draft water resources operating budgets - murfreesboro, tn
TRANSCRIPT
. . . creating a better quality of life
Fiscal Year 2017-2018 Draft
Water Resources Operating Budgets
Water Resources Board
John Sant Amour, Jr., Chairman Madelyn Scales Harris, Council Member Dr. Alphonse Carter, Jr. Sandra Trail Kathy Moore Nobles Ron Crabtree Brian Kidd
City Council
Shane McFarland, Mayor Madelyn Scales Harris, Vice Mayor Rick LaLance Eddie Smotherman Bill Shacklett Kirt Wade
Water Resources Staff
Darren Gore, Director
Doug Swann, Assistant Director of Finance and Administration
Valerie Smith, Assistant Director of Engineering and Compliance
Steve Tate, Effective Utility Management Coordinator
Alan Cranford, Drinking Water Plant Manager
John Strickland, Water Resource Recovery Plant Manager
Donald Hughes, Distribution Operations Manager
Jimmy Stacey, Collection Operations Manager
Sharon Seibert, Customer Service Manager
City Administration
Rob Lyons, City Manager
Jim Crumley, Assistant City Manager
Jennifer Moody, Assistant City Manager
Craig Tindall, City Attorney
Melissa Wright, City Recorder/Finance Director
Erin Tucker, Assistant. Finance Director
3
About the Cover - “Water Resources – One Water”
The concept of “one water” has been around for several years in the water and wastewater industry. As a general rule, the industry has kept drinking water and wastewater separate. Now, due to water shortages in some areas of North America and throughout the world, we’ve added repurified water (e.g., reuse or reclaimed water) to the mix. Stormwater has also become a more focal target as rainfall hits our paving and rooftops and generates significant runoff volume into our streams and rivers. The Water and Sewer Department is changing our entire approach to water use in the City; considering it a single resource – or One Water. We are therefore changing our Department name to Murfreesboro Water Resources.
The Murfreesboro Water Resources Department was recently recognized as a Water Resources Utility of the Future Today. As a Utility of the Future, MWRD must be “change-ready” and “rebrand” both our role and the products we produce. We are One Community that must make full use of our One Water. MWRD looks forward to the challenges facing our community as they are seen as opportunities to lead and advance the culture into a Right Water for Right Use mentality. As part of this rebranding, the Sinking Creek Wastewater Plant will be renamed the Stones River Water Resource Reclamation Facility (WRRF).
5
TABLE OF CONTENTS
BUDGET MESSAGE .............................................................................................. 7
COMMUNITY PROFILE ....................................................................................... 13
Overview ................................................................................................................................... 13
City Government ....................................................................................................................... 14
City of Murfreesboro Organizational Chart .............................................................................. 15
BUDGET GUIDE ................................................................................................. 17
WATER, SEWER AND STORMWATER BUDGET HIGHLIGHTS ............................... 21
Strong and Sustainable Economic and Financial Health ........................................................... 21
Excellent Services with a Focus on Customer Service .............................................................. 21
Engaging our Community ......................................................................................................... 21
FY 2017 Department Accomplishments ................................................................................... 22
FY 2018 Department Goals ....................................................................................................... 23
Organizational Structure ........................................................................................................... 25
EFFECTIVE UTILITY MANAGEMENT .................................................................... 27
BENCHMARKING ............................................................................................... 31
Financial Viability ...................................................................................................................... 31
Staffing Levels ........................................................................................................................... 32
Customer Satisfaction ............................................................................................................... 32
Infrastructure Stability .............................................................................................................. 34
Employee and Leadership Development .................................................................................. 35
Community Sustainability ......................................................................................................... 36
WATER RESOURCES BUDGET SUMMARY .......................................................... 37
Water Resources Revenue Summary ....................................................................................... 39
Water Resources Expense Summary ........................................................................................ 40
REVENUE ITEMIZATION ..................................................................................... 43
Water Revenue ......................................................................................................................... 45
Sewer Revenue ......................................................................................................................... 46
Repurified Water Revenue ....................................................................................................... 47
Water taps / Sewer taps (System Development Charges) ....................................................... 48
6
Special Sewer Assessment Fees ................................................................................................ 49
FY18 Proposed Rate Schedule .................................................................................................. 50 Draft Ordinance .................................................................................................................................. 52 Bill Amount for Selected Residential Monthly Consumption .............................................................. 55 Rate Affordability ............................................................................................................................... 55 Rates, Fees and Charges Objectives ................................................................................................... 56
DIVISION NARRATIVES – ACCOMPLISHMENTS AND GOALS ............................... 59
Department Summary .............................................................................................................. 59
Administration & Customer Service ......................................................................................... 61
Engineering ............................................................................................................................... 65
Operations and Maintenance ................................................................................................... 69
Drinking Water Treatment Plant .............................................................................................. 73
Water Resource Recovery Facility ............................................................................................ 77
DEBT SERVICE (CAPITAL OUTLAY) ...................................................................... 83
RATE FUNDED CAPITAL EXPENDITURES ............................................................. 87
WORKING CAPITAL RESERVES ........................................................................... 89
STORMWATER .................................................................................................. 93
PROPOSED BUDGET STORMWATER ......................................................................................... 96
CAPITAL IMPROVEMENTS – STORMWATER ............................................................................. 97
APPENDICES ...................................................................................................... 99
SYSTEM INFRASTRUCTURE REPORT 4/30/17 ........................................................................... 99
FY18 RATE-FUNDED CAPITAL DETAILS .................................................................................... 101
DETAILED BUDGET ITEMIZATION............................................................................................ 105
7
BUDGET MESSAGE
May 10, 2017 Honorable Mayor and Members of the City Council and Water Resource Board, RE: Draft 2017-18 (FY18) Budget I submit to you the 2017-2018 (FY18) Draft Budget for review and consideration. It is presented in the same format that the City Budget has been prepared. As the City budget is amended so will the Water Resource and Stormwater budgets. The multiple accomplishments of the Murfreesboro Water Resource Department (MWRD) for FY17 are detailed on page 22 of this document. The Department’s highlighted or most significant accomplishments for FY17 are associated with completing the construction of the Broad St. pump station near International Paper, completing the Advanced Metering Infrastructure (AMI) implementation, continued construction of the Phase 4D Sinking Creek Water Resource Recovery facility, installing three (3) biosolids presses at the Sinking Creek plant and initiating a pilot study to generate Class “A” biosolids using lime pasteurization (creating a commodity fertilizer in lieu of a landfilled waste product). The Department’s FY18 goals are detailed on page 23. The most significant ongoing projects by the Department are the anticipated completion of the Sinking Creek Water Resource Recovery Facility, expanding the plant from a rated 16 million gallons per day (MGD) to 24 MGD. MWRD also anticipates completing its Water Resources Integration Plan (WRIP) that complements the City’s Comprehensive Plan; ensuring proper water resources and infrastructure are in place for supporting the vision for growth in Murfreesboro’s Urban Growth Boundary (UGB). Completion of pumping station #13 on DeJarnette Lane is anticipated in the upcoming year. Also, the Department expects to initiate a Waste Load Allocation (WLA) model in conjunction with development of a new National Pollutant Discharge Elimination System (NPDES) permit rationale. Customer Service renovations are planned to occur in FY18 as well as a more intentional approach to have customers participate in our “Help 2 Others” (H2O) to help supplement low income customers’ ability to pay their water and sewer bills.
8
The water resources FY18 draft budget is balanced and is not expected to deviate significantly from the overall revenue and expense total of $51,164,000. This amount is a $1,074,500 over the FY17 budget and $534,000 under FY17 projected revenues.
The $1,074,500 increase in budget can be attributed to the following:
1) An adjustment in the rate design as well as an anticipated reduction in sewer commodity revenue
due to General Mills / Yoplait land applying approximately 550,000 gallons per day on the Indian Hills Golf Course. The combination of the rate design increasing revenue and the aforementioned revenue decrease results in an estimated net increase of $360,000. Chart 1 identifies those components that make up the increase and shortfall anticipated to yield a net increase of $360,000 in revenue
2) The tap revenue has been increased by $700,000 for FY18 due to anticipated growth and connections made to the Department’s sewer system. Tap revenue is simply being adjusted above what was budgeted for FY17. Tap revenue is a direct corollary to the level of development that occurs within MWRD’s service area. All tap revenue is expensed to the Department’s working capital reserves to fund future capacity projects or major repair and replacement projects.
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
FY18 BUDGET
TAP REVENUE $6,700,000
INTEREST INCOMEOTHER INVEST.
$55,000
TOTAL OPERATINGREVENUES
$44,409,000
Total Revenues, $51.16M
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
FY18BUDGET
TRANSFERS TORESERVES
$10,436,754
DEBT SERVICE $13,398,513
CAPITALEXPENDITURES
$5,928,620
TOTAL OPERATINGEXPENDITURES
$21,400,113
Total Expenses, $51.16M
9
$1,766,254 of sinking funds are being earmarked to assign the excess revenue for future construction or repair and replacement. The sinking funds identified below have been assigned rate revenue since FY15. The total FY18 earmarked amounts and FY15-17 “banked” amounts are as tabulated below:
FY18 Budget FY15-17 Budget 1. Water Plant Membrane Replace (Funding Complete) $ - $800,000 2. Lift Station Replacement (Ongoing) $250,000 $910,000 3. Biosolids Storage & Processing Equipment $500,000 $1,300,000 4. NE Regional P.S. & FM (10-yrs for $10.0M) $890,000 $1,500,000 5. Walter Hill Dam Remediation/Rehabilitation $125,000 $ -
The sinking funds will be sustained until such time that the entire anticipated debt service hits in the first quarter of 2018 and potentially eliminates the opportunity to continue supporting sinking funds for cash funded projects. The use of sinking funds reduces the need to incur debt thereby alleviating the need for future rate increases. Based on the FY15 Cost of Service Study (COSS) and FY20 Pro Forma developed by Jackson Thornton Financial Consultants, the following chart identifies the revenue deficit projected for the water resources enterprise funds as it relates to the over-recovery that was experienced in FY15.
SewerRevenue
fromReduction in
Min.Allowance or
Raise Min.Bill
SewerRevenue
from NewGrowth
SewerRevenue
fromCommodity
SalesIncrease
SewerEnhancedRevenuefrom AMI
SewerCommodity
Revenue Lost
WaterRevenue
fromReduction in
Min.Allowance orRaise in Min.
Bill
WaterRevenue
from NewGrowth
WaterRevenue
fromCommodity
SalesIncrease
WaterEnhancedRevenuefrom AMI
FY18 $231,369.82 $235,373.50 $0.00 $540,288.21 (1,214,006.0 $207,009.19 $0.00 $0.00 $360,192.14
($1,400,000.00)
($1,200,000.00)
($1,000,000.00)
($800,000.00)
($600,000.00)
($400,000.00)
($200,000.00)
$0.00
$200,000.00
$400,000.00
$600,000.00
$800,000.00
FY18 Revenue Increase by Source w/Anticipated Rate Design
10
Chart 2: Historical COS Studies and FY20 Pro Forma Revenue Requirements
Table 1 itemizes the projects that will ultimately equal an approximate annual debt service of $3.0 million dollars. Approximately $2.13M of that annual debt service payment is built into the Department’s FY18 budget; based on the completion of the Southwest regional pumping station, force main, and Sinking Creek Headworks projects, and 85% completion of the Sinking Creek Plant Expansion Phase 4D.
Table 1: Water Resources Department Debt Funded CIP (FY14-18)
Project Funding Source
Total Estimated Project Cost
Principal Forgiveness
Total Estimated Loan
Southwest Regional Pump Station SRF $7.3 M $2.47 M $4.83 M
Southwest Regional Force Main SRF $8.3 M $400k $7.9M
SCWWTP Headworks SRF $7.8 M $0 $7.8 M
SCWWTP Plant Expansion SRF $30.5M $0 $30.5M
Engineering & Inspection SRF $1.3M $0 $1.3M
TOTAL $55.2M $2.87M $52.33M
A rate structure change is recommended for FY18. Since July 2008, a rate strategy has been implemented to reduce the consumption allowance for a minimum bill over multiple years. In FY14, the minimum monthly allowance for 5/8 inch meters was reduced to a zero minimum allowance per month. In FY16, customers with a 5/8 inch meter (primarily residential) were increased by $0.50 on the sanitary sewer minimum monthly bill. Approximately 96% of MWRD’s customers have 5/8” meters. In FY18, staff is recommending no rate increase for customers with 5/8 inch meters. With no rate increase, the
11
Department maintains AWWA’s affordability index, or 4% of a very low income earner as defined by the Department of Housing and Urban Development. The proposed FY18 rate design also reduces the minimum monthly allowance for all meter sizes one (1”) inch and greater by one hundred (100%) percent. FY18 completes the reduction of all allowances for meters sizes one (1”) inch and greater. The minimum monthly monetary charges for all meter sizes remain the same. Table 2 provides the average monthly dollar increase for each size meter one (1”) inch and greater.
TABLE 2: Estimated FY16-20 Revenue Generated based on Average Monthly Bills by Meter Size
Fiscal Year Estimated ↑
Revenue
Monthly Rate Increase for
5/8” Residential
Avg Monthly Increase for 1” &
1 1/2” Meters
Avg Monthly Increase for 2”
& 3” Meters
Avg Monthly Increase for
4” & 6” Meters
July 1, 2015 (FY16) $1,153,676 $0.50 $6.39 $29.07 $184.78
July 1, 2016 (FY17) $1,304,951 $0.00 $6.39 $29.07 $184.78
July 1, 2017 (FY18) $360,227 $0.00 $6.39 $29.07 $184.78
July 1, 2018 (FY19) ($978,632) $0.00 $0.00 $0.00 $0.00
July 1, 2019 (FY20) ($978,632) $0.00 $0.00 $0.00 $0.00
5-yr Total $860,453 5-yr Pro Forma Requirement $3,180,495
The water and sewer rate has been changed to $ per 1,000 gallons instead of $ per 100 cubic feet. Since all allowances are being eliminated as part of the FY18 proposed rate ordinance, the 90 cents per 100 cubic feet Operation and Maintenance Fee can be incorporated into the sewer rate. The water rate is recommended at $3.66 per 1,000 gallons ($0.00366 per gallon) and the sewer rate is recommended at $5.67 per 1,000 gallons ($.00567 per gallon). The average monthly bill for an MWRD customer that uses 5,200 gallons per month for water and 4,800 gallons per month of sewer will remain the same, or $66.70 per month.
There are no increases recommended to the water and sewer connection fees. Based on findings in the Cost of Service Study by Jackson Thornton Utilities in 2007, water and sewer connection fees were scheduled to increase annually until the water connection fee reached $1,700 and the sewer connection fee $3,300. The Study identifies connection fees that can be justified based on utility assets. However, when setting these fees the regional market and economy are taken into account. These increases are recommended to be suspended and considered again next year. The FY18 total operating expenses, including benefits and payroll, decreased $(329,641), or -1.52% under the FY17 budgeted amount. The following personnel requests, the FY18 personnel budget is expected to increase by 1.25% or $134,346. There are a total of 164 full time and four (4) part time positions budgeted for FY17. Included in the full time positions are seven (7) positions in the stormwater department. There are three (3) new positions requested for the FY18 personnel budget:
12
1. Administration/Finance – One (1) position is anticipated to be cut from MWRD’s payroll budget.
Ms. Peggy Goodwin’s position of Admin Aide II is no longer deemed necessary. . 2. Engineering – Two (2) new Full Time Equivalents are requested for the Engineering Division.
One (1) full-time GIS Technician and one of the following options: a. Two (2) part-time Engineering Support Specialists (Cooperative Students), or b. One (1) full-time Engineer-in-Training (EIT).
The GIS position is necessary to increase the effectiveness of the GIS Coordinator to allow
elevated duties in conjunction with the new CIS and AMI systems as well as start development
of the new Computerized Maintenance Management System (CMMS). The new GIS Technician
will take over the more routine GIS functions of Data Entry of Easements, Geocoding,
Subdivisions, Addressing, Impervious Surfaces, Water Infrastructure, Stormwater Infrastructure,
Reclaimed Water Infrastructure, etc. The part-time Engineering Support Specialists (Coop
Students) or EIT are deemed necessary to aid in the development plans review process and
development of plan of service responses for Planning Commission. The additional engineering
support would be groomed for potential backfill of a hard to fill position.
3. Operations & Maintenance – O&M is requesting two (2) new internal promotions that will culminate in two (2) new entry level hires as W/WW Laborers. The two (2) new internal promotions are requested as CCTV Technicians. Since the creation of the Department’s off-road sonar/CCTV crew in 2014 (FY15), the CCTV Vans operating in the road right-of-way have been down to one (1) FTE each. Their production has gone down by 50% and safety is a concern with only one (1) employee working in the road right-of-way. This request would bring the CCTV vans back to full operational output and increase safety with two (2) FTE’s in each van. The other internal promotion is the creation of a new W/WW Foreman. This position would be in charge of the New Construction Crew and would take over a portion of the duties that the Line Construction Coordinator position had previously been accountable for.
The rate funded capital budget is $5,928,620, which is a decrease of ($724,945) from the FY17 budget. MWRD’s goal is a minimum of $5 million per year in rate-funded capital purchases. With increased projected revenues from FY17 factored into the FY18 budget, staff is investing more into the Department’s sinking funds for future major repair and replacement projects. Debt service expense increased $1,239,271 as compared to the FY17 budget. This increase is due to the Sinking Creek plant expansion being around 85% complete and the full debt service for the $30.5M improvements hitting the books in FY18.
13
COMMUNITY PROFILE
OVERVIEW
Overview - Water Resources Department
Water service is provided through approximately 26,824 meter connections within the Murfreesboro Water Resources Department water service area (35.54 square miles), and sanitary sewer service is being provided to areas served in the Consolidated Utility District water service area for an estimated additional 18,093 sewer only customers. The City operates a separate fund for Stormwater services and has 34,939 customers. There are 60.46 square miles within the city limits and 179.6 square miles within the Murfreesboro Urban Growth Boundary (UGB). The City also operates the largest reclaimed water system in the State of Tennessee; having 160 customers and delivering between 4 to 8 million gallons per day of high quality repurified water. The Murfreesboro Water Resources Department (Department) is an enterprise fund of the City of Murfreesboro. The fund is managed to fully recover the expenses of providing services from users (as opposed to taxes) and to build and preserve a substantial, long lived capital asset base in the treatment facilities, water distribution and storage system, wastewater collection system and repurified water distribution and storage system. Because utilities have many characteristics of a business, business accounting and financial management rules are usually applied to enterprise funds. Because of this, the presentation of the Department differs from that of the City General Fund Budget. The Department’s aggressive maintenance and replacement programs result in a greater asset value. The Total Asset Value as of June 30, 2016 was $477,043,767, a 6.19% increase from FY15. The Department financial and management model is to improve infrastructure each year, strive to provide excellent customer service, make knowledge-based decisions, and stretch the dollar to get the maximum benefit and minimize waste. The employees of the Department are dedicated to providing its customers with a bountiful supply of clean, safe water, sanitary sewer service and recycled water service in the most economical and efficient way possible. The Department’s responsibility to manage the City’s municipal separate storm sewer system (MS4) National Pollutant Discharge Elimination System (NPDES) permit, which directly affects the quality of stormwater runoff within the City, allows for a holistic approach to affect the quality of the water we withdraw from our natural resources and the quality of the water returned to our streams, rivers and lakes. There are a total of 167 full time and four (4) part time positions in water and sewer, including eight (8) full time stormwater positions budgeted for FY18. There are three (3) licensed professional engineers, one (1) engineer-in-training, one (1) certified public accountant, three (3) professional operators, and fifty-one (51) employees with a Tennessee Certified Operators License for one or more of the following: water treatment, wastewater treatment, water distribution and wastewater collection system.
14
CITY GOVERNMENT
The City operates under a Council-Manager form of government. The governing body is the City Council, which consists of seven members who serve four-year terms of office. Non-partisan elections for City Council are held in even numbered years on a staggered basis. City Council members are elected at large. The City Council is responsible for adopting ordinances, the annual budget, appointing committees and establishing policies. The City Council appoints a City Manager, who is responsible for carrying out the policies and ordinances of the City Council and the day-to-day operations. The City Manager appoints and supervises the various department heads of the City. The Water and Sewer Department was created in 1958 by the adoption of a city ordinance. The powers and duties of the Board are established in Article IV of the Murfreesboro City Code. A seven member citizen advisory board has the oversight of department policy and financial operations. The Board makes recommendations to the City Council. User charges provide the sole source of revenue for the Water and Sewer Department. No general tax base revenues are received. The Murfreesboro Water and Sewer Board held its first meeting on December 12, 1958. The first members consisted of C. B. Huggins, Herman O. Jones (Councilman), Jennings A. Jones, Sam Lasseter, and Fount Pitts. At that time, the Mayor was A. L. Todd, Jr., City Manager was H. L. McCullough, and Joe W. Lovell was Superintendent of the Water Department. The Director of the Department reports to the City Manager. There have been five (5) Directors over the past fifty five years; Joe Lovell, Jim Clark, Doug Miller, Joseph Kirchner and Darren Gore. As of July 1, 2017, The Water and Sewer Department will be newly titled the Water Resources Department. The Water Resources Board meetings are held on the fourth Tuesday of each month at 3:30 p.m., at 1725 South Church Street, Murfreesboro.
17
BUDGET GUIDE
OVERVIEW
A budget is a financial and operating plan for a city enterprise fund for a period called a “fiscal year.” The budget is a plan for the use of the fund’s resources. Through these resources, services are provided to meet the needs and desires of water and sewer customers. The City of Murfreesboro’s and Water Resources Department’s fiscal year begins on July 1 and ends on June 30. The fiscal year that begins on July 1, 2017 is referred to as FY18.
BUDGET PROCESS The preliminary steps in the budget include a review of current economic conditions, revenue projections, community input, program initiatives, long range plans and federal and state mandates. The departmental budget requests are submitted to the Director. These budget requests are reviewed by the Director and Assistant Director of Finance and Administration. The City Charter provides that the City Manager must prepare a proposed budget and submit it to the City Council not later than May 15 each year. The Water Resources Board (Board) reviews the proposed budget at its April meeting. The Board recommends to the City Council the draft budget and any changes to rates and fees. The Director presents the draft budget and related recommendations to the City Council. The City Council conducts a public hearing on the proposed budget to obtain additional citizen input on the spending plan. Following the public hearing, the City Council amends the draft budgets as needed and adopts a budget ordinance for the city along with water and sewer rate ordinance and the water resources budget resolution. The WATER RESOURCES Department follows the general timeline in setting rates to coincide with the Department Budget Development:
• October Audit completed – Assessment of Working Capital Reserves available as of June 30.
• Cost of Service Study and Pro Forma commissioned in Sept/Oct. – Available by December.
• Capital Improvements Plan updated December – New Debt Service Cash Flow inserted into
Trailblaze Financial Model; Large Capital Outlay from Working Reserves Identified
• January/February – Board and Council Update on Revised CIP, Debt Service and Rate Design
• March - Initiate Preliminary Budget
18
MONITORING OF REVENUES AND EXPENDITURES Through the course of each fiscal year, the Director, Assistant Director of Finance and Administration and division heads monitor the budget established by City Council.
FUND OVERVIEW
FUND DESCRIPTIONS A fund is established to account for a specific activity or purpose. Law mandates the creation of some funds. Other funds are established by management to demonstrate financial compliance with budget or legal requirements. All of the funds of the City of Murfreesboro can be divided into three categories: governmental funds, proprietary funds, and fiduciary funds.
19
GOVERNMENTAL FUNDS Governmental funds are used to account for most of the City's basic services. Governmental fund information is useful in determining whether there are more or fewer financial resources that can be spent in the near future to finance the City's programs. The City of Murfreesboro maintains twenty-nine (29) individual governmental funds. The modified accrual accounting method is used to account for the City’s general government operations. This accounting method measures cash and all other financial assets that can be readily converted into cash.
Murfreesboro City Schools prepares a separate budget document.
PROPRIETARY FUNDS There are two types of proprietary funds: enterprise funds and internal service funds. Enterprise funds are used to account for operations that are financed and operated in a manner similar to private business enterprises. The City's water resources department and electric department are the largest of these funds and prepare their own budget documents. While funds are appropriated by City Council, these enterprise funds are not presented in this document.
Internal service funds are used to account for activities that provide supplies and services for the City's other programs and activities. These services predominantly benefit governmental functions such as the fleet maintenance of vehicles and for its self-insurance programs.
FIDUCIARY FUNDS Fiduciary funds are used to account for resources held for the benefit of parties outside of the government. The resources of those funds are not available to support the City's own programs. The accounting used for fiduciary funds is much like that used for proprietary funds. The Pension Fund is accounted for in this category.
EMPLOYEE COMPENSATION Department employees are covered under the city’s Classification and Compensation Plan.
21
WATER, SEWER AND STORMWATER BUDGET HIGHLIGHTS
The City Manager, in collaboration with the City Council, identified and established six priorities: public safety, neighborhoods, customer service, financial stability, economic growth and civic engagement. Department initiatives have been established based on these goals.
The following Department initiatives in the Proposed Budget have been established, in addition to those in the City Budget, based on the six priorities including:
STRONG AND SUSTAINABLE ECONOMIC AND FINANCIAL HEALTH
Update financial reviews and operate within Financial Management Policies for the Water Resources Enterprise Fund and Stormwater Enterprise Fund.
Maintain sufficient reserve funds to cover one year’s operating expenses
Maintain a Debt Service Coverage Ratio of 1.2 or greater
Complete a Cost of Service Study for year ending June 30, 2017
Fund capital expenses related to road projects from reserve funds
Fund $1.25 million target annually for sewer rehabilitation
Fund stormwater capital projects with “banked” working capital reserves, incurring no debt
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Remodel customer service offices to better serve the public
Monitor and report customer account ratios- customer service costs per account
Monitor and report billing accuracy
Implement interactive voice response (IVR) for customers for payment by phone.
Participate with the City to centralize the maintenance, operation, acquisition and planning for computers, GIS, technology, radio communications, mobile data and office equipment through coordination with the City’s Information Technology (IT) Department.
The City has developed an information technology master plan that will create a roadmap for the acquisition of computer hardware and software. The Department’s next endeavor is the procurement and acquisition of a Computerized Maintenance Management System (CMMS) to proactively manage our horizontal assets (i.e., water distribution and wastewater collection systems).
Participate in the City initiative for “Service Excellence”.
ENGAGING OUR COMMUNITY
Develop outbound voice and email messaging to customers, notifying them of issues associated with their account (i.e., potential leak), and upcoming initiatives involving the Water Resources Department.
