITHIN 6
INCHES OF A SUMP CORNER)
2'-0"5"
INSULATION AND COVER BOARD AT
SUMP EDGE IS 3" AND 4" AT OVERFLOW
DRAIN
EXTEND VAPOR BARRIER INTO ROOF DRAIN
5"
APPLY SEALANT TO DRAIN BODY BELOW
LEADING EDGE OF TPO FLASHING SHEET
TPO FLASHING SHEET
NEW DRAIN BODY, CLAMPING RING, BOLTS
AND CAST IRON STRAINER (REFER TO M
DRAWINGS)
CUT MEMBRANE 1 IN. FROM INSIDE OF
CLAMPING RING. THE DIAMETER OF THE
HOLE IN THE MEMBRANE MUST BE
LARGER THAN THE DIAMETER OF THE
DRAIN PIPE
CUT COVER BOARD PROVIDE A SMOOTH
TRANSITION INTO THE DRAIN BODY
HOT AIR WELD TPO FLASHING TO FIELD
MEMBRANE
FASTENERS WITH PLATES AT EDGE OF
FIELD MEMBRANE
SE
E D
ET
AIL 3
,
TH
IS
S
HE
ET
CLAD METAL FASCIA SECTION SET IN A BED
OF SEALANT AND FASTENED 6 IN. ON
CENTER STAGGERED
ANCHOR NEW BLOCKING TO SUBSTRATE
WITH STAGGERED ANCHORS 12 IN. ON
CENTER, HEIGHT TO MATCH EXISTING
STEEL ANGLE. RIP TOP BLOCK MIN SLOPE
OF 1:12
INSTALL TAPERED EDGE STRIP TO PROVIDE
SMOOTH TRANSITION
NEW METAL DECK (REFER TO
SHEETS S100 AND S101)
EXISTING STEEL ANGLE, PREPARE
AND APPLY NEW COATING
PREPARE STEEL FRAMING SURFACE
AND APPLY NEW COATING, TYP.
HOT WELDED MEMBRANE FLASHING OVER
CLAD METAL AND FIELD MEMBRANE
12
1
SE
E D
ET
AIL
3
, T
HIS
S
HE
ET
CLAD METAL SCUPPER SET IN A BED OF
SEALANT AND FASTENED 6 IN. ON CENTER
STAGGERED
HOT WELDED MEMBRANE FLASHING OVER
CLAD METAL AND FIELD MEMBRANE
CUT STEEL ANGLE, 2 IN. ABOVE DECK AND 8
IN. WIDE
SIDE OF SCUPPER AT ROOF EDGE
OPENING WITH ROOFING MEMBRANE
LAPPED OVER EDGES
RIP WOOD BLOCKING TO SLOPE TOWARDS
EDGE
SCUPPER EDGE
TYPICAL EDGE
NEW METAL DECK (REFER TO
SHEETS S100 AND S101)
TAPERED POLYISOCYANURATE
INSULATION WITH STAGGERED
JOINTS
COVER BOARD MECHANICALLY
ATTACHED
FULLY ADHERED TPO MEMBRANE
ADHERED TPO WALL FLASHING APPLY
UP AND OVER PARAPET, PRESS INTO
PLACE WITH A HAND ROLLER AND HOT
AIR WELD LAP SEAMS
PERIMETER FASTENERS AT 12 IN. O.C.
(WALL OR SLAB)
HOT AIR WELD TPO FLASHING TO TPO
FIELD MEMBRANE
CAST IN PLACE CONCRETE WALL TO
REMAIN
SCREW FASTENER WITH SEALING
WASHER
24 GA PREFINISHED GALVANIZED SLIP
METAL COUNTERFLASHING FASTENED
AT 12 IN. CENTERS
PREPARE STEEL FRAMING SURFACE
AND APPLY NEW COATING, TYP.
NEW METAL DECK (REFER TO
SHEETS S100 AND S101)
INSTALL CONT. GALVINIZED CLEAT,
FASTEN TO WOOD BLOCKING AT 12 IN.
