~ 1 ~ CAPSTONE PROJECT-II Implementation and evaluation of a distribution load flow algorithm for networks with distributed generation Submitted in partial fulfillment of the course requirements for the Bachelor of Engineering (Electrical) degree Submitted by :- Sachin Kumar (061358) Sachin Grover (061356) Under the supervision of: Prof. Sandeep Kaur To :- DEPARTMENT OF ELECTRICAL ENGINEERING PEC University of Technology CHANDIGARH-160012

Upload: sachincoolsexy

Post on 27-Jul-2015

1.030 views

Category:

Documents


1 download

DESCRIPTION

Hi guys....m Sachin Kumar Singla....Final year electrical PEC Chandigarh...I have done my final project on Distribution ...In this report u can find improvement of voltage profile on receiving end with Dispersed generation (DG) also called Embedded generation, Distributed generation ....So i hope this will help u...:)

TRANSCRIPT

Page 1: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 1 ~

CAPSTONE PROJECT-II

Implementation and evaluation of a distribution load flow algorithm for networks with

distributed generation

Submitted in partial fulfillment of the course requirements for the Bachelor of

Engineering (Electrical) degree

Submitted by :-

Sachin Kumar (061358)

Sachin Grover (061356)

Under the supervision of:

Prof. Sandeep Kaur

To :-

DEPARTMENT OF ELECTRICAL ENGINEERING

PEC University of Technology

CHANDIGARH-160012

Page 2: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 2 ~

DECLARATION

We hereby declare that the project entitled “Implementation and evaluation of a

distributed load flow Algorithm for networks with distributed generation” is

an authentic record of our own work carried out as a fulfillment of our course

requirements for the award of BE, Electrical Engineering, PEC University of

Technology, Chandigarh, under the guidance of Prof Sandeep Kaur, PEC

University of Technology, during January to May 2010.

Date:

Sachin Kumar (061358)

Sachin Grover (061356)

Certified that the above statement made by the students is correct to the best of our

knowledge and belief.

Place: CHANDIGARH Prof. Sandeep Kaur

Page 3: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 3 ~

ACKNOWLEDGEMENT

The submission of the project gives us an opportunity to convey our gratitude to all

those who have helped us in completion of our project. We hereby would like to

acknowledge the invaluable support of our capstone project guide Prof. Sandeep

Kaur, Electrical Engineering Department, PEC University of Technology. She has

helped us through her invaluable suggestions and support throughout the duration

of the project and has been an unending source of inspiration for us.

We would also like to thank Dr. Shiv Narayan (Head of Electrical Engineering

Department, PEC University of Technology, Chandigarh) and Prof. Balwinder

Singh (Department of Electrical Engineering, PEC University of Technology,

Chandigarh) for giving us an opportunity to take up this project in the given field.

Also we would like to extend our deepest thanks to the college authorities, for

showing trust in our abilities and providing us with an atmosphere to work in. We

were allowed usage of all facilities and infrastructure available in the department.

In the end we would like to thank all the people who helped us in the completion of

our project.

Sachin Kumar (061358)

Sachin Grover (061356)

Page 4: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 4 ~

ABSTRACT

In this semester project, an existing algorithm for the calculation of power flow in a

distribution network with dispersed generation is implemented in MATLAB and a

given network is analyzed. MATLAB with its toolboxes such as Simulink and

SimPower Systems is one of the most popular software packages used by educators

to enhance teaching the transient and steady-state characteristics of electric

machines and power system . Special consideration was given to the voltage profile

of the network, and active and reactive power flows. Different types of

representative distribution generation profiles and load profiles were adopted.

Comparisons were made in case with and without DG units.

The topic was chosen and was carried out after discussions with our mentor, the

faculty and after doing a secondary research for a variety of projects on distribution

networks. It involved the following steps :-

Phase 1 : Network without dispersed generation

Phase 2 : Network with dispersed generation

Page 5: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 5 ~

TABLE OF CONTENTS

1. Chapter 1 Load flow and Distribution Networks ………………....…7-10

1.1 Introduction.....................................................................................7

1.2 Special features of distribution systems ……………...……....... 8

1.3 Summary of some distribution load flow methods ………….. 9

2. Chapter 2 Theoretical Background....................................................11-19

2.1. Basic equations ...........................................................................11

2.2. Dynamic data structure algorithm................................................12

2.3. Power flow calculation algorithm ...............................................15

3. Chapter 3 Case Study.........................................................................20-30

3.1. Network topology ..................................................................................20

3.2. Load and Generation Profiles ................................................................21

3.3. Expected Results of the load flow calculation ......................................29

4 Chapter 4 Results ……………….....................................................31-38

4.1. Voltage profiles without DG………………………………..………....31

4.2. Active & Reactive power profiles without DG……………..………...33

4.3. Voltage profiles with DG……...……………………………….……...35

4.4. Active & Reactive power profiles with DG…………………….….....37

5. Chapter 5 Conclusion …………………………………………….…...39

6. Appendix .……………………………………………………………....40-58

a. Appendix A (MATLAB Code)……………………..………………..40-54

b. Appendix B (E-TAP Simulation)…………………………………....55-58

7. References……………………………………………………………….....59

Page 6: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 6 ~

List of Figures

Figure 2.1: Model of a transmission line

Figure 2.2: Schematic diagram of a dynamic data structure

Figure 2.3: Radial system used as an example in this work with all the branches

displayed

Figure 2.4: Representation of the data structure storing details of branch I

Figure 2.5: Load flow algorithm for networks with dispersed generation

Figure 3.1: Distribution Network uses as a benchmark

Figure 3.2: Active power load per bus

Figure 3.3: Reactive power load per bus

Figure 3.4: Active power generation per bus

Figure 3.5: Reactive power generation per bus

Figure 3.6: Active load-generation per bus

Figure 3.7: Reactive load-generation per bus

Figure 3.8: Voltage profile without DG

Figure 3.9: Voltage profile with DG

List of Tables

Table 3.1 Load –Generation Active and Reactive Power

Table 3.2 Line Data (Resistance and Inductance)

Page 7: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 7 ~

Chapter 1

“Load Flow And Distribution Networks”

1.1 Introduction

Load flow is an important tool for proper design and operation of distribution networks. At the

design stage, load flow analysis can be used to check whether the voltage limits are satisfied all

over the network. At the operation stage, it can be utilized to check the different possible

supplying arrangements to fulfill the required voltage profile and to achieve minimum system

losses. In recent years, introduction of system automation, dispersed generation and the power

industry deregulation have increased the need for powerful tools, including load flow, for the

system analysis. Although the conventional load flow methods, e.g. Newton- Raphson and Fast

Decoupled, are very efficient for transmission networks, they are not so efficient or even may be

unusable in the some cases for distribution networks. The inefficiency of these methods is the

result of inherent features of distribution networks. The inefficiency is the cause of the

divergence, since distribution networks are placed in ill conditioned networks for these methods.