Develop more outreach and engagement with MWRD customers through the use of social media (e.g., Facebook, Twitter, etc.)
Participate in the City’s Facebook presence, Police and Fire academies, CityTV and other tools to reach out to our residents
22
Provide a web-based portal for customers to view their water consumption history in near real time; actively allowing them to participate in water budgeting. This portal is being provided through the Advanced Metering Infrastructure implementation.
Conduct stakeholder meetings on critical issues.
Participate in the City’s initiative in implementing an electronic agenda system for City Council that will significantly decrease staff preparation of the council meeting packets as well as making the complete packet available to our residents via the website
Continue co-permitting relationship with MTSU on NPDES MS4 Phase II stormwater permit
FY 2017 DEPARTMENT ACCOMPLISHMENTS
Recognition as a “Utility of the Future” Today. MWRD received recognition as a Utility of the Future Today:
o By continuing to develop The Water Resource Integration Plan that was commissioned in May 2015
o Through advancing MWSD’s 2015 Annual Review of Trends and Strategic Planning Issues o In continuing to seek to measure those key performance indicators that provide insight
and guidance into becoming a more efficient and Lean organization. o In developing Agricultural Partnerships for Land Application of Effluent Spray Irrigation
(e.g., Williamson Farm, MTSU Farm) o In developing Industrial Partnerships for Financial, Environmental and Social Gains (e.g.,
General Mills & Indian Hills Collaboration) o In facilitating Development Partnerships that may benefit from unconventional sewage
treatment techniques (e.g., Dill/Rushing/Lyons Property). o Collaborating water management strategies with the Consolidated Utility District to
identify challenges and strategies to providing water services within the Urban Growth Boundary
Developed decentralized Septic Tank Effluent Pump (STEP) design guidelines for developments seeing a better business case or significant constraints in tying to MWRD’s centralized sewer collection system.
Completed Broad Street pump station near International Paper. This allowed abandonment of three (3) other pump stations – two (2) of which were at the end of their useful life.
Completed the implementation of an $8.3M Advanced Metering Infrastructure (AMI) network across MWRD’s water service area. In conjunction with this implementation, MWRD has developed the meter reading workforce into a more sophisticated level of skills and abilities that are now actively finding leaks using an Acoustic Leak Detection (ALD) system.
Continued use of the Department’s Interactive Voice Response (IVR) software for “out bound” calls giving advance notice to customers needing to pay prior to water being turned off.
Received renewal of the City’s National Pollutant Discharge Elimination System (NPDES) permit from the Tennessee Department of Environment and Conservation.
Introduced language for a bill that affords the City of Murfreesboro 100% credit for return flows (i.e., effluent) from our Water Resource Recovery facility into J. Percy Priest reservoir. The bill was passed on April 17th by the 110th Tennessee General Assembly and signed by the Governor on April 28th; taking affect July 1, 2017.
23
Conduct on-going testing and analysis of the biological water quality analyses on the West and East Fork Stones River to prepare the foundation for additional potential discharges into the City of Murfreesboro’s receiving streams; allowing for continued growth.
Replaced three (3) Fournier Biosolids Presses and the associated electronic and networking systems, variable frequency drives, and Penn Valley sludge transfer pumps.
Developed a Biosolids Master Plan (BMP) and conducted a Biosolids pilot project utilizing the Schwing Bioset process to lime pasteurize biosolids into Class “A” quality; effectively taking a waste product and turning into a commodity (e.g., fertilizer).
85% complete in expanding the Sinking Creek Treatment Plant from 16 million gallons per day (MGD) to 24 MGD (Notice to Proceed date April 27, 2015). Beginning year five (5) of MWRD’s Information Technology Master Plan; two (2) years into a new Financial Information Systems (FIS) for general ledger accounting and reporting under the MUNIS software platform and three (3) years into a successful utility billing and customer information systems (CIS) software (CIS.Infinity from Advanced Utility Solutions) along with a Mobility Workforce Management wireless work order system. Customer engagement has grown through the use of on-line payment ability.
FY 2018 DEPARTMENT GOALS
Implement “Help 2 Others” (H2O) program in conjunction with Community Helpers of Rutherford County that provides a venue to allow customers to pay additional monies above their water and sewer bill to provide a need based resource to help and/or supplement low income customers’ ability to pay monthly water and sewer bills.
Complete the improvements associated with the Sinking Creek plant upgrade, including a new ultraviolet (UV) disinfection system that is anticipated to save energy in December 2017.
Complete MWRD’s Water Resource Integration Plan (WRIP); the goals of which are: o Look holistically at the management of water (drinking water, wastewater, repurified
water, and stormwater) within the potential service areas of the Murfreesboro Water & Sewer Department.
o Coordinate efforts with the City’s Comprehensive Plan, so that the overall goal of facilitating the growth of the City of Murfreesboro will be accomplished in an orderly fashion with consideration of affordable and sustainable water management.
24
o Coordinate water management strategies with the Consolidated Utility District to identify challenges and strategies to providing water services within the Urban Growth Boundary.
o Coordinate with other studies currently underway assessing the assimilative capacity of the East and West Fork Stones Rivers.
Seek partnerships with agricultural and industrial operations to increase the disposal rate of effluent and biosolids for land application generated at the Sinking Creek plant.
Complete replacement of DeJarnette Lane Pump Station #13 and bid out for replacement the Ransom Drive pumping station.
Initiate and complete a Waste Load Allocation model to integrate into a site-specific rationale for TDEC review as a prototype for the City’s upcoming 2021 NPDES permit.
Continue to make a presence at public outreach events such as Earth Day, partner with MTSU when the opportunity presents itself, and educate public on water cycle, stormwater best practices and recycling of water for the “right use”.
Continue developing predictive benchmarking and performance measurement criteria that advance MWRD into a performance driven utility. MWRD expects to launch Power BI (Business Intelligence) that will allow for leveraging CIS, utility billing and financial data to be utilized in a “living” dashboard.
Initiate and complete enhancing security in the Customer Service Area through renovation and remodeling efforts.
Continued Partnering with Key Stakeholders, such as the U.S. Army Corps of Engineers, Tennessee Department of Environment and Conservation, the Rutherford County Chamber of Commerce, General Mills / Pillsbury, Rutherford County, Middle TN State University, Consolidated Utility District, and the development community.
Develop development “tool kits” such as grease interceptor requirements for food service establishments discharging fats, oils and grease (FOG), and industrial discharge criteria for interested industries looking to Murfreesboro as a potential building site.
Seek to simplify the development process for small business owners and integrate into a “one stop shop” culture.
Continue to reduce unaccounted for water through more accurate meter reading and utilization of Acoustic Leak Detection system.
Begin development of a Meter Change Out Program.
0
20
40
60
80
100
Oct
No
v
De
c
Jan
Feb
Mar
Ap
r
May Jun
Jul
Au
g
Sep
Oct
No
v
De
c
Jan
Feb
Mar
Ap
r
2015 2016 2017
%
Water Loss vs AMI Completion
AMI % Complete Water Loss 3 month mov avg
25
ORGANIZATIONAL STRUCTURE
0
20
40
60
80
100
120
140
160
180
FY14 FY15 FY16 FY17 FY18 Budget
Administration, 8
Customer Service, 10
Engineering, 17
Water Treatment Plant, 30
Operations & Maintentance, 58
AMI/Field Service, 10
Wastewater Treatment, 32
Stormwater, 8
Nu
mb
er
of
Emp
loye
es
POSITIONS BY DIVISION
160164 167 169
173 (5 PT, 3 COND)
Finance and
Administration
Water
Treatment
Water
Resource
Recovery
Water Resources
Department
Collection/
Distribution
Accounting Customer
Service
Water & Sewer
Board
Engineering and
Compliance
AMI / Field
Service
Reclaimed
Water
Storm
Water
27
EFFECTIVE UTILITY MANAGEMENT
Murfreesboro Water Resources Department (MWRD) is committed to servicing Murfreesboro
residents, businesses, and visitors by providing high-quality drinking water, advanced
wastewater treatment and water reclamation,
and stormwater management. In adopting the
concepts and tools of Effective Utility
Management, MWRD named the 10 EUM
attributes as their goals. Every initiative,
every action, every decision, and every dollar
expended is now explicitly targeted at
achieving one or more of these goals for the
express benefit of the community.
Effective Utility Management
Murfreesboro Water Resources Department
Product Quality (PQ)
Customer Satisfaction (CS)
Employee and Leadership Development (ELD)
Operational Optimization (OO)
Financial Viability (FV)
Enterprize Resiliency (ER)
Infrastructure Strategy and Performance (ISP)
Community Sustainability (CSU)
Water Resource Sustainability (WRS)
Stakeholder Understanding and Support (SUS)
“EUM is not a program. It’s a framework
and a mindset. Its value is in its capacity to
organize, communicate, and manage the
mission in terms that everyone…staff,
customers, and governing bodies can
embrace”.
Steve Tate, MWRD EUM Coordinator
28
MWRD’s EUM Journey
Implementation at a Glance
Keys to Management Success: The MWRD Approach
Murfreesboro, Tennessee (Southeast U.S.)
Combined Water + Wastewater Public
System Profile
Water Wastewater
Residents Served 78,000 130,000
Lines 442 mi. 646 mi.
Plant Capacity 20 mgd 24 mgd
Water Supply: East Fork Stones River and Percy Priest Reservoir Receiving Stream: W. Fork Stones River
Overseen by a seven-member Board, which makes recommendations to City Council
Last WTP Expansion 2010 Last WWTP Expansion Fall 2017
2012
Does self-
assessment and
identifies top three
EUM priority
attributes
Product Quality
Financial
Viability
Customer
Satisfaction
Presents EUM
model to City
Council
2013
Creates a
position for an
EUM
Coordinator
Develops
Information
Technology
Master Plan to
replace CIS and
implement AMI
Initiates data
trending of key
performance
indicators (KPI)
2011
Begins
contemplating
the EUM
Primer concepts
and tools
2014
Initiates
Annual Trends
and Strategic
Plan (updated
annually)
Participates
annually in
AWWA
Utility
Benchmarking
Study
Identifies KPIs
with
substandard
performance
vs peer group
2016
Receives
“Utility of the
Future: Today”
Recognition
29
The EUM Keys to Management Success listed below represent the tools by which we plan, address issues, and
track performance
The Utility Self-Assessment The Self-Assessment was conducted by the MWRD Leadership Team (Division Managers) and the Water
Resources Board, separately. Both groups identified Customer Satisfaction, Product Quality and
Financial Viability as our highest priority goals. More importantly, the exercise also produced a priority list
of EUM attributes in need of the most improvement. These included Customer Satisfaction and Employee and
Leadership Development. Since 2013, improvement initiatives have largely focused on the Customer
Satisfaction attribute.
Activities and Process Improvements
2013, Replaced a legacy customer information system, began accepting credit cards, introduced e-
billing
2014, Installed Interactive Voice Response (IVR) giving customers access to account information and
the ability to pay their bill remotely
2014, Began use of Mobile Workforce Management software which issues/tracks electronic service
orders to field technicians
2015-2017, Procured and installed Advanced Metering Infrastructure (AMI) providing more accurate
metering, early leak notification to customers, and online customer access to their own water
consumption data
2001-2016, Instituted stormwater runoff enhancements and WWTP improvements
Measurable Results
Online and IVR transactions have risen to ~5000 per month, serving ~18% of our customers
Apparent water loss reduced by ~ 25%, resulting in ~$1.5M/yr in new recurring consumption revenue
Measured improvements in water quality and biological health of our receiving stream as measured
by the Tennessee Macroinvertebrate Index. Improvements have led to approval of a renewed and
Key MWRD Approach
Measurement Benchmark, select KPIs, track and trend
Knowledge Management Enhance data connectivity and communication, work as teams, and
succession plan
Strategic Business Planning Tactically define annual objectives for improvement and tie to budgets and 5
yr CIP
Continual Improvement
Management
Repeat the process, modify KPIs as needed, analyze the trends
Leadership Management commitment, sharing successes, and illuminating the
challenges
30
expanded NPDES permit, and delisting of one and possibly two receiving stream segments from the
303d “Impaired” list
Lessons Learned
1. Prior to EUM, there was no formal strategic plan or continual improvement process.
There was an understanding of priority and funding, but not a cohesive vision/document
that tied all core missions into one place, nor was there a connection between smaller,
less evident ventures or purchases to the grander scheme. Now there is.
2. EUM has helped us to accomplish perhaps our biggest challenge, that being the
mechanism by which we could effectively communicate to our Board and Council the
need for every action and funding request as being part of a bigger picture.
“EUM SETS CLEAR EXPECTATIONS
FOR EVERYONE IN THE DEPARTMENT.
THE MESSAGE OF IMPROVING
PERFORMANCE THROUGH A ‘MEASURE
TO MANAGE’ STRUCTURE CREATES
FOCUS AND A COLLABORATIVE TEAM
ENVIRONMENT THAT BUILDS
MOMENTUM AND NURTURES A
CHANGE-READY MINDSET “ Darren Gore, Director
31
BENCHMARKING
MWRD participated in the 2015 American Water Works Assocation Utility Benchmarking program and received the results in August of 2016. 163 Utilities (124 in 2014) particiapted in the benchmarking survey with 98 Combined Water and Wastewater Services (80 in 2014), 33 States Represented, 6 from Tennessee (including Memphis, Metro Nashville, Johnson City, Brentwood, Atoka, and Murfreesboro)
FINANCIAL VIABILITY
MWRD Scored in or near TOP Quartile in every financial parameter
32
STAFFING LEVELS
MWRD has a Higher O&M staff percentage and Lower Admin percentage than survey respondents
CUSTOMER SATISFACTION
37
WATER RESOURCES BUDGET SUMMARY
The following is a summary of the budget:
The FY18Budget reflects $51,164,000 in total revenues. The proposed budget is $1,074,500 more than the FY17 budget and $(534,000) less than FY17 projections.
FY18 Operating Revenues total $44,409,00, a decrease of $(34,000) over FY17 projections and $364,500 increase over FY17 budget.
No rate increase is proposed for residential, or 5/8” size meters; however, the minimum monthly allowance for meter sizes one (1) inch and larger is recommended to be reduced by 100% of the monthly minimum volume (cf) allowance. This reduction is year five (5) of a five (5) year plan to eliminate volume allowances under the minimum monthly bill.
The minimum monthly dollar amounts for all meter sizes 1” and larger remain the same.
The water rate is recommended to remain at $2.74 per 100 cubic feet ($3.66 per 1000 gallons). The Sewer Service Fee is recommended at $4.24 per 100 cubic feet ($5.67 per 1000 gallons).
REVENUES FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
WATER, OPERATING REVENUE 14,536,259$ 15,364,876$ 15,902,000$ 16,136,000$ 16,616,000$
REPURIFIED, OPERATING REVENUE 26,597$ 28,723$ 28,000$ 29,000$ 29,000$
SEWER, OPERATING REVENUE 24,121,275$ 26,262,131$ 27,259,500$ 27,300,000$ 27,144,000$
OTHER INCOME AND EXPENSE 1,428,362$ 1,021,210$ 855,000$ 978,000$ 620,000$
TOTAL OPERATING REVENUES 40,112,493$ 42,676,940$ 44,044,500$ 44,443,000$ 44,409,000$
INTEREST INCOME OTHER INVEST. 55,500$ 39,996$ 45,000$ 55,000$ 55,000$
TAP REVENUE 4,971,879$ 9,686,020$ 6,000,000$ 7,200,000$ 6,700,000$
TOTAL REVENUES 45,139,872$ 52,402,956$ 50,089,500$ 51,698,000$ 51,164,000$
EXPENSES
WATER, OPERATING & MAINTENANCE 5,142,050$ 6,384,829$ 6,701,338$ 6,066,987$ 6,588,059$
SEWER, OPERATING & MAINTENANCE 5,800,777$ 6,479,440$ 7,949,314$ 6,596,254$ 7,736,949$
CUSTOMER BILLING & COLLECTION 1,356,388$ 1,690,264$ 2,033,696$ 1,892,617$ 2,099,088$
ADM & GENERAL EXPENSES 7,522,528$ 5,512,324$ 5,045,406$ 4,459,446$ 5,007,023$
TOTAL OPERATING EXPENDITURES 19,821,743$ 20,066,857$ 21,729,754$ 19,015,304$ 21,431,119$
CAPITAL EXPENDITURES 2,561,638$ 3,645,500$ 6,653,565$ 5,914,500$ 5,928,620$
DEBT SERVICE 9,994,324$ 11,246,686$ 12,159,242$ 12,352,337$ 13,398,513$
TRANSFERS TO RESERVES 6,831,321$ 11,832,752$ 9,546,939$ 11,156,938$ 10,405,748$
TOTAL EXPENDITURES/RESERVES 39,209,026$ 46,791,795$ 50,089,500$ 48,439,079$ 51,164,000$
-$
DEBT COVERAGE RATIO (DCR)
OPERATING REVENUES 40,112,493$ 42,676,940$ 44,044,500$ 44,443,000$ 44,409,000$
OPERATING EXPENSES 19,821,743$ 20,066,857$ 21,729,754$ 19,015,304$ 21,431,119$
FUNDS AVAILABLE FOR DEBT COVERAGE 20,290,750$ 22,610,083$ 22,314,746$ 25,427,696$ 22,977,881$
DEBT SERVICE 9,994,324$ 11,246,686$ 12,159,242$ 12,352,337$ 13,398,513$
DCR (Goal = >1.2) 2.03 2.01 1.84 2.06 1.71
38
Water and sewer connection fees are set at $1,200 and $2,550, respectively. From February 2011 through February 2012, water and sewer connection fees were reduced to $950 and $1,500, respectively. Effective March 1, 2012 rates returned to their pre-reduction levels. No increase in connection fees are budgeted for FY18.
Customer Service/Collection and Administrative/General expenses increased by $65,392 (3.2%).
Water Treatment Operating and Maintenance Expenses decreased by $(113,279) (-1.7%).
Wastewater Treatment Operating and Maintenance Expense decreased by $(212,365) (-2.7%)
Rate funded capital purchases total $5,928,620, a decrease of $(724,945) (-10.9) from FY17 budget.
Debt Service Expenses total $13,398,513, an increase of $1,239,271 (10.2%) from FY17 budget. This debt has increased based on the payment derived from SRF loan 2016 and the Phase 4D Sinking Creek Plant Expansion.
FY18 transfers to Reserves from connection fees and other sources have been budgeted at $10,405,748, a decrease of ($759,190) from FY17 projections. This includes $1,735,248 in reserve income for sinking funds to pay cash for large upcoming capital expenditures and $335,000 in reserves for future debt.
The Department is funding $65,000 for pension administration by the City.
Department and Stormwater fund $140,000 to the City for legal services.
The Department is funding $15,000 for the City’s Human Resources Department.
There are a total of one hundred sixty-seven (167) full time and four (4) part time positions budgeted. Included in the full time positions are eight (8) positions in the stormwater department. There are four (4) new positions requested and one (1) position recommended for elimination for the FY18 personnel budget:
Administration/Finance – One (1) position is anticipated to be cut from MWRD’s payroll budget. Ms. Peggy Goodwin’s position of Admin Aide II is no longer deemed necessary.
Engineering – Two (2) new Full Time Equivalents are requested for the Engineering Division. One (1) full-time GIS Technician and one of the following options:
o Two (2) part-time Engineering Support Specialists (Cooperative Students), or o One (1) full-time Engineer-in-Training (EIT).
The GIS position is necessary to increase the effectiveness of the GIS Coordinator to allow
elevated duties in conjunction with the new CIS and AMI systems as well as start development of
the new Computerized Maintenance Management System (CMMS). The part-time Engineering
Support Specialists (Coop Students) or EIT are deemed necessary to aid in the development plans
review process and development of plan of service responses for Planning Commission. The
additional engineering support would be groomed for potential backfill of a hard to fill position.
Operations & Maintenance – O&M is requesting two (2) new internal promotions that will culminate in two (2) new entry level hires as W/WW Laborers. The two (2) new internal promotions are requested as CCTV Technicians. Since the creation of the Department’s off-road sonar/CCTV crew in 2014 (FY15), the CCTV Vans operating in the road right-of-way have been down to one (1) FTE each. Their production has gone down by 50% and safety is a concern with only one (1) employee working in the road right-of-way. This request would bring the CCTV vans back to full operational output and increase safety with two (2) FTE’s in each van. The other internal promotion is the creation of a new W/WW Foreman. This position would be in responsible charge of the New Construction Crew.
39
WATER RESOURCES REVENUE SUMMARY
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
TAP REVENUE $4,971,879 $9,686,020 $6,000,000 $7,200,000 $6,700,000
INTEREST INCOME OTHER INVEST. $55,500 $39,996 $45,000 $55,000 $55,000
TOTAL OPERATING REVENUES $40,112,493 $42,676,940 $44,044,500 $44,443,000 $44,409,000
Total Revenues, $51,164,000
WATER, OPERATING REVENUE ,
$16,616,000 , 33%
REPURIFIED, OPERATING REVENUE
, $29,000 , 0%
SEWER, OPERATING REVENUE ,
$27,144,000 , 53%
OTHER INCOME AND EXPENSE ,
$620,000 , 1%
INTEREST INCOME OTHER INVEST. ,
$55,000 , 0%TAP REVENUE
, $6,700,000 , 13%
FY18 Total Revenues $51.16M
40
WATER RESOURCES EXPENSE SUMMARY
$-
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
TRANSFERS TO RESERVES $6,831,321 $11,832,752 $9,546,939 $11,156,938 $10,405,748
DEBT SERVICE $9,994,324 $11,246,686 $12,159,242 $12,352,337 $13,398,513
CAPITAL EXPENDITURES $2,561,638 $3,645,500 $6,653,565 $5,914,500 $5,928,620
TOTAL OPERATING EXPENDITURES $19,821,743 $20,066,857 $21,729,754 $19,015,304 $21,431,119
Total Expenses, $51,164,000
CAPITAL EXPENDITURES $5,928,620 , 12%
DEBT SERVICE, $13,398,513 , 26%
TRANSFERS TO RESERVES,
$10,405,748 , 20%
WATER, OPERATING & MAINTENANCE,
$6,588,059 , 13%
SEWER, OPERATING & MAINTENANCE,
$7,736,949 , 15%
CUSTOMER BILLING & COLLECTION ,
$2,099,088 , 4%
ADM & GENERAL EXPENSES ,
$5,007,023 , 10%
Other, $21,431,119 , 42%
FY18 Total Expenses $51.16M
41
RESERVE WATER, 231 , 200,000 , 2%
RESERVE FUNDS SEWER, 232 6,500,000 , 63%
RESERVE INTEREST INCOME 225 , 55,000 ,
1%
RESERVE FUTURE CAPITAL EXPENSE,
1,000,000 , 10%
RESERVE FUTURE DEBT, 234 335,000 , 3%
RESERVE SINKING FUND CORPS 235, 30,500 , 0%
RESERVE SINKING SALEM BUCH 241, 100,000 , 1%
RESERVE SINKING OTHER DIST 242, 100,000 , 1%
RESERVE SINKING OTHER DIST 243, 350,000 , 3%
Biosolids Processing Equip & Storage, $500,000 , 5%
Lift Station Replacement (On-going), $250,000 , 2%
Walter Hill Dam Repair/Remediation,
$125,000 , 1%
NE Regional P.S. & FM, $860,248 , 8%
Sinking Funds, $1735248, 16%
FY18 RESERVE EXPENSES & SINKING FUNDS
43
REVENUE ITEMIZATION
Projected Department Revenue for FY18 totals $51,164,000, which is $1,074,500 more than the FY17 budget. This is mainly a result of:
1) An adjustment in the rate design as well as an anticipated reduction in sewer commodity revenue due to General Mills / Yoplait land applying approximately 550,000 gallons per day on the Indian Hills Golf Course. The combination of the rate design increasing revenue and the aforementioned revenue decrease results in an estimated net increase of $360,000. Chart 1 identifies those components that make up the increase and shortfall anticipated to yield a net increase of $360,000 in revenue
2) The tap revenue has been increased by $700,000 for FY18 due to anticipated growth and connections made to the Department’s sewer system. Tap revenue is simply being adjusted above what was budgeted for FY17. Tap revenue is a direct corollary to the level of development that occurs within MWRD’s service area. All tap revenue is expensed to the Department’s working capital reserves to fund future capacity projects or major repair and replacement projects.
A five (5) year rate design was initiated in FY14 to eliminate all minimum volume allowances covered by the minimum monthly bill over a five (5) year period. FY18 represents year five (5) of five (5) and as such, it is recommended the minimum monthly allowance for all meter sizes 1 “ and above be reduced by one hundred percent (100%) of their previous allowance. The minimum monthly monetary water charges for all meter sizes remain the same. The minimum monthly water and sewer charge for 5/8” (residential customers) is recommended to stay the same. The water rate is recommended to remain at $2.74 per 100 cubic feet ($3.66 per 1000 gallons). The Sewer Service Fee is recommended to remain at $3.34 per 100 cubic feet and the Sewer Operation and Maintenance Fee is recommended to remain at 90 cents per 100 cubic feet. Since the allowance for all meters will be eliminated in FY18, the O&M fee can be incorporated into the commodity rate; setting the commodity rate for sewer at $4.24 per 100 cubic feet (or $5.67 per 1000 gallons).
SewerRevenue
fromReduction in
Min.Allowance
or RaiseMin. Bill
SewerRevenue
from NewGrowth
SewerRevenue
fromCommodity
SalesIncrease
SewerEnhancedRevenuefrom AMI
SewerCommodity
RevenueLost
WaterRevenue
fromReduction in
Min.Allowanceor Raise inMin. Bill
WaterRevenue
from NewGrowth
WaterRevenue
fromCommodity
SalesIncrease
WaterEnhancedRevenuefrom AMI
FY18 $231,369.82 $235,373.50 $0.00 $540,288.21 (1,214,006. $207,009.19 $0.00 $0.00 $360,192.14
($1,400,000.00)
($1,200,000.00)
($1,000,000.00)
($800,000.00)
($600,000.00)
($400,000.00)
($200,000.00)
$0.00
$200,000.00
$400,000.00
$600,000.00
$800,000.00
FY18 Revenue Increase by Source w/Anticipated Rate Design
45
WATER REVENUE
Water Revenue at year end FY17 is projected to be higher than budgeted. It is estimated to be approximately $234,000 over FY17 budget. The recommended rate structure change and AMI accuracy is projected to increase revenue by $480,000 for FY18.
