dma qualification packet
DESCRIPTION
ÂTRANSCRIPT
INTRODUCTION TO NASON TEAM AND PREVIOUS EXPERIENCE
EXCELLENCE IN CONSTRUCTION
HONORING OUR HERITAGE BY BUILDING YOUR FUTURE
Nason Construction, Inc. | www.nasonconstruction.com | [email protected] | 610-639-1024
COMPANY CONTACTS NASON CONSTRUCTION, INC.
Thomas W. Nason, II
Chief Executive Officer 3411 Silverside Road Tatnall Building Suite 200 Wilmington, DE 19810 P: (302) 529-2800 M: (610) 636-9500 [email protected]
Bob Batley
Director of Business Development and Marketing 3411 Silverside Road Tatnall Building Suite 200 Wilmington, DE 19810 M: (610) 639-1024 [email protected]
Bob Coppins
Project Executive 3411 Silverside Road Tatnall Building Suite 200 Wilmington, DE 19810 P: (302) 529-2523 M: (610) 220-1447 [email protected]
Jason Nix
Lead Preconstruction Manager The Navy Yard, Quarters M-3 4605 S Broad St Philadelphia, PA 19112 P: (215) 599-0621 M: (215) 776-9706 [email protected]
PRECONSTRUCTION SERVICES Nason provides comprehensive preconstruction services that help our clients
address their unique construction programs. Our firm has developed a
proven partnering approach and open book policy that involves all project
team members to establish a unified delivery throughout the project.
Our project team approaches the preconstruction phase with the intent of
providing the most value and quality within budget. Nason develops various
purchasing and construction scenarios to efficiently allocate the available
funding.
CONSTRUCTION MANAGEMENT Nason Construction's approach to construction management is centered on
an open book policy and partnering effort involving the client, design team
and all necessary stakeholders.
Our professionals will immediately assume overall accountability for
managing the project and budget. Nason has experience operating as the
CM at Risk and within a CM Agency program format. On an annual basis,
Nason completes approximately 65% of our workload using this delivery
method.
DESIGN / BUILD Extensive experience with all facets of design-build projects, including fast-
track schedules, lump sum, or guaranteed maximum price (GMP) has
afforded Nason the ability to develop a comprehensive process. Our team
will work closely with the design team through a collaborative effort to
ensure that project goals are achieved.
GENERAL CONTRACTING Nason has had considerable success delivering projects as a general
contractor and the firm is capable of obtaining a competitive price in all
practicing regions.
LEED / SUSTAINABLE SOLUTIONS Nason is committed to promoting sustainable and environmentally
responsible construction methods. Our goal is to help our clients gain a
competitive advantage by operating more energy efficient and cost effective
facilities that are healthier places to live and work.
NASON SERVICES
COMPANY HISTORY
Our time-honored tradition
of providing construction
services began when
Walton H. Nason founded
the firm in 1922. His son,
“Toppy”, led the company
to its current regional
status, and stewardship of
this legacy is now embraced
by Nason CEO, Tom Nason,
II. Our many years of
experience include the
construction management
of a wide variety of facilities
with a proven track record
of delivering projects on
time and on budget. We
are committed to providing
the highest level of service,
professionalism, and quality
on every project for every
client. Our goal is to carry
on the legacy begun by
Walton H. Nason:
Excellence in Construction.
Nason Construction, Inc. | www.nasonconstruction.com | [email protected] | 610-639-1024
NASON CONSTRUCTION, INC. provides construction management,
design-build, and general contracting solutions for clients in a variety of
market sectors throughout Delaware, Pennsylvania, Maryland, Virginia, and
New Jersey. More than half of Nason’s annual revenues are accomplished
as a Construction Manager, and we perform our work in a completely “open
book” fashion to best serve your interests.
PRINCIPAL THOMAS W. NASON, II
CHIEF EXECUTIVE OFFICER & PRESIDENT
Our CEO and President, Tom Nason, the third
generation owner of Nason Construction, continues
building the company that his grandfather and
father built. Tom is actively involved in the
day-to-day business of the firm and he, along with
his management team, are accessible to our clients
and our project team 24 hours a day, 7 days a week.