Some of the troublemaking features of distribution networks are: radial or near to radial

structure, high R/X ratio, unbalanced multi-phase operation, distributed loads and generation.

Regarding to the inherent difference between transmission and distribution networks, the

modeling methods of the transmission system components are not suitable for the distribution

networks. Therefore, especial modeling methods are required for the distribution networks.

Many methods are presented for distribution load flow solution. The presented methods can be

categorized in some groups. Some of these methods are modified versions of Newton-Raphson,

and the method deals with formation of Jacobians and computation of power mismatches. Some

others are based on the backward and forward sweep method involving branch current flows

computing. Moreover, a method is presented for direct solution of the network, by modelling

loads as constant impedances. The above mentioned methods are very accurate involving

detailed modelling of the system. Most of them are dealing with deterministic conditions and

accept only fixed inputs. Therefore, their result accuracy greatly depends on the validity of

inputs. The input variables are normally unknown, so they would be obtained by estimation

according some past and present data.

Page 8: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 8 ~

1.2 SPECIAL FEATURES OF DISTRIBUTION SYSTEMS

1. Radial or near to radial structure. Similar to transmission systems, distribution

networks have an interconnected structure, but they are operated in radial mode unlike

the transmission systems. One or few rings may exist in the distribution networks, but the

number of rings in the whole system is very low. This is because of the arisen difficulties

in protection of the ringed networks.

2. High R/X ratio. This ratio is low in the transmission systems, e.g. 0.1 or less, whereas in

distribution systems it is in the range of 0.5 to 2 or even higher for the lines with low

cross section conductors.

3. Unbalance multi-phase operation. Transmission system are balanced and the loads are

supplied through the three phases. Loads in distribution systems can be fed through three-

phases, two-phase or single-phase, and so distribution systems may be unbalanced.

Therefore, the methods base on the balanced three-phase loads may not be able to solve

the distribution networks load flow problem.

4. Distributed loads. Transmission system loads are lumped and they are located on the

buses of the system. In the case of each transmission line, there are two loads at each end

and there is rarely tap-off load along the line. On the other hand, loads are tapped along

the length of the distribution feeder. If each load is considered as a node, it may result in

an excessive number of nods. In distribution systems so many laterals are fed via the

main feeder. Therefore, each distribution feeder contains some laterals as well as some

distributed load points.

5. Dispersed generation. In the transmission systems, the generator buses are considered as

a PV bus and their voltage can be set at a desirable value in an allowed rang. In the recent

years, dispersed generation has been introduced into distribution systems. This type of

generation is based on the renewable energy sources such as solar, wind, or small

hydrounits, or on the other hand based on the non-renewable sources such as micro-

turbine and small gas-turbine. The controlling strategy of these generators is not similar

to the large generators. Some of them are set in a way that they generate a fixed P and Q.

On the other hand, some others are set to have a fixed power factor. Only a small fraction

of dispersed generators can stabilise the voltage of their connection point, which can be

considered as a PV bus.

Page 9: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 9 ~

6. Loads in distribution networks. In distribution systems, loads are supplied through

very small distribution transformers, e.g. 5 kVA. If each load point is considered as a

node, the number of nods would be so high. Modeling the distributed loads, as two

lumped loads at the end of a selected line sections, overcomes this problem. Beside the

distributed load feature, loads characteristics are also important. Normally, loads are

modelled as a fixed P and Q. In some algorithms, loads are modeled as constant

impedance component. But loads in a distribution network have both fixed P and Q, and

constant impedance features, but the percentage of each one would vary. The validity of a

load flow method can be increased, by considering both models simultaneously.

1.3 SUMMARY OF SOME OF DISTRIBUTION LOAD FLOW METHODS

Many efforts have been done on distribution load flow in recent years and some methods

are presented. These can be grouped as follows:

1. Backward and forward sweep methods, or ladder network based methods. These

methods are based on the radial feature of the distribution networks, i.e. there is a unique

path between each node and the source. The algorithm consists of two stages; backward

and forward sweep, which are repeated until convergence. Currents or powers are

calculated at the backward sweep stage, using the computed voltages. Then voltages are

computed at the forward stage, based on the calculated currents or powers. This method

can be summarized as:

Consider a flat voltage profile for all nodes

Determine the impedance between each node and the source

Calculate the currents at backward stage, starting from the end nodes

Compute the voltages at forward stage, starting from the source

Repeat the above two stages until convergence

2. Shirmohammadi method. Shirmohammadi, present a load flow method, which is three-

phase version of their method presented in. This can consider the specialities of the

distribution systems, especially unbalanced loading. This method can also be used for

weekly meshed networks. In these cases, firstly loops are opened and each opened point

is compensated by two injected current sources with opposite directions. Therefore, the

Page 10: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 10 ~

opening point is converts to two nodes with compensating current sources. After opening

the loops, the resultant radial network will be solved. This method can be summarised as:

Consider a flat voltage profile for all nodes

Compute the current injections due to the voltage profile

Determine current flow through the line sections, starting from the end nodes

Compute the node voltages due to the line section current flow, starting from the

source

Repeat the above three stages until convergence

3. Implicit Z method. This method utilizes sparse bifactored Y bus matrix and equivalent

current injections. It is based on the superposition principle for voltages. Here, voltage

consists of two parts: the voltage due to the source and the voltage due to the equivalent

current injections. Loads, generators, capacitors, and reactors are modeled as current

injection sources. The voltage relates to the source is the no load voltage, and it can be

equal to the source voltage. The other part can not be determined directly, and should be

determine through the following procedure:

Form the Y and estimate nodes voltages

Order and factor the Y bus optimally

Calculate the injected current for each node

Compute the voltage mismatches using the injected bus currents and factored Y

Update the voltages applying the super-position principle

Repeat three above stages until convergence

4. Direct method. The previously mentioned methods are based on iterative computations.

Goswami and Basu present a method to solve the load flow directly. Here, the load flow

problem formulated in a way that the direct solution becomes feasible. Loads are

modeled as constant impedances instead of fixed P and Q. Then, KVL's are formed in

loops start from the source and last to the end loads. These equations are ordered in a way

that the node voltage is on one side. Regarding these equations, Z matrix is formed. The

Z matrix then converts to an up-triangular matrix, which is applied to direct solution of

the network.

