discover the new green era - ternienergia industrial plan 2014-2016

29
INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE OCTOBER 1, 2013 – LONDON, UK DISCOVER THE NEW GREEN ERA TERNIENERGIA INVESTOR BOOKLET

Upload: ternienergia-spa

Post on 20-Aug-2015

20.240 views

Category:

Investor Relations


1 download

TRANSCRIPT

Page 1: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

DISCOVER THE NEW GREEN ERA TERNIENERGIA

INVESTOR BOOKLET

Page 2: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

DISCLAIMER

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

2

This presentation contains statements that constitute forward-looking statements based TerniEnergia SpA’s current expectations and projections about future events and does not constitute an offer or solicitation for the sale, purchase or acquisition of securities of any of the companies mentioned and is directed to professionals of the financial community. These statements appear in a number of places in this presentation and include statements regarding the intent, belief or current expectations of the customer base, estimates regarding future growth in the different business lines and the global business, market share, financial results and other aspects of the activities and situation relating to the Company. Such forward looking statements are not guarantees of future performance and involve risks and uncertainties, and actual results may differ materially from those expressed in or implied by these forward looking statements as a result of various factors, many of which are beyond the ability of TerniEnergia SpA to control or estimate precisely. Consequently it is recommended that they be viewed as indicative only. Analysts are cautioned not to place undue reliance on those forward looking statements, which speak only as of the date of this presentation. TerniEnergia SpA undertakes no obligation to release publicly the results of any revisions to these forward looking statements which may be made to reflect events and circumstances after the date of this presentation, including, without limitation, changes in TerniEnergia SpA business or acquisition strategy or to reflect the occurrence of unanticipated events. Statement The Manager mandated to draft corporate accounting documents of TerniEnergia SpA, Paolo Allegretti, attests – as per art.154-bis. comma 2 of the Testo Unico della Finanza (D.Lgs. 58/1998) – that all the accounting information contained in this presentation correspond to the documented results, books and accounting of the Company.

Page 3: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA

AGENDA

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

3

STEFANO NERI CHAIRMAN & CEO

PAOLO RICCI MANAGING DIRECTOR

FABRIZIO VENTURI MANAGING DIRECTOR

PAOLO ALLEGRETTI CFO

DISCOVER THE NEW GREEN ERA – STRATEGIC OVERVIEW

A NEW WORLD MARKET ASSESSMENT

INDUSTRIAL ROADMAP

DISCOVER THE NEW GREEN ERA - FINANCIALS

Page 4: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

DISCOVER THE NEW GREEN ERA TERNIENERGIA

STEFANO NERI CHAIRMAN & CEO

Page 5: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

•33.3 MW in full ownership •11.1 MW in JV 50:50 •1.5 MW biomass

•272 PV Plants installed •272.2 MW installed •20,000 area lights managed

•2 Biomass plants installed •1 Discarded Tyres recovery plant installed •2 water remediation plant installed