We believe that the personal involvement of our
principals guarantees our clients the best possible
service and a successful project, delivered on time and on budget.
CAPACITY Nason Construction is headquartered in Wilmington, DE, and has fully
operational regional offices conveniently located in The Navy Yard in
Philadelphia, PA, and in
Salisbury, MD, that
support five Mid-Atlantic
States. We employ our
own in-house resources
throughout our three
offices as well as various
field offices, including but
not limited to:
COMPANY PROFILE
NASON CONSTRUCTION, INC.
Nason Construction, Inc. | www.nasonconstruction.com | [email protected] | 610-639-1024
SERVICES AND MARKETS Nason manages a broad spectrum of
projects in the following markets:
Corporate
Healthcare
Education
Government
Parking Garages
Pharmaceutical
Research & Development
Religious Facilities
Senior Care
Warehouse and
Distribution Centers
Retail
Mixed-Use
Sustainable / LEED solutions
These projects are delivered through Construction Management, General Contracting, or Design-Build services.
REPEAT CLIENTELE Consistently successfully delivering projects has resulted in significant repeat business. Over 85% of our
current projects directly originated from a client, architect, or engineer, or from their referral, and 60% of this
work is negotiated construction management contracts.
EXCELLENCE IN SAFETY AND CONSTRUCTION Our firm has an outstanding reputation with clients and subcontractors; we have a valued list of clients that
award us multiple projects, and we have excellent regular bidder participation. Our commitment to quality and
safety is also represented by the fact that we
have received over 30 industry awards honoring
our excellence in safety and construction over
the last decade from both local and national
construction organizations, including Associated
Builders and Contractors (ABC) and the Delaware
Contractors Association (DCA).
COMPANY PROFILE
NASON CONSTRUCTION, INC.
& vision
values
Our vision: to be the best
The Nason Construction vision is to stand above our competitors in the Mid-Atlantic construction market by being known for the quality of our work, the exceptional service we provide, and the integrity with which we treat all of our employees and business relationships, Clients, consultants, and subcontractors will be enthusiastic to work with us on any project and our employees will be proud to say that they are a part of the Nason Construction Team.
Our values: integrity, quality, service, commitment
Integrity We are committed to conducting all of our business relationships in a manner that is honest, fair and ethical and that emphasizes open, direct communication.
Quality We are committed to excellence in all aspects of our work; our construction, our service, our people, our work environment and our dedication to safety. We strive for continuous improvements in everything we do.
Service We focus on anticipating and exceeding the expectations of all of our business partners, finding the best solutions for their needs and responding in a timely manner. We will do this by adhering to a standard of professionalism that represents our knowledge, experience and respect for others.
Commitment to our employees We will achieve our vision by attracting and retaining the best employees. We encourage our employees to strive for success in both their personal and business relationships by upholding our values. As part of our pledge to our employees, we will:
• strive to provide interesting and challenging opportunities to make a difference
• communicate openly and honestly • utilize, value and acknowledge individual skills, talents and
contributions • make safety a priority • encourage and support professional development • have fun together while striving for excellence
Integrity, quality, service, commitment; Each of us will
demonstrate our commitment to and passion for the Nason
Construction Team by incorporating these values into all
our pursuits
THREE OFFICES SERVING FIVE STATES
REGIONAL SUCCESS IN ALL MARKETS
Nason Construction, Inc. | www.nasonconstruction.com | [email protected] | 610-639-1024
"I WOULD ENTHUSIASTICALLY RECOMMEND NASON
CONSTRUCTION FOR FUTURE PROJECTS. NASON'S ABILITY
TO LEAD, LISTEN, AND WORK COLLABORATIVELY WAS A
TESTAMENT TO NASON'S CORE VALUE."
