document development sequence comprehensive plan adopted 2008; last revised
TRANSCRIPT
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
1/66
Document Development Sequence
Comprehensive PlanAdopted 2008; last revised in 2001
(with Land Use Principles)
Land Use CodeLast substantial revision in 1981
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
2/66
Land Use Principles (n=12)
Developed and approved by City Council
prior to work on the
Land Use Chapter of Comprehensive Plan
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
3/66
Principle 1: The small town character will be
enhanced.
Principle 2: The natural environment will be protected,enhanced and better integrated in the community.
Principle 3: The preference for accommodating future growth
is in infill locations, then redevelopment opportunities, and
then on the edge of existing developed areas.
Principle 4: New and redeveloped residential communities
(areas) will have strong neighborhood qualities.
Principle 5: Environmentally-sensitive and sustainable
practices will be integrated into new developments and
redeveloped areas.
Principle 6: Places with a mix of uses that are distinctive and
contribute to increasing the Citys overall vitality are
preferred.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
4/66
Principle 7: Neighborhood serving commercial will be small
scale and integrated with the residential context.
Principle 8: A wider range of housing choices will be
encouraged in the Community as well as in neighborhoods.
Principle 9: Rural character of certain areas of the
Community will be protected.
Principle 10: Streets will create an attractive public realm and
be exceptional places for people.
Principle 11: Places will be better connected, in part to
improve the function of the street network and also to better
serve neighborhoods.
Principle 12: Opportunities will be created to walk and bike
throughout the Community.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
5/66
Comprehensive Plan Contents
Demographics
Community Identity
Land Use
Environmental Resources
Sewer & Water
Transportation
Parks & Recreation
Community Facilities
Economic Development
Housing
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
6/66
Each chapter identified:
Goal
Key findings of
current status
Objectives
Strategies
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
7/66
Objectives: Community Identity
Strengthen downtown as historical &
cultural center
Preserve historic sites & structures
Encourage a traditional development
pattern
Host local arts and cultural activities
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
8/66
Objectives: Land Use
Protect & enhance the small town character
Promote downtown core as important aspect of
community life
Encourage compact development pattern &support infill, redevelopment and land
intensification
Encourage commercial/retail and office mixeduse development (continued)
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
9/66
(continued) Objectives: Land Use
Improve transportation choices & efficiency
Improve development review process
Monitor the effectiveness of development
regulations
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
10/66
Economic Development
Goal
|
Objectives (n=4)
|
Strategies (n=19)
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
11/66
Goal for Economic Development
Promote economic development by
supporting existing businesses, by talent
attraction and retention, by aggressive
business recruitment, and by increasingthe availability of commercial and
industrial land.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
12/66
Objectives: Economic Development
Support existing businesses
Make sufficient land resources available for
development
Expand Cannon River corridor to maintainhistoric character of Northfield
Support vitality through business retention and
recruitment and enhancement of tourism
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
13/66
Objective: The City will support existing
businesses.
Strategies: (an example)
Seek opportunities to address barriers to
retention and expansion of existing
businesses.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
14/66
Objective: Expanding and revitalizing the Cannon River corridorwill be a pivotal part of the strategy to maintain the historic
character that is Northfield.
Strategies: (an example)
Any infill and redevelopment/intensificationalong the Cannon River corridor should be
oriented to maximize the advantage that
the river corridor creates for such
opportunities.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
15/66
Next Step:
Finish Development of
Land Use Code
Current Draft written by
Consultant
City Staff Some areas modified by Advisory Committee
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
16/66
Advisory Committee
- City groups City Council
Planning Commission (n=2)
Heritage Preservation Commission
Design Advisory Board Environmental Quality Commission
Non-motorized Task Force
EDA Park & Recreation Advisory Board
Housing and Redevelopment Authority
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
17/66
Advisory Committee
- non city group representatives
Architects (2)
Builders & developers (3)
Civil engineer Sustainable development expert
Rice Co. Soil & Water Dept.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
18/66
Disclaimers about this code
presentation: Only some aspects of code related to C1 are included.