A SMALL GLOBAL COMPANY FULLY INTEGRATED IN THE GREEN INDUSTRY

HANDLED THE SLOWDOWN SCENARIO THROUGH BUSINESS INTERNATIONALIZATION

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

5

INDEPENDENT POWER PRODUCER

INTEGRATED ENERGY SOLUTIONS

ENVIRONMENTAL RESOURCES SOLUTIONS

AVERAGE PLANT CAPACITY PER YEAR (MW) INSTALLED MW

0.076 0.259

0.907 1.016

1.758 1.85

7.67

2007 2008 2009 2010 2011 2012 1H 2013

199.46

33.30

11.10 1.55

EPC

JV

FO

BIOMASS

Page 6: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

6

NET PROFIT ~ 7 Mio €

INDUSTRIAL ENFORCEMENT

WITH FINANCIAL BALANCE

FOREIGN SUBSIDIARIES

A SMALL GLOBAL COMPANY FULLY INTEGRATED IN THE GREEN INDUSTRY

HANDLED THE SLOWDOWN SCENARIO THROUGH BUSINESS INTERNATIONALIZATION

2013 FORECAST

~

Page 7: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

A CLEAR SET OF INDUSTRIAL AND FINANCIAL PRIORITIES

DISCOVER THE NEW GREEN ERA

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

7

INCREASE INTERNATIONAL ACTIVITY

AN INNOVATIVE MODEL FOR ACCESSING CAPITAL

STRONG SELECTION OF VALUE-DRIVEN CAPITAL ALLOCATION

HIGHER CASH FLOW PRODUCTION

OUTPUT OF STABLE PROFITABILITY IN THE LONG TERM

FOCUS ON UTILITY SCALE PLANTS

CUSTOMERS AND PARTNERS WITH ACKNOWLEDGMENT OF CREDIT RATING

Page 8: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

WHERE WE SEE OPPORTUNITIES

• EMERGING COUNTRY MARKETS WHERE PV ENERGY DEMAND INCREASING

• MARKETS CHARACTERIZED BY DEMAND FOR REPLACEMENT CAPACITY AND ENERGY EFFICIENCY

• DEVELOPMENT OF PLANTS IN COUNTRIES WHERE GRID PARITY MOST LIKELY TO HAPPEN OR THROUGH PRIVATE OR PUBLIC PPA (POWER PURCHASE AGREEMENTS)

KEY SUCCESS FACTORS

• TRACK RECORD AS EPC PROVIDER ON OVER 20 MW OF UTILITY SCALE PROJECTS

• OUR TEAM HAS THE ABILITY TO UNDERSTAND COUNTRY OPPORTUNITIES AND TO CONDUCT RISK ASSESSMENT

• TARGET OPTIMIZED ON LATE STAGE PROJECT BACKLOG

• REVENUES BY SELECTED INVESTMENTS WITH HIGH POWER CAPACITY

CUSTOMERS AND INVESTORS

• DRIVE THE INCREASING DEMAND FROM INSTITUTIONAL INVESTORS TO A NEW ASSETS CLASS REPRESENTED BY RENEWABLE ENERGY PLANTS

• FOCUS ON PARTNERSHIP WITH DEVELOPERS AND END BUYERS (INVESTOR FUND AND MAJOR UTILITIES) OF GRID CONNECTED PLANTS

TERNIENERGIA IS READY TO START A NEW GROWTH STAGE

KEY INDUSTRY TRENDS ACTION PLAN BREAKDOWN

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

8

Page 9: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

IMPROVE ACCESS TO CAPITAL

TERNIENERGIA IS READY TO START A NEW GROWTH STAGE

KEY FINANCIAL SOLUTIONS

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

9

NFP UNDER CONTROL

CREATE VALUE BY A NEW MODEL OF ASSET MANAGEMENT

INVESTMENT FUND ALLOWING ADDITIONAL OPPORTUNITIES

THE INDUSTRIAL PLAN SELF-FINANCING THE CASH NEEDS

Page 10: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

Contratto di locazione

TERNIENERGIA Property and Facility Manager

System Integrator

INVESTORS

10

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

10

TERNIENERGIA IS READY TO START A NEW GROWTH STAGE

STRATEGIC ASSET CLASS IN GROWING MARKETS

Rent rates

Lease plant

Sh

are

s A

dv

isory

TERNIENERGIA EPC - BOT

Investment

Industrial power plants

Page 11: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

64 74

87

68 60

52

1.06

0.81

0.60

-2,00

-1,50

-1,00

-0,50

0,00

0,50

1,00

0

20

40

60

80

100

120

140

160

2014 E 2015 E 2016 E

NFP/EQUITY (Mio €)

EQUITY NFP NFP/EQUITY

136

201

248

14.50% 14.50% 14.50%

-4,00%

1,00%

6,00%

11,00%

16,00%

21,00%

-

50

100

150

200

250

300

2014 E 2015 E 2016 E

REVENUES (Mio €) – EBITDA MARGIN (%)

REVENUES EBITDA MARGIN

8

15

20

0

5

10

15

20

25

2014 E 2015 E 2016 E

NET PROFIT (Mio €)

NET PROFIT

A SOLID PERSPECTIVE OF CAPITAL EFFICIENCY

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

11

TOTAL REVENUES: 585 Mio € TOTAL NET PROFIT: 43 Mio €

DIVIDENDS: ~ 50 % OF THE

CONSOLIDATED PROFIT

It is recommended that these forward looking statements are to be viewed as indicative only.