- Dennis Groom, Director
Division of Facilities Management, The State of Delaware
Red Clay Consolidated School District,
Wilmington Campus Renovations
2010 ABC Delaware, Excellence in
Construction, Merit Award
2010 DCA, Construction Excellence
Award, First Place
Wilmington Friends School, Lower
School Expansion
2005 ABC Delaware, Excellence in
Construction, Merit Award
Ursuline Academy, Lower School
Renovation
2009 ABC Delaware, Excellence in
Construction Award, Honorable Mention
Nason K-12 Education
Project Awards
Queen Anne’s County Public Schools,
New Sudlersville Middle School
2012 LEED Gold Certification
Dorchester County Public Schools,
North Dorchester Middle School
2009 ABC Delaware, Excellence in
Construction Award, First Place
Ursuline Academy, Upper School
Science Center Renovation
2003 ABC Delaware, Excellence in
Construction
2003 DCA, Construction Excellence
Award
2002 Project Awards
University of Delaware, Carpenter
Sports Center
2014 NIRSA Outstanding Sports
Facilities Award
2013 ABC Delaware, Excellence in
Construction, Merit Award
Virginia Institute of Marine Science,
Seaside Hall
2013 American School University
Portfolio Awards, Outstanding Design
Philadelphia University, SEED Center
2012 LEED Gold Certification
Villanova University, Davis Center
for Athletics and Fitness
2008 Project of the Year, Project
Management Institute, Delaware
Valley Chapter, Honorable Mention
Widener University, Wellness Center
2006 McGraw Hill’s Mid-Atlantic
Construction, Higher Education
Project of the Year
University of Delaware, Academy
Street Building and Perkins Garage
2001 ABC Delaware, Excellence in
Construction, Merit Award
2001 DCA, Construction Excellence
Award
Nason Higher Education
Project Awards
Virginia Institute of Marine Science,
Eastern Shore Seawater Laboratory
2013 American School University
Portfolio Awards, Outstanding Design
Salisbury University, Manokin,
Wicomico & Nanticoke Halls
2011 ABC Chesapeake Shores, Excellence
in Construction Award
2011 LEED Gold Certification
University of Maryland Eastern Shore,
Student Development Center
2007 ABC Chesapeake Shores, Excellence
in Construction, Renovation Project of
the Year
University of Delaware, Carvel
Research and Education Center
2006 ABC Chesapeake Shores, Excellence
in Construction Award, First Place
University of Maryland Eastern Shore,
Physical Plant and Central Receiving
2004 ABC Chesapeake Shores, Excellence
in Construction, Overall Outstanding
Project of the Year
2004 ABC Chesapeake Shores, Excellence
in Construction, Industrial Project of the
Year
Philadelphia
Wilmington
Salisbury
Red Clay Consolidated School DistrictWilmington Campus Renovations
Nason Construction provided construction management services for this $20.5 million phased renovation of an occupied, three-story high school. The school houses both the Cab Calloway School of the Arts and the Charter School of Wilmington.
The phased renovation was managed so at most, only seven rooms are under construction at any given time. This allowed for full accommodation of all 1,800 students and faculty, and avoided the need to utilize trailers as classrooms. Logistics and thorough communication proved to be extremely important while coordinating construction in a fully operational learning environment.
Location: Wilmington, DE
PlannedCompletion:
September 2009
ActualCompletion:
September 2009
Planned Budget: $20,500,000
Actual Budget: $20,500,000
Square Feet: 275,000
Project Type: Expansion and
Renovation
Owner: Marcin Michalski
RCCSD(302) 892-3284
Architect: Kathy Knotts
BSA+A (302) 658-9300
Ed LupinekStudioJAED
(302) 832-1652
The project included a new HVAC system, a new fire detection system, a new power distribution system, MEP upgrades, classroom renovations, science lab renovations, ADA upgrades, and window replacements.
The project was completed by the start of the 2009-2010 school year.
