DRAWING NO. C001 C100 PLANT OUTFALL PLAN & PROFILE GENERAL NOTES C101 PLANT OUTFALL SECTIONS & DETAILS DESCRIPTION ADELAIDE PCP OUTFALL STRUCTURE C003 ENVIRONMENTAL PROTECTION C002 GENERAL NOTES

Upload: others

Post on 02-Nov-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

DRAWING NO.

C001

C100PLANT OUTFALL PLAN & PROFILE

GENERAL NOTES

C101PLANT OUTFALL SECTIONS & DETAILS

DESCRIPTION

ADELAIDE PCP OUTFALL

STRUCTURE

C003ENVIRONMENTAL PROTECTION

C002GENERAL NOTES

Page 2: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

GENERAL NOTES AND CONDITIONS

1. ALL WORK SHALL, MEET THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE CITY OF LONDON ENVIRONMENTAL AND

ENGINEERING DEPARTMENT, THE STANDARD CONTRACT DOCUMENTS FOR MUNICIPAL & PROVINCIAL CONSTRUCTION

PROJECTS, AS ADOPTED BY COUNCIL ON MAY 30, 1994 AND AS AMENDED FROM TIME TO TIME ARE TO BE APPLIED TO THIS

PROJECT, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.

2. PRIOR TO COMMENCING CONSTRUCTION, ALL EXISTING UNDERGROUND UTILITIES AND EXISTING SERVICES SHALL BE

LOCATED AND MARKED. ANY UTILITIES OR SERVICES DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO THE SATISFACTION OF THE GOVERNING UTILITY AT THE CONTRACTOR'S EXPENSE. ANY

POLE SUPPORT OR RELOCATION SHALL BE CARRIED OUT BY THE APPROPRIATE AUTHORITY AND NOT THE CONTRACTOR,

BUT ANY COSTS ARE AT THE EXPENSE OF THE CONTRACTOR.

3. A GEOTECHNICAL INVESTIGATION WAS UNDERTAKEN BY GOLDER ASSOCIATES, DATED SEPTEMBER 2013, REPORT No.

12-1132-0098-R01.

4. ALL EXCESS MATERIAL IS TO BE HAULED OFFSITE AND MANAGED AS PER OPSS-180.

5. THE CONTRACTOR SHALL VERIFY ALL OUTLET INFORMATION PRIOR TO COMMENCING CONSTRUCTION AND REPORT ANY

DISCREPANCIES TO THE CONTRACT ADMINISTRATOR.

6. ALL MANHOLES, SANITARY & STORM PDC's, CATCH BASIN OR CATCH BASIN LEADS DAMAGED DURING THE CONSTRUCTION

SHALL BE RESTORED AT THE EXPENSE OF THE CONTRACTOR.

7. THE CONTRACTOR SHALL REMOVE, SALVAGE AND REINSTALL ALL SIGNAGE ETC. IMPACTED BY CONSTRUCTION.

8. ALL EXISTING SURFACE AND UNDERGROUND DRAINAGE SYSTEMS ARE TO BE MAINTAINED DURING CONSTRUCTION.

9. IF AN ELECTRICAL DISTRIBUTION LINE IS ENCOUNTERED DURING CONSTRUCTION ON OR ADJACENT TO THIS SITE , THE

CONTRACTOR SHALL PLACE WARNING SIGNS ON THE POLES SUPPORTING THE CONDUCTORS STATING "DANGER -

OVERHEAD ELECTRICAL WIRES" IN ALL LOCATIONS WHERE PERSONNEL AND CONSTRUCTION VEHICLES MIGHT COME IN

CLOSE PROXIMITY TO THE CONDUCTORS.

OPSD-219.110 LIGHT DUTY SILT FENCE BARRIER

OPSD-219.130 HEAVY DUTY SILT FENCE BARRIER

OPSD-219.180 STRAW BALE FLOW CHECK DAM

OPSD-219.240 DEWATERING TRAP

OPSD-219.260 TURBIDITY CURTAIN

OPSD-220.010 BARRIER FOR TREE PROTECTION

OPSD-401.020 CAST IRON, CIRCULAR FRAME WITH CIRCULAR 745mm COVER FOR

MAINTENANCE HOLES

OPSD-405.020 MAINTENANCE HOLE STEPS, SOLID

OPSD-701.011 PRECAST CONCRETE MAINTENANCE HOLE, 1500mm DIA.

OPSD-701.021 MAINTENANCE HOLE BENCHING AND PIPE OPENING ALTERNATIVES

OPSD-701.040 PRECAST CONCRETE MAINTENANCE HOLE COMPONENTS, 1500mm DIA.,

TRANSITION CONE AND SLABS

OPSD-701.041 PRECAST CONCRETE MAINTENANCE HOLE COMPONENTS, 1500mm DIA., RISER

AND BASES

OPSD-704.010 PRECAST CONCRETE ADJUSTMENT UNITS MAINTENANCE HOLES, CATCH

BASINS AND VALVE CHAMBERS

OPSD-802.010 FLEXIBLE PIPE EMBEDMENT AND BACKFILL, EARTH EXCAVATION

OPSD-802.030 RIGID PIPE BEDDING, COVER AND BACKFILL, TYPE 1 OR 2 SOIL, EARTH

EXCAVATION

OPSD-802.031 RIGID PIPE BEDDING, COVER AND BACKFILL,TYPE 3 SOIL, EARTH EXCAVATION

OPSD-802.032 RIGID PIPE BEDDING, COVER AND BACKFILL, TYPE 4 SOIL, EARTH EXCAVATION

OPSD-804.030 CONCRETE HEADWALL FOR PIPE LESS THAN 900mm DIA.

OPSD-804.040 CONCRETE HEADWALL, FOR SEWER OR CULVERT PIPE OUTLET

OPSD-804.050 GRATING FOR CONCRETE ENDWALL

OPSD-810.010 RIP-RAP TREATMENT FOR SEWER AND CULVERT OUTLETS

OPSD-1006.020 SEWER SERVICE CONNECTIONS FOR FLEXIBLE MAIN PIPE SEWER

THE FOLLOWING OPS DRAWINGS

SHALL BE USED ON THIS PROJECT:

OPSS 180 GENERAL SPECIFICATIONS FOR MANAGEMENT OF EXCESS MATERIALS

OPSS 182 ENVIRONMENTAL PROTECTION FOR CONSTUCTION IN WATERBODIES

AND ON WATERBODY BANKS

OPSS 206 CONSTRUCTION SPECIFICATION FOR GRADING

OPSS 310 HOT MIX ASPHALT

OPSS 401 TRENCHING, BACKFILLING, AND COMPACTING

OPSS 402 EXCAVATING, BACKFILLING, AND COMPACTING FOR MAINTENANCE

HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS

OPSS 404 SUPPORT SYSTEMS

OPSS 407 MAINTENANCE HOLE, CATCH BASIN, DITCH INLET AND VALVE

CHAMBER INSTALLATION

OPSS 410 PIPE INSTALLATION IN OPEN CUT

OPSS 492 SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES,

UTILITIES, AND ASSOCIATED STRUCTURES

OPSS 501 COMPACTING

OPSS 506 DUST SUPPRESSANTS

OPSS 511 RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING

OPSS 517 DEWATERING OR PIPELINE, UTILITY, AND ASSOCIATED STRUCTURE

EXCAVATION

OPSS 518 CONTROL OF WATER FROM DEWATERING OPERATIONS

OPSS 801 THE PROTECTION OF TREES

OPSS 802 TOPSOIL

OPSS 803 SODDING

OPSS 804 SEED AND COVER

OPSS 805 TEMPORARY EROSION CONTROL MEASURES

OPSS 1001 AGGREGATES - GENERAL

OPSS 1002 AGGREGATES - CONCRETE

OPSS 1003 AGGREGATES - HOT MIX ASPHALT

OPSS 1010 AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE AND BACKFILL

MATERIAL

OPSS 1820 CIRCULAR CONCRETE PIPE

OPSS 1850 FRAMES, GRATES, COVERS AND GRATINGS

OPSS 1860 GEOTEXTILES

THE FOLLOWING OPS SPECIFICATIONS

SHALL BE USED ON THIS PROJECT:

ALL DISTURBED AREAS SHALL BE RESTORED AS FOLLOWS:

GRANULAR ACCESS ROAD

-150mm GRANULAR "A" BASE MATERIAL COMPACTED TO 100% SPMDD

-400mm GRANULAR "B" SUB BASE MATERIAL COMPACTED TO 100% SPMDD

ASPHALT PAVEMENT (CITY MAINTENANCE ROAD)

-75mm HL3 SURFACE ASPHALT (97% MARSHALL)

-150mm GRANULAR "A" BASE (98% SPMDD)

-375mm GRANULAR "B" (98% SPMDD)

PAVEMENT RESTORATION

SW-1.0 BEDDING STANDARD FOR GRAVITY PIPE

SPO-1.4A ASPHALT MAINTENANCE ROAD

THE FOLLOWING CITY OF LONDON DRAWINGS

SHALL BE USED ON THIS PROJECT:

10.THE CONTRACTOR SHALL COORDINATE ALL CHANGES IN TRAFFIC MOVEMENT WITH THE ROADS OWNER/OPERATING

AUTHORITY AND SHALL FOLLOW M.T.O. TRAFFIC CONTROL MANUAL (BOOK 7) FOR ROADWAY WORK OPERATION.