$0 $4 $8 $12 $16Millions
FY18 BUDGET
Metered Water Sales $15,360,000
Water Adjustments $(40,000)
Private Fire Protection $90,000
Service Initiation $210,000
Late Fees $660,000
Non-Payment $176,000
Returned Payment Fees $12,000
CCC $140,000
Enernoc 10000
Water Tap Fees $400,000
FY18 Water Operating Revenue, $16,616,000
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
WATER, OPERATING REVENUE $14,536,259 $15,364,876 $15,902,000 $16,136,000 $16,616,000
WATER, OPERATING REVENUE
46
SEWER REVENUE
Sewer Revenue at year end FY18 is projected to be higher than budgeted. It is estimated to be approximately $156,000 over FY17 budget. Growth, loss of approximately $1.1M in revenue from General Mills/Pillsbury, rate adjustments and AMI accuracy for sewer is estimated to provide a net loss of revenue in the amount of ($115,500) in FY18.
$- $5 $10 $15 $20 $25 $30Millions
FY18 BUDGET
Enernoc $7,000
Sewer Charges $26,800,000
Sewer Adjustment $(60,000)
O & M Fee $-
Surveillance Fees $30,000
Sampler $15,000
BOD $240,000
Amonia $70,000
Septage Charges $42,000
Sewer Inspection Fees $150,000
FY18 Sewer Operating Revenue, $27,144,000
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
SEWER, OPERATING REVENUE $24,121,275 $26,262,131 $27,259,500 $27,300,000 $27,144,000
SEWER, OPERATING REVENUE
47
REPURIFIED WATER REVENUE
In an effort to reduce effluent discharge from the Sinking Creek Wastewater Treatment Plant, in 2006 MWRD began offering Repurified Water for irrigation purposes to portions of our service area. In addition to reducing necessary effluent discharge, repurified irrigation water also reduces the amount of water that the MWRD Water Treatment Plant must process and distribute. Rates for repurified water were set low (5₵ per hundred cubic feet) to encourage use by consumers. Consumption is budgeted to increase by 20% for FY18; a more accurate projection of FY17 revenue. Revenue from Repurified water sales is small compared to water and sewer sales. A cost of service study was performed on the repurified system for FY15. The study showed that the Department is only currently recovering approximately 4% of its expenses in delivering this commodity. However, this commodity is unique in that it is only used during the summer months and is considered “waste” in the winter months. The Department is seeking solutions regarding recapturing the cost to serve this commodity to its customers. Disposal of repurified water via irrigation or land application does allow more capacity for the discharge of effluent to the West Fork Stones River, so there is a capacity (i.e., sustainability) benefit that is not calculated in the “hard” numbers associated with the FY15 COSS.
Rate Revenue for FY15 $26,587 Cost of Service (Under-recovery) $(661,550) FY18 Budget Repurified Revenue $55,000
48
WATER TAPS / SEWER TAPS (SYSTEM DEVELOPMENT CHARGES)
FY18 water tap revenue is budgeted to decrease ($300,000) below the FY17 budgeted amount. FY17 water tap fees are expected to be below budget by this same amount. All excess tap fees beyond labor and material costs associated with tap installation are reserved for future capacity enhancement. Sewer tap revenue is projected above the expected amount of activity anticipated in FY17. FY17 sewer tap fees are expected to be above budget by $1,500,000. FY18 budgeted tap fees are $1,000,000 above FY17 budget. All excess tap fees beyond labor and material costs associated with tap installation are reserved for future capacity enhancement.
- 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000
FY18 BUDGET
Water Taps 200,000
Sewer Taps 6,500,000
FY18 Taps Revenue $6,700,000
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
TAP REVENUE $4,971,879 $9,686,020 $6,000,000 $7,200,000 $6,700,000
TAP REVENUE
49
SPECIAL SEWER ASSESSMENT FEES
Summary of Special Assessment Districts at February 28, 2017
Assessment Districts
Inception
Date
Actual Construction
Costs Unit Amount
Assessment As of
FEB 2017
Revenue as % of
Construction
Compton Road 1994 $557,516.00 $300.00 $536,858.00 96%
Overall Creek 1999 $18,218,700.00 $1,000.00 $13,522,313.00 74%
Salem Barfield 2001 $2,920,664.00 $750.00 $1,355,227.50 46%
US 41 Florence 2001 $2,851,514.00 $252,474.00 9%
Buchanan Elam 2001 $4,701,959.00 $1,000.00 $1,381,557.15 29%
Osborne Lane 2001 $293,665.00 $2,500.00 $154,685.00 53%
Medical Center Parkway 2006 $3,099,400.00 $10,000.00 $2,194,390.10 71%
Rockvale Sewer 2006 $1,414,290.00 $1,550.00 $16,616.00 1%
Pitts Lane 2008 $324,400.00 $2,350.00 $28,200.00 9%
Three Rivers Phase 3 2014 $240,807.00 $900.00 $101,700.00 42%
Basin D 2007 $1,448,846.00 $36,075.00 2%
South Church St 2016 $297,274.00 $0.00 0%
Total $36,369,035.00 $19,580,095.75
0%
20%
40%
60%
80%
100%
Compton Road
OverallCreek
SalemBarfield
US 41Florence
Buchanan Elam
OsborneLane
MedicalCenter
Parkway
RockvaleSewer
PittsLane
ThreeRivers
Phase 3
Basin D SouthChurch
St.
Thru Feb 2017 96% 74% 46% 9% 29% 53% 71% 1% 9% 42% 2% 0%
Thru Feb 2016 94% 66% 39% 9% 27% 53% 60% 1% 5% 16% 0% 0%
Thru Feb 2015 86% 60% 32% 7% 21% 47% 49% 1% 3% 4% 0%
Thru Feb 2014 81% 57% 28% 0% 19% 30% 48% 1% 2% 0% 0% 0%
Co
nst
ruct
ion
Co
sts
% R
eco
vere
d
50
FY18 PROPOSED RATE SCHEDULE
Since July 2008 a rate strategy has been implemented to reduce the consumption allowance for a minimum bill over a five (5) year period. The consumption allowance was dropped to zero (0) July 1, 2013 (FY14) for 5/8” sized meters. This same year, meters 1” and larger minimum allowances started to be reduced over a five (5) year period. FY18 represents year five (5) of that five (5) year plan. Based on the FY15 Cost of Service Study (COSS) and FY20 Pro Forma developed by Jackson Thornton Financial Consultants, the following chart identifies the revenue deficit projected for the water and sewer enterprise funds as it relates to the over-recovery that was experienced in FY15.
Historical COS Studies and FY20 Pro Forma Revenue Requirements
The table below illustrates where the revenue over the next five (5) years will be based on various factors. Note that this table shows a total of $860,453 of revenue generated from the various sources described, while $3,180,495 is required. I would qualify the revenue generated from new growth and enhanced revenue from the Advanced Meter Infrastructure (AMI) categories as assumptive. Additionally, the sewer commodity lost is estimated from an anticipated irrigation system at Indian Hills Golf Course being fed by General Mills / Pillsbury process water effluent. If General Mills disposes of 550,000 gallons per day on average at Indian Hills, the revenue lost to the Water Resource Department is approximately $1.1M.
51
I believe it prudent to continue with the decrease in the allowance reductions in the meters greater than 5/8” in FY18, estimated to generate a secured $438,379. I believe it is also prudent to leave the minimum bill for residential accounts flat within this same time frame. A new cost of service study will be scheduled for FY17, and the rate design can be reevaluated at that time.
The water commodity rate is recommended to remain at $2.74 per 100 cubic feet. The sewer commodity rate is recommended at $4.24 per 100 cubic feet.
Proposed 5/8” Meter Water and Sewer Rate Increases for FY18 – Minimum Bill Estimates
Cost of Service FY15
Current Rate FY17
Proposed Rate FY18 Pro Forma FY20
Water Min. Customer Charge 12.87 8.22 8.22 14.44
Water Commodity Charge ($/ccf) 2.11 2.74 2.74 2.51
Sewer Min. Customer Charge 23.49 9.72 9.72 27.85
Sewer Commodity Charge ($/ccf) 2.05 4.34 4.34 2.41
Total Min. Charge 36.36 17.94 17.94 42.29
Total Commodity Charge ($/ccf) 4.16 6.98 6.98 4.92
Average Monthly Bill (5,200 gal water; 4,800 gal sewer) $64.25 $64.26 $64.26 $75.28
Increase from Current $-0- $0.00 $11.02
Fiscal Year
↑ Revenue
Generated
Revenue from
Reduction in
Min. Allowance
or Raise Min. Bill
Revenue
from New
Growth
Revenue
from
Commodity
Rate Increase
Enhanced
Revenue from
AMI
Sewer
Commodity
Revenue Lost
July 1, 2015 (FY16) $1,152,540 $675,454.66 $227,882.30 $0.00 $249,203.00 $0.00
July 1, 2016 (FY17) $1,304,951 $438,379.01 $231,627.90 $0.00 $710,949.95 ($76,006.00)
July 1, 2017 (FY18) $360,227 $438,379.01 $235,373.50 $0.00 $900,480.35 (1,214,006.00)
July 1, 2018 (FY19) ($978,632) $0.00 $235,373.50 $0.00 $0.00 (1,214,006.00)
July 1, 2019 (FY20) ($978,632) $0.00 $235,373.50 $0.00 $0.00 (1,214,006.00)
TOTAL (5-yr period) $860,453 $1,552,213 $1,165,631 $0 $1,860,633 (3,718,024.00)
52
DRAFT ORDINANCE
ORDINANCE 17-O-15 amending Chapter 33, Water and Sewers, Section 33-1 of the Murfreesboro City Code, dealing with minimum monthly water charges and minimum monthly sewer charges.
WHEREAS, the City of Murfreesboro should have water and sewer rates, fees and
charges which will generate sufficient funds to retire indebtedness for existing and planned capital
improvements of the Water Resources Department and to meet its normal operating expenses;
and,
WHEREAS, the City of Murfreesboro Cost of Service Study and Pro Forma prepared by
Jackson Thornton Utilities determined the water and sewer rates were insufficient in meeting the
system’s future revenue requirements; and,
WHEREAS, the Water Resources Board studied and decided to recommend these
charges to the City Council on March 21, 2017.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
MURFREESBORO, TENNESSEE, AS FOLLOWS:
SECTION 1. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (B), Water Rate and Minimum Bill, by amending the
rate, “$2.74 per 100 cubic feet of consumption $0.0274 per c.f.)”, to read, “$3.66 per 1000 gallons
of consumption ($0.00366 per gallon)”.
SECTION 2. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (B) by deleting the table titled “Minimum Monthly
Water Charges” in its entirety and substituting in lieu thereof the following:
MINIMUM MONTHLY WATER CHARGES Meter Size Charge* Allowance, gallons
5/8 inch $ 8.22 - 1 inch 19.18 - 1 1/2 inch 41.10 - 2 inch 65.76 - 3 inch 164.40 - 4 inch 328.80 - 6 inch 685.00 -
*Tax not included
53
SECTION 3. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (F), Water shortage surcharge, by amending the
charge, “$0.35 per 100 cubic feet of water after the first 300 cubic feet”, to read, “$0.47 per 1000
gallons of water after the first 2,250 gallons”.
SECTION 4. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (G), Sewer rates by amending the sewer rate set
forth in subsection (1), “$3.34 per 100 cubic feet of metered water consumption ($0.0334 per
c.f.)”, to read, “$5.67 per 1000 gallons of metered water consumption ($0.00567 per gallon)”.
SECTION 5. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (G)(1) by deleting the table titled “Minimum Monthly
Sewer Usage Charges” in its entirety and substituting in lieu thereof the following:
MINIMUM MONTHLY SEWER USAGE CHARGES
Meter Size Charge* Allowance, gallons 5/8 inch $10.22 - 1 inch 27.98 - 1½ inch 61.90 - 2 inch 100.06 - 3 inch 252.70 - 4 inch 507.10 - 6 inch 1,058.30 -
SECTION 6. Section 33-1, Water and Sewer Rates and Charges, of the Murfreesboro
City Code is hereby amended at subsection (G), Sewer rates by amending the sewer rate set
forth in subsection (1)33-51, Reduction in charges for water excluded from sewerage system,
of the Murfreesboro City Code is hereby amended at subsection (B)(1) as follows:
Subsection (a) - revise the measurement of “15,000 cubic feet” to read “112,500 gallons”
Subsection (c) - revise the measurement of “900 cubic feet” to read “6,750 gallons.”
54
SECTION 7. That this Ordinance shall take effect for bills printed on or after July 1,
2017 on its passage upon third and final reading, the public welfare and the welfare of the City
requiring it.
Passed: Shane McFarland, Mayor 1st reading
2nd reading
ATTEST: APPROVED AS TO FORM: Melissa B. Wright Craig D. Tindall City Recorder City Attorney SEAL
55
BILL AMOUNT FOR SELECTED RESIDENTIAL MONTHLY CONSUMPTION
Note: The table above is the fee schedule for monthly consumptions associated with 5/8” or 3/4" water meters (tax not included).
RATE AFFORDABILITY
The Department seeks to maintain a target affordability ratio of 2.0% or less for water and 2.0% or less for sewer (combined 4.0%). This is measured by the dividing of the average annual residential bill by the median household income of the City. When setting rates and evaluating rate structures, the impact on low income customers, while assuring that cost of service principals are met, are considered. The Safe Drinking Water Act (S.1547) established special assistance where the average residential water bill exceeds 2 percent of median income.
Gallons Cubic Feet Water Sewer Total Increase % increase
$8.22 $10.22 $18.44 $0.00 0.00%
748 100 $10.96 $14.46 $25.42 $0.00 0.00%
1,122 150 $12.33 $16.58 $28.91 $0.00 0.00%
1,496 200 $13.70 $18.70 $32.40 $0.00 0.00%
2,244 300 $16.44 $22.94 $39.38 $0.00 0.00%
2,992 400 $19.18 $27.18 $46.36 $0.00 0.00%
3,740 500 $21.92 $31.42 $53.34 $0.00 0.00%
4,047 541 $23.04 $33.16 $56.20 $0.00 0.00%
4,989 667 $26.50 $38.50 $65.00 $0.00 0.00%
5,236 700 $27.40 $39.90 $67.30 $0.00 0.00%
5,984 800 $30.14 $44.14 $74.28 $0.00 0.00%
6,732 900 $32.88 $48.38 $81.26 $0.00 0.00%
7,480 1,000 $35.62 $52.62 $88.24 $0.00 0.00%
9,971 1,333 $44.74 $66.74 $111.48 $0.00 0.00%
11,220 1,500 $49.32 $73.82 $123.14 $0.00 0.00%
14,960 2,000 $63.02 $95.02 $158.04 $0.00 0.00%
22,440 3,000 $90.42 $137.42 $227.84 $0.00 0.00%
24,931 3,333 $99.54 $151.54 $251.08 $0.00 0.00%
37,400 5,000 $145.22 $222.22 $367.44 $0.00 0.00%
44,880 6,000 $172.62 $264.62 $437.24 $0.00 0.00%
67,320 9,000 $254.82 $391.82 $646.64 $0.00 0.00%
89,760 12,000 $337.02 $519.02 $856.04 $0.00 0.00%
112,200 15,000 $419.22 $646.22 $1,065.44 $0.00 0.00%
149,600 20,000 $556.22 $858.22 $1,414.44 $0.00 0.00%
2,244 300 $16.44 $22.94 $39.38 $0.00 0.00%
5,004 669 $26.55 $38.59 $65.14 $0.00 0.00%
$2.74/100CF water, $4.24/100CF sewer
Proposed Rate 2017-2018
No raise in minimum bill or commodity rate
56
AWWA Research Foundation report entitled “Water Affordability Programs” suggest that programs should not be based on median income but rates that cause water bills to exceed 2 percent of income for impoverished households. Because of the focus on impoverished households, measure of the 2 percent was selected to determine if water costs were burdensome. The FY18 proposed monthly cost of water, tax, sewer and stormwater is compared to the Threshold Limits for Affordable Housing Assistance Murfreesboro Community Development 2016 below. Based on the average of 2.5 people per household using 5,200 gallons per month of water and 4,800 gallons per month of sewer, the annual cost of water, tax, sewer and stormwater after July 1, 2017 is calculated as $842, or $70.18 per month. This expense is less than 4% of the very low income threshold of $94.92 per month, or $1,139 annually. In comparing one (1) person through a five (5) household, the affordability metric passes.
FY18 RATE DESIGN: AFFORDABILITY FOR RESIDENTIAL 5/8” METERS
RATES, FEES AND CHARGES OBJECTIVES
The Department’s schedule of rates, fees, and charges are reviewed and adjusted, if necessary, on an annual basis to ensure that rate and revenue levels are adequately funding the overall goals and objectives of the Department and are reasonable and affordable. Rates and fees are established with consideration given to the following long-term rate setting objectives. Rate structures should reflect fixed costs that don’t vary with changes in water usage and production. They should also reflect variable costs, which do vary depending on the amount of water used or produced. The following objectives provide a general framework which can be consistently applied to future water and sewer rate reviews. Because some policy objectives may unavoidably conflict with others, they should be
$80.00
$91.33
$102.83
$114.17 $123.33
$-
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
$140.00
0 2000 4000 6000 8000 10000 12000
$ /
mo
nth
Gallons per Month
Cost of Service FY15
Proposed Rate FY18
Pro Forma FY20
Affordability HUD 2016
1 Person
2 Persons
3 Persons4 Persons
Avg. 5,200 gal/mo water Avg. 4,800 gal/mo sewer = $66.70 per month
5 Persons
57
considered in their entirety to strike an appropriate balance among them when reviewing and establishing the Department’s water and sewer rates.
1. Revenue Requirements: Rates shall be sufficient to meet the Department’s revenue requirements, while striving to charge the lowest feasible cost to the customer over the long run.
2. Customer Payment of Cost-of-Service: The Department shall implement a system of rates, fees,
and charges that effectively recovers allocated costs to customers in proportion to their responsibility for the costs incurred by the utility. Adherence to the cost-of-service principle
(benefiting party pays) shall be a guiding philosophy.
3. Equity: Rates should reflect a fair apportionment of the various costs of providing service among
different groups of customers served by the Department based on their differing service requirements.
4. Efficiency: Rates should provide incentives for cost effective use of facilities and conservation of
water and efficient use and reuse of water resources.
5. Rate Stability: Rate levels and structures shall be changed through gradual programmed
implementation of rate adjustments.
6. Financial Stability: Rate levels and structures shall be sufficient in the recovery of costs to operate
the system.
7. The Department will seek to maintain a target affordability ratio of 2 % or less for water and 2% or
less for sewer (combined 4%). This is measured by the dividing of the average annual residential bill by the median household income of the City. When setting rates and evaluating rate structures the impact of on low income customers, while assuring that cost of service principals are met, will be considered.
8. Connection Fees: The Department shall collect connection fees and sanitary sewer district fees from new water and sewer customers. These charges are intended to recover costs associated with facility capacity expansions necessary to meet the new customer’s water and sewer demands. These charges provide a method for dividing the cost burden of existing and planned facilities
between old and new customers.
9. Periodically the Department shall consider using the services of a qualified independent consultant
to conduct a comprehensive cost of service and rate study every two years.
59
DIVISION NARRATIVES – ACCOMPLISHMENTS AND GOALS
DEPARTMENT SUMMARY
The Murfreesboro Water Resources Department (Department) is an enterprise fund of the City of Murfreesboro. The fund is managed to fully recover the expenses of providing services from users (as opposed to taxes) and to build and preserve a substantial, long lived capital asset base in the treatment facilities, water distribution and storage system, wastewater collection system and repurified water distribution and storage system. Because utilities have many characteristics of a business, business accounting and financial management rules are usually applied to enterprise funds. Because of this, the presentation of the Department differs from that of the City General Fund Budget.
The Department’s aggressive maintenance and replacement programs result in a greater asset value. The Total Asset Value as of June 30, 2016 is $477,043,767, a 6.19% increase from FY15. The Department financial and management model is to improve infrastructure each year, strive to provide excellent customer service, make knowledge-based decisions and stretch the dollar to get the maximum benefit and minimize waste. The employees of the Department are dedicated to providing its customers with a bountiful supply of clean, safe water, sanitary sewer service and repurified (i.e., recycled) water service in the most economical and efficient way possible. Stormwater permit management is also provided. Water service is provided through approximately 26,824 meter connections within the Murfreesboro Water Resources Department water service area (35.54 square miles), and sanitary sewer service is being provided to areas served in the Consolidated Utility District water service area for an estimated additional 18,093 sewer only customers. The City operates a separate fund for Stormwater services and has 34,939 customers. There are 60.46 square miles within the city limits and 179.6 square miles within the Murfreesboro Urban Growth Boundary (UGB). The City also operates the largest reclaimed water system in the State of Tennessee; having 160 customers and delivering between 4 to 8 million gallons per day of high quality repurified water. There are a total of 168 full time and five (5) part-time positions budgeted for fiscal year 2018. There are three (3) licensed professional engineers, one (1) engineer-in-training, one (1) certified public accountant, three (3) professional operators, and fifty-one (51) employees with a Tennessee Certified Operators License for one or more of the following: water treatment, wastewater treatment, water distribution and wastewater collection system; eleven (11) at the Wastewater plant, eighteen (18) at Operations & Maintenance, and twenty-two (22) at the Water plant.
The Murfreesboro Water Resources Board held its first meeting on December 12, 1958. The first members consisted of C. B. Huggins, Herman O. Jones (Councilman), Jennings A. Jones, Sam Lasseter, and Fount Pitts. At that time, the Mayor was A. L. Todd, Jr., City Manager was H. L. McCullough, and Joe W. Lovell was Superintendent of the Water Department. The Director of the Department reports to the City Manager.
A seven member advisory board has the oversight of department policy and financial operations. The Board makes recommendations to the City Council. User charges provide the sole source of revenue for the Water Resources Department. No general tax base revenues are received, yet our rates are well below those of many of our sister utilities.
The Water Resources Board meetings are held on the fourth Tuesday of each month at 3:30 p.m., at 1725 South Church Street, Murfreesboro.
61
ADMINISTRATION & CUSTOMER SERVICE
DIVISION SUMMARY
The mission of the Murfreesboro Water Resources Administration and Customer Service staff is to provide service excellence in the initiation and ongoing service of water, sewer and repurified water. This division also expect to offer several web based platforms for our customers to engage in their water consumption and billing history to afford the opportunity to formulate and maintain water budgets. The “Help 2 Others” (H2O) program is intended to be a partnering collaboration with Rutherford County Community Helpers to afford aid to lower income customers who may need aid to pay for their water and sewer services.
ORGANIZATIONAL CHART
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
Reconfigure customer service office to provide better service to customer.
Employee health and safety severity rate
Training hours per employee
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Update financial reviews and conform to Financial Management Policies that were adopted on December 17, 2013.
Maintain reserve funds to annual operating expenses
Maintain a Debt Service Coverage Ratio of 1.2 or greater
ADMINISTRATION
AMI & Field
Services
Accounting Customer
Service
Safety
Fixed Assets Accounts
Payable
General IT
62
Perform a Cost of Service Study for year ending June 30, 2017
Fund capital expenses related to road projects from reserve funds
Fund $1.25 million annually for sewer rehabilitation
Continue implementation of the adopted Water Resources Department Information Technology (IT) master plan
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Implement an Advanced Metering Infrastructure (AMI) (e.g., wireless radio reading of water meters), proactively engage customers primarily through early leak notifications.
Allow Customer interface to account history and usage through new CIS and AMI web-based portals.
Improve billing accuracy
Voice and email messaging to customers
PROPOSED ADMINISTRATION, ENGINEERING AND CUSTOMER SERVICE BUDGET
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
ADM & GENERAL EXPENSES $7,522,528 $5,512,324 $5,045,406 $4,459,446 $5,007,023
CUSTOMER BILLING & COLLECTION $1,356,388 $1,690,264 $2,033,696 $1,892,617 $2,099,088
CUSTOMER BILLING/COLLECTION AND ADMIN/GENERAL EXPENSES
63
7561
7342
7327
6683
7267
67186960
6284
6054
62656097
6083
63045871
5887
6139
6167
5634
6048
5498
5828
5562
5296
55965499
52935634
5177
5505
5251
0
1000
2000
3000
4000
5000
6000
7000
8000D
ec-1
1
Jun
-12
Dec
-12
Jun
-13
Dec
-13
Jun
-14
Dec
-14
Jan
-15
Feb
-15
Mar
-15
Ap
r-1
5
May
-15
Jun
-15
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-15
Dec
-15
Jan
-16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-16
CASHIER PAYMENTS
CASHIER
76006971 6607
5974 6176 60146830
5426 53544606
5699 53904732
5489 5064 48975517
45815345 5191
1897
19141913
1853 16491297
1433
1204 986
1091
10391071
1059
1067946 921
1135
898
985 924
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
MAILED AND DEPOSITED PAYMENTS
MAIL NIGHT DEP
Walk in and drive through transactions are down 27.7% (~2100 per month)
Night deposits (drop box) are down 46.7% (~900 per month) Receipts by mail are down 32.4% (~2500 per month)
64
5528 5662 5726 57656814
5731 5851 5907 5923 5930 5920 5944 5915 5932 5974 5981 5977 5947 5933 5982
17352600 2853 2657
2915
2673 3053 2756 3020 2516 2804 2989 2623 2665 2784 2628 2798 2512 2762 28060
0471 881
1376
1453
2553 3269
46484160
44544754
4681 4666 4799 4804 5056 5091 5048 5170
0
2000
4000
6000
8000
10000
12000
14000
16000
ELECTRONIC PAYMENTS
ACH ELECTRONIC ONLINE/IVR
Electronic bill payments are up 56.6% (~1000 per month), currently serving ~10% of our customer base and growing
Online and IVR transactions are trending strongly upward and currently stand at ~4800 per month, serving ~18% of our customer base
65
ENGINEERING
DEPARTMENT SUMMARY
The mission of the Murfreesboro Water Resources Engineering Department staff is to provide adequate water, sewer and repurified water infrastructure for the citizens of Murfreesboro, to provide information regarding this infrastructure geographically through our GIS system and to meet the State of Tennessee’s NPDES Stormwater permit requirements for MS4 Cities.
ORGANIZATIONAL CHART
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
Provide adequate water, sewer and repurified water infrastructure.
Manage encroachments into easements to allow proper maintenance of infrastructure.
To continue to upsize water mains to provide fire protection.
Continue to upsize existing sewer infrastructure as development continues.
To rehabilitate the existing sewer collection system to prevent back-ups and overflows.