Awards:Delaware Contractor’s Association Construction Excellence, 1st Place 2010
Associated Builders and Contractors Delaware Chapter Excellence in Construction 2010
Nason Construction has been a strategic
partner with Wilmington Friends School for
years. Highlighted below are some of our past
projects.
Middle and Upper School Renovations
This $2.1 million renovation project was
designed by Voith & MacTavish. The 12,400 sf
renovation included classrooms and meeting
spaces in three areas, the Art Center, the
Music Center and the Quest Center.
Upgrades made to the renovated spaces
included a 20-person seminar room with a
SMART Board, and increased seating capacity
from 250 people to 400 in the Meeting Room.
Construction on the campus was completed
over the summer months, as to not disrupt
school activities.
Other Additions and Renovations
As construction manager, Nason
Construction lead this two-phased expansion
and renovation project.
Phase one consisted of constructing a new
gymnasium and multi-purpose building. The
new facility accommodates classrooms for
after school activities, a kitchen and a
computer lab. Phase consisted of renovating
an existing two-story elementary school, an
addition to the meeting house, and the
construction of an arts wing.
Demolition of existing structures and
extensive site development was required
before construction started. The addition was
oriented to maintain existing wooded areas.
Site work also involved the planting of
inviting landscape features.
Philadelphia
Wilmington
Salisbury
Queen Anne’s County Public SchoolsSudlersville Middle School
Location:Sudlersville, MD
Completion:April 2012
Value:$23,200,000
Square Feet:110,000
Project Type:New Construction
Architect: Crabtree,
Rorhbaugh & Associates
Nason Construction was awarded general contracting services for the new Sudlersville Middle School. The two-story, 110,000 square foot school accommodates 800 students in grades 6-8 and attained LEED Gold Certification. The new school unites sustainable practices, technology, and education through high-tech classrooms with the latest in leading edge learning technology, and environmentally responsible building control systems.
Sustainable features include solar panels and geothermal heating and cooling systems to make the school energy efficient while off-setting energy costs. In addition, the building features 80% daylighted spaces and has projected a 40% reduction in water use. The projected energy savings is 34%.
Administrative offices, two recreational gymnasiums, and related athletic fields for student use were also constructed.
The school was built on a greenfield site in Sudlersville, MD to address the expanding needs of Queen Anne’s County, which has the second highest growth rate of any Upper Eastern Shore County in Maryland.
Awards:2013
Delaware Contractors Association,
Construction Excellence Award
Dorchester County Public SchoolsNorth Dorchester Middle School
Nason Construction was selected as the General Contractor for the new North Dorchester Middle School. This 95,000 square foot, $26.2 million middle school was built next to the existing middle school in Dorchester County.
The new middle school bridges technology and education by bringing hi-tech devices into the classroom. Classrooms are equipped with interactive whiteboards linked to computers so information can be shown to the entire class. The school has a media server for educational materials, cutting down on the traditional clutter of videos and other multi-media learning materials.
The new middle school incorporates many green and sustainable features, including 144 wells for a geothermal HVAC system, increased daylighting, lighting controls
Location: Hurlock, MD
Completed:May 2009
Value:$26,200,000
Square Feet:95,000
Project Type:New Construction
Architect:DCMM Architects
Awards:2009 Excellence in
Constructionfrom the ABC
Chesapeake and Eastern
Shore combined Chapters
with motion-sensor detectors, and water saving and waterless fixtures in the restrooms. The geothermal HVAC system uses all-natural energy from the earth to heat and cool the building. The daylighting in the school increases natural sunlight to areas that would otherwise be dependent on electric lighting. Studies have shown that natural daylighting enhances a student’s ability to learn and comprehend school subject matter, and student performance increases. All of these strategies increase overall energy efficiency and lower the operational costs for the school district.
In addition to the school building, softball and soccer fields were remodeled and six new tennis courts were constructed.