ON CENTER
INSTALL 24 GA PREFINISHED GALVANIZED
COPING, FASTEN TO WOOD BLOCKING WITH
METAL TO WOOD FASTENERS AT 12 IN. O.C.
COPING SPLICES SHALL CONSIST OF
1
2
IN.
JOINTS WITH 8" CONCEALED SPLICE PLATES
SET IN SEALANT - 2 CONTINUOUS BEADS PER
SIDE, 1 IN. FROM EDGES AND APART. SEE
SPLICE PLATE DETAIL ON 1 / A505
INSTALL WOOD BLOCKING SLOPE OF
1:12, FASTEN TO MASONRY WITH WOOD
TO MASONRY ANCHORS AT 2 FT. O.C.
WITH
1
4
IN. DIA. EXPANSION ANCHORS
SE
E D
ET
AIL 3
, T
HIS
S
HE
ET
SELF-ADHERED MEMBRANE
SEPARATOR BETWEEN
WOOD AND CONCRETE
MULTIPLE PLY BUILT UP MEMBRANE
GRAVEL
LIGHTWEIGHT INSULATION FILL
METAL DECK
COVER BOARD ADHERED W/
ADHESIVE
FULLY ADHERED TPO MEMBRANE
TWO LAYERS OF 2 INCH
POLYISOCYANURATE INSULATION SET
IN LOW RISE FOAM ADHESIVE
SELF-ADHERED VAPOR
RETARDER/TEMPORARY ROOFING
AND PRIMER
TAPERED POLYISOCYANURATE
INSULATION SET IN LOW RISE FOAM
ADHESIVE
COVER BOARD MECHANICALLY
FASTENED
EXISTING METAL DECK
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Roof 10 and 16 Details
A503
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.Pl
otte
d: 1
/3/2
020
12:4
2 PM
by
Moy
, Glo
ria
File
Nam
e: p
:\201
9\20
19.3
xxx\
2019
.319
7.0
- lan
e co
unty
adu
lt co
rrec
tions
mai
n ja
il (r
cr)\D
raw
ings
\She
ets\
A50
3 D
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
7
SCALE: 3" = 1'-0"
Wall Detail
Roof10
9
SCALE: 3" = 1'-0"
Dividing Wall Detail
Roof 16
5
SCALE: 3" = 1'-0"
Drain Detail (Overflow Drain at Area 10 - Similar)
Roof10
6
SCALE: 3" = 1'-0"
Drain Detail
Roof 16
4
SCALE: 3" = 1'-0"
Edge Detail
Roof 16
3
SCALE: 3" = 1'-0"
New Roofing System
Roof 16
8
SCALE: 3" = 1'-0"
Parapet Detail
Roof 16
1
SCALE: 3" = 1'-0"
Existing Roofing System
Roof 10 and 16
2
SCALE: 3" = 1'-0"
New Roofing System
Roof 10
NOTE : FIELD MOCK UP REQUIRED
NOTE : FIELD MOCK UP REQUIREDNOTE : FIELD MOCK UP REQUIRED
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
FIELD MEMBRANE CLAD SHEET METAL MEMBRANE CLAD EDGE METAL FLASHING MEMBRANE
FLASHING MEMBRANE
HEMMED EDGE
AT 45 DEGREES,
AND APPLY
SEALANT
SEALANT BETWEEN
METAL AND WALL
SURFACE SEALANT BETWEEN METALS
24 GA GALVANIZED
SHEET METAL SADDLE,
ALL SEAMS SOLDERED
WATERTIGHT OR
MEMBRANE CLAD
SHEET METAL
SHEET METAL COPING
HEMMED EDGE
AT 45 DEGREES,
AND APPLY
SEALANT
CLAD METAL THROUGHWALL
SCUPPER; ALL SEAMS SEALAED
WITH HEAT WELDED PATCHES.