Is not purported to be comprehensive
Is no attempt to address C2
Full document can be found on City Web site underPlanning Commission
Current version is a DRAFT
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
19/66
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
20/66
BASE DISTRICTS Residential
Current Proposed
Neighborhood General 1
District
N1-BNo Existing District- -
Manufactured Home Park
District
R4-BManufactured Home Park
District
R-6
High Density Residential
District
R3-BHigh Density Residential
District
R-5
Medium Density Residential
District
R2-BMedium Density Residential
District
R-4
Low to Medium DensityResidential DistrictR-3
One- and Two-FamilyResidential District
R-2
Low Density Residential
District
R1-BOne-Family Residential
District
R-1
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
21/66
BASE DISTRICTS Business & Industry
Current Proposed
Industrial DistrictI
Industrial DistrictI1-BLight Industrial
District
LI
Gateway
Commercial
District
C2-BGateway
Commercial
District
C-3
Downtown Fringe
District
C-2
Downtown
District
C1-BDowntown
District
C-1
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
22/66
SPECIAL BASE DISTRICTS
Current Proposed
Public andInstitutional District
PI-SNo Existing District--
CollegeDevelopment District
CD-SCollege DevelopmentDistrict
CDZ
Agricultural Holding
District
AH-SAgricultural DistrictA-G
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
23/66
OVERLAY DISTRICTS
Current Proposed
Planned Unit
Development Overlay
District
PDPlanned Unit
Development
PUD
Downtown Historic
Overlay District
DHDowntown Historic
District
--
Wild and Scenic
River/Shoreland/
Public Waters Overlay
District
WSWild and Scenic
River/Shoreland/
Public Waters District
WS
Floodplain Overlay
District
FPFloodplain DistrictFP
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
24/66
FLOATING DISTRICTS
Current Proposed
Economic
Development
Floating District
ED-FNo Existing District--
Neighborhood
Center FloatingDistrict
NC-FNo Existing District--
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
25/66
3.2.3 C-1 Development Standards
Use:
Ground floor Permitted -
non-residential
Upper floor(s) Permitted
residential/office/commercial
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
26/66
C-1 Development Standards (continued)
Build-to-line (distance from property line)
Front 0 ft.
Side 0 ft.
Setback
Side 0 ft.
Rear
Adj. to residential 15 ft.
Adj. to other use 10 ft.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
27/66
C-1 Development Standards (continued)
Building Form:
Primary St. built to BTL 80% min.Lot width 75 ft. max.
Lot depth 200 ft. max.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
28/66
C-1 Development Standards (continued)
Height requirements
Building min. 22 ft.
Building max. 3 stories, 50 ft.
Finish ground floor level 12 max.above sidewalk
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
29/66
C-1 Development Standards (continued)
Corner lots: min. of 30 % at built-to-
line in both directions
Fence or wall must define any section
along build-to-line without building
Faade variation a min. of every 25 ft.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
30/66
2.5.3 Downtown Historic Overlay
Activity in historic overlay requires acertificate of appropriateness from
HPC.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
31/66
3.44. Design Requirements (C2 + ED)
Building Facades
Blank walls facing streets forbidden. Buildings in C1 & C2 will make use of river frontage.
Roof Style Pitched roof not more than building height
Building Design & Mass
- Principal buildings will have base, body & cap
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
32/66
3 4 5 L S l N
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
33/66
3.4.5 Large Scale (>10,000 sq. ft.)Non-res.
Buildings
Faade Variations every 50 ft. or roof line changes
Flat roofs
-Parapets no more than 2 ft. above roof
Wall openings- At least 25% window surface on street frontage
Customer entrance- Entrance defined with features (options given)
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
34/66
2.6.1 Floating Zones NC
In existing neighborhoods
Buildings subject to compatibility standards
NC lots located at intersection of two street
types (collector and/or arterial) Development standards address:
use, off-street parking, landscaping,outdoor lighting, operation.