This project was constructed following IAC and State of Maryland guidelines and regulations.Philadelphia
Wilmington
Salisbury
Associated
Builders and
Contractors
Delaware
Excellence in
Construction
2013 Merit
Award
2014 NIRSA
Outstanding
Sports Facilities
Award
A long-standing client, the University of
Delaware selected Nason Construction to
provide preconstruction and construction
management services for the renovation and
addition to the Carpenter Sports Building,
which is the primary recreation facility on
campus.
The current building was 167,000 sf and
included:
• two gymnasiums
• volleyball courts
• student and employee fitness centers
• racquetball and squash courts
• a rock-climbing wall
• locker rooms
• faculty and staff offices
The Carpenter Sports Building also houses a
15,000 sf natatorium, which is home to both
the men and women’s swimming and diving
teams, and accommodates seating for 700
fans.
Nason Construction provided
preconstruction services to finalize the scope,
schedule and budget for a 49,000 sf addition
and 47,000 sf renovation. Nason was further
selected to provide construction management
services for the addition and renovation,
which addition is three stories, and connects
to the existing building. It provides a new
entry lobby, centralized offices for recreation,
and a large fitness center.
This project was completed utilizing Building
Information Modeling (BIM) techniques.
before
after
Student Center:
ABC Eastern
Shore 2007
Excellence in
Construction
Renovation
Project of the
Year 1st Place
Physical Plant:
Winner, 2004
Excellence in
Construction,
Outstanding
Overall Project of
the Year &
Industrial Project
of the Year from
ABC Eastern
Shore.
Student Center Renovation
Nason Construction managed the renovation
of the 45,539 sf Student Development Center,
which included an open two-story lobby in
the center surrounded by offices, counseling
rooms, conference rooms, computer labs, and
storage areas.
The renovation included an upgrade of the
HVAC System, all interior finishes, structural
work, and the replacement of the exterior
glass curtain façade, as well as a small
addition totaling 2,360 sf to house the new
mechanical equipment.
Murphy Hall Annex
Nason also provided general contracting
services for the renovation and fit-out of a
three-story student dormitory. The project
required replacement of all new mechanical,
electrical and plumbing systems, including
the HVAC system, masonry restoration,
complete window replacement, and
construction of a new elevator shaft.
The dormitory accommodates 100 student
beds with a men’s and women’s restroom and
shower facility on each floor complete with all
new fixtures, study lounges, a small kitchen
area, and a laundry facility.
The project was completed on a fast-track
schedule in only nine months.
Physical Plant and Central Receiving
Nason provided general contracting services
for this new masonry and architectural
precast facility. The new building
accommodates administrative offices and a
maintenance facility with a covered storage
area, vehicle garage with hydraulic lifts,
plumbing shops, and electrical shops. The
project also included extensive site
development, extension of all site utilities,
and finished landscaping.
2013 American
School &
University
Portfolio
Outstanding
Design Award
The Virginia Institute of Marine Science
(VIMS) and the Graduate School of Marine
Science at the College of William and Mary
provides interdisciplinary research in coastal,
ocean, and estuarine science at the main
campus and the Eastern Shore Laboratory
(ESL). The ESL serves as both a field station in
support of research and teaching and as a site
for resident research in coastal ecology and
aquaculture.
Nason Construction provided construction
services for a new single story 8,000 square
foot seawater laboratory on pile foundations.
The new lab has running seawater for
research on coastal marine ecology and
aquaculture in a high salinity environment.
The building was poured-in-place concrete,
with wood construction and will provide a
new flood proof structure.
Sample Signature Projects
Excellence in
Construction,
ABC Delaware
Construction
Excellence,
Delaware
Contractors
Association
Nason Construction has been working with
Sallie Mae since 2008 on a series of multiple
projects, such as:
Corporate Headquarters Fit-Out, Phases 1-7
In January 2011, Nason began a $10 million,
17 month fit-out of 150,000 sf; completed in
seven phases, in an occupied building.
Exterior Façade Renovation
In 2011, the award winning, $7.3 million
Exterior Façade renovation commenced. The
new, large windows not only make the
building look inviting, but add an increase in
natural light for guests and employees.
