document development sequence comprehensive plan adopted 2008; last revised

Upload: api-27444268

Post on 30-May-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    1/66

    Document Development Sequence

    Comprehensive PlanAdopted 2008; last revised in 2001

    (with Land Use Principles)

    Land Use CodeLast substantial revision in 1981

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    2/66

    Land Use Principles (n=12)

    Developed and approved by City Council

    prior to work on the

    Land Use Chapter of Comprehensive Plan

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    3/66

    Principle 1: The small town character will be

    enhanced.

    Principle 2: The natural environment will be protected,enhanced and better integrated in the community.

    Principle 3: The preference for accommodating future growth

    is in infill locations, then redevelopment opportunities, and

    then on the edge of existing developed areas.

    Principle 4: New and redeveloped residential communities

    (areas) will have strong neighborhood qualities.

    Principle 5: Environmentally-sensitive and sustainable

    practices will be integrated into new developments and

    redeveloped areas.

    Principle 6: Places with a mix of uses that are distinctive and

    contribute to increasing the Citys overall vitality are

    preferred.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    4/66

    Principle 7: Neighborhood serving commercial will be small

    scale and integrated with the residential context.

    Principle 8: A wider range of housing choices will be

    encouraged in the Community as well as in neighborhoods.

    Principle 9: Rural character of certain areas of the

    Community will be protected.

    Principle 10: Streets will create an attractive public realm and

    be exceptional places for people.

    Principle 11: Places will be better connected, in part to

    improve the function of the street network and also to better

    serve neighborhoods.

    Principle 12: Opportunities will be created to walk and bike

    throughout the Community.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    5/66

    Comprehensive Plan Contents

    Demographics

    Community Identity

    Land Use

    Environmental Resources

    Sewer & Water

    Transportation

    Parks & Recreation

    Community Facilities

    Economic Development

    Housing

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    6/66

    Each chapter identified:

    Goal

    Key findings of

    current status

    Objectives

    Strategies

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    7/66

    Objectives: Community Identity

    Strengthen downtown as historical &

    cultural center

    Preserve historic sites & structures

    Encourage a traditional development

    pattern

    Host local arts and cultural activities

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    8/66

    Objectives: Land Use

    Protect & enhance the small town character

    Promote downtown core as important aspect of

    community life

    Encourage compact development pattern &support infill, redevelopment and land

    intensification

    Encourage commercial/retail and office mixeduse development (continued)

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    9/66

    (continued) Objectives: Land Use

    Improve transportation choices & efficiency

    Improve development review process

    Monitor the effectiveness of development

    regulations

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    10/66

    Economic Development

    Goal

    |

    Objectives (n=4)

    |

    Strategies (n=19)

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    11/66

    Goal for Economic Development

    Promote economic development by

    supporting existing businesses, by talent

    attraction and retention, by aggressive

    business recruitment, and by increasingthe availability of commercial and

    industrial land.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    12/66

    Objectives: Economic Development

    Support existing businesses

    Make sufficient land resources available for

    development

    Expand Cannon River corridor to maintainhistoric character of Northfield

    Support vitality through business retention and

    recruitment and enhancement of tourism

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    13/66

    Objective: The City will support existing

    businesses.

    Strategies: (an example)

    Seek opportunities to address barriers to

    retention and expansion of existing

    businesses.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    14/66

    Objective: Expanding and revitalizing the Cannon River corridorwill be a pivotal part of the strategy to maintain the historic

    character that is Northfield.

    Strategies: (an example)

    Any infill and redevelopment/intensificationalong the Cannon River corridor should be

    oriented to maximize the advantage that

    the river corridor creates for such

    opportunities.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    15/66

    Next Step:

    Finish Development of

    Land Use Code

    Current Draft written by

    Consultant

    City Staff Some areas modified by Advisory Committee

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    16/66

    Advisory Committee

    - City groups City Council

    Planning Commission (n=2)

    Heritage Preservation Commission

    Design Advisory Board Environmental Quality Commission

    Non-motorized Task Force

    EDA Park & Recreation Advisory Board

    Housing and Redevelopment Authority

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    17/66

    Advisory Committee

    - non city group representatives

    Architects (2)

    Builders & developers (3)

    Civil engineer Sustainable development expert

    Rice Co. Soil & Water Dept.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    18/66

    Disclaimers about this code

    presentation: Only some aspects of code related to C1 are included.

