des moines area metropolitan planning organization (mpo

84
Altoona Ankeny Bondurant Carlisle Clive Dallas County Des Moines DART Grimes Johnston Mitchellville Norwalk Pleasant Hill Polk City Polk County Urbandale Warren County Waukee West Des Moines Windsor Heights The MPO receives federal funding and may not discriminate against anyone on the basis of race, color, or national origin, according to Title VI of the Civil Rights Act of 1964. For more information or to obtain a Title VI Complaint form, call 515-334-0075. NOTICE OF MEETING Des Moines Area Metropolitan Planning Organization (MPO) *************************** 4:00 p.m., Thursday, August 15, 2013 Des Moines Area MPO - Burnham Conference Room *************************** TENTATIVE AGENDA The established protocol for minutes of this meeting will be to list all attendees, and with each item on which a vote is conducted in the ordinary course in order to take formal action, those voting nay or abstaining will be identified by name. Any member who is absent from the meeting for any period of time during which a vote of the body is taken, is expected to notify the recording secretary at the conclusion of the meeting so that the absence can be duly noted in the minutes. Roll Call votes will be taken as required by law or upon the request of any member that is approved by the chair, and the vote of each member for or against the proposition, or abstention, will be incorporated in the minutes or recorded on a separate sheet attached to the minutes.. 1. Call To Order 2. VOTE: Approval of Agenda 3. VOTE: Approval of Meeting Minutes ....................................................................................... Page 3 Approve the July 25, 2013, meeting minutes. 4. CONSENT and VOTE: July 2013 Financial Report ............................................................... Page 7 Report on the July 2013 Financial Statement; consider approval. 5. REPORT and VOTE: Horizon Year 2035 Metropolitan Transportation Plan Amendment Request ....................................................................................................................................... Page 8 Report on a request from the Cities of Grimes and Urbandale to amend the Horizon Year 2035 Metropolitan Transportation Plan to incorporate the Interstate 35/80 Operations Study recommendations; consider approval. 6. REPORT and VOTE: Fiscal Year 2014-2017 Transportation Capital Improvement Program Draft ........................................................................................................................................... Page 15 Report on the draft of the Fiscal Year 2014-2017 Transportation Capital Improvement Program; consider approval. 7. REPORT and VOTE: Congestion Management Process...................................................... Page 16 Report on the Congestion Management Process document; consider approval. 8. REPORT and VOTE: Federal Fiscal Year 2014-2017 Transportation Improvement Program Revisions .................................................................................................................................. Page 17 Report on requested revisions to the Federal Fiscal Years 2014-2017 Transportation Improvement Program; consider approval. 9. REPORT and OPTIONAL VOTE: Excess Federal Fiscal Years 2013-2016 Transportation Alternatives Program Funding Recommendation ................................................................ Page 20 Report on a recommendation for excess Transportation Alternatives Program funds; consider approval. 10. REPORT and OPTIONAL VOTE: Amendments to the Fiscal Year 2014 Unified Planning Work Program .................................................................................................................................... Page 21 Report on proposed amendments to the Fiscal Year 2014 Unified Planning Work Program to add two special projects; consider approval. 11. REPORT: Traffic Incident Management Plan ........................................................................ Page 23 Report on an update of the regions Traffic Incident Management Plan.

Upload: others

Post on 03-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Des Moines Area Metropolitan Planning Organization (MPO

Altoona Ankeny Bondurant Carlisle Clive Dallas County Des Moines DART Grimes Johnston Mitchellville Norwalk Pleasant Hill Polk City Polk County Urbandale Warren County Waukee West Des Moines Windsor Heights

The MPO receives federal funding and may not discriminate against anyone on the basis of race, color, or national origin, according to Title VI of the Civil Rights Act of 1964. For more information or to obtain a Title VI Complaint form, call 515-334-0075.

NOTICE OF MEETING

Des Moines Area Metropolitan Planning Organization (MPO) ***************************

4:00 p.m., Thursday, August 15, 2013 Des Moines Area MPO - Burnham Conference Room

*************************** TENTATIVE AGENDA

The established protocol for minutes of this meeting will be to list all attendees, and with each item on which a vote is conducted in the ordinary course in order to take formal action, those voting nay or abstaining will be identified by name. Any member who is absent from the meeting for any period of time during which a vote of the body is taken, is expected to notify the recording secretary at the conclusion of the meeting so that the absence can be duly noted in the minutes. Roll Call votes will be taken as required by law or upon the request of any member that is approved by the chair, and the vote of each member for or against the proposition, or abstention, will be incorporated in the minutes or recorded on a separate sheet attached to the minutes..

1. Call To Order 2. VOTE: Approval of Agenda 3. VOTE: Approval of Meeting Minutes ....................................................................................... Page 3

Approve the July 25, 2013, meeting minutes. 4. CONSENT and VOTE: July 2013 Financial Report ............................................................... Page 7

Report on the July 2013 Financial Statement; consider approval. 5. REPORT and VOTE: Horizon Year 2035 Metropolitan Transportation Plan Amendment

Request ....................................................................................................................................... Page 8 Report on a request from the Cities of Grimes and Urbandale to amend the Horizon Year 2035

Metropolitan Transportation Plan to incorporate the Interstate 35/80 Operations Study recommendations; consider approval.

6. REPORT and VOTE: Fiscal Year 2014-2017 Transportation Capital Improvement Program Draft ........................................................................................................................................... Page 15

Report on the draft of the Fiscal Year 2014-2017 Transportation Capital Improvement Program; consider approval.

7. REPORT and VOTE: Congestion Management Process ...................................................... Page 16 Report on the Congestion Management Process document; consider approval.

8. REPORT and VOTE: Federal Fiscal Year 2014-2017 Transportation Improvement Program Revisions .................................................................................................................................. Page 17

Report on requested revisions to the Federal Fiscal Years 2014-2017 Transportation Improvement Program; consider approval.

9. REPORT and OPTIONAL VOTE: Excess Federal Fiscal Years 2013-2016 Transportation Alternatives Program Funding Recommendation ................................................................ Page 20

Report on a recommendation for excess Transportation Alternatives Program funds; consider approval. 10. REPORT and OPTIONAL VOTE: Amendments to the Fiscal Year 2014 Unified Planning Work

Program .................................................................................................................................... Page 21 Report on proposed amendments to the Fiscal Year 2014 Unified Planning Work Program to add two

special projects; consider approval. 11. REPORT: Traffic Incident Management Plan ........................................................................ Page 23

Report on an update of the regions Traffic Incident Management Plan.

Page 2: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

12. REPORT: Iowa Clean Air Attainment Program Schedule .................................................... Page 24 Report on the Fiscal Year 2015 Iowa Clean Air Attainment Program schedule.

13. REPORT: Trail Counter Report ............................................................................................... Page 25 Report on the first year’s collection of data from the Central Iowa Trail Count Program.

14. REPORT: The Tomorrow Plan Draft ....................................................................................... Page 28 Report on The Tomorrow Plan.

15. REPORT: CHAT! Recap ........................................................................................................... Page 29 Report on the July 25, 2013, CHAT! public event hosted by the MPO staff.

16. INFORMATION: Iowa Chapter of the Urban Land Institute ................................................. Page 30 17. INFORMATION: Transportation Management Association Update .................................. Page 31 18. INFORMATION: MPO Progress Report ................................................................................ Page 32 19. Other Non-Action Items of Interest to the Committee 20. Next Meeting Date

4:00 p.m., Thursday, September 19, 2013, Des Moines Area MPO Office. 21. Adjournment

2

Page 3: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013

Item No. 3

ISSUE: Approval of Meeting Minutes

VOTE: Consider approval of the July 25, 2013, MPO Policy Committee meeting minutes. BACKGROUND:

The minutes of the July 25, 2013, MPO Policy Committee meeting are enclosed on the following pages.

RECOMMENDATION:

Approve the minutes of the July 25, 2013, MPO Policy Committee meeting. STAFF CONTACT:

Jennifer Ratcliff, [email protected]; (515) 334-0075.

3

Page 4: Des Moines Area Metropolitan Planning Organization (MPO

© FY 2013 Des Moines Area Metropolitan Planning Organization. Please call (515) 334-0075 to obtain permission for use.