GIS Private
Development
Capital Improvement
& Sanitary Sewer
Rehabilitation
Assistant Director of
Engineering &
Compliance
Plans Review
Data Support &
Management
Stormwater
NPDES
Compliance
Design
Inspection of
Control
Measures
Building &
Codes
Coordination
Easement
Acquisition
Illicit
Discharges
GPS Data
Collection (water,
sewer, stormwater,
repurified water)
Inspection
Bidding
Inspection
66
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Provide coordination of the City’s and Murfreesboro Water Resources Department’s Capital Improvement Program.
Design and provide project management and construction inspection as necessary to strive to reduce the total cost of the Capital Improvement Program.
To maintain a Closed Circuit Television database of the sewerage system to assist with the Operations and Maintenance of the sewerage system.
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Ensure prompt review and approval of private development construction plans for water, sewer and repurified water extensions to include coordination and explanation of the review and approval process with both engineers and developers.
Provide water, sewer and repurified water connection fees for current projects under development within a timely manner.
FY 2017 ACCOMPLISHMENTS
Completed construction of the 2015-2016 Sewer Rehabilitation Project, S. Church St. Sanitary
Sewer Extension and Sanitary Sewer Assessment District
Completed numerous projects through the Mechanical/Electrical Services Contract with John
Bouchard.
Recalculated non-residential Stormwater Fees for parcels in City Limits
Created SOP’s for standard GIS/CIS tasks
Linked COBOL based Tap Information to correct Acct records in CIS Infinity to retire historical
COBOL Tap System (62% complete)
Updated 28,000 sewer services in GIS using information from CobraTec software.
Continued updates to mobile/web applications with ArcGIS Online. Currently using 34 applications
for employee and public use.
Continued to maintain Facebook account for MWRD.
Continued to maintain MWRD’s web site with the City of Murfreesboro.
FY 2018 DEPARTMENT GOALS
Development of decentralized sewer treatment system Septic Tank Effluent Pump (STEP) design guidelines and development policy
Continue J. Percy Priest reservoir modeling confirming Corps of Engineers 2016 reallocation report results; provide recommendation regarding purchasing additional storage from Corps
Development of Biosolids Master Plan
Development of Water Resource Integration Plan (WRIP) as a corollary to Murfreesboro 2035
67
Complete Construction of the Sinking Creek WWTP, Phase 4D – Expansion to 24 MGD, and Dejarnette Lane Pump Station #13 Replacement
TN Department of Environment and Conservation (TDEC) consolidation of bioassessment surveys, waste load allocation modeling in order to develop 2021 National Pollutant Discharge Elimination System (NPDES) permit rationale
Manufacturing pilot, marketing study and agricultural stakeholder engagement for Class A biosolids
Begin construction of the 2016-2017 Sewer Rehabilitation Project, Raleigh Ct. Pump Station Abandonment and Ransom Dr. Pump Station Replacement.
Continue to Design and Construct Water & Sewer Infrastructure Improvements in conjunction with the City’s Annual Paving Efforts Utilizing the experience of Operations and Maintenance
Continue Permanent & Temporary Flow Monitoring within the Department’s sewer system.
Create & publish metadata for all features in GIS
Recover lost revenue from non-billed accounts with Fire Protection, identify locations where fire protection systems have not been metered & direct installation, & establish a fair & equitable mechanism to bill for fire protection.
Link COBOL based Tap Information to correct Acct records in CIS Infinity to retire historical COBOL Tap System (62% complete)
Create and maintain new MWRD web site in conjunction with city’s update to web site.
Update GIS servers and GIS software to current ESRI software.
69
OPERATIONS AND MAINTENANCE
DIVISION SUMMARY
The Operations and Maintenance division of the Murfreesboro Water Resources Department is an essential part of the department in that it encompasses many aspects of the management of the City’s Wastewater Collection and Water Distribution Lines. This includes the maintenance and rehabilitation of existing water and sewer lines, installing new meters and sanitary sewer cleanout connections, repairing water main leaks, main sewer line blockages, and pump station maintenance and repairs as well as new construction projects such as replacement and installation of new main water lines and sewer lines throughout the City of Murfreesboro.
The Department sanitary sewer service planning area encompasses the present city limits as well as the area within the Murfreesboro Urban Growth Boundary (UGB) and certain drainage basins which are contiguous to the UGB and drain naturally into the UGB. The total planning area encompasses 203 square miles. This planning area was established as part of the 201 Facilities Plan Update in 2002. The wastewater collection system consists of 612.66 miles of gravity sewer (reflects an increase of 12.77 miles), 46 pumping stations with 34.5 miles of force main (increase of 5.23) and 14,900 manholes (increase of 441), and 201.73 miles of house service lines (increase of 16.23 miles).
ORGANIZATIONAL CHART
O&
M
Water
Transmission & Distribution
Repurified
New Construction
Meter Reading
WasteWater
Collection Systems
Rehab
Pump Station
Private Lateral
Stormwater
Admin & Inventory Control
70
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
We provide and maintain 441.57 miles of high quality water service for all citizens of the City of Murfreesboro.
Provide and maintain 25.01 miles of repurified water lines.
Provide and maintain fire protection in order to maintain Class 2 fire rating; 3,432 fire hydrants (increase of 46).
Insure well trained staff follows all public health procedures set forth by the TDEC and EPA.
Certifications – Eighteen certified Grade II Operators in Collection/Distribution.
Meters – 26,822 (increase of 154).
Stormwater –665.21 (increase of 1.18)
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Provide water and sewer service that meets all consumers needs along with maintaining an ISO Fire Rating Class 2.
Continue to operate within the budget.
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Maintain and expand an infrastructure that provides water and sewer service that will attract businesses and residents.
Provide immediate response to customers’ complaints, along with maintaining all services to the consumers.
Respond to citizen inquiries regarding other city services by directing them to the right department and follow up that they have been contacted by others.
Continue to rehab the water and sewer infrastructure by replacing water/sewer main lines, updating house service connections including customers’ sanitary sewer house services if criteria for replacement are met.
FY 2017/2018 DEPARTMENT GOALS
Continue to replace infrastructure that will upgrade the distribution system that will provide a better quality of water along with providing fire protection to areas that are lacking.
Continue to rehabilitate the sanitary sewer collection system in order to reduce inflow/infiltration and help reduce the pumping and treatment process costs.
Continue to maintain the approximately 1113.78 miles of water, sewer, and repurified infrastructure at a high quality at the most economical cost possible to the consumer. (Increase of 21.57)
Continue to purchase maintain 1.1 million of inventory and improve recent audit that is within 5/10 of 1 percent accuracy.
Work with Street Department in maintaining 665.21 miles of stormwater system.
71
Continue house service crew to repair and/or replace customer house sewer service at no charge to the customer if it meets the department’s criteria.
Continue AMI Implementation Total cleanouts installed:
2014 – 743 2015 – 780
2016 – 1140
BENCHMARKING MEASURES
Provide at least 216 hours of educational training for Distribution II and Collection II Operators according to TDEC.
Complete 8 hours of Blasting Training required by TN Department of Commerce and Insurance.
Achieve a score of 100 on the Sanitary Survey. (Previous score 100).
O&M has 18 certified operators and management will encourage additional employees to obtain the DS II and CS II Operator Licenses from TDEC.
Continue Employee Involvement Program (EIP) to improve employee communication and customer service.
73
DRINKING WATER TREATMENT PLANT
DIVISION SUMMARY
The Water Treatment Plant is charged with directing and conducting treatment, production and distribution of potable water for consumption; quality control and assurance through laboratory analysis of the potable water; the maintenance all plant facilities, storage tanks and equipment; flushing of distribution mains and dead-end lines; and identifying, detecting and preventing cross-connections to the potable water system. The Stones River Water Treatment Plant is located behind the Alvin York Veteran’s Administration Hospital, at 5528 Sam Jared Road. It has a treatment capacity of 20 million gallons per day. The last expansion in 2010 increased treatment and pumping capacity, added membrane filtration, granular activated carbon contactors, standby power generation and changed the disinfection process from chlorine gas to sodium hypochlorite. The water quality laboratory facilities were remodeled and expanded. The sand filters, replaced by membrane microfiltration, were converted to granular activated carbon beds providing removal of taste and odors; pharmaceuticals and personal care products; and disinfection byproducts. The plant operates continuously producing an average of 12 million gallons per day, with a peak of 17 million gallons per day, of potable water, all of which meets or surpasses all state and federal drinking water regulations. The primary water source is the East Fork of the Stones River with an alternative source at the J. Percy Priest Lake, both of which are classified as surface water supplies. The water system is interconnected with Consolidated Utility District of Rutherford County’s potable water system in case of an emergency. The Department’s water service area encompasses 36 square miles. The water distribution system includes five water storage tanks with a total storage capacity of 12 million gallons. All five storage tanks have standby power generation which allows the water treatment plant to control water in and out of the tank; monitor the telemetry systems; monitor the security system; and keep the wireless network operating in the event of a power outage. Murfreesboro maintains a Class 2, ISO Public Protection Classification for fire protection. The water system accounts for 40% of the score and the remaining 60% the Murfreesboro Fire Department. In the last rating survey the Water Resources Department scored 37.76 points out of a possible 40 for water supply toward the scoring for the classification. In 2010, the Stones River Water Treatment Plant was recognized by the American Council of Engineering Companies of Tennessee with the 2010 Engineering Excellence Grand Award and the Kentucky-Tennessee Section American Water Works Association 2010 Award of Excellence for Plant Operations in the 10 million gallons per day and above category.
In 2014, the Stones River Water Treatment Plant became a member in the Partnership for Safe Water Treatment Plant Optimization Program. The Plant is going into its second year in the program. In 2016, the Murfreesboro Water Resources Department received a 100%, 599 points out of 599, on the Tennessee Department of Environment and Conservation Water Resources Sanitary Survey.
ORGANIZATIONAL CHART
74
Water Treatment
Plant
Operations
Cross-
Connection
Control
Adminstration Laboratory Maintenance
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
Safeguarding public health and the environment through highly trained personnel dedicated to producing, analyzing and distributing high-quality drinking water.
Safeguarding public health and the environment through the proper handling and disposal of chemicals.
Safeguarding public health through a well-executed cross-connection control program designed to eliminate possible contamination of the System’s drinking water.
Safeguarding public health through a well-executed distribution flushing program designed to maintain high-quality drinking water.
Safeguarding public health through a well-qualified staff trained in emergency response.
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Provide an adequate supply of water and pressure for fire protection to maintain an ISO Class 2 fire rating.
Provide high-quality drinking water that will attract and maintain businesses and residents.
Provide sufficient quantity of water to meet customer’s demands.
Provide twelve million gallons of potable water storage.
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Maintain good communication and rapport with neighboring utilities.
Provide an annual water quality report.
Provide high-quality drinking water that will attract and maintain businesses and residents. Provide immediate response to customer complaints and inquiries.
FY 2017/18 DEPARTMENT GOALS
Continue to improve energy conservation at all locations and participation in the EnerNOC program.
Maintain standard for water treatment plant operators to achieve a TDEC Grade IV water certification within twenty-four (24) months from the date of being assigned as an operator.
75
Encourage Shift Supervisors obtain the Certification Commission for Environmental Professionals’ (C2EP) Class IV Professional Operator Certification.
BENCHMARKING MEASURES
Achieve drinking water compliance rate of 100%.
Achieve combined filter effluent turbidity of less than 0.10 NTU in 95 percent of all samples monthly based on values recorded at 15 minute time intervals.
Maintain certification as a State Certified Laboratory in Chemistry and Microbiology.
Maintain training hours per full-time employee at twelve (12) hours or more annually.
Respond to 100% of customer complaints within 24-hours.
WATER LOSS
In accordance with TCA 7-82-702 and 68-221-1009a, the Utility Management Review Board and the Water and Wastewater Financing Board (Boards) have set an excessive water loss percentage at 30%. The Boards adopted the American Water Works Association (AWWA) water loss methodology for determinant water loss reported on financial statements.
Water Source Expenses$241,000
3%
Water Treatment Operations$3,949,399
60%
Water Treatment
Maint$-
0%
Water Storage$63,500
1%
Water Distribution Operations$1,436,649
22%
Water Distribution Maintenance
$-0%
Cross Connection$249,271
4%
Water Plant Administration
$648,240 10%
Water Division FY17-18 Operating Expenses
77
WATER RESOURCE RECOVERY FACILITY
DIVISION SUMMARY
The Clean Water Act prohibits discharging pollutants into a "water of the United States” without a National Pollutant Discharge Elimination System (NPDES) permit. The United States Environmental Protection Agency (EPA) has delegated enforcement of this federal law to the Tennessee Department of Environment and Conservation (TDEC). In turn, TDEC has issued the City of Murfreesboro an NPDES permit to discharge the Sinking Creek plant’s effluent into the West Fork Stones River. The Sinking Creek Wastewater Treatment plant is the heart of an operation which begins with an expansive
wastewater collection system that is regulated by a Pretreatment program and a Fat, Oils, and Grease (F.O.G.) program. The operation’s process is complete when the high quality effluent is either discharged into West Fork Stones River or put to beneficial reuse. The reuse portion of the operation includes an expanding network of over 26 miles of reuse water lines, public irrigation sites, two Department owned farms totaling over 600 acres, and two storage towers with a combined capacity of two million gallons. The Sinking Creek Plant, located at 2032 Blanton Drive, was constructed in three phases beginning in 1995. The final phase was commissioned in May of 2000. It has a permitted design flow capacity of 16 million gallons per day (MGD). In the autumn of 2017, construction of a 50% plant expansion will be complete and capacity will be expanded to provide for the City’s rapid population growth. Sinking Creek provides primary treatment of the influent flow through the use of fine step screens and a vortex grit removal process. Secondary treatment is a carefully controlled multi-stage biological process that includes various microorganisms metabolizing ammonia ultimately into Nitrogen gas and other microorganisms accumulating Phosphorus. This takes place in anoxic basins for denitrification, oxidation ditches which utilizes an extended aeration process for nitrification, and four two million gallon final clarifiers. The effluent from the biological process is passed through eight deep-bed sand filters for the removal of fine solids and then disinfected with ultraviolet light. Lastly, the effluent is oxygen enriched by submerged aerators. In 2001 the Sinking Creek Wastewater Treatment Plant was recognized by the Greater Nashville Regional Council with the Local Government award for Excellence in Water/Wastewater Facilities and by the American Council of Engineering Companies of Tennessee with the Engineering Excellence Award. In 2011& 2015 the plant received the Tennessee’s Beneficial Reuse of Effluent Award from the Kentucky-Tennessee Water Environment Association. In January of 2015 Sinking Creek received the Outstanding Performance Award (or “Plant of the Year” as it’s known) from The Tennessee Water and
78
Wastewater Association. Sinking Creek will receive the Operational Excellence Award in July 2017 at the Kentucky-Tennessee Water Professionals Conference for the fifth year in a row.
ORGANIZATION CHART
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
Safeguarding neighborhoods and the environment through the employment of a highly trained staff of scientists, master electricians and mechanics, management information systems specialist, and treatment experts dedicated to producing high-quality effluents.
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Sustaining adequate capacity to meet wastewater customers’ treatment needs.
Providing sufficient repurified water to meet customers’ needs without any service interruptions.
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Providing a high quality product that will attract repurified water consumers.
Maintaining pretreatment services that are welcoming to new and prospective industries.
Providing immediate, friendly response to customer inquiries and first call resolution to complaints.
Operations Lab Maintenance Repurified
Water
Water Resource Recovery
Pretreatment
Program
F.O.G.
Program
SCADA
Admin. Biosolids
Instrumentation
& Electronics Distribution
Farms
79
ENGAGING OUR COMMUNITY
Participating in public outreach to educate students and citizens.
Conduct facility tours to promote stakeholder understanding and civic engagement.
FY 2017 GOALS
Operations
Operational excellence with a 100% wastewater effectiveness rate.
Complete construction of 4D plant expansion with successful startup.
All plant operators to become TDEC Grade IV Wastewater Treatment certified.
Encourage Master Operators to get PO & Collection System certification. Biosolids
Optimize the three new Fournier presses.
Complete the Biosolids Master Plan for the production of Class A EQ Biosolids. Laboratory
Successfully pass the Study 37 analysis.
Prepare for potential Wastewater Laboratory certification. Pretreatment Program
Streamline services for new and potential industrial customers.
Maintain a good rapport with all industrial users. F.O.G. Program (Fats, Oil, & Grease)
Increase quality control measures for grease control equipment services.
Explore new methods to reduce F.O.G. accumulations in the collections system. Maintenance
Further develop and utilize the Computer Maintenance Management System.
Improve preventative and predictive maintenance measures. Repurified Water
Engage Citizens concerning the value of Reuse water & the concept of “Direct to Potable.”
Install two medium irrigation units at the Coleman and Jordan farms.
80
KEY PERFORMANCE MEASURES
1,000+ Trips to the Landfill 20,000+ Tons of Biosolids
Hauled Another – ACCIDENT FREE -
year
FY 2017
Biosolids
81
PROPOSED BUDGET WASTEWATER COLLECTION & TREATMENT
Sewer Collections Operations$1,571,894
20%
Sewer Collections Maintenance
$-0%
Sewer Rehabilitation$155,466
2%
Sewer Pump Stations$660,069
9%
Sewer Ind Surv Person
$292,763 4%
Sewer Private Laterals$7,500
0%
House Services$12,000
0%
Sewer Treatment Operations$3,131,688
40%
Sewer Disposal$639,727
8%
Sewer Plant Administration
$907,887 12%
Repurified System Expenses$357,955
5%
Sewer Division Operating Expenses
83
DEBT SERVICE (CAPITAL OUTLAY)
The Debt Service or Capital Outlay budget is based on the Debt Policy approved by the Murfreesboro Water Resources Board in December 2011. Principal and interest on Department debt is funded from revenues received for services provided. It is backed by the full faith, credit and taxing power of the City. Murfreesboro has two outstanding loans issued through the variable rate debt program managed by the Tennessee Municipal Bond Fund (Loan IDs 50279 and 50368). The two remaining variable rate obligations total approximately $33 million and represent 31 percent (31%) of the Department’s current outstanding debt. The Department entered into three Clean Water, State Revolving Fund (SRF) Loan agreements in the fall of 2012 (see table below). Loans 2012-306, 2013-317 and 2012-303 total $37 million in proceeds. Debt forgiveness on the loans totals $2.87 million, resulting in a maximum of $34.13 million in debt. Interest is at 1.01%. Final loan proceeds are expected to be approximately $25.1 million. All three (3) loans are amortized with an annual debt service of $1.87 million over 20 years. On October 9, 2014 the Department was awarded $4,000,000 and $32,500,000 SRF loans for the expansion of the Sinking Creek Wastewater Treatment Plant from 16.0 MGD to 24.0 MGD (see table below). The loans are 20-year term with a fixed interest rate of 1.38%. The $4 million loan has been fully drawn, with annual debt service of $225K over 20 years. The 32.5 million loan should be amortized in early FY18, with an annual debt service of $1.8 million. Final loan draws will determine the final debt service amounts.
Project Funding Source
Total Estimated Project Cost
Principal Forgiveness
Total Estimated Loan
Southwest Regional Pump Station SRF $8.6 M $2.1M $6.5 M
Fournier Presses and related equipment SRF $1.4 M $400 k $1.0
Southwest Regional Force Main SRF $8.9 M $400k $8.5M
SCWWTP Headworks SRF $9.1 M $0 $9.1 M
SCWWTP Plant Expansion SRF $34.0M $0 $34.0M
TOTAL $61.9M $2.9M $59.0M
84
One of MWRD’s financial policies is to maintain a Debt Coverage Ratio (funds available for debt coverage divided by capital outlay) of 1.2 or greater. The following graph is a summary of MWRD’s FY18 Debt Coverage Ratio summary:
$(1,000,000)
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
1/1
/20
13
4/1
/20
13
7/1
/20
13
10
/1/2
01
3
1/1
/20
14
4/1
/20
14
7/1
/20
14
10
/1/2
01
4
1/1
/20
15
4/1
/20
15
7/1
/20
15
10
/1/2
01
5
1/1
/20
16
4/1
/20
16
7/1
/20
16
10
/1/2
01
6
1/1
/20
17
4/1
/20
17
7/1
/20
17
10
/1/2
01
7
1/1
/20
18
4/1
/20
18
7/1
/20
18
Cap
ital
OU
tlay
($
)
Quarterly Periods
MWSD Capital Improvements Plan Cash Flow Expenditures FY14 to FY18
SCWWTP Process expansion to 24 mgd - Construction
Wastewater Treatment Plant- Headworks Construction
Southwest Regional Pumping Station
Southwest Regional Force Main
Principal Forgiveness
Engineering for PS, FM and HW & 4D Inspection
Total $52,330,000
-
0.50
1.00
1.50
2.00
2.50
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
DCR (Goal = >1.2) 2.03 2.01 1.84 2.06 1.71
DEBT COVERAGE RATIO
85
Summary of FY18 Capital Outlays:
DEBT SERVICE FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
FY18 BUD
vs FY17
PROJ
BOND EXP SERVICE CHARGES 30,580 28,793 36,000 28,000 30,000 2,000
-
TAP FEE EXPENSE 378,845 469,090 350,000 -
-
INTEREST INC 2016 ADV REFUNDING -
-
INTEREST EXP TMBF 2003 LN 31,051 32,098 44,000 46,800 50,000 3,200
INTEREST EXP TML 2006 218,974 231,054 300,000 356,000 400,000 44,000
INTEREST EXP 2009 REFUND 1,085,813 1,157,400 1,081,800 355,250 242,250 (113,000)
INTEREST EXP 2013 REFUNDING 326,294 284,991 239,010 239,010 192,439 (46,571)
INTEREST EXP 2016 REFUNDING 641,061 662,000 20,939
INTEREST SRF 2012-303 PS - 62,063 67,500 73,308 69,804 (3,504)
INTEREST SRF 2013-317 FM 20,965 34,632 32,940 32,940 31,248 (1,692)
INTEREST SRF 2012-306 HW - 154,609 206,500 223,896 213,204 (10,692)
INTEREST SRF 2016 4D #1 27,348 - 52,860 50,412 (2,448)
INTEREST SRF 2016 4D #2 21,604 - 225,000 388,000 163,000
-
PRINCIPAL TML 2003 428,000 442,000 456,000 456,000 471,000 15,000
PRINCIPAL TML SERIES 2006 1,798,000 1,879,000 1,963,000 1,963,000 2,051,000 88,000
REVENUE AND TAX BOND 2009 2,115,000 2,195,000 2,260,000 2,260,000 2,370,000 110,000
PRINCIPAL 2013 REFUNDING 3,465,000 3,510,000 3,555,000 3,555,000 3,600,000 45,000
PRINCIPAL 2016 REFUNDING 100,000 100,000 -
PRINCIPAL SRF 2012-303 PUMP ST - 114,368 345,500 345,240 348,468 3,228
PRINCIPAL SRF 2013-317 FORCE MN 95,802 165,444 166,992 166,992 168,552 1,560
PRINCIPAL SRF 2012-306 HEADWORKS - 349,340 1,055,000 1,054,548 1,064,388 9,840
PRINCIPAL SRF 2016 4D #1 87,852 - 177,432 179,748 2,316
PRINCIPAL SRF 2016 4D #2 - 716,000 716,000
- - -
DEBT SERVICE 9,994,324 11,246,686 12,159,242 12,352,337 13,398,513 1,046,176
86
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
FY15ACTUAL
FY16ACTUAL
FY17BUDGET
FY17PROJECTION
FY18BUDGET
DEBT SERVICE $9,994,324 $11,246,686 $12,159,242 $12,352,337 $13,398,513
CAPITAL EXPENDITURES $2,561,638 $3,645,500 $6,653,565 $5,914,500 $5,928,620
CAPITAL OUTLAY (DEBT SERVICE) & CAPITAL EXPENDITURES
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
20
14
20
15
20
16
20
17
20
18
20
19
20
20
20
21
20
22
20
23
20
24
20
25
20
26
20
27
20
28
20
29
20
30
20
31
20
32
20
33
20
34
20
35
20
36
MWSD Annual Debt Service Existing and SRF Added
SRF ADDED DEBT SERVICE
TOTAL EXISTING DEBT SERVICE
87
RATE FUNDED CAPITAL EXPENDITURES
Rate Funded Capital Expenditures are infrastructure and equipment that is funded from the user rates. It includes vehicles replacement, treatment equipment, water meters, fire hydrants, and allowances for water, sewer and sewer rehabilitation projects constructed with Department crews. The goal is to annually fund over $5.0M in Rate Funded Capital Expenditures.
METERS 100,000
2%
WATER TAPS 200,000
3%SEWER TAPS
100,000 2%
REPURFIED TAPS 5,000 0%
FIRE HYDRANTS 25,000
0%
WATER LINES 425,000
7%
SEWER LINES 350,000
6%
SEWER REHAB CONSTRUCTION 1,500,000
25%
BLDG/LAND IMPROVEMENTS 662,000
11%
NEW EQUIP VEHICLE 510,000
9%
NEW EQUIP SWR REHAB 16,000
0%
NEW EQUIP WTR PLANT 18,500
0%
NEW EQUIP MAINT. 263,500
4%
NEW EQUIP SWR PLANT 67,500
1%
NEW EQUIPMENT LIFT STATNS 136,000
2%
NEW EQUIPMENT OTHER 10,000
0%
EQUIP REPLACE WTR PLNT
522,100
9%
EQUIP REPLACE MAINT 16,500
0%
EQUIP REPLACE OTHER 65,920
1%
EQUIP REPLACE
SWR REHAB 28,500
0%
WIP LABOR ALL SOURCES 400,000
7%
EQUIP REPLACEMENT SWR PLT 500,600
8%
EQUIPMENT REPLACE LIFT ST 6,500 0%
FY18 Capital Expenditure Budget
89
WORKING CAPITAL RESERVES
Working Capital is Department cash available to fund Department projects less any secured cash reserves and after obligations in various work orders. MWRD is projecting $26.76M in Operating Cash available to pay for capital projects as of March 31, 2017. “Available” funds are those funds designated above that has been committed to current or pending projects and above the secured twelve (12) month minimum balance of operating and maintenance expenses.