Compatibility standards address:setbacks & build-to lines, and buildingheight & massing,
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
35/66
2.7 Permitted Uses in C1
Household living
Multifamily dwelling (upper floors)
Office use
General Office, Office Business,Medical or Dental Clinic
Commercial use
Banks, Bars/Taverns, Funeral Homes,Hotel/Motel, Personal Services, PrivateClubs, Restaurant, Retail Sales, Theaters
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
36/66
2.7 Permitted Uses in C1 (continued)
Mixed use
Mixed use with residential uses
Public, Institutional or Recreational
Open space/conservation areasUrban, public open space (plazas)
Public facilities
Essential servicesRegional pipelines/utility transmissions,
Utility structures
2 7 C diti l U i C1
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
37/66
2.7 Conditional Uses in C1
Household Living
Bed & Breakfast establishments
Commercial use
Parking lots
Mining ExtractionPublic, Institutional or Recreational
Cultural institutions
Public access to rivers
Public/semi-public buildings
Religious institutions
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
38/66
2.7 Prohibited Uses in C1 (selected items)
Household living
Apartment house with 4-8 units
Commercial
Auto Service Stations
Banquet Halls
Convenience stores
Day care facility
Gasoline station
Greenhouse, garden, landscaping sales(continued)
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
39/66
2.7 Prohibited Uses in C1 (selected items)(continued)
Industrial, Manufacturing, Research & Wholesale
Industrial use (indoors)
Research & development labs
Public, Institutional or Recreational UsesIndoor recreational facilities
School (trade, business or other)
Public Facilities, Utilities
Public transit stations, bus stops or park &
ride lots
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
40/66
2.8.5 Commercial Use Category
(Defines various types of businesses)
Examples:
Adult Uses Vet Clinics
Auto Service Stations Banks
Bars Rec. Vehicle Sales
Convenience Stores Gas Stations
Greenhouses Hotel/Motel
Kennels Motor Vehicle SalesPersonal services Private Clubs
Restaurant Retail Sales
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
41/66
2.10.4 Accessory Uses
(E) Home Business
Permitted Examples:
Art & craft work, Tailors, Offices (architect,
attorney, consultant, etc.), Physical therapy, Mail
order businesses, Pet grooming
Prohibited Examples:
Animal hospitals, Automotive repair, Scrapyards, Fitness facility, Personal services
On-site sales
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
42/66
Home Business (continued)
Operating Standard examples:
Business is secondary to full-time use asresidence
No more than one advertising sign notexceeding 4 sq. ft.
No window display or outdoor storage
No vehicles on property other than residents
passenger vehicles Customers limited to one at a time & only
between 9 a.m.- 8 p.m.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
43/66
3.3.2 Outdoor Dining, Display,
and Storage (selected examples)
Outdoor dining on private property:
Parking: Uses in C1-B district are
exempt from off-street parking SpaceRequirements. 3.8.5
Umbrellas must be secured
Enclosing dining area with roof or
expansion of structure requires zoning
certificate.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
44/66
3.3.2 Outdoor Sale & Display
Sales in vacant lots require a
temporary use permit.
Merchandise on sidewalk must allow a
min. of 5 ft. of clear walkway.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
45/66
3.3.2 Outdoor Storage:
Prohibited on vacant lots & between
principal building & street.
Permitted in side or rear yard.
If more than 6 ft. high, requires ascreen of 6 ft. compatible with main
structure.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
46/66
3.3.3 Outdoor LightingStandards
Max. Height (C1): 10 ft. for non-cutoff;
20 for 90 cutoff
Illumination(C1): Max. footcandles across
property line = 2.5; at property line whenadjacent to lot in the same district = 0.1
Wall packs: Must be fully shielded, direct light
downward, used to light unsafe areas vs.calling attention to the building.
3 NC D l
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
47/66
3.5.5 NC Development
Standards
Use Limitations: no drive-through,
outdoor storage, or delivery services
Required: required off-street parkinglandscaping/screening
Outdoor lighting: fully-shielded, max.
height of 15 ft.
Operation: limit outdoor activity by 8 p.m.
