LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019)
DEPARTMENT: Agriculture Production Annexure-A Approved Projects
Final Approved Cost AA Accorded Balance Amount Timeline to
Decision of the LUP Code Name of Project/ Location District complete the (In Cr.) (Yes/No) Required (In Cr.) Project
HPC
LUP1645 Construction of Girls Hostel Wadura Sopore SKUAST-K Baramulla 5.30000 Yes 3.60000 March 2019 Approved
LUP1646 Construction of Girls Hostel Rangil Ganderbal SKUAST-K Ganderbal 5.30000 Yes 4.15000 December 2019 Approved
LUP1647 Construction of Girls Hostel Benehama SKUAST-K Ganderbal 5.30000 Yes 4.15000 December,2019 Approved
LUP1648 Construction of Syposium at Main Campus Shalimar SKUAST-K Srinagar 9.00000 Yes 2.61890 March 2019 Approved
LUP1649 Construction of Girls Hostel Shuhama Alustang SKUAST-K Srinagar 5.30000 Yes 2.80000 March 2019 Approved
LUP1650 Constuction of Girls Hostel Shalimar SKUAST-K Srinagar 5.30000 Yes 2.85000 December,2018 Approved
LUP1651 Constuction of Lab cum Office Block B,Shalimar SKUAST-K Srinagar 11.00000 Yes 1.05650 March 2019 Approved
Total 21.22540
(Khurshid ed Shah~ Commissioner Secretary to~.
PW(R&B) Department Member (HPC)
Jl al Secretary to Govt.
PD&MD Member (HPC)
I Secretary to Govt. Principal Secretary to Govt. Finance Department
Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. {February 2Sth,2019)
DEPARTMENT: Estates Annexure-B Approved Projects
Final Approved AA Accorded Balance Amount Timelineto LUPCode Name of Project / Location District
Cost (In Cr.) (Yes/No) Required (In Cr.) complete the Decision of the HPC PrniP~t
LUP1652 Construction of 400 flats at pampore Pulwama 90.65300 Yes 72.60300 2021 Approved
Total 72.60300
ll (Khurshid ed Sha~
Commissioner Secreta~ Govt. PW(R&B) Department
Member (HPC)
Princi
Concerned Adm Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019)
DEPARTMENT: Floriculture Annexure-C Approved Projects
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of the LUP Code Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) complete the HPC
Proiect
LUP1653 Development of Bhour Camp Garden at Jammu (Phase 1st) Jammu 7.42000 Yes 6.52000 1 Year Approved
LUP1654 Upgradation of Bagh-e-Bahu garden at Jammu Jammu 6.31350 Yes 5.96350 1 Year Approved
Total 12.48350
Commissioner Secretary to Govt. PWD (R&B)
Member (HPC)
--AM-~11~~ (-Raj Kua:\al' Go;aij (Navin K. Choudhary)
Principal Secretary to Govt. Principal Secretary to Govt. PD & MD Floriculture Department
Member HPC Concerned Adm. Secretary
Principal Secretary to Govt. Finance Department
Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019)
DEPARTMENT: Higher Education
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the LUPCode Name of Project/ Location District
Cr.) (Yes/No) Required (In Cr.) complete the HPC Prni .. rt
LUP1671 ....... Construction of Class Room Block at Govt. Degree College Pattan Baramulla 7.00000 Nil 7.00000 2 Years Approved
LUP1672 / Const. of Lecture Block at GDC Sopore Baramulla 7.42620 Nil 7.42620 3 Years Approved
LUP1673 .,,- Construction of Academic Block at GDC Magam Budgam 5.87070 Submitted 5.87070 2 Years Approved
LUP1674 Bhaderwah Campus Faculty Residence (University of Jammu) Doda 4.80478 Yes 4.05825 18 Months Approved
LUP1675 Bhaderwah Campus Boys Hostel (University of Jammu) Doda 5.44124 Yes 2.72062 18 Months Approved
LUP1676 Bhaderwah Campus Girls Hostel (University of Jammu) Doda 5.44124 Yes 2.72062 18 Months Approved
LUP1677 Bhaderwah Campus Professors/HODS Staff Quarters (University of Doda 4.99393 Yes 2.49696 18 Months Approved Jammul
II' LUP1678 Const. of 06 Class Rooms incl Psychology Lab at GDC Kangan Ganderbal 4.78000 Nil 4.78000 Dec-2019 Approved
,,~UP1679 Const. of 12 Roomed Additional Accomodation (Double Storey) at GDC Ganderbal 5.96610 Nil 5.96610 - Approved Ganderbal Construction of multi storey building alongwith Double Storey Parking 2 Years 6
Approved L~P1680 with basement for Govt. Womens College Parade Jammu 14.48000 Submitted 14.48000 Months
Total I 57.51945
Annexure-E Approved Projects
Commissioner Secretary to Govt. PW(R&B) Department
Member(HPC)
Commissioner Secretary to Govt. Higher Education Department Concerned Adm. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the LUP Code Name of Project / Location District
Cr.) (Yes/No) Required (In Cr.) complete the HPC n._,_...,
LUP1681 Academic Block of Degree College Akhnoor Jammu 3.56290 Under Process 3.56290 - Approved
LUP1682 Construction of Pre-Engineered/Pre-fabricated 04 Class rooms and 04 Jammu 1.28670 Yes 1.28670 06 Months Approved Labs in Govt. oeeree Colleze Bisnah
LUP1683 Construction of 08 No Lecture Halls and 04 No of Laboratories at GDC Jammu 10.10000 Nil 10.10000 2 Years Approved Palloura IMishriwallal
LUP1684 Construction of Additional Class Rooms/ Labs and other allied works at Jammu 4.43000 Nil 4.43000 1 Year Approved GDC Hiranae:ar
LUP1685 Ramnagar Campus Academic Block (University of Jam mu) Jammu 1.88812 Yes 0.94406 18 Months Approved
LUP1686 Ramnagar Campus Boys Hostel (University of Jammu) Jammu 3.77843 Yes 2.71843 18 Months Approved
LUP1687 Ramnagar Campus Girls Hostel (University of Jam mu) Jammu 3.67242 Yes 2.151242 18 Months Approved
LUP1688 Kathua Campus Academic Block (University of Jammu) Kathua 9.64495 Yes 2.50506 18 Months Approved
LUP1689 Kathua Campus Boys Hostel (University of Jammu) Kathua 3.97076 Yes 1.98538 18 Months Approved
LUP1690 Kathua Campus Girls Hostel (University of Jam mu) Kathua 4.89656 Yes 2.44828 18 Months Approved
LUP1691 Construction of Lecture Block & Auditorium at GDC Kulgam Kulgam 13.33180 Submitted 8.82780 March-2020 Approved
LUP1692 Construction of additional Classroom block with Library at GDC Tral Pulwama 5.60750 Yes 5.60750 2 Working Approved seasons
LUP1693 Construction of Class room/Library block at Govt Womens Degree Pulwama 7.74840 Submitted 7.74840 2 Years Approved Colleae Pulwama
LUP1694 Const of Science Block 02 at GDC Pulwama Pulwama 4.89990 Nil 4.89990 2 Years Approved
Total II 59.21565
(KhursM~ Commissioner Secretary to~
PW(R&B) Departmlirt Member(HPC)
Commissioner Secretary to Govt. Higher Education Department Concerned Adm. Secretary
. ._,_..--···-a Prin · Secretary to Govt.
PD&MD Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
,,,,,
Final Approved Cost (In AA Accorded Balance Amount Timelineto
Decision ofthe LUPCode Name of Project / Location District
Cr.) (Yes/No) Required (In Cr.) complete the
HPC Project
LUP1695 Reasi Campus Academic Block (University of Jammu) Reasi 1.88812 Yes 1.33880 18 Months Approved LUP1696 Reasi Campus Boys Hostel (University of Jammu) Reasi 3.77843 Yes 3.19842 18 Months Approved LUP1697 Reasi Campus Girls Hostel (University of Jammu) Reasi 3.67242 Yes 3.10682 18 Months Approved
LUP1698 Construction of Commerce/Mathematics Block, Amar Singh College Srinagar 8.97000 Under Process 8.97000 2 Working Approved seasons
LUP1699 Construction of PG Block-lslamia College Hawal Srinagar 12.37030 Yes 8.37030 2 Working Approved seasons
LUP1700 Udhampur Campus Academic Block (University of Jammu) Udhampur 6.57089 Yes 5.21053 18 Months Approved LUP1701 Udhampur Campus Boys Hostel (University of Jammu) Udhampur 5.54169 Yes 4.64216 18 Months Approved
Total Ill 34.83703
Grand Total {1+11+111) 151.5721287
(Khu,sh~ Commissioner Secretary to~
PW(R&B) Department Member(HPC}
Commissioner Secretary to Govt. Higher Education Department
Concerned Adm. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC}
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE
FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019) DEPARTMENT: Health & Medical Education
Balance Timelineto
LUPCode Name of Project/ Location District Final Approved AA Accorded Amount complete the Decision of the
Cost (In Cr.) (Yes/No) Required Project HPC lln r» I
LUP1655 PHC building Saidwara Anantnag 2.85000 Yes 1.12640 2019-20 Approved
LUP1656 NTPHC at Baramulla Baramulla 1.88000 Yes 1.78000 2019-20 Approved
LUP1657 Nursing College Dalina Baramulla 4.50000 Yes 4.05000 2019-20 Approved
LUP1658 NTPHC Lalpora Budgam 3.55000 Yes 1.42000 2019-20 Approved
LUP1659 NTPHC Parisabad Budgam 3.55000 Yes 1.66000 2019-20 Approved
LUP1660 NTPH Hardu Panzoo Budgam 1.80000 Yes 1.75000 2019-20 Approved
LUP1661 PHC Dadompora Chadoora Budgam 2.60000 Yes 1.00030 2019-20 Approved
LUP1662 SITC of Electro Mechanical Equipments for Centralized Medical Gas Pipeline
Jammu 4.75590 Yes 4.75590 12 Months Approved of Oxygen and Vaccum outlets for existing wards of GMCH, Jammu
LUP1663 GNM School Kargil Kargil 5.91000 Yes 0.91000 2019-20 Approved
LUP1664 District Hospital Kathua Kathua 25.57300 Yes 2.87110 2019-20 Approved LUP1665 NTPHC building at Chowgam Kulgam 2.50000 Yes 0.94780 2019-20 Approved
LUP1666 Construction of Doctor's Quarters & Renovation of NTPHC at Natnoossa Kupwara 1.22850 Yes 1.17850 2019-20 Approved
LUP1667 NTPHC at Ratnipora Pulwama 1.85000 Yes 1.75000 2019-20 Approved
LUP1668 Walling at District Hospital Shopian Shopian 1.45000 Yes 1.40000 2019-20 Approved
Total I 26.60000
Annexure-0 Approved Projects
...... ;w Commissioner Secretary to Govt.
PWD (R&B) Depart~ Member (HPC) Member HPC
- Principal Secretary to Govt.
H&ME Department Concerned Adm. Secretary
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LUPCode Name of Project/ Location District Balance Amount Required Decision of the
(In Cr.) HPC
LUP1669 Augumenting Health Infrastructure in Hospitals of Jammu Jammu
Renal Transplant Center at SSH jammu 15.00000 Approved Creation of High Dependency Ward at GMCH Jam mu 15.00000 Approved
Eye Bank at GMC Jam mu 1.00000 Approved HlNl Swine Flu Lab (BSL 2/3) 1.00000 Approved
Conversion of old CCU ward into ICU at GMC, Jammu 7.50000 Approved MRI (3-Tesla) 10.50000 Approved
Total II 50.00000 Approved
LUP1670 Augumenting Health Infrastructure in Hospitals of Srinagar Kashmir
Magnetic Resonance Imaging (MRI) under NMHP (Psychiatry Disease Hospital Srinagar) 10.00 Crores available under NMHP 4.50000 Approved High tech Ultrasound Machine (Radiology Department) 0.27000 Approved
03 Units of continous Renal ReplacementTherapy (CRRT) 1.00000 Approved High Tech Sleep Lab (Chest disease Hospital Srinagar) 0.25000 Approved
Estabilishment of Genetic Division (Phase First) (Anatomy Department) 10.00000 Approved Lab track System along with allied supportive services (Biochemistry Department) 5.00000 Approved Gamma Camera (SMHS Hospital Sgr./ Radiation Oncology Department 2.80000 Approved
Magnetic Resonance Imaging (MRI) (Lalla Ded Hospital Srinagar) 14.43000 Approved Lithoclast (Ultrasound and Pneumatic) (Urology Department) 0.40000 Approved
Ultrasound machine (3d Equipped) with trans-rectal probe and biopsy (02. No's) (Urology Department) 0.35000 Approved Magnetic Resonance imaging(MRI) 9.00000 Approved
Establishment of high tech lab as per MCI requirement 0.90000 Approved Fibro scan (latest Model) 1.10000 Approved
Total Ill 50.00000 Grand Total (1+11+111) 126.60000
KhuBh}\ m ~ Commissione:~
PWD (R&B) Department Member (HPC)
Principal retary to Govt. PD&MD
Member (HPC)
(Atal Dulloo) Principal Secretary to Govt.
H&ME Department Concerned Adm. Secretary
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019)
DEPARTMENT: HUDD Annexure-F Approved Projects
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of LUP Code Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) complete the the HPC
Prni.,.r+
LUP1702 Comprehensive Sewerage Scheme Jammu Jammu 108.16000 Yes 35.95000 24 Months Approved
LUP1703 Comprehensive Sewerage Scheme Srinagar Srinagar 154.69000 Yes 42.35000 24 Months Approved
Total 78.30000
(Khurshid ti d Shah) ~ Commissioner Secretary to Gp<it.
