Page 1: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

1

Page 2: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Disposal of Site 3

Included in the 2020-21 Land Sale Programme

In lieu of the conventional cash-only tender, a two-envelope tendering process will be adopted

tenderers’ proposals will be evaluated on the basis of design merits and premium offers, allowing the Government to select the proposal achieving the best combination of both.

2

Page 3: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

VISION FOR SITE 3

3

Page 4: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Vision of Site 3

Hong Kong’s new landmarkBenchmark for sustainable designIntegration with surroundings

4

Page 5: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Previous Discussion on the Planning and Design Considerations of Site 3

5

Since 2005

• Active involvement of the HarbourfrontCommission (HC) and its predecessor, Harbourfront Enhancement Committee (HEC)

2007-2011

• Urban Design Study for the New Central Harbourfront (UDS) • Two stages of Extensive Public Engagement

2016

• Planning Brief (PB)• Endorsed by the Town Planning Board and shall

be followed by the future developer

Page 6: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Planning Brief Guiding SITE 3 Development

6

Page 7: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Key Development Parameters

7

Not more than 150 000 m2 of commercial gross floor area

Not less than 25 000 m2 of Public Open Space (i.e. about half of the site area), including at least 12 000 m2 being at-grade

Public car parking spaces, transport facilities, district-tied postal facilities, public toilets and the reconstructed Star Ferry Clock Tower

Stringent height limits (50mPD on the western portion of the site and 16mPDthe eastern portion)

COG

H

Page 8: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

8

Location Plan of Site 3

Page 9: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Good Urban Design - Examples

9

Diversity in building form, stepped height profile & adequate building separation

Integrated site planning & innovative

architectural design

Provision of voids/skylights &

atrium design

High permeability podium design

Environmental friendly building design

Page 10: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Pedestrian-oriented environment

10

Multi-level network (elevated, at-grade, underground)

24-hour, barrier-free, weather-protected, from hinterland to harbourfront

Landscaped deck as focal points with identity

Page 11: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Public Open Space (POS)

11

Open 24 hours a day & free of charge

Adequate greenery, thematic planting, quality paving & street furniture, outdoor seating & shades

Diverse uses including entrance plaza, alfresco dining, kiosks and open air cafes to ensure harmony of waterfront

Integrate with surrounding POS & harbourfront

Page 12: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Landscaping and Greening Opportunities

12

Minimum site coverage

requirements

High quality greening & maximization of

greening opportunity

Integration with surroundings

Page 13: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

13

Notional Architectural Scheme (2016) – Indicative only

Page 14: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

PROPOSED TWO ENVELOPE APPROACH

14

Page 15: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Proposed Two Envelope Approach

Drawn up with due regard to the Stores and Procurement Regulations (SPRs)

Subject to relevant approval by Government’s Central Tender Board (CTB)

15

Page 16: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Tender process involving design & price elements

Submission of a design proposal & a price proposal concurrently but in separate envelopes

A relatively longer tender period for preparation of design proposals

50:50 design-to-price weighting Bid with the highest combined score will be

awarded the tender16

Page 17: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Tender Assessment A Tender Assessment Panel (TAP) comprising government

officers to be set up to assess tenders received to safeguard the integrity of the procurement exercise as required by the SPRs

Technical Advisers (TAs) from development-related professional fields to be appointed and advise the TAP on the relative design merits

TAPs to take part in the marking but not TAs Tender to be awarded after consideration and decision of

the CTB

17

Page 18: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Design Proposal Planning Brief (PB) to be adopted for guiding the design proposal

Need to comply with the mandatory features in the Planning Brief

Scoring criteria in the Marking Scheme can be broadly categorised into three groupswith particular emphasis on facilities with strong public dimension –

rewarding good design treatment of mandatory featuresin the PB;

incentivising desirable design features in the PB; andencouraging meritorious features beyond those in the PB

but relevant to modern mixed use development.

18

Page 19: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Rewarding good design treatment of mandatory features in the PB

Design treatment of stepping down building height

Design of Public Open Space

Design of Landscaped Deck19

Page 20: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Incentivising desirable design featuresin the PB

Respect the harbourfront setting in terms of building form, massing & separation

Visual connection with surroundings

High quality, contemporary & innovative architecture that will enhance the visual quality of the harbourfront & underscore the significance of the site

Pedestrian connections & landscaping provisions over & above those required under the Planning Brief 20

Page 21: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Encouraging meritorious features beyond those in the PB

Sustainable design

Roof design

Curation & management of Public Open Space

21

Page 22: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Price Proposal

Price envelope to be opened following completion of assessment of design proposals

Reserve price to be set with price offers not lower than the reserve price to be accepted

22

Page 23: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

IMPLEMENTATION

23

Page 24: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

Implementation

Master Layout Plan Submission to the Town PlanningBoard: Based on the winning proposal

TAP would ensure that the eventual designincorporated with changes, if any, required by TPBis no less favourable than the winning proposal

Harbour Office (HO) to collaborate with relevantdepartments to ensure proper implementation (e.g.implementation, management and maintenanceof the POS to the satisfaction of HO)

24

Page 25: Disposal of Site 3€¦ · 24-hour, barrier-free, weather-protected, from hinterland to harbourfront. Landscaped deck as focal points with identity. Public Open Space (POS) 11 Open

25