EFFECTIVE UTILITY MANAGEMENT
Financial Viability MWRD WORKING CAPITAL ACCOUNT SUMMARY
ESTIMATED Working Capital at 3/31/17
Board Designated (System Dev, Assessments, etc) as of 6/30/16 $ 26,890,920
Undesignated Excess Funds as of 6/30/16 28,114,143
Estimated Reserve Revenue thru 3/31/17 7,672,000
Estimated Reserve Expenditures thru 3/31/17 (8,422,419)
$ 54,254,644
COMMITTED Reserves at 3/31/17 $ 3,863,780
BALANCE of Working Capital after COMMITMENTS $ 50,390,864
DESIGNATED Projects Pending $ 2,200,000
ESTIMATED UNCOMMITTED Working Capital Reserves $ 48,190,864
SECURED FY17-18 Operating and Maintenance Expenses $ 21,431,119
UNASSIGNED Working Capital Funds (Est. Uncommitted - Secured) $ 26,759,745
Outstanding commitments in work orders approved by the Board and Council to be funded from Restricted Cash amount to obligations of existing Restricted Cash in the amount of approximately $3.86M. The Board adopted a policy to keep an equivalent of one year operating expense as a restricted reserve. For FY18 this minimum balance will be $21,431,119 million. This results in an estimated $26,759,745 in available cash (working capital) for future projects to be funded. The following table shows a pro forma forecast of the available working capital fund through FY21 based on projected tap revenue, sinking fund revenue from rates, enhanced AMI revenue and anticipated projects funded with cash on hand (i.e., working capital reserves).
90
SECURED AND OPERATING CASH
2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
2017 FY 2018 FY 2019 FY 2020 FY 2021 FY
PROJECTED RESERVE FUND BALANCE REVENUE (TAPS) $6,000,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000
PROJECTED ENHANCED REVENUE FOR RESERVES $500,000 $750,000 $2,000,000 $2,000,000 $2,000,000
SINKING FUND DEPOSITS TO RESERVES FROM RATES $1,485,000 $1,765,000 $1,375,000 $1,375,000 $1,375,000
SECURED MIN. BALANCE FOR WORKING CAPITAL RESERVES $21,792,755 $22,228,610 $22,673,182 $23,126,646 $23,589,179
PROJECTED WORKING CAPITAL RESERVE BALANCE $50,850,453 $45,810,453 $42,485,453 $35,160,453 $34,535,453
FUNDS ABOVE SECURED MINIMUM BALANCE $29,057,698 $23,581,843 $19,812,271 $12,033,807 $10,946,274
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
$50,000,000
$55,000,000
2017 FY 2018 FY 2019 FY 2020 FY 2021 FY
Wo
rkin
g C
apit
al R
ese
rve
Fu
nd
s
Fiscal Year
Projected Working Capital Account Comparedto Minimum Balance Required
PROJECTED WORKING CAPITALRESERVE BALANCE
SECURED MIN. BALANCE FORWORKING CAPITAL RESERVES
91
The following table itemizes the capital projects anticipated to be funded with the Department’s working capital reserves (i.e., cash on hand).
PROJECT 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 TOTAL
2017 FY 2018 FY 2019 FY 2020 FY 2021 FY
W&S CAPITAL IMPROVEMENT PROJECTS
Misc FY16 Working Reserve Commitments $1,400,000 $1,400,000
Customer Service Area Security Renovations $750,000 $750,000
NE Regional Engineering Design $250,000 $1,000,000 $500,000 $250,000 $250,000 $2,250,000
NE Regional P.S. $2,500,000 $5,000,000 $2,500,000 $10,000,000
NE Regional Force Main $2,500,000 $5,000,000 $2,500,000 $10,000,000
Walter Hill Dam Repair/Remediation $500,000 $500,000
Lift Station Rehab/Replacement (#13) $500,000 $1,000,000 $1,500,000
Lift Station Rehab/Replacement (#9) Ransom Dr. $650,000 $650,000
Add #4 Hi Service Pump SRWTP $680,000 $680,000
WTP Membrane Replacement $650,000 $650,000
Biolsolids Processing Equipment & Storage Addition $1,500,000 $1,500,000 $1,500,000 $1,500,000 $6,000,000
Direct Potable Reuse Pilot $200,000 $200,000
Stones River Water Qual Sampling / NPDES Permitting $200,000 $250,000 $250,000 $150,000 $150,000 $1,000,000
WTP Bar Screen, Pipe Gallery Leaks, Actuator Access $750,000 $800,000 $1,550,000
Subtotal CAPITAL PROJECTS $3,850,000 $6,080,000 $7,250,000 $12,550,000 $7,400,000 $37,130,000
TRANSPORTATION (Water/Sewer Imp.)
Bradyville Pike $500,000 $500,000 $500,000 $1,500,000
MT Blvd Widening- Greenland to Main $250,000 $250,000
Lytle St. Relocation (Ph1 & Ph2) $750,000 $750,000 $1,500,000
SR 99 Widening- Old Fort to Cason Lane $500,000 $500,000 $500,000 $1,500,000
St. Clair St. $500,000 $500,000
John Rive Blvd & Rucker Lane $200,000 $200,000
Cherry Lane Repurified Main Extension (14,600 LF) $825,000 $1,000,000 $1,825,000
Maney Avenue Reconstruction - Phase 2 $250,000 $250,000 $500,000
Wilkinson Pike Reconstruction ( MCP to TL) $650,000 $650,000
Subtotal TRANSPORTATION PROJECTS $1,000,000 $4,175,000 $2,250,000 $1,000,000 $0 $8,425,000
REHABILITATION
Sewer Rehabiliation - Maintenance Contract $1,500,000 $1,500,000 $1,000,000 $1,000,000 $1,000,000 $6,000,000
INFORMATION TECHNOLOGY PROJECTS
Advanced Metering Infrastructure (AMI) $950,000 $950,000
IT/Computer Systems Hardware Upgrades $50,000 $50,000 $50,000 $100,000 $100,000 $350,000
Electronic Content Management (Scanning/Imaging) $150,000 $150,000 $150,000 $450,000
IT Design Services & Consulting $100,000 $100,000 $100,000 $300,000
Comp Maintenance Management System (CMMS) $400,000 $400,000 $800,000
Subtotal INFORMATION TECHNOLOGY PROJECTS $1,100,000 $300,000 $700,000 $650,000 $100,000 $2,850,000
TOTAL Projects from Working Capital Reserves $7,450,000 $12,055,000 $11,200,000 $15,200,000 $8,500,000 $54,405,000
93
STORMWATER
DEPARTMENT SUMMARY
The NPDES Stormwater Program refers to aspects of stormwater management required under a Federally-mandated and State-issued National Pollutant Discharge Elimination System (NPDES) permit for the discharge of stormwater runoff from the municipal separate storm sewer system (MS4). The goal of the program is clean stormwater runoff discharged to local streams. This is accomplished through education of residents and business operators in pollution prevention, through good management of city operations, and through ordinances and requirements designed to prevent or capture pollutants in stormwater runoff both during and after construction in areas of new development and redevelopment.
ORGANIZATIONAL CHART
IMPLEMENTATION OF COUNCIL PRIORITIES
SAFE AND LIVABLE NEIGHBORHOODS
Promote green infrastructure (vegetation) as part of stormwater quality management practices
Educate the public on stormwater pollution prevention (oils, litter, herbicides, pet waste)
Monitor, and develop strategies to improve, water quality of local streams
STRONG AND SUSTAINABLE FINANCIAL AND ECONOMIC HEALTH
Stormwater quality standards that encourage practicable and long-term reliable stormwater management designs
EXCELLENT SERVICES WITH A FOCUS ON CUSTOMER SERVICE
Clearly stated ordinances and standards
Clear and understandable forms and submittal requirements for development projects
Prompt response and resolution of complaints
City TV and on-line web videos that provide news and education on stormwater programs
94
FY 2017 ACCOMPLISHMENTS
Visual stream assessment in Overall Creek watershed
Overall Creek Tree Day give-away and outreach
~200 trees planted at Jordan Farm with MTSU students
With MTSU completed wet-weather bacteria sampling study
Identified potential locations for retrofits of vegetation-based (green) stormwater controls
FY 2018 DEPARTMENT GOALS
Update Stormwater ordinance to add green infrastructure option for any sized development
Enforcement Response Policy per State permit requirement to 100% complete
Stormwater management plan (SWMP) to 75% complete
Better understand the hydrology of western Murfreesboro – Overall Creek watershed
Help determine how the Murfree Spring Wetlands can function properly
Stabilize eroding streambanks through streambank stabilization project
West Fork Stones River bank stabilization at Cason Trail
With Street Division install rain garden and/or planter box
95
Z:\engineering\Project Files\Stormwater\2017\17010 - Budget Work FY 2017-18\Narrative\Stormwater Budget Narrative FY 18.docx
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
FY14 Actual FY15 Actual FY16 Actual FY17Projected
FY18 Budget
Operating Revenues $2,720,680 $2,771,103 $2,815,808 $2,850,000 $2,900,000
O&M Expenses 1,531,329 2,846,987 2,677,696 2,422,788 1,679,626
Stormwater Revenues & Expenses
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
FY18 Revenues
StormwaterFees
$2,900,000
Total FY18 Revenues $2.9M
$0
$1,000,000
$2,000,000
$3,000,000
FY18Expenses
Working Capital ReserveExpense
$605,374
Storm Sewer Repair &Replacement
$250,000
Rate-funded CapitalAssets
$365,000
Outside Services $78,138
Generald Fund Services $854,150
Transportation $73,158
Public Outreach/Education
$59,652
Labor & Benefits $614,528
Total FY18 Expenses $2.9M
96
PROPOSED BUDGET STORMWATER
FY17 FY18 FY19 FY20 FY21
Projected Budget Pro Forma Pro Forma Pro Forma
REVENUE
Stormwater Fees $2,850,000 $2,900,000 $2,950,000 $3,000,000 $3,050,000
EXPENDITURES
Labor $405,402 $417,564 $430,091 $442,993 $456,283
Taxes/Benefits $191,227 $196,964 $202,873 $208,959 $215,228
City Reimbursement - Engineering $430,000 $442,900 $456,187 $469,873 $483,969
City Reimbursement - Legal $25,000 $25,000 $25,000 $25,000 $25,000
City Reimbursement - Street Dept. $375,000 $386,250 $397,838 $409,773 $422,066
City Reimbursement - Other $0 $0 $0 $0 $0
Consulting Services - MTSU $50,000 $50,000 $50,000 $50,000 $50,000
Consulting - Other $27,318 $28,138 $28,982 $29,851 $30,747
Transportation $71,027 $73,158 $75,353 $77,613 $79,942
Public Outreach/Adv $18,576 $19,134 $19,708 $20,299 $20,908
Other Expenses $39,338 $40,518 $41,734 $42,986 $44,275
Total Operating Expenses $1,632,889 $1,679,626 $1,727,764 $1,777,347 $1,828,418
Rate-funded Capital Assets $539,899 $365,000 $500,000 $350,000 $350,000
Storm Sewer Repair & Replacement $250,000 $250,000 $250,000 $250,000 $250,000
TOTAL EXPENDITURES $2,422,788 $2,294,626 $2,477,764 $2,377,347 $2,428,418
EXCESS REVENUES $427,212 $605,374 $472,236 $622,653 $621,582
WORKING CAPITAL RESERVES
Beginning Balance $4,669,293 $4,046,505 $3,376,879 $1,949,115 $1,646,767
Additions $427,212 $605,374 $472,236 $622,653 $621,582
Deductions - CIP -$1,050,000 -$1,275,000 -$1,900,000 -$925,000 -$525,000
Deductions - Participation $0 $0 $0 $0 $0
Ending Balance $4,046,505 $3,376,879 $1,949,115 $1,646,767 $1,743,350
3 mos Reserved Operating Expenses $408,222 $419,906 $431,941 $444,337 $457,104
FY18 BudgetFY17 Projected, FY19-FY21 Pro Forma
Preliminary Draft STORMWATER FUND
97
CAPITAL IMPROVEMENTS – STORMWATER
PROJECT Originator 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 TOTAL
2017 FY 2018 FY 2019 FY 2020 FY 2021 FY
Projected Budget Pro Forma Pro Forma Pro Forma
Neighborhood Projects (NP)
Memorial Blvd / Haynes Dr. Drainage Improvements City Eng $25,000 $50,000 $50,000 $50,000 $175,000
Mitchell-Nielson Drainage Project City Eng $50,000 $50,000 $100,000
Huntwood/Leaf Ave Neighborhood Drainage Imp. City Eng $100,000 $100,000 $200,000
Southern Meadows / Kimbro Woods Drainage Imp. City Eng $200,000 $250,000 $450,000
Liberty Dr. / Thatcher Trace Spring Box City Eng $25,000 $50,000 $50,000 $125,000
Pennington Drive Drainage Repair/Upgrade (Added) City Eng $0
Gateway Pond Repair (Added) Eng/MWSD $0
Hardwood Drive Drainage Upgrade (Added) City Eng $250,000 $250,000
Pacific Place/Riverrock Blvd Drainage Imp. City Eng $200,000 $150,000 $350,000
Subtotal $0 $325,000 $925,000 $300,000 $100,000 $1,650,000
Water Quality Improvement (Compliance) Projects (WQ)
Town Creek Bioretention BMP's @ Cannonsburgh MWSD $75,000 $75,000
Molloy Lane Water Quality Pond MWSD $100,000 $100,000 $200,000
Rosebank Springs Constructed Wetlands City Eng $50,000 $150,000 $150,000 $350,000
Lee's Branch Stream Restoration City Eng $25,000 $50,000 $50,000 $50,000 $50,000 $225,000
West Fork Stones River at Cason Trail; bank repair MWSD $100,000 $50,000 $150,000
Bear Branch Water Quality Mitigation City Eng $50,000 $50,000 $50,000 $50,000 $200,000
Sinking Creek Headwater protection BMP City Eng $150,000 $150,000 $100,000 $400,000
Todd's Lake Regional Wetlands Improvements City Eng $50,000 $50,000 $50,000 $150,000
Hooper's Bottom Regional Water Quality Project City Eng $25,000 $75,000 $150,000 $150,000 $150,000 $550,000
Lytle Creek/Ridgley Road Bacteriological Reduction (Added) MWSD $50,000 $50,000
Memorial Blvd/VA Pond Trash Rack (Added) MWSD $50,000 $50,000
Spence Creek Restoration Eng/MWSD $100,000 $25,000 $25,000 $25,000 $25,000 $200,000
Subtotal $200,000 $575,000 $875,000 $575,000 $375,000 $2,600,000
Public Drainage/Streets Participation Projects (PD)
Maney Avenue Phase 2 City Eng $50,000 $50,000 $100,000
Town Creek Conveyance (Murfree Springs to Cannonsburgh) City Eng $800,000 $250,000 $50,000 $50,000 $50,000 $1,200,000
Maple St. Alley Permeable Paver Project City Eng $50,000 $75,000 $125,000
Subtotal $850,000 $375,000 $100,000 $50,000 $50,000 $1,425,000
Totals 1,050,000$ 1,275,000$ 1,900,000$ 925,000$ 525,000$ 5,675,000$
98
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
FY14 ActualFY15 Actual
FY16 ActualFY17
Projected FY18 Budget
Wo
rkin
g R
ese
rve
s
Fiscal Year
Stormwater Working Capital Reserve Balance FY14-FY16Draft Projected Working Capital Reserve FY17 & FY18 Budget
99
APPENDICES
SYSTEM INFRASTRUCTURE REPORT 4/30/17
The following are totals of System features whose locations have been collected with GPS and moved
to their correct location in GIS.
Water Distribution System
Feature Count # GPS Located % Located Meters 26,824 26,810 99.9%
MWRD Hydrants 3,435 3,435 100%
Valves 9,442 9,123 96.6%
Blowoffs 484 452 93.4%
CUD Hydrants 2,390 2,390 100%
CUD Hydrant Valves 2,371 2,371 100%
Totals 44,946 44,581 99.2%
Water Line Footage : 441.64 miles
The majority of the water lines are 8” or greater (332.93 mi. or 75.4%) and the majority
are made of PVC or Ductile Iron (323.56 mi. or 73.3%) Water Service Area = 35.54 mi²
Sewer Collection System
Feature Count # GPS Located % Located Manholes 14,973 14,934 99.7%
Pumpstations 46 46 100.0%
Cleanouts 36,400 29,086 79.9%
Industrial Monitors 21 20 95.2%
Totals 51,440 44,086 85.7%
Gravity Sewer Footage : 614.81 miles
Force Main Footage : 34.64 miles
The majority of the gravity sewer lines are 8” or greater (612.38 mi. or 99.6%) and are
made of PVC or Ductile Iron (525.14 mi. or 85.4%)
100
Repurified Water System
Feature Count # GPS Located % Located Valves 256 255 99.6% Meters 160 156 98.0%
Totals 416 411 98.8%
Repurified Water Line Footage : 25.01 miles
Storm-Water Collection System
Feature Count # GPS Located % Located Junction Boxes 14,825 14,660 98.9%
Headwalls / Wingwalls 6,324 6,252 98.9%
Discharge Points 641 606 94.5%
Detention Basins 415 393 94.7%
Totals 22,166 21,877 98.7%
Storm Water Collection Footage: 666.17 miles and consists of 334.32 miles of
Conduit flow; 326.17 miles of Open Channel flow; and 5.68 miles of Culvert flow
General Totals for the Past Month (April)
31– Construction Plans/Plats/DVDs submitted for approval (New Plans & Revisions)
? – “Notices to Proceed” issued
8 – ACA’s sent (construction project finalized)
101
FY18 RATE-FUNDED CAPITAL DETAILS
Murfreesboro Water and Sewer / Stormwater Capital Budget 2017-2018 Items Over $5,000
Account Description TOTAL
AMOUNT STORM WATER
280 Meters $100,000
290 Water Taps $200,000
300 Sewer Taps $100,000
305 Repurified water taps $5,000
310 Fire Hydrants (includes $12,000 automated flushing device) $25,000
320 Water Lines (includes $75,000 Leak Detection Imaging) $425,000
330 Sewer Lines $350,000
335 Sewer Rehab Construction, Lines and manhole replacement/repairs $1,500,000
$2,705,000
350 Land Improvements / Structure Improvements
ADMIN - Mature Tree (to replace one cut down by City) $0
ENGR - Reception Area Renovations (door 5K; furn 5k; net/secur 2k) $15,000
WTP - Add #4 High Service Pump $0
WTP - Replace #2 & #3 RWPs, Valves and VFD $0
WTP - Traveling Screen - River Intake $0
WTP - Raw Water Intake Modifications $0
WTP - Facility Painting $200,000
WTP - High Service Check Valves (4) $165,000
WTP - Repair Trough / Channel Lining $0
WTP - Replace PLC and Controls at River Intake $0
WTP - VFD Drives $0
WTP - Raw Water Meters $53,000
WTP - Platforms in Pipe Gallery and Aux Intake $0
WTP - Windows, Doors, Glass Block $45,000
WTP - Driveway / Ramp $40,000
WTP - Metal Storage Shed $25,000
WTP - LED Light at Tanks, Lake, and Plant $20,000
WTP - Shed Pad $16,500
O&M (Sewer Rehab) - Pump Station Asphalt Sealing $10,000
O&M - Coleman / Jordan Farm $20,000
O&M - Change to PEX Pipe, Fittings, and Tools $25,000
O&M - Replace Front Gate Operator $15,000
WWTP - Headworks Wall Closure Panels $12,500
SUBTOTAL: LAND IMPROVEMENTS $662,000
360 Engineering Study
102
Account Description TOTAL
AMOUNT STORM WATER
SUBTOTAL: ENGINEERING STUDY $0
370 New Equipment - Vehicles
O&M - Replace Unit 5 (2004 F-350) $50,000
O&M (Sewer Rehab) - Replace Unit 24 (2000 Swr Crew Truck) $85,000
O&M (Sewer Rehab) - Hydraulic Sewer Line Easement Cleaning Machine $60,000
O&M (Sewer Rehab) - Replace Unit 35 (2003 TV Truck) $180,000
MR - Replace Unit 63 (2007 Ford F-150 (including accessories) $30,000
WTP - Replace Unit 48, 2005 GMC $35,000
WTP - Replace Unit 52, 2001 Ford $35,000
WWTP - Replace Unit 64, 1994 GMC Sierra (Biosolids) $35,000
SW - Replace Unit 103 (2010 Explorer (Paul Haney) $0 $28,000
SUBTOTAL: NEW EQUIPMENT VEHICLES $510,000 $28,000
375 New Equipment, Sewer Rehabilitation
O&M - Adjustable 8' / 8' Trench Box $16,000
SUBTOTAL: NEW EQUIPMENT SEWER REHAB $16,000
380 New Equipment Water Plant
Lift for Auxiliary Intake $12,000
Milling Machine $6,500
SUBTOTAL: NEW EQUIPMENT WATER PLANT $18,500
390 New Equipment - Operations & Maintenance
Mini Excavator (New Construction Crew) $92,000
Insert-Valve Machine $71,000
Hydraulic Power Unit $10,000
Solar Arrow Board $5,000
MR - 300 Gallon Vacuum System w/ Trailer $65,000
MR - C-3 Leak Correlators $11,500
MR - Itron Repeater 100 (2 @ $4500 ea) $9,000
SUBTOTAL: NEW EQUIPMENT O&M $263,500
400 New Equipment Sewer Plant
Remote Monitoring of Grease Control Equipment $7,500
Solitax Probe w/ Mount $15,000
Sludge Trailer (Biosolids) $45,000
SUBTOTAL: NEW EQUIPMENT SEWER PLANT $67,500
405 New Equipment Lift Stations
O&M - Pump Station Above Ground Controls $40,000
O&M - Backup Generator Pump Station #25 $75,000
O&M - Mission Monitors Pump Stations (5 @ $3000 ea) $15,000
Shop Tool Box $6,000
SUBTOTAL: NEW EQUIPMENT LIFT STATIONS $136,000
103
Account Description TOTAL
AMOUNT STORM WATER
410 New Equipment, Other (Admin, C/S, Engr)
ADMIN - Furniture, Filing System (for office renovation) $10,000
SUBTOTAL: NEW EQUIPMENT OTHER (ADMIN, C/S, ENGR) $10,000
420 Equipment Replacement Water Plant
GAC Media $110,000
Turbidimeters $77,000
Distribution Monitoring Panels $51,000
Chemical Feed Pump $17,000
Pinch Valves for Lime System $17,000
Fluoride Analyzer $9,000
Security Cameras $8,000
RF Pump $8,000
SCADA Hardware Upgrae $80,000
SCADA Upgrade Installation $50,000
Wireless Network from Lake Intake to Halls Hill Tank $25,000
Wireless Radios & Switch from Jones Blvd & Mill St Tanks $25,000
Desktop / Network Computers and iPads $10,500
Server Refresh $10,000
Digital Video Recorders (DVRs) $9,000
SCADA What's Up Upgrade $8,000
Copier $7,600
SUBTOTAL: EQUIPMENT REPLACEMENT WATER PLANT $522,100
430 Equipment Replacement - Operations & Maintenance
Repair Existing Main Line Tapping Machine $9,000
IT - Security Camera $7,500
SUBTOTAL: EQUIPMENT REPLACEMENT O&M $16,500
440 Equipment Replacement - Admin, C/S, Engr
IT FOR ADMIN / CS - DVR $8,000
ENGR - Large Format Plotter/Copier/Scanner 1/2 (replaces 2008-19,310) $12,500
ENGR - GPS Reference Station Upgrade GIS (2/3 W&S; 1/3 SW) $17,420
ENGR - GPS Unit Replacement GIS (1 unit W&S; 1 unit SW) $28,000
ENGR (SW) - Large Format Plotter/Copier/Scanner (1/2 W&S; 1/2 SW) $0 $12,500
ENGR (SW) - GPS Reference Station Upgrade GIS (2/3 W&S; 1/3 SW) $0 $8,580
ENGR (SW)- GPS Unit Replacement GIS (1 unit W&S; 1 unit SW) $0 $28,000
$0
SUBTOTAL: EQUIPMENT REPLACEMENT ADMIN, C/S, ENGR $65,920 $49,080
445 Equipment Replacement - Sewer Rehabilitation
Mini Scout Cameras (2 @ $10000 ea) $20,000
Bypass Hose - 6" $8,500
SUBTOTAL: EQUIPMENT REPLACEMENT SEWER REHAB $28,500
460 Equipment Replacement - Sewer Plant
Industrial Sampler (2 @ $7800 ea) $15,600
104
Account Description TOTAL
AMOUNT STORM WATER
WWTP Storage Tank Wireless Network Update (4 @ $6000 ea) $24,000
Polymer System Volute Mis Assembly (Biosolids) $9,000
Polymer System Panel and Telemetry $45,000
Spirac Shaftless Auger $33,000
Spare Conveyor SEW Eurodrive - Short $9,000
Spare Conveyor SEW Eurodrive - Long $11,000
Quincey QT 10 Compressor $6,000
Traveling Sprinkler - Medium Farm (2 @ $22500 ea) $45,000
Clarifier Drive Gear Box with Motor $9,000
G&R T10 Rotating Assembly (2 @ $7500 ea) $15,000
Clear Well Pump rotating Assembly $16,000
Penn Valley Pump $15,000
Plant Perimeter Lighting - LED (9 @ $1000 ea) $9,000
Main Operator Building MCC - Main Breaker Trip Unit $6,000
Sand Filter Valve Actuators (6 @ $8000 each) $48,000
Main Pump Station Valve Actuators $9,000
New Front Gate and Operator $25,000
Main Breaker (2 @ $32000 ea) $64,000
Automatic Transfer Switch $5,000
12-Ton Portable Air Cooler $20,000
Miele Professional Dishwasher $15,000
Barnstead Still $15,000
HVAC (2 @ $16000 ea) $32,000
SUBTOTAL: EQUIPMENT REPLACEMENT SEWER PLANT $500,600
465 Equipment Replacement, Lift Stations
Truck Mount Generator, Air Compressor, Welder $6,500