Page 11: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 11 ~

CHAPTER 2

“Theoretical Background”

The following part explains the theoretical background of load flow algorithm used in this

semester thesis.

2.1 Basic equations

It is assumed that the three-phase distribution system is balanced and can be represented by an

equivalent single line diagram. The line-to-ground capacitance at the distribution voltage level is

small and thus neglected [2, 4]. A simple model of a transmission line, which has been used in

the algorithm, is shown in Figure 1:

Figure 2.1 Model of a Transmission Line

A number of methods for power flow calculation use recursive equations in different forms

considering sending end ( - h end) or receiving end ( - h end). Those equations are proposed in

[2, 3, 5, 6, and 7] and will also be used in this work. The equations are given below:

The receiving end bus voltage considering sending end powers of the line is given

below:

…… 2.1

The receiving end bus voltage considering receiving end powers of the line is given

below:

.….. 2.2

Page 12: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 12 ~

Using the value of receiving end bus voltage, the receiving end bus angle can be

calculated through the equation given below:

………..2.3

The line losses between the receiving and sending end buses and be

calculated using equations (4) and (5):

………2.4

………. 2.5

2.2 Dynamic data structure algorithm

The method used to store dynamic data structure details of a branch is explained below.

The following attributes were taken in to account when this method was developed [4] :-

1. Dynamic nature of data structures is such that it may be created and altered in the

execution stage.

2. Dynamic data structure required for holding the information of a branch must be compact

and addressable from any function.

3. Dynamic data structure must be flexible to accommodate any number of buses within a

branch.

4. Dynamic data structure must be flexible also to address data structures of branches that

emanate from the end of a branch.

The data structure of a branch needs to hold the following information according to [3]:

Parent bus to which the branch is connected;

Number of buses in the branch;

An array to store IDs of all the buses in the order of their location from the head of the

branch;

Number of branches emanating from the last bus of this branch;

Page 13: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 13 ~

An array of pointers pointing to the data structures that store information of emanating

branches;

The schematic diagram of the dynamic data structure is shown in Figure 2.2. Starting from the

main substation, branches are sequentially stored in the data structure using a recursive function.

Figure 2.2 Schematic diagram of a dynamic data structure

The method creates the branch structures by starting at the main substation bus and then

recursively calling a function that forms the first branch by sequentially considering buses until it

finds one that has several branches emanating from it. Referring to Figure 2.3, which presents the

radial system used as an example in this work taken from reference [4], it builds the first branch

from bus 1 up to bus 3, where two branches emanate. Therefore the data structure created for the

branch labeled I, starts with bus 1 and ends with bus 3, comprising three buses. It has two

branches emanating from it, namely II and III. In the structure labeled I pointers that point

towards the structures storing details of branches II and III are stored. The recursive function

Page 14: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 14 ~

calls itself five times, once for each branch. This process proceeds until data structures for all the

branches are built.

Figure 2.3 Radial system used as an example in this work with all the branches displayed

A representation of the data structure storing details of branch I is shown in Figure 2.4.

Figure 2.4 Representation of the data structure storing details of branch I

Page 15: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 15 ~

2.3 Power flow calculation algorithm

The dynamic data structures presented above are highly flexible and very convenient for usage

by a recursive function that solves the power flow in the radial distribution network. The

recursive algorithm computes voltage magnitudes and phase angles at all buses of a radial

distribution system. It starts by computing the voltage at the furthest end of the first branch using

equation 2.2 . If there are branches emanating from this end bus, this algorithm recursively calls

itself to compute the state of the buses in these branches and the power they draw from the

furthest bus. This recursive call is continued until a branch is reached from which other branches

do not emanate. Then, the algorithm computes the voltage at the furthest bus using voltage

equation 2.2 , with knowledge of its load. Using the expressions for line losses equations 2.4 and

2.2 between the receiving and sending end buses, power loss in the transmission line is computed

connecting this bus and the next bus in a direction leading to the first bus of the branch . With

load known at bus and transmission power loss in the line between buses and known, the

algorithm computes the line load at bus . This process continues until the voltage has been

computed for the first bus. The phase angle of the voltage phasor at the - h bus could be

computed using the equation 2.3. In this work for convergence is checked whether the sum of

powers flowing out of the lines connected to each bus equals (or equals within a tolerable limit)

the net power injected into that bus by the connected generators and loads. Mathematically, this

convergence criterion is described in equations 2.6 and 2.7 where is a tolerance value.

…………2.6

.………2.7

In the MATLAB implementation, the net power injected in the equations 2.6 and 2.7 is in a

slightly different form, which is explained below. The following part explains the derivation of

Page 16: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 16 ~

the net apparent power in case of three bus network.

The basic voltage equations between buses 1 and 2 and buses 2 and 3 are:

…………………... 2.a

............................... 2.b

The net apparent power injected 2 into the bus 2 is:

............................... 2.c

From the equations (2.a),(2.b) and (2.c) the following equation for 2 is derived:

............................... 2.d

The final equation for calculation of the net apparent power injected, in which the self impedance

is contained, is given below. This form of the equation is implemented in the code.

So far, a method for the calculation of a distribution load flow without PV buses in a network has

been presented. A modification of this method is possible in order to calculate the load flow in a

distribution system with distributed generation with controllable bus voltage [2]. Any bus

containing a generator with voltage control possibility is represented as a PV bus. All other buses

in the distribution system are represented as PQ buses. The known variables and those to be

calculated during a load flow for PV and PQ buses are as follows:

Page 17: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 17 ~

PV buses:

known variables are active power and voltage magnitude;

unknown variables are reactive power and voltage angle;

PQ buses:

known variables are active and reactive power;

unknown variables are voltage magnitude and angle;

Equation 2.2 is used to calculate the voltage of a PQ bus, since the real and reactive powers are

known. A different method is used for calculating the reactive power injected into a PV bus .