PW(R&B) Department Member(HPC)
Pri
MemberHPC
Principal Secretary to Govt. Housing & Urban Dev. Department
Concerned Adm. Secretary
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST Of ,:LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019}
DEPARTMENT: Industries & Commerce Annexure-G Approved Projects
Final Approved Cost (In AA Accorded Balance Amount Timelineto
Decision of the LUPCode Name of Project / Location District
Cr.) (Yes/No) Required (In Cr.) complete the
HPC Project
LUP1704 Upgradation of Sports Goods Complex Bijbehara Anantnag 8.15000 Yes 6.55000 May-19 Approved
LUP1705 Upgradation of Industrial Estate, Baramulla Baramulla 2.59000 Yes 2.59000 Mar-19 Approved
LUP1706 Upgradation of Industrial Estate, Sopore Baramulla 2.42000 Yes 2.42000 Mar-19 Approved
LUP1707 Construction of existing common efflent Treatment Plant (60 KLD + Baramulla 1.80000 Yes 1.76000 Mar-20 Approved
ZLDI at Food Park Doubuzh sooore
LUP170B Construction of Sewerage and Drainage Disposal System for Baramulla 0.50000 Yes 0.48000 Mar-20 Approved
Industrial Effluents at Food Park Doubzah Sooore
LUP1709 Construction of Sewerage and Drainage Disposal System for Budgam 2.50000 Yes 2.45000 Mar-20 Approved
Industrial Effluent~ at EIPttrnnic Cornolex Ranzreth LUP1710 Upgradation of Industrial Estate, Digiana Jammu 4.62000 Yes 1.89000 Apr-19 Approved
LUP1711 Upgradation of Industrial Estate, Jammu Cantt Jammu 0.62000 Yes 0.29000 Apr-19 Approved
LUP1712 Upgradation of Industrial Estate, Digiana (Jammu) Jammu 3.58000 Yes 2.04000 Apr-19 Approved
LUP1713 Upgradation of Industrial Estate, Gangyal Phase II Jammu 8.35000 Yes 8.35000 Aug-19 Approved
Total I 28.82000
(Khu~Md~~ Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC)
Principal S ry to Govt. PD&MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Industries & Commerce Deptt.
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the Name of Project/ Location District Cr.) (Yes/No) Required (In Cr.) complete the HPC LUPCode n--•-·•
LUP1714 Construction of Common Effluent Treatment Plant at Industrial 7.50000 7.44000 Mar-20 Approved Complex, Badi Brahmna Discharge Location No. 03, Phase II
Jammu Yes
LUP1715 Construction of Common Effluent Treatment Plant at Industrial Jammu 7.50000 Yes 7.46000 Mar-20 Approved
Complex, Badi Brahmna Discharge Location No. 02, Phase II
LUP1716 Construction of Common Effluent Treatment Plant at Industrial Jammu 7.50000 Yes 7.46000 Mar-20 Approved
Complex, Badi Brahmna Discharge Location No. 01, Phase II
LUP1717 Construction of Common Effluent Treatment Plant at Industrial Jammu 7.50000 Yes 7.44000 Mar-20 Approved
Complex, Badi Brahmna Discharge Location No. 04, Phase II
LUP1718 Construction of Common Effluent Treatment Plant at Industrial Jammu 7.50000 Yes 7.44000 Mar-20 Approved
Complex, Badi Brahmna Discharge Location No. 05, Phase II
Construction of Sewerage Drainage disposal Syatem for Industrial Effluents including provision of Shifting / Dismantling of existing GI
LUP1719 Pipes and Electric cables of Street Lightening, Damage of Concrete Jammu 7.20000 Yes 7.16000 Mar-20 Approved
Drain, Road cutting including rectifying the same at various Industrial complex, Bari Brahmna
LUP1720 Upgradation of Industrial Estate, Kathua Kathua 1.48000 Yes 1.16000 Apr-19 Approved LUP1721 Upgradation of Industrial Estate, Kathua (Old) Kathua 1.34000 Yes 0.84000 Apr-19 Approved LUP1722 Upgradation of Industrial Estate, Sangrambhatta Kishtwar 1.55000 Yes 1.21000 Apr-19 Approved
LUP1723 Construction of existing common Effluent Treatment Plant at Pulwama 7.50000 Yes 7.44000 Mar-20 Approved
tasloora Phase II rsoo KLD CETP+ZLD\
LUP1724 Construction of existing common Effluent Treatment Plant at Pulwama 7.50000 Yes 7.45000 Mar-20 Approved
Lasinora Phase 11500 KLD CETP+ZLD\
LUP1725 Construction of existing 600 KLD common Effluent Treatment Plant Pulwama 7.00000 Yes 6.90000 Mar-20 Approved
into Zl.D Svstern at I assioora Pulwama
LUP1726 Construction of existing 500 KLD common Effluent Treatment Plant Pulwama 6.00000 Yes 5.90000 Mar-20 Approved
into ZLD svstem at tassloora Pulwarna
Total II 75.30000
Commissioner Secretary Govt. PW(R&B) Department
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Industries & Commerce Deptt.
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the LUPCode Name of Project / Location District Cr.) (Yes/No) Required (In Cr.) complete the HPC n._,_.,.
Construction of Sewerage and Drainage Disposal System for LUP1727 Industrial Effluents at Industrial Complex, Lassipora, Pulwama Phase Pulwama 5.00000 Yes 4.95000 Mar-20 Approved
IR, II
LUP1728 Upgradation of Industrial Estate, Kheora Rajouri 2.53000 Yes 1.38000 Apr-19 Approved LUP1729 Upgradation of Industrial Estate, Samba Samba 0.49000 Yes 0.26000 Apr-19 Approved
Construction of Common Effluent Treatment Plant at Industrial LUP1730 Growth centre, Phase-I, Samba Samba 7.50000 Yes 7.38000 Mar-20 Approved
LUP1731 Construction of Common Effluent Treatment Plant at Industrial Samba 7.50000 Yes 7.46000 Mar-20 Approved
Growth centre PhasP-11 Samba Construction of Common Effluent Treatment Plant at Industrial
LUP1732 Growth centre, Location No. 02, Phase-II, Samba Samba 7.50000 Yes 7.45000 Mar-20 Approved
Construction of Common Effluent Treatment Plant at Industrial LUP1733
Growth centre, Location No. 03, Phase-II, Samba Samba 7.50000 Yes 7.44000 Mar-20 Approved
Construction of Common Effluent Treatment Plant at Industrial LUP1734
Growth centre, Location No. 04, Phase-Ill, Samba Samba 7.50000 Yes 7.46000 Mar-20 Approved
Construction of Common Effluent Treatment Plant at Industrial LUP1735
Growth centre, Location No. 05, Phase-Ill, Samba Samba 7.50000 Yes 7.45000 Mar-20 Approved
Construction of Sewerage Drainage disposal Syatem for Industrial Effluents including provision of Shifting / Dismantling of existing GI
LUP1736 Pipes and Electric cables of Street Lightening, Damage of Concrete Samba 4.80000 Yes 4.76000 Mar-20 Approved Drain , Road cutting including rectifying the same at various Industrial complex, Samba
LUP1737 Development of Industrial Estate Zainakot (HMT Land) Srinagar 17.30000 Yes 15.63000 Aug-19 Approved
LUP1738 Construction of existing common efflent Treatment Plant (60 KLD + Srinagar 1.80000 Yes 1.77000 Mar-20 Approved
ZLDI at Shaltenz
Total Ill 73.39000
(Khu,sh~ Commissioner Secretary~
PW(R&B) Departrlient Member (HPC)
u (Rohit Kansa
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Industries & Commerce Deptt.
Final Approved Cost {In AA Accorded Balance Amount Timelineto Decision of the LUPCode Name of Project / Location District Cr.) (Yes/No) Required (In Cr.) complete the HPC
D•nl4r+
LUP1739 Construction of existing common efflent Treatment Plant Phase I Srinagar 7.50000 Yes 7.43000 Mar-20 Approved 500 KLD+ ZLDI at 1.C Khunmoh
LUP1740 Construction of existing common efflent Treatment Plant Phase Ill Srinagar 7.50000 Yes 7.45000 Mar-20 Approved rsoo KLD+ ZLDI at I.C Khunmoh
LUP1741 Construction of Sewerage and Drainage Disposal System for Srinagar 4.00000 Yes 3.96000 Mar-20 Approved Industrial Effluents at Industrial Complex, Khunmoh, Phase I and Ill
LUP1742 Construction of Sewerage and Drainage Disposal System for Srinagar 0.50000 Yes 0.48000 Mar-20 Approved Industrial Effluents at lndustrial Comolex Shaltena
LUP1743 Upgradation of Industrial Estate, Batta I Ballian, Phase II Udhampur 7.09000 Yes 4.21000 Apr-19 Approved LUP1744 Upgradation of Water Supply Infrastructure in IID Batta I Ballian
Udhampur 9.98000 Yes 8.96000 Oct-19 Approved ludhamcur Phase IR. II
Total IV 32.49000
Grand Total {l+ll+lll+IV} 210.00000
I
(Khu,,hl~ Commissioner Secretary to~
PW(R&B) Department Member (HPC)
u ~ Principal Secretary to Govt.
PD&MD Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Industries & Commerce Deptt.
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019)
DEPARTMENT: Information Annexure-H Approved Projects
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the LUP Code Name of Project/ Location District complete the Cr.) (Yes/No) Required (In Cr.) HPC Dr,.;,.,-+
LUP1745 Construction of Reading Room cum Reference Library & other Srinagar 2.28340 Yes 2.08340 One working Season Approved additional works in Media Complex, Srinagar
Total 2.08340
(Kh,,sh~ Commissioner Secretary to Go~
PWD(R&B) ,..-- Member (HPC)
Princip
~~- ~ ( ~o--c ~ (Raj Kum r Goyal) Z~ \ (Navin K. Choudhary)
ecretary to Govt. Principal Secretary to Govt. Principal Secretary to Govt. PD & MD Information Department Finance Department
Member HPC Concerned Adm. Secretary Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019}
DEPARTMENT: Ladakh Affairs
Final Approved AA Accorded Balance Amount Timeline to Decision of the LUPCode Name of Project / Location District Cost (In Cr.) (Yes/No) Required (In Cr.) complete the HPC
Proiect LUP1746 Improvement/Re-modelling of Khurbathang main irrigation
Kargil 9.75000 Yes 6.36970 Nov.21 Approved canal
LUP1747 Const. of Trespone Khu I Kargil 6.00000 Yes 5.80000 2020-21 Approved
LUP1748 Beautification of Kargil Town Kargil 20.00000 Yes 19.03460 2020-21 Approved
LUP1749 Const. of L/R Darchoks Bridge to Tingdo Kargil 3.50000 Yes 2.22010 2020-21 Approved
LUP1750 Remodelling of Gongyur Khul Chulichan upto Themrang
Kargil 1.65000 Yes 1.46440 Nov. 2020 Approved Kyok
LUP1751 Const. of Water Reservior Tank Luniyal Khul Chanigund Kargil 1.65850 Yes 1.44000 Nov.2020 Approved
LUP1752 Const. of Distributry Channel at Kaksar Khul Kargil 1.80000 Yes 1.25000 2019-20 Approved
LUP1753 Constt. Of L/RGrip to Middle School Grip Kargil 1.20000 Yes 1.05320 Nov-19 Approved
Total I 38.63200
Annexure-I Approved Projects
(Rigz~lj Commissioner Secretary to Govt.
Ladakh Affairs Department
Concerned Adm. Secretary
Commissioner Secretary to Govt.
PW(R&B) Department
Member (HPC)
u ~ Principal Secretary to Govt.
PD&MD Member (HPC)
~ (Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Final Approved AA Accorded Balance Amount Timelineto Decision of the LUP Code Name of Project/ Location District
Cost (In Cr.) (Yes/No) Required (In Cr.) complete the HPC Drnior+
WP1754 Constt. Of L/R Y. Shagaran instead of Shakar to Zeberthang Kargil 2.68750 Yes 2.51250 Nov-20 Approved
LUP1755 Constt. Of Water Supply Scheme Youkchok Dass Daythang Kargil 1.20000 Yes 1.07160 Nov-19 Approved
LUP1756 Constt. Of water Reserviour tank and WSS at
Kargil 1.20000 1.01770 Nov-19 Approved Takskangrong/Lankore(Phase-lst)
Yes
LUP1757 Extension of L/R Kharmang to Sandoe via Khangltak Ayet
Kargil 1.90000 Yes 1.89000 2020-21 Approved Yokma kharboo
LUP1758 Constt. Of L/R to Lingchey Broq Kargil 2.65000 Yes 2.60000 Nov-19 Approved
LUP1759 Constt. Of L/R Motorable Bridge at karkitchoo Kargil 3.51000 Yes 1.81000 Dec-19 Approved
LUP1760 Constt. Of L/R Govia Choskore Kargil 5.22000 Yes 4.85030 Nov-19 Approved
LUP1761 Const. of L/R from Biathang Motorable Bridge to Foot Kargil 2.88260 Yes 2.87030 Nov-19 Approved
Bride:e Shilichev
LUP1762 Const. of L/R to Adam Mohallah Silmo Kargil 2.25000 Yes 1.70000 2019-20 Approved
LUP1763 Constt. Of L/R Qatilgah Hagnis to Shakar Hr. Sec. kargil Kargil 4.00000 Yes 3.30000 2019-20 Approved
LUP1764 Construction L/R Iqbal Micro hydel Project to Honaki
Kargil 1.20000 Yes 1.18020 2019-20 Approved Gongma, kargil
Total II 24.80260
(Rigz~ Commissioner Secretary to Govt.
Ladakh Affairs Department Concerned Adm. Secretary
' (Khu~h~4 Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC) Member (HPC)
~ (Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved AA Accorded Balance Amount Timelineto Decision of the LUPCode Name of Project / Location District
Cost (In Cr.) (Yes/No) Required (In Cr.) complete the HPC Proiect
LUP1765 Constt. Of L/R from Sandoo to Lamsoo Kargil 4.50000 Yes 4.10000 Nov-19 Approved
LUP1766 Const. of L/R Mangrochey Lungma to Brakphos/Ayet via Kargil 3.25000 Yes 2.89700 Nov-19 Approved
Gravevard
LUP1767 Construction of link road from Foo Bodhkharboo to
Kargil 9.80000 9.33450 Nov-19 Approved Gongchoks Wakha.
Yes
LUP1768 Const. of link road Haniskotdoo to Haniskotdoo Phoo via Kargil 2.40000 Yes 2.11000 Nov-21 Approved
Khar.
LUP1769 Const. of Pandrass to Mushkoo Kargil 2.80000 Yes 2.40020 Nov-19 Approved
LUP177O Updg. Of L/R Heniskote Kargil 2.46000 Yes 2.03000 2020-21 Approved
LUP1771 Const. of L/R Tingdoo Kargil 4.27000 Yes 3.25000 2020-21 Approved
LUP1772 Const. of 20 beded Hospital GM Pore Kargil 5.04040 Yes 3.28040 2020-21 Approved
LUP1773 Const./Updg of L/R from Bull Mother fram Khurbathang to Kargil 14.98970 Yes 8.79250 2020-21 Approved
Mutrik Choskore
LUP1774 Const. of L/R Chapring Choskore Kargil 2.05000 Yes 1.37620 2019-20 Approved
LUP1775 Realignment of Zamindari Khu I Kaksar Kargil 9.99560 Yes 5.68000 Nov-20 Approved
Total Ill 45.25080
(Rigzin~ Commissioner Secretary to Govt.
Ladakh Affairs Department
Concerned Adm. Secretary
' ~
(Khurs~~ Commissioner Secretary to Govt.
PW(R&B) Department
Member (HPC)
u ~
Principal Secretary to Govt.