11.THE CONTRACTOR SHALL NOTE THAT IT IS THEIR RESPONSIBILITY TO PROTECT, SUSTAIN AND ADEQUATELY SUPPORT ALL

EXCAVATION WALLS AND EXISTING UTILITIES AND MAINTAIN THEM IN THEIR ORIGINAL TRENCHES DURING THE WORK AND

MAKE GOOD ANY DAMAGE, WHETHER OR NOT THE TYPE OF SHORING HAS BEEN SPECIFIED.

12.THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES TO FACILITATE UTILITY RELOCATIONS AND SUPPORT

REQUIREMENTS INCLUDING STAMPED DRAWINGS IF REQUIRED BY THE UTILITY.

13.THE CONTRACTOR SHALL CONDUCT ALL HIS OPERATIONS WITHIN THE LIMITS OF THE CONTRACT UNLESS OTHERWISE

DIRECTED BY THE CONTRACT ADMINISTRATOR.

14. THE SETTING OF LINES AND GRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

15. AN APPROVED SET OF DRAWINGS AND SPECIFICATIONS FOR THE PROJECT MUST REMAIN ON SITE WHILE ANY WORK IS

BEING DONE.

16. ALL EXISTING BOULEVARDS, ROAD SURFACES, ASPHALT DRIVEWAYS AND PLAYGROUND AREAS DISTURBED DURING

CONSTRUCTION SHALL BE RESTORED TO A CONDITION AS GOOD AS THE ORIGINAL OR AS SPECIFIED, WHICHEVER IS THE

MOST STRINGENT.

17. ALL LANDSCAPING INCLUDING DRIVEWAYS, CURBS, RETAINING WALLS, SHRUBS, HEDGES, TREES, ETC. TO BE PRESERVED

AND OR REPLANTED/RECONSTRUCTED TO AS GOOD CONDITION AS EXISTING.

ADELAIDE POLLUTION

CONTROL PLANT

A

D

E

L

A

I

D

E

S

T

R

E

E

T

K

I

P

P

S

L

A

N

E

CONTRACTOR TO KEEP CLEAR

OF SOCCER FIELDS AT ALL

TIMES.

APPROX. SITE LOCATION

ALL EQUIPMENT IS TO STAY

CLEAR OF ASPHALT PATHWAYS

POTENTIAL

STAGING

AREA

S

IT

E

A

C

C

E

S

S

KEY PLAN

PLANT UV CHANNEL TO OUTFALL

SET UP PUMPS HERE.

PROPOSED DISCHARGE LOCATION FOR

TEMP. PUMPING. C/W EROSION CONTROL

MEASURES

TEMP OVERLAND PIPING

ADELAIDE POLLUTION CONTROL PLANT

OUTFALL STRUTURE REPLACMENT

ES 5165-12

GENERAL NOTES

Page 3: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

WINTER EROSION CONTROL

IN ORDER TO ENSURE WINTER EROSION CONTROL AND TO MINIMIZE SOIL TRANSPORT, THE FOLLOWING MEASURES WILL

BE IMPLEMENTED:

1. EROSION CONTROL DURING WINTER CONSTRUCTION WILL INCLUDE A PERIMETER SEDIMENT CONTROL FENCE AROUND

ALL WORKING AREAS.

2. INSTALLATION OF SEDIMENT AND WATER CONTROL STRUCTURES (ROCK AND STRAW CHECK DAMS) AT THE EDGE OF

THE RIGHT-OF-WAY WHERE SURFACE WATER SWALES DISCHARGE OR COLLECT.

3. INSTALLATION OF HEAVY DUTY SILT FENCE BARRIER IN THE VICINITY OF ANY WATERCOURSE AS ILLUSTRATED

OPSD-219.130.

4. UNDER FROZEN CONDITIONS, SILT FENCING IS TO BE KEYED IN USING COURSE-GRAINED AGGREGATE MATERIAL; AND,

5. STRAW MULCH APPLICATIONS ARE TO BE ADDED TO EXPOSED TOPSOIL AND SUBSOIL STOCKPILES DURING WINTER TO

MINIMIZE EROSION. (AS ADVISED BY THE CONTRACT ADMINISTRATOR AND ENVIRONMENTAL INSPECTOR).

NOT TO SCALE

200

300

0.75

1.5m

0.30

BACK-FILLING

SAND AND GRAVEL BACKFILL WILL BE USED IF, IN THE OPINION OF THE CONTRACT ADMINISTRATOR, IT IS REQUIRED.

EXCAVATED MATERIAL MAY BE USED FOR BACK-FILL PROVIDED THAT SUCH MATERIALS SUITABLE FOR BACKFILLING IN THE

OPINION OF THE ENGINEER AND GEOTECHNICAL CONSULTANT.

ALL BACKFILLING MATERIAL SHALL BE FREE FROM FOREIGN MATERIALS SUCH AS REFUSE, CINDERS, WOOD, VEGETABLE OR

ORGANIC MATERIAL, BOULDERS, ROCKS, STONES OR OTHER MATERIAL WHICH, IN THE OPINION OF THE ENGINEER, SHOULD

NOT BE USED FOR BACKFILLING.

THE INSPECTOR MAY ORDER THE TRENCH TO BE BACK-FILLED BY HAND FROM THE BOTTOM OF THE TRENCH TO THE

SPRINGLINE OF THE PIPE WITH SAND AND GRAVEL OR OTHER APPROVED MATERIALS IN LAYERS OF 75mm AND COMPACTED

BY MECHANICAL TAMPERING EQUIPMENT. BACKFILLING MATERIAL SHALL BE PLACED IN A TRENCH ON EACH SIDE

SIMULTANEOUSLY.

FROM THE CENTERLINE OF THE PIPE, FITTING OR APPURTENANCES TO A DEPTH OF 0.3m ABOVE THE PIPE, THE TRENCH

SHALL BE BACKFILLED BY HAND OR OTHER METHODS APPROVED BY THE INSPECTOR. THE TYPE OF BACKFILL MATERIAL

SHALL BE SAND, GRAVEL OR APPROVED EXCAVATED MATERIAL. THE CONTRACTOR SHALL TAKE SPECIAL CARE IN PLACING

AND COMPACTING THIS PORTION OF BACKFILLING SO AS TO AVOID DAMAGING OR MOVING THE PIPE.

ZONE 'A' - PIPE BEDDING AS SPECIFIED ON PLAN AND PROFILE DRAWINGS

COMPACTED TO 95% SPMDD IN LAYERS NOT EXCEEDING 150mm, TO

300mm ABOVE PIPE.

ZONE 'B' - SHALL CONSIST OF APPROVED NATIVE MATERIALS OR GRANULAR 'C'

COMPACTED TO 95% SPMDD IN LAYERS NOT EXCEEDING 300mm.

ZONE 'C' - SHALL CONSIST OF APPROVED NATIVE MATERIALS OR GRANULAR 'C'

COMPACTED TO 98% SPMDD IN LAYERS NOT EXCEEDING 300mm UP TO

BOTTOM OF SUBBASE.

ZO

NE

'B

'Z

ON

E 'C

'Z

ON

E 'A

'

TRENCH BACKFILL

(SEE NOTE ABOVE)

COARSE SAND

BEDDING

GEOTEXTILE

(TERRAFIX 270R OR

APPROVED EQUAL)

1/4 Bc 150mm min.

19mm CLEAR STONE

BEDDING

300mm

TRENCH BACKFILL

(SEE NOTE)

COARSE SAND OR

GRANULAR 'A'

150mm min.

GRANULAR 'A'

300mm

N.T.S. N.T.S.

TRENCHING AND PIPE BEDDING

1. TRENCH CONSTRUCTION TO BE IN ACCORDANCE WITH THE LATEST SPECIFICATIONS REGARDING TRENCH WIDTH. (Ont. Reg. 213/91).

2. EXCAVATION WITHIN TYPE 3 SOILS IS TO BE CARRIED OUT USING SIDE SLOPES OF 1:1 FROM THE BOTTOM OF THE EXCAVATION. SIDE SLOPES

OF 1:3 OR FLATTER ARE TO BE USED FOR EXCAVATION IN TYPE 4 SOILS.

3. 19mm CLEAR STONE BEDDING ENCLOSED WITH A SUITABLE GEOTEXTILE (TERRAFIX 270R OR APPROVED EQUAL) TO BE USED WHERE

HYDRAULIC GRADIENT CONDITIONS ARE ANTICIPATED WITH STANDARD BEDDING AS NOTED ON THE PLAN AND PROFILE DRAWINGS BEING

USED IN ALL OTHER AREAS, ALL AS RECOMMENDED BY THE ENGINEER.

4. PIPE BEDDING AS SPECIFIED ON PLAN AND PROFILE DRAWINGS COMPACTED TO 95% SPMDD IN LAYERS NOT EXCEEDING 150mm, TO 300mm

ABOVE THE PIPE.