SUBTOTAL: EQUIPMENT REPLACEMENT LIFT STATIONS $6,500
Replacement Equipment - Stormwater
HP Jet Hose 3/4" $6,000
SUBTOTAL: EQUIPMENT REPLACEMENT STORMWATER $0 $6,000
Labor $400,000 TOTAL LABOR $400,000 TOTAL W&S / Stormwater CapEx $5,928,620 $83,080
MURFREESBORO WATER & SEWER DEPARTMENT
FY18 BUDGET
REVENUES FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
WATER, OPERATING REVENUE 14,536,259$ 15,364,876$ 15,902,000$ 16,136,000$ 16,616,000$
REPURIFIED, OPERATING REVENUE 26,597$ 28,723$ 28,000$ 29,000$ 29,000$
SEWER, OPERATING REVENUE 24,121,275$ 26,262,131$ 27,259,500$ 27,300,000$ 27,144,000$
OTHER INCOME AND EXPENSE 1,428,362$ 1,021,210$ 855,000$ 978,000$ 620,000$
TOTAL OPERATING REVENUES 40,112,493$ 42,676,940$ 44,044,500$ 44,443,000$ 44,409,000$
INTEREST INCOME OTHER INVEST. 55,500$ 39,996$ 45,000$ 55,000$ 55,000$
TAP REVENUE 4,971,879$ 9,686,020$ 6,000,000$ 7,200,000$ 6,700,000$
TOTAL REVENUES 45,139,872$ 52,402,956$ 50,089,500$ 51,698,000$ 51,164,000$
EXPENSES
WATER, OPERATING & MAINTENANCE 5,142,050$ 6,384,829$ 6,701,338$ 6,066,987$ 6,588,059$
SEWER, OPERATING & MAINTENANCE 5,800,777$ 6,479,440$ 7,949,314$ 6,596,254$ 7,736,949$
CUSTOMER BILLING & COLLECTION 1,356,388$ 1,690,264$ 2,033,696$ 1,892,617$ 2,099,088$
ADM & GENERAL EXPENSES 7,522,528$ 5,512,324$ 5,045,406$ 4,459,446$ 5,007,023$
TOTAL OPERATING EXPENDITURES 19,821,743$ 20,066,857$ 21,729,754$ 19,015,304$ 21,431,119$
CAPITAL EXPENDITURES 2,561,638$ 3,645,500$ 6,653,565$ 5,914,500$ 5,928,620$
DEBT SERVICE 9,994,324$ 11,246,686$ 12,159,242$ 12,352,337$ 13,398,513$
TRANSFERS TO RESERVES 6,831,321$ 11,832,752$ 9,546,938$ 10,456,938$ 10,405,748$
TOTAL EXPENDITURES/RESERVES 39,209,026$ 46,791,795$ 50,089,499$ 47,739,079$ 51,164,000$
DEBT COVERAGE RATIO (DCR)
OPERATING REVENUES 40,112,493$ 42,676,940$ 44,044,500$ 44,443,000$ 44,409,000$
OPERATING EXPENSES 19,821,743$ 20,066,857$ 21,729,754$ 19,015,304$ 21,431,119$
FUNDS AVAILABLE FOR DEBT COVERAGE 20,290,750$ 22,610,083$ 22,314,746$ 25,427,696$ 22,977,881$
DEBT SERVICE 9,994,324$ 11,246,686$ 12,159,242$ 12,352,337$ 13,398,513$
DCR (Goal = >1.2) 2.03 2.01 1.84 2.06 1.71
Murfreesboro Water & Sewer
FY18 Budget
Water Revenues FY15 ACTUAL FY16 ACTUAL FY17 BUDGET FY17 PROJ FY18 BUDGET
31701916 334000 State Grants - -$
31701916 371100 Metered Water Sales 13,242,535 14,077,976 14,700,000$ 14,800,000 15,360,000$
31701916 371101 Water Adjustments (32,479) (70,745) (75,000)$ (36,000) (40,000)$
31701916 371102 Private Fire Protection 83,977 83,886 80,000$ 84,000 90,000$
31701916 371104 Service Initiation 214,815 214,570 200,000$ 218,000 210,000$
31701916 371105 Late Fees 660,680 683,224 650,000$ 733,000 660,000$
31701916 371106 Non-Payment 215,898 208,170 200,000$ 176,000 176,000$
31701916 371107 Returned Payment Fees 11,850 14,550 12,000$ 13,000 12,000$
31701916 371109 CCC 124,235 130,971 125,000$ 140,000 140,000$
31701916 371111 Enernoc 14,698 21,976 10,000$ 8,000 8,000$
31701916 371990 Miscellaneous 50 298 -$ - -$
Total Water Revenues 14,536,259 15,364,876 15,902,000 16,136,000 16,616,000
FY15 ACTUAL FY16 ACTUAL FY17 BUDGET FY17 PROJ FY18 BUDGET
Repurified Revenue 26,597 28,723 28,000 29,000 29,000
Wastewater Revenue FY15 ACTUAL FY16 ACTUAL FY17 BUDGET FY17 PROJ FY18 BUDGET
31702916 371111 Enernoc 7,857 14,310 6,000$ 7,000 7,000$
31702916 372100 Sewer Charges 19,915,543 21,736,557 22,600,000$ 22,800,000 26,800,000$
31702916 372101 Sewer Adjustment (77,270) (68,483) (45,000)$ (97,000) (60,000)$
31702916 372102 Pool Adjustments -
31702916 372103 Summer Sewer Credit (1,586) -$ (4,000) -$
31702916 372105 O & M Fee 3,935,353 4,064,340 4,200,000$ 4,200,000 -$
31702916 372106 Surveillance Fees 29,969 32,530 30,000$ 37,000 30,000$
31702916 372107 Sampler 13,950 15,450 14,000$ 17,000 15,000$
31702916 372108 BOD 216,875 318,664 290,000$ 220,000 240,000$
31702916 372109 Amonia 47,136 107,547 130,000$ 68,000 70,000$
31702916 372111 FOG Charges 2,182 582 500$ - -$
31702916 372112 Septage Charges 29,680 42,220 34,000$ 52,000 42,000$
Total Sewer Revenues 24,121,275 26,262,131 27,259,500 27,300,000 27,144,000
Other Income (Expense) FY15 ACTUAL FY16 ACTUAL FY17 BUDGET FY17 PROJ FY18 BUDGET
31701916 371960 Water Tap Fees 378,845 469,090 400,000$ 400,000 400,000$
31701916 334000 Grant Income 860,539 347,110 250,000$ 300,000 -$
31701916 361000 Interest Earnings 19,094 47,603 25,000$ 40,000 40,000$
31701916 371108 Miscellaneous Income 54,020 41,543 30,000$ 48,000 30,000$
31702916 372200 Sewer Inspection Fees 115,864 115,864 150,000$ 190,000 150,000$
Total Other Income (Expense) 1,428,362 1,021,210 855,000 978,000 620,000
31701916 361001 Interest Earnings - Restricted 55,500 39,996 45,000$ 55,000 55,000$
Tap Revenue FY15 ACTUAL FY16 ACTUAL FY17 BUDGET FY17 PROJ FY18 BUDGET
Water Taps 286,953 159,187 500,000 200,000 200,000
Sewer Taps 4,684,926 9,526,833 5,500,000 7,000,000 6,500,000
Total Tap Revenue 4,971,879 9,686,020 6,000,000 7,200,000 6,700,000
Murfreesboro Water & Sewer
FY18 Budget
ACCOUNT DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Water Division Operating Expenses
Water Source Expenses 192,110$ 246,000$ 198,537$ 241,000$
Water Treatment Operations 3,727,908$ 3,876,726$ 3,827,093$ 3,949,399$
Water Treatment Maint 221,888$ -$ -$ -$
Water Storage 47,864$ 70,500$ 44,470$ 63,500$
Water Distribution Operations 964,922$ 1,528,397$ 1,054,761$ 1,436,649$
Water Distribution Maintenance 122,627$ 500$ -$ -$
Cross Connection 197,129$ 254,970$ 223,026$ 249,271$
Water Plant Administration 910,380$ 724,245$ 719,100$ 648,240$
5,142,050$ 6,384,829$ 6,701,338$ 6,066,987$ 6,588,059$
Sewer Division Operating Expenses
Sewer Collections Operations 386,171$ 1,451,840$ 1,218,318$ 1,571,894$
Sewer Collections Maintenance 25,443$ 7,500$ 3,514$ -$
Sewer Rehabilitation 740,601$ 294,750$ 113,173$ 155,466$
Sewer Pump Stations 501,976$ 768,900$ 647,665$ 660,069$
Sewer Ind Surv Personnel 206,142$ 289,085$ 257,615$ 292,763$
Sewer Private Laterals 76,230$ 31,800$ 827$ 7,500$
House Services 154,655$ 12,000$ 42,379$ 12,000$
Sewer Treatment Operations 3,034,959$ 3,177,296$ 2,728,445$ 3,131,688$
Sewer Disposal 422,431$ 525,649$ 583,401$ 639,727$
Sewer Plant Administration 735,143$ 1,017,757$ 727,554$ 907,887$
Repurified System Expenses 195,689$ 372,737$ 273,363$ 357,955$
5,800,777$ 6,479,440$ 7,949,314$ 6,596,254$ 7,736,949$
Meter Field Services 453,472$ 695,946$ 635,499$ 739,027$
Customer Service 1,236,792$ 1,337,750$ 1,257,118$ 1,360,061$
1,356,388$ 1,690,264$ 2,033,696$ 1,892,617$ 2,099,088$
Engineering/Admin
O&M Administration 1,016,993$ 928,208$ 776,514$ 774,129$
Engineering Department 683,155$ 920,058$ 682,800$ 966,574$
Field Inspectors Department 336,712$ 370,882$ 315,871$ 348,149$
Water & Sewer Administration Dept 3,475,464$ 2,826,258$ 2,684,261$ 2,918,171$
7,522,528$ 5,512,324$ 5,045,406$ 4,459,446$ 5,007,023$
Murfreesboro Water & Sewer
FY18 Budget
CAPITAL EXPENDITURES FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
60000.280 METERS/ERTs/M-Logs 123,479 6,500 100,000 100,000 100,000
60000.290 WATER TAPS 228,181 298,000 200,000 200,000 200,000
60000.300 SEWER TAPS 142,605 160,000 100,000 100,000 100,000
60000.305 REPURFIED TAPS 11,000 13,000 5,000 10,000 5,000
60000.310 FIRE HYDRANTS 13,450 21,000 25,000 25,000 25,000
60000.320 WATER LINES 469,249 362,000 425,000 425,000 425,000
60000.330 SEWER LINES 287,551 111,000 350,000 350,000 350,000
60000.335 SEWER REHAB CONSTRUCTION 16,756 1,165,000 2,000,000 1,500,000 1,500,000
60000.340 WIP LABOR ADJUSTMENTS (503,557) - - -
60000.350 BLDG/LAND IMPROVEMENTS 158,755 70,000 1,100,000 1,000,000 662,000
60000.360 PREL. ENGINEER STUDY - -
60000.370 NEW EQUIP VEHICLE 369,662 475,000 822,000 750,000 510,000
60000.375 NEW EQUIP SWR REHAB 40,308 40,000 65,500 65,000 16,000
60000.380 NEW EQUIP WTR PLANT 70,433 41,000 83,000 83,000 18,500
60000.390 NEW EQUIP MAINT. 12,303 18,000 64,000 60,000 263,500
60000.400 NEW EQUIP SWR PLANT 90,239 36,000 54,500 50,000 67,500
60000.405 NEW EQUIPMENT LIFT STATNS 13,799 1,000 37,500 35,000 136,000
60000.410 NEW EQUIPMENT OTHER 7,538 19,000 23,500 20,000 10,000
60000.420 EQUIP REPLACE WTR PLNT 319,845 237,000 262,500 260,000 522,100
60000.430 EQUIP REPLACE MAINT 17,564 39,000 23,700 20,000 16,500
60000.440 EQUIP REPLACE OTHER 58,397 26,000 40,000 37,000 65,920
60000.445 EQUIP REPLACE SWR REHAB 1,390 12,000 19,500 19,500 28,500
60000.450 WIP LABOR ALL SOURCES 524,627 325,000 400,265 400,000 400,000
60000.460 EQUIP REPLACEMENT SWR PLT 70,441 145,000 393,000 350,000 500,600
60000.465 EQUIPMENT REPLACE LIFT ST 17,623 25,000 59,600 55,000 6,500
60000.470 NEW EQUIPMENT, REUSE - - - -
CAPITAL EXPENDITURES 2,561,638$ 3,645,500$ 6,653,565$ 5,914,500$ 5,928,620$
Murfreesboro Water & Sewer
FY18 Budget
DEBT SERVICE FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
BOND EXP SERVICE CHARGES 30,580 28,793 36,000 28,000 30,000
TAP FEE EXPENSE 378,845 469,090 350,000
INTEREST INC 2016 ADV REFUNDING
INTEREST EXP TMBF 2003 LN 31,051 32,098 44,000 46,800 50,000
INTEREST EXP TML 2006 218,974 231,054 300,000 356,000 400,000
INTEREST EXP 2009 REFUND 1,085,813 1,157,400 1,081,800 355,250 242,250
INTEREST EXP 2013 REFUNDING 326,294 284,991 239,010 239,010 192,439
INTEREST EXP 2016 REFUNDING 641,061 662,000
INTEREST SRF 2012-303 PS - 62,063 67,500 73,308 69,804
INTEREST SRF 2013-317 FM 20,965 34,632 32,940 32,940 31,248
INTEREST SRF 2012-306 HW - 154,609 206,500 223,896 213,204
INTEREST SRF 2016 4D #1 27,348 - 52,860 50,412
INTEREST SRF 2016 4D #2 21,604 - 225,000 388,000
PRINCIPAL TML 2003 428,000 442,000 456,000 456,000 471,000
PRINCIPAL TML SERIES 2006 1,798,000 1,879,000 1,963,000 1,963,000 2,051,000
REVENUE AND TAX BOND 2009 2,115,000 2,195,000 2,260,000 2,260,000 2,370,000
PRINCIPAL 2013 REFUNDING 3,465,000 3,510,000 3,555,000 3,555,000 3,600,000
PRINCIPAL 2016 REFUNDING 100,000 100,000
PRINCIPAL SRF 2012-303 PUMP ST - 114,368 345,500 345,240 348,468
PRINCIPAL SRF 2013-317 FORCE MN 95,802 165,444 166,992 166,992 168,552
PRINCIPAL SRF 2012-306 HEADWORKS - 349,340 1,055,000 1,054,548 1,064,388
PRINCIPAL SRF 2016 4D #1 87,852 - 177,432 179,748
PRINCIPAL SRF 2016 4D #2 - 716,000
- -
DEBT SERVICE 9,994,324 11,246,686 12,159,242 12,352,337 13,398,513
Murfreesboro Water & Sewer
FY18 Budget
RESERVES FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
RESERVE WATER, 231 194,353 159,187 400,000 200,000 200,000
RESERVE FUNDS SEWER, 232 2,919,666 9,526,833 5,200,000 7,000,000 6,500,000
RESERVE INTEREST INCOME 225 68,000 30,000 45,000 55,000 55,000
RESERVE FUTURE CAPITAL EXPENSE 2,038,540 1,201,232 1,500,000 1,500,000 1,000,000
RESERVE FUTURE DEBT, 234 333,824 335,000 335,000 335,000 335,000
RESERVE SINKING FUND CORPS 235 30,000 30,500 30,500 30,500 30,500
RESERVE SINKING SALEM BUCH 241 248,462 100,000 100,000 100,000 100,000
RESERVE SINKING OTHER DIST 242 282,026 100,000 100,000 100,000 100,000
RESERVE SINKING OTHER DIST 243 716,450 350,000 350,000 350,000 350,000
Biosolids Processing Equip & Storage 400,000 - 500,000$
Lift Station Replacement (On-going) 286,438 286,438 250,000$
Walter Hill Dam Repair/Remediation 300,000 - 125,000$
NE Regional P.S. & FM 500,000 500,000 860,248$
TOTAL SINKING FUNDS 1,486,438 786,438 1,735,248
6,831,321$ 11,832,752$ 9,546,938$ 10,456,938$ 10,405,748$
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Source - Operations
31701118 524000 Utility Services 185,080 195,000 190,000 190,000
31701118 524504 Instrumentation - 4,000 4,250 4,000
31701118 525002 Inspections - 25,000 - 25,000
31701118 525406 Stream Monitoring 1,847 3,000 2,000 3,000
31701118 526200 Repair & Maint. Other Mach & Eq 1,075 -
31701118 526500 Repair & Maint Grounds & Imp - - 2,000 2,000
31701118 526600 Repair & Maint. Buildings 3,295 10,000 287 8,000
31701118 526900 Repair & Maint. Other - 4,000 - 4,000
31701118 533100 Gas, Oil, Diesel, Grease - 3,000 - 3,000
31701118 599900 Miscellaneous Expense 813 2,000 - 2,000
192,110 246,000 198,537 241,000
Treatment - Operations
31701137 511100 Salary - Full-Time - Regular 1,393,588 1,136,367 1,089,942 1,116,594
31701137 511400 Longevity 17,460 26,370 17,040
31701137 512300 Overtime Wages 29,444 82,686 72,403 75,000
31701137 514100 Social Security Tax 27,299 96,448 69,027 64,259
31701137 514101 Medicare Tax 6,384 - 16,143 15,036
31701137 514200 Hospital And Health Insurance 95,740 346,270 316,473 337,100
31701137 514203 Dental Insurance - Delta 4,157 15,491 13,262 13,801
31701137 514204 Dental Insurance - Assurant 81 - 43 -
31701137 514300 Defined Benefit Plan 35,644 115,248 97,263 101,541
31701137 514301 Defined Contribution Plan 4,478 16,746 13,940 16,289
31701137 514500 LTD & Life Insurance 12,567 8,910 7,322 7,289
31701137 514804 Physicals/Immunizations - - - -
31701138 523000 Publicity, Subscription & Dues - - - -
31701138 524000 Utility Services 985,366 975,000 1,006,406 1,000,000
31701138 524500 Telephone & Other Comm. - - - -
31701138 524501 Cell Phone - - 60 -
31701138 524504 Instrumentation 21,771 20,000 21,263 20,000
31701138 525000 Professional Services - - - -
31701138 525409 Other Monitoring - - 3,800 3,000
31701138 526101 Fleet - Repair & Maintenance 8,647 10,000 6,240 8,700
31701138 526200 Repair & Maint Other Mach & Eq 100,634 80,000 47,852 80,000
31701138 526500 Repair & Maint Grounds & Imp 27,830 50,000 24,050 40,000
31701138 526600 Repair & Maint Bldg 6,407 6,500
31701138 526900 Repair & Maint - Other 2,803 4,500 26,561 26,500
31701138 528200 Car Allowance & Mileage - - - -
31701138 531000 Office Supplies and Materials 2,245 - - -
31701138 531200 IT Supplies - - 353 500
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701138 532000 Operating Supplies 3,519 5,000 10,412 10,500
31701138 532001 Electrical Supplies 928 3,000 15,231 15,000
31701138 532002 Plumbing Supplies 2,938 6,500 1,032 6,500
31701138 532003 Flushing Supplies - - 1,497 5,000
31701138 532008 Maintenance Supplies 1,580 1,600
31701138 532010 Building Supplies 3,804 4,000
31701138 532200 Chemical, Lab & Med Supplies 36,982 45,000 49,106 52,000
31701138 532202 LIME 219,863 235,000 211,787 252,000
31701138 532203 CARBON DIOXIDE WTP 1,365 2,000 2,456 4,000
31701138 532204 SODIUM CHLORIDE WTP 87,596 65,000 64,071 65,000
31701138 532207 POLYMER WTP 42,331 30,000 36,965 36,000
31701138 532208 SODA ASH WTP - 12,000 16,328 17,000
31701138 532209 CALCIUM THIOSULFATE WTP 7,622 6,500 15,384 12,000
31701138 532210 SODIUM HYDROXIDE WTP 4,312 4,500 3,828 5,000
31701138 532211 CITRIC ACID WTP 60,114 20,000 17,381 18,000
31701138 532213 FLUORIDE WTP 25,459 17,000 16,727 17,000
31701138 532214 PERMANGANATE WTP 284,803 200,000 298,353 275,000
31701138 532215 HYDROGEN PEROXIDE-WTP 17,840 30,000 26,816 26,000
31701138 532216 Phosphate 43,028 45,000 47,199 45,000
31701138 532217 Coagulant 30,508 25,000 30,704 25,000
31701138 532218 Lab Chemicals 20,989 35,000 11,330 18,000
31701138 532299 Other Chemicals 6,211 15,000 23,594 17,000
31701138 532601 Clothing and Uniforms - - - -
31701138 532609 Personal Protective Equipment 5,345 10,000 8,666 10,000
31701138 533100 Gas, Oil, Diesel, Grease, Etc. 2,284 6,500 8,903 9,000
31701138 533101 Fuel 8,225 20,000 9,240 10,000
31701138 533200 Vehicle Parts & Accessories 358 500
31701138 534102 Small Tools 7,636 5,000 3,122 5,000
31701138 534400 Safety Supplies 437 6,000
31701138 553300 Machinery and Equipment Rental 881 3,000 2,043 3,000
31701138 554000 Depreciation 22,277 37,600 - -
31701138 594000 Machinery and Equipment 6,268 2,000 3,915 6,700
31701138 594001 Lab Equipment 4,261 6,000 5,223 20,450
31701138 594100 Transportation Equip 7,759 - 1,920 -
31701138 594500 Communication Equipment Exp 901 3,000 3,000 -
31701138 594901 Furniture & Fixtures 6,140 4,000 9,501 -
31701138 599900 Miscellaneous Expense 844 3,000 - 3,000
TOTAL: 3,727,908 3,876,726 3,827,093 3,949,399
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Treatment - Maintenance
31701147 511100 Salary - Full-Time - Regular 95,300 - - -
31701147 511400 Longevity - - -
31701147 512300 Overtime Wages 3,315 - - -
31701147 514100 Social Security Tax 5,600 - - -
31701147 514101 Medicare Tax 1,310 - - -
31701147 514200 Hospital And Health Insurance 33,469 - - -
31701147 514203 Dental Insurance - Delta 1,281 - - -
31701147 514300 Defined Benefit Plan 7,297 - - -
31701147 514301 Defined Contribution Plan 954 - - -
31701147 514500 LTD & Life Insurance 1,509 - - -
31701147 524504 Instrumentation 1,979
31701148 526200 Repair & Maint Other Mach & Eq 9,070 - - -
31701148 526600 Repair & Maint Bldg 59,594 - -
31701148 532001 Electrical Supplies 76 - - -
31701148 534102 Small Tools 1,135 - - -
31701148 599900 Miscellaneous Expense - - - -
221,888 - - -
Storage - Operations
31701157 511100 Salary - Full-Time - Regular 17,092 - - -
31701158 524000 Utility Services 13,145 20,000 10,334 15,000
31701158 524504 Instrumentation 765 3,000 3,000 3,000
31701158 525409 Other Monitoring - 20,000 - -
31701158 526200 Repair & Maint Other Mach & Eq - - 4,727 10,000
31701158 526500 Repair & Maint Grounds & Improv - 10,000 10,000 7,500
31701158 526900 Repair & Maint Generators 167 - - 7,500
31701158 531200 IT Supplies - - 293 500
31701158 532000 Operating Supplies 783 1,500 - 1,000
31701158 532001 Electrical Supplies - - 5,954 4,000
31701158 532003 Flushing - 5,000 - -
31701158 532299 Other Chemicals 1,930 2,000 4,007 2,500
31701158 533100 Gas, Oil, Diesel, Grease 1,529 2,500 - 2,500
31701158 534102 Small Tools 539 - - -
31701158 553300 Machinery and Equipment Rental 267 500 405 500
31701158 594000 Machinery & Equipment 1,023 3,500
31701158 594702 Computer Equipment 1,837 2,500 - -
31701158 599900 Miscellaneous Expense 9,810 3,500 4,727 6,000
47,864 70,500 44,470 63,500
Cross Connections - Operations
31701197 511100 Salary - Full-Time - Regular 142,299 149,248 140,063 156,658
31701197 511400 Longevity 3,780 5,670 3,960
31701197 512300 Overtime Wages 672 6,854 4,525 5,000
31701197 514100 Social Security Tax 2,807 12,303 9,119 9,465
31701197 514101 Medicare Tax 656 - 2,132 2,214
31701197 514200 Hospital And Health Insurance 22,835 23,347 24,912 22,596
31701197 514203 Dental Insurance - Delta 898 1,386 960 902
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701197 514300 Defined Benefit Plan 5,052 18,842 17,896 18,249
31701197 514500 LTD & Life Insurance 950 1,160 1,014 1,027
31701198 523000 Publicity, Subscription & Dues 45 45 428 300
31701198 523500 Memberships 285 300 - -
31701198 524500 Telephone & Other Comm. - - - -
31701198 524501 Cell Phone 1,765 1,800 2,034 1,950
31701198 524502 Internet 1,224 1,250 1,224 1,250
31701198 526101 Fleet - Repair & Maintenance 1,888 3,500 4,007 3,500
31701198 526200 Repair & Maint Other Mach Eq 380 - 1,050 1,050
31701198 526213 Repair & Maint. - Computers - 1,000 213 1,000
31701198 528000 Training & Travel 1,566 6,055 1,350 6,500
31701198 531000 Office Supplies and Materials 231 250 141 250
31701198 531100 Office Stationery & Forms - - - 500
31701198 532000 Operating Supplies 574 1,500 - 1,000
31701198 532601 Clothing and Uniforms 1,053 1,200 1,664 1,900
31701198 532609 Personal Protective Equipment - 500 - 600
31701198 533101 Fuel 2,866 5,000 3,249 5,000
31701198 533200 Vehicle Parts & Repair - - 1,070 1,000
31701198 534102 Small Tools - - 200 200
31701198 554000 Depreciation 8,080 13,650 - -
31701198 573200 Compensation for Damages - - 105 -
31701198 594000 Machinery & Equipment 1,003 1,000 - 2,700
31701198 599900 Miscellaneous Expense - 1,000 - 500
197,129 254,970 223,026 249,271
Transmission & Distribution
31701177 511100 Salary - Full-Time - Regular 466,855 653,054 497,146 760,237
31701177 511400 Longevity 10,320 15,300 10,140
31701177 512300 Overtime Wages 16,507 21,686 34,115 35,000
31701177 514100 Social Security Tax 17,775 52,839 37,039 42,176
31701177 514101 Medicare Tax 4,157 - 8,663 9,869
31701177 514200 Hospital And Health Insurance 75,082 176,601 137,428 170,158
31701177 514203 Dental Insurance - Delta 3,563 9,338 6,651 8,079
31701177 514204 Dental Insurance - Assurant 106 - 62 -
31701177 514300 Defined Benefit Plan 20,142 54,222 50,790 52,234
31701177 514301 Defined Contribution Plan 4,706 15,786 7,856 13,397
31701177 514500 LTD & Life Insurance 4,740 5,078 4,183 5,303
31701177 514804 Physicals/Immunizations - - - -
31701178 523000 Publicity, Subscription & Dues - - - -
31701178 524000 Utility Services 8,449 9,000 8,831 9,000
31701178 524500 Telephone & Other Comm. - - - -
31701178 524501 Cell Phone - - - -
31701178 524504 Instrumentation - - - -
31701178 525002 Inspections - - - -
31701178 525409 Other Monitoring 16,857 - 5,948 6,000
31701178 526000 Repair & Maint. Services 42,060 45,000 27,008 40,000
31701178 526101 Fleet - Repair & Maintenance 52,229 55,000 60,845 65,000
31701178 526200 Repair & Maint Other Mach & Eq 1,716 1,700 4,553 5,000
31701178 526213 Repair & Maint. - Computers 100 5,000 - 1,000
31701178 526500 Repair & Maint Grounds & Imp - - - -
31701178 526807 Repair & Maintenance - Meters 9,035 11,000 2,724 7,000
31701178 526808 Repair & Maint. - Hydrants 2,677 13,000 3,230 7,000
31701178 528000 Training & Travel - - - -
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701178 528200 Car Allowance & Mileage - - - -
31701178 531100 Office Supplies 308 -
31701178 532000 Operating Supplies 9,604 17,500 11,802 12,000
31701178 532003 Flushing Supplies 635 2,000 1,095 2,000