METAL CLADDING AND
COUNTERFLASHING NOT
SHOWN FOR CLARITY
HOT AIR WELD TPO FLASHING TO
TPO FIELD MEMBRANE AND SHEET
METAL SCUPPER
FIELD MEMBRANE
ADHERED TPO WALL FLASHING
OVER WALL. PRESS INTO PLACE
WITH A HAND ROLLER AND HOT AIR
WELD LAP SEAMS
FIELD MEMBRANE CLAD SHEET METAL MEMBRANE CLAD EDGE METAL FLASHING MEMBRANE FLASHING MEMBRANE METAL COPING
HEMMED EDGE
AT 45 DEGREES,
AND APPLY
SEALANT
SEALANT BETWEEN
METAL AND WALL
SURFACE SEALANT BETWEEN METALS
HEMMED EDGE
AT 45 DEGREES,
AND APPLY
SEALANT
24 GA GALVANIZED SHEET METAL
SADDLE, ALL SEAMS SOLDERED
WATERTIGHT
24 GA PREFINISHED GALVANIZED
COPING
APPLY 2 BEADS OF BUTYL SEALANT
AT ALL IN LAPS, TYP.
24 GA PREFINISHED GALVANIZED
SHEET METAL SADDLE, ALL SEAMS
SOLDERED WATERTIGHT.
24 GA PREFINISHED GALVANIZED
COPING
45 DEGREE HEMMED EDGE AND
APPLY SEALANT
APPLY 2 BEADS OF BUTYL SEALANT
AT ALL IN LAPS, TYP.
APPLY 1 "BY 1" SEALANT FILLET AT
TRANSITION
V
A
R
I
E
S
3
"
3
"
2
1
2
±
1" HEMMED EDGE
TYP. AT ALL SIDES
ONE COMPONENT 22
GA STAINLESS STEEL
SHROUD SOLDER ALL
SEAMS WATERTIGHT
3
4
" HEMMED EDGE
BENT AT 45
DEGREES
24 GA PREFINISHED GALVANIZED
SHEET METAL SADDLE, ALL SEAMS
SOLDERED WATERTIGHT.
24 GA PREFINISHED GALVANIZED
COPING
45 DEGREE HEMMED EDGE AND
APPLY SEALANT
APPLY 2 BEADS OF BUTYL SEALANT
AT ALL IN LAPS, TYP.
APPLY 1 "BY 1" SEALANT FILLET AT
TRANSITION
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Sheet Metal Details
A504
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 12
:43
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\A
504
Shee
t Met
alD
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
3
SCALE: NTS
Roof 16 Detail
2
SCALE: NTS
Throughwall Scupper
1
SCALE: NTS
Roof 16 Detail
4
SCALE: NTS
Saddle Detail
5
SCALE: NTS
Saddle Detail
7
SCALE: 3" = 1'-0"
Scupper Shroud
6SCALE: 3" = 1'-0"
Saddle Detail
NOTE : FIELD MOCK UP REQUIRED NOTE : FIELD MOCK UP REQUIRED
NOTE : FIELD MOCK UP REQUIRED
NOTE : FIELD MOCK UP REQUIRED NOTE : FIELD MOCK UP REQUIRED
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
4
"
4
"
M
I
N
.
2
"
1
"
NOTCH IN HEMMED
EDGE FOR
CONSTRUCTABILITY
2 BEADS OF SEALANT
WITHIN LAP
NOTCH IN HEMMED EDGE
FOR CONSTRUCTABILITY,
SEE DET. 3A THIS SHEET.
TYPICAL TELESCOPING JOINT AT NEW COUNTERFLASHING
4
"
2
"
1
"
1
"
V
IF
6
"
M
I
N
V
I
F
6
"
M
I
N
V
I
F
1/2 TO 1 IN.
GREATER THAN 1 IN.
W/2
W/2
1/4 IN.
1/4 TO 1/2 IN.
SEALANT CHART
1/4 IN.
1/4 IN.
DW
8
"
C
O
N
C
E
A
L
E
D
S
P
L
I
C
E
P
L
A
T
E
1
"
2
"
1
"
2
"
1
4
"
G
A
P
2 BEADS OF SEALANT
REGLET BEND SHOWN CUT
BACK FOR CLARITY; TRIM AS
REQUIRED AT LAP
ONE COMPONENT 24 GA.