5. TRENCH BACKFILL FROM TOP OF PIPE BEDDING TO UNDERSIDE OF GRANULAR "B" SUBBASE SHALL CONSIST OF APPROVED NATIVE

MATERIALS COMPACTED TO 95% SPMDD IN LAYERS NOT EXCEEDING 300mm.

6. PRIOR TO PLACING THE GRANULAR SUBBASE MATERIAL, ALL TOPSOIL, SOFT OR OTHERWISE COMPRESSIBLE MATERIAL MUST BE REMOVED

FROM SUBGRADE AREA AND THE SUBGRADE PROOF ROLLED TO COMPACT ANY LOOSE SURFACE ZONES. ALL EXCAVATED AREAS MUST BE

BACKFILLED WITH APPROVED ON-SITE NATIVE MATERIALS OR IMPORTED GRANULAR PIT-RUN MATERIAL, COMPACTED TO 98% SPMDD

CLASS 'B' BEDDINGSTONE BEDDING

MANHOLE

CATCH BASIN

BELL PEDESTEL

MISC. SIGN

CONIFEROUS TREE

DECIDUOUS TREE

GRAVEL SHOULDER

LEGEND:

ASPHALT RAMP AT DOORWAY

CATCH BASIN MANHOLE

ELECTRICAL PULL BOX

BRUSHLINE

GUY WIRE

VALVE

SANITARY FORCEMAIN MARKER

GAS MARKER

GAS MAIN

UNDERGROUND BELL CABLE

PROPOSED SANITARY FORCEMAIN

WATERMAINS

DITCH INLET CATCHBASIN

MAILBOX

GAS

BTUC

POLE

FENCE LINE

FIRE HYDRANT

NOT TO SCALE

N.T.S.

FERTILIZER

1. APPLY AN ORGANIC 8-32-16 RATIO FERTILIZER AT A RATE OF 380KG/HA AT THE TIME OF

SEEDING (BOTH SEED MIXES). FINAL RATIO AND RATE TO BE CONFIRMED FOLLOWING

SOIL TEST.

BENCHMARK

CITY OF LONDON: V92-9

BRONZE CAP IN CONCRETE: ON ADELAIDE STREET, 300m SOUTH OF THE CENTRELINE OF WINDERMERE

ROAD, 7.0m WEST OF THE CENTRELINE OF ADELAIDE STREET, SET IN THE CONCRETE SIDEWALK ON THE

NORTHWEST SIDE OF THE BRIDGE CARRYING ADELAIDE STREET OVER THE NORTH BRANCH OF THE

THAMES RIVER.

ELEVATION: 245.641 metres

50 X50 WOOD POST STANDARD OR

BETTER OR EQUAL ALTERNATE

STEEL FENCE POST AT 1.8m

CENTERS (MAX.)

50mm X 50mm 14

GA. WIRE FABRIC

FILTER FABRIC MATERIAL

(TEXEL 140 OR APPROVED

ALTERNATE)

50 X50 WOOD POST STANDARD OR

BETTER OR EQUAL ALTERNATE

STEEL FENCE POST AT 1.8m

CENTERS (MAX.)

FILTER FABRIC MATERIAL ON 1500mm WIDE

ROLLS OVERLAYING 50mm X 50mm 14 GA.

WIRE FABRIC ATTACHED WITH STAPLES OR

WIRE RINGS

BACKFILL & COMPACT

THE EXCAVATED SOIL

IN TRENCH AND ON

BOTH SIDES OF THE

FILTER FENCE FABRIC

FOLD & SET FILTER

FABRIC INTO SOIL

BURY BOTTOM OF FILTER MATERIAL IN

200mm X 300mm TRENCH

SEED MIXTURES

CITY OF LONDON NATURALIZATION MIX: SPO-8

SEED AT A RATE OF 100KG/10,000M²

(SPO-8, TABLE 1).

SPECIES INCLUDED AS FOLLOWS:

Orchard Grass 12%

Creeping Red Fescue 13%

Perennial Rye Grass 13%

Double Cut Red Clover 17%

Kentucky Blue Grass 17%

Dutch White Clover

13%

O.S.C. Native Prairie

Meadow Mixture 15%

SEEDING

1. THE CONTRACTOR IS RESPONSIBLE TO ENSURE COVERAGE AND SEED MIX CATCH.

2. THE CONTRACTOR IS TO PROVIDE A WRITTEN GUARANTEE STIPULATING A MINIMUM 80% SEED CATCH. AREAS OF PROPERLY

ESTABLISHED SEED WILL BE ACCEPTED BY THE LANDSCAPE ARCHITECT.

3. SEED APPLICATION IS TO BE UNDERTAKEN IN A CONSISTENT AND THOROUGH FASHION COVERING THE ENTIRE SITE INCLUDING

SHRUB AND TREE AREAS, THROUGH, UNDER AND AROUND THE ENTIRE PERIMETER OF PLANTS.

4. SINGLE DIRECTIONAL SPREADING OF SEED MIX IS NOT ACCEPTABLE.

5. CONTACT THE CONTRACT ADMINISTRATOR PRIOR TO SEEDING TO COORDINATE OPERATIONS.

6. ALL SEEDING AND PLANTING OF DISTURBED AREAS MUST OCCUR IMMEDIATELY UPON COMPLETION OF THE GRADING WORK,

WEATHER PERMITTING. SEEDING OPERATIONS WITH THE SPECIFIED SEED MIXTURE MUST BE COMPLETED BETWEEN SPRING

THAW AND JUNE 15TH.

7. SURFACE TO BE UNIFORMLY CULTIVATED TO A MINIMUM DEPTH OF 100mm AND SHALL NOT HAVE SURFACE STONES GREATER

THAN 25mm DIAMETER.

8. ALL TOPSOIL COMPACTED DURING CONSTRUCTION ACTIVITIES IS TO BE SCARIFIED TO THE SATISFACTION OF THE CONTRACT

ADMINISTRATOR PRIOR TO SEED APPLICATION.

9. ALL AREAS DISTURBED DURING REMOVAL OF SEDIMENT AND EROSION CONTROL MEASURES ARE TO BE SEEDED WITH A HAND

BROADCAST APPLICATION OF THE SPECIFIED SEED MIX.

ADELAIDE POLLUTION CONTROL PLANT

OUTFALL STRUTURE REPLACMENT

ES 5165-12

GENERAL NOTES

Page 4: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

ENVIRONMENTAL REQUIREMENTS

2. CONDITIONS OF APPROVAL

1. THE CONTRACTOR AND EACH SUBCONTRACTOR, WHILE PERFORMING THE WORK, SHALL COMPLY WITH

RELEVANT STATUTES, REGULATIONS, BYLAWS AND DIRECTIVES OF LEGISLATIVE AUTHORITIES IN ALL

MATTERS RELATING TO THE PROTECTION OF THE ENVIRONMENT. WITHOUT LIMITING THE GENERALITY OF

THE FOREGOING, THE FOLLOWING LEGISLATION IS CALLED TO THE ATTENTION OF THE CONTRACTOR.

A. FEDERAL

I. CANADIAN ENVIRONMENTAL PROTECTION ACT

II. CANADA WILDLIFE ACT

III. FISHERIES ACT

IV. NAVIGABLE WATERS PROTECTION ACT

V. HAZARDOUS PRODUCTS ACT

VI. TRANSPORTATION OF DANGEROUS GOODS ACT

VII. EXPLOSIVES ACT.

B. ONTARIO

I. ENVIRONMENTAL PROTECTION ACT

II. ONTARIO WATER RESOURCES ACT

III. AGGREGATE RESOURCES ACT

IV. ONTARIO HERITAGE ACT

V. PESTICIDE ACT

VI. LAKES AND RIVERS IMPROVEMENT ACT

VII. WILDERNESS AREAS ACT

VIII. FOREST FIRES PREVENTION ACT

IX. GASOLINE HANDLING ACT

X. HIGHWAY TRAFFIC ACT.

C. LOCAL

I. LOCAL MUNICIPAL BYLAWS E.G., NOISE CONTROL, LICENSING OF TRADES PEOPLE

A. ALL PERMITS, AUTHORIZATIONS AND APPROVALS OBTAINED BY THE CONTRACTOR WILL BE

MADE AVAILABLE ONSITE DURING CONSTRUCTION OR WHEN OBTAINED PRIOR TO SITE

SPECIFIC WORK UNDER APPROVAL PROCEEDING.

B. THE CONTRACTOR SHALL FULLY COMPLY WITH ALL CONDITIONS OF SUCH PERMITS,

AUTHORIZATIONS AND APPROVALS.

3. ENVIRONMENTAL SITE AWARENESS

A. THE CONTRACTOR SHALL MAINTAIN AN AWARENESS OF ENVIRONMENTAL REQUIREMENTS

AND DEVELOPING ISSUES ON SITE.

B. THE CONTRACTOR'S ENVIRONMENTAL COORDINATOR IN CONSULTATION WITH THE

CONTRACT ADMINISTRATOR SHALL HOLD FORMAL ENVIRONMENTAL ORIENTATION

MEETINGS INVOLVING KEY SITE PERSONNEL.