Meeting Minutes

Des Moines Area Metropolitan Planning Organization (MPO) 4:00 p.m., Thursday, July 25, 2013

Des Moines Area MPO Burnham Conference Room Des Moines, Iowa

The MPO held a meeting at 4:00 p.m. on July 25, 2013, in the Des Moines Area MPO Burnham Conference Room. Before the meeting, the MPO staff emailed agenda packets to the MPO’s representatives and posted the agenda at the MPO office at 12:46 p.m. on July 18, 2013. The fiscal year-to-date publication cost of meeting minutes for the MPO: $1238.51. In addition to these published tentative minutes, there also may be additional Meeting Notes on file with the MPO staff that are public records and available upon request as provided by law. These tentative minutes reflect all action taken at the meeting. Representatives Present: Bobbi Bentz, City of Ankeny Mark Arentsen, City of Bondurant Ruth Randleman, City of Carlisle John Edwards, City of Clive Ted Weaver, City of Clive Mark Hanson, Dallas County Elizabeth Presutti, Des Moines Area Regional

Transit Authority Mike Clayton, Iowa Department of

Transportation* Tracy Troutner, Federal Highway

Administration* Chris Coleman, City of Des Moines Chris Johansen, City of Des Moines Pat Kozitza, City of Des Moines Richard Clark, City of Des Moines Robert Mahaffey, City of Des Moines Tom Armstrong, City of Grimes Paula Dierenfeld, City of Johnston Doyle Scott, Madison County** Ken Thomas, City of Mitchellville Jim Lane, City of Norwalk Martha Miller, City of Pleasant Hill Robert Brownell, Polk County Robert Andeweg, City of Urbandale Creighton Cox, City of Urbandale Mike Carver, City of Urbandale Dean Yordi, Warren County Bill Peard, City of Waukee Tim Moerman, City of Waukee Ted Ohmart, City of West Des Moines Russ Trimble, City of West Des Moines Steve Gaer, City of West Des Moines Dave Jenison, City of Windsor Heights

Representatives Absent: Skip Conkling, City of Altoona Kyle Mertz, City of Altoona Wade Steenhoek, City of Ankeny John Peterson, City of Ankeny David Chelsvig, City of Cumming** Matt Anderson, City of Des Moines Larry Hulse, City of Des Moines Halley Griess, City of Des Moines Brian Meyer, City of Des Moines Brian Laurenzo, City of Johnston Gary Mahannah, City of Polk City Angela Connolly, Polk County Eric Hanson, City of Indianola Julia Castillo, Heart of Iowa Regional Transit

Agency** Kevin Foley, Des Moines International Airport* Mark Bechtel, Federal Transit Administration* * Advisory/Non-Voting Representatives ** Associate/Non-Voting Representatives Others Present: Wendy Lacina, Public Jennifer Bohac, City of Des Moines Paul Moritz, City of Ankeny Staff Present: Gary Myers, General Counsel Todd Ashby, Executive Director Jennifer Ratcliff, Executive Assistant Dylan Mullenix, Principal Transportation Planner Luke Parris, Senior Transportation Planner Zach Young, Senior Transportation Planner Bethany Wilcoxon, Senior Transportation

Planner Nathan Goldberg, Senior Transportation Planner Aaron Bartling, Associate Transportation

Planner

4

Page 5: Des Moines Area Metropolitan Planning Organization (MPO

© FY 2013 Des Moines Area Metropolitan Planning Organization. Please call (515) 334-0075 to obtain permission for use.

1. Call to Order

MPO Chair Coleman recognized a quorum and called the July 25, 2013, meeting to order at 4:07 p.m.

2. Approval of Agenda

MOTION: A motion was made and seconded to approve the Des Moines Area Metropolitan Planning Organization July 25, 2013, meeting agenda.

MOTION CARRIED UNANIMOUSLY

3. Approval of the Meeting Minutes

MOTION: A motion was made and seconded to approve the Des Moines Area Metropolitan Planning Organization’s June 20, 2013, meeting minutes.

MOTION CARRIED UNANIMOUSLY

4. June 2013 Financial Statement

MOTION: A motion was made and seconded to approve the June 2013, Financial Statement.

MOTION CARRIED UNANIMOUSLY

(CHRIS JOHANSEN ARRIVED AT 4:10 PM)

5. Federal Fiscal Year 2014-2017 Transportation Improvement Program Final Draft

MOTION: A motion was made and seconded to approve the final Federal Fiscal Year

2014-2017 Transportation Improvement Program.

MOTION CARRIED UNANIMOUSLY

(TOM ARMSTRONG ARRIVED AT 4:12 PM)

6. City of Van Meter Associate Membership

MOTION: A motion was made and seconded to approve the City of Van Meter’s request to join the MPO as an associate, non-voting member.

MOTION CARRIED UNANIMOUSLY

7. 2013 Certification Review Report

Federal Highway Administration staff presented; discussion on item 7.

(RUSS TRIMBLE ARRIVED AT 4:20 PM) (DEAN YORDI ARRIVED AT 4:23 PM)

8. Horizon Year 2035 Metropolitan Transportation Plan Amendment Request

MPO staff presented; discussion on item 8.

9. Fiscal Year 2014-2017 Transportation Capital Improvement Program

Development Draft

MPO staff presented; discussion on item 9.

10. Fiscal Years 2014-2017 Transportation Improvement Program Revisions

MPO staff presented; discussion on item 10.

11. Congestion Management Process Draft

MPO staff presented; discussion on item 11.

5

Page 6: Des Moines Area Metropolitan Planning Organization (MPO

© FY 2013 Des Moines Area Metropolitan Planning Organization. Please call (515) 334-0075 to obtain permission for use.

12. The Tomorrow Plan Draft

MPO staff presented; discussion on item 12.

13. Transportation Performance Measure Workshop Recap

MPO staff presented; discussion on item 13.

14. Transportation Management Association Update

Information on item 14.

15. CHAT!

MPO staff presented; discussion on item 15.

16. MPO 30th Anniversary Presentation

MPO staff presented; discussion on item 16.

17. MPO Progress Report

18. Other Non-Action Items of Interest to the Committee

19. Next Meeting Date

4:00 p.m. Thursday, August 15, 2013, Des Moines Area MPO Burnham Conference Room.

20. Adjournment

Hearing no objection to the contrary, Chair Coleman adjourned the meeting at 4:56 p.m.

6

Page 7: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 4

ISSUE: July 2013 Financial Statement

CONSENT and VOTE: Consider approval of the July 2013 Financial Statement. BACKGROUND:

The July 2013 Financial Statement will be provided prior to the Policy Committee meeting. RECOMMENDATION:

Approve the July 2013 Financial Statement. STAFF CONTACT:

Stephanie Muller, [email protected]; (515) 334-0075.

7

Page 8: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 5

ISSUE: Horizon Year 2035 Metropolitan Transportation Plan Amendment Request

REPORT and VOTE: Consider a request from the Cities of Grimes and Urbandale to amend the Horizon Year 2035 Metropolitan Transportation Plan to incorporate recommendations from the Interstate 35/80 Operations Study: Douglas Avenue to NW 86thStreet.

BACKGROUND:

The Cities of Urbandale and Grimes and the Iowa Department of Transportation (DOT), with assistance from HR Green, Inc., recently completed the I-35/80 Operations Study: Douglas Avenue to NW 86th Street. The study recommends several changes in the area in and around the Iowa Highway 141 and Interstate 35/80 Interchange. The Iowa DOT now will take the lead on an Interchange Justification Report (IJR) but would first like the study’s recommendations reflected in the MPO’s Horizon Year 2035 Metropolitan Transportation Plan (HY 2035 MTP). The study recommends the following changes to the HY 2035 MTP:

Eliminate plans for the development of NW 50th Avenue from the north ramp of the Iowa Highway 141 Interchange to 128th Street, as currently identified in the HY 2035 MTP;

Add a northbound flyover ramp from northbound I-35/80 to northbound Iowa Highway 141;

Add a ramp from Meredith Drive to southbound I-35/80 for southbound traffic; and, Add a ramp to Meredith Drive from northbound I-35/80 for northbound traffic.

The MPO held a public input meeting on Tuesday, July 30, 2013, at Urbandale City Hall. Included on the following pages are the letters of request and supporting documentation. At its August 7, 2013, meeting, the MPO Executive Committee asked for the Cities of Urbandale and Grimes to provide additional documentation stating that those communities will develop plans and secure funding to make any improvements to the local street network that might be necessary as a result of implementing the I-35/80 Operations Study. MPO staff has contacted the communities for this information and will share responses at the MPO meeting. Members of the Executive Committee also expressed uncertainty with some aspects of the proposed projects. The committee’s preference is to allow the MPO the ability to reconsider the proposed amendments once the IJR is completed. The Executive Committee, therefore, requests that the MPO consider approval of the amendments to the HY 2035 MTP solely for the purpose of completing the IJR.

RECOMMENDATION:

Approve the requested amendments to the HY 2035 MTP for the purposes of allowing the Iowa DOT to complete an Interchange Justification Report on the Iowa Highway 141 and Interstate 35/80 Interchange.

STAFF CONTACT:

Dylan Mullenix, [email protected]; (515) 334-0075.

 

8

Page 9: Des Moines Area Metropolitan Planning Organization (MPO

9

Page 10: Des Moines Area Metropolitan Planning Organization (MPO

10

Page 11: Des Moines Area Metropolitan Planning Organization (MPO

11

Page 12: Des Moines Area Metropolitan Planning Organization (MPO

12

Page 13: Des Moines Area Metropolitan Planning Organization (MPO

13

Page 14: Des Moines Area Metropolitan Planning Organization (MPO

14

Page 15: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 6

ISSUE: Fiscal Years 2014-2017 Transportation Capital Improvement Program

REPORT and VOTE: Consider approval of the Fiscal Years 2014-2017 Transportation Capital Improvement Program.