31701178 532004 Pipe/Material/Supplies 30,482 27,500 29,499 30,000
31701178 532400 Household & Janitor Supplies 399 13,000 - -
31701178 532601 Clothing and Uniforms 442 1,000 - 1,000
31701178 532609 Personal Protective Equipment 1,689 1,800 - 1,000
31701178 533100 Gas, Oil, Diesel, Grease, Etc. 3,072 5,000 2,012 3,000
31701178 533101 Fuel 33,002 47,000 29,819 36,000
31701178 533200 Vehicle Parts & Repair - - 194 500
31701178 534102 Small Tools 7,731 19,950 8,658 15,000
31701178 534400 Safety Supplies 29 200 36 500
31701178 545100 Crushed Stone 16,523 17,000 13,178 17,000
31701178 547100 Asphalt and Asphalt Filler 20,689 32,000 8,748 25,000
31701178 553300 Machinery and Equipment Rental 2,665 3,200 300 3,000
31701178 554000 Depreciation 48,962 107,991 - -
31701178 573200 Compensation For Damages 81 500 1,331 1,200
31701178 594000 Machinery and Equipment 24,424 70,732 23,418 24,856
31701178 594100 Transp Equipment 3,275 2,500 227 -
31701178 594701 Software - 3,000 - -
31701178 594801 Meters 1,548 2,400 9,056 5,000
31701178 594802 Hydrants 10,134 12,000 - 10,000
31701178 594901 Office Furniture & Equipment - 500 - -
31701178 599900 Miscellaneous Expense 2,778 3,000 2,708 3,000
964,922 1,528,397 1,054,761 1,436,649
T&D
31701187 511100 Salary - Full-Time - Regular 71,209 - - -
31701187 511400 Longevity - - -
31701187 512300 Overtime Wages 8,922 - - -
31701187 514100 Social Security Tax 6,388 - - -
31701187 514101 Medicare Tax 1,494 - - -
31701187 514200 Hospital And Health Insurance 26,895 - - -
31701187 514203 Dental Insurance - Delta 1,179 - - -
31701187 514300 Defined Benefit Plan 5,670 - - -
31701187 514301 Defined Contribution Plan 327 - - -
31701187 514500 LTD & Life Insurance 271 - - -
31701188 526101 Fleet - Repair & Maintenance - - -
31701188 526500 Repair & Maint Grounds & Imp 271 500 - -
31701188 532000 Operating Supplies - - -
31701188 533101 Fuel - - -
31701188 554000 Depreciation - - -
122,627 500 - -
Murfreesboro Water & Sewer
FY18 Budget
Water Operations
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Water - Administration
31701237 511100 Salary - Full-Time - Regular 78,516 263,905 249,586 267,343
31701237 511400 Longevity 4,080 6,120 4,320
31701237 512300 Overtime Wages 5,474 474 1,000
31701237 514100 Social Security Tax 4,688 21,278 15,452 16,255
31701237 514101 Medicare Tax 1,096 - 3,614 3,804
31701237 514200 Hospital And Health Insurance 238,312 29,431 31,117 28,301
31701237 514203 Dental Insurance - Delta 11,059 2,772 1,770 1,808
31701237 514300 Defined Benefit Plan 8,675 30,252 28,467 31,090
31701237 514500 LTD & Life Insurance 1,700 1,853 1,687 1,719
31701237 514803 Respiratory Protection Program 1,589 - 1,269 -
31701237 514804 Physicals/Immunizations 154 - 219 -
31701238 522000 Printing - Wtr Quality Report - - 10,000 10,000
31701238 523000 Publicity, Subscription & Dues 1,000 1,698 1,200
31701238 523100 Advertising 9,439 1,000 231 1,000
31701238 523500 Memberships 3,153 3,500 3,443 3,500
31701238 523501 License/Prof Fees 1,550 2,500 1,665 2,500
31701238 523600 Public Relations 1,969 2,500 1,278 2,500
31701238 524500 Telephone & Other Comm. 1,594 2,000 1,695 2,000
31701238 524501 Cell Phone 10,114 10,000 12,125 10,500
31701238 524502 Internet 2,884 3,000 2,894 3,000
31701238 525401 Corps of Engineer Report 25,860 32,000 35,880 32,000
31701238 525402 Environmental Fees 42,029 42,100 42,254 43,000
31701238 526200 Repair & Maint Other Machines - - - -
31701238 526213 Repair & Maint. - Computers 40,243 45,000 50,450 59,000
31701238 526500 Repair & Maint Grounds & Imp 33,978 17,000 19,773 20,000
31701238 526600 Repair & Maint Bldg - - - -
31701238 528000 Training & Travel 39,132 43,000 38,705 42,550
31701238 528050 Safety Training - - - 1,600
31701238 528200 Car Allowance & Mileage 2,247 2,500 2,592 2,500
31701238 529801 Sediment Removal - 112,000 110,000 -
31701238 531000 Office Supplies and Materials 4,026 7,500 8,849 8,000
31701238 531100 Office Stationery & Forms - - - 750
31701238 531200 IT Supplies 320 - 345 500
31701238 531300 Postage & Shipping 432 600 1,029 600
31701238 532010 Building Supplies - - 1,098 1,100
31701238 532200 Lab Supplies - - - -
31701238 532300 Food 526 2,500 1,721 2,500
31701238 532400 Household & Janitor Supplies 6,180 6,000 5,940 6,000
31701238 532601 Clothing and Uniforms 11,941 12,000 19,412 16,000
31701238 534400 Safety Supplies 2,133 2,500 2,531 2,500
31701238 552500 Property Insurance - - 75 -
31701238 554000 Depreciation 317,375 - - -
31701238 592000 Buildings Exp 7,468 15,000 3,642 15,000
31701238 594901 Furniture & Office Equip - - - 2,800
910,380 724,245 719,100 648,240
5,142,050 6,384,829 6,701,338 6,066,987 6,588,059
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Collections - Ops
31702317 511100 Salary - Full-Time - Regular 159,955 756,452 679,642 943,158
31702317 511400 Longevity 14,400 19,710 15,960
31702317 512300 Overtime Wages 13,633 25,885 28,848 30,000
31702317 514100 Social Security Tax 11,388 61,406 45,345 51,341
31702317 514101 Medicare Tax 2,663 - 10,605 11,968
31702317 514200 Hospital And Health Insurance 30,497 248,355 230,860 272,735
31702317 514203 Dental Insurance - Delta 1,676 11,375 8,961 10,741
31702317 514300 Defined Benefit Plan 15,982 72,389 65,381 70,582
31702317 514301 Defined Contribution Plan 804 12,782 9,826 17,094
31702317 514500 LTD & Life Insurance 5,324 5,865 5,508 6,165
31702318 524500 Telephone & Other Comm. 33 - - -
31702318 524501 Cell Phone - - - -
31702318 526101 Fleet - Repair & Maintenance 50,610 50,000 41,157 50,000
31702318 526200 Repair & Maint Other Mach & Eq 438 500 719 500
31702318 526213 Repair & Maint. - Computers 100 150 - 150
31702318 531000 Office Supplies and Materials - - - -
31702318 531100 Office Stationery 429 -
31702318 531300 Postage & Shipping 13 - - -
31702318 532000 Operating Supplies 9,208 10,000 8,018 10,000
31702318 532004 Pipe/Material/Supplies - - 6,063 7,500
31702318 532005 Field Supplies - - 237 500
31702318 532601 Clothing and Uniforms - 1,000 - -
31702318 532609 Personal Protective Equipment 1,702 2,000 210 2,000
31702318 533100 Gas, Oil, Diesel, Grease, Etc. 184 100 2,000 2,000
31702318 533101 Fuel 31,509 49,000 31,437 40,000
31702318 534102 Small Tools 4,033 10,000 4,235 5,000
31702318 545100 Crushed Stone 16,457 17,000 12,095 17,000
31702318 547100 Asphalt and Asphalt Filler 7,984 4,500 2,019 4,500
31702318 553300 Machinery and Equipment Rental 525 1,500 405 1,500
31702318 554000 Depreciation 19,657 52,781 - -
31702318 573200 Compensation For Damages - 1,500 - -
31702318 594000 Machinery and Equipment - 32,900 3,185 -
31702318 594001 Lab Equipment 1,000
31702318 594100 Transportation Equip 102 - 227
31702318 594702 Computer Equipment - 5,000 -
31702318 599900 Miscellaneous Expense 1,693 4,000 1,196 1,500
386,171 1,451,840 1,218,318 1,571,894
Collections - Maint
31702327 511100 Salary - Full-Time - Regular 6,843 - 598 -
31702328 526101 Fleet - Repair & Maintenance 571 1,000 - -
31702328 526200 Repair & Maint Other Mach & Eq 40 1,000 81 -
31702328 526500 Repair & Maint Grounds & Imp 271 500 - -
31702328 528200 Car Allowance & Mileage - 1,000 - -
31702328 532400 Household & Janitor Supplies 399 500 - -
31702328 533101 Fuel - - - -
31702328 549000 Other Supplies & Materials 1,097 2,000 2,835 -
31702328 554000 Depreciation 14,880 - - -
31702328 594000 Machinery and Equipment 1,342 1,500 - -
25,443 7,500 3,514 -
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Sewer Rehab
31702337 511100 Salary - Full-Time - Regular 455,867 11,158 -
31702337 511400 Longevity - -
31702337 512300 Overtime Wages 7,763 - -
31702337 514100 Social Security Tax 9,588 - -
31702337 514101 Medicare Tax 2,243 - -
31702337 514200 Hospital And Health Insurance 48,073 - -
31702337 514203 Dental Insurance - Delta 1,802 - -
31702337 514204 Dental Insurance - Assurant 12 - -
31702337 514300 Defined Benefit Plan 16,530 - -
31702337 514301 Defined Contribution Plan 1,264 - -
31702337 514500 LTD & Life Insurance 3,416 - -
31702338 520000 Contractual Services 14,369 -
31702338 526005 Repair & Maint Manholes - - 5,000
31702338 526101 Fleet - Repair & Maintenance 39,994 55,000 38,942 55,000
31702338 526200 Repair & Maint Other Mach & Eq 10,633 8,000 14,591 10,000
31702338 531300 Postage & Shipping 446 1,000 1,586 1,000
31702338 532000 Operating Supplies 3,969 7,000 657 2,500
31702338 532004 Pipe/Material/Supplies 16,446 25,000 8,972 22,000
31702338 533100 Gas, Oil, Diesel, Grease, Etc. 104 100 - 100
31702338 533101 Fuel 23,286 37,000 24,842 30,000
31702338 534102 Small Tools 137 2,000 - 4,000
31702338 545100 Crushed Stone 406 2,000 3,197 3,500
31702338 547100 Asphalt and Asphalt Filler 6,401 10,000 5,904 7,500
31702338 554000 Depreciation 65,409 121,730 - -
31702338 594000 Machinery and Equipment 12,143 23,170 3,324 11,866
31702338 594100 Transportation Equipment 300 - - -
31702338 594702 Computer Equipment - 2,750 - -
31702338 594901 Furniture & Fixtures - - - 3,000
740,601 294,750 113,173 155,466
Lift Statons
31702357 511100 Salary - Full-Time - Regular 56,209 156,169 153,124 107,448
31702357 511400 Longevity 2,880 4,320 3,060
31702357 512300 Overtime Wages 4,018 5,622 33,381 35,000
31702357 514100 Social Security Tax 1,707 12,669 11,360 9,270
31702357 514101 Medicare Tax 399 - 2,657 2,169
31702357 514200 Hospital And Health Insurance 26,739 32,109 29,179 29,854
31702357 514203 Dental Insurance - Delta 1,015 2,079 1,116 1,139
31702357 514300 Defined Benefit Plan 2,508 18,775 18,053 19,023
31702357 514500 LTD & Life Insurance 286 1,193 1,033 1,056
31702357 514803 Respiratory Protection Program 137 - - -
31702358 520000 Contractual Services - - - -
31702358 523501 License/Prof Fees 140 200 135 200
31702358 524000 Utility Services 250,763 250,000 222,981 250,000
31702358 524200 Water 3,483 3,500 4,175 4,000
31702358 524500 Telephone & Other Comm. 572 1,000 195 1,000
31702358 524501 Cell Phone 1,766 2,000 2,109 2,000
31702358 524502 Internet 1,224 1,500 1,224 1,500
31702358 524503 Telemetry - - - -
31702358 526101 Fleet - Repair & Maintenance 5,895 10,000 7,671 10,000
31702358 526200 Repair & Maint Other Mach & Eq 15,293 58,400 26,091 30,000
31702358 526500 Repair & Maint Grounds & Imp 18,795 25,000 27,023 27,500
31702358 526600 Repair & Maint. Buildings 104 5,000 - 5,000
31702358 526900 Repair & Maint Other 1,051 - 4,227 4,000
31702358 528000 Training & Travel 220 500 282 500
31702358 532000 Operating Supplies 625 5,250 1,362 2,000
31702358 532255 Odor Control 45,733 50,000 47,324 50,000
31702358 532601 Clothing and Uniforms 691 1,000 1,194 1,500
31702358 532609 Personal Protective Equipment 1,159 1,500 - 1,500
31702358 533100 Gas, Oil, Diesel, Grease, Etc. 7,992 6,000 602 2,500
31702358 533101 Fuel 14,125 20,000 13,538 20,000
31702358 534102 Small Tools 1,062 13,225 2,343 6,000
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31702358 554000 Depreciation 3,363 10,979 - -
31702358 594000 Machinery and Equipment 24,724 56,850 30,846 32,750
31702358 594702 Computer Equipment 4,350 - - -
31702358 599900 Miscellaneous Expense 419 3,000 120 100
31702367 511100 Salary - Full-Time - Regular -
31702368 526200 Repair & Maint Other Mach & Eq 4,908 7,500 - -
31702368 532000 Operating Supplies 501 5,000 - -
501,976 768,900 647,665 660,069
Private Laterals
31702397 511100 Salary - Full-Time - Regular 33,572 - - -
31702397 511400 Longevity - - -
31702397 512300 Overtime Wages 1,583 - - -
31702397 514100 Social Security Tax 2,258 - - -
31702397 514101 Medicare Tax 528 - - -
31702397 514200 Hospital And Health Insurance 13,824 - - -
31702397 514203 Dental Insurance - Delta 347 - - -
31702397 514204 Dental Insurance - Assurant - - -
31702397 514300 Defined Benefit Plan 3,499 - - -
31702397 514301 Defined Contribution Plan 757 - - -
31702397 514500 LTD & Life Insurance 888 - - -
31702398 526101 Fleet - Repair & Maintenance - - - -
31702398 532000 Operating Supplies 233 100 - -
31702398 532004 Pipe/Material/Supplies 5,573 7,000 827 5,000
31702398 533101 Fuel - - - -
31702398 534102 Small Tools 153 500 - 500
31702398 545100 Crushed Stone 149 1,000 - 1,000
31702398 554000 Depreciation 12,466 22,200 - -
31702398 599900 Miscellaneous Expense 400 1,000 - 1,000
31702407 511100 Salary - Full-Time - Regular - -
76,230 31,800 827 7,500
House Services
31702417 511100 Salary - Full-Time - Regular 141,029 - 34,162 -
31702418 526101 Fleet - Repair & Maintenance - - - -
31702418 532000 Operating Supplies 9,837 12,000 8,217 12,000
31702418 533101 Fuel - - - -
31702418 554000 Depreciation 3,789 - - -
31702418 599900 Miscellaneous Expense - - - -
31702427 511100 Salary - Full-Time - Regular - - -
31702428 526101 Fleet - Repair & Maintenance - - -
31702428 533101 Fuel - - -
31702428 554000 Depreciation - - -
154,655 12,000 42,379 12,000
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Industrial Surveillance
31702377 511100 Salary - Full-Time - Regular 145,205 144,608 136,174 146,397
31702377 511400 Longevity 3,180 - 3,360
31702377 512300 Overtime Wages 3,473 5,164 9,371 10,000
31702377 514100 Social Security Tax 2,495 11,773 8,495 8,242
31702377 514101 Medicare Tax 583 - 1,987 1,929
31702377 514200 Hospital And Health Insurance 14,249 59,016 54,212 55,956
31702377 514203 Dental Insurance - Delta 513 2,079 1,960 1,998
31702377 514300 Defined Benefit Plan 4,370 18,078 17,359 18,037
31702377 514500 LTD & Life Insurance 642 1,112 984 1,000
31702378 523000 Publicity, Subscription & Dues - 1,500 173 1,500
31702378 523500 Memberships 111 100 - 100
31702378 523501 License/Prof Fees 60 600 90 750
31702378 525403 TDEC Fees - 2,000 - 2,000
31702378 525409 Other Monitoring 10,146 10,000 16,119 16,000
31702378 526101 Fleet - Repair & Maintenance 1,153 2,500 1,772 2,000
31702378 528000 Training & Travel 2,826 3,800 1,478 3,744
31702378 528200 Car Allowance & Mileage 1,438 3,000 965 2,000
31702378 531300 Postage & Shipping 72 200 53 200
31702378 532200 Chemical, Lab & Med Supplies 165 5,000 321 5,000
31702378 532256 Samplers Indust Surveillance 1,485 2,000 2,849 2,000
31702378 532601 Clothing and Uniforms 966 800 1,382 800
31702378 532609 Personal Protective Equipment 786 1,000 - 1,000
31702378 533100 Gas, Oil, Diesel, Grease, Etc. - 1,500 - 500
31702378 533101 Fuel 1,298 3,000 1,679 2,000
31702378 534102 Small Tools 156 - - 250
31702378 554000 Depreciation 2,509 1,075 - -
31702378 594000 Machinery and Equipment 11,156 5,000 - 5,000
31702378 599900 Miscellaneous Expense 285 1,000 192 1,000
206,142 289,085 257,615 292,763
Treatment
31702457 511100 Salary - Full-Time - Regular 794,974 778,443 693,140 735,167
31702457 511400 Longevity 10,380 13,770 6,840
31702457 512300 Overtime Wages 7,634 25,146 15,323 18,000
31702457 514100 Social Security Tax 16,518 62,653 42,842 43,542
31702457 514101 Medicare Tax 3,863 - 10,019 10,189
31702457 514200 Hospital And Health Insurance 61,342 213,247 151,599 142,241
31702457 514203 Dental Insurance - Delta 2,523 10,395 6,305 6,127
31702457 514300 Defined Benefit Plan 19,623 56,757 31,785 29,058
31702457 514301 Defined Contribution Plan 5,576 23,335 22,312 29,922
31702457 514500 LTD & Life Insurance 5,370 5,920 4,981 5,502
31702457 514804 Physicals/Immunizations - - -
31702458 524000 Utility Services 1,341,431 1,400,000 1,261,034 1,400,000
31702458 524200 Water 9,576 9,000 8,286 9,000
31702458 524500 Telephone & Other Comm. - 9,000 69 7,000
31702458 524501 Cell Phone 175 6,000 - 4,000
31702458 524504 Instrumentation 28,375 15,000 4,338 15,000
31702458 525406 Stream Monitoring 22,950 29,000 - 29,000
31702458 525407 Flow Monitoring - 15,000 - -
31702458 525409 Other Monitoring 30,171 30,000 22,539 30,000
31702458 526101 Fleet - Repair & Maintenance 5,818 10,000 11,618 10,500
31702458 526200 Repair & Maint Other - - 69,405 70,000
31702458 526213 Repair & Maint. - Computers 637 8,000 800 5,000
31702458 526500 Repair & Maint Grounds & Imp 2,871 30,000 6,780 15,000
31702458 526600 Repair & Maint. Buildings 292 5,000 18,735 20,000
31702458 526900 Repair & Maint - Other 27,622 7,500 5,369 7,500
31702458 528200 Car Allowance & Mileage 480 2,000 - 1,000
31702458 531100 Office Stationery - - 468 1,000
31702458 531200 IT Supplies - - 251 1,000
31702458 532000 Operating Supplies 9,242 8,000 5,543 8,000
31702458 532001 Electrical Supplies - - 7,722 8,000
31702458 532002 Plumbing Supplies - - 1,554 2,000
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31702458 532007 Communication Supplies - - 336 500
31702458 532008 Maintenance Supplies - - 3,632 4,000
31702458 532010 Building Supplies - - 86 500
31702458 532200 Chemical, Lab & Med Supplies 43,072 55,000 24,540 40,000
31702458 532218 Lab Chemicals 9,693 4,500 15,381 19,500
31702458 532252 UV Disinfecant 82,742 90,000 2,711 80,000
31702458 532255 Odor Control 42,035 45,000 26,301 40,000
31702458 532400 Household & Janitor Supplies 1,905 6,500 2,169 2,500
31702458 532601 Clothing and Uniforms 3,036 7,500 3,165 7,500
31702458 532609 Personal Protective Equipment 4,063 10,000 8,558 10,000
31702458 533100 Gas, Oil, Diesel, Grease, Etc. 9,083 30,000 9,525 15,000
31702458 533101 Fuel 5,682 7,000 4,758 6,500
31702458 533200 Vehicle Parts & Repair - - 717 1,500
31702458 534102 Small Tools 3,658 3,500 10,487 4,000
31702458 553300 Machinery and Equipment Rental 9,782 7,500 9,543 10,000
31702458 554000 Depreciation 8,276 14,520 - -
31702458 592000 Building Expense - - 162 1,000
31702458 594000 Machinery and Equipment 11,187 9,000 11,897 67,700
31702458 594001 Lab Equipment 6,695 - - 5,100
31702458 594702 Computer Equipment 2,585 15,000 17,595 14,300
31702467 511100 Salary - Full-Time - Regular 295,669 - - -
31702467 511400 Longevity - - -
31702467 512300 Overtime Wages 5,424 - - -
31702467 514100 Social Security Tax 5,821 - - -
31702467 514101 Medicare Tax 1,361 - - -
31702467 514200 Hospital And Health Insurance 13,136 - - -
31702467 514203 Dental Insurance - Delta 478 - - -
31702467 514300 Defined Benefit Plan 5,421 - - -
31702467 514301 Defined Contribution Plan 670 - - -
31702467 514500 LTD & Life Insurance 1,416 - - -
31702468 526200 Repair & Maint Other Mach & Eq 63,404 95,000 160,295 125,000
31702468 526900 Repair & Maint - Other 1,213 2,500 - 2,500
31702468 534102 Small Tools 389 5,000 - 5,000
3,034,959 3,177,296 2,728,445 3,131,688
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Disposal
31702477 511100 Salary - Full-Time - Regular 97,590 146,002 141,577 148,704
31702477 511400 Longevity 1,860 2,790 2,040
31702477 512300 Overtime Wages 4,908 - 462 1,000
31702477 514100 Social Security Tax 3,827 11,383 8,596 8,792
31702477 514101 Medicare Tax 895 - 2,010 2,058
31702477 514200 Hospital And Health Insurance 9,827 28,521 28,199 34,504
31702477 514203 Dental Insurance - Delta 603 2,079 1,538 1,568
31702477 514300 Defined Benefit Plan 4,924 12,794 12,461 13,245
31702477 514301 Defined Contribution Plan 1,207 2,800 3,214 3,298
31702477 514500 LTD & Life Insurance 1,319 1,077 998 1,018
31702478 526001 Repair & Maint - FournierPress 51,258 40,000 16,875 40,000
31702478 526002 Repair & Maint - Tires-Sludge 18,253 25,000 12,351 25,000
31702478 526003 Repair & Maint - Sludge Press 22,528 20,000 21,794 22,000
31702478 526101 Fleet - Repair & Maintenance 39,430 21,000 49,911 45,000
31702478 526200 Repair & Maint Other Mach & Eq 6,545 10,000 17,195 12,000
31702478 526600 Repair & Maint Bldg - - 765 2,000
31702478 532000 Operating Supplies - - 2,070 2,000
31702478 532251 Polymer 127,317 150,000 238,418 250,000
31702478 532400 Household & Janitor Supplies 4,727 3,000 1,871 3,000
31702478 532609 Personal Protective Equipment 108 1,000 452 1,000
31702478 533100 Gas, Oil, Diesel, Grease, Etc. 5,621 4,000 353 3,000
31702478 533101 Fuel 4,083 20,000 8,855 15,000
31702478 533200 Vehicle Parts & Repair - - 467 1,000
31702478 534102 Small Tools 30 500 225 500
31702478 554000 Depreciation 13,203 22,633 - -
31702478 594000 Machinery & Equip 3,915 - 3,900 -
31702478 594702 Computer Equip - - 6,054 -
31702478 599900 Miscellaneous Expense 313 2,000 - 2,000
422,431 525,649 583,401 639,727
WasteWter Admin
31702517 511100 Salary - Full-Time - Regular 69,758 324,447 270,672 326,328
31702517 511400 Longevity 5,160 - 5,220
31702517 514100 Social Security Tax 4,222 25,359 16,930 19,641
31702517 514101 Medicare Tax 987 - 3,960 4,596
31702517 514200 Hospital And Health Insurance 200,535 49,506 33,234 45,694
31702517 514203 Dental Insurance - Delta 8,494 2,772 1,251 1,805
31702517 514300 Defined Benefit Plan 7,825 31,299 31,333 32,571
31702517 514301 Defined Contributuion Plan 3,274 - 3,518
31702517 514500 LTD & Life Insurance 886 2,240 1,802 2,139
31702517 514803 Respiratory Protection Program 274 -
31702518 520000 Contractual Services 3,000 5,000 - 5,000
31702518 523000 Publicity, Subscription & Dues 510 13,000 552 6,000
31702518 523500 Memberships 2,248 1,000 1,568 590
31702518 523501 License/Prof Fees 510 2,700 855 3,050
31702518 523600 Public Relations 38 - 393 7,000
31702518 524500 Telephone & Other Comm. 4,406 3,000 4,530 4,600
31702518 524501 Cell Phone 9,296 5,000 10,128 11,000
31702518 524502 Internet 1,088 1,500 816 1,500
31702518 525402 Environmental Fees 12,760 13,000 2,070 13,000
31702518 525407 Flow Monitoring 291,830 420,000 246,849 300,000
31702518 526213 Repair & Maint. - Computers 8,024 7,500 9,888 8,000