C. THE CONTRACTOR SHALL HAVE AN ENVIRONMENTAL COMPONENT AT ITS WEEKLY

WORK-GROUP TOOLBOX MEETINGS INVOLVING ALL WORKERS.

D. ORIENTATION MEETINGS WITH MEMBERS OF THE SITE TEAM SHALL BE HELD AT THE START

OF THE WORK (AT THE TIME OF MOBILIZATION) AND WHEN NEW STAFF JOIN THE

WORKFORCE. ENVIRONMENTAL REVIEW MEETINGS WITH THE SITE TEAM SHALL ALSO BE

HELD AT OTHER KEY TIMES THROUGHOUT THE WORK PRIOR TO STARTING SIGNIFICANT

NEW TASKS.

E. THE CONTRACTOR SHALL REVIEW THE ENVIRONMENTAL CONTENT OF ITS ORIENTATION, AS

WELL AS REVIEW TOOLBOX MEETINGS WITH THE CONTRACT ADMINISTRATOR.

F. THE CONTRACTOR SHALL PROVIDE MINUTES OF ITS ORIENTATION, REVIEW AND TOOLBOX

MEETINGS TO ALL ATTENDEES AND THE CONTRACT ADMINISTRATOR. EACH ATTENDEE

SHALL BE REQUIRED TO SIGN AN ATTENDANCE LIST WHICH INCLUDES A POINT FORM

SUMMARY OF THE MEETING CONTENT.

4. HAZARDOUS SUBSTANCES

A. THE CONTRACTOR SHALL MAKE ITSELF FULLY AWARE OF ALL FEDERAL AND

PROVINCIAL LEGISLATION AND RESTRICTIONS ON THE STORAGE AND USE OF

CERTAIN PRODUCTS OR MATERIALS CONSIDERED HARMFUL TO THE ENVIRONMENT

OR PERSONS AND SHALL COMPLY WITH ALL APPLICABLE REGULATIONS AND

GUIDELINES.

B. THE CONTRACTOR SHALL REQUIRE ITS MANUFACTURERS OR SUPPLIERS TO

PROVIDE CURRENT MATERIAL SAFETY DATA SHEETS (MSDS) FOR ALL SUCH

PRODUCTS AND SHALL COMPLY WITH ALL REQUIREMENTS OF THE WORKPLACE

HAZARDOUS MATERIALS INFORMATION SYSTEM (WHMIS) REGULATIONS.

C. THE CONTRACTOR SHALL PROMPTLY PROVIDE THE CONTRACT ADMINISTRATOR

WITH COPIES OF ALL MSDS RELATING TO ALL HAZARDOUS SUBSTANCES BROUGHT

TO THE PROJECT SITE.

5. WATER MANAGEMENT

A. THE CONTRACTOR SHALL MAKE ITSELF FULLY AWARE OF WATER LEVEL, WATER

FLOW AND WEATHER CONDITIONS IN AND AFFECTING THE WORK AND SHALL

ALLOW FOR ALL EFFECTS THAT ANY SUCH CONDITIONS MIGHT HAVE ON THE

WORK.

B. THE CONTRACTOR SHALL COMPLY WITH ANY PERMIT TO TAKE WATER

REQUIREMENTS OF THE ONTARIO WATER RESOURCES ACT IN CONNECTION WITH

ITS OPERATIONS.

6. WASTE MANAGEMENT

A. THE CONTRACTOR SHALL DISPOSE OF ALL WASTES GENERATED ON SITE AND SHALL BE

RESPONSIBLE FOR ALL PERMITS AND APPROVALS REQUIRED FOR WASTE DISPOSAL. FOR

RECYCLED MATERIALS AND FOR DISPOSAL OF HAZARDOUS, SUBJECT AND CONTAMINATED

WASTES, THE CONTRACTOR SHALL PROVIDE PROOF OF RECYCLING AND/OR DISPOSAL

DOCUMENTATION TO THE CONTRACT ADMINISTRATOR.

B. THE CONTRACTOR SHALL PROVIDE INFORMATION ON QUANTITIES OF PRINCIPAL PRODUCTS

BROUGHT TO SITE AND QUANTITIES OF LIKE PRODUCTS REUSED, RECYCLED AND WASTED IN

THE PROCESS OF USING THESE PRODUCTS. THE CONTRACTOR SHALL ALSO PROVIDE

INFORMATION ON QUANTITIES OF WASTES ARISING FROM DEMOLITION AND CONCRETE

REMOVALS AND CORRESPONDING QUANTITIES REUSED, RECYCLED AND WASTED.

C. WASTE TYPES ANTICIPATED AT THE WORK SITE INCLUDE SANITARY SEWAGE, DOMESTIC

GARBAGE, CONSTRUCTION GARBAGE, CONCRETE AND CEMENT GROUT WASTES, IRON AND

STEEL WASTES, GRANULAR MATERIALS WASTES, SMALL ELECTRICAL FIXTURES, WARE, FORM

WORK AND FALSE WORK WASTES, OPERATING FLUID WASTES FROM VEHICLES AND

CONSTRUCTION EQUIPMENT AND COLLECTED SEDIMENT. DISPOSAL OF THESE AND OTHER

WASTES SHALL BE AS INDICATED IN THIS SECTION. THE CONTRACTOR SHALL RECYCLE

WASTES WHERE POSSIBLE.

D. SANITARY SEWAGE SHALL BE COLLECTED IN PORTABLE TOILET FACILITIES. WASTE SHALL BE

DISPOSED OF AT A LICENSED DISPOSAL LOCATION BY A LICENSED HAULER. WASTE SHALL BE

REMOVED ON A REGULAR BASIS CONSISTENT WITH HEALTH AND SAFETY REQUIREMENTS.

E. THE CONTRACTOR SHALL MINIMIZE THE VOLUMES OF DOMESTIC AND CONSTRUCTION

GARBAGE PRODUCED ON SITE. AN MOE-APPROVED LOCAL LANDFILL SHALL BE USED FOR

DISPOSAL OF DOMESTIC AND CONSTRUCTION GARBAGE. WASTE STORAGE BINS WITH LIDS

SHALL BE PROVIDED BY THE CONTRACTOR AND USED ON SITE FOR COLLECTION AND

TEMPORARY STORAGE OF DOMESTIC GARBAGE. THE CONTRACTOR SHALL ENSURE THAT

WASTES ARE DEPOSITED IN DESIGNATED BINS AND THAT THE SITE IS KEPT IN A CLEAN AND

TIDY CONDITION. WASTE SHALL BE REMOVED ON A REGULAR BASIS TO AVOID

ACCUMULATION ON SITE. ALL ELECTRICAL FIXTURES, WIRING AND OTHER WASTE TYPES,

IMPRACTICAL TO RECYCLE DUE TO ANTICIPATED SMALL VOLUME WILL BE TREATED AS

CONSTRUCTION GARBAGE.

G. THE CONCRETE WASHOUT BASIN AND SURROUNDING AREA SHALL BE STORED UPON

COMPLETION OF THE WORK. LOOSE OR EXPOSED CONCRETE REINFORCING STEEL OR IRON

AND OTHER STEEL WASTES SHALL BE RECYCLED BY THE CONTRACTOR. THE CONTRACTOR

SHALL COLLECT THE RECYCLE METAL WASTES ARISING ON SITE. PREFERENCE SHALL BE

GIVEN TO CONSTRUCTIVE REUSE OF UNCONTAMINATED GRANULAR MATERIAL NO LONGER

REQUIRED FOR PROJECT.

H. QUANTITIES OF CONSTRUCTION LUMBER AND WOOD PRODUCTS WASTED DURING

CONSTRUCTION SHALL BE MINIMIZED. EVERY REASONABLE EFFORT SHALL BE MADE TO

REUSE WASTE OR SURPLUS WOOD. WASTE WOOD THAT CANNOT BE REUSED OR GIVEN

AWAY SHALL BE DISPOSED OF AT AN MOE-APPROVED LOCAL LANDFILL SITE.

I. OPERATING FLUID WASTES ARISING ON SITE FROM VEHICLES AND CONSTRUCTION

EQUIPMENT SHALL BE COLLECTED IN SUITABLE CONTAINERS WITH TIGHT SEALING LIDS AND

SHALL BE REMOVED FROM SITE FOR RECYCLING OR DISPOSAL AS HAZARDOUS WASTE.

J. WASTES SHALL BE PROPERLY LABELED ACCORDING TO WHMIS REGULATIONS.

UNCONTAMINATED COLLECTED AND EXCAVATED SEDIMENT SHALL BE REMOVED FROM THE

SITE FOR DISPOSAL AS INERT FILL OR AS CONSTRUCTION GARBAGE. COLLECTED AND

EXCAVATED SEDIMENT CONTAMINATED, OR SUSPECTED TO BE CONTAMINATED BY

ENVIRONMENTALLY HARMFUL SUBSTANCES SHALL BE REMOVED FROM SITE. THE CRITERIA,

PROCEDURES, TERMS AND CONDITIONS FOR DISPOSAL OF CONTAMINATED SEDIMENT

SHALL BE THOSE SET OUT IN CURRENT MOE REGULATIONS AND GUIDELINES. HAZARDOUS,

SUBJECT AND CONTAMINATED SOLID AND LIQUID WASTES SHALL BE DISPOSED OF OFF SITE

USING LICENSED DISPOSAL AGENTS AND HAULERS. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR REGISTRATION OF ALL HAZARDOUS, SUBJECT AND CONTAMINATED

WASTES UNDER REGULATION 347 OF THE ONTARIO ENVIRONMENTAL PROTECTION ACT.