PD&MD Member (HPC)
(Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Final Approved AA Accorded Balance Amount Timelineto
Decision of the LUP Code Name of Project / Location District complete the
Cost (In Cr.) (Yes/No) Required (In Cr.) Project HPC
LUP1776 Seerthang Irrigation Canal Kargil 13.00000 Yes 7.85780 2020-21 Approved
LUP1777 Construction/Re-modelling of Yak Farm Canal Kargil 9.20000 Yes 6.10000 Nov-21 Approved bodhkharboo
LUP1778 Const. of HS Hardass Kargil 1.95000 Yes 1.40000 2020-21 Approved
LUP1779 Const. of Examination Hall/Hi-Tech Lab. HSS Girls Kargil Kargil 3.51000 Yes 3.03500 2020-21 Approved
LUP1780 Up-gradation of various L/R at Goma Minjee/Minjee Kargil 2.86640 Yes 1.32720 2019-20 Approved
LUP1781 Const. of Motor able Bridge at Fish Farm Wakhs including Kargil 4.50000 Yes 1.98440 2019-20 Approved Fish Fram Wakha to lumber thane Wakha
LUP1782 Construction of Tourist Budget Accomodation at Kargil 2.82000 Yes 1.19740 2019-20 Approved Kurbathanz karail
LUP1783 Const./Remodeling of Khangral Thang Irrigation Canal Kargil 9.75000 Yes 6.85000 Oct. 2021 Approved
LUP1784 Constt. Of Dathang Garkone Irrigation Canal Kargil 5.94240 Yes 4.50000 Jul-21 Approved
LUP1785 Const. of Lan kerchay Tuina Irrigation Canal Kargil 6.50000 Yes 3.31340 2020-21' Approved
LUP1786 Const. of Grip Choskorethang Canal Panikhar Kargil 14.24250 Yes 4.95380 Nov-20 Approved
Total IV 42.51900
' (Khu~~) (~ns
Commissioner Secretary to Govt. Ladakh Affairs Department Concerned Adm. Secretary
Commissioner Secretary to Govt. PW(R&B) Department
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (H PC)
Final Approved AA Accorded Balance Amount Timelineto
Decision of the LUPCode Name of Project / Location District complete the Cost (In Cr.) (Yes/No) Required (In Cr.) Project
HPC ~- LUP1787 Const of Auzuri to Shahi Bagh Irrigation Canal Kargil 8.50000 Yes 4.84930 2021-22 Approved
LUP1788 Const. of Distributory Channel at Khurbathang Plataue Kargil 5.59960 Yes 1.95220 2019-20 Approved
LUP1789 Const. of Parkachik Khaws Irrigation Kargil 56.15030 Yes 13.64470 Nov-21 Approved
LUP179O Construction of Karpokhar Sankoo Irrigation Canal Kargil 8.57000 Yes 3.55000 Nov-20 Approved
LUP1791 Const./Updg. Of Bl Road Km0.9th Kargil 10.00000 Yes 9.13740 2021-22 Approved
LUP1792 Const. of L/R I mambada Khawas Kargil 2.50000 Yes 1.55980 2019-20 Approved
LUP1793 Const. of L/R Brako to Thuina Kargil 3.80570 Yes 2.71890 2019-20 Approved
LUP1794 Updg. Of L/R Youkma Gato Lanakarchey Kargil 4.81000 Yes 2.50000 2019-20 Approved
LUP1795 Up-gradation of Link Road Saniyal Shah Kargil 1.20000 Yes 1.03700 2019-20 Approved
LUP1796 Const. of L/R Lalung Sandoo Kargil Kargil 8.68570 Yes 1.52810 2019-20 Approved
Total V 42.47740
(Rigz~ Commissioner Secretary to Govt.
Ladakh Affairs Department Concerned Adm. Secretary
Commissioner Secretary to Govt. PW(R&B) Department
Member (HPC)
u Pri~.
PD&MD Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (H PC)
Final Approved AA Accorded Balance Amount Timelineto
Decision of the LUP Code Name of Project/ Location District Cost (In Cr.) (Yes/No) Required (In Cr.)
complete the HPC
Project
LUP1797 Const. of L/R Chaqstay to Fotnag Bodhkarboo Kargil 3.70000 Yes 3.67000 2020-21 Approved
LUP1798 Const. /Remodeling of Bari Khu I Lakha Silmoo Kargil 2.71000 Yes 1.86310 Nov-19 Approved
LUP1799 Const./Re-modeling of Mayour Khul Grong Silmoo Kargil 2.65000 Yes 1.85030 Nov-19 Approved
LUP1800 Const. of lrri. Canal from Sheela to Chazar Kargil 2.03000 Yes 1.27070 Nov-19 Approved
LUP1801 Re-activation of various Old WSS Schemes of District kargil Kargil 9.98500 Yes 6.09480 Nov-20 Approved
LUP1802 Drilling/Installation of deep drilled Hand Pumps in District Kargil 9.98270 Yes 7.71340 Nov-20 Approved
LUP1803 Const. of RCC R Wall circular road town Kargil Kargil 7.50000 Yes 6.39810 Nov-21 Approved
LUP1804 Const. of L/R Adul Gond to Lungmithang Kargil Kargil 1.81550 Yes 1.54550 Nov-19 Approved
LUP1805 Const. of L/R to Garkone Monestry Kargil 3.20000 Yes 1.79020 Nov-19 Approved
LUP1806 Const. of L/R Marpoyul to Changyul Sapi Kargil 1.98000 Yes 1.08000 2019-20 Approved
Total VI 33.27610
,.,!sf Commissioner Secretary to Govt.
Ladakh Affairs Department Concerned Adm. Secretary
Commissioner Secretary to Govt. PW(R&B) Department
Member (HPC)
u ~
Principal Secretary to Govt. PD&MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved AA Accorded Balance Amount Timeline to
Decision of the LUPCode Name of Project / Location District complete the Cost (In Cr.) (Yes/No) Required (In Cr.)
Project HPC
LUP1807 L/R Khachey to Sandar Kargil 2.60000 Yes 1.83000 Nov-19 Approved
LUP1808 Construction of Link road from Main Road to Grongjuk Kargil 2.79630 Yes 2.47730 Nov-19 Approved Fokar Foo
LUP1809 L/R Kharboo to Samoni Kargil 1.97000 Yes 1.10000 Nov. 19 Approved
LUP1810 Const. of L/R Sapi Shakar Kargil 6.50000 Yes 5.97830 2019-20 Approved
LUP1811 Const. of Bridge at Thilla Kargil 3.64530 Yes 1.15970 Nov-20149 Approved
LUP1812 Const. of L/R Purtikchey to yaldik Barsoo Kargil 2.86490 Yes 1.25770 Nov-20 Approved
LUP1813 Const. of L/R lmambara Yokma Horlam to lmambara Gund Kargil 2.75570 Yes 1.75360 Nov-20 Approved
LUP1814 Const. of L/R GM Pore to Owlithang upto Gaskal Kargil 2.61250 Yes 1.39580 Nov-20 Approved
LUP1815 Const. of L/R TB Purtikchey to Gama Purtikchey Kargil 2.56080 Yes 1.15380 Nov-19 Approved
LUP1816 Const. of L/R Stangrimo Ubrok Kargil 2.52380 Yes 1.63560 Nov-19 Approved
LUP1817 Const. of sport stadium at Shargole Kargil 4.82000 Yes 4.14080 2020-21 Approved
Total VII 23.88260
(Rlgz~ Commissioner Secretary to Govt.
Ladakh Affairs Department
Concerned Adm. Secretary
{Khurshi e ah)
Commissioner Secretary to~ Pri
PW{R&B) Department PD & MD
Member {HPC} Member {HPC)
{Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman {HPC)
Final Approved AA Accorded Balance Amount Timelineto
Decision of the LUP Code Name of Project / Location District Cost (In Cr.) (Yes/No) Required (In Cr.)
complete the HPC
Project
LUP1818 Balance work of Const of L/R Lankore Kargil 5.08940 Yes 4.92710 Nov-20 Approved
LUP1819 Constt of L/R Mohalla Kharkat and Yokhor G.Minjee Kargil 1.10000 Yes 1.00000 Nov-19 Approved
LUP182O Const. of Link Road Beamathang Kargil 2.29630 Yes 1.54210 2019-20 Approved
LUP1821 Constt. Of Play ground at upper Chokspang at Goma Kargil Kargil 1.92550 Yes 1.27970 2019-20 Approved
LUP1822 Const of M/S Donchik Kargil 1.29000 Yes 1.15960 2019-20 Approved
LUP1823 Const. of L/R Khukhlon Pandrass Kargil 1.90000 Yes 1.11050 2019-20 Approved
LUP1824 Const. of L/R Shargandi to ltchoo Including 20 M span steel Kargil 9.24000 Yes 1.50000 Nov-19 Approved girder bridge
LUP1825 Permanent restoration of Pishu irrigation canal Kargil 2.36000 Yes 1.45000 Nov-19 Approved
LUP1826 Const of Irrigation Canal Mangbore dachey Kargil Kargil 2.32000 Yes 1.00000 Nov-20 Approved
LUP1827 Const. of Samrah Irrigation Khu I Kargil 2.25000 Yes 1.01050 Nov-20 Approved
Total VIII 15.97950
(Rigzin~ Commissioner Secretary to Govt.
Ladakh Affairs Department Concerned Adm. Secretary
g (Khurshi -n-Tu•n Shah) / ~
Commissioner Secretary to Govt. Principal Secretary to Govt. PW(R&B) Department PD & MD
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Balance Amount Timelineto
Decision of the Name of Project / Location Final Approved AA Accorded complete the LUPCode District
Cost (In Cr.) (Yes/No) Required (In Cr.) HPC Project
LUP1828 Const. of Sahangshin Maita Irrigation canal Kargil 8.10000 Yes 3.50700 Nov-20 Approved
LUP1829 Const. of Stackchey Samrah Irrigation canal Kargil 7.93050 Yes 7.93050 Nov-20 Approved
LUP1830 Jeepable suspension bridge for Tuna over river Indus Leh 2.70710 Yes 2.32750 2019-20 Approved
LUP1831 WSS Skurbuchan (Khangral) Leh 3.29760 Yes 1.04090 One working season Approved
LUP1832 WSS Temisgam Ang Leh 3.19650 Yes 1.67270 One working season Approved
LUP1833 WSS Nimo Leh 3.99000 Yes 1.16420 One working season Approved
LUP1834 Construction of road Rongdo to Sumdha Chun P-IV Leh 1.51000 Yes 1.07440 1 Year Approved
LUP1835 Construction of upper Liker road Leh 1.37500 Yes 1.17930 2019-20 Approved
LUP1836 Construction of Jungchen Rumbak Road L=G.41 Km Leh 4.77470 Yes 2.79450 2019-2020 Approved
LUP1837 Construction of Cold Storage at Leh Leh 11.72000 Yes 6.18000 2018-19 Approved
Total IX 28.87100
\Q.
(Ri~~ Commissioner Secretary to Govt.
Ladakh Affairs Department
Concerned Adm. Secretary
Commissioner Secretary to Govt.
PW(R&B) Department
Member (HPC)
Pri al Secretary to Govt.
PD&MD
Member (HPC)
(Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Final Approved AA Accorded Balance Amount Timeline to Decision of the LUPCode Name of Project/ Location District
Cost (In Cr.) (Yes/No) Required (In Cr.) complete the HPC Proiect
LUP1838 Construction of Link road from Kongshed to Zinglo Leh 2.95000 Yes 2.77840 2021-22 Approved Hemishukpachan
LUP1839 Link road Shanglang Potortsey Leh 3.40640 Yes 2.90890 2020-21 Approved
LUP1840 Link road to Tia Balukhar Leh 2.37620 Yes 1.23190 2020-21 Approved
LUP1841 Const. of Play Ground/Statdium at Kharu Oho Leh 1.28000 Yes 1.24500 2020-21 Approved
LUP1842 Const. of I/Canal chakmarthang at Bogdang Leh 2.00000 Yes 1.69800 3 years Approved
Total X 9.86220
Grand Total (l+ll+lll+IV+V+Vl+Vll+Vlll+IX+X) 305.55320
{R;gz~;1 Commissioner Secretary to Govt.
Ladakh Affairs Department Concerned Adm. Secretary
med Shah)/ Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC)
~nd~. PD&MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019)
DEPARTMENT: PWD - Balance Amount
Timelineto
LUPCode
AA Accorded complete the Decision of the
Name of Project / Location Final Approved Required
District Cost (In Cr.) (Yes/No) Project HPC
(In Cr.)
LUP1843 U pgradation of interior roads at Watnard
1.41460 Mar-20 Approved
Anantnag 1.50070 Yes
LUP1844 Constr.of Khull Brah Kralgund road
1.11060 Mar-20 Approved
Anantnag 1.17460 Yes
LUP1845 Constr.of Brah Dawoodpora road
1.14100 Mar-20 Approved
Anantnag 1.34100 Yes
LUP1846 Constr of Arhama Badasgam road
0.71630 Mar-20 Approved
Anantnag 1.27880 Yes
LUP1847 Construction/Upgradation of waltangoo Vasakanag road
1.90510 Mar-21 Approved
Anantnag 4.40510 Yes
LUP1848 Upgradation of Mandipora Changoo Chinar links
2.99190 Mar-21 Approved
Anantnag 3.45690 Yes
LUP1849 Construction of road fr Kh . . om ayar to Bomar via Lawaypora at 0.59610 Sep-19 Approved
Bandipora Bandipora 0.87610 Yes
LUP1850 Upgradation of Kehnoosa Rajpora road
4.09060 Aug-19 Approved
Bandipora 7.52440 Yes
LUP1851 Completion of balance works for Construction/upgradation of 2.22170 Mar-20 Approved
Nawa to Runda road Baramulla 5.95530 Yes
LUP1852 Cosnt of Road from KM 4th Dada Bhaderwah Road to Nai Dangri
2.27040 Dec-20 Approved
Dada 2.65540 Yes
Total I 18.45830
Annexure J Approved Projects
• (Khuo;h;~ PW(R&B} Department
Concerned Admin. Secretary Member (HPC}
-~ (Navin K. Ch~
Principal Secretary to Govt. Finance Department
Chairman (HPC} Member (HPC}
Timeline to Decision of the
Balance Amount complete the Final Approved AA Accorded
Required Project HPC
lUPCode Name of Project / Location
District Cost (In Cr.) (Yes/No)
(In Cr.)