PREFINISHED GALVANIZED
(U.N.O.) COUNTERFLASHING; ALL
SEAMS SOLDERED WATERTIGHT.
VERIFY DIMENSIONS AND
PROFILES IN FIELD.
6
"
M
I
N
.
(
V
I
F
)
6
"
M
I
N
.
(
V
I
F
)
V
IF
ONE COMPONENT 24 GA.
PREFINISHED GALVANIZED
(U.N.O.) COUNTERFLASHING; ALL
SEAMS SOLDERED WATERTIGHT.
VERIFY DIMENSIONS AND
PROFILES IN FIELD.
2 BEADS OF SEALANT
WITHIN EACH LAP
NEW COPING ON ROOF 15 AND 16
Wiss, Janney, Elstner Associates, Inc.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTSMATERIALS SCIENTISTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
GM/SEH
January 13, 2020
As Noted
Checked By
Sheet Metal Details
A505
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 12
:43
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\A
505
Shee
t Met
alD
etai
ls.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 3" = 1'-0"
Typical Details
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
108'-2"±
76
'-6
" ±
16
'-0
"±
NE
W M
ET
AL
D
EC
K A
BO
VE
AR
EA
O
F W
OR
K
T
S
3
x
3
x
.
2
5
T
S
3
x
3
x
.
2
5
T
S
3
x
3
x
.
2
5
T
S
3
x
3
x
.
2
5
T
S
3
x
3
x
.
2
5
T
S
3
x
3
x
.
2
5
5"
10
"
5"
10
"
TOP AND BOTTOM BRIDGING
TS 3x3x.25
TS 3x3x.25
59
'-0
"±
EX
IS
TIN
G S
EC
UR
IT
Y S
CR
EE
N P
AN
EL
S A
BO
VE
NO
T IN
S
CO
PE
TS 3x3x.25
CONT. L5x3x.25 (ABOVE)
TOP BRIDGING
EXISTING 10"
CONCRETE
WALL BELOW
EXISTING SECURITY
SCREEN PANELS, TYP.
TOP AND BOTTOM BRIDGING
TOP AND BOTTOM BRIDGING
TOP BRIDGING
TOP AND BOTTOM BRIDGING
TOP BRIDGING
40 LH 10 JOIST
TS 3x3x.25 (ABOVE)
TOP BRIDGING
PERIMETER TUBE
STEEL INCLUDED IN
PAINTING SCOPE OF
WORK, TYP.
TUBE STEEL AND TOP
CHORDS AT JOISTS
INCLUDED IN PAINTING
SCOPE OF WORK, TYP.
HORIZONTAL TUBE STEEL
INCLUDED IN PAINTING
SCOPE OF WORK, TYP.
DIAGONAL TUBE STEEL
INCLUDED IN PAINTING
SCOPE OF WORK, TYP.
REMOVE EXISTING
METAL DECK
CLEAN TUBE STEEL
AND TOP CHORD
COMPONENTS OF
OPEN WEB STEEL
JOIST PER 3/S101
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
BRS
January 13, 2020
As Noted
BSC/JTS
Roof 16 Framing Plan &
General Notes
S100
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/3
/202
0 11
:46
PM b
y M
oy, G
loria
Fi
le N
ame:
p:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\S1
00 R
oof 1
6 Fr
amin
gPl
an.d
wg
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
STRUCTURAL NOTES
SCOPE OF WORK INVOLVES THE FOLLOWING:
1. REPLACEMENT OF EXISTING CORRODED METAL DECK. METAL DECK CONNECTIONS ARE DESIGNED TO RESIST CURRENT WIND
SPEEDS AS DEFINED IN THE OREGON SPECIALTY STRUCTURAL CODE (OSSC) FOR COMPONENTS AND CLADDING BECAUSE
EXISTING CONNECTION IS UNKNOWN.