    Is not purported to be comprehensive

    Is no attempt to address C2

    Full document can be found on City Web site underPlanning Commission

    Current version is a DRAFT

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    19/66

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    20/66

    BASE DISTRICTS Residential

    Current Proposed

    Neighborhood General 1

    District

    N1-BNo Existing District- -

    Manufactured Home Park

    District

    R4-BManufactured Home Park

    District

    R-6

    High Density Residential

    District

    R3-BHigh Density Residential

    District

    R-5

    Medium Density Residential

    District

    R2-BMedium Density Residential

    District

    R-4

    Low to Medium DensityResidential DistrictR-3

    One- and Two-FamilyResidential District

    R-2

    Low Density Residential

    District

    R1-BOne-Family Residential

    District

    R-1

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    21/66

    BASE DISTRICTS Business & Industry

    Current Proposed

    Industrial DistrictI

    Industrial DistrictI1-BLight Industrial

    District

    LI

    Gateway

    Commercial

    District

    C2-BGateway

    Commercial

    District

    C-3

    Downtown Fringe

    District

    C-2

    Downtown

    District

    C1-BDowntown

    District

    C-1

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    22/66

    SPECIAL BASE DISTRICTS

    Current Proposed

    Public andInstitutional District

    PI-SNo Existing District--

    CollegeDevelopment District

    CD-SCollege DevelopmentDistrict

    CDZ

    Agricultural Holding

    District

    AH-SAgricultural DistrictA-G

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    23/66

    OVERLAY DISTRICTS

    Current Proposed

    Planned Unit

    Development Overlay

    District

    PDPlanned Unit

    Development

    PUD

    Downtown Historic

    Overlay District

    DHDowntown Historic

    District

    --

    Wild and Scenic

    River/Shoreland/

    Public Waters Overlay

    District

    WSWild and Scenic

    River/Shoreland/

    Public Waters District

    WS

    Floodplain Overlay

    District

    FPFloodplain DistrictFP

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    24/66

    FLOATING DISTRICTS

    Current Proposed

    Economic

    Development

    Floating District

    ED-FNo Existing District--

    Neighborhood

    Center FloatingDistrict

    NC-FNo Existing District--

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    25/66

    3.2.3 C-1 Development Standards

    Use:

    Ground floor Permitted -

    non-residential

    Upper floor(s) Permitted

    residential/office/commercial

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    26/66

    C-1 Development Standards (continued)

    Build-to-line (distance from property line)

    Front 0 ft.

    Side 0 ft.

    Setback

    Side 0 ft.

    Rear

    Adj. to residential 15 ft.

    Adj. to other use 10 ft.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    27/66

    C-1 Development Standards (continued)

    Building Form:

    Primary St. built to BTL 80% min.Lot width 75 ft. max.

    Lot depth 200 ft. max.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    28/66

    C-1 Development Standards (continued)

    Height requirements

    Building min. 22 ft.

    Building max. 3 stories, 50 ft.

    Finish ground floor level 12 max.above sidewalk

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    29/66

    C-1 Development Standards (continued)

    Corner lots: min. of 30 % at built-to-

    line in both directions

    Fence or wall must define any section

    along build-to-line without building

    Faade variation a min. of every 25 ft.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    30/66

    2.5.3 Downtown Historic Overlay

    Activity in historic overlay requires acertificate of appropriateness from

    HPC.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    31/66

    3.44. Design Requirements (C2 + ED)

    Building Facades

    Blank walls facing streets forbidden. Buildings in C1 & C2 will make use of river frontage.

    Roof Style Pitched roof not more than building height

    Building Design & Mass

    - Principal buildings will have base, body & cap

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    32/66

    3 4 5 L S l N

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    33/66

    3.4.5 Large Scale (>10,000 sq. ft.)Non-res.

    Buildings

    Faade Variations every 50 ft. or roof line changes

    Flat roofs

    -Parapets no more than 2 ft. above roof

    Wall openings- At least 25% window surface on street frontage

    Customer entrance- Entrance defined with features (options given)

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    34/66

    2.6.1 Floating Zones NC

    In existing neighborhoods

    Buildings subject to compatibility standards

    NC lots located at intersection of two street

    types (collector and/or arterial) Development standards address:

    use, off-street parking, landscaping,outdoor lighting, operation.