With rearrangement of the previously given equation 2.2 , can be a variable to solve and

to be a known variable. Another method for calculating is to use the reactive power injection

equation, as given below:

………………….. 2.8

Due to real and reactive power limits of the generator, it is not sufficient to use the above

equation to calculate the of a PV bus. Once calculated, this value of can be used to

determine the amount of reactive power produced by the generator at that PV bus. The actions

that need to be taken for maximum and minimum reactive power generator limits ( , )

violations are outlined below :

Page 18: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 18 ~

……...2.9

The distribution load flow algorithm for networks with distributed generation is shown as a flow

chart in Figure 2.5. The subscript refers to the index of the current "receiving end bus" (refer to

Figure 1.1). The "start bus" should be the last bus at the end of a radial branch, as was mentioned

previously in the text, since the load flow iterates from the end of a radial branch up to the top-

most bus (which typically represents the substation bus). The values of and are calculated

with previously given equations 2.2 and 2.3. The reactive power injected into bus is

calculated for PV buses by using the above equations. Then can be used for calculation of the

reactive power generated at that bus . The procedures for generator reactive power limit

violations are given above. The convergence criteria remain the same as previously explained.

Page 19: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 19 ~

Figure 2.5 Load flow algorithm for networks with dispersed

generation

Page 20: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 20 ~

Chapter-3

“Case Study”

In this chapter the above presented algorithm implemented in MATLAB code was employed for

a case study. A typical distribution network with DG units shown on Figure 3.1 taken from

reference [3] was used and the following studies were made:

Study of the impact of DG units on network voltage profile;

Study of the impact of DG units on active and reactive power flows in the lines;

Study of the impact of DG units on line losses in the network.

In the studies two cases were considered: the network with DG units and without DG units.

Representative load profiles used in this work were taken from VDEW association of the

electrical energy industry in Germany [8] available on their web page. Representative generation

profiles except wind infeed were taken from EnBW Energie Baden-Württemberg Regional AG

from Germany [9] available on-line on their internet web page. The wind infeed profile used here

was taken from E.on Netz (Germany) [10] available on-line on their internet web page. More

detailed figures of load profiles used.

3.1 Network topology

The distribution network used in this case study is taken from reference [4]. Bus 3 is considered

as PV bus the rest of the buses are PQ buses with bus 1 as a slack bus. Bus 1 is main substation

bus, it is assumed that its voltage magnitude and angle are constant 1 . and 0

respectively. This network is derived from a German MV distribution network. The network has

rural character and supplies a small town and the surrounding rural area. The rated voltage level

of the network is 11 kV. It is supplied from a 110 kV transformer station with apparent power 1

MVA. Most connections are made with cables, but there are also sections of overhead lines. The

original network had 30 nodes. To reduce the size to a level that is suitable for DG integration

studies while maintaining the realistic character, the original network number of nodes is reduced

[4]. The resulting network from reference [4] proposed as a benchmark in this semester work is

shown in Figure 3.1. The total length of the lines in this distribution network is equal to about 15

km. Due to the fact that different countries have varying distribution network parameters, the

original values given for the German network were transferred into the per unit system. This

facilitates the adaptation of the benchmark to regionally varying parameters. In Figure 3.1 the

Page 21: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 21 ~

distribution of generation and loads per bus is given and is slightly different from the one given

in reference [4]. Installed power per bus and per DG type is given below Table 3.1.

3.2 Load and Generation Profile

Figure 3.1 Distribution network used as a benchmark network

1

2

6

5

4

11

10

9

8

7

Biomass

PV

Biomass

Biomass

Biomass Biomass

PV

House holds

House holds

House holds

House holds

House holds

Industry Industry

Households +

Industry

Households +

Industry

Households +

Industry

3

Page 22: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 22 ~

BUS No . Pgen (KW) Qgen (KW) P load (KW) Q load (KW)

1 50 -80 90 30

2 0 0 0 0

3 0 0 90 30

4 30 5 80 25

5 0 0 80 25

6 0 0 80 25

7 40 -15 80 35

8 40 5 80 25

9 30 -10 80 35

10 40 -15 90 30

11 50 -80 80 25

Table 3.1 Load –Generation Active and Reactive Power

BUS

(From)

BUS ( To) R

(ohm/km)

X (ohm/km) Length

(km)

R (ohm) L (mH)

1 2 0.579 0.367 2.82 1.63 3.29

2 3 0.164 0.113 4.42 0.725 1.59

3 4 0.262 0.121 0.61 0.159 0.235

3 8 0.202 0.122 2.99 0.604 1.06

4 5 0.354 0.129 0.56 0.198 0.230

5 6 0.336 0.126 1.54 0.517 0.618

7 8 0.294 0.123 1.67 0.036 0.650

8 9 0.339 0.130 0.32 0.109 0.133

9 10 0.399 0.133 0.77 0.307 0.326

10 11 0.367 0.133 0.33 0.121 0.118

Table 3.2 Line Data (Resistance and Inductance )

Page 23: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 23 ~

Simulink on MATLAB without Dispersed Generation

Page 24: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 24 ~

Simulink on MATLAB with Dispersed Generation

Page 25: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 25 ~

First, on Figure 3.2 and 3.3 active and reactive power loads on every bus during one working day

are shown. Reactive power loads are calculated from active power loads by assuming a power

factor of cos = 0.9. Active and reactive power generation on every bus in the period of one

working day is shown in Figures 3.4 and 3.5. Reactive power generation is calculated using the

graphic shown in Figure 3.5. In that graphic is the active power generation in a certain moment

of the day at a certain bus and is nominal active power generation in that bus. In our case

is 0.1 . for all PQ buses. This method for DG unit’s reactive power generation is required by

the grid codes [8]. According to them DG units should be helpful and convenient in voltage and

frequency control in the network. With reactive power generation according to the curve shown

on Figure 11 required helpful behavior from DG units for voltage control is achieved. This

procedure for calculation of reactive power generation was used for PQ buses. For PV buses this

is different, reactive power generation is calculated using equations 2.8 and 2.9 .The difference

between active load and active generation per bus is shown on Figure 3.6 and the difference

between reactive load and reactive generation is shown on Figure 3.7.