2. CLEANING AND PAINTING HORIZONTAL STEEL TUBE BRACES, TOP CHORD OF OPEN WEB STEEL JOISTS, AND OTHER
MISCELLANEOUS STEEL THAT IS PART OF THE ROOF SYSTEM IN AREA OF WORK. PAINTING IS INTENDED TO RESTORE
CORROSION PROTECTION TO STEEL MEMBERS.
CODES
THIS PROJECT WAS DESIGNED IN ACCORDANCE WITH THE FOLLOWING CODES:
1. THE OREGON STRUCTURAL SPECIALTY CODE 2019 (OSSC).
DESIGN LOADS
1. LIVE LOADS: PRINCIPAL DESIGN LIVE LOADS ARE SHOWN BELOW. ALL LIVE LOADS WETHER LISTED BELOW, OR NOT, ARE
BASED UPON THE REQUIREMENTS OF THE BUILDING CODE CITED IN THE STRUCTURAL NOTES ABOVE UNLESS LOADS ARE
GREATER.
· ROOF LIVE LOADS: 20 PSF.
· SNOW LOADS: 20 PSF WITH 5 PSF RAIN ON SNOW SURCHARGE.
2. LIVE LOAD REDUCTION MAY BE CONSIDERED AS ALLOWED UNDER THE REFERENCED BUILDING CODE.
3. DEAD LOADS INCLUDE THE SELF-WEIGHT OF THE STRUCTURAL AND ARCHITECTURAL ELEMENTS. ANY CHANGES FROM THE
CONSTRUCTION MATERIALS FROM THOSE SHOWN ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE
REPORTED BY THE GENERAL CONTRACTOR TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF THE LOAD CARRYING
CAPACITY OF THE STRUCTURE.
4. WIND DESIGN DATA:
· WIND SPEED: 130 MPH, ULTIMATE RISK CATEGORY III (Vasd = 101 MPH) (EUGENE, OR).
· EXPOSURE CATEGORY B.
· INTERNAL PRESSURE COEFFICIENT: ±0.00 (OPEN BUILDING).
STEEL ROOF DECK
1. INSTALLATION, STORAGE AND DELIVERY PER STEEL DECK INSTITUTE SDI MANUAL OF CONSTRUCTION WITH STEEL DECK
EDITION 3.
2. ROOF DECK: FABRICATE PANELS, WITHOUT TOP-FLANGE STIFFENING GROOVES, TO COMPLY WITH SDI SPECIFICATIONS AND
COMMENTARY FOR STEEL ROOF DECK, IN SDI PUBLICATION No. 31, AND WITH THE FOLLOWING:
· GALVANIZED-STEEL SHEET: ASTM A653/A653 M, STRUCTURAL STEEL (SS), G90 (Z275) ZINC COATING.
· PROFILE DEPTH: 1
1
2
INCH TYPE B (WIDE RIB) PROFILE.
· PANEL WIDTHS: 36 INCHES.
· 20 GAUGE.
· LIGHTLY BRUSH BLAST GALVANIZING TO REMOVE PASSIVATING LAYER AND PROVIDE TEXTURED SURFACE FOR PRIMER.
SHOP PRIME UNDERSIDE OF DECK TO PROVIDE APPROPRIATE SURFACE FOR FIELD APPLIED COATINGS. PRIMER TO BE
COMPATIBLE WITH GALVANIZING AND PROVIDED METAL DECK COATINGS BELOW.
· DECK SHALL HAVE MINIMUM THREE SPANS CONTINUOUS. END LAP MINIMUM OF 2 INCHES CENTERED AT SUPPORTS.
FASTENERS
FOR METAL DECK
1. TO STRUCTURAL SUPPORTS:
· SIMPSON STRONG-TIE STRONG DRIVE XL
1
4
"x1
1
4
" WITH QUICK GUARD
®
COATING OR APPROVED EQUAL.
2. SIDE-LAP FASTENERS:
· SIMPSON STRONG-TIE STRONG DRIVE X #10-16x1" SELF-DRILLING SCREW WITH QUICK GUARD ® COATING.
· INSTALL LAP SCREWS AT 12 INCHES ON CENTER.