WASTES SHALL BE PROPERLY STORED AND LABELED ACCORDING TO WHMIS REGULATIONS.

K. THERE SHALL BE NO OPEN OR BURNING WASTE, ETC., ON SITE. THE CONTRACTOR SHALL

PROVIDE FIRE EXTINGUISHERS FOR ALL MECHANICAL EQUIPMENT.

7. SURFACE WATER QUALITY PROTECTION

A. THE CONTRACTOR SHALL ENSURE THAT NO SEDIMENTS, WASTE SUBSTANCES OR MATERIALS

RESULTING FROM WORK ACTIVITIES ENTER THE MUNICIPAL DRAINS.

B. THE CONTRACTOR SHALL UNDERTAKE ALL WATER QUALITY MONITORING, SAMPLING AND

TESTING NECESSARY TO DETERMINE AND /OR CONFIRM TO THE SATISFACTION OF THE

CONTRACT ADMINISTRATOR THE EFFECTS OF THE WORK ON THE QUALITY OF THE WATER IN

WATERCOURSES AND WATER BODIES ADJOINING OR AFFECTED BY THE WORK.

C. THE CONTRACTOR SHALL VISUALLY MONITOR WATER QUALITY WITH RESPECT TO

BACKGROUND AND PROJECT-RELATED SEDIMENT LOADING ON A DAILY BASIS AND SHALL

RECORD THESE OBSERVATIONS IN A WATER QUALITY LOG. VISUAL MONITORING SHALL BE IN

THE FORM OF AN ONGOING VISUAL AWARENESS ON THE PART OF THE WORK CREW OF THE

EFFECTS OF THE WORK ON WATER QUALITY, WITH SUMMARY OBSERVATIONS, INCLUDING

WATER ELEVATIONS, BEING RECORDED DAILY IN THE LOG. PARTICULAR ATTENTION SHALL BE

PAID TO MONITORING DURING GROUTING OPERATIONS. WHERE RELEASES OF SEDIMENT

BECOME EVIDENT, THE CONTRACT ADMINISTRATOR MAY REQUIRE PERIODIC WATER

SAMPLING AND TESTING TO DETERMINE ACTUAL TOTAL SUSPENDED SOLIDS (TSS) LEVELS

AND/OR TO SUPPORT AND CONFIRM VISUAL WATER QUALITY OBSERVATIONS.

D. ALL WORK AFFECTING ANY WATERCOURSE OR WATER BODY SHALL CEASE UPON A SPILL OF

SEDIMENT TO A RECEIVING WATERCOURSE OF WATER BODY. A SPILL OF SEDIMENT IS

DEFINED AS A RELEASE OF SEDIMENT TO A RECEIVING WATERCOURSE OR WATER BODY

SUCH THAT THE LEVEL OF SEDIMENT IS INCREASED BY MORE THAT 15MG/L (TSS) ABOVE THE

BACKGROUND LEVEL AT THE POINT OF DISCHARGE. THE CONTRACTOR MAY INITIALLY

ASSESS THE LEVEL OF SUSPENDED SOLIDS BY VISUAL OBSERVATION AND SUBSEQUENTLY

CONFIRM THESE OBSERVATIONS BY SAMPLING AND TESTING. THE RULING OF THE CONTRACT

ADMINISTRATOR ON THE VISUALLY ASSESSED LEVEL OF IN-WATER SEDIMENT CONSTITUTING

A SPILL SHALL BE BINDING IN THE ABSENCE OF THE RESULTS OF TESTS CONDUCTED AT THE

TIME OF DISCOVERY OF A POTENTIAL SPILL. ALL NECESSARY MEASURES SHALL BE TAKEN BY

THE CONTRACTOR TO STOP THE RELEASE. THE CONTRACT ADMINISTRATOR WILL NOT ALLOW

WORK TO RESUME ON THE TASK WHICH RESULTED IN THE RELEASE UNTIL THE SITE

OPERATIONS OF THE CONTRACTOR HAVE BEEN REVIEWED AND PROCEDURES ACCEPTABLE

TO THE CONTRACT ADMINISTRATOR FOR CONTINUING THE WORK ON THE PARTICULAR TASK

HAVE BEEN ESTABLISHED.

E. THE CONTRACTOR SHALL PROVIDE UPDATED COPIES OF ITS WATER QUALITY LOG, AND THE

RESULTS OF ALL WATER QUALITY TESTING UNDERTAKEN TO THE CONTRACT ADMINISTRATOR

AT THE WEEKLY PROGRESS MEETINGS.

F. THE CONTRACTOR SHALL PREVENT GROUT MATERIALS FROM ENTERING WATERCOURSE OR

WATER BODIES.

G. THE CONTRACTOR SHALL REPORT TO THE CONTRACT ADMINISTRATOR WITHOUT DELAY ALL

OBSERVED RELEASE OF SEDIMENT TO AN ADJOINING WATERCOURSE OR WATER BODY UPON

THEIR DISCOVERY AND SHALL IMMEDIATELY TAKE MEASURES TO EFFECTIVELY STOP SUCH

RELEASES AND PREVENT THE OCCURRENCE OF A SEDIMENT SPILL. ALL SPILLS OF SEDIMENT

SHALL BE DEALT WITH AND REPORTED AS REQUIRED BY THE SPILL REPORTING

REQUIREMENTS IN THIS SPECIFICATION AND AS REQUIRED BY REGULATION.

H. ACCIDENTAL CHEMICAL OR EQUIPMENT OPERATING FLUID SPILLS WHICH MAY ENTER A

WATER BODY SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AND REPORTED AS

REQUIRED AS DETAILED IN THIS SPECIFICATION AND AS REQUIRED BY REGULATION.

8. SEDIMENT, EROSION AND DUST CONTROL

A. THE CONTRACTOR. SHALL BE RESPONSIBLE FOR SEDIMENT, EROSION AND DUST

CONTROL ON THE SITE BOTH ON LAND AND WATERCOURSES AND WATER BODIES

ADJOINING AND/OR AFFECTED BY THE WORK. THE CONTRACTOR SHALL PROVIDE AND

MAINTAIN ALL SEDIMENT, EROSION AND DUST CONTROL INSTALLATIONS AS REQUIRED

BY SITE CONDITIONS AND/OR AS REQUIRED FROM TIME TO TIME BY THE CONTRACT

ADMINISTRATOR.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN, OPERATION AND

MAINTENANCE OF ALL SEDIMENT, EROSION AND DUST CONTROL FACILITIES TO MEET

THE REQUIREMENTS OF THE CONTRACT, REGULATIONS AND APPROVALS GRANTED

FOR THIS PROJECT SPECIFIED. THE CONTRACTOR SHALL REVIEW ITS DESIGNS AND

PLANS FOR SEDIMENT CONTROL WITH THE CONTRACT ADMINISTRATOR AT THE START

OF THE WORK AND PRIOR TO CRITICAL STAGES OF THE WORK AS IT PROGRESSES.

C. CONTAINMENT, SETTLING AND/OR DIRECT FILTERING TECHNIQUES SHALL BE USED TO

CONTROL SUSPENDED SOLIDS IN ALL SITE DISCHARGE WATER AND RUNOFF AND TO

CONTAIN WORK AREA SEDIMENT RELEASES IN WATER, AS NECESSARY TO MEET THE

WATER QUALITY REQUIREMENTS AS DETAILED IN THIS SPECIFICATION. TURBID WATER

IN PUMP DISCHARGES SHALL BE PASSED THROUGH FILTER SOCKS OR BAGS AS THE

PRIMARY SEDIMENT RETENTION SYSTEM FOR DEWATERING PUMP DISCHARGES.

D. THE CONTRACTOR SHALL TAKE MEASURES TO ENSURE THAT A STABLE BASE, NOT

PRONE TO EROSION, IS PROVIDED AT ALL TIMES IN LAY DOWN, WORK AND OTHER

AREAS WHICH ARE OR BECOME, PRONE TO DISTURBANCE. EROSION AND SEDIMENT

CONTROL MEASURES SUCH AS SILT FENCES AND STRAW BALE BARRIERS SHALL BE

USED IN DRAINAGE AND RUNOFF AREAS ON LAND AND WITHOUT DEWATERING AREAS

AS REQUIRED BY SITE CONDITIONS.

E. THE CONTRACTOR SHALL INSTALL SILT FENCES, SILT CURTAINS AND OTHER SEDIMENT

CONTROL STRUCTURES. SILT FENCES SHALL BE INSTALLED AROUND THE LAY DOWN

AREA PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES AND MOBILIZATION OF

EQUIPMENT AND MATERIALS.