Page 26: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 26 ~

Figure 3.2 Active power load per bus

Figure 3.3 Reactive Power load per bus

Page 27: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 27 ~

Figure 3.4 Active power generation per bus

Figure 3.5 Reactive Power generation per bus

Page 28: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 28 ~

Figure 3.6 Active load-generation per bus

Figure 3.7 Reactive load Generation per bus

Page 29: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 29 ~

3.3. Expected results of the load flow calculation

In Figures 3.8 and 3.9, voltage magnitudes are shown, respectively without and with dispersed

generation. Buses 1, 2 and 3 are in branch I as you can see from Figure 3. Branch II is consists

of buses 4, 5 and 6, branch III is consists of bus 8, branch IV is consists of buses 9, 10 and 11

and branch V is consists of bus 7. With comparison of voltage profiles given on Figures 14 and

15 it can be concluded that the voltage drop in the case without DG is larger than in the case

with DG. In the case without DG can be noticed that the voltage curve is following the load

profile curve and in the period of the day with increased load, the voltage drop is increased too.

While in the case with DG can be noticed improvement in the voltage profile. In some periods of

the day when there is low load, voltage goes even beyond 1 . value but in the given tolerance

limits.

Page 30: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 30 ~

Figure 3.8 Voltage profile without DG

Figure 3.9 Voltage Profile with DG

Page 31: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 31 ~

Chapter 4

“Results”

4.1 Voltage profiles without DG

Page 32: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 32 ~

Page 33: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 33 ~

4.2 Active & Reactive power profile without DG

Page 34: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 34 ~

Page 35: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 35 ~

4.3 Voltage profiles with DG

Fig. Voltage profiles at bus 1, 2, 3, 4, 5 and 6

Page 36: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 36 ~

Fig. Voltage profiles at bus 7, 8, 9, 10, & 11

Page 37: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 37 ~

4.4 Active & Reactive power profile with DG

Fig. active and reactive power profiles for bus 1, 2, 3, 4, 5 & 6

Page 38: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 38 ~

Fig. active and reactive power profiles for bus 7, 8, 9, 10 & 11

Page 39: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 39 ~

Chapter 5

“Conclusion”

In this semester work the distribution load flow algorithm presented in [2] and [4]

was implemented in MATLAB. The implemented code in MATLAB was used to

perform analyses of the impact of DG units on network voltage profile, on active

and reactive power flows in the lines and the impact of DG units on line losses in

the network. A representative example of distribution network in this work was

analyzed. Different types of representative distribution generation profiles and load

profiles were used in all the studies and comparisons are made between the cases

without and with presence of DG units in the network. The results from

comparisons were shown graphically and structured by bus from where part of the

overall impact of the presence of DG units in the network can be seen.

Page 40: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 40 ~

APPENDIX A

Following is the MATLAB code that implements the presented load flow calculation algorithm.

File: start.m

Network = build_network;

Profiles = build_profiles;

Voltages(Profiles.time_intervals, Network.num_buses)=0;

Angles(Profiles.time_intervals, Network.num_buses)=0;

Ploads(Profiles.time_intervals, Network.num_buses)=0;

Qloads(Profiles.time_intervals, Network.num_buses)=0;

Pgen(Profiles.time_intervals, Network.num_buses)=0;

Qgen(Profiles.time_intervals, Network.num_buses)=0;

Plosses(Profiles.time_intervals, Network.num_buses)=0;

Qlosses(Profiles.time_intervals, Network.num_buses)=0;

Pbus(Profiles.time_intervals, Network.num_buses)=0;

Qbus(Profiles.time_intervals, Network.num_buses)=0;

for i=1:Profiles.time_intervals

Results = compute_DLF(Network, Profiles, i);

for k=1:Network.num_buses

Voltages(i,k)=Results.buses(k).V;

Angles(i,k)=Results.buses(k).delta;

Ploads(i,k)=Results.buses(k).P_load;

Qloads(i,k)=Results.buses(k).Q_load;

Pgen(i,k)=Results.buses(k).P_gen;

Qgen(i,k)=Results.buses(k).Q_gen;

Plosses(i,k)=Results.P_loss(k);

Qlosses(i,k)=Results.Q_loss(k);

Pbus(i,k)=Results.P_per_bus(k);

Qbus(i,k)=Results.Q_per_bus(k);

end

Page 41: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 41 ~

end

plot_results(Voltages, Angles, Ploads, Qloads,Pgen,Qgen,Plosses,Qlosses,Pbus,Qbus);

File: build_network.m

function [Network] = build_network

file1 = 'incidence_matrix_11.dat';

file3 = 'resistance_11.dat';

file4 = 'reactance_11.dat';

A=load(file1);

C=load(file3);

D=load(file4);

clear file1 file3 file4

Network.S_B = 1000; % kVA

Network.V_B = 11; % kV

branches=struct('ID',0,'parent_bus_ID',0,'num_buses_in_branch',0,'array_bus_IDs',0','num_branc

hes_em',0,'array_head_busIDs_em_branches',[],'neigh_branches',[]);

branches = create_structure(branches, 1, 1, A, 0);

Network.branches = branches;

s=size(branches,2);

for i=1:s

branches(i)

end

clear branches;

Network.num_branches=size(Network.branches,2);

Network.num_buses=size(A,2);

resistance=C;

resistance=resistance+resistance'; %make it symmetric

resistance=resistance./400; % divide by impedance base

reactance=D;

reactance=1*(reactance+reactance'); %make it symmetric

reactance=reactance./400; % divide by impedance base

Network.resistance = resistance;

Network.reactance = reactance;

Network.z=zeros(Network.num_buses);

Page 42: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 42 ~

Network.teta=zeros(Network.num_buses);

for i=1:Network.num_buses

for j=1:Network.num_buses

Network.z(i,j)=sqrt(Network.resistance(i,j)^2+Network.reactance(i,j)^2);

if Network.resistance(i,j)~=0

Network.teta(i,j)=atan(Network.reactance(i,j)/Network.resistance(i,j));

end

end

end

clear resistance reactance A B C D

File: build_profiles.m

function [Profiles] = build_profiles

Pload=load('P_load_work.dat');

Profiles.P_load = Pload;

Profiles.Q_load = Profiles.P_load*tan(acos(0.95));