Landscaping & Pond Renovations
In Spring 2013, Nason began the renovation of
Sallie Mae’s employee common space,
creating a new outdoor seating and dining
area adjacent to their new cafeteria, and a
serene pond with surrounding boardwalk for
employees to enjoy.
Other projects include:
Executive Office Suite renovations
Reconfigure Open Floor Work Spaces
Lobby renovations
Cafeteria renovation & expansion
Fitness Center renovation
Elevator modernization
Board Room & Conference Rooms
Stair Tower renovations
Parking Lot expansions
Bathroom upgrades
Mailroom renovations
Credit Operations Center Office fit-out
and renovation
“We are extremely happy with our totally
renovated space and it has made a huge
difference in our service to our customers.”
- Paul Smith, Director of Facilities
Philadelphia
Wilmington
Salisbury
State of DelawareKent County Courthouse Complex
Nason Construction provided CM-At-Risk services for the construction of a new, three story, 150,000 square foot courthouse annex and a 50,000 square foot renovation to the existing 1874 historic Kent County Courthouse. The project was the first CM-At-Risk project undertaken by the state. Work included historic preservation of the existing courthouse as well as the complete demolition of the neighboring Robert O’Brien Building.
The new, three-story, 150,000 square-foot facility features seven courtrooms, including hearing rooms, and an arraignment courtroom. The facility houses the Superior Court, Court of Common Pleas, Department of Corrections, Capitol Police, and probation officers.
Location: Dover, DE
Completed:June 2013
(Renovation)June 2011 (Addition)
Value:$67,000,000
Square Feet:50,000 Renovation
150,000 Addition
Project Type:New Construction
& Historic Renovation
Architect: Moeckel Carbonell
& Ricci Greene Architects
Awards: 2011 Excellence in Construction from
Associated Builders & Contractors
Delaware Chapter and
Delaware Contractors Association
Nason Construction worked with the State to prequalify contractors with sufficient expertise and size to complete such a complex project. Unique features of the new building include significant architectural millwork finishes in the courtrooms, detention and holding cells with isolated elevators for prisoner transport, and high-tech security systems including closed circuit television, access controls, and comprehensive data and telecommunications systems.
The newly renovated historic building houses two courtrooms, the Chancery Court, the Attorney General’s Office, administrative offices, a Grand Jury room, and the Law Library.
This project includes a new 25,000 sf addition
and 6,350 sf renovation to the kitchen serving
the Howard R. Young Correctional
Institution, a Level 5 prison facility, located in
Wilmington, DE. The facility processes
approximately 60% of all admissions in the
Delaware Correctional system, and houses the
majority of the detainee population.
The addition is comprised of a two-story
space over a crawl space. The first floor
above the crawl space contains an expanded
facility storage area, new bulk dry food
storage, a sally port serving only food service
needs, a food service receiving area, loading
dock, elevators and machine room, and trash
rooms with space for outdoor compactors.
The second floor contains a new food service
kitchen serving 2,000 inmates, three meals a
day. Spaces include a new sally port, frozen
and refrigerator storage, day dry food storage,
non-food storage, can/wash recycle area,
staging area including space for at least 33
food carts, two staff offices, an inmate break
area, elevators, preparation area, cooking
area, warewashing area, and tray assembly
area.
Renovations to the space included a detailed,
$5,000,000 security system upgrade, which
was also the largest contract for the project.
Upgrades included the installation of Allen
Bradley PLC and inner connection wiring for
the same, along with upgrades and an
addition of 190 new cameras to the over 100
existing cameras in the facility’s closed-circuit
television system. The upgrades were
successfully converted in phases for two
months while maintaining all security
functions of the prison at all times.