STEEL FINISH AND REPAIR PAINT
1. MISCELLANEOUS STEEL: USE ONE OF THE FOLLOWING SYSTEMS OR APPROVED EQUAL:
A. CARBOLINE COMPANY
· PRIMER: CARBOCRYLIC 3358.
· FINISH COAT: CARBOCRYLIC 3359.
B. PITTSBURGH PAINTS, PPG ARCHITECTURAL FINISHES, INC.
· PRIMER: SPEEDHIDE 6-212.
· FINISH COAT: PITT-TECH 90-374.
C. SHERWIN WILLIAMS
· PRIMER: PRO-CRYL UNIVERSAL PRIMER.
· FINISH COAT: SHER-CRYL HPA HIGH PERFORMANCE ACRYLIC, SEMI-GLOSS.
2. METAL DECK UNDERSIDE: USE ONE OF THE FOLLOWING SYSTEMS OR APPROVED EQUAL:
A. CARBOLINE COMPANY
· FINISH COAT: CARBOCRYLIC 3359.
B. PITTSBURGH PAINTS, PPG ARCHITECTURAL FINISHES, INC.
· FINISH COAT: PITT-TECH 90-374.
C. SHERWIN WILLIAMS
· FINISH COAT: SHER-CRYL HPA HIGH PERFORMANCE ACRYLIC, SEMI-GLOSS.
3. COLOR TO MATCH EXISTING AND SUBMIT SAMPLE TO BE APPROVED BY OWNER AND ARCHITECT/ENGINEER. PREPARE AND
APPLY MATERIALS ACCORDING TO COATING MANUFACTURER'S WRITTEN INSTRUCTIONS, AT RECOMMENDED RATES AND
COVERAGES.
4. REPRESENTATIVE COATING MOCKUP (100 SQ FT AREA) AND MANUFACTURER'S RECOMMENDED ADHESION TESTING TO BE
PERFORMED BY CONTRACTOR.
P1SCALE: NOT TO SCALE
EXISTING STRUCTURE PHOTO
1
SCALE: 1/8" = 1'-0"
ROOF 16 FRAMING PLAN
S100
P1
S101
1
S101
2
KP
SCALE: 1/64" = 1'-0"
KEY PLAN
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
NEW ROOFING AND INSULATION
PER ARCHITECTURAL SHEETS
NEW METAL DECK; PREPARE,
PRIME, AND PAINT TO MATCH
EXISTING
PREPARE, PRIME, AND PAINT
EXISTING TUBE STEEL AND
TOP CHORDS OF STEEL
JOISTS TO MATCH EXISTING,
TYP.
NEW SELF-DRILLING SCREW. FASTEN
DECK TO STRUCTURAL SUPPORTS
USING
36
4
PATTERN, TYP. SIDE LAP
FASTENERS PER NOTES ON S100
5'-0", TYP.
NEW
PREPARE, PRIME, AND PAINT
EXISTING PERIMETER TUBE
STEEL BRACES TO MATCH
EXISTING, TYP.
PREPARE, PRIME, AND PAINT
EXISTING DIAGONAL TUBE
STEEL BRACES TO MATCH
EXISTING, TYP.
PREPARE, PRIME, AND
PAINT EXISTING TUBE
STEEL AND TOP CHORDS
OF STEEL JOISTS TO
MATCH EXISTING, TYP.
EXISTING SECURITY SCREEN, TYP.
EXISTING 40 LH 10 JOIST, TYP.
EXISTING TS 3x3x.25 DIAGONAL BRACE, TYP.
EXISTING TS 3x3x.25 BOTTOM BRIDGING, TYP.
EXISTING TS 3x3x.25 TOP BRIDGING , TYP.
EXISTING CONCRETE
WALL
EXISTING TS 3x3x.25
5'-0", TYP.
2'-6" 2'-6"
453.05'
T.O. JOIST
EXISTING CONTINUOUS L5x3x.25
NOTE:
EXISTING SECURITY SCREEN NOT IN SCOPE.
EXISTING TS 3x3x.25 TOP BRIDGING , TYP.