Page 12: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

DISCOVER THE NEW GREEN ERA TERNIENERGIA

PAOLO RICCI MANAGING DIRECTOR

Page 13: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

• STRONG PV TECHNOLOGY PRICE DECREASE • ELECTRICITY PRICE INCREASE • NUMBER ONE ELECTRICITY SOURCE IN EU IN TERMS OF NEWLY INSTALLED CAPACITY (2.6% ELECTRICITY DEMAND – 5.2% PEAK ELECTRICITY DEMAND)

WORLD WIDE PV INDUSTRY

STATE OF THE ART

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

13

PV TECHNOLOGY

MATURE MAINSTREAM SOURCE OF ENERGY

102 GW CUMULATED CAPACITY AS AT 2012

INSTALLED

2012 SUMMARY

• 31.1 GW INSTALLED (30.4 IN 2011) • 17.2 GW GRID CONNECTED IN EUROPE (22.4 IN 2011) • GERMANY IS THE MARKET LEADER WITH 7,6 GW FOLLOWED BY CHINA (5 GW), ITALY (3.4), USA AND JAPAN

Page 14: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

PV INDUSTRY EVOLUTION

A NEW WORLD MARKET ASSESSMENT*

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

14

SINCE 2012 THE EUROPEAN LEADING ROLE IN THE PV POLICY DRIVEN MARKET IS COMING TO AN END

NEW PV EUROPEAN INSTALLATIONS DECREASED (FROM 74% TO 55%)

2013 INSTALLATION GROWTH OF PV WILL BE MOSTLY REALIZED OUTSIDE EUROPE

* ANNEXES: DETAILED DATA

PV MARKET IS BECOMING TRULY GLOBAL

Page 15: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

FOCUS ON PV MARKET EUROPE VS WORLD

FORECAST UNTIL 2020

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

15

DRASTIC DECREASE OF FEED IN TARIFF PROGRAMMES

UNCERTAIN FUTURE FOR THE EUROPEAN PV MARKET

BASELINE SCENARIO* ESTIMATES THAT 4% IN 2020 AND UP TO 10% IN

2030 OF THE ELECTRICITY DEMAND WILL BE PROVIDED BY PV

YEAR 2012 SLOWED FIRST PV MARKET DECLINE IN EUROPE SINCE

2000

* Source: EPIA

GROWTH POTENTIAL OUTSIDE EUROPE

OPPORTUNITIES IN PPA, FIT AND REPLACEMENT OF FOSSIL SOURCE

FAST GROWING MARKETS: CHINA, INDIA, SOUTHEST ASIA, LATIN

AMERICA and MENA

POTENTIALITY: 60 TO 250 GW IN 2020

260 TO 1.100 GW IN 2030

Page 16: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

FUTURE PROSPECTS FOR MARKET DEVELOPMENT

TWO SETS OF DRIVERS

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

16 * Source: EPIA

INVESTORS’ MOOD CAN RAPIDLY CHANGE VERY VARIABLE DEVELOPMENT PANORAMA

ATTRACTIVENESS OF THE COUNTRY FOR INVESTORS

ATTRACTIVENESS OF PV

FOR THE COUNTRY

Page 17: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

BIOENERGY AND CIRCULAR INDUSTRY EVOLUTION

GROWTH OF ENERGY FROM MARGINAL RESOURCES

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

17 Source: SHELL

* Excluding traditional biomass

2020 6 GW

2020 16.000

2020 50 Mtoe

BIOGAS ENERGY INSTALLED IN EU

BIOGAS ENERGY PLANTS IN EU

TOE SAVED BY BIOMASS WASTE IN EU

THE INDUSTRIAL SECTOR IS THE LARGEST BIOENERGY CONSUMER IN 2010 AT 196 MTOE, INCREASING TO OVER 300 MTOE IN 2035

GROWING AT AN AVERAGE RATE

OF 3.3% PER YEAR

DEMAND FOR BIOENERGY* WILL BE MORE THAN DOUBLED

FROM 526 MTOE IN 2010 TO NEARLY 1,200 MTOE BY 2035

Page 18: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

DISCOVER THE NEW GREEN ERA TERNIENERGIA

FABRIZIO VENTURI MANAGING DIRECTOR

Page 19: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA BUSINESS DIFFERENTIATION

EXECUTING THE NEW GREEN ERA 2016

WHY WE ARE READY

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

19

INDEPENDENT POWER PRODUCER

INTEGRATED ENERGY SOLUTIONS

ENVIRONMENTAL RESOURCES SOLUTIONS

LEADING EXPERIENCE IN RENEWABLE SECTOR

TARGETING GROWTH DEMAND SUPPORTED BY FINANCIAL DRIVER

BUSINESS AND TECHNOLOGY DIVERSIFICATION

Renewable energy production by direct investments or with primary co-investors.