Additional security concepts incorporated
were:
• Doors are controlled / operated by
central control
• Exterior walls consist of horizontal and
vertical reinforced masonry / concrete
• Window penetrations are no wider than
five inches
• Loading docks and service yards are
secured with sally ports
• Security glazing consisted of glass-clad
polycarbonate
• Security ceilings were utilized
Philadelphia
Wilmington
Salisbury
Christiana Care Health SystemHelen F. Graham Cancer Center Expansion
Location: Newark, DE
Completed:May 2009
Value: $29,900,000
Square Feet: 120,000
Project Type: New Construction
Architect: HKS Architects
Awards:Mid-Atlantic Construction
2009 HealthcareProject of the Year
Delaware Contractor’s Association
Construction Excellence 2009
Associated Builders and Contractors
Delaware Chapter Excellence in
Construction 2009
Nason Construction provided construction management services for a four-story, 120,000 square foot Medical Office Building at Christiana Hospital. The new Helen F. Graham Cancer Center Pavilion will be able to better serve Christiana Care Health System’s cancer patients, the number of which grew from 6,000 in 2003 to over 110,000 in 2007.
The building expansion is located adjacent to the current Helen F. Graham Cancer Center and is connected by a glass-enclosed walkway and reflecting pool. It currently is home to doctor and surgeon offices, radiology and nuclear medicine, including MRI, CT, and PET/CT, multiple labs, surgical areas, research labs, administrative areas, and a pharmacy.
Site work included “Green” technologies in addition to a partial second floor roof garden.
Nason Construction was selected to build a
new $10 million nursing school for Beebe
Healthcare in Lewes, DE. This project will be
completed in a single phase spanning 13
months, combining both the new construction
and renovation projects.
Three buildings currently exist on the site of
the new school. Of the three buildings, two
will be demolished and one will be erected in
their place. The new building will include
two, six-bed skills laboratories and two,
one-bed skills laboratories outfitted like
modern hospital rooms, as well as classroom
and conference room spaces.
The third building will undertake mechanical
and cosmetic upgrades and renovations,
while Nason ensures uninterrupted
operations for Beebe. The space will remain
occupied throughout construction.
Nason has worked with Beebe throughout the
entire process in both a consulting and
partnership role. Extensive time is being
spent with value engineering to assist in
budgeting. Partnering with various
consultants and working closely with the
architect, owner, and subcontractors, Nason
was able to provide a savings strategy to
Beebe that could bring a 10% decrease in
overall cost.
Another method in which Nason delivered
additional value to Beebe was in the
transition of our contracting model.
Originally bid as a lump sum project, Nason
and Beebe collaborated to create a new
Construction Management contract, which
will result in great cost savings to the Client.
Philadelphia
Wilmington
Salisbury
U.S. Army Corps of EngineersCharles C. Carson Center for Mortuary Affairs
Dover Air Force Base
Nason Construction accepted the challenge to complete this design-build contract for the new $18.9 million state-of-the-art mortuary at the Dover Air Force Base. The 73,000 square foot building accommodates administrative offices, a pathology lab, radiology suite, five refrigerated vaults, two ballistic-proof scanning rooms, and a preparation/processing area adjacent to four loading docks. The new facility was designed to meet the Department of Defense Anti-Terrorism and Force Protection Standards and was completed on time and within budget.
The steel-framed and brick structure is accented with marble panel siding. Architectural features include various roof elevations with an aluminum and kalwal barrel roof over the lobby, a glass curtain wall entrance and an ornate lobby.
Location: Dover, DE
Completed:April 2004
Value: $18,900,000
Square Feet: 73,000
Project Type: New Construction
Architect: Becker Morgan
The lobby features the “Wall of Fallen Heroes” and a reflecting pool with a fountain designed to instill a sense of peace and tranquility adding ambiance to the center.
The mortuary was completed on a fast-track schedule in only 20 months from design concept to completion. It is the only one of its kind in the world and boasts an innovative ventilation system that turns air flow 15 times an hour to ensure a safe work environment.
Nason Construction is currently working on
our fifth project with Campbell Soup
Company at their World Headquarters in
Camden, NJ. Our relationship spans a
program of multiple projects. Highlighted
below are some of those projects.