BACKGROUND: The MPO annually develops a four-year Transportation Capital Improvement Program (TCIP). The TCIP lists all projects in the MPO planning area that do not use federal funding but are scheduled to begin within the next four fiscal years. To develop the Fiscal Years 2014-2017 Transportation Capital Improvement Program, MPO staff requested member governments and participating agencies submit a document containing any transportation projects that will be constructed in the next four years. The draft Fiscal Years 2014-2017 Transportation Capital Improvement Program is included as a supplemental item.

RECOMMENDATION:

Approve the Fiscal Years 2014-2017 Transportation Capital Improvement Program. STAFF CONTACTS:

Aaron Bartling, [email protected]; (515) 334-0075.

15

Page 16: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 7

ISSUE: Congestion Management Process

REPORT: Consider approval of the Congestion Management Process document. BACKGROUND:

MPOs with a population over 200,000 are required to develop a Congestion Management Process (CMP) to define the process by which the region will monitor and manage congestion. The need to update the MPO’s CMP was identified as recommendation during the MPO’s recent Quadrennial Certification Review. The US Department of Transportation created the Guidebook on the Congestion Management Process in Metropolitan Transportation Planning, which outlines eight steps to help develop a CMP. These eight steps are as follows:

1. Develop objectives; 2. Identify the area of application; 3. Define the system on which to implement the CMP; 4. Develop performance measures; 5. Develop a monitoring plan; 6. Identify and evaluate strategies to manage congestion; 7. Implement congestion management strategies; and, 8. Monitor effectiveness of the CMP.

The CMP developed by MPO staff follows this eight-step process. The process will be further enhanced by the update of the MPO’s long-range transportation plan, which is in progress. The draft Congestion Management Process document is included as a supplemental item to this agenda packet.

RECOMMENDATION:

Approve the Congestion Management Process document.

STAFF CONTACT:

Nathan Goldberg, [email protected]; (515) 334-0075.

16

Page 17: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 8

ISSUE: Federal Fiscal Years 2014-2017 Transportation Improvement Program Amendment Requests

REPORT: Consider approval of revisions to the Federal Fiscal Years 2014-2017 Transportation Improvement Program.

BACKGROUND:

The City of Bondurant and the City of Grimes requested the following revisions to the Federal Fiscal Year 2014-2017 Transportation Improvement Program (FFY 2014-2017 TIP):

Sponsor: City of Bondurant Project: Chichaqua Valley Trail: 800 LF West of Grant Street N and 2nd Street NE to NE 88th Street TAP Award Amount: $300,000 in FFY 2017 TAP funds Total Cost: $850,000 Change: Move funds awarded in FFY 2017 to FFY 2014 Revision Type: Administrative Modifications Sponsor: City of Grimes Project: S 19th St: Iowa 141 to 2,600 feet east of Iowa 141 STP Award Amount: $600,000 in FFY 2015 STP funds Total Cost: $2,595,000 Change: Move funds awarded in FFY 2015 to FFY 2014 Revision Type: Administrative Modification

Included, immediately following, are maps showing the location of these projects.

The MPO staff notes that, due to the nature of these administrative modifications, approval of the MPO is necessary. MPO staff held an STP Funding Subcommittee meeting on July 30, 2013 to discuss the revisions and to develop a recommendation for the MPO Policy Committee to consider at their August 25, 2013 meeting. The MPO notes that these revisions require the movement of funds from FFY 2015 and FFY 2017 to FFY 2014. MPO staff has reviewed the MPO's fiscal capacity in FFY 2014 and has determined that movement of funds is fiscally possible.

RECOMMENDATION:

Approve the requested revisions to the FFY 2014-2017 TIP.

STAFF CONTACTS:

Zach Young, [email protected]; and, Luke Parris, [email protected];

(515) 334-0075.

17

Page 18: Des Moines Area Metropolitan Planning Organization (MPO

Iowa TPMS project map 10:35 AM 7-25-2013

Sponsor Bondurant

Identity STP-E-0747(606)--8V-77 TPMS# 22144 TIP# --

Location Chichaqua Valley Trail: 800 LF West of Grant StreetN and 2nd Street NE to NE 88th Street

Characteristics &#60NA> / /

Type of Work Ped/Bike Grade & Pave

Vicinity Map

Project Site

18

Page 19: Des Moines Area Metropolitan Planning Organization (MPO

Iowa TPMS project map 4:51 PM 7-02-2013

Sponsor Grimes

Identity STP-U-3125(611)--70-77 TPMS# 20956 TIP# --

Location S 19TH ST: Iowa 141 to 2,600 feet east of Iowa 141

Characteristics Minor Arterial / 0.49 MI / 6400 - 6400

Type of Work Grade and Pave,Lighting,Right of Way

Vicinity Map

Project Site

19

Page 20: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 9

ISSUE: Excess Federal Fiscal Years 2013-2016 Transportation Alternatives Program Funding Recommendation

REPORT AND OPTIONAL VOTE: Consider approval of an award recommendation for excess Federal Fiscal Year 2013-2016 Transportation Alternatives Program funds.

BACKGROUND:

The MPO Surface Transportation Program (STP) Funding Subcommittee annually determines a funding recommendation for Transportation Alternative Program (TAP) funds. Last year, changes to federal transportation legislation through Moving Ahead for Progress in the 21st Century (MAP-21) increased the TAP targets for the MPO. The increase in funds is due to changes to the TAP that require the MPO to include Safe Routes to Schools (SRTS) as an eligible project category. The MPO staff identified that there were $1,410,393 of excess TAP funds available to be awarded. The STP Funding Subcommittee met on July 30, 2013 and made the following recommendation for awarding the excess funds.

Year Sponsor Project Category Original Award

Additional Award

Total Cost

2014 Des Moines

Waveland Trail – I-235 to University Avenue

Bike/Ped $150,000 $100,000 $400,000

2014 Windsor Heights

Hickman Road – three blocks west of 63rd Street and one block south

Streetscape $107,000 $148,432 $521,000

2014 MPO Iowa by Trail Smartphone Application

Bike/Ped N/A $50,000 $100,000

2015 Altoona Gay Lea Wilson Trail East Extension

Bike/Ped $200,000 $500,000 $1,518,000

2017 Bondurant US 65/Lincoln Street Pedestrian Underpass

Safe Routes to School

N/A $250,000 $850,000

The STP Funding Subcommittee recommendation would award $1,048,432 in excess TAP funds and leave $361,961 unallocated. The unallocated funds would be awarded during the FFY 2018 TAP application cycle.

RECOMMENDATION:

Recommend approving the MPO STP Subcommittee’s recommendation for the excess FFY 2013-2016 TAP funds and forward the recommendation to the Policy Committee.

STAFF CONTACTS:

Zach Young, [email protected]; and, Luke Parris, [email protected];

(515) 334-0075.

20

Page 21: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 10

ISSUE: Amendments to the Fiscal Year 2014 Unified Planning Work Program

REPORT and OPTIONAL VOTE: Consider approval of amendments to the Fiscal Year 2014 Unified Planning Work Program.

BACKGROUND:

MPO staff has identified the need to add two special projects to the Fiscal Year 2014 Unified Planning Work Program (FY 2014 UPWP). The addition of these projects will allow the MPO to be reimbursed for expenses incurred by staff and/or project consultants. The two projects and budget amounts are as follows:

Work Element 13.5 – Inclusive Coordinated Transportation Study Funding Source: Community Transportation Association of America Budget Amount: $19,455 Work Element 13.6 – The Tomorrow Plan Funding Source: Sustainable Communities Regional Planning Grant Budget Amount: $60,000

Included on the following page is a revised FY 2014 UPWP budget summary highlighting the proposed amendments. MPO staff notes the addition of the two special projects do not affect the MPO’s assessment rate, federal carryover balance, or local carryover balance.

RECOMMENDATION:

Approve the amendments to the FY 2014 UPWP.

STAFF CONTACT:

Dylan Mullenix, [email protected]; (515) 334-0075.