H. ALL STOCKPILES SHALL BE PROTECTED AGAINST EROSION.

I. DUSTS SHALL BE CONTROLLED FOR THE DURATION OF THE WORK.

J. REGULAR MECHANICAL SWEEPING, ENVIRONMENTALLY ACCEPTABLE DUST SUPPRESSANTS

AND/OR WATER SHALL BE USED AS NECESSARY TO CONTROL DUST ON THE ACCESS ROAD

AND IN LAY DOWN AND WORK AREAS.

K. OILS SHALL NOT BE USED FOR DUST CONTROL.

L. THE CONTRACTOR SHALL NOT USE CHEMICAL DUST SUPPRESSANTS.

9. SPILL CONTINGENCY PLANNING

A. THE CONTRACTOR SHALL ENDEAVOR AT ALL TIMES THROUGHOUT THE WORK TO

PREVENT SPILLS, AND PROVIDE IN THE EVENT OF A SPILL, THE BEST RESPONSE

WITHIN THE SHORTEST POSSIBLE TIME.

B. ENVIRONMENTAL LEGISLATION WITH RESPECT TO SPILLS TREATS SEDIMENT

RELEASES TO WATER AS SPILLS DETRIMENTAL TO THE NATURAL ENVIRONMENT.

SEDIMENT RELEASES TO A WATERCOURSE OR WATER BODY ARE THEREFORE

INCLUDED IN THE SAME CATEGORY AS SPILLS OF POLLUTANTS.

C. THE CONTRACTOR SHALL DESIGNATE AN EMERGENCY RESPONSE COORDINATOR

(ERC) FROM SUITABLY QUALIFIED MEMBER OF ITS SITE WORKFORCE. THE

CONTRACTOR SHALL SUBMIT THE NAME OF THE ERC FOR REVIEW AND

CONCURRENCE.

D. ABSORBENT BOOMS SHALL ALSO BE PROVIDED AND KEPT READILY AVAILABLE AT

NEAR\QC WATER WORK AREAS FOR LOCAL DEPLOYMENT AS A PRECAUTIONARY

MEASURE.

E. ABSORBENT MATERIAL SHALL BE ON HAND AT ALL WORK AREAS, AT EQUIPMENT

STORAGE OR PARKING AREAS AND AT ALL REFUELING LOCATIONS AS A MEANS OF

CONTAINING AND SOAKING UP ANY SPILL SUBSTANCE BEFORE IT REACHES THE

GROUNDWATER TABLE OR OPEN WATER.

F. UNLESS OTHERWISE APPROVED BY THE CONTRACT ADMINISTRATOR, DRIP AND SPILL

TRAYS SHALL BE CONSTRUCTED ON METAL OR RIGID MOLDED PLASTIC. DRIP AND

SPILL TRAYS SHALL BE EFFECTIVELY OF ON-PIECE CONSTRUCTION, HAVE NO LEAKS

AND SHALL NOT BE READILY DEFORMABLE.

G. EMPTY OPEN-HEAD DRUMS WITH SEALABLE LIDS SHALL BE PROVIDED ON SITE FOR

PREDISPOSAL STORAGE OF SPILLABLE SUBSTANCES AND FOR DISPOSAL OF USED

ABSORBENTS, CONTAMINATED SOIL, ETC. A MINIMUM OF FOUR 205-L NOMINAL SIZE

DISPOSAL DRUMS SHALL BE PROVIDED AND SUITABLY LOCATED ON SITE.

H. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF TWO COMPLETE SPILL KITS TO BE

LOCATED IN THE PRINCIPAL WORK AREAS. THE EXACT LOCATION OF ANY SPILL KIT

WITHIN A WORK AREA MAY VARY BUT A KIT SHALL ALWAYS BE LOCATED IN CLOSE

PROXIMITY TO THE ACTUAL WORK ZONE AND SHALL BE READILY ACCESSIBLE.

I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING SPILLS. ALL SPILLS SHALL

BE REPORTED TO THE CONTRACT ADMINISTRATOR IMMEDIATELY FOLLOWING THEIR

DISCOVERY AND ATTENTION TO IMMEDIATE SAFETY AND CONTAINMENT CONCERNS.

ALL SPILLS TO THE NATURAL ENVIRONMENT SHALL BE REPORTED TO THE CONTRACT

ADMINISTRATOR AND THE MOE (SPILLS ACTION CENTRE 1-800-268-6060) AND OTHER

EXTERNAL AGENCIES.

J. THE CONTRACTOR SHALL SUBMIT WRITTEN SPILL NOTIFICATION REPORTS TO THE

CONTRACT ADMINISTRATOR WITHIN NOT MORE THAN 2 WORKING DAYS AFTER THE

DISCOVERY OF A SPILL.

K. ALL SPILLS TO THE NATURAL ENVIRONMENT RESULTING FROM ACTION OR INACTION

ON THE PART OF THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR. ALL TESTING REQUIRED BY THE

CONTRACTOR, THE CONTRACT ADMINISTRATOR OR MNR IN CONNECTION WITH A SPILL

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

I. EXCESS GROUT AND OTHER LIQUID WASTE PRODUCTS SHALL BE DIRECTED TO

SECURE CONTAINMENT FACILITIES FOR SUBSEQUENT REMOVAL AND DISPOSAL IN

ACCORDANCE WITH CURRENT ENVIRONMENTAL REQUIREMENTS.

10. CONSTRUCTION LAY DOWN, PARKING, ACCESS AND WORK AREAS

A. LAY DOWN AREAS HAVE BEEN IDENTIFIED AND DESIGNATED FOR USE BY THE

CONTRACTOR, AS SHOWN ON THE DRAWINGS. MATERIALS AND EQUIPMENT

STORAGE, PARKING AND SITE OFFICE FACILITIES WILL BE RESTRICTED TO THE AREA

DEVELOPED AS A LAY DOWN AREA.

B. THE CONTRACTOR SHALL PREPARE, DEVELOP AND MAINTAIN LAY DOWN, PARKING

ACCESS, WORK AND STAGING AREAS AS REQUIRED TO EXECUTE THE WORK. THERE

SHALL BE NO CLEARING OR CUTTING OF TREES OR SHRUBS EXCEPT AS ALLOWED BY

THE CONTRACT ADMINISTRATOR. THERE SHALL BE NO STRIPPING OF EXISTING

SURFICIAL SOILS AND MATERIALS ON SITE EXCEPT AS REQUIRED FOR THE

PROVISION OF AN EXCESS CONCRETE/TRUCK MIXER WASHINGS DISPOSAL BASIN.

C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF ALL WORK AND

ACCESS AREAS ADJOINING AREAS OPEN TO THE PUBLIC AND SHALL AT ALL TIMES

PREVENT PUBLIC ACCESS TO THE WORK.

D. THE SECURITY OF THE PROPERTY OF THE CONTRACTOR ON SITE SHALL BE ENTIRELY

THE RESPONSIBILITY OF THE CONTRACTOR. INSTALLATION OF TEMPORARY

SECURITY FACILITIES SHALL BE AT THE DISCRETION OF THE CONTRACTOR AND

SUCH FACILITIES SHALL BE REMOVED ON COMPLETION OF THE WORK.

E. LAY DOWN, PARKING, WORK AND ACCESS AREAS SHALL BE CLEANED OF ALL

CONSTRUCTION MATERIALS AND DEBRIS AND SHALL BE RESTORED BY THE

CONTRACTOR UPON COMPLETION.

11. WORK NEAR WATER

A. THE CONTRACTOR IS PROHIBITED FROM WORKING WITHIN THE RIVER WITHOUT OBTAINING

APPROVAL FROM THE MNR EITHER DIRECTLY OR THROUGH THE LOCAL GOVERNING AUTHORITY.

WORKING INCLUDES BUT IS NOT LIMITED TO THE PLACEMENT OF PERMANENT OR TEMPORARY

STRUCTURES, TRAVERSING THROUGH THIS AREA WITH EQUIPMENT OR MATERIAL, DEPOSITING ANY

MATERIAL WITHIN THE RIVER.

B. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FULLY FAMILIARIZE ITSELF WITH WATER LEVEL

AND FLOW CONDITIONS IN THE MUNICIPAL DRAINS AND TO ANTICIPATE THE EFFECTS THAT ANY

WATER LEVELS AND FLOWS MAY HAVE ON THE WORK.

C. THE CONTRACTOR SHALL MEET THE WATER QUALITY PROTECTION REQUIREMENTS AND THE

EROSION AND SEDIMENT CONTROL REQUIREMENTS OF THIS SPECIFICATION AND ALL APPLICABLE

REGULATIONS. TURBID WATER SHALL NOT BE DIRECTLY DISCHARGED TO THE LAKE OR RIVER.

D. ANY DEWATERING, WATER CONTAINMENT, SETTLING AND/OR FILTERING AND DRAINAGE FACILITIES

SET UP IN WORK AREAS SHALL BE REMOVED IN THEIR ENTIRETY UPON COMPLETION OF THE WORK.