Development and construction (EPC or BOT) of utility scale plants for premium customers. Energy efficiency activity with third part financing formula. O&M activity.

Direct investments for sustainable solutions to recover energy and material from marginal resources.

Page 20: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA COUNTRY DIFFERENTIATION

EXECUTING THE NEW GREEN ERA 2016

WHY WE ARE GOING GLOBAL

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

20

COUNTRY RISK DIVERSIFICATION

FLEXIBLE FOCUS ON MARKETS WHERE WE BELIEVE IT’S MORE PROFITABLE TO DEVELOP NEW PLANTS

BUSINESS CORE IN EMERGING COUNTRIES WITH STRONG GROWTH IN ENERGY AND ENVIRONMENTAL DEMAND

LONDON POLAND

ROMANIA

GREECE

ITALY

RSA

Page 21: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA INDUSTRIAL ROADMAP

EXECUTING THE NEW GREEN ERA 2016

OUR ANSWERS TO OPTIMIZE THE VALUE CHAIN

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

21

STRENGHTHEN THE CORE ACTIVITY IN UTILITY SCALE PLANTS DEVELOPMENT

PORTFOLIO OPTIMIZATION TROUGH PROJECTS BACKLOG REPRESENTED BY RA FUND INVESTMENTS

PROJECT DEVELOPMENT

EPC & BOT POWER GENERATION

SELECT AND PERMIT INTERNATIONAL UTILITY SCALE PROJECTS DEVELOP PORTOFOLIO OF NEW PLANTS MIX TOWARDS FULLY PERMITED PROJECTS ADVISE NEW INVESTMENT TO FUND ADVISOR (POWER CAPITAL) AND MANAGENT COMPANY (PRELIOS SGR)

PROVIDE ENGINEERING AND DETAIL DESIGN PROCUREMENT OF PROJECT MATERIALS SECURE THE SUPPLY CHAIN BY PROVIDING MAJOR COMPONENTS THROUGH GLOBAL PURCHASING CONSTRUCTION OF PLANTS AND CONNECTION TO THE GRID AND/OR SELL

MANAGE FULL OWNED OR IN JV OWNED CONNECTED PLANTS IN THE SOLAR OR BIOMASS SECTOR (19 MW TOT) RECEIVE FEED IN TARIFF OR INCENTIVES FOR RENEWABLE POWER PRODUCTION SALE THE SOLAR POWER TO LOCAL OR NATIONAL GRID AUTHORITY OR TO PREMIUM CUSTOMERS

FINANCING NEW PROJECTS & ASSET CONTRIBUTION

OPERATION & MANTEINANCE

ACHIEVE THE HIGHEST LEVEL OF PERFORMANCE AND RELIABILITY FROM THE SOLAR ASSETS PROVIDE A COMPREHENSIVE SCHEME FOR TECHNICAL OPERATIONAL MANAGEMENT AUDIT ENERGY PRODUCTION, MONITOR REAL-TIME DATA, SUPPLY IN-DEPTH PERFORMANCE REPORTS

CLOSE RELATIONSHIPS WITH INVESTMENT FUND (RA- RENEWABLE ASSETS) AND MAJOR FINANCIAL INSTITUTIONS CONTRIBUTE OPERATING AND CONNECTED PLANTS TO INVESTMENT FUND (19,4 MW TOT) OBTAINING IN COUNTERPART A SHARE OF FUND

Page 22: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA INDUSTRIAL ROADMAP

EXECUTING THE NEW GREEN ERA 2016

FOCUS CORE ACTIVITIES IN GREEN INDUSTRY

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

22

EXCELLENCE

EASE OF PROCUREMENT

INSTALLATION RAPIDITY

MARKET COMPETITIVE

BANKABILITY

HIGH RETURNS IN RELATION TO RISK (IRR DOUBLE DIGIT)