21

Page 22: Des Moines Area Metropolitan Planning Organization (MPO

FHW

A P

L

Fun

ds

Car

ryo

ver

FTA

530

3

Fun

ds

-

Car

ryo

ver

FHW

A P

L

Fun

ds

- N

ew

FTA

53

03

Fun

ds

- N

ew

MP

O M

atch

Fun

ds

Oth

er L

oca

l

Fun

ds

CIR

TPA

Co

ntr

act

MP

O S

TP

Fun

ds

Rai

l

Rev

olv

ing

Loa

n F

un

ds

SCP

G F

un

ds

CTA

A G

ran

t

Fun

ds

MP

O T

OTA

LFe

de

ral F

un

ds

Loca

l Mat

ch

Fun

ds

DA

RT

TOTA

L

1.0

Lon

g-R

ange

Tra

nsp

ort

atio

n

Pla

nn

ing

$45,

157

$0$1

62,6

54$2

9,8

82

$5

6,8

80

$8

,84

4$0

$0$0

$0$0

$3

03

,41

7$0

$0$0

$3

03

,41

7

2.0

Tran

spo

rtat

ion

Sys

tem

s

Pla

nn

ing

$25,

646

$0$9

2,3

74$1

6,9

70

$3

2,3

02

$5

,02

3$0

$0$0

$0$0

$1

72

,31

5$0

$0$0

$1

72

,31

5

3.0

Pu

blic

Invo

lvem

ent

$9,5

68$0

$34,

463

$6,3

31

$1

2,0

52

$1

,87

4$0

$0$0

$0$0

$6

4,2

88

$0$0

$0$

64

,28

8

4.0

Inte

rage

ncy

Co

ord

inat

ion

$17,

598

$0$6

3,3

87$1

1,6

45

$1

5,3

69

$1

0,2

43

$0$0

$0$0

$0$

11

8,2

42

$0$0

$0$

11

8,2

42

5.0

Tran

spo

rtat

ion

Imp

rove

men

t P

rogr

am$1

3,75

8$0

$49,

554

$9,1

04

$1

7,3

28

$2

,69

4$0

$0$0

$0$0

$9

2,4

38

$0$0

$0$

92

,43

8

6.0

CIR

TPA

$0$0

$0$0

$0$0

$7

9,6

21

$0$0

$0$0

$7

9,6

21

$0$0

$0$

79

,62

1

7.0

Un

ifie

d P

lan

nin

g W

ork

Pro

gram

$4,4

65$0

$16,

081

$2,9

54

$5

,62

4$8

74$0

$0$0

$0$0

$2

9,9

98

$0$0

$0$

29

,99

8

8.0

Tran

sit

Pla

nn

ing

$7,4

83$0

$26,

952

$4,9

52

$9

,42

5$

1,4

65

$0$0

$0$0

$0$

50

,27

7$

14

0,0

00

$3

5,0

00

$1

75

,00

0$

22

5,2

77

9.0

Co

mm

itte

e S

up

po

rt$2

5,26

4$0

$90,

998

$16,

71

7$

31

,82

1$

4,9

48

$0$0

$0$0

$0$

16

9,7

48

$0$0

$0$

16

9,7

48

10.0

Ad

min

istr

atio

n$2

8,26

2$0

$101

,796

$18,

70

1$

35

,59

7$

5,5

35

$0$0

$0$0

$0$

18

9,8

91

$0$0

$0$

18

9,8

91

11.0

Info

rmat

ion

Tec

hn

olo

gy$0

$0$0

$0$0

$2

0,0

00

$0$0

$0$0

$0$

20

,00

0$0

$0$0

$2

0,0

00

12.0

Trav

el a

nd

Tra

inin

g$5

,286

$0$1

9,0

39$3

,49

8$

7,6

93

$0$0

$0$0

$0$0

$3

5,5

16

$0$0

$0$

35

,51

6

$182

,487

$0$6

57,2

98$1

20,7

54

$2

24

,09

1$

61

,50

0$

79

,62

1$0

$0$0

$0$

1,3

25

,75

1$

14

0,0

00

$3

5,0

00

$1

75

,00

0$

1,5

00

,75

1

13.1

Spec

ial P

roje

ct –

GD

MP

/DC

A

TMA

$0$0

$0$0

$0$

57

,87

5$0

$4

7,5

00

$0$0

$0$

10

5,3

75

$0$0

$0$

10

5,3

75

13.2

Spec

ial P

roje

ct –

Pictometry

$0$0

$0$0

$0$

16

,00

0$0

$0$0

$0$0

$1

6,0

00

$0$0

$0$

16

,00

0

13.3

Spec

ial P

roje

ct-

Rai

l Po

rt

Stu

dy

$0$0

$0$0

$0$

25

,00

0$0

$0$

10

0,0

00

$0$0

$1

25

,00

0$0

$0$0

$1

25

,00

0

13.4

Spec

ial P

roje

ct -

Am

es/

Des

Mo

ines

Co

rrid

or

Tran

sit

Stu

dy

$0$0

$0$0

$0$0

$0$0

$0$

10

0,0

00

$0$

10

0,0

00

$0$0

$0$

10

0,0

00

13.5

Spec

ial P

roje

ct -

Incl

usi

ve

Co

ord

inat

ed T

ran

spo

rtat

ion

Stu

dy

$0$0

$0$0

$0$0

$0$0

$0$0

$1

9,4

55

$1

9,4

55

$0$0

$0$

19

,45

5

13.6

Spec

ial P

roje

ct -

Th

e

Tom

orr

ow

Pla

n

$0$0

$0$0

$0$0

$0$0

$0$

60

,00

0$0

$6

0,0

00

$0$0

$0$

60

,00

0

$9

8,8

75

$1

60

,00

0$

19

,45

5$

42

5,8

30

$4

25

,83

0$

98

,87

5$

10

0,0

00

$3

46

,37

5$

34

6,3

75

$3

46

,37

5$

16

0,3

75

$1

60

,00

0$

19

,45

5$

1,7

51

,58

1$

1,9

26

,58

1$

16

0,3

75

$1

00

,00

0$

1,6

72

,12

6$

1,6

72

,12

6$

1,8

47

,12

6

= N

ew It

ems

Blu

e Te

xt=

New

am

ount

Red

Tex

t=

Pre

viou

s am

ount

Sub

To

tal F

Y 2

014

Bu

dg

et

Sub

To

tal F

Y 2

014

Bu

dg

et

TOTA

L FY

201

4 B

UD

GET

FISC

AL

YEA

R 2

01

4W

OR

K P

RO

GR

AM

BU

DG

ET B

Y A

GEN

CY

Am

end

men

t 1

1-A

ug-

13

UP

WP

CO

DE

WO

RK

ELE

MEN

T

Des

Mo

ines

Are

a M

etro

po

litan

Pla

nn

ing

Org

aniz

atio

n (

MP

O)

De

s M

oin

es

Are

a R

egi

on

al T

ran

sit

Au

tho

rity

(D

AR

T)

GR

AN

D T

OTA

L

$0

$182

,487

$0 $0

$0

$657

,29

8

$0

$120

,75

4

$0

$2

24

,09

1

$0

$7

9,6

21

$4

7,5

00

$4

7,5

00

$1

00

,00

0

$1

00

,00

0

$0

$1

40

,00

0

$0

$3

5,0

00

$0

$1

75

,00

0

22

Page 23: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 11

ISSUE: Traffic Incident Management Plan

REPORT: Discussion on the Iowa Department of Transportation’s proposed update to the Traffic Incident Management Plan.

BACKGROUND:

The Iowa Department of Transportation (DOT) sponsored an Advanced Traffic Incident Management (TIM) workshop – led by the Federal Highway Administration – on May 15, 2013. One of the primary outcomes of this workshop was the proposal to update the Traffic Incident Management Plan for the MPO area. The Iowa DOT has secured a consultant to assist and would like the MPO’s Transportation Technical Committee and Traffic Management Advisory Committee to help steer the process. The Iowa DOT is planning a kickoff meeting for late August or early September.

RECOMMENDATION:

None. Report and discussion only.

STAFF CONTACT:

Nathan Goldberg, [email protected]; (515) 334-0075.

23

Page 24: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 12

ISSUE: Iowa’s Clean Air Attainment Program Schedule

REPORT: Brief report on the Federal Fiscal Year (FFY) 2015 Iowa’s Clean Air Attainment Program Schedule.

BACKGROUND:

Modeled after the federal Congestion Mitigation and Air Quality Improvement Program, Iowa’s Clean Air Attainment Program (ICAAP) was created by the Iowa Department of Transportation (DOT) in 1994. The purpose of ICAAP is to provide funds to transportation projects that maintain the national ambient air quality standards outlined in the 1990 Clean Air Act Amendments. Each year, the Iowa DOT awards ICAAP funds to projects with the highest potential for reducing transportation-related congestion and air pollution. Applications for ICAAP are available at the Iowa DOT’s ICAAP website, https://forms.iowadot.gov/BrowseForms.aspx?templateid=230017. Member governments and agencies planning to apply for ICAAP funds should submit letters of intent to the MPO no later than August 27, 2013; ICAAP applications are due to the MPO by 4:30 pm, on Friday, September 13, 2013. The MPO staff will review all ICAAP applications and submit the applications to the Iowa DOT by the October 1, 2013, deadline.

RECOMMENDATION:

None. Report and discussion only.

STAFF CONTACT: Zach Young, [email protected]; (515) 334-0075.