31702518 526500 Repair & Maint Grounds & Imp 26,236 15,000 13,815 16,000
31702518 528000 Training & Travel 29,798 30,300 27,581 30,635
31702518 528200 Car Allowance & Mileage 1,715 3,000 1,470 2,000
31702518 531000 Office Supplies and Materials 5,174 6,000 4,232 6,000
31702518 531200 IT Supplies 136 - 21 500
31702518 531300 Postage & Shipping 317 1,000 542 1,000
31702518 532000 Operating Supplies 498 500 - 500
31702518 532300 Food 1,121 1,200 1,277 1,500
31702518 532400 Household & Janitor Supplies 7,990 7,000 6,947 7,000
31702518 532601 Clothing and Uniforms 5,012 6,500 11,754 12,000
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31702518 534400 Safety Supplies 1,696 1,500 2,841 7,000
31702518 554000 Depreciation 8,407 15,000 - -
31702518 573200 Compensation for Damages 5,058 - - 5,000
31702518 594000 Machinery and Equipment 4,450 6,500 14,027 -
31702518 594702 Computer Equipment 5,331 4,000 5,709 15,500
31702518 594901 Furniture & Fixtures 3,496 2,500 - -
31702518 599900 Miscellaneous Expense 2,017 2,000 507 2,000
735,143 1,017,757 727,554 907,887
Repurified
31703617 511100 Salary - Full-Time - Regular - -
31703618 520000 Contractual Services - 20,000 - -
31703618 524000 Utility Services - 8,000 - -
31703618 526101 Fleet - Repair & Maintenance 45 4,000 - -
31703618 526200 Repair & Maint Other Mach & Eq 1,168 14,000 6,975 15,000
31703618 526500 Repair & Maint Grounds & Imp 91 2,000 - 2,500
31703618 526600 Repair & Maint. Buildings - 4,500 - 5,000
31703618 532100 Agriculture and Hort. Supplies - 35,000 - -
31703618 532200 Chemical, Lab & Med Supplies 55,007 85,000 - 5,000
31703618 532205 Sodium Hypochlorite - - 54,959 75,000
31703618 533101 Fuel - 15,000 - -
31703618 534102 Small Tools - 4,000 - 1,000
31703618 554000 Depreciation - 14,429 - -
31703618 599900 Miscellaneous Expense 3,151 3,000 1,575 3,000
31703637 511100 Salary - Full-Time - Regular 1,211 53,043 39,657 54,249
31703637 511400 Longevity 300 810 600
31703637 512300 Overtime Wages 1,989 1,759 2,000
31703637 514100 Social Security Tax 68 4,281 2,338 3,056
31703637 514101 Medicare Tax 16 - 547 715
31703637 514200 Hospital And Health Insurance 19,672 17,907 18,756
31703637 514203 Dental Insurance - Delta 693 653 666
31703637 514300 Defined Benefit Plan 2,556 4,252 4,466
31703637 514500 LTD & Life Insurance 274 242 247
31703638 524000 Utility Services 1,496 2,000 1,367 2,000
31703638 526200 Repair & Maint Other - - 1,575 2,000
31703638 526500 Repair & Maint Grounds & Imp 1,440 2,000 990 2,000
31703638 532001 Electrical Supplies 404 1,000 38 1,000
31703638 532004 Pipe, Materials, Supplies - - 1,389 5,000
31703638 599900 Miscellaneous Expense - - 57 1,000
Murfreesboro Water & Sewer
FY18 Budget
Wastewater
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31703657 511100 Salary - Full-Time - Regular 18,717 - - -
31703657 511400 Longevity - - -
31703657 512300 Overtime Wages 650 - - -
31703657 514100 Social Security Tax 1,078 - - -
31703657 514101 Medicare Tax 252 - - -
31703657 514200 Hospital And Health Insurance 19,195 - - -
31703657 514203 Dental Insurance - Delta 700 - - -
31703657 514300 Defined Benefit Plan 1,635 - - -
31703657 514500 LTD & Life Insurance 309 - - -
31703658 520000 Contractual Services 29,094 28,000 34,086 38,000
31703658 524000 Utility Services 5,024 6,000 7,148 8,000
31703658 526101 Fleet - Repair & Maintenance 1,642 2,000 1,431 2,000
31703658 526200 Repair & Maint Other Mach & Eq 18,441 15,000 29,105 25,000
31703658 526500 Repair & Maint Grounds & Imp 2,928 2,000 2,244 10,000
31703658 526600 Repair & Maint Bldg - - 147 5,000
31703658 532000 Operating Supplies - - 1,452 2,000
31703658 532006 Shop Supplies - - 657 1,500
31703658 532010 Building Supplies - - 2,279 2,500
31703658 532100 Agriculture and Hort Supplies 17,367 - 35,000 40,000
31703658 532300 Food - - 119 200
31703658 532400 Household & Janitor Supplies 1,287 1,500 - 1,500
31703658 532609 Personal Protective Equipment 141 - 492 500
31703658 533100 Gas, Oil, Diesel, Grease, Etc. 44 500 810 1,000
31703658 533101 Fuel 4,470 4,500 3,507 4,500
31703658 533200 Vehicle Parts & Repair - - 667 2,500
31703658 534102 Small Tools 3,183 3,500 3,705 3,500
31703658 534400 Safety Supplies - - 54 500
31703658 549000 Other Supplies & Materials 426 1,000 693 1,000
31703658 553300 Machinery and Equipment Rental - - 540 2,500
31703658 592000 Building Improvements 2,000
31703658 594000 Machinery and Equipment 5,009 12,000 12,137
195,689 372,737 273,363 357,955
5,800,777 6,479,440 7,949,314 6,596,254 7,736,949
Murfreesboro Water & Sewer
FY18 Budget
O&M Admin (29)
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701297 511100 Salary - Full-Time - Regular 273,175 363,968 237,146 220,126 211,139
31701297 511400 Longevity 0 0 9,060 13,680 8,160
31701297 512300 Overtime Wages 0 0 15,370 19,706 25,000
31701297 514100 Social Security Tax 0 7,202 58,147 38,431 41,312
31701297 514101 Medicare Tax 0 1,685 0 8,988 9,667
31701297 514200 Hospital And Health Insurance 0 420,917 209,734 172,254 163,706
31701297 514203 Dental Insurance - Delta 0 20,415 11,333 8,327 8,508
31701297 514300 Defined Benefit Plan 0 5,546 51,896 43,895 41,508
31701297 514301 Defined Contribution Plan 0 1,339 21,453 7,284 14,104
31701297 514500 LTD & Life Insurance 0 3,054 5,535 4,494 5,575
31701297 514803 Respiratory Protection Program 0 206 0 0 -
31701297 514804 Physicals/Immunizations 0 308 0 119 -
31701297 599921 O&M Payroll New Construction 0 10,024 100,066 0 -
31701298 520000 Contractual Services 0 375 1,000
31701298 523000 Publicity, Subscription & Dues 2,500 753 1,500 504 1,000
31701298 523100 Advertising 80 100
31701298 523500 Memberships 0 1,389 1,700 68 100
31701298 523501 License/Prof Fees 0 1,050 1,500 2,895 3,000
31701298 523600 Public Relations 200 0 200 0 200
31701298 524000 Utility Services 0 42,276 45,000 42,954 45,000
31701298 524500 Telephone & Other Comm. 0 5,117 5,000 5,871 6,000
31701298 524501 Cell Phone 0 5,368 4,900 6,690 7,000
31701298 524502 Internet 0 7,344 7,500 7,344 7,500
31701298 524910 Tennessee One Call 0 17,345 17,500 36,515 40,000
31701298 526101 Fleet - Repair & Maintenance 0 822 950 1,574 1,000
31701298 526213 Repair & Maint. - Computers 0 3,454 3,500 3,674 5,000
31701298 526500 Repair & Maint Grounds & Imp 0 10,951 12,000 10,599 12,000
31701298 526600 Repair & Maint Bldg 1,244 2,000
31701298 528000 Training & Travel 15,500 12,082 12,000 11,711 17,500
31701298 528200 Car Allowance & Mileage 0 86 200 0 200
31701298 531000 Office Supplies and Materials 5,800 7,526 7,800 6,939 8,300
31701298 531100 Office Stationery 324 1,000
31701298 531200 IT Supplies 0 437 250 593 500
31701298 531300 Postage & Shipping 150 2 150 3 150
31701298 532010 Building Supplies 57 100
31701298 532300 Food 0 2,198 2,300 2,741 2,500
31701298 532400 Household & Janitor Supplies 0 23,889 25,000 27,089 28,000
31701298 532601 Clothing and Uniforms 0 19,536 26,000 30,189 32,000
31701298 532609 Personal Protective Equipment 0 6,820 6,500 8,643 7,500
31701298 533100 Gas, Oil, Diesel 96 100
31701298 533101 Fuel 0 1,714 3,000 906 1,500
31701298 534400 Safety Supplies 0 2,404 2,000 5,013 4,500
31701298 554000 Depreciation 0 0 5,818 0
31701298 573200 Compensation For Damages 0 2,157 1,000 4,184 2,500
31701298 594000 Machinery and Equipment 0 4,200 13,500 13,898 -
31701298 594701 Software 1,900 -
31701298 594702 Computer Equipment 0 327 700 3,897 6,700
31701298 594901 Furniture & Fixtures 521 2,184 -
31701298 599900 Miscellaneous Expense 0 661 1,000 356 1,500
297,325 1,016,993 928,208 776,514 774,129
Murfreesboro Water & Sewer
FY18 Budget
Customer Service/AMI Field Services
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
Customer Service
31701717 511100 Salary - Full-Time - Regular 412,688 365,987 325,568 374,810
31701717 511400 Longevity 4,980 7,380 5,340
31701717 512300 Overtime Wages 27 12,494 236 1,000
31701717 514100 Social Security Tax 7,994 29,600 19,067 21,392
31701717 514101 Medicare Tax 1,870 - 4,459 5,008
31701717 514200 Hospital And Health Insurance 109,046 118,428 100,361 104,613
31701717 514203 Dental Insurance - Delta 4,995 6,237 4,898 5,807
31701717 514204 Dental Insurance - Assurant 81 - 134 -
31701717 514300 Defined Benefit Plan 7,663 22,475 21,149 23,032
31701717 514301 Defined Contribution Plan 1,903 12,410 4,614 7,024
31701717 514500 LTD & Life Insurance 3,601 2,739 2,213 2,515
31701717 514804 Physicals/Immunizations - - -
31701717 529000 Other Contractual Services 1,463 - - -
31701718 522001 Bill Print & Mail Services 169,800 180,000 166,155 170,000
31701718 522002 Billing Fees CUD 195,089 200,000 209,618 225,000
31701718 523000 Memberships and Dues 160 - 200 200
31701718 523500 Memberships 645 1,000 263 1,000
31701718 523600 Public Relations 2,143 - 215 2,000
31701718 524500 Telephone & Other Comm. 5,019 7,500 5,144 6,000
31701718 524501 Cell Phone 917 1,000 683 1,000
31701718 524502 Internet 3,635 4,200 1,770 3,600
31701718 525001 Collection Agency Fees 15,069 13,000 15,765 16,000
31701718 526101 Fleet - Repair & Maintenance - - -
31701718 526213 Repair & Maint. - Computers 98,052 100,000 118,244 120,000
31701718 526600 Repair & Maint Bldg 1,800 -
31701718 528000 Training & Travel 9,971 13,000 10,959 13,000
31701718 528200 Car Allowance & Mileage 326 600 204 600
31701718 531000 Office Supplies and Materials 6,478 9,000 5,826 6,000
31701718 531100 Office Stationery and Forms - - -
31701718 531200 IT Supplies 525 600
31701718 531300 Postage & Shipping 2,099 3,000 1,958 3,000
31701718 532000 Operating Supplies 147 - - 500
31701718 532010 Building Supplies 125 200
31701718 532300 Food 584 800
31701718 532400 Household & Janitoral Supplies 1,098 1,100
31701718 532601 Clothing and Uniforms 67 - 591 700
31701718 532609 Personal Protective Equipment - 15 20
31701718 533101 Fuel - - -
31701718 534102 Small Tools - - -
31701718 554000 Depreciation - - -
31701718 555501 Credit Card Fees - - -
31701718 573200 Compensation For Damages 50 100 - 100
31701718 574100 Bad Debt Expense 173,747 225,000 225,000 225,000
31701718 594701 Software 467
31701718 594702 Computer Equipment 1,000 - 12,800
31701718 594901 Office Furniture & Equip 4,000 - -
31701718 599900 Miscellaneous Expense 1,580 - 297 300
1,236,792 1,337,750 1,257,118 1,360,061
Murfreesboro Water & Sewer
FY18 Budget
Customer Service/AMI Field Services
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
AMI Field Services (Meter Reading)
31701707 511100 Salary - Full-Time - Regular 255,196 375,909 353,430 390,776
31701707 511400 Longevity 5,280 7,920 5,700
31701707 512300 Overtime Wages 1,746 20,218 15,570 20,000
31701707 514100 Social Security Tax 8,621 30,948 21,760 22,091
31701707 514101 Medicare Tax 2,016 - 5,089 5,170
31701707 514200 Hospital And Health Insurance 116,998 121,238 117,755 141,772
31701707 514203 Dental Insurance - Delta 5,352 6,930 5,485 6,233
31701707 514300 Defined Benefit Plan 9,258 29,232 26,721 29,366
31701707 514301 Defined Contribution Plan 2,475 10,776 5,199 5,766
31701707 514500 LTD & Life Insurance 2,363 2,965 2,465 2,653
31701708 524501 Cell Phone 4,039 4,200 3,717 4,000
31701708 524502 Internet 4,080 4,100 4,080 4,100
31701708 526101 Fleet - Repair & Maintenance 11,730 15,000 12,737 15,000
31701708 526213 Repair & Maint. - Computers 4,221 1,900 11,006 5,000
31701708 528000 Training & Travel 2,847 14,000 10,244 14,000
31701708 531000 Office Supplies and Materials 167 500 926 1,500
31701708 531100 Office Stationery & Forms 158 500
31701708 531300 Postage & Shipping 257 239 500
31701708 532000 Operating Supplies 498 12,500
31701708 532005 Field Supplies 912 1,000 912 1,500
31701708 532601 Clothing and Uniforms 4,285 5,600 6,831 5,000
31701708 533101 Fuel 15,541 15,500 13,878 15,500
31701708 533200 Vehicle Parts & Repair 596 1,000
31701708 534102 Small Tools 306 5,325 1,613 2,500
31701708 534400 Safety Supplies - - -
31701708 554000 Depreciation 20,000 -
31701708 573200 Compensation for Damages 735 - 767 1,000
31701708 594000 Machinery & Equipment 725 1,106 13,100
31701708 594701 Software 3,000 - -
31701708 594702 Computer Equipment 327 1,000 3,897 12,800
31701708 594901 Office Furniture & Equip 600 900 -
453,472 695,946 635,499 739,027
1,356,388 1,690,264 2,033,696 1,892,617 2,099,088
Murfreesboro Water & Sewer
FY18 Budget
Engineering Department
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701737 511100 Salary - Full-Time - Regular 754,498 446,509 494,188 390,041 536,953
31701737 511400 Longevity 0 0 7,080 9,720 7,440
31701737 512300 Overtime Wages 57 1,000
31701737 514100 Social Security Tax 0 10,931 38,563 23,687 31,751
31701737 514101 Medicare Tax 0 2,557 0 5,540 7,429
31701737 514200 Hospital And Health Insurance 0 77,972 110,538 77,010 125,065
31701737 514203 Dental Insurance - Delta 0 2,908 4,851 0 4,043
31701737 514300 Defined Benefit Plan 0 17,481 49,630 45,786 52,047
31701737 514301 Defined Contribution Plan 0 1,215 5,810 1,147 6,778
31701737 514500 LTD & Life Insurance 0 2,963 3,628 2,691 3,668
31701737 514804 Physicals/Immunizations 1,500 0 0 0
31701737 519010 Temporary Agency Service 0 11,214 0 4,799
31701738 520000 Contractual Services 20,000 24,309 20,000 10,000 20,000
31701738 523000 Publicity, Subscription & Dues 2,600 140 500 300 500
31701738 523500 Memberships 0 689 1,600 510 1,600
31701738 523501 License / Professional Fees 0 400 600 90 1,200
31701738 523600 Public Relations 200 66 200 0 200
31701738 524500 Telephone & Other Comm. 10,000 4,234 5,000 4,349 5,000
31701738 524501 Cell Phone 600 3,182 4,000 3,032 4,000
31701738 524502 Internet 0 178 75 408 500
31701738 526101 Fleet - Repair & Maintenance 4,500 0 0 260 500
31701738 526200 Repair & Maint Other Mach & Eq 0 930 7,000 5,214 8,000
31701738 526213 Repair & Maint. - Computers 22,000 33,685 75,400 75,000 83,450
31701738 526500 Repair & Maint Grounds & Imp 1,500 293 1,500 84 650
31701738 526600 Repair & Maint Bldg 57 100
31701738 528000 Training & Travel 16,000 7,257 12,550 5,511 18,000
31701738 528200 Car Allowance & Mileage 100 0 100 0 100
31701738 529000 Other Contractual Services 0 336 0 0 300
31701738 531000 Office Supplies and Materials 12,875 4,289 3,250 4,917 6,500
31701738 531200 IT Supplies 0 947 1,000 237 1,000
31701738 531300 Postage & Shipping 1,200 919 1,200 936 1,200
31701738 532001 Electrical Supplies 99 100
31701738 532005 Field Supplies 2,650 0 0 0 100
31701738 532300 Food 0 1,181 1,200 663 1,200
31701738 532400 Household & Janitor Supplies 10,000 9,014 10,000 6,702 10,000
31701738 532601 Clothing and Uniforms 2,610 0 0 356 400
31701738 532609 Personal Protective Equipment 0 0 500 0 200
31701738 533101 Fuel 15,000 121 0 2,655 1,500
31701738 534400 Safety Supplies 0 386 200 327 400
31701738 554000 Depreciation 8,900 7,830 13,695 0 -
31701738 573200 Compensation For Damages 1,000 0 1,000 0 1,000
31701738 594000 Tools & Equipment 5,800
31701738 594701 Software 0 0 11,000 0
31701738 594702 Computer Equipment 0 5,140 21,600 0 9,450
31701738 594901 Office Furniture & Equip 0 3,638 12,350 450 7,200
31701738 599900 Miscellaneous Expense 0 184 250 222 250
887,733 683,155 920,058 682,800 966,574
Murfreesboro Water & Sewer
FY18 Budget
Field Inspectors
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701747 511100 Salary - Full-Time - Regular 0 231,685 182,713 170,309 188,195
31701747 511400 Longevity 0 0 3,060 4,590 3,300
31701747 512300 Overtime Wages 0 22,150 68,517 46,193 55,000
31701747 514100 Social Security Tax 0 5,941 19,550 13,315 11,015
31701747 514101 Medicare Tax 0 1,389 0 3,114 2,578
31701747 514200 Hospital And Health Insurance 0 42,155 38,097 33,396 35,664
31701747 514203 Dental Insurance - Delta 0 2,460 2,772 2,115 2,235
31701747 514300 Defined Benefit Plan 0 6,373 22,769 16,433 17,411
31701747 514301 Defined Contribution Plan 0 1,408 4,381 3,312 3,752
31701747 514500 LTD & Life Insurance 0 2,471 1,828 1,194 1,269
31701748 523501 License/Prof Fees 0 240 320 360 320
31701748 524501 Cell Phone 0 2,289 2,200 2,732 2,800
31701748 526101 Fleet - Repair & Maintenance 0 4,394 6,500 4,358 6,500
31701748 528000 Training & Travel 0 720 500 0 550
31701748 531000 Office Supplies and Materials 0 478 500 540 550
31701748 531200 IT Supplies 0 190 300 216 300
31701748 532005 Field Supplies 0 897 1,975 350 1,000
31701748 532300 Food 0 29 50
31701748 532609 Personal Protective Equipment 0 0 1,200 212 610
31701748 532601 Clothing and Uniforms 0 1,991 3,000 1,344 2,500
31701748 533101 Fuel 0 8,538 8,000 8,162 8,500
31701748 533200 Vehicle Parts & Repair 0 387 200
31701748 534102 Small Tools 0 140 3,350
31701748 534400 Safety Supplies 0 0 500 0 500
31701748 594000 Machinery & Equipment 513 0 -
31701748 594100 Transportation Equipment 1,124
31701748 594702 Computer Equipment 0 430 2,200 1,946 -
0 336,712 370,882 315,871 348,149
Murfreesboro Water & Sewer
FY18 Budget
Water & Sewer Dept Administration
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701757 511100 Salary - Full-Time - Regular 575,786 639,575 637,890 608,984 605,436
31701757 511400 Longevity 0 0 5,820 8,730 9,600
31701757 512300 Overtime Wages 0 10,423 42,277 31,826 32,000
31701757 513000 Employee Benefit 1,700,000 (71) 0 0
31701757 513100 Retirement-Vacation & Sick Pay 122,000 89,258 200,000 196,612 231,702
31701757 513300 Vacation Pay 121,905
31701757 514100 Social Security & Medicare Tax 600,000 362,583 67,928 51,277 52,553
31701757 514101 Medicare Tax 0 4,061 0 11,866 11,785
31701757 514200 Hospital And Health Insurance 0 34,940 124,540 146,280 168,636
31701757 514201 Retiree Hospital & Health Ins. 325,000 311,019 325,000 316,128 325,000
31701757 514203 Dental Insurance - Delta 0 5,674 9,229 6,383 7,786
31701757 514300 Defined Benefit Plan 850,000 553,201 71,261 40,614 69,299
31701757 514301 Defined Contribution Plan 90,000 40,097 19,113 17,516 19,812
31701757 514500 LTD & Life Insurance 0 42,392 6,300 49,276 5,762
31701757 514600 Worker's Compensation 300,000 274,304 300,000 230,494 250,000
31701757 514700 State Unemployment 5,000
31701757 514901 S.125 Administration Costs 0 1,500 0 1,790 1,800
31701757 516000 Per Diem 0 0 0 0
31701757 516100 Board And Committee Members 10,000 1,500 10,000 6,600 8,400
31701758 520000 Contractual Services 0 8,571 30,000 0 10,000
31701758 522000 Printing Services 1,818 2,400
31701758 523000 Publicity, Subscription & Dues 26,000 27,966 26,000 5,240 12,000
31701758 523100 Advertising 120 1,200
31701758 523500 Memberships 0 6,296 9,000 48,008 48,000
31701758 523501 License / Professional Fees 800 800 800
31701758 523600 Public Relations 9,000 2,529 9,000 1,305 1,500
31701758 524000 Utility Services 30,000 28,422 33,000 30,318 33,000
31701758 524500 Telephone & Other Comm. 9,600 7,911 9,600 7,362 9,000
31701758 524501 Cell Phone 600 2,904 3,000 2,721 3,000
31701758 524502 Internet 0 773 1,200 446 1,200
31701758 525000 Professional Services 275,000 67,455 75,000 120,000 160,000
31701758 525300 Accounting & Auditing Services 16,000 17,500 25,000 24,900 25,000
31701758 525401 Corps of Engineer Report 0 2,900 3,000 0 3,000
31701758 525402 Environmental Fees 1,000 1,000 0 0 1,000
31701758 525500 IT Support Charges 90,000 35,220 50,000 50,000 50,000
31701758 525501 HR Support Charges 15,000 9,991 50,000 50,000 50,000
31701758 525503 Legal Support Charges 115,000 117,083 115,000 115,001 115,000
31701758 525509 Other Support Charges 100,000 0 100,000 100,000 100,000
31701758 525600 Consultant's Services 0 48,015 3,000 0 15,000
31701758 526000 Repair & Maint. Services 0 45 1,000 0 1,000
31701758 526213 Repair & Maint. - Computers 200,000 104,177 50,000 85,404 90,000
31701758 526500 Repair & Maint Grounds & Imp 3,600 2,498 4,800 2,940 3,600
Murfreesboro Water & Sewer
FY18 Budget
Water & Sewer Dept Administration
ORG OBJ DESCRIPTION FY15 ACTUAL FY16 ACTUAL FY17 BUDGET
FY17
PROJECTION FY18 BUDGET
31701758 526600 Repair & Maint Bldg 180 1,200
31701758 528000 Training & Travel 58,600 28,424 40,000 38,297 54,000
31701758 528050 Safety Training 0 1,595 3,000 0 3,000
31701758 528200 Car Allowance & Mileage 3,000 2,240 2,400 1,941 2,400
31701758 531000 Office Supplies and Materials 27,600 10,574 10,000 6,269 6,600
31701758 531100 Office Stationery 335 1,200
31701758 531200 IT Supplies 0 270 1,000 585 1,200
31701758 531300 Postage & Shipping 3,200 2,242 2,400 2,229 2,400
31701758 532001 Electrical Supplies 1,518
31701758 532010 Building Supplies 125 1,200
31701758 532300 Food 0 1,287 1,500 1,553 1,800
31701758 532400 Household & Janitor Supplies 20,000 16,444 18,000 16,314 18,000
31701758 532601 Clothing and Uniforms 0 62 0 740 1,200
31701758 534400 Safety Supplies 0 864 1,000 537 1,200
31701758 552500 Property Insurance 275,000 225,456 250,000 234,560 250,000
31701758 553300 Machinery and Equipment Rental 0 2,444 0 2,654 3,600
31701758 559400 Retirement - Admin Costs 65,000 0 65,000 0
31701758 569200 Bond Sales Costs 169,844
31701758 573200 Compensation For Damages 10,000 (572) 1,000 0 1,000
31701758 594500 Communication Equipment Exp 0 384 1,000 0
31701758 594701 Computer Software Exp 0 14,514 9,000 0
31701758 594702 Computer Equipment 0 8,167 2,500 2,870 20,600
31701758 594901 Office Furniture & Equip 0 372 1,500 0 1,300
31701758 599900 Miscellaneous Expense 0 4,618 0 4,613 6,000
5,925,986 3,475,464 2,826,258 2,684,261 2,918,171