Dec-19 Approved 0.45500
Const. of Chakka to Upper Dandi link road KM 1st RD (0-1000)
1.45000 Yes
LUP1853
Doda
Approved
District Doda length lkms
3.33960 Dec-20
Const. and upgradatin of Shiva Allalbani link Road from Km 6th to
4.18960 Yes
lUP1854
Doda
Oct-20 Approved
10th
3.86730 6.00000 Yes Doda
Approved
lUP18SS Const. of Parmaz Link Road
7.13910 Dec-20 7.36910 Yes
-
lUP1856 Const. of Road from National Highway to Sharerna via Shaja
Dada
Approved 7.94850 Sep-20
Upgradation of Balta! Dumail road by way of Pre-Cast Blocks ( For
9.15850 Yes
lUP1857
Ganderbal
Approved
Shri Amarnath Ji Yatra)
1.41420 Sep-19
Construction of lx20 Mtr span single lane plate girder bridge
2.50000 Yes
LUP1858 including Development of road approaches at Bala Sathun on
Ganderbal
Approved 3.15750 Sep-20
!..LWmJ.illa 1A1,1,,.,,., _.road .
7.74250 Yes
lUP1859 Const. of internal roads in Gangyal Ekta Vihar Kunjwani and Shanti Jammu
Approved
Nqgar Jammu
2.20260 Dec-19
Roads in Bathindi area including 4 nos. bridges on bathindi
9.57870 Yes
lUP1860
Jammu
Dec-19 Approved
Nallah(02 on upstream and 2 no. down stream of Makkah Masjid)
3.70200 3.94000 Yes
lUP1861 Roads from NHI to Kiryani Talab to Dongian via Kargil colony
Jammu
Mar-20 Approved 2.93790
Const. of various links/approach road to Jeevan Nagar Murallian
3.44790 Yes·
Approved
lUP1862
Jammu
0.65000 Mar-19
Miran Sahib road Jammu
2.71000 Yes
Approved
lUP1863 Roads in Chowadi near Rauli Talab
Jammu
2.36030 Sep-19 8.17000 Yes
lUP1864 Roads in Digiana
Jammu
39.17 400 Total II
' (Khurshid
PW(R&B) Department Concerned Admin. Secretary
Member (HPC)
(Ro · a
pal Secretary to Govt. PD&MD
Member (HPC)
~ {Navin K. Choudhary)
Principal Secretary to Govt. Finance Department
Chairman (HPC)
'' Balance Amount Timelineto
LUPCode Name of Project / Location District Final Approved AA Accorded
Required complete the Decision of the Cost (In Cr.) (Yes/No)
(In Cr.) Project HPC
LUP1865 Const. of road form Fatwal to chumbian Panditian L=l kms Jammu 0.57600 Yes 0.47600 06-2019 Approved
LUP1866 lmp./Upgradation of link road to Bishnah Ashram W. No 02 upto
Jammu 1.03800 Yes 0.86800 06-2019 Approved to KC Morh Bishnah L=l.20 kms
LUP1867 Const. of Road from Nandpur to Pindi Charkan Via Dua Ii Khui in
Jammu 1.54500 Yes 0.81000 06-2019 Approved Km 3rd Rd 800 -1000 km 4th &5th L=22 mtrs
LUP1868 Const. of Road from Palli to Chak Avtara L=3 kms Jammu 1.56800 Yes 0.99800 12-2019 Approved
LUP1869 Const. of Road at Sarore along Distributory No. 3 L=2.40 kms Jammu 1.22500 Yes 0.83240 12-2019 Approved
LUP1870 Const. of link road from Sai Khurd to Sardari Camp (Birdhipur
Jammu 1.49700 Yes 0.86700 12-2019 Approved Banal L=2 kms
LUP1871 Cosnt. Of Road from Chak Keema to Karyal L=2 kms Jammu 0.79500 Yes 0.54860 09-2019 Approved
LUP1872 Const. of link road from Kalapul Satrayian to Chowala Fattu Chak
Jammu 1.35200 Yes 0.85200 12-2019 Approved L=l.15 kms
LUP1873 Const. of Road form Mana to Shamshan Ghat L=2.10 kms Jammu 1.57500 Yes 1.16500 12-2019 Approved
LUP1874 Const. of Road from Talli Morh to Darsopur Ganda L=l.50 kms Jammu 0.99500 Yes 0.70500 12-2019 Approved
Total Ill 8.12200
" (Khurshi ~
PW(R&B) Department
Concerned Admin. Secretary
Member (HPC)
u ~
Principal Secretary to Govt.
PD&MD Member (HPC)
u (Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Balance Amount Timelineto
LUP Code Name of Project/ Location District Final Approved AA Accorded
Required complete the Decision of the
Cost (In Cr.) (Yes/No) (In Cr.)
Project HPC
LUP1875 Const. of Road from Gondla to Shamshan Ghat (Village Agwan)
Jammu 1.49600 Yes 1.00100 03-2020 Approved L=l.75 kms
LUP1876 Const. of link rod from Baspur to Samka (Suchetgarh Constituency Jammu 1.87350 Yes 1.23350 Dec-19 Approved L=l.80 kms
LUP1877 Imp/ Upgradation of link road Nari Khaper L=l.10 kms Jammu 0.71000 Yes 0.50000 Sep-19 Approved
LUP1878 Const. of Internal links at Dhyansar L=2.50 kms Jammu 1.25600 Yes 0.87100 Dec-19 Approved
LUP1879 Imp/ Upgradation of Road from Krishna Nagar to Gazian (Muralian Jammu 0.71850 Yes 0.41850 Sep-19 Approved Upto Shamshan Ghat) L=l kms
LUP1880 Const. of Road from Salehar to Chak Majra L-3 kms Jammu 1.50850 Yes 1.15850 Dec-19 Approved
LUP1881 Const. of Road from Kothi Morh to Lala Chak Road at RD 2-450 on Jammu 1.29500 Yes 0.69500 Dec-19 Approved Bari Brahmana Bishnah Road L=l.90 kms
LUP1882 Const. of link road from Biaspur Pariah to Ta lad road L=l.40 kms Jammu 1.80750 Yes 1.18250 Dec-19 Approved
LUP1883 Const./ Extension of Road from Kotli Charkan to Byepass Road Jammu 1.87550 Yes 1.26550 Dec-19 Approved Bishnah via Dhinday Khurd including links L-2 kms
Total IV 8.32550
' ~
(Khurshid Ahmed Shah)
PW(R&B) Department
Concerned Admin. Secretary
Member (HPC)
J-l Pri~.
PD&MD Member (HPC}
~ (Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Balance Amount Timelineto
LUPCode Name of Project / Location District Final Approved AA Accorded
Required complete the Decision of the Cost (In Cr.) (Yes/No)
(In Cr.) Project HPC
LUP1884 Const. of Road from Tanda to Chowala Fattu Chak L 3 kms Jammu 1.72550 Yes 1.32550 Mar-20 Approved
LUP1885 Const. of link road from Haripur to Dangra L 2.50 kms Jammu 2.39700 Yes 2.02700 Mar-20 Approved
LUP1886 lmp./upgradation and strengthening of Road from Pindi Sarochan Jammu 1.29000 Yes 0.95000 Dec-19 Approved to Garore Nallah L=0.96 kms
LUP1887 Const. o Road from Deoli Preet Nagar to Shamshan Ghat L=l.80 Jammu 0.91350 Yes 0.66350 Sep-19 Approved kms
LUP1888 Const. of link road from Devigarh to Jobowal L 2.20 kms Jammu 1.37250 Yes 1.14750 Dec-19 Approved
LUP1889 Const. of Road from Makhanpur to Pasgal L 2.50 kms Jammu 1.33000 Yes 0.97000 Dec-19 Approved
LUP1890 Const. of Road from Palli to Bhatyari via Kanhal L 3 kms Jammu 1.50100 Yes 0.92600 Dec-19 Approved
LUP1891 Const. of Lanes opposite Rajiv Gandhi Hospital Gangyal from Jammu 2.17100 Yes 1.98100 Mar-20 Approved House to Sh Bairam Singh to Biscuit Factory Jam mu
LUP1892 Imp./ Upgradation of Road from Sector F Sainik Colony to Lower Jammu 3.87500 Yes 3.35500 Mar-20 Approved Chowadhi
LUP1893 Const. of road including Bridge at Nagrota Migrant Camp to Jagti Jammu 8.59700 Yes 1.78700 Mar-20 Approved including Dhammi road
TotalV 15.13250
(Khu,shid~ PW(R&B) Department ,
Concerned Admin. Secretary
Member (HPC)
L1 ~
Principal Secretary to Govt.
PD&MD
Member (HPC)
~ (Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Balance Amount Timelineto
Name of Project/ Location Final Approved AA Accorded complete the Decision of the
LUPCode District Required Cost (In Cr.) (Yes/No) Project HPC
(In Cr.)
LUP1894 Const. of Road from Kanah Chargal to Dhoon Jammu 3.74650 Yes 3.48650 May-20 Approved
LUP1895 Const. of Road from passenger Shed Badsoo to Upper Badsoo Jammu 8.45700 Yes 8.30700 Mar-21 Approved
LUP1896 Imp./ Upgradation of Road from Jagti to Tanda Jammu 6.32180 Yes 5.89180 Mar-21 Approved
LUP1897 Const. of Road from Jakhari (Peer Baba Ji) to Seoura Jammu 2.34950 Yes 2.14950 Mar-20 Approved
LUP1898 Const. of Road from Nandani to Tara upto Madrasa incl. Vented
Jammu 4.89670 Yes 4.23170 Aug-20 Approved Causeway
LUP1899 Const of Tharakalyal to Alna Trapper Uchapind and Link road
Kathua 1.44220 Yes 0.93060 Mar-20 Approved Grave Yard to Pongran via Bhudal
LUP1900 Const. of Sulari link Road Kathua 2.13760 Yes 1.26700 Mar-20 Approved
LUP1901 Const.of Bhaddu to Phongal Road Kathua 1.77240 Yes 1.52360 Mar-20 Approved
LUP1902 Const. of Lakhari to Kunoo Road Kathua 1.62000 Yes 1.47000 Mar-20 Approved
LUP1903 Const. of Circular Road to Thantoo Kalai Kathua 1.07130 Yes 0.79360 Mar-20 Approved
Total VI 30.05130
•
~ (Khurshid Ahmed Shah)
PW(R&B) Department
Concerned Admin. Secretary
Member (HPC} PD&MD
Member (HPC)
(Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Balance Amount Timelineto
LUPCode Name of Project/ Location District Final Approved AA Accorded
Required complete the Decision of the
Cost (In Cr.) (Yes/No) (In Cr.)
Project HPC
LUP1904 Const. of Road from Circular Road from Barota via Mohallah
Kathua 1.91000 1.74000 Dec-20 Approved Galleria Yes
LUP1905 Const. of link road from Dhar road to Tarkhan Mohallah Sarmal
Kathua 1.lS000 Yes 0.84500 Oct-19 Approved Mohallah & SC Mohallah in village Pallan
LUP1906 Const. of Tilla Bather Road Kathua 4.29700 Yes 3.74930 Mar-20 Approved
LUP1907 Const. of Marta Nagrota to Pantair via Bari and Khlow road Kathua 3.33000 Yes 2.48970 Mar-20 Approved
LUP1908 Const. of link road from Dhar Road to Mohallah Lunia Kathua 3.17610 Yes 2.89110 Mar-20 Approved
LUP1909 Const. of 83 mtr causeway on Jandore & Brow via Hate km s" Rd Kathua 3.3S700 Yes 3.21700 Dec-19 Approved 850-950 connecting Hatli Manu road.
LUP1910 lmp./Upgradation of Parnalla Seri Mooni Plail Banhore road. Kathua 5.85740 Yes 5.80740 Mar-20 Approved
LUP1911 Double Lanning of Road from National Highway to Sunjwan Kathua 3.22320 Yes 2.41320 Jun-19 Approved
LUP1912 Const. of Ladoli Link road Billawar incl. Mangloor to Ladoli via
Kathua 5.70540 Yes 5.29360 Mar-20 Approved Jambal Dode
LUP1913 Const. of Road from Lokhli PHE Tube Well via Prillan De Maina to
Kathua 3.25900 Yes 2.98400 Mar-19 Approved Jardian De Talaian (Bakerwals Basti)
Total VII 31.43030
' (Khursh~ PW(R&B) Department
Concerned Admin. Secretary Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Balance Amount Tlmeline to
LUPCode Name of Project / Location District Final Approved AA Accorded
Required complete the Decision of the Cost (In Cr.) (Yes/No)
(In Cr.) Project HPC
LUP1914 Const. of Road from Dungara to Pargan Kathua 1.26150 Yes 1.14210 Jan-20 Approved
LUP1915 132 mtr span motorable Bridge over Nallah Bheeni including Kathua 7.91000 Yes 6.28500 Dec-19 Approved approaches at Beril in Billawar
LUP1916 Dadikathwah to Aamraie Road Kishtwar 1.50000 Yes 1.29000 Dec-19 Approved
LUP1917 Approach Road to Polytechnic College Cherhar Kishtwar 0.95320 Yes 0.64980 Oct-19 Approved
LUP1918 Const. of Atholi link road and its extension upto Gossi Kishtwar 2.26100 Yes 1.51050 Oct-19 Approved
LUP1919 Const. of Parking Places at Kishtwar Town on NH 244 Kishtwar 1.64640 Yes 1.34640 Oct-19 Approved
LUP1920 Const. ofThal Kwath Beyond km 4th Kishtwar 4.74160 Yes 4.11160 Sep-20 Approved
LUP1921 Const.of Foot bridge over Galwanpora Nallah near Thana Kishtwar 1.07550 Yes 0.63550 Mar-20 Approved
LUP1922 Const. of Link road from Whythana to Mulchitter Kishtwar 5.93880 Yes 5.85880 Sep-20 Approved
Total VIII 22.82970
PW(R&B) Department Concerned Admin. Secretary
Member (HPC)
(Roh~al) Princip~.