24

Page 25: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 13

ISSUE: Trail Counter Report

REPORT: Report on the Central Iowa Trail Count Program. BACKGROUND:

In October 2011, the MPO began the Central Iowa Trail Count Program with 40 infrared trail counters from TRAFx Research Ltd. to provide a consistent method for collecting trail user data across central Iowa. The purpose of this program is to implement Chapter Seven, Objective 3, Action 3.1, Benchmark 3.1.1 of the Central Iowa Bicycle and Pedestrian Action Plan, which states, “Administer bicycle/pedestrian counts and user survey’s annually.” The first trail counters were placed in the field in April 2012. The data collected from the counters will be used to set a baseline against which future trail usage can be compared. This information helps the MPO and the Bicycle and Pedestrian Roundtable understand where future trail investments may be needed. The Trail Counter Report is included on the following pages.

RECOMMENDATION:

None. Report and discussion only.

STAFF CONTACTS:

Aaron Bartling, [email protected]; (515) 334-0075.

25

Page 26: Des Moines Area Metropolitan Planning Organization (MPO

1. High Trestle Bridge (East Side)

2. North Walnut Creek (Urbandale)

3. High Trestle Trail (Slater)

4. Walnut Creek Trail (I-235)

5. Lakeview Park Trail (Urbandale)

Central Iowa Trail Count Program

In October 2011, the MPO began

the Central Iowa Trail Count Program with

40 infrared trail counters from TRAFx

Research Ltd. to provide a consistent

method for collecting trail user data

across central Iowa. The purpose of this

program is to implement Chapter Seven,

Objective 3, Action 3.1, Benchmark 3.1.1

of the Central Iowa Bicycle and

Pedestrian Action Plan, which states,

“Administer bicycle/pedestrian counts

and user survey’s annually”.

The trail counters became

available for Des Moines Area

Metropolitan Planning Organization

(MPO) and Central Iowa Regional

Transportation Planning Alliance (CIRTPA)

member governments to checkout in

January 2012 and the first counters were

placed in the field in April, 2012.* As of July

2013, 39 different locations have been

counted (some of which are still in the

process of being counted). A count is

recorded each time someone passes by.

Therefore, one count is equal to one trip.

The MPO and the Bicycle and

Pedestrian Roundtable will use data

collected from the trail counters to set a

baseline against which future trail usage

can be compared. The information helps

the MPO and Bike-Pedestrian Roundtable

understand where future trail investments

may be needed.

*Some trail count data was collected outside of the

Trail Count Program from sources other than the MPO

and began prior to April, 2012.

Trail Counter Update

Trail counters

in Central

Iowa

The Annual Average Daily

Trips (AADT) in 2012 for the

entire trail system was 130.

Listed above are the top 5

trail counter locations with the

highest AADT values in 2012.

July 2013 | Des Moines Area MPO | (515) 334-0075

DRAFT

26

Page 27: Des Moines Area Metropolitan Planning Organization (MPO

48147

71888

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Monthly Totals

Mon, 14%

Tue, 12%

Wed, 11%

Thu, 11% Fri, 12%

Sat, 19%

Sun, 21%

Daily Averages

A total of 11 trail counters were used to analyze monthly

trends occurring within the trail system during the past

year. These 11 trail counters had continuous counts

from April of 2012 to June of 2013 (with the exception of

Lakeview Park).

Trends

Based off of one full year

of counting, central Iowa has

seen increases in trail usage.

When comparing June of 2012 to

June of 2013, there was an

increase of nearly 24,000 counts

on the trails being measured. This

one-year analysis tells us that trail

usage may be on the rise in

central Iowa.

Continued analysis of the

trail counters will allow for a better

understanding of the trends taking

place on central Iowa trails. This

will result in a more efficient and

successful way of planning for

trails in the region. Further analysis

will include looking at annual

trends to estimate the number of

users along a given trail segment.

These annual counts will also

display more accurate trends that

are taking place.

Selected trail counters

for monthly analysis

Pulling together data from the MPO’s trail counters, as well as

the Army Corps of Engineers and the City of Perry, daily and

hourly averages for trail usage were calculated. Trail usage

during the day peaks between 4 and 5 PM, when 7.8% of the

total trips take place. However, the distribution remains

somewhat consistent from around 10 AM to 6 PM. The most

common days to use the trail system are Saturdays and

Sundays, but the overall distribution is fairly proportionate

throughout the week.

Selected Trail Counters:

Raccoon River Valley Trail Adel

Dallas Center

Dawson

Minburn

Redfield

Waukee Northwest

Waukee West

North Walnut Creek Trail Colby Woods

Walker Johnson Park

Urbandale Trails Lakeview Park (began

June ’12)

Walnut Creek Park

*Daily averages calculated from Average Daily Traffic (ADT)

Trai

l Co

un

ts

Pe

rce

nt

of

Tota

l Dai

ly C

ou

nts

7.8%

0%

1%

2%

3%

4%

5%

6%

7%

8%

9%

Hourly Averages

DRAFT

27

Page 28: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 14

ISSUE: The Tomorrow Plan Draft

REPORT: Report on development of The Tomorrow Plan. BACKGROUND:

Over the past two years, the MPO has led a regional consortium in developing The Tomorrow Plan. The product of input from elected officials, stakeholders, staff members, and thousands of Greater Des Moines residents, the plan recognizes that we are many distinct communities working as one region to compete globally and to leave a sustainable legacy for future generations. It focuses on the economy, the environment, community vitality, and regional cooperation. As implementation of the plan gets underway, it will save communities and the region money, draw resources to the region, and prepare us for future growth. The executive summary of The Tomorrow Plan is included as a supplemental item.

RECOMMENDATION:

None. Report and discussion only.

STAFF CONTACT:

Bethany Wilcoxon, [email protected]; (515) 334-0075.

28

Page 29: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 15

ISSUE: CHAT! Recap

REPORT: Recap of the July 25, 2013, CHAT! event. BACKGROUND:

The MPO hosted CHAT! — Come Help Advance Transportation — on Thursday, July 25, 2013. The open house offered attendees the chance to learn more about the MPO, the projects that we participate in, and how residents can become more involved with the planning process. CHAT! also kicked off the public participation component of Mobilizing Tomorrow: A Transportation Plan for a Greener Greater Des Moines, which will be developed over the next year. Once complete, Mobilizing Tomorrow will be the implementation plan for the transportation portion of The Tomorrow Plan and serve as the MPO’s required long-range transportation plan. CHAT! celebrated the MPO’s 30th anniversary as well. On July 1, 1983, the MPO was designated as the new metropolitan planning organization for the area pursuant to US Code. At CHAT!, the MPO provided a look back at our last thirty years, including development patterns and key transportation projects that have shaped our region into the vibrant place we live, work, and play. An update on CHAT! will be provided at the August 15, 2013, meeting.

RECOMMENDATION:

None. Report and discussion only.

STAFF CONTACT:

Bethany Wilcoxon, [email protected]; (515) 334-0075.

29

Page 30: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 16

ISSUE: Iowa Chapter of the Urban Land Institute

INFORMATION: Report on the development of a statewide chapter of the Urban Land Institute. BACKGROUND:

The MPO, the Greater Des Moines Partnership, the City of Des Moines, Drake University, and several other partners are looking at forming an Iowa chapter of the Urban Land Institute (ULI). ULI “provides leadership in the responsible use of land and in creating and sustaining thriving communities worldwide. ULI is an independent global nonprofit supported by members representing the entire spectrum of real estate development and land use disciplines.” By forming a chapter in Iowa, Greater Des Moines would be able to further the implementation of The Tomorrow Plan and of Capital Crossroads. An update will be provided at the August 15, 2013, meeting.

RECOMMENDATION:

None. Information only.

STAFF CONTACT:

Bethany Wilcoxon, [email protected]; (515) 334-0075.

30

Page 31: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 17

ISSUE: Transportation Management Association Update

INFORMATION: Report of the Transportation Management Association’s (TMA) program for June 2013.

BACKGROUND:

RAGBRAI’s stop in Des Moines provided a change in the TMA work program. TMA staff worked with the organizers in Des Moines to extend D Line Service to the campgrounds at Waterworks Park and into the later hours to support the main event Downtown. TMA staff also organized and operated two large bike valets on the Riverwalk that night. The ‘Ride On’ advertising campaign is now in progress, with 14 billboards throughout the region purchased, as well as ads on local radio channels. Work on securing a passenger rail connection to Iowa City and beyond also continues. The TMA staff notes the following activities for July 2013:

7/2 – Attended DART Commission meeting 7/11 – Attended MPO Transportation Technical Committee meeting 7/11 – Hosted Iowa Department of Transportation’s Passenger Rail Advisory Committee

meeting 7/15 – Attended Project Launch of Anyone, Anywhere, Any Time on Any Service

Transportation Study at DART 7/16 - Staffed alternative transportation information table with Des Moines Bicycle

Collective/B-Cycle at Nationwide Health Fair 7/17 – Attended Downtown RAGBRAI planning meeting 7/17 – Attended Freight Roundtable 7/18 - Staffed alternative transportation information table with Des Moines Bicycle

Collective/B-Cycle at Greater Des Moines Partnership building food court 7/23 – Coordinated RAGBRAI downtown bike valet parking and staffing by volunteers 7/25 – Gave report at MPO Policy meeting

Ongoing activities:

Posted articles and links on high-speed passenger rail Iowa, Midwest events, and news tabs on All Aboard for Iowa website.