World Headquarters Renovation,
Phases 1 & 2
Nason Construction originally provided
general contracting services for the first two
phases of the World Headquarters renovation.
Completed in February 2011, the first phase
included the installation of all IT equipment.
The second phase, completed in June 2012,
involved the complete renovation of 68,000 sf
of administrative space at the Headquarters’
main building.
The retrofit included selective demolition and
interior fit-out with high-end corporate office
finishes and extensive mechanical and
electrical upgrades. The building remained
fully occupied during the renovation.
World Headquarters, Building 70
Renovations
Nason provided general contracting services
for Campbell Soup’s Building 70 interior
renovations, which was the first venture
between Campbell’s and Nason. The scope of
the project included demolition of a portion of
the existing Day Care and build-out of new
space and meeting rooms, as well as a new
HVAC system and skylight installations.
Work was completed during the night shift
hours to allow the Day Care and office
operations to continue without interruption.
The Nason construction team successfully
coordinated construction activities within the
occupied building and with the furniture
assembly crews to allow on-time move-in to
the renovated space.
St. Mary Medical Center/Centerre Health Rehabilitation Hospital
Philadelphia
Wilmington
Salisbury
Location:
Langhorne, PA
Total Value:
$17,500,000
Square Feet:
53,000
Project Type:
New Construction
Completion:
June 2014
Architect:
ESa
Nason Construction was selected to build a new $17.5 million rehabilitation hospital in Langhorne, PA, for the partnership of St. Mary Medical Center and Centerre Healthcare Corporation. The 50-bed acute care facility is the first stand-alone specialty rehabilitation hospital of its kind in Bucks County, PA.
The 52,879 square foot facility includes dedicated brain-injury, spinal-cord-injury, trauma, and stroke units, and provides physical, occupational, and speech therapy, along with neuropsychology services. The new hospital is located across the street from the existing St. Mary Medical Center main campus facility.
This is the first phase of development of this new campus, and will allow St. Mary Medical Center to convert its existing 31-bed rehabilitation unit in the main hospital into a private-bed unit, so the 374-bed hospital will have all private rooms.
Philadelphia
Wilmington
Salisbury
Stroud Water Research CenterMoorhead Environmental Complex
Location: Avondale, PA
Completed:May 2012
Value: $5,600,000
Square Feet:14,000
Project Type: Addition
Architect: M2 Architecture &
Re:Vision Architecture
Client Testimonial: “We chose Nason to build
the Moorhead Environ-mental Complex because
of their outstanding track record and unwavering
dedication to getting things done right.”
-Bernard W. Sweeney, Ph.D., President,
Stroud Water Research Center
Nason Construction provided Construction Management services for the construction of a two-story, 14,000 square foot new education and development center for Stroud Water Research Center. The building incorporated significant sustainable design and achieved LEED Platinum, the highest level of certification issued by the US Green Building Council. The complex provides improved and expanded classroom and administrative space to enable the Center to achieve its mission of advanc-ing knowledge and stewardship of fresh water through research, education, and restoration.
Sustainable components include:• storm water management using natural landscaping with porous surfaces• green roof• geothermal heating and cooling system• rooftop rainwater capture system feeding water-efficient toilets• rain gardens with native vegetation• conversion of septic system to wetland wastewater treatment system• composting toilets• radiant, underfloor heating• natural ventilation• solar power• high-efficiency windows
The building is connected to the existing complex through the stream house. The facility is designed to capture rainwater to support aquatic research needs helping further the research endeavours of the Center.
Wilmington
3411 Silverside Rd, Tatnall Building
Suite 200
Wilmington, DE 19810
302-529-2800 T
302-397-2387 F
Salisbury
224 Phillip Morris Dr
Suite 400
Salisbury, MD 21801
410-749-5300 T
410-630-7221 F
Philadelphia
The Navy Yard, Quarters M-3
4605 S Broad St
Philadelphia, PA 19112
215-334-9400 T
215-689-0839 F