PD&MD Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Balance Amount Timelineto
Final Approved AA Accorded complete the Decision of the LUPCode Name of Project / Location District Required Cost (In Cr.) (Yes/No)
(In Cr.) Project HPC
LUP1923 Upgradation of Langate Hajin Takiya road including Langate Kupwara 6.29890 Yes 3.29390 Aug-19 Approved Panditpora Shailnar link
LUP1924 Upgradation of Geeripora Tumpora road Kupwara 3.03020 Yes 2.71020 Mar-21 Approved
LUP1925 Construction/Upgradation of Challagund Gundisana road Kupwara 5.76910 Yes 4.96910 May-21 Approved
LUP1926 Constructionof lx30 Mtr span steel girder bridge at Gabra ( Kupwara 2.64830 Yes 2.02910 Dec-20 Approved Mudiyan) including approaches road
LUP1927 Construction of link road from Upper Tadda to Qazi Mohalal Kupwara 2.14900 Yes 1.98000 Dec-20 Approved
LUP1928 Construction of Kona Gabra Choorkungi road Kupwara 4.07210 Yes 3.57210 Dec-20 Approved
Construction of 2x25 Mtr double lane steel girder bridge instead
LUP1929 of construction of lx45 Mtr span double lane steel girder bridge Kupwara 6.14980 Yes 1.52480 May-19 Approved including strengthening of existing bridge over nallah Kalarooch in
Km 6th of Kupwara Sogam road at Khumriyal
LUP1930 construction of road from Hathi Matha to Devi mang Poonch 2.78000 Yes 1.44700 Dec-19 Approved
LUP1931 Const. of Road from Dharmsal to Kanthole Rajouri 7.14700 Yes 7.08700 Dec-20 Approved
LUP1932 Garan Phalli Road Rajouri 6.72000 Yes 5.41000 Apr-20 Approved
LUP1933 Const. of VIP suit in PWD Dak Bungalow at Koteranka Rajouri 1.08830 Yes 0.91830 Mar-19 Approved
Total IX 34.94150
it (R~
Principal Secretary to Govt. PD&MD
Member (HPC)
Concerned Admin. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
I LUPCode Balance Amount Timeline to Name of Project/ Location District Final Approved AA Accorded
Required complete the Decision of the Cost {In Cr.) (Yes/No) Project HPC (In Cr.)
LUP1934 Const. of Road from Dhandkote to Sokargali Rajouri 4.48600 Yes 4.20600 Oct-19 Approved
LUP1935 Const. of Ujhan Darhal Kandi Road Rajouri 6.34700 Yes 5.02640 Mar-20 Approved
LUP1936 Patyari to Domel Via Thangiote Rajouri 3.59560 Yes 2.97560 Apr-20 Approved
LUP1937 Panjnara Phalli Road Rajouri 3.09000 Yes 2.35000 Apr-20 Approved
LUP1938 Link road from Kotedhara Bridge to Sanga Sahib Zia rat Rajouri 7.64920 Yes 7.43920 Dec-20 Approved
LUP1939 construction of road from Charyala to chak sarkari via Daryala Rajouri 3.55000 Yes 2.51000 Dec-19 Approved
LUP1940 Const of road from katha Bajaran to Saim samat Rajouri 4.13340 Yes 3.9S840 Mar-20 Approved Const. of road from Govt Medical College to Baba Gu lam Shah
LUP1941 Badshah University Rajouri connecting APJ Abdul Kalam Botinical Rajouri 8.75000 Nil 8.60000 Jun-20 Approved I Park IC:nori"I • Proiectl
LUP1942 Const. of Single Lane Motorable Bridge adjacent to Abdulla Bridge Rajouri 7.20000 Nil 6.20000 May-20 Approved Raiouri ISoecial Infrastructure Proiectl
LUP1943 Const/ Widening of road from rajouri to BGSB University (Special Rajouri 31.52000 Nil 26.70050 Mar-21 Approved Infrastructure Proiectl
LUP1944 Construction of road from Abdullah bridge to Court Complex via Rajouri S.88100 Yes 5.78100 Aug-20 Approved Anandnur Ashram/ Masiid Sharief
Construction of 40 mtr span single lane steel girder Motorable LUP1945 bridge including approaches at Tasyala Panjgrain (Under District Rajouri 1.99740 Yes 1.94740 Mar-20 Approved
IPl;,n\
LUP1946 Construction of Road from Rehan to Dhar Sakri Via Demote Rajouri 2.97400 Yes 2.71950 Jun-20 Approved
Total X 80.41400
(Khurshid PW(R&B) Department
Concerned Admin. Secretary Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Balance Amount Timeline to
LUPCode Name of Project/ Location District Final Approved AA Accorded
Required complete the Decision of the
Cost (In Cr.) (Yes/No) (In Cr.)
Project HPC
LUP1947 Const. of Road fromDachan to Ind Via Sasal Road Ramban 2.26560 Yes 1.67560 Dec-19 Approved
LUP1948 Const. of Hewaga Neel Road Ramban 2.20940 Yes 0.60400 Mar-20 Approved
LUP1949 Sangaldan Kanthan Road Ramban 1.62110 Yes 0.99110 Mar-20 Approved
LUP1950 Const.of Bus Stand at Ukhral Ramban 1.80000 Yes 1.70000 Mar-20 Approved
LUP1951 Banihal Lamber Road Ramban 2.81780 Yes 2.66780 Mar-20 Approved
LUP1952 Const. of 50 mtr span Motorable Bridge over Bishlari Nallah &
Ramban 2.50000 Yes 1.69000 Mar-20 Approved Approach Road to Degree College Banihal
LUP1953 lmp./Upgradation of Shiv Khori track at ransoo (L=3 kms) Reasi 2.89400 Yes 2.36900 Mar-20 Approved
LUP1954 Construction of link road from Suchani to Khoo da Ta lab Samba 2.49010 Yes 2.35010 Dec-19 Approved
LUP1955 Widening/04-lanning of Bemina Budgam road fromT atoo Ground
Srinagar 8.96570 Yes 8.69570 Sep-20 Approved crossing to Bemina Byepass Crossing ( Phase-I)
LUP1956 Const./ upgradation of Road from CEO office Udhampur to
Udhampur 0.73460 Yes 0.70470 Mar-20 Approved Mohalla Dhandyal
LUP1957 Const. of Road to Village Upper Badole via PTC Nalanda Academy Udhampur 1.90030 Yes 1. 75650 Mar-20 Approved Udhamnur
LUP1958 Imp./ Upgradation of Pattangarh to Matloa Road Udhampur 1.70550 Yes 1.38700 Oct-19 Approved
Total XI 26.59150
Grand Total (l+ll+lll+IV+V+Vl+Vll+Vlll+IX+X+XI) 315.47060
(Khurshid Ahmed Shah) _,,,,,,,, PW(R&B) Department
Concerned Admin. Secretary Member (HPC) Member (HPC)
Jl (Navin K. Choudhary)
Principal Secretary to Govt. Finance Department
Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2O19)
DEPARTMENT: POD Annexure-K Approved Projects
Final Approved Cost (In AA Accorded Balance Amount Timeline to Decision of the LUPCode Name of Project/ Location District Cr.) (Yes/No) Required (In Cr.) complete the HPC
Proiect Segregation I biifurcation of existing 11 KV Bhella-Chiralla
LUP1959 feeder on Prem Nagar Receiving Station and 11 KV Khellani Doda 0.78650 Yes 0.77150 Mar-19 Approved feeder on Bhalla Receiving Station
LUP1960 Replacement of Old Obsolete 11 KV Panel Sets at Medical, Jammu 1.39900 Yes 1.27900 Mar-19 Approved Janiour and Bantalab 16 Setsl
LUP1961 Replacement of Old Obsolete 11 KV Panel Sets at Bhalwal, Jammu 1.22080 Yes 1.10080 Mar-19 Approved Kanachak Batera Khour and Parzwal-l IS Sets)
LUP1962 Shifting/Realignment and Thickening of 33 KV Janipur Muthi Jammu 0.93720 Yes 0.88720 Mar-19 Approved Line from ACSR Wolf to ACSR Panther
Replacement of damaged cable of 33 KV G-4 line by 33 KV Single LUP1963 Core 630 mm2 XPLE Power Cable alongwith construction of RCC Jammu 0.40850 Yes 0.38850 Mar-19 Approved
cable trench at railway crossing Near Police Post Bagh-e-Bahu
Bifurcation and re-alignment of llKV Kattal Batta I feeder
LUP1964 emanating from 6.3 MVA Receiving station Nagrota and 11 KV Jammu 0.44390 Yes 0.39390 Feb-19 Approved Bamyal feeder and Nagrota feeder emanating from 2x10 MVA I:,..++; Dar~; .. ino c+~+;~"
Segregation / biifurcation of existing 11 KV TP-1, MU-4, MU-5, LUP196S UD-3, BH-1, SN-I and GM-2 feeder emanating from R/Stn Toph, Jammu 0.71930 Yes 0.66930 Mar-19 Approved
Muthi, Udheywala, Bhalwal, Subash Nagar and Gho Manhsan
Total I 5.49020
(Khurshid tlmed Shah) /" Commissioner Secretary to Gl"vt.
PW(R&B) Department Member(HPC)
Commissioner Secretary to Govt. Power Dev. Department
Concerned Adm. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost (In AA Accorded Balance Amount Timelineto Decision of the LUP Code Name of Project/ Location District complete the Cr.) (Yes/No) Required (In Cr.)
Project HPC
LUP1966 Replacement of Old/ Obsolete 11 KV Panel Sets at 33/11 KV Jammu 0.95550 Yes 0.95050 06 Months Approved R/Stns Jindrah Machillian and Sohal Bhalwal
LUP1967 Replacement of Old/ Obsolete 11 KV Panel Sets at 33/11 KV
Jammu 0.91210 Yes 0.90710 06 Months Approved R/Stns Gajansoo, Chowki Choura, Gho Manhasa and Balli Gulaba
Shifting / Realignment of 33 KV G-9 line passing over LUP1968 Chandergufa Complex on Circular Road near Panjtirthi Chowk Jammu 0.15320 Yes 0.14820 Mar-19 Approved
l:1mm11
LUP1969 Bifurcation / realignment of 11 KV Malhori Jaggir and Sidhra-1 Jammu 0.71280 Yes 0.70280 3 Months Approved feeder emanatine: from Malhori Ja11t1ir
LUP1970 220 KV ERS 9Suspension Type) with complete accessories Kashmir 3.75000 Yes 1.73000 2018-19 Approved
Division
LUP1971 220 KV ERS 9Suspension Type) with complete accessories Kashmir 6.85000 Yes 4.82000 2018-19 Approved
Division
LUP1972 Augmentationn of 33/11 R/Stn Basholi from 6.3 MVA to 10 MVA Kathua 0.70500 Yes 0.50100 Mar-19 Approved
LUP1973 Replacement of old / obsolete 11 KV Panel Sets with new 11 KV
Kathua 8.19330 Yes 8.10330 12 months Approved VCB Panel Sets at 66-33/11 KV Receiving Stations of STD-Kathua
LUP1974 Improvement of Diplapidated and Vunerable 11 KV Birpur Kathua 0.39140 Yes 0.36640 12 Months Approved Industrial Comolex feeder {31.5 MVAI
LUP1975 Laying of 11 KV Independent Feeder for Holy Devsthan Kathua 0.46860 Yes 0.43710 12 Months Approved Purmandal Block Purmandal
LUP1976 lmprovement/Stablization of HT/LT Network in Vijaypur Kathua 0.79720 Yes 0.76220 12 Months Approved Constituencv
Total II 19.42860
(Khursw Commissioner Secretary~
PW(R&B) Department Member(HPC)
Power Dev. Department Concerned Adm. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost (In AA Accorded Balance Amount Timeline to Decision of the
LUPCode Name of Project/ Location District complete the Cr.) (Yes/No) Required (In Cr.) HPC
Prnior• Improvement / Strenghtening / Stablization of DT's along with
LUP1977 11 KV feeders emanating from 66/11 KV lxl0 MVA R/Stn Kathua 0.75760 Yes 0.72760 12 Months Approved ITh::,lnfo,
Improvement/ Strenghtening / Stablization of Distribution Sub- LUP1978 Station along with 11 KV feeders emanating from 66/11 KV lxl0 Kathua 0.71600 Yes 0.67160 12 Months Approved
MVA Ghagwal and Randwal Samba
LUP1979 Evacuation of Power from 132/33 KV Grid station, Siot. Rajouri 0.47010 Yes 0.42010 6 months Approved Replacement/Overhauling of Worn-out equipments of 6.3 MVA
LUP1980 R/Stn Kangri, 6.3 MVA R/Stn Raja!, 6.3 MVA R/Stn Kalakote 3.15 Rajouri 0.99930 Yes 0.98930 06 Months Approved MVA R/Stn Qila Darhal, 6.3 MVA R/Stn Phall and 3.15 MVA IR/,tn ··~rrL..-1~ nf n:rh:r+ lb1in11ri
Replacement/Overhauling of Worn-out equipments of 3.15
LUP1981 MVA R/Stn Dangri, 6.3 MVA R/Stn Fatehpur, 3.15 MVA R/Stn
Rajouri 0.94750 Yes 0.93750 06 Months Approved Dhanwan, 6.3 MVA R/Stn Dharal, 10 MVA R/Stn Thana Mandi, 3.15 MVA R/Stn Palma of District Rajouri
LUP1982 Replacement/Overhauling of Worn-out equipments of various Rajouri 0.96200 Yes 0.95200 06 Months Approved Recelvlnz Stations
LUP1983 Shifting of Divisonal Stores from Panama Chowk to Kalakote Rajouri 3.23290 Yes 1.26180 12 Months Approved
Replacement of old obsolete llKV Panel sets with new one at
LUP1984 10 MVA Receiving Station Banihal, 6.3 MVA Receiving Station
Ramban 0.93930 Yes 0.92930 Mar-19 Approved Chareel, 3.15+4.0 MVA Receiving Station Ramsoo and 3.15 MVA Receiving Station Assar of District Ramban.
Total Ill 6.88920
(Khurshid ed Sha;y Commissioner Secretary to Govt.
PW(R&B) Department Member(HPC)
Power Dev. Department Concerned Adm. Secretary Member (HPC)
~ (Navin K. Choudhary)
Principal Secretary to Govt. Finance Department
Chairman (HPC)
Final Approved Cost (In AA Accorded Balance Amount Timelineto
Decision of the LUPCode Name of Project / Location District complete the Cr.) (Yes/No) Required (In Cr.) Project
HPC
Segregation/ biifurcation of existing 11 KV and Battery Cheshma LUP1985 feeders emanating from R/Stn Maitra and Battery Cheshma at Ramban 0.36540 Yes 0.3SS40 Mar-19 Approved
IDic;tric:t Ramhan LUP1986 Renovation/upgradation of PDD Guest House at Katra. Reasi 0.39060 Yes 0.38060 Mar-19 Approved
Replacement of old obsolete llKV Panel sets with new one at LUP1987 6.3 MVA Receiving Station Darmari, 6.3 MVA Receiving Station Reasi 0.80410 Yes 0.79410 Mar-19 Approved
Panthal and 2x10 MVA Receiving Station Katra of District Reasi.
LUP1988 Evacuation of power at 33 KV level from lxSO MVA 132/33 KV Reasi 1.14410 Yes 1.09410 6 months Approved Grid Station Reasi
Replacement of old obsolete llKV Panel sets with new one at
LUP1989 6.3 MVA Receiving Station Chenani, 6.3+2.5 MVA Receiving
Udhampur 0.98300 Yes 0.97300 Mar-19 Approved Station Ramnagar, 6.3 MVA Receiving Station Phalata and 6.3 MVA Receiving Station Sataney of District Udhampur.