New alternative transportation advertising campaign for radio, billboards, and skywalk ads began.

Posted Construction Alerts on Downtown Community Alliance (DCA) website. DCA transportation pages - continued to post articles on alternative transportation. Maintained Commuter Club customer service by answering member questions (emails and

phone calls), answering Preferred Parking requests, and other administrative duties. Planned July public information tables with DART and Des Moines Bicycle

Collective/B-Cycle. RECOMMENDATION:

None. Information only. STAFF CONTACT:

Glenn Lyons, [email protected].

31

Page 32: Des Moines Area Metropolitan Planning Organization (MPO

Agenda Report MPO Policy Committee

© FY 2014 Des Moines Area Metropolitan Planning Organization Please call (515) 334-0075 to obtain permission for use.

August 2013 Item No. 18

ISSUE: MPO Progress Report

INFORMATION: Distribution of the July 2013 Progress Report. BACKGROUND:

The monthly Progress Report is a summary of work performed by the MPO staff. The July 2013 Progress Report will be provided prior to the MPO Policy Committee meeting.

RECOMMENDATION:

None. Information only.

STAFF CONTACT:

Stephanie Muller, [email protected]; (515) 334-0075.

32

Page 33: Des Moines Area Metropolitan Planning Organization (MPO

The timeline for launching the regional initiatives serves as one key measure of success. Are we getting these big picture efforts underway according to plan?

The Tomorrow Plan also looks at specifi c measures to track the region’s progress, including:

• Half of high-quality natural areas protected by 2025 (all by 2050)

• Improved stream stability measured at 13 existing monitoring stations (volatility reduced by one-fourth by 2025 and half by 2040)

• Steady reduction in the poverty rate

• Steady increase in transit service frequency at nodes

• Steady reduction in combined housing and transportation costs

• Steady growth in jobs per household

• Steady growth in the arts and audience participation

The Tomorrow Plan looks forward to 2050 for Greater Des Moines. We are many distinct communities working as one to compete globally and leave a dynamic, enduring legacy for future generations. We focus on the economy, the environment, community vitality, and regional cooperation. The plan will save us money, draw resources and talent to the region, and prepare us for future growth.

Everyone has a role.The Tomorrow Plan works as a voluntary, best practices guide for communities to use as they see appropriate. Though this document is non-binding, the communities that do participate will reap the benefi ts of leaving a lasting legacy through:

Our Mission

Ever mindful of future generations, our mission is to cooperate across political boundaries to achieve social, economic, and environmental resilience for Greater Des Moines.

• Cost savings through effi ciency• Strengthened public health, personal

happiness, and sense of community• Improved development opportunities• Enhanced community character• More choices to live, learn, work, and play• Power of a regional brand to supplement

community identity

• More choices to share culture and experiences

• Increased funding for infrastructure, services, technology and the arts

• Enhanced recreation and ecology benefi ts• Lowered fl ood risk with improved water

quality• Empowered neighborhoods and dynamic

nodes of opportunity

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

Measuring Tomorrow

LET’S GET STARTED! TIMELINE

of opportunity

Page 34: Des Moines Area Metropolitan Planning Organization (MPO

Let’s Get Started!

TOMORROW IS TODAY -

ACRONYM GLOSSARY

This document not only summarizes The Tomorrow Plan’s highlights, it also outlines the top action steps we’ll take over the next 1 to 2 years so all of the regional initiativeslaunch and the goals get well underway. This piece also highlights partners to lead orserve as catalysts for progress.

The Tomorrow Plan belongs to all of us, but someone needs to make sure it movesforward. The Tomorrow Plan Steering Committee provides oversight for the ongoingwork of The Tomorrow Plan, while the MPO staff offers day-to-day prompting and supports the work with its many partners.

To keep The Tomorrow Plan going, the Steering Committee meets at least three times annually. It reviews the work, makes recommendations to the MPO Policy Committee regarding regional priorities, and reports on the plan’s progress. The MPO PolicyCommittee sets fi nal priority projects, helps identify funding opportunities, and adjusts the MPO’s traditional priorities to better support The Tomorrow Plan. Growingfunding opportunities for all is an ongoing effort of The Tomorrow Plan, the SteeringCommittee, the MPO, and the many partners.

CC Capital Crossroads

CF Community Foundation of Greater Des Moines

CISS Central Iowa Shelter & Services

COSC Center on Sustainable Communities

CVB Convention & Visitors Bureau

DART Des Moines Area RegionalTransit Authority

DMACC Des Moines AreaCommunity College

DMARC Des Moines Area Religious Council

DMSC Des Moines Social Club

DMWW Des Moines Water Works

DOT Do One Thing

HP2020 Healthy Polk 2020

GDMP Greater Des Moines Partnership

IDNR Iowa Department of Natural Resources

INHF Iowa Natural Heritage Foundation

ISU Iowa State University

MAA Metro Arts Alliance

MPO Metropolitan PlanningOrganization

MWA Metro Waste Authority

NGO Non-GovernmentalOrganizations

PCCB Polk County Conservation Board

PCHTF Polk County Housing Trust Fund

RICC Regional Infrastructure Coordinating Committee

TMA Transportation Management Association

UA Urban Ambassadors

WMA Watershed Management Authority

WRA Wastewater Reclamation Authority

YP Young Professionals

EVERYDAY STEWARDS:DO ONE THINGAs we said at the outset, everyone has a role in The Tomorrow Plan. Whether as a resident steward, an activist, a champion, a teacher, mediator, community leader, or neighborhood group, The Tomorrow Plan – and our region’s future – depends on you.

Many small actions add up. To further the idea of taking small steps, The Tomorrow Plan is launching the Do One Thing (DOT) campaign. With every seemingly small DOT activity, we build the foundation for big shifts and help make our region a better place.

KEY STEPS TO LAUNCH

1. Launch the Do One Thing – DOT – campaign and secure 15,000 DOT pledges (MPO)

2. Take the Do One Thing pledge (You)

3. Connect the DOTs by engaging with one of the many existing community groups – see the Acronym Glossary for some ideas (You)

Taking the DOT pledge? Here are some ideas!

• Buy local goods and food whenever possible

• Garden, compost, and use native plants

• Reduce, reuse, recycle

• Turn off and unplug

• Drink tap water

• Carpool, ride the bus, walk, or bike

• Donate your time and money

• Check out local and regional events

• Vote in all elections

• Get to know your neighbors

Mobilizing Tomorrow

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

INITIATIVE 5

Page 35: Des Moines Area Metropolitan Planning Organization (MPO

GOAL 1

Create a resilient regional economy

GDMP + MPO

A healthy economy is the foundation upon which to build a more sustainable future. The Tomorrow Plan builds on our strengths to compete in a changing global marketplace. Economic analysis indicates opportunities to diversify our economy by leveraging the work of other planning efforts, expanding the capacity for entrepreneurship, and growing educational options in necessary skills.

LET’S GET STARTED!

Leverage libraries and the access

they offer to technology and the

arts (Libraries, communities)

Educate banks, developers,

real estate professionals,

and appraisers about nodes

and corridors (MPO, GDMP,

communities)

Support DART Forward 2035

by increasing transit service and

reducing parking requirements

accordingly (MPO, TMA, DART)

Implement Capital Crossroads, the

region’s economic development

strategy (GDMP, MPO)

Launch Nodes & Corridors Initiative!

A. Develop a vibrant, walkable system of employment and residential activity centers with access to public transportation (nodes and corridors)

B. Provide many means of access and transportation throughout the region

C. Create an innovation core for advanced manufacturing, biotechnology, and information technology

D. Enhance Greater Des Moines’ digital infrastructure

E. Grow and retain existing companies

F. Expand and enhance preparation for the world of work, including retraining

Strategies

Page 36: Des Moines Area Metropolitan Planning Organization (MPO

NODES & CORRIDORS

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

KEY STEPS TO LAUNCH

1. Identify areas for development/redevelopment as walkable nodes and corridors. (MPO, communities)

2. Develop sample codes to help communities achieve vibrant, mixed-use, walkable environments. (MPO, communities)

3. Promote through inclusion in community comprehensive plans (Communities)

The Nodes & Corridors initiative emphasizes a strategic, regional approach to guiding growth towards identifi ed locations – nodes – throughout Greater Des Moines. These nodes connect with one another and the region as a whole through corridors. This creates compact, walkable mixed-use centers while strengthening our existing investments, protecting the environment, and providing a variety of employment, housing, and transportation choices.