S-Th. & 10 p.m., Fri. & Sat.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
48/66
3.7 Signage
Staff has reported,
We are not making significant changesto the sign regulations
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
49/66
3.8.5 Off-street Parking
Uses in C1-B district are exempt from
off-street parking Space
Requirements.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
50/66
User Friendly Goals of New Code
Reduce the number of conditional use
permit reviews,
Provide clear regulations for developers,
and citizens, and
Offer a more timely review process.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
51/66
4.7 Development Review Committee
Function: Performs technical review
Membership:
City Planner (chair)
Community Development Director
City Engineer, Building Official, Fire Chief
Additional staff members as needed:
Economic Development Manager,
Police Dept., City Attorney, DNR, Soil &Water District
Proposed addition for consultation:
Architect, Design professional
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
52/66
Review Types 1 - 6
Type 1 City Planner Decision (alone; no DRC)Request: Zoning Certificate
Temporary Use Permit
Construction Drawings (may ask City
engineer to review)Administrative Lot Line Adjustment
Code Interpretation
Timeline: Decision within 15 days of application
Appeal: ZBA within 10 days of city planner
decision
Submit
applicationApplication
Certification
City Planner
Decision
Review Types (continued):
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
53/66
Review Types (continued):
Type 2 City Planner Decision with DRC
ConsultationRequest: Zoning Certificate
Temporary Use Permit
Flood Plain Permit
Amendment to the PD-O District
Appeal: ZBA within 10 days of city planner
decision
Preapp.meeting Submitapplication App.certificationDRC City PlannerDecision
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
54/66
Review Type (continued)
Type 3 Planning Commission/HPC Decision
Request: Zoning Certificate
Amendment to the PD-O District
Site Plan Review
Certificate of Appropriateness(HPC)Conditional Use Permit
Options: City Planner may request a
neighborhood meetingApplicant may request an informal
meeting with the PC
Appeal: District Count within 30 days
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
55/66
Review Type 3 (continued)
Preapp.
Meeting
Neighbor-
hoodMeeting, i.r.
PC
Informal
Meeting, i.r.
Submit
application
DRCApp.
certification
Public notice
&
Staff report
PC
Decision
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
56/66
Review Type (continued)
Type 4 Planning Commission Recommendation
& City Council Decision
Request: Heritage Preservation Site Designation
Major Subdivision Preliminary Plat
Zoning Map or Text Amendments to Code
Annexation
Options: City Planner may request a neighborhood meeting;required for subdivisions with 50+ lots
Applicant may request an informal meeting with
the PC
Rezoning for a floating zoning district can receivean expedited review with joint meeting ofthe City Council and planning Commission.
Appeal: Court having jurisdiction
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
57/66
Review Type 4 (continued)
Preapp.
Meeting
Neighbor-
hoodMeeting, i.r.
PC
Informal
Meeting, i.r.
Submit
application
DRCApp.
certification
Public notice
&
Staff report
PC
Recommends
City Council
Decision
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
58/66
Review Types (continued):
Type 5 City Council Decision (no PC
recommendation)
Request: Minor Subdivision and Lot
Consolidation
Major Subdiv. Final Plat
Appeal: Court having jurisdictionApplication DRC App.certification Public noticeStaff Report
City C.Decision
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
59/66
Proposed Timeline
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
60/66
Proposed Timeline
for completion of Land Use CodeMay 22
Current draft of code is posted on the city website
June 1
City Council decides on process for completion
June-August
Planning Commission works on codeJune-July
Planning Commission accepts input from boards, commissions andpublic
September - October
Planning Commission completes work, holds public hearing andsends to City Council
November
City Council adopts LDC
F b d C d
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
61/66
Form-based Code
Places more emphasis on the physical form
rather than the traditional basis of separationby "uses.
Emphasizes standards & parameters of form
(e.g., build-to-lines, frontage typerequirements, buildings relationship on the
street, height and width). Includes
Neighborhood Compatibility standards.
Regulations are specific to zone. Pure form-based code provides clear, specific,
unambiguous regulations (with diagrams)
allowing more administrative approvals.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
62/66
Form-based codes (continued)
Supports compact development (similar toolder parts of Northfield)
Emphasizes public spaces, social
interaction, pedestrian scaled blocks (gridpattern), and connectivity.
Summary:
Form-based codes pull together theelements of the public realm:buildings, streets & open space.
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
63/66
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
64/66
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
65/66
Form-based Caveats
Current version used in code is hybrid; somewarn about difficulty with a hybrid code.
Tension between specific codes allowing moreadministrative approvals but possibly allows
less flexibility. May result in more costs to end-user (more city
staff time required to review).
Note: The writing of the regulations is"in process".
-
8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised
66/66
NDDC Next Step:
PLEASE ASSIST & READ CODE
Code can be found under the Planning
Commission Meeting of 5/26/09 located
below under the Packet Addendum.
Thank you!