PVPQinfo=load('PV_PQ_info11.dat');

Profiles.PVPQinfo=PVPQinfo;

Voltages_init=load('Voltages_init11.dat');

Profiles.Voltages_init=Voltages_init;

Pgen=load('Pgen.dat');

Pn=0.7;

Profiles.P_gen = Pgen;

for i=1:size(Pgen,1)

for j=1:size(Pgen,2)

if((Profiles.P_gen(i,j)/Pn)==0)

Profiles.Q_gen(i,j)=0;

elseif ((Profiles.P_gen(i,j)/Pn)<=0.1)

Profiles.Q_gen(i,j)=Profiles.P_gen(i,j)*tan(acos(0.9));

elseif ((Profiles.P_gen(i,j)/Pn)>=0.9)

Profiles.Q_gen(i,j)=-Profiles.P_gen(i,j)*tan(acos(0.9));

elseif ((Profiles.P_gen(i,j)/Pn)>0.1) &&((Profiles.P_gen(i,j)/Pn)<=0.5)

Profiles.Q_gen(i,j)=Profiles.P_gen(i,j)*tan(acos(0.9+0.25*((Profiles.P_gen(i,j)/Pn)-0.1)));

Page 43: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 43 ~

else

Profiles.Q_gen(i,j)=-Profiles.P_gen(i,j)*tan(acos(1-0.25*((Profiles.P_gen(i,j)/Pn)-0.5)));

end

end

end

Profiles.time_intervals=size(Pload,1);

File: compute_DLF.m

function [Results] = compute_DLF(Network, Profiles, t)

fprintf('*******************************\n\t\tTime

Interval:d\n*******************************\n', t)

%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%specify number of iterations

num_itr=100;

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%%%%%

% Inititalize the result structure

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%

Results.buses=struct('ID',0,'P_load',0,'Q_load',0,'P_gen',0,'Q_gen',0,'V',1,'delta',0,'isPV',0);

for i=1:Network.num_buses

if ~isempty(Results.buses) && isstruct(Results.buses)

Results.buses(i)=struct('ID',i,'P_load',Profiles.P_load(t,i),'Q_load',Profiles.Q_load(t,i),'P_gen',Pr

ofiles.P_gen(t,i),'Q_gen',Profiles.Q_gen(t,i),'V',Profiles.Voltages_init(i),'delta',0,'isPV',Profiles.P

VPQinfo(i));

end

end

clear i

Results.dP(1:Network.num_buses)=0;

Results.dQ(1:Network.num_buses)=0;

%Initialize vectors containing data

Results.P_per_branch(1:Network.num_branches)=0;

Page 44: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 44 ~

Results.Q_per_branch(1:Network.num_branches)=0;

Results.P_loss(1:Network.num_buses)=0;

Results.Q_loss(1:Network.num_buses)=0;

Results.P_per_bus(1:Network.num_buses)=0;

Results.Q_per_bus(1:Network.num_buses)=0;

Results.P_gen(1:Network.num_buses)=0;

Results.Q_gen(1:Network.num_buses)=0;

Results.V(1:Network.num_buses)=0;

Results.delta(1:Network.num_buses)=0;

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%

% Start the iterations

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%

for itr = 1:num_itr

% fprintf('*******************************\n\t\tIterationnumber:

%d\n*******************************\n', itr)

%call the function that calculates the load for every bus.

The

%calculation starts for the first branch but inside the

%function

%calculate_load.m it is called recursivly for all thebranches

[Results.buses, Results.P_per_branch, Results.Q_per_branch,Results.P_loss, Results.Q_loss,

Results.P_per_bus,Results.Q_per_bus]=calculate_load(Network.branches(1),Results.buses,

Network, Results.P_per_bus, Results.Q_per_bus,Results.P_loss, Results.Q_loss,

Results.P_per_branch,Results.Q_per_branch);

P(1:Network.num_buses)=0; % P receiving (used forconvergence check)

Q(1:Network.num_buses)=0; % Q receiving (used forconvergence check)

%For all the buses calculate the differences.

for br=1:Network.num_branches

for n=1:Network.branches(br).num_buses_in_branch

m=Network.branches(br).array_bus_IDs(n);

Page 45: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 45 ~

if (n<Network.branches(br).num_buses_in_branch)

%calculation for all but last bus in a branch

% k-m-l busses

l=Network.branches(br).array_bus_IDs(n+1);

if((n==1)&&(br==1))

P(m)=0; Q(m)=0;

elseif ((n==1)&&(br>1))

k=Network.branches(br).parent_bus_ID;

P(m)=Results.buses(m).V*Results.buses(k).V*cos(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)+Results.buses(m).V*Results.buses(l)

.V*cos(Results.buses(m).delta-Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*(cos(Network.teta(m,k))/Network.z(m,k)+cos(Network.teta(m,l))/Networ

k.z(m,l));

Q(m)=Results.buses(m).V*Results.buses(k).V*sin(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)+Results.buses(m).V*Results.buses(l)

.V*sin(Results.buses(m).delta-Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*(sin(Network.teta(m,k))/Network.z(m,k)+sin(Network.teta(m,l))/Network

.z(m,l));

else

k=Network.branches(br).array_bus_IDs(n-1);

P(m)=Results.buses(m).V*Results.buses(k).V*cos(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)+Results.buses(m).V*Results.buses(l)

.V*cos(Results.buses(m).delta-Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*(cos(Network.teta(m,k))/Network.z(m,k)+cos(Network.teta(m,l))/Networ

k.z(m,l));

Q(m)=Results.buses(m).V*Results.buses(k).V*sin(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)+Results.buses(m).V*Results.buses(l)

.V*sin(Results.buses(m).delta-Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*(sin(Network.teta(m,k))/Network.z(m,k)+sin(Network.teta(m,l))/Network

.z(m,l));

end

else %calculation for last bus in a branch

for nl=1:Network.branches(br).num_branches_em;

%for all the neighbor busses from the emanating neighborbranches

Page 46: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 46 ~

l=Network.branches(br).array_head_busIDs_em_branches(nl);

P(m)=P(m)+Results.buses(m).V*Results.buses(l).V*cos(Results.buses(m).delta-

Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*cos(Network.teta(m,l))/Network.z(m,l);