EXISTING SECURITY SCREEN PANELS, TYP.
NEW METAL DECK
NEW ROOFING AND INSULATION
PER ARCHITECTURAL SHEETS
453.05'
T.O. JOIST
NEW SELF-DRILLING SCREW. FASTEN DECK TO
ANGLE AT 12" O.C. ALONG PERIMETER EDGE, TYP.
NOTE:
PREPARE, PRIME, AND PAINT ALL STRUCTURAL TUBE
STEEL INCLUDING ALL PERIMETER, HORIZONTAL, AND
DIAGONAL TUBE BRACES THAT ARE DIRECTLY BELOW
UNDERSIDE OF METAL DECK PER MANUFACTURER'S
RECOMMENDATIONS IN AREA OF WORK.
AREA OF WORK
EXISTING TS 3x3x.25 BOTTOM
BRIDGING , TYP.
EXISTING 40 LH 10 JOIST
EXISTING TS 3x3x.25
(IN SCOPE OF
PAINTING WORK)
EXISTING TS 3x3x.25
HORIZONTAL BRACE AT
UNDERSIDE OF METAL DECK
(IN SCOPE OF PAINTING WORK)
REMOVE EXISTING ROOFING AND
LIGHT WEIGHT CONCRETE
REMOVE EXISTING 20 GAUGE
METAL DECK
MECHANICALLY CLEAN EXISTING
TUBE STEEL AND EXISTING TOP
CHORD OF OPEN WEB STEEL
JOIST TO SSPC-3 MINIMUM TO
REMOVE CORROSION AND
PROVIDE CLEAN WHITE STEEL
SURFACE, TYP.
5'-0", TYP.
EXISTING
MECHANICALLY CLEAN EXISTING
TUBE STEEL AND EXISTING TOP
CHORD OF OPEN WEB STEEL
JOIST TO SSPC-3 MINIMUM TO
REMOVE CORROSION AND
PROVIDE CLEAN WHITE STEEL
SURFACE, TYP.
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
Lane County
County Administration
Department Division of
Operations
125 East 8th Avenue
Eugene, Oregon 97401
2019.3197.0
BRS
January 13, 2020
As Noted
BSC/JTS
Roof 16 Structural Details
S101
1
A
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B
C
D
E
F
A
B
C
D
E
F
Project
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
© C
opyr
ight
201
9. A
ll rig
hts r
eser
ved.
No
part
of th
is d
ocum
ent m
ay b
e re
prod
uced
in a
ny fo
rm o
r by
any
mea
ns w
ithou
tpe
rmis
sion
from
Wis
s, Ja
nney
, Els
tner
Ass
ocia
tes,
Inc.
(WJE
). W
JE d
iscl
aim
s any
resp
onsi
bilit
y fo
r its
una
utho
rized
use
.
Plot
ted:
1/4
/202
0 1:
11 P
M b
y M
oy, G
loria
Fi
le N
ame:
P:\2
019\
2019
.3xx
x\20
19.3
197.
0 - l
ane
coun
ty a
dult
corr
ectio
ns m
ain
jail
(rcr
)\Dra
win
gs\S
heet
s\S1
01 S
truct
ural
Det
ails
.dw
g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
Consultants
Client
R
E
L
E
A
S
E
D
F
O
R
B
I
D
S
1
SCALE: 1" = 1'-0"
TYPICAL SECTION AT SECURITY SCREEN
2
SCALE: 1" = 1'-0"
SECTION AT METAL DECK TO SECURITY SCREEN TRANSITION
3
SCALE: 3" = 1'-0"
SECTION AT METAL DECK
S101
3
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
WJE Engineers & Architects, P.C.
960 South Harney Street
Seattle, Washington 98108
206.622.1441 tel | 206.622.0701 fax
www.wje.com
ENGINEERSARCHITECTS
Headquarters & Laboratories : Northbrook, IllinoisAtlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | DetroitHonolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
LCAC Roofing System
Replacement Phase 1
101 West 5th Avenue
Eugene, Oregon 97401