    Compatibility standards address:setbacks & build-to lines, and buildingheight & massing,

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    35/66

    2.7 Permitted Uses in C1

    Household living

    Multifamily dwelling (upper floors)

    Office use

    General Office, Office Business,Medical or Dental Clinic

    Commercial use

    Banks, Bars/Taverns, Funeral Homes,Hotel/Motel, Personal Services, PrivateClubs, Restaurant, Retail Sales, Theaters

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    36/66

    2.7 Permitted Uses in C1 (continued)

    Mixed use

    Mixed use with residential uses

    Public, Institutional or Recreational

    Open space/conservation areasUrban, public open space (plazas)

    Public facilities

    Essential servicesRegional pipelines/utility transmissions,

    Utility structures

    2 7 C diti l U i C1

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    37/66

    2.7 Conditional Uses in C1

    Household Living

    Bed & Breakfast establishments

    Commercial use

    Parking lots

    Mining ExtractionPublic, Institutional or Recreational

    Cultural institutions

    Public access to rivers

    Public/semi-public buildings

    Religious institutions

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    38/66

    2.7 Prohibited Uses in C1 (selected items)

    Household living

    Apartment house with 4-8 units

    Commercial

    Auto Service Stations

    Banquet Halls

    Convenience stores

    Day care facility

    Gasoline station

    Greenhouse, garden, landscaping sales(continued)

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    39/66

    2.7 Prohibited Uses in C1 (selected items)(continued)

    Industrial, Manufacturing, Research & Wholesale

    Industrial use (indoors)

    Research & development labs

    Public, Institutional or Recreational UsesIndoor recreational facilities

    School (trade, business or other)

    Public Facilities, Utilities

    Public transit stations, bus stops or park &

    ride lots

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    40/66

    2.8.5 Commercial Use Category

    (Defines various types of businesses)

    Examples:

    Adult Uses Vet Clinics

    Auto Service Stations Banks

    Bars Rec. Vehicle Sales

    Convenience Stores Gas Stations

    Greenhouses Hotel/Motel

    Kennels Motor Vehicle SalesPersonal services Private Clubs

    Restaurant Retail Sales

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    41/66

    2.10.4 Accessory Uses

    (E) Home Business

    Permitted Examples:

    Art & craft work, Tailors, Offices (architect,

    attorney, consultant, etc.), Physical therapy, Mail

    order businesses, Pet grooming

    Prohibited Examples:

    Animal hospitals, Automotive repair, Scrapyards, Fitness facility, Personal services

    On-site sales

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    42/66

    Home Business (continued)

    Operating Standard examples:

    Business is secondary to full-time use asresidence

    No more than one advertising sign notexceeding 4 sq. ft.

    No window display or outdoor storage

    No vehicles on property other than residents

    passenger vehicles Customers limited to one at a time & only

    between 9 a.m.- 8 p.m.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    43/66

    3.3.2 Outdoor Dining, Display,

    and Storage (selected examples)

    Outdoor dining on private property:

    Parking: Uses in C1-B district are

    exempt from off-street parking SpaceRequirements. 3.8.5

    Umbrellas must be secured

    Enclosing dining area with roof or

    expansion of structure requires zoning

    certificate.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    44/66

    3.3.2 Outdoor Sale & Display

    Sales in vacant lots require a

    temporary use permit.

    Merchandise on sidewalk must allow a

    min. of 5 ft. of clear walkway.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    45/66

    3.3.2 Outdoor Storage:

    Prohibited on vacant lots & between

    principal building & street.

    Permitted in side or rear yard.

    If more than 6 ft. high, requires ascreen of 6 ft. compatible with main

    structure.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    46/66

    3.3.3 Outdoor LightingStandards

    Max. Height (C1): 10 ft. for non-cutoff;

    20 for 90 cutoff

    Illumination(C1): Max. footcandles across

    property line = 2.5; at property line whenadjacent to lot in the same district = 0.1

    Wall packs: Must be fully shielded, direct light

    downward, used to light unsafe areas vs.calling attention to the building.

    3 NC D l

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    47/66

    3.5.5 NC Development

    Standards

    Use Limitations: no drive-through,

    outdoor storage, or delivery services

    Required: required off-street parkinglandscaping/screening

    Outdoor lighting: fully-shielded, max.

    height of 15 ft.

    Operation: limit outdoor activity by 8 p.m.

    S-Th. & 10 p.m., Fri. & Sat.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    48/66

    3.7 Signage

    Staff has reported,

    We are not making significant changesto the sign regulations

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    49/66

    3.8.5 Off-street Parking

    Uses in C1-B district are exempt from

    off-street parking Space

    Requirements.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    50/66

    User Friendly Goals of New Code

    Reduce the number of conditional use

    permit reviews,

    Provide clear regulations for developers,

    and citizens, and

    Offer a more timely review process.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    51/66

    4.7 Development Review Committee

    Function: Performs technical review

    Membership:

    City Planner (chair)

    Community Development Director

    City Engineer, Building Official, Fire Chief

    Additional staff members as needed:

    Economic Development Manager,

    Police Dept., City Attorney, DNR, Soil &Water District

    Proposed addition for consultation:

    Architect, Design professional

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    52/66

    Review Types 1 - 6

    Type 1 City Planner Decision (alone; no DRC)Request: Zoning Certificate

    Temporary Use Permit

    Construction Drawings (may ask City

    engineer to review)Administrative Lot Line Adjustment

    Code Interpretation

    Timeline: Decision within 15 days of application

    Appeal: ZBA within 10 days of city planner

    decision

    Submit

    applicationApplication

    Certification

    City Planner

    Decision

    Review Types (continued):

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    53/66

    Review Types (continued):

    Type 2 City Planner Decision with DRC

    ConsultationRequest: Zoning Certificate

    Temporary Use Permit

    Flood Plain Permit

    Amendment to the PD-O District

    Appeal: ZBA within 10 days of city planner

    decision

    Preapp.meeting Submitapplication App.certificationDRC City PlannerDecision

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    54/66

    Review Type (continued)

    Type 3 Planning Commission/HPC Decision

    Request: Zoning Certificate

    Amendment to the PD-O District

    Site Plan Review

    Certificate of Appropriateness(HPC)Conditional Use Permit

    Options: City Planner may request a

    neighborhood meetingApplicant may request an informal

    meeting with the PC

    Appeal: District Count within 30 days

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    55/66

    Review Type 3 (continued)

    Preapp.

    Meeting

    Neighbor-

    hoodMeeting, i.r.

    PC

    Informal

    Meeting, i.r.

    Submit

    application

    DRCApp.

    certification

    Public notice

    &

    Staff report

    PC

    Decision

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    56/66

    Review Type (continued)

    Type 4 Planning Commission Recommendation

    & City Council Decision

    Request: Heritage Preservation Site Designation

    Major Subdivision Preliminary Plat

    Zoning Map or Text Amendments to Code

    Annexation

    Options: City Planner may request a neighborhood meeting;required for subdivisions with 50+ lots

    Applicant may request an informal meeting with

    the PC

    Rezoning for a floating zoning district can receivean expedited review with joint meeting ofthe City Council and planning Commission.

    Appeal: Court having jurisdiction

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    57/66

    Review Type 4 (continued)

    Preapp.

    Meeting

    Neighbor-

    hoodMeeting, i.r.

    PC

    Informal

    Meeting, i.r.

    Submit

    application

    DRCApp.

    certification

    Public notice

    &

    Staff report

    PC

    Recommends

    City Council

    Decision

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    58/66

    Review Types (continued):

    Type 5 City Council Decision (no PC

    recommendation)

    Request: Minor Subdivision and Lot

    Consolidation

    Major Subdiv. Final Plat

    Appeal: Court having jurisdictionApplication DRC App.certification Public noticeStaff Report

    City C.Decision

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    59/66

    Proposed Timeline

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    60/66

    Proposed Timeline

    for completion of Land Use CodeMay 22

    Current draft of code is posted on the city website

    June 1

    City Council decides on process for completion

    June-August

    Planning Commission works on codeJune-July

    Planning Commission accepts input from boards, commissions andpublic

    September - October

    Planning Commission completes work, holds public hearing andsends to City Council

    November

    City Council adopts LDC

    F b d C d

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    61/66

    Form-based Code

    Places more emphasis on the physical form

    rather than the traditional basis of separationby "uses.

    Emphasizes standards & parameters of form

    (e.g., build-to-lines, frontage typerequirements, buildings relationship on the

    street, height and width). Includes

    Neighborhood Compatibility standards.

    Regulations are specific to zone. Pure form-based code provides clear, specific,

    unambiguous regulations (with diagrams)

    allowing more administrative approvals.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    62/66

    Form-based codes (continued)

    Supports compact development (similar toolder parts of Northfield)

    Emphasizes public spaces, social

    interaction, pedestrian scaled blocks (gridpattern), and connectivity.

    Summary:

    Form-based codes pull together theelements of the public realm:buildings, streets & open space.

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    63/66

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    64/66

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    65/66

    Form-based Caveats

    Current version used in code is hybrid; somewarn about difficulty with a hybrid code.

    Tension between specific codes allowing moreadministrative approvals but possibly allows

    less flexibility. May result in more costs to end-user (more city

    staff time required to review).

    Note: The writing of the regulations is"in process".

  • 8/14/2019 Document Development Sequence Comprehensive Plan Adopted 2008; Last Revised

    66/66

    NDDC Next Step:

    PLEASE ASSIST & READ CODE

    Code can be found under the Planning

    Commission Meeting of 5/26/09 located

    below under the Packet Addendum.

    Thank you!