Q(m)=Q(m)+Results.buses(m).V*Results.buses(l).V*sin(Results.buses(m).delta-

Results.buses(l).delta+Network.teta(m,l))/Network.z(m,l)-

Results.buses(m).V^2*sin(Network.teta(m,l))/Network.z(m,l);

end

if(n==1)

k=Network.branches(br).parent_bus_ID;

else

k=Network.branches(br).array_bus_IDs(n-1);

end

P(m)=P(m)+Results.buses(m).V*Results.buses(k).V*cos(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)-

Results.buses(m).V^2*cos(Network.teta(m,k))/Network.z(m,k);

Q(m)=Q(m)+Results.buses(m).V*Results.buses(k).V*sin(Results.buses(m).delta-

Results.buses(k).delta+Network.teta(m,k))/Network.z(m,k)-

Results.buses(m).V^2*sin(Network.teta(m,k))/Network.z(m,k);

end

end

end

%For all the buses calculate the differences.

for i=2:Network.num_buses

dP(i)=P(i) - Results.buses(i).P_load +Results.buses(i).P_gen;

dQ(i)=Q(i) - Results.buses(i).Q_load +Results.buses(i).Q_gen;

Results.P_gen(i)=Results.buses(i).P_gen;

Results.Q_gen(i)=Results.buses(i).Q_gen;

Results.P_load(i)=Results.buses(i).P_load;

Results.Q_load(i)=Results.buses(i).Q_load;

Results.V(i)=Results.buses(i).V;

Results.delta(i)=Results.buses(i).delta;

end

end

Page 47: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 47 ~

fprintf('Error for Active Power: \n')

dP

P

fprintf('Error for Reactive Power: \n')

dQ

Q

File: calculate_load.m

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%

%%This function is called recursivly: if the parent branch has children

%%branches that are no calculated, then calculate for them fist.

%%P_branch,Q_branch contain the calculated P and Q powers starting from the

%%last bus and going up to the top of the branch.

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%%%%%%%%%%%%%%

function [buses, P_branch, Q_branch, P_loss, Q_loss, P_bus,Q_bus] = calculate_load(branch,

buses, Network, P_bus, Q_bus,P_loss, Q_loss, P_branch, Q_branch )

k=branch.ID; % id of the branch that is being calculated

P_branch(k)=0;

Q_branch(k)=0;

%if the branch has children

if (branch.num_branches_em~=0)

for i=1:branch.num_branches_em % for each child

child_branch=branch.neigh_branches(i);

[buses, P_branch, Q_branch, P_loss, Q_loss, P_bus,Q_bus] = calculate_load(child_branch,

buses, Network, P_bus,Q_bus, P_loss, Q_loss, P_branch, Q_branch); %recusivly calculateabout

the child

P_branch(k)=P_branch(k)+P_branch(child_branch.ID); %

add the total absorbed P of the child branch

Q_branch(k)=Q_branch(k)+Q_branch(child_branch.ID); %

add the total absorbed Q of the child branch

end

Page 48: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 48 ~

end

% fprintf('********** Calculating for branch: %d **********\n', k)

% if (branch.num_buses_in_branch>1) % if the branch has more

than 1 buses

for n=branch.num_buses_in_branch:-1:1 % start from thelast bus until the second one

j=branch.array_bus_IDs(n);

%%The following part is needed in order to calculate the powers between

%%the fist bus of each branch and the parent bus ofit. Exception is

%%only the first branch of the network, where thecurrent power is summed up.

if n == 1,

if(branch.array_bus_IDs(branch.num_buses_in_branch)~=Network.branches(k).parent_bus_ID)

% now calculate for the fist bus of the branchand the parent bus

i=Network.branches(k).parent_bus_ID;

else

i = 0;

end

else

i=branch.array_bus_IDs(n-1);

end

if (i~=0)

if (buses(j).isPV) %if the bus is PV bus

Qmin=-buses(j).P_gen*tan(acos(0.9));

Qmax=buses(j).P_gen*tan(acos(0.9));

P_branch(k)= P_branch(k) + buses(j).P_load -buses(j).P_gen; % add the load of the bus to the

total absorbedP of the branch

Qs=Q_branch(k);

%

Q_branch(k)=calculate_Q(j,n,k,Network,buses);

%

Q_branch(k)=(P_branch(k)*Network.reactance(i,j)-

buses(j).V*buses(i).V*sin(buses(i).deltabuses(j).delta))/Network.resistance(i,j);

w=buses(j).V^2*Network.reactance(i,j)/(Network.reactance(i,j)^2+Network.resistance(i,j)^2);

q=(buses(j).V^4-

buses(j).V^2*buses(i).V^2+2*buses(j).V^2*P_branch(k)*Network.resistance(i,j)+P_branch(k)^2

Page 49: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 49 ~

*Network.resistance(i,j)^2+P_branch(k)^2*Network.reactance(i,j)^2)/(Network.reactance(i,j)^2

+Network.resistance(i,j)^2);Q_branch(k)=-w+sqrt(w^2-q);

buses(j).Q_gen=Qs-Q_branch(k)+buses(j).Q_load;

% fprintf('Calculation for bus : %d \n',j)

% fprintf('Calculation for Qs: %6.5f\n',Qs)

% fprintf('Calculation for Qj: %6.5f\n',Q_branch(k))

% fprintf('Calculation for Qload: %6.5f\n',buses(j).Q_load)

% fprintf('Calculation for Q gen=Qs-Qj+Q_load: %6.5f \n',buses(j).Q_gen)

violation=0;

if (buses(j).Q_gen>Qmax)

buses(j).Q_gen=Qmax;

Q_branch(k)=Qs+buses(j).Q_loadbuses(j).Q_gen;

violation=1;

elseif (buses(j).Q_gen<Qmin)

buses(j).Q_gen=Qmin;

Q_branch(k)=Qs+buses(j).Q_loadbuses(j).Q_gen;

violation=1;

end

if (violation)