HIGH QUALITY DESIGN

CONSOLIDATED PV INDUSTRY SUPPLY CHAIN

FAST EXECUTION OF PROJECTS WORLD WIDE

ABILITY TO GENERATE SCALE ECONOMIES

RELATIONSHIP AND TRACK RECORD WITH MAJOR BANKS

STRONG ENGINEERING AND INNOVATION SCOUTING

Page 23: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

DISCOVER THE NEW GREEN ERA TERNIENERGIA

PAOLO ALLEGRETTI CFO

Page 24: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

2014 E 2015 E 2016 E

IES FPM*+ERS+EE**+IPP CAGR

TERNIENERGIA FINANCIAL ROADMAP

FOCUS ON REVENUES (Mio €)

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

24

35%

* FUND PLANTS MANAGEMENT ** ENERGY EFFICIENCY

136

201

248

75.0%

71.0% 65.3%

25.0%

29.0%

34.7%

It is recommended that these forward looking statements are to be viewed as indicative only.

Page 25: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

14

23

30

3.76

6.74

11.23

2014 E 2015 E 2016 E

EBIT EBIT/NIC (NET INTEREST COST)

TERNIENERGIA FINANCIAL ROADMAP

FOCUS ON EBIT (Mio €)

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

25

It is recommended that these forward looking statements are to be viewed as indicative only.

Page 26: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA FINANCIAL ROADMAP

FOCUS ON NET WORKING CAPITAL (Mio €)

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

26

30.4 34.5

38.6

46.0

63.9 74.9

(30.0) (46.2)

(61.5)

(3.4)

(9.7)

(10.1)

31.60%

21.20%

16.80%

2014 E 2015 E 2016 E

(100,0)

(50,0)

-

50,0

100,0

150,0

Inventories Trade Receibles Trade payables Other Assets / Liabilities NWC/Sales (%)

43

42.5 41.9

It is recommended that these forward looking statements are to be viewed as indicative only.

Page 27: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

68 60

52

1.06

0.81 0.60

-

0,20

0,40

0,60

0,80

1,00

1,20

-

10

20

30

40

50

60

70

80

2014 E 2015 E 2016 E

Net Financial Position NFP/EQUITY

TERNIENERGIA FINANCIAL ROADMAP

FOCUS ON CAPEX & NFP (Mio €)

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

27

TOTAL INVESTMENTS IN THE PLAN PERIOD

16.5 Mio €

ESCO ACTIVITIES TPF

It is recommended that these forward looking statements are to be viewed as indicative only.

NET CASH FLOW (Mio €) 9 8 8

Page 28: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

TERNIENERGIA FINANCIAL ROADMAP

FOCUS ON INDICATORS

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

28

2014 E 2015 E 2016 E

NFP/EBITDA 3,44 2,07 1,45

NFP/EQUITY 1,06 0,81 0,60

EBIT/NET INTEREST COST 3,76 6,74 11,23

ROE 15,3% 24,7% 30,6%

ROI 10,9% 17,2% 21,5%

It is recommended that these forward looking statements are to be viewed as indicative only.

Page 29: Discover the new green era - TerniEnergia Industrial Plan 2014-2016

INDUSTRIAL PLAN 2013-2016 TARGETS UPDATE

OCTOBER 1, 2013 – LONDON, UK

29

TERNIENERGIA

FOR FURTHER INFORMATIONS

PAOLO ALLEGRETTI CFO HEAD OF INVESTOR RELATIONS [email protected] +39 0744.7581

FEDERICO ZACAGLIONI HEAD OF CORPORATE COMMUNICATION PRESS OFFICE [email protected]

FILIPPO CALISTI BUDGETING AND CONTROL MANAGER [email protected]

MICHELE LIZZIO FINANCIAL CONTROLLER [email protected]

FLORIANA VITALE [email protected] +39 02.45473883

TERNIENERGIA

IR TOP

CONTENTS BY FEDERICO ZACAGLIONI

DESIGNED BY

CRISTIANO MANZONI

THANKS TO http://icons8.com/

CREDITS