INITIATIVE 1

Page 37: Des Moines Area Metropolitan Planning Organization (MPO

GOAL 2

A. Promote use of renewable energy and reduced energy consumption

B. Minimize the waste stream, emphasizing waste reduction

C. Build a region-wide greenways system

D. Develop a regional stormwater approach that includes natural systems

E. Expand tree canopy and regional park capacity – acres, facilities, programs, and connections

Improve the region’s environmental health and access to the outdoors

Strategies

MWA + MPO

How the region manages energy, waste, and natural resources provides the backdrop for vibrant economies, welcoming communities, and public and personal health. The stormwater management, clean air, reduced waste, energy conservation and public recreation strategies greatly benefi t the region in ways we can measure.

LET’S GET STARTED!

Conduct a regional tree inventory

(Tree NGOs)

Set baseline energy consumption

metrics (MPO, GDMP)

Relaunch the Share Good Energy

collaborative (Communities)

Launch regional food rescue program

(MWA, DMARC, C ISS)

Complete a regional soil analysis

to identify stormwater best

management sites (RICC)

Identify streams and watersheds for

regional focus (WMAs)

Identify and acquire key regional park,

trail, and greenway properties (INHF,

PCCB, IDNR)

Launch Greenways Initiative!

Page 38: Des Moines Area Metropolitan Planning Organization (MPO

GREENWAYS

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

KEY STEPS TO LAUNCH

1. Assign staff to coordinate and communicate greenway work (MWA, MPO)

2. Conduct a natural areas inventory (RICC)

3. Celebrate connecting land purchases (INHF)

4. Launch with Bio-Blitz of most connected areas (INHF)

5. Coordinate WMA efforts for watershed planning (MPO)

Selectively expand the network of parks, conservation areas, open space, and trails to build a fully-connected system of natural resource areas.

INITIATIVE 2

Page 39: Des Moines Area Metropolitan Planning Organization (MPO

GOAL 3

A. Ensure diverse housing choices – in terms of cost, style, and location – throughout the region

B. Make walking, biking, and using public transportation as viable as driving

C. Make healthy choices intuitive

D. Provide access to healthy food

E. Encourage and celebrate community building

F. Promote community/regional heritage, character, and historic preservation

G. Create Zest, a committee to refl ect and celebrate our diversity, and spark regional “wow” factors

Further the health and well-being of all residents in the region

Strategies

PCHTF + HP2020

Quality of life sets Greater Des Moines apart from its competitors. The region earns high marks for its affordability, access to the outdoors, and family-friendly atmosphere. Yet challenges to the region include access to ample housing choices, jobs, and local food; a lack of transportation options; decreasing physical activity; and more. For Greater Des Moines to fl ourish, all aspects of health and well-being need promotion throughout the region.

LET’S GET STARTED!

Kickoff open streets and play

streets events around the region

– picture a big block party (Des

Moines Bicycle Collective, MPO)

Create and foster Zest (DMSC,

Eat Greater Des Moines, MAA)

Develop a local arts incubator (CF,

DesMoinesArts)

Create a marketing campaign to

link transportation options, the built

environment, and public health and

well-being (TMA, DART, MPO)

Create a regional food system

clearinghouse (Eat Greater Des

Moines)

LLLLLLLaaaauuuuunnnncccchhhh RRRRRRRRRRReeeessssiiiillllliiieeeennnttt NNNNNeeeeiiiiiggggggggggggggghhhhbbbbboorrrrrhhhhhhooooooooddddsss IIIIIInnniiittttiiaaaatttttiiiivvvvveee!!!

Page 40: Des Moines Area Metropolitan Planning Organization (MPO

RESILIENT NEIGHBORHOODS

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

KEY STEPS TO LAUNCH

1. Establish neighborhood associations throughout the region (Communities)

2. Initiate the regional affordable housing plan (PCHTF)

3. Create a model inclusionary zoning ordinance (PCHTF, MPO)

As economic, social, or environmental conditions change over time, neighborhoods must adapt, or show resilience. Having a patchwork quilt of multiple resilient neighborhoods—each with different character, assets, and strengths—makes a region fl exible and able to adapt to any challenges it may face. In other words, a region composed of resilient neighborhoods stands the test of time.

INITIATIVE 3

Page 41: Des Moines Area Metropolitan Planning Organization (MPO

GOAL 4

A. Leverage the ongoing work of the MPO to serve as the entity to address monitoring and implementation of The Tomorrow Plan

B. Develop a Regional Infrastructure Coordinating Committee (RICC)

C. Maintain ongoing educational efforts for the development and maintenance of healthy communities

D. Leverage The Tomorrow Plan to secure and award funding for regional benefi t

E. Explore the merits of regional alternative revenue sources

Increase regional cooperation and effi ciency at all levels

Strategies

RICC + MPO

For any of the goals of The Tomorrow Plan to succeed, increased regional collaboration is essential. These collaborations lead to effi ciencies in cost, time, and materials without sacrifi cing the character and particular advantages of each of the local communities or counties connected in the region.

LET’S GET STARTED!

Work with the communities to

adopt resolutions of support

of The Tomorrow Plan (MPO,

communities) Implement The Tomorrow Plan

(MPO) Convene the RICC (MPO)

Modify the MPO funding allocation

system and identify new funding

sources (MPO)

Launch a community calendar as

a one-stop look at community and

regional events (GDMP, CVB)

Launch Regional Cooperation

Initiative!

Page 42: Des Moines Area Metropolitan Planning Organization (MPO

REGIONAL COOPERATION

V I S I T T H E W E B S I T E FO R M O R E I N FO R M AT I O N

WWW.THETOMORROWPLAN.COM

KEY STEPS TO LAUNCH

1. Analyze suitability around the region for natural stormwater utilities (RICC)

2. Analyze community stormwater practices and ordinances (RICC)

3. Develop sample ordinances for the region (RICC)

Reach across jurisdictional boundaries to manage systems, including utilities and infrastructure.

INITIATIVE 4

Page 43: Des Moines Area Metropolitan Planning Organization (MPO

Fiscal Years 2014-2017

Transportation Capital

Improvements Program

DRAFT

Des Moines Area Metropolitan Planning Organization August 2013

Page 44: Des Moines Area Metropolitan Planning Organization (MPO

The Des Moines Area Metropolitan Planning Organization (MPO) has prepared this report with

partial funding from the United States Department of Transportation’s (DOT) Federal Highway

Administration (FHWA) and Federal Transit Administration (FTA), and in part through local

matching funds provided by the MPO member governments. These contents are the

responsibility of the MPO. United States Government and its agencies assume no liability for

the contents of this report or for the use of its contents.

© 2013 Des Moines Area Metropolitan Planning Organization

2

Page 45: Des Moines Area Metropolitan Planning Organization (MPO

TABLE OF CONTENTS

Introduction ......................................................................................................................................4

Major Budget Programs and Abbreviations ....................................................................................7

Transportation Capital Improvement Program ................................................................................9

Bridges ............................................................................................................................................. 9

Trails .............................................................................................................................................. 10

Intersections ................................................................................................................................... 12

Sidewalks/Streetscape .................................................................................................................... 14

Traffic Safety .................................................................................................................................. 16

Roads/Parking Lots ........................................................................................................................ 19

Map of Fiscal Years 2014-2017 Project Locations........................................................................29

3

Page 46: Des Moines Area Metropolitan Planning Organization (MPO

INTRODUCTION

The Fiscal Year 2014-2017 Transportation Capital Improvement Program (FY2014-

2017 TCIP) lists upcoming capital improvement projects that affect the Des Moines Area MPO

Planning Area’s transportation system. This document contains all planned TCIP projects for

FY 2014-2017 as of June 2013 (Fiscal Year runs from July 1 to June 30). The TCIP is a

companion document to the Des Moines Area MPO’s annual Transportation Improvement

Program (TIP). Both documents are prepared annually for upcoming fiscal years and allow the

Des Moines Area MPO and its members to have a more comprehensive view of short-range

transportation projects and improvements that are going to be implemented throughout the Des

Moines Area MPO Planning Area. Unlike the TIP, which documents projects anticipated to

receive federal funds, the TCIP documents all other capital improvement projects that are not

anticipated to receive federal funds. These transportation projects are compiled from the Des

Moines Area MPO member governments’ respective capital improvement plans (CIP).

Government’s that do not prepare CIP’s provided the Des Moines Area MPO projects

anticipated for construction between FY 2014-2017. Because projects included in the TCIP are

compiled from CIPs, the projects may or may not be in the Des Moines Area MPO’s adopted

Metropolitan Transportation Plan. Please consult the Horizon Year 2035 Metropolitan

Transportation Plan for a listing of projects officially identified by the Des Moines Area MPO

for implementation in future years. Note that the TCIP includes projects from only the member

governments that responded to the MPO’s request for transportation projects or had an up to date

CIP on their website. Some member governments gave no response and therefore are not

included in the TCIP.