Segregation of 11 KV Kud Madha feeder and LUP1990 improvement/stabilization of feeder by way of insertion of poles Udhampur 0.15600 Yes 0.14600 Mar-19 Approved
lin lonaer soan Segregation of 11 KV Jaganoo feeder emanating from 33/11 KV
LUP1991 3.15 MVA R/stn. Dhar Road & Shifting of part load of Jaganoo Udhampur 0.44700 Yes 0.43700 Mar-19 Approved feeder to 11 KV Satani feeder emanating from 33/11 kv 3.15 IVl\/1\ R/c:tn C:~hnl
LUP1992 Segregation of 11 KV Jakhani Back Feeder emanating from 4.0 Udhampur 0.41500 Yes 0.40500 Mar-19 Approved MVA 33/11 KV R/stn. Jakhani
Segregation of 11 KV Panchari feeder emanating from 33/11 KV LUP1993 3.15 MVA R/stn.Pathi for separate feeder to Meer, Pancheri, Udhampur 0.39800 Yes 0.38800 Mar-19 Approved
INowara Th11aai Parc:nn and r.:n,u,ari
Total IV 4.97320
Grand Total (l+ll+lll+IV) 36.781201
(Khursh;W- Commissioner Secretary to G6vt.
PW(R&B) Department Member(HPC)
Power Dev. Department Concerned Adm. Secretary Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February, 25, 2019)
DEPARTMENT: Rural Development Annexure-L Approved Projects -·
Final Approved Cost AA Accorded Balance Amount Timelineto Decision of LUP Code Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) complete the
the HPC n--:A~+
LUP1994 Construction of road upto Patta Village -Doda Doda 1.99470 Yes 1.84470 Aug-19 Approved
LUP1995 Constuction of temporary accomodation for establishment of Doda 0.36360 Yes 0.31360 Aug-19 Approved new KV at Jodhour- Doda
LUP1996 Constrcution of Hanch to Draman road -Doda Doda 0.94680 Yes 0.84680 Aug-19 Approved
LUP1997 Construction of link road from Dharout to Kastigarh- Doda Doda 1.62000 Yes 1.57000 Aug-19 Approved
LUP1998 Construction of road from Kathri to Kantoie via Sheikh Mohalla Doda 0.42960 Yes 0.37960 Aug-19 Approved Kastiaarh Doda
LUP1999 Construciton of another storey over already constrcuted buliding Doda 0.28960 Yes 0.23960 Aug-19 Approved of HSS Gai
LUP2000 Construction of Public Sarai near Jamaia Ganayat-ul-Uloom Doda 0.22620 Yes 0.17620 Aug-19 Approved Bhatvas
LUP2001 Construction of community hall at Bhata Peryote Doda Doda 0.25090 Yes 0.20090 Aug-19 Approved
LUP2002 Clearance of pending work done liabilities of Sars- Gagwa road Doda 0.51930 Yes 0.33930 Aug-19 Approved
LUP2003 Constt of Foot suspension Bridge on Sarthal Sewa Nalahha Block Kathua 0.19500 Yes 0.12000 May-19 Approved Bani-Villaee Sarthal
LUP2004 Construction of Road up to Shamshan Ghat via Dange Wali Kathua 0.40380 Yes 0.38500 Mar-19 Approved Mata Kootah- Kootah More
LUP2005 Development of Pond at Sahar - Sahar Kathua 0.14000 Yes 0.06000 Mar-19 Approved
Total I 6.47570
~. (~e~a;:"'~
Conce~~cretary Rural Development Department
Commissioner Secretary t PW(R&B) Department
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of LUPCode Name of Project/ Location District
(In Cr.) (Yes/No} Required (In Cr.) complete the the HPC Drniort
LUP2006 Rejuvenation of pond at Chack Sajjan - Chack Sona Nupa Kathua 0.19400 Yes 0.11400 Mar-19 Approved Development of Sham Shan Ghat at Bhanderkoot - Block Kishtwar 0.35700 Yes 0.30700 6 Months Approved
LUP2007 Kishtwar LUP2008 Development of Playground at Gulabgarh- Block Paddar Kishtwar 0.39960 Yes 0.34960 6 Months Approved
Repair/ Renovation of Zia rat Sharief Haza rat Abu Bakar Sadiq Kishtwar 0.28070 Yes 0.23070 6 Months Approved LUP2009 llRA\ at Yourdu Marwah- Block Marwah LUP2010 Const of Community Hall (CFC At Mandi ) Pyt Mandi Poonch 0.36170 Yes 0.28670 1 Year Approved
Const. of CFC at Baba Mastan Shah Zairat Nakka Manjhari Poonch 0.36170 Yes 0.31170 6 Months Approved LUP2011 Mendhar- Panchavat Nakamaniri
Construction of upgradation of Play stadium at MS Saroola Poonch 0.17280 Yes 0.14780 3 Months Approved LUP2012 Dhazloon-Pvt Dharaloon uooer
LUP2013 Const. of up-gradation of play field at HS Dharati-Pyt Dharati Poonch 0.10710 Yes 0.08210 6 Months Approved
LUP2014 Const of CFC at Zairat Sain Faqar Din- Pyt Ajote Poonch 0.19150 Yes 0.14150 4 Months Approved LUP2015 Constrcution of Community Hall at Kotedhara-Rajouri Rajouri 0.28890 Yes 0.23890 3 Months Approved LUP2016 Community Hall at Gadyoge Dehlari- Block Khawas Rajouri 0.25220 Yes 0.17720 3 Months Approved
Constrcution of culvert/ approach road from Kampla Mohalla to Rajouri 0.14120 Yes 0.09120 2 Months Approved LUP2017 haii Shabir Nowshera-Oila Darhal
Constrcution of Link Road from Chask Sarkari to Majid Mohalla - Rajouri 0.17510 Yes 0.12510 3 Months Approved LUP2018 Gila Darhal
LUP2019 Constt. Of Community Hall at Zero Point Kalsian- Block Nowshera Rajouri 0.27370 Yes 0.22370 2 Months Approved
LUP2020 Community Hall at Jawahar Nagar- Rajouri Rajouri 0.67260 Yes 0.63760 4 Months Approved
Total II 3.46480
j» (She~
Concerned Admin. Secretary Rural Development Department
} lj_ (Khurs · ..,._ .... _ __.,,~ (Roh it
Commissioner Secreta~Govt. Principal ecretary to Govt. PW(R&B) Department PD & MD
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of
LUPCode Name of Project/ Location District (In Cr.) (Yes/No) Required (In Cr.)
complete the the HPC Proi@ct
LUP2021 Constt. Of Road from Jabba Bari to Pattan to Dhak -Seri Rajouri 0.32600 Yes 0.27600 2 Months Approved
Construction of L/Road from main road to Dodhi Mohalla Rajouri 0.63920 Yes 0.58920 3 Months Approved LUP2022 Charran- Block Raiouri
Construction of road from Bathuni to DD Gas Agency Store- Block Rajouri 0.12160 Yes 0.04160 1 Month Approved LUP2023 Raiouri
LUP2024 Constt ofT/Road from Thandi Kassi to Sadyal -Block Panjgrain Rajouri 0.18940 Yes 0.16940 3 Months Approved
Constt. Of Road K.K.Brick Kilm to Mohalla Saranoo Thathi- Rajouri 0.18940 Yes 0.13940 3 Months Approved LUP2025 Dhanzri
LUP2026 Constt. Of Road main Kalaban to Mohalla Soo Kalaban-Manjakote Rajouri 0.15820 Yes 0.13320 3 Months Approved
LUP2027 Construction of Link Road at Shri Mata Vashno Devi ji Temple Rajouri 0.09930 Yes 0.06430 1 Month Approved
Construciotn of Forest Bridge Gujjar Basti Gagoni, Block Ramsoo- Ramban 0.73830 Yes 0.70130 9 Months Approved LUP2028 Ramsoo
Construciton of Steel Girder Foot Bridge (through Type 35 M Spap) at Oak Nallaha Gagoni, Panchayat Bohardar -A Ramban 0.59850 Yes 0.56150 9 Months Approved
LUP2029 I Rlnrl, D-,mcnn
Construction of Protection Bund at Nallah Dooligam Gund, Block Ramban 0.66660 Yes 0.60360 9 Months Approved LUP2030 Banihal -Banhihal
Construciton of Protection Bund at Mirpora Gujjarnar Ramban 0.25700 Yes 0.22270 9 Months Approved LUP2031 PANCHAYAT Lamber Block Banihal- Lamber Banihal
Construciton of Link Road from National Highwat to Ziyarat Ramban 0.35000 Yes 0.29950 9 Months Approved LUP2032 Sharief Nowgam, Panchayat Nowgam, Block Banihal
LUP2033 Const. of CFC Buliding Sukhalghati- Pyt Devi Garh Block Bhamagh Reasi 0.32880 Yes 0.21570 Mar-19 Approved
Total Ill 4.01740
(Sheet~ Concerned Admin. Secretary
Rural Development Department
e Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC)
Princi
u (Rohit Kans
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of LUPCode Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) complete the the HPC
Prnio.+ LUP2034 Const. of Shelter Shed at Kali Mata Mandir Pouni-Pouni Reasi 0.13640 Yes 0.08640 Mar-19 Approved LUP2035 Const. of Community Centre at Sadheen -Block Pouni Reasi 0.33630 Yes 0.28630 6 Months Approved LUP2036 Const. of CFC Bu Ii ding at Sujandhar Vilalge Sujandhar Reasi 0.33630 Yes 0.28630 Mar-19 Approved LUP2037 Const. of Community Centre at Kheral- Block Pouni Reasi 0.33630 Yes 0.28630 6 Months Approved LUP2038 Const. of Community Centre at Agnithalal, Akhali Buttan Reasi 0.33620 Yes 0.28620 2 Years Approved
Construciton ofT/Road Agriculture University Dera Baba to Upper Tanda ST Mohalla via Masjid Mohalla - Village Tanda Dera Reasi 0.42380 Yes 0.36010 5 Months Approved
LUP2039 I R::ih::i Bandha D"'"c:i Protection bound on Mananu-Nud Nallah 9Part A)- Mananu-
Samba 0.06000 Yes 0.04640 1 Month Approved LUP2040 Block Nud Construction of pacca nallah in Mananau, Block Nud- Mananu
Samba 0.03870 Yes 0.01220 Mar-19 Approved LUP2041 Block Nud Construction of road from Kahanwal to Shamshan Ghat 0-450 (
Samba 0.09980 Yes 0.07820 Mar-19 Approved LUP2042 Part-Al Pvt Rehian Constt. Of Waiting shed at Nathwal, Rajuinder pura Village
Samba 0.14210 Yes 0.11750 Mar-19 Approved LUP2043 Nathwal Povt Raiindernur Metalled Road from Shiv Mandir tic Dati Mata alongwith Protection and Retaining wall- Bati Mata at pyt Gurha Salathia Samba 0.31870 Yes 0.29270 4 Months Approved
LUP2044 IUnn<>r
LUP2045 Foot Bridget over Devak at Sainkhaina/ Haridabad Udhampur 0.12000 Yes 0.10640 Mar-19 Approved LUP2046 Foot Bridge M/S Kulsar Udhampur 0.13300 Yes 0.10410 Mar-19 Approved LUP2047 Foot Bridge at Barkunda Bupp Udhampur 0.15000 Yes 0.13570 Mar-19 Approved LUP2048 Foot Bridge Shitla Matta Mandir - Kohsar Udhampur 0.09900 Yes 0.05540 Mar-19 Approved LUP2049 Foot Brdige Badeni Sarar Udhampur 0.15000 Yes 0.13040 Mar-19 Approved LUP2050 Construction of Foot Bridge at Bugyal -Kanah Udhampur 0.08450 Yes 0.04170 Mar-19 Approved LUP2051 Constrcution of Foot Bridge over Dudoo Nalla Sundla Udhampur 0.13350 Yes 0.10230 Mar-19 Approved
Total IV 2.81460
Rural Development Department
u ~
Commissioner ecretary to~ Principal Secretary to Govt. PW(R&B) Department PD & MD
Member (HPC) Member (HPC)
~ (Navin K. Choudhary)
Principal Secretary to Govt. Finance Department
Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of LUPCode Name of Project/ Location District
(In Cr.) (Yes/No) Required (In Cr.) complete the the HPC _ero_ject
LUP2052 Constrcution of Foot Bridge at Denadi Nallaha Upper Meer Udhampur 0.05900 Yes 0.03055 Mar-19 Approved LUF:Z053 Const.of Foot Bridge over Nallah Dayal- Ring Udhampur 0.14000 Yes 0.12420 Mar-19 Approved
LUP2054 Const. of Foot Bridge W.No 2 Pinger NHO Mulkh Raj-Pinger Udhampur 0.12000 Yes 0.10230 Mar-19 Approved
LUP2055 Const. of Foot Bridge W.No 3 over Pinger Mata Nallah Pinger Udhampur 0.13000 Yes 0.05110 Mar-19 Approved LUP2056 Const.of Foot Bridge over Nallah Daria -Darla Udhampur 0.08000 Yes 0.06140 Mar-19 Approved LUP2057 Const.of Foot Bridge near Shimbe-Di-Bain Batta! Udhampur 0.06000 Yes 0.01674 Mar-19 Approved
LUP2058 Const.of Foot Bridge near P/S Himbra Tali Lehar - Gandala Udhampur 0.06000 Yes 0.02250 Mar-19 Approved LUP2059 Const.of Foot Bridge near M/S Seniote -Hartaryan Udhampur 0.05000 Yes 0.02134 Mar-19 Approved LUP2060 Const.of Foot Bridge near P/S Ansu-Kiotli Bala Udhampur 0.05000 Yes 0.01264 Mar-19 Approved
Const.of Foot Bridge over Nallaha SC Mohalla near H/o Sh. Udhampur 0.05150 Yes 0.01520 Mar-19 Approved LUP2061 Baldev Chand-Neeli Nallah
LUP2062 Const. of foot Bridge at Megan i -Sansoo Udhampur 0.35000 Yes 0.30100 Mar-19 Approved Const. of foot Bridge NHO Dr. Arun Mahajan Laddan udhampur-
Udhampur 0.03000 Yes 0.01000 Mar-19 Approved LUP2063 Kotli Bala Const. of foot Bridge at Morha Soran Paddar NHO Kher din -
Udhampur 0.07750 Yes 0.03250 Mar-19 Approved LUP2064 Battal LUP2065 Const. of foot Bridge near Old age home-Barrian Udhampur 0.12000 Yes 0.10250 Mar-19 Approved
LUP2066 Const. of Culvert over Nallah Kaller Kambal Danga- Kambal Danga Udhampur 0.07600 Yes 0.03000 Mar-19 Approved
TotalV 0.93397
Grand Total (l+ll+lll+IV+V) 17.706471
Rural Development Department
(Khurshid A ed Sha~ Commissioner Secretar-¢ Govt.