COLLECTED AND EXCAVATED SEDIMENTS SHALL BE CAREFULLY REMOVED FOR DISPOSAL

REQUIREMENTS IN ACCORDANCE WITH THIS SPECIFICATION AND ALL APPLICABLE REGULATIONS.

E. WHERE GEOTEXTILES AND PLASTIC GEOMEMBRANES ARE USED, THEY SHALL BE REMOVED IN THEIR

ENTIRETY ON COMPLETION AND DISPOSED OF AT AN APPROVED LOCAL LANDFILL. GEOTEXTILE

CONTAINING CONTAMINATED SEDIMENT SHALL BE DISPOSED OF IN ACCORDANCE WITH THIS

SPECIFICATION AND ALL APPLICABLE REGULATIONS.

12. LIQUID STORAGE, REFUELING AND EQUIPMENT OPERATION

A. ON-SITE BULK FUEL STORAGE TANKS AND BULK STORAGE FOR OTHER ENVIRONMENTALLY HAZARDOUS

LIQUIDS SHALL BE LOCATED AT LEAST 30 M AWAY FROM THE RIVER, WITHIN DYKES OR EQUIVALENT

SECONDARY CONTAINMENT ON FLAT GROUND IN THE LAY DOWN AREA.

B. CONTAINMENT IN LIQUID STORAGE AREAS SHALL BE SUCH AS TO CONTAIN THE TOTAL VOLUME STORED

PLUS PRECIPITATION. A MINIMUM SECONDARY STORAGE CAPACITY EQUIVALENT TO 110% OF THE

VOLUME OF STORED LIQUIDS SHALL BE PROVIDED.

C. THE CONTRACTOR SHALL REGULARLY CHECK ALL SPILL CONTAINMENT FACILITIES FOR PRECIPITATION

AND SPILLED SUBSTANCE AND MAINTAIN THESE FACILITIES IN A CLEAN AND SERVICEABLE CONDITION,

REGULARLY REMOVING PRECIPITATION TO MAINTAIN THE SECONDARY STORAGE VOLUME. WHERE

EFFECTIVE, SECONDARY CONTAINMENT CANNOT OTHERWISE BE ACHIEVED, PROTECTION AGAINST

SEEPAGE SHALL BE PROVIDED BY THE USE OF IMPERMEABLE LINERS.

D. FUEL AND OTHER LIQUIDS REQUIRED FOR THE WORK SHALL NOT BE TRANSPORTED TO AND/OR

TEMPORARILY STORED IN THE WORK AREA IN QUANTITIES OF MORE THAN 30 M AWAY FROM A

WATERCOURSE OR WATER BODY AND WITHIN SECURE SECONDARY CONTAINMENT OF AN APPROPRIATE

SIZE. SECURE SECONDARY CONTAINMENT AS SPECIFIED ABOVE SHALL BE PROVIDED THROUGHOUT ALL

THE TRANSPORTATION AND TEMPORARY WORK AREA STORAGE.

E. SMALL CONTAINERS OF FUEL AND OTHER CHEMICAL PRODUCTS SHALL HAVE SECURE SECONDARY

CONTAINMENT AND SHALL BE PROTECTED AT ALL TIMES FROM ACCIDENTAL SPILLAGE.

F. ABSORBENT MATERIALS SHALL BE ON HAND AT ALL LIQUID STORAGE AREAS, WHETHER FOR LARGE OR

SMALL VOLUMES, AS A MEANS OF CONTAINING OR SOAKING UP ERRANT SPILLS.

G. EMPTY OPEN-HEAD DRUMS WITH SEALABLE LIDS SHALL BE ON HAND FOR PRE-DISPOSAL STORAGE OF

SPILLED SUBSTANCES; SUFFICIENT DRUMS SHALL BE AVAILABLE TO ACCOMMODATE STORED AND

IN-SERVICE VOLUMES OF SPILLABLE SUBSTANCES.

H. REFUELING SHALL BE UNDERTAKEN AS FOLLOWS:

I. MOBILE HIGHWAY VEHICLES SHALL BE REFUELED OFF SITE.

II. EQUIPMENT WHICH IS NOT READILY MOBILE MAY BE REFUELED AT THE WORK SITE LOCATION AS

FAR AS POSSIBLE FROM OPEN WATER OR WATERCOURSES. DRIP TRAYS SHALL BE USED AND

ABSORBENT MATERIALS SHALL BE IMMEDIATELY ON HAND FOR USE IN PREVENTING A SPILL.

III. WHEN ENGAGED IN REFUELING, WORKERS SHALL HAVE WITH THEM A SUPPLY OF ABSORBENT

MATERIAL AND DRIP TRAYS AS REQUIRED TO MEET ALL NEEDS IN CONTAINING AND/OR SOAKING

UP ALL SPILLS DURING REFUELING OPERATION.

I. EQUIPMENT OPERATION SHALL BE UNDERTAKEN FOLLOWING THESE PROCEDURES:

I. EQUIPMENT WORKING NEAR WATER SHALL BE CLEANED AND SERVICED AS NECESSARY TO

PREVENT DEPOSITION OF SOILS, OIL, GREASE, COOLANT, FUEL AND ANY OTHER CONTAINMENT.

II. STATIONARY EQUIPMENT OPERATION NEAR OPEN WATER OR IN DEWATERED AREAS SHALL BE

EQUIPPED WITH DRIP TRAYS TO CONTAIN ANY FUEL, OIL, COOLANT OR GREASE LEAKAGE.

EQUIPMENT DRIP TRAYS SHALL BE OF A SUFFICIENT SIZE TO EFFECTIVELY PROTECT FROM ALL

POTENTIAL DRIPS OR SPILLS THE PLAN AREA BENEATH EACH PIECE OF EQUIPMENT FOR WHICH

PROTECTION IS PROVIDED. DRIP TRAYS FOR CONCRETE PUMPS, GROUT PUMPS AND GROUT

RESERVOIRS SHALL BE CAPABLE OF CONTAINING ALL ACCIDENTAL SPILLS/LEAKAGE DURING

OPERATION AND HOSE CONNECTION.

III. TRUCK AND EQUIPMENT WASHING INVOLVING THE REMOVAL OF COLLECTED DIRT, GREASE, OIL

AND OTHER CONTAINMENTS IS NOT PERMITTED ON SITE. CONCRETE MIXERS, CEMENT GROUT

MIXERS AND ASSOCIATED EQUIPMENT SHALL BE WASHED OUT SUCH THAT ALL CONCRETE AND

CEMENT GROUT WASHINGS ARE DISCHARGED INTO THE EXCESS CONCRETE DISPOSAL BASIN IN

THE LAY DOWN AREA.

IV. NO EQUIPMENT SHALL BE WASHED IN OR NEAR OPEN WATER OR WATERCOURSES.

V. ALL EQUIPMENT SHALL BE IN GOOD CONDITION AND MEET APPLICABLE STATUTORY

REQUIREMENTS FOR SERVICEABILITY AND EXHAUST EMISSIONS. EXHAUST SYSTEMS SHALL

FUNCTION IN A MANNER TO CONTROL EXHAUST NOISE WITHIN ACCEPTABLE REGULATED LEVELS.

VI. MAJOR REPAIRS TO EQUIPMENT WILL NOT BE PERMITTED AT THE WORK SITE. ROUTINE

EQUIPMENT SERVICING OF A MINOR NATURE WILL BE ALLOWED ON SITE WITH THE PROVISION

THAT DRIP/SPILL TRAYS BE USED TO CONTROL ONGROUND SPILLAGE OF FUELS, OILS, COOLANTS

AND GREASE.

J. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CLEANUP OF CONTAMINATION RESULTING

FORM ITS OPERATIONS.

K. CONTAMINATED GRANULAR MATERIALS AND OTHER CONTAMINATED SOILS SHALL BE CAREFULLY

EXCAVATED AND SHALL BE DISPOSED OF ACCORDING TO MOE REGULATIONS AND GUIDELINES. THESE

MATERIALS MAY BE CLASSIFIED AS HAZARDOUS WASTE.

I. SOILS AND SIMILAR MATERIALS CONTAMINATED BY EQUIPMENT OPERATING FLUIDS SHALL BE REMOVED

FROM SITE AND DISPOSED OF IN ACCORDANCE WITH THIS SPECIFICATION AND ALL APPLICABLE

REGULATIONS.

13. CONSTRUCTION NOISE CONTROL

A. UNLESS AS DETAILED` AS. A SEPARATE ITEM IN THE "SCHEDULE OF ITEMS AND

PRICES" IN THE FORM OF TENDER SECTION AND SUBSEQUENTLY DESCRIBED

UNDER ANOTHER SECTION WITHIN THE SPECIFICATIONS, NO SEPARATE PAYMENT

WILL BE MADE FOR THE PROVISION OF ALL LABOUR, MATERIALS, PLANT AND

EQUIPMENT TO COMPLY WITH THE ENVIRONMENTAL REQUIREMENTS OF THIS

SECTION OF THE SPECIFICATIONS. FULL COMPENSATION FOR COMPLYING WITH

ALL THE REQUIREMENTS OF THIS SECTION SHALL BE DEEMED TO BE INCLUDED IN

THE PAYMENTS FOR THE WORK TO WHICH THESE REQUIREMENTS ARE RELATED.