% recalculate the voltage of the bus incase of Qgen violation

a=(Network.resistance(i,j)*P_branch(k)+Network.reactance(i,j)*Q_branch(k)-buses(i).V^2/2)^2;

b=(Network.resistance(i,j)^2+Network.reactance(i,j)^2)*(P_branch(k)^2+Q_branch(k)^2);

c=(Network.resistance(i,j)*P_branch(k)+Network.reactance(i,j)*Q_branch(k)-buses(i).V^2/2);

buses(j).V=sqrt(sqrt(a-b)-c);

end

else % if the bus is PQ bus

P_branch(k)= P_branch(k) + buses(j).P_load -buses(j).P_gen; % add the load of the bus to the

total absorbedP of the branch

Q_branch(k)= Q_branch(k) + buses(j).Q_load -buses(j).Q_gen; % add the load of the bus to the

total absorbed Q of the branch% calculate the voltage of the bus

a=(Network.resistance(i,j)*P_branch(k)+Network.reactance(i,j)*Q_branch(k)-buses(i).V^2/2)^2;

b=(Network.resistance(i,j)^2+Network.reactance(i,j)^2)*(P_branch(k)^2+Q_branch(k)^2);

c=(Network.resistance(i,j)*P_branch(k)+Network.reactance(i,j)*Q_branch(k)-buses(i).V^2/2);

buses(j).V=sqrt(sqrt(a-b)-c);

Page 50: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 50 ~

end

P_bus(j)=P_branch(k);

Q_bus(j)=Q_branch(k);

buses(j).delta=buses(i).deltaasin((P_branch(k)*Network.reactance(i,j)-

Q_branch(k)*Network.resistance(i,j))/(buses(i).V*buses(j).V));

P_loss(j)=Network.resistance(i,j)*(P_branch(k)^2+Q_branch(k)^2)/buses(j).V^2;

Q_loss(j)=Network.reactance(i,j)*(P_branch(k)^2+Q_branch(k)^2)/buses(j).V^2;

P_branch(k)=P_branch(k)+P_loss(j);

Q_branch(k)=Q_branch(k)+Q_loss(j);

else

P_bus(j)=P_branch(k)+buses(j).P_loadbuses(j).P_gen;

Q_bus(j)=Q_branch(k)+buses(j).Q_loadbuses(j).Q_gen;

end

end

File: plot_results.m

function plot_results(Voltages, Angles, Ploads,Qloads,Pgen,Qgen,Plosses,Qlosses,Pbus,Qbus)

figure(1)

for i=1:size(Voltages,2)

subplot(3,4,i);

plot(Voltages(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Voltage')

axis([0 100 0.9 1])

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(2)

for i=1:size(Angles,2)

subplot(3,4,i);

Page 51: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 51 ~

plot(Angles(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Angles')

axis([0 100 -0.014 0.014])

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(3)

for i=1:size(Ploads,2)

subplot(3,4,i);

plot(Ploads(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('P loads')

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(4)

for i=1:size(Qloads,2)

subplot(3,4,i);

plot(Qloads(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Q loads')

axis([0 100 0 0.4])

ttl=['Bus ' int2str(i)];

title(ttl);

Page 52: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 52 ~

end

figure(5)

for i=1:size(Pgen,2)

subplot(3,4,i);

plot(Pgen(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('P generation')

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(6)

for i=1:size(Qgen,2)

subplot(3,4,i);

plot(Qgen(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Q generation')

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(7)

for i=2:size(Plosses,2)

subplot(3,4,i-1);

plot(Plosses(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('P losses')

Page 53: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 53 ~

axis([0 100 0 0.25])

ttl=['Line between buses ' int2str(i)];

title(ttl);

end

figure(8)

for i=2:size(Qlosses,2)

subplot(3,4,i-1);

plot(Qlosses(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Q losses')

axis([0 100 0 0.25])

ttl=['Line between buses ' int2str(i)];

title(ttl);

end

figure(9)

for i=1:size(Pbus,2)

subplot(3,4,i);

plot(Pbus(:,i),'--bs','LineWidth',2,...

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('P per line')

axis([0 100 0 10])

ttl=['Bus ' int2str(i)];

title(ttl);

end

figure(10)

for i=1:size(Qbus,2)

subplot(3,4,i);

plot(Qbus(:,i),'--bs','LineWidth',2,...

Page 54: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 54 ~

'MarkerEdgeColor','k',...

'MarkerFaceColor','b',...

'MarkerSize',3);

xlabel('Intervals')

ylabel('Q per line')

axis([0 100 0 10])

ttl=['Bus ' int2str(i)];

title(ttl);

end

Page 55: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 55 ~

APPENDIX B

E-TAP SIMULATION OF ANALYSED NETWORK WITH FAST

DECOUPLED METHOD TO COMPARE THE RESULTS

Simulation without DG

Page 56: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 56 ~

Output of Simulation without DG

Page 57: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 57 ~

Simulation with DG

Page 58: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 58 ~

Output of Simulation with DG

Page 59: Distribution network study with and without DG --Final year Project report--PEC chd.--SACHIN KUMAR SINGLA

~ 59 ~

References

[1] N.I. Voropai: Distributed Generation in Electric Power Systems The DIGESEC CRIS

Workshop, Magdeburg, Germany, Dec. 6-8, 2006

[2] A. Rost, B. Venkatesh and C. P. Diduch: Distribution System with Distributed

Generation Load Flow Department of Electrical and Computer Engineering New

Brunswick, NB, Canada

[3] B. Venkatesh and R. Ranjan: Data Structure for Radial Distribution System Load

Flow Analysis IEE Proc.-Gener. Transm. Distrib. Vol 150 No.1 January 2003

[4] K. Rudion, A. Orths, Z. A. Styczynski, K. Strunz: Design of Benchmark of Medium

Voltage Distribution Network for Investigatioof DG Integration

[5] G. Renato Cespedes: New Method for the Analysis of Distribution Network IEEE

Transactions on Power Delivery, Vol. 5, No. 1, January 1990

[6] S. Ghosh and D. Das: Method for Load-Flow Solution of Radial Distribution

Networks IEE Proc.- Gener. Transm. Distrib., Vol. 146, No. 6, November 1999

[7] G. B. Jasmon and L. H. C. C. Lee: Stability of Load-flow Techniques for Distribution

System Voltage Stability Analysis IEE Proceedings-C, Vol. 138, No. 6, November 1991

[8]„BDEW“:Technische Richtlinie “Erzeugungsanlagen am Mittelspannungsnetz”

BDEW, June 2008

[9] „EnBW Energie Baden-Württemberg Regional AG“: http://www.enbw.com

[10] „E.on Netz (Germany)“: http://www.eon-energie.com