PW(R&B) Department Member (HPC)
u ~ Principal Secretary to Govt.
PD&MD Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019)
DEPARTMENT: School Education Annexure-M Approved Projects
Final Approved Cost AA Accorded Balance Amount Timelineto Decision of the LUPCode Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) complete the HPC
Proiect
LUP2067 Constructin of 09 roomed Three Storied building at GHS Dooru Anantnag Yes May. 2019 Approved Anantnaz 0.85550 0.55550
LUP2068 Construction of 06 roomed double storey building for Govt. MS Anantnag Yes Aug-19 Approved Hunumannora Anantnaz 0.45650 0.35650
LUP2069 Providing of Water Supply to 207 uncovered Schools of Anantnag Yes Approved Anantnaa 1.8856 1.8856 2 Months
LUP2070 Construction of 06 Roomed Double Story Building for Govt. HSS Bandipora Yes Oct-19 Approved Nadihal Bandioora. 0.96350 0.86350
LUP2071 Providing of Water Supply to 548 uncovered Schools of Bandipora Yes Approved Bandinora 4.4317 4.4317 2 Months
LUP2072 Construction of 06 roomed Double Storied building for Govt. MS Baramulla Yes Jul-19 Approved Checki Seri Nehal Pora Baramulla. 0.96350 0.81350
LUP2073 Construction of G+2 (12 roomed double Storied Building at Baramulla Yes Jul-19 Approved Govt. Girls HS Kunzer Baramulla. 1.07500 0.97500
LUP2074 Const. of KGBV Chankan Sopore Baramulla 1.17000 Yes 0.78250 4 months Approved
LUP2075 Const. of KGBV Fajipora/ Machikhud Tangmarg Baramulla 1.18780 Yes 0.50080 4 months Approved
LUP2076 Const. of KGBV Khawajabagh Baramulla Baramulla 1.13120 Yes 0.44420 4 months Approved
LUP2077 Const. of KGBV Watergam Rafiabad Baramulla 1.13120 Yes 0.44420 4 months Approved
LUP2078 Const. of KGBV Tagpora Rohama Baramulla 1.13120 Yes 0.44420 4 months Approved
\V I,\ Total I 12.49720
~~~ ~
I )
~ ~
(Ajeet Kumar Sahu) Secretary to Govt.
School Education Department Concerned Adm. Secretary
(Khurshid Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC)
Principa ecretary to Govt. PD&MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of the LUP Code Name of Project / Location District (In Cr.) (Yes/No} Required (In Cr.) complete the HPC
Proi11>ct LUP2079 Const. of KGBV Watergam Wagoora Baramulla 1.13120 Yes 0.44420 4 months Approved
LUP2080 Const. of KGBV SultanDaki, Uri Baramulla 1.39560 Yes 1.00810 4 months Approved
LUP2081 Const. of KGBV Mundji Dangerpora Zaingeer Baramulla 1.13120 Yes 0.44420 4 months Approved
LUP2082 Providing of Water Supply to 277 uncovered Schools of Baramulla Yes Approved Baramulla 1.7246 1.7246 2 Months
LUP2083 Construction of 10 roomed Double Storied Building for Govt. HS Budgam Yes Sep. 2019 Approved Bugroo Budgam 0.96330 0.86330
LUP2084 Construction of 10 roomed Double Storied Building for Govt. HS Budgam Yes Sep. 2019 Approved TF Shah Budgam 0.96330 0.86330
LUP2085 Construction of 06 roomed Double Storey Building for Govt.
Budgam Yes Jul-19 Approved HSS Khansahib Budgam 1.00830 0.90830
LUP2086 Construction of 09 roomed Three Storied Building for Govt. HSS Budgam Yes Sep. 2019 Approved Wadwan Budgam 1.86450 1.76450
LUP2087 Const. of KGBV Bagat I Kanipora Rakhshalina Budgam 1.08320 Yes 0.39620 2 months Approved
LUP2088 Const. of KGBV Narbal SK Pora Magam Budgam 1.08320 Yes 0.39620 2 months Approved
LUP2089 Providing of WS to 152 uncovered Schools of Budgam Budgam 0.3744 Yes 0.3744 2 Months Approved
LUP2090 Const. of KGBV Assar Doda Doda 1.19230 Yes 0.80480 09 months Approved \V
Total II 9.99210
(Ajeet Kumar Sahu) Secretary to Govt.
School Education Department Concerned Adm. Secretary
(KhurshW Commissioner Secretary to Govt.
PW(R&B) Department Member (HPC)
Ll (~
Principal Secretary to Govt. PD& MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timelineto Decision of the
LUPCode Name of Project/ Location District (In Cr.) (Yes/No) Required (In Cr.) complete the
HPC Proiect LUP2091 Providing Drinking water supply to 136 No. of uncovered schools Doda 1.32160 Yes 1.32160 2 Years Approved Construction of 08 roomed Double Storied building for Govt.
Ganderbal Yes Aug-19 Approved LUP2092 BHS Suhama Ganderbal
0.79430 0.69430 Providing of Water Supply to 58 uncovered Schools of Ganderbal Yes Approved
LUP2093 Ganderbal 0.2366 0.2366 2 Months LUP2094 Coverage of 70 No. uncovered schools Jammu 0.81370 Yes 0.81370 2 Years Approved LUP2095 Const. of KGBV Bani Kathua
Kathua 0.91000 Yes 0.26000 04 months Approved LUP2096 Const. of KGBV Basohli Kathua Kathua 1.24480 Yes 0.35480 04 months Approved Providing of Drinking Water Supply in 157 Nos. Uncovered Govt. Kathua 2.06400 Yes 2.06400 Approved
LUP2097 Schools of District Kathua 2 Years LUP2098 Const. of KGBV Marwah Kishtwar
Kishtwar 1.26180 Yes 0.33480 09 months Approved LUP2099 Coverage of 109 No. uncovered Schools Kishtwar 0.55300 Yes 0.55300 1 Year Approved Construction of 06 roomed additional accomodation at Govt. Kulgam Yes Sep.2019 Approved
LUP2100 HSS Munid Kule:am 0.80860 0.64860 Construction of 04 roomed additional accomodation at GHSS
Kulgam Yes Aug-19 Approved LUP2101 Kule:am
0.61580 0.46580 Construction of 04 roomed additional accomodation at HSS Kulgam Yes Aug-19 Approved
LUP2102 Areh Kulgam. 0.61580 0.47090 \ .......
I Total Ill 8.21810
'D ~ (Ajeet Kumar Sahu) Secretary to Govt.
School Education Department Concerned Adm. Secretary
(Khurshinu.a,, .. m,....., Sha~ (Ro~ Commissioner Secretary to Govt. Princi~retary to Govt.
PW(R&B) Department PD & MD Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to Decision of the LUPCode Name of Project/ Location District (In Cr.) (Yes/No) Required (In Cr.) complete the HPC
Prni11>rt
LUP2103 Providing of Water Supply to 71 uncovered Schools of Kulgam Kulgam 0.331 Yes 0.331 2 Months Approved
LUP2104 Const. of KGBV Gotlipora Kupwara Kupwara 1.27890 Yes 0.59190 4 months Approved LUP2105 Const. of KGBV Langate Gundchobtra Kupwara 1.27640 Yes 0.58940 4 months Approved LUP2106 Const. of KGBV Tangdar Khawaharpora Kupwara 1.31570 Yes 0.62870 6 months Approved LUP2107 Const. of KGBV Trehgam Kupwara Kupwara 1.28640 Yes 0.59940 4 months Approved
LUP2108 Providing of Water Supply to 582 uncovered Schools of Kupwara Kupwara 3.3193 Yes 3.3193 2 Months Approved
LUP2109 Const. of KGBV Balakote Poonch Poonch 0.90930 Yes 0.25930 04 months Approved Provision of water facility to 342 No. uncovered schools of
Poonch 1.70000 Yes 1.70000 Approved LUP2110 District Poonch 2 Years Construction of 06 roomed Double Storied building for Govt.
Pulwama Yes Sep.2019 Approved LUP2111 HSS Wasoora Pulwama. 0.85000 0.70000 Providing of Water Supply to 128 uncovered Schools of Pulwama Yes Approved LUP2112 Pulwama 1.0669 1.0669 2 Months
LUP2113 Const. of KGBV Manjakote Katarmal Rajouri Rajouri 1.01030 Yes 0.36030 04 months Approved
LUP2114 Providing drinking water supply to 649 No. of uncovered schools Rajouri 6.15610 Yes 6.15610 2 Years Approved
Total IV 16.30230
(Ajeet Kumar Sahu) Secretary to Govt.
School Education Department
Concerned Adm. Secretary
Ll ,_,,., .. ~uShah..V-----
Commissioner Secretary to Govt. Principal Se ry to Govt. PW(R&B) Department PD & MD
Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Final Approved Cost AA Accorded Balance Amount Timeline to
Decision of the LUP Code Name of Project/ Location District
(In Cr.) (Yes/No) Required (In Cr.) complete the
HPC Project
LUP2115 Const. of KGBV Banihal Ramban Ramban 1.19200 Yes 0.26500 09 months Approved
LUP2116 Coverage of 85 No. uncovered Schools Ramban 0.82000 Yes 0.82000 2 Years Approved
LUP2117 Const. of KGBV Mahore/ Chassana Reasi Reasi 0.91540 Yes 0.26540 06 months Approved
LUP2118 Const. of KGBV Arnas Reasi Reasi 1.19200 Yes 0.30200 06 months Approved
LUP2119 Providing water supply to 220 No. uncovered schools Reasi 2.34900 Yes 2.34900 2 Years Approved
LUPZlZO Prov. Water supply to 55 No. uncovered schools of District Samba 0.87500 Yes 0.87500 Approved Samba 2 Years
LUPZlZl Providing of Water Supply to 81 uncovered Schools of Shopian Shopian 0.7957 Yes 0.7957 2 Months Approved
LUPZlZZ Const. of KGBV Srinagar Panchkarwari Srinagar 1.37390 Yes 0.44690 6 months Approved
LUPZ1Z3 Providing of Water Supply to 07 uncovered Schools of Srinagar Srinagar 0.035 Yes 0.035 2 Months Approved
LUPZ1Z4 Providing water supply to 584 No. uncovered schools Udhampur 5.41450 Yes 5.41450 2 Years Approved
Total V 11.56850
Grand Total (l+ll+lll+IV,V) 58.578201
(Ajeet Kumar Sahu) Secretary to Govt.
School Education Department Concerned Adm. Secretary
{Khurshid h Commissioner Secretary to. . .atrvr.-Pifocipal Secretary to Govt.
PW(R&B) Department PD & MD Member {HPC) Member (HPC)
{Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman {HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019) DEPARTMENT: Technical Education Department
Annexure-N Annrove Prolects Timelineto Decision of Final Approved Cost AA Accorded Balance Amount
LUPCode Name of Project/ Location District (In Cr.) (Yes/No) Required (In Cr.) complete the the HPC
Project
LUP2125 Completion of deficient infrastructure pointed out by AICTE in Anantnag 1.21620 Yes 0.83920 August, 2019 Approved Govt. Polvtechnic Anantnaa
LUP2126 Completion of deficient infrastructure pointed out by AICTE in Bandipora 1.19920 Yes 1.18920 August, 2019 Approved Govt. Polvtechnic Baninura
LUP2127 Completion of deficient infrastructure pointed out by AICTE in Baramulla 1.22320 Yes 1.18920 August, 2019 Approved Govt. Polvtechnic Baramulla
LUP2128 Completion of deficient infrastructure pointed out by AICTE in Budgam 1.21570 Yes 0.81000 August, 2019 Approved Govt. Polvtechnic Bude:am
LUP2129 Completion of deficient infrastructure pointed out by AICTE in Doda 0.83920 Yes 0.82920 August, 2019 Approved Govt. Polvtechnic Doda
LUP2130 Completion of deficient infrastructure pointed out by AICTE in Ganderbal 1.20220 Yes 0.47000 August, 2019 Approved Govt. Polvtechnic Ganderbal
LUP2131 Completion of deficient infrastructure pointed out by AICTE in Jammu 0.50400 Yes 0.49920 August, 2019 Approved Govt. Bovs Polvtechnic Jam mu
LUP2132 Completion of deficient infrastructure pointed out by AICTE in Jammu 0.53520 Yes 0.49360 August, 2019 Approved Govt. Women Polvtechnic Jammu
LUP2133 Completion of deficient infrastructure pointed out by AICTE in Kargil 0.93720 Yes 0.89920 August, 2019 Approved Govt. Polvtechnic Karail
LUP2134 Completion of deficient infrastructure pointed out by AICTE in Kathua 1.15920 Yes 0.75260 August, 2019 Approved Govt. Polvtechnic Kathua
LUP2135 Completion of deficient infrastructure pointed out by AICTE in Kishtwar 0.83920 Yes 0.82920 August, 2019 Approved Govt. Polvtechnic Kishtwar
Total I 8.80060
d
Commissioner Secretary to Govt. PW(R&B) Department
Member (HPC)
Princi Secretary to Govt. PD&MD
Member (HPC)
Mo/. i.e g..•Jp,;t·;fg}r,;] /(B.aj K~mar G~I)
Principal Secretary to Govt. Technical Education Dept. Concerned Adm. Secretary
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Timeline to Decision of Final Approved Cost AA Accorded Balance Amount
complete the LUPCode Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) the HPC
Project
LUP2136 Completion of deficient infrastructure pointed out by AICTE in Kulagam 1.22320 Yes 0.82000 August, 2019 Approved Govt. Polvtechnic Kulaarn
LUP2137 Completion of deficient infrastructure pointed out by AICTE in Kupwara 1.19920 Yes 1.18920 August, 2019 Approved Govt. Polvtechnic Kuowara
LUP2138 Completion of deficient infrastructure pointed out by AICTE in Leh 0.93720 Yes 0.58000 August, 2019 Approved Govt. Polvtechnic Leh
LUP2139 Completion of deficient infrastructure pointed out by AICTE in Poonch 0.83920 Yes 0.82920 August, 2019 Approved Govt. Polvtechnic Poonch
LUP2140 Completion of deficient infrastructure pointed out by AICTE in Ramban 1.20220 Yes 1.17920 August, 2019 Approved Govt. Polvtechnic Ramban
LUP2141 Completion of deficient infrastructure pointed out by AICTE in Reasi 1.16520 Yes 1.13920 August, 2019 Approved Govt. Polvtechnic Reasi
LUP2142 Completion of deficient infrastructure pointed out by AICTE in Samba 1.19920 Yes 0.47000 August, 2019 Approved Govt. Polvtechnic Samba
LUP2143 Completion of deficient infrastructure pointed out by AICTE in Shopian 0.83920 Yes 0.82920 August, 2019 Approved Govt. Polvtechnic Shooian
LUP2144 Completion of deficient infrastructure pointed out by AICTE in Srinagar 0.52220 Yes 0.49920 August, 2019 Approved Kashmir Govt. Polvtechnic Srinagar
LUP2145 Completion of deficient infrastructure pointed out by AICTE in Srinagar 0.52220 Yes 0.12000 August, 2019 Approved Govt. Women Polvtechnic Srinagar
LUP2146 Completion of deficient infrastructure pointed out by AICTE in Udhampur 0.83920 Yes 0.82920 August, 2019 Approved Govt. Polvtechnic Udhamour
TOTAL-II 8.48440
Grand Total (1+11) 17.285001
(Khursh~ Commissioner Secretary~.