B. CONSTRUCTION SAFETY (OHSA REQUIREMENTS) AND LOCAL MUNICIPAL BYLAWS

SHALL PROVIDE THE REGULATORY BASIS FOR NOISE CONTROL AND HEARING

PROTECTION. NOISE BYLAWS OR FORMAL EXEMPTION THEREOF SHALL BE USED IN

SETTING HOURS OF WORK LIMITATIONS.

F. UNLESS DETAILED OTHERWISE IN THE CONTRACT DRAWINGS OR SPECIFICATION, THE

SILT FENCE AND FILTERING SYSTEM DESIGN SHALL CONFORM TO THE FOLLOWING

SPECIFICATIONS:

I. SILT FENCE DESIGN SHALL BE BY CONTRACTOR. "SNOW"FENCING LINED WITH

FILTER FABRIC SHALL BE ATTACHED TO POSTS SECURELY SET IN THE GROUND.

SILT FENCE FILTER FABRIC SHALL BE TERRAFIX 270 R SYNTHETIC FIBRE FABRIC

OR EQUIVALENT APPROVED BY THE CONTRACT ADMINISTRATOR.

II. FILTER MATERIAL FOR USE AS FILTER SOCKS OR BAGS ON DEWATERING PUMP

DISCHARGE HOSES OR FOR USE IN SETTLING BASIN OVERFLOW WEIRS SHALL BE

COMPRISED OF TERRAFIX 370 RS SYNTHETIC FIBRE FABRIC OR APPROVED

EQUIVALENT. FILTER SOCKS AND FILTER BAGS SHALL HAVE A MINIMUM SURFACE

FILTERING AREA OF NOT LESS THAN 80 TIMES THE CROSS-SECTIONAL AREA OF

THE DISCHARGE HOSE TO WHICH THEY ARE ATTACHED.

III. CLOGGED, RUPTURED OR OTHERWISE INEFFECTIVE FILTER SOCKS AND FILTER

BAGS SHALL BE REPLACED WITHOUT DELAY TO MAINTAIN THE SERVICEABILITY OF

DEWATERING PUMP DISCHARGE FILTERING SYSTEMS.

G. A VISUAL INSPECTION OF THE SEDIMENT, EROSION AND DUST CONTROL MEASURES

SHALL BE COMPLETED DAILY AND REPAIRS TO ANY DAMAGES TO BE COMPLETED

IMMEDIATELY UPON IDENTIFICATION.

F. ALL EXCESS WET CONCRETE, EXCESS CEMENT GROUT TRUCK MIXER WASHINGS SHALL BE

DISPOSED OF IN A WASHOUT BASIN TO BE DEVELOPED BY THE CONTRACTOR IN THE LAY

DOWN AREA AWAY FROM THE RIVER AT THE SITE. THE PROPOSED DESIGN OF THE EXCESS

WET CONCRETE WASHOUT BASIN SHALL BE SUBMITTED TO THE CONTRACT ADMINISTRATOR

FOR APPROVAL. THE BASIN SHALL BE FORMED BY SUBSTANTIAL BERMS OF IMPORTED SAND

AND MATERIAL EXCAVATED FOR THE BASIN SHALL BE USED TO FORM A BERM AROUND THE

BASIN OR STOCKPILED FOR FUTURE USE IN RESTORATION. HARDENED EXCESS CONCRETE,

CEMENT GROUT AND UNCONTAMINATED WASHINGS IN A DISPOSAL BASIN SHALL BE

REMOVED FOR DISPOSAL AS CONCRETE RUBBLE IF THE CAPACITY FOR THE BASIN IS

REACHED BEFORE COMPLETION OF THE WORK.

ADELAIDE POLLUTION CONTROL PLANT

OUTFALL STRUTURE REPLACMENT

ES 5165-12

ENVIRONMENTAL PROTECTION

Page 5: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

THAMES RIVER

ADELAIDE POLLUTION CONTROL PLANT

OUTFALL STRUTURE REPLACEMENT

ES 5165-12

PLANT OUTFALL

PLAN & PROFILE

ADELAIDE PCP OUTFALL SEWER-PLAN

Page 6: DESCRIPTION - London, Ontario · 5. straw mulch applications are to be added to exposed topsoil and subsoil stockpiles during winter to minimize erosion. (as advised by the contract

SECTION A-A

(SEE DRAWING C100)

CONSIDERATIONS FOR STAGING OPERATIONS

THIS INFORMATION IS BEING PROVIDED AS A GUIDE FOR THE CONTRACTOR TO ASSIST THEM IN PREPARING THE

CONSTRUCTION STAGING PLAN FOR THIS PROJECT.

1. THE CITY OF LONDON OPERATIONS CAN TEMPORARILY HOLD FLOW BACK AT THE PLANT FOR APPROXIMATELY 6 HOURS

TO ASSIST WITH THE INSTALLATION OF THE HEADWALL. THIS WORK NEEDS TO BE COORDINATED WITH THE CITY PLANT

OPERATION STAFF AT LEAST 72 HOURS IN ADVANCE OF THE WORK. THE WORK MAY BE DELAYED OR POSTPONED AT ANY

TIME DUE TO FORECASTED WEATHER AND ANTICIPATED PLANT FLOWS. THE CONTRACTOR MAY EXPLORE THE OPTION TO

WORK AFTER HOURS OR ON WEEKENDS TO FURTHER EXTEND THE POSSIBLE SHUTDOWN TIME OF THE OUTLET PIPE.

THIS WILL HAVE TO BE DISCUSSED IN DETAIL WITH THE CITY OPERATIONS STAFF.

2. IF THE CONTRACTOR ANTICIPATES REQUIRING A LONGER SHUT DOWN THAN 6 HOURS TO COMPLETE THE INSTALLATION

OF THE HEADWALL STRUCTURE TEMPORARY PIPING & PUMPING CAN BE USED TO DIVERT FLOW FROM THE EXISTING UV

CHANNEL AT THE PLANT TO A NEAR BY DITCH ( REFER TO DRAWING C001) THIS MAY INCREASE THE LENGTH OF THE

SHUTDOWN. IF TEMPORARY PUMPING IS USED THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL SEDIMENT AND

EROSION CONTROL MEASURES AND DISSIPATING THE FLOW PRIOR TO ENTERING THE DITCH TO ENSURE NO WASH OUTS

OCCUR. REFER TO THE SPECIAL PROVISION ITEM M10 FOR FURTHER INFORMATION ON TEMPORARY PUMPING.

3. THE CONTRACTOR SHOULD PREPARE AS MUCH OF THE EXCAVATION, RIP RAP/CONCRETE MAT AND ARMOUR STONE AS

POSSIBLE PRIOR TO THE INSTALLATION OF THE HEADWALL. THE CONTRACTOR SHOULD ANTICIPATE TEMPORARILY

SUPPORTING THE OUTFALL PIPE IF REQUIRED.

4. THE CONTRACTOR SHOULD ALSO ANTICIPATE FLOWS IN THE OUTLET PIPING THAT CAN NOT BE HELD BACK DUE TO

STORM SEWERS THAT MAY TIE INTO THE PIPING BETWEEN THE POLLUTION CONTROL PLANT UV CHANNEL AND THE

EXISTING HEADWALL STRUCTURE. AN ADDITIONAL PLUG IN THE 900mm OUTLET PIPE MAY BE REQUIRED.

5. THE TYPICAL LEVEL OF THE RIVER IS ABOVE THE INVERT OF THE OUTLET PIPE AND CAN RANGE FROM 200mmTO FULL

SUBMERGENCE DEPENDING ON THE FLOWS IN THE RIVER. THIS WORK SHOULD BE SCHEDULED DURING LOW FLOW

CONDITIONS .THE CONTRACTOR WILL NEED TO PROVIDE A TEMPORARY PLUG IN THE PIPE TO PREVENT FLOW FROM

TRAVELING THROUGH THE PIPE AND INTO THE EXCAVATION.

6. A PERMIT TO TAKE WATER HAS BEEN APPLIED FOR TO ALLOW FOR TEMPORARY PUMPING AT THE HEADWALL LOCATION

TO CONTEND WITH GROUND WATER ISSUES.

7. GIVEN THAT THE NEW LOCATION OF THE HEADWALL IS SET BACK FROM THE EXISTING RIVERBANK CONSIDERATION

SHOULD BE GIVEN TO LEAVING THE EXISTING BANK IN PLACE WHILE INSTALLING THE HEADWALL. ONCE THE HEADWALL IS

IN PLACE THE EXISTING EMBANKMENT COULD THEN BE REMOVED WITHIN THE NEW CHANNEL, AND FINAL CHANNEL

RESTORATION/CONSTRUCTION COMPLETED AT THAT TIME.

ADELAIDE POLLUTION CONTROL PLANT

OUTFALL STRUTURE REPLACEMENT

ES 5165-12

PLANT OUTFALL

DETAILS & SECTIONS