PW(R&B) Department Member (HPC)
' I ~~·>-\"''\ ~ ------- ~. w. r~ r ~r (R~I) (Baj ltumit' 60,al)
Principal Secretary to Govt. Principal Secretary to Govt. PD & MD Technical Education Dept.
Member (HPC) Concerned Adm. Secretary
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th,2019}
DEPARTMENT: Youth Services & Sports Annexure- Aonrove ProJects
Timelineto Decision of the Final Approved Cost AA Accorded Balance Amount
complete the LUP Code Name of Project / Location District
(In Cr.) (Yes/No) Required (In Cr.) HPC Project LUP2147 Up-gradation of Playinfg Field at Marhama Bijbihara, Anantnag Anantnag 0.83000 Yes 0.83000 Mar-19 Approved LUP2148 Up-gradation of Playinfg Field at Munjhara Bijbihara, Anantnag Anantnag 0.81000 Yes 0.81000 Mar-19 Approved
LUP2149 Development of play field at Panzmullla Anantnag by way of earth work and Anantnag 0.25000 Yes 0.19000 Mar-19 Approved flllinz.
LUP2150 Development of play field at Seer Hamdan by way of levelling Anantnag 0.15000 Yes 0.07000 Mar-19 Approved Extension of play field at Pahalgam Anantnag by way of earth work in
LUP2151 cutting /filling, dismantling of existing fencing and damaged building and Anantnag 0.19000 Yes 0.19000 Aug-19 Approved construction of chain link fencing around the extended side
LUP2152 Dev. of P/F by way of chain link fencing at Shangus Nowgam Anantnag 0.31000 Yes 0.31000 Aug-19 Approved
LUP2153 Development of Play field at Wullarhama, Pahalgam by way of Earth work in Anantnag 0.37000 Yes 0.36000 Apr-19 Approved cuttlnz & fillin<>
LUP2154 Construction of Retaining Wall at Indoor Stadium, Baramulla. Baramulla 0.44000 Yes 0.23000 Aug-19 Approved
LUP2155 P/F of chain link fencing at Play ground Azad Gunj near water filtration plant Baramulla 0.20000 Yes 0.20000 Aug-19 Approved
LUP2156 Development of Play field at Hudi pora Baramulla by way of construction of Baramulla 0.15000 Yes 0.12000 May-19 Approved R/Wall and Earth work in cuttlnz/ftlllna I Phase-Ill
LUP2157 Construction of Pavilion Block Jehlum Indoor Stadium at Baramulla Baramulla 0.35000 Yes 0.35000 May-19 Approved LUP2158 Development of play field at Bounjwah Doda Doda 0.17000 Yes 0.06000 Mar-19 Approved
LUP2159 Construction of Mini Pavilion block at Madri Meharban Stadium, Ganderbal. Ganderbal 0.35000 Yes 0.27000 Aug-19 Approved
LUP2160 Construction of Govt College of Physical Education Gadoora Ganderbal Ganderbal 30.39040 Yes 1.86840 2018-19 Approved
LUP2161 Construction of All Weather Swimming Pool & allied components at MA Jammu 5.38000 Yes 3.50000 Aug-19 Approved Stadium Jammu
Total I 9.35840
0 d
(Khu,.Md~ Commissioner Secretary to Govt.
PW(R&B) Departmeny- Member (HPC)
u (R:~ Principa~~a;~ Govt.
PD&MD Member (HPC)
tl (Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC) Youth Services & Sports Deptt
Concerned Adm. Secretary
Final Approved Cost AA Ac corded Balance Amount Timellneto
Decision of the LUP Code Name of Project / Loc ation District (In Cr.) (Yes/No) Required (In Cr.) complete the
HPC D•-•ft~• Construction of Indoor Stadium near BHSS Akhnoor iincluding development
1.95000 Yes 1.34000 Dec-18 Approved LUP2162 of play field Jammu
LUP2163 Construction of Pavilion at Play field Palma Akhnoor Jammu 1.31000 Yes 0.60000 Dec-18 Approved LUP2164 Construction of change room in upper Terrace of Mini Stadium Parade
Jammu 0.22000 Yes 0.20000 May-19 Approved Jammu LUP2165 Construction of Wrestling Akhara at M.A. Stadium jammu Jammu 0.16000 Yes 0.11000 Dec-18 Approved
LUP2166 Development of skating rink near Indoor Sports Complex M.A. Stadium Jammu 2.64000 Yes 1.99000 Mar-19 Approved Jammu
LUP2167 Consruction of pavilion at K.K. Hakku Hockey Stadium Jammu Jammu 1.78000 Yes 0.48000 Nov-18 Approved LUP2168 Development of play field at Shashtri Nagar Jammu Jammu 1.63000 Yes 1.54000 Mar-19 Approved LUP2169 Construction of Mini Stadium near HSS Bhour Camp Jammu Jammu 1.50000 Yes 1.05000 Mar-19 Approved LUP2170 Development of green field play field at Gandhi Nagar Jammu Jammu 0.65000 Yes 0.54000 Oct-18 Approved LUP2171 Development of play field at Palma Akhnoor Jamu Jammu 0.29000 Yes 0.20000 Dec-18 Approved
LUP2172 Development of sports house including Chowkidar quarter at M.A. Stadium Jammu 0.25000 Yes 0.23000 Dec-18 Approved Jammu
LUP2173 Development of Boxing Ring at M.A. Stadium Jam mu Jammu 0.24000 Yes 0.15000 Nov-18 Approved LUP2174 Development of play field at Old Satwari Jammu Jammu 0.15000 Yes 0.10000 Mar-19 Approved
Development of playing field at Devsar Kulgam by way of construction of LUP2175 change room seating tiers, chain link fencing and earth work and cutting. Kulgam 0.63000 Yes 0.52000 Aug-19 Approved
LUP2176 Construction of R/wall at play field Devsar Kulgam 0.16000 Yes 0.16000 Mar-19 Approved Development of play field at Kilam Kulgam by way of leveling of ground
Kulgam 0.15000 Yes 0.15000 Mar-19 Approved LUP2177 construction of cricket pitches
LUP2178 Development of Play field at Parrigam Homeshali Bugh, Kulgam Kulgam 1.49000 Yes 1.49000 Dec-19 Approved
Total II 10.85000
(KhuH~ Commissioner Secretary to r-
PW(R&B) Department Member (HPC) Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Youth Services & Sports Deptt Concerned Adm. Secretary
Timelineto De cision of the Final Approved Cost AA Accorded Balance Amount
complete the LUP Code Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.) HPC
Project
LUPZ179 Construction of Sports Infrastructure {Indoor Hall & Pavilion) in the premises Poonch 4.16000 Yes 1.86000 Mar-20 Approved
of Sports Comolex at Poonch LUPZ180 Repair/Renovation of Sports Stadium building Pulwama Pulwama 0.38000 Yes 0.17000 Mar-19 Approved
LUPZ181 Development of Sports Stadium at Pulwama by way of providing of sanitary Pulwama 0.20000 Yes 0.11000 Mar-19 Approved
works
LUPZ182 Dev. Of play field at Kadlabal Pam pore by way of Earth filling/P/F of chain Pulwama 1.30000 Yes 0.41000 Aug-19 Approved
link fenclna & Turf of around LUPZ183 Development of play field at Cheva Khu rd Pulwama Pulwama 0.82000 Yes 0.60000 Mar-19 Approved
LUPZ184 Construction of Skating Rink at Sports Stadium Pulwama Pulwama 0.19000 Yes 0.12000 Mar-19 Approved
LUPZ185 Development of Football Ground and Cricket field at Tral Stadium Pulwama 0.84000 Yes 0.84000 May-19 Approved
LUPZ186 Development of Sports field at Kandi Kotranka Rajouri Rajouri 0.50000 Yes 0.44000 Jun-19 Approved
LUPZ187 Development of play field at Lamber Banihal Ramban Ramban 2.28000 Yes 2.26000 Dec-19 Approved
LUPZ188 Development of Sports Stadium at Smailpur Samba 2.50000 Yes 2.40000 Jul-19 Approved
LUPZ189 Execution of various works at Artificial Turf TRC Football Ground Srinagar Srinagar 4.31000 Yes 4.31000 Nov-19 Approved
LUPZ190 Restoration of Basketball Courts at SKMASC Gindun Rajbagh Srinagar 0.50000 Yes 0.50000 Aug-19 Approved
LUPZ191 Construction of sheds at Bakhshi stadium Srinagar. Srinagar 0.10000 Yes 0.10000 Mar-19 Approved
LUPZ192 P/L of tiles/ cement concrete around basketball court at SKISC with repairs Srinagar 0.06000 Yes 0.06000 Mar-19 Approved
to ceilin_g_ of corridor and nrovidina of entrance aate.
LUPZ193 Restoration of play field at Amar singh college 14.7 kanals by way of levelling Srinagar 0.08000 Yes 0.08000 Mar-19 Approved
of around and cutting of wild grass.
LUPZ194 Construction of 1 no. competition cricket pitch and 1 no. cricket practice Srinagar 0.06000 Yes 0.06000 Mar-19 Approved
loitch at TRC oolo around
Total Ill 14.32000
, ...... ~ Commissioner Secretary t~
PW(R&B) Departm<r;t Member (HPC)
UoLl (Rohit Kansai) ---~
Principal S ary to Govt. PD&MD
Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Youth Services & Sports Deptt Concerned Adm. Secretary
Final Approved Cost AA Accorded Balance Amount Timelineto
Decision of the LUP Code Name of Project / Location District (In Cr.) (Yes/No) Required (In Cr.)
complete the HPC
Project
LUP2195 Construction of Olympic Standard Swimming Pool at SKMSAC Gindun Srinagar 20.60000 Yes 19.10000 Nov-19 Approved Ralbaah Srlnazar
LUP2196 Development of play field at Alouchi Bagh Srinagar Srinagar 1.14000 Yes 1.14000 Jan-19 Approved
LUP2197 Restoration and completion of Squash Hall at SKMASC Gindun Rajbagh Srinagar 0.47000 Yes 0.47000 Nov-18 Approved srlnasar Phase-I
Development of play field at lllahibagh by way of earth filling and levelling Srinagar 0.25000 Yes 0.19000 Mar-19 Approved LUP2198
LUP2199 Repairs/Strengthening of existing fencing and construction of concrete Srinagar 0.10000 Yes 0.07000 Mar-19 Approved works at Polo ground west.
LUP2200 Development of play field at Gani Memorial Stadium, Rajouri kadal by way Srinagar 0.28000 Yes 0.13000 Mar-19 Approved of orovldlz of chain link fencing around the olav field area
LUP2201 Chain link fencing including construction of gate at Amda Kadal Srinagar 0.09000 Yes 0.06000 Mar-19 Approved
LUP2202 Construction of skating rink at Rada pora Srinagar Srinagar 0.18000 Yes 0.11000 Mar-19 Approved Remodeling of Attic floor of Adm block to accommodate additional office
Mar-19 Approved LUP2203 space and meeting hall Srinagar 0.24000 Yes 0.08000
Dev of Rugby field at Pologround Srinagar by way of Earth 0.24000 Mar-19 Approved LUP2204 filling/levelling/turfing and chain link fencing Srinagar 0.36000 Yes
Renovation/remodeling damaged room(Hut) at TRC ground adjacent to Srinagar 0.35000 Yes 0.18000 Mar-19 Approved LUP2205 artificial football ground Srinagar
LUP2206 P/F of colour coated sheet (0.5mm thick) fencing on east and west side of Srinagar 0.19000 Yes 0.07000 Mar-19 Approved TRC around Srlnaaar
LUP2207 Augumenting Sports Infrastructure projects including equipments for
State 7.22920 Yes 7.22920 6 Months Approved Rowing & Sculling, Kayaking & Canoeing
Total IV 29.06920
(KhuBhld~ Commissioner Secretary to G~
PW(R&B) Departm/t Member (HPC) Member (HPC)
(Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department
Chairman (HPC)
Youth Services & Sports Deptt Concerned Adm. Secretary
LUP Code Name of Project/ Location District Balance Amount Required Decision of the
(In Cr.) HPC
Augumentation of Sports Infrastructure in State LUP2208 State
Football Turf 25.00000 Approved
AstroTurf Hockey 25.00000 Approved
Basketball Court 19.65000 Approved
Volleyball Court 12.00000 Approved
Badminton Court 6.69000 Approved
Handball Court 37.50000 Approved
T.TTable 1.00000 Approved
Synthetic maintenance Machine 0.80000 Approved
Lawn Tennis Court 2.60000 Approved
Cricket Net/Wicket 1.20000 Approved
Cricket Bowling Machine 0.36000 Approved
Cricket roller 1.10000 Approved
Shooting Range 2.50000 Approved
Swimming Pool 15.00000 Approved
Roller Skating Rink 1.68000 Approved
I TotalV 152.08000
PW(R&B} Department Member (HPC) Member (HPC)
(Navin K. Choudhary)
Principal Secretary to Govt.
Finance Department Chairman (HPC)
Youth Services & Sports Deptt Concerned Adm. Secretary
LUP Code Name of Project/ Location District Balance Amount Required Decision of the
(In Cr.) HPC
State
Climbing Wall 2.20000 Approved
Cycling Track 2.00000 Approved
Synthetic Athletic Track 36.00000 Approved
Archery Field 5.00000 Approved
Rugby Playfield 5.00000 Approved
Total VI 50.20000
Grand Total {l+ll+lll+IV+V+VI) 265.87760
, ... , ... ;.~ Commissioner Secretary to Govt.
PW(R&B) Depa,tr,,eill Member (HPC)
(Navin K. Choudhary) Principal Secretary to Govt.
Finance Department Chairman (HPC)
Youth Services & Sports Deptt Concerned Adm. Secretary