About the Des Moines Area MPO

The Des Moines Area MPO has full voting membership open to any county or city

government located, wholly or partially, in the designated Metropolitan Planning Area (MPA)

containing a minimum population of 1,500 persons that adopts the Des Moines Area MPO’s 28E

Agreement (agreement entered into under Chapter 28E, Code of Iowa, establishing the Des

Moines Area MPO and its responsibilities). DART also adopted the 28E agreement and is a full

voting member. In addition to DART, Des Moines Area MPO membership includes the

following cities and counties: Altoona, Ankeny, Bondurant, Carlisle, Clive, Dallas County, Des

4

Page 47: Des Moines Area Metropolitan Planning Organization (MPO

Moines, Grimes, Johnston, Mitchellville, Norwalk, Pleasant Hill, Polk City, Polk County,

Urbandale, Warren County, Waukee, West Des Moines, and Windsor Heights.

Two entities within the Des Moines Area MPO MPA, the City of Cumming and Madison

County, fall below the minimum population threshold for full membership. The City of

Cumming and Madison County are associate Des Moines Area MPO members. Associate

membership allows a non-voting representative to participate actively in the transportation

planning process and is available to all governments within the Des Moines Area MPO MPA

that do not meet the minimum population threshold for full membership. Outside the Des

Moines Area MPO MPA, the City of Indianola is an associate, non-voting member.

The Iowa Department of Transportation (DOT), the Des Moines International Airport

(DSM), the Federal Highway Administration (FHWA), the Federal Transit Administration

(FTA), and the Heart of Iowa Regional Transportation Alliance (HIRTA) serve as advisory non-

voting representatives to the Des Moines Area MPO. Special thanks to the MPO members who

have provided the information within this document.

The members of the MPO consider the planned projects listed within this document to be

subject to change at any time.

5

Page 48: Des Moines Area Metropolitan Planning Organization (MPO

THIS PAGE LEFT BLANK INTENTIONALLY

6

Page 49: Des Moines Area Metropolitan Planning Organization (MPO

MAJOR BUDGET PROGRAMS AND ABBREVIATIONS

Assessment – Fees assessed to the affected property owners to assist with project funding.

Capital Project Cash – Cash reserves that have been earmarked specifically for a capital

project.

Contributions (Developer, Private, School District, District) – Funding provided by a specific

entity assisting in project funding.

Decision Package – A plan or budget of proposals on how to fund a specific project that can be

accepted or rejected, a procedure in zero-based budgeting.

Farm-to-Market – State or county designated roadways with connected funds to assist

movement of agriculture products on secondary roads.

Gaming Monies – Revenues received from state gambling entities.

General Funds (GF) – Non-obligated city funds.

General Obligation Bonds (G.O. Bonds) - Issued to get money on credit for projects, popular

because primarily based on the ability to tax; the most common source of funding projects.

Gifts – Private funding contributions for a project.

Grants – State funding support.

Local – Funds designated primarily to aid local residents in movement.

Park and Trail Improvement Fund 318 – Funds dedicated to park and trail improvements in

the City of Johnston allocated from Hotel/Motel Tax revenues.

Road User Tax Fee (RUT) – Part of the gasoline tax received from the State of Iowa for

roadway projects.

Special Assessment (Spc Assmt) – Charges levied for public projects located within special

assessment districts.

Tax Increment Financing (TIF) – Funds spent on current projects based on the assumed

increase of tax revenue in a TIF-designated district.

Traffic Safety – Funds used for the installation of traffic signalization.

(Blank) – Funding sources not cited in CIP.

7

Page 50: Des Moines Area Metropolitan Planning Organization (MPO

THIS PAGE LEFT BLANK INTENTIONALLY

8

Page 51: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: BRIDGES

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Des Moines Army Post Rd. Over Frink Creek

Bridge Replacement $635,000 $635,000

Gaming Monies, State, Cash Balances

Des Moines City-wide Various Locations

Bridge Repair/Rehab $1,300,000 $300,000 $300,000 $350,000 $2,250,000

G.O. Bonds, Cash Balances

Des Moines East Payton Ave. Over Stream Bridge

Replacement $50,000 $300,000 $250,000 $600,000 Gaming

Monies, Cash Balances

Des Moines Evergreen Ave.

Over Easter Lake

Bridge Repair/Rehab $150,000 $250,000 $400,000 G.O. Bonds

Des Moines Grand Ave. Over Walnut Creek

Bridge Replacement $1,808,185 $1,808,185** Cash Balance

Des Moines Locust St. Over Des Moines River

Bridge Repair/Rehab $200,000 $200,000 G.O. Bonds

Des Moines Scott Ave. Over Des Moines River

Bridge Repair/Rehab $200,000 $200,000 $400,000

Gaming Monies

Des Moines South Union St.

Over Yeader Creek

Bridge Repair/Rehab $300,000 $450,000 $750,000

G.O. Bonds, Cash Balances

Johnston NW 66th Ave. Kempton Bridge Reconstruction $430,000 $430,000 $430,000 $430,000 $1,720,000

G.O. Bonds, Polk County

Polk County NW Madrid Dr. At Big Creek Bridge Overlay $400,000 $400,000 Local

Polk County NE 62nd Ave. East of NE Berwick Dr. Bridge Overlay $215,000 $215,000 Local

Urbandale Walnut Creek 156th St. Bridge Replacement $222,000 $1,480,000 $1,702,000 G.O. Bonds

TOTAL $4,745,185 $3,360,000 $1,545,000 $1,430,000 $11,080,185

9

Page 52: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: TRAILS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Clive City-wide Various Locations

Annual Trail Replacement

Program $240,000 $200,000 $200,000 $200,000 $840,000 G.O. Bonds

Clive NN Phase III Greenbelt Trail

West of Alice’s Road to

pedestrian bridge

Trail Extension: Phase 1

$10,000 $605,000 $615,000 G.O. Bonds,

Existing Capital Funds

Johnston Beaver Drive Trail Beaver Dr. Phases 1-3

Construction $684,169 $389,475 $427,950 $1,501,594 G.O. Bonds

Johnston Trail, Summit

Dr. to Highland Oaks

Summit Dr. to Highland Oaks

Trail Maintenance $30,000 $30,000

Park and Trail Imp. Fund 318

Johnston Century Trace Various Locations

Trail Maintenance $65,000 $65,000

Park and Trail Imp. Fund 318

Johnston Westridge District Park

Various Locations

Trail Maintenance $60,000 $60,000

Park and Trail Imp. Fund 318

Norwalk Hwy 28 Sunset Trail Trail Reconstruction $150,000 $150,000 TIF

Norwalk G14 Hwy 28 to 50th St.

Trail Construction $725,000 $725,000 General Fund

Norwalk 50th to County Line Rd.

50th to County Line Rd.

Trail Construction $650,000 $650,000 General Fund

Norwalk

County Line Rd. to G.

Western Bike Trail

County Line Rd. to G.

Western Bike Trail

Trail Construction $180,000 $180,000 General Fund

Urbandale City-wide Various Locations

Trail Improvements $75,000 $75,000 $75,000 $75,000 $300,000 General Fund

Urbandale Trail-Walnut Trace Park

Meredith Dr. to 156th St. Trail Extension $420,000 $420,000 G.O. Bonds

Urbandale Trail-Waterford Park

156th St. to Waterford Rd.

Trail Construction $628,800 $628,800 G.O. Bonds

10

Page 53: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: TRAILS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Urbandale Trail System Walnut Creek Regional Park

Interior Trails Trail Construction $285,600 $285,600 G.O. Bonds

Waukee 6th St. Northview Dr. to University

Ave.

Trail Construction $500,000 $500,000

G.O. Bonds, TIF,

General Funds

West Des Moines Grand Ave. Fuller to RRP Trail

Construction $310,000 $310,000 G.O. Bonds,

Private

West Des Moines Ashworth Rd. Prairie View to

60th St. Trail

Construction $100,000 $290,000 $390,000 G.O. Bonds

West Des Moines City-wide Various

Locations

Trails (Sidepath)

Construction $90,000 $90,000 G.O. Bonds

West Des Moines 60th St. Underpass Repairs $40,000 $40,000 G.O. Bonds

West Des Moines City-wide Various

Locations Trail

Renovation $215,000 $220,000 $435,000 G.O. Bonds

West Des Moines City-wide Various

Locations Trail Signage $35,000 $35,000 G.O. Bonds

Windsor Heights

North of College Dr. to

bridge

North of College Dr. to

bridge

Trail Replacement $25,000 $25,000 GF

TOTAL $2,234,769 $2,559,475 $1,897,950 $1,583,800 $8,275,994

11

Page 54: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: INTERSECTIONS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Ankeny SE Corporate Woods & SE Four Mile Dr.

SE Corporate Woods & SE Four Mile Dr. Intersection

Widening $79,700 $520,000 $599,700 G.O. Bonds, TIF Abated

Des Moines E. 46th St/ Hubbell Ave.

E. 46th St. and Hubbell Ave

Intersection Improvement $100,000 $200,000 $550,000 $850,000

G.O. Bonds, State

Des Moines Euclid Ave.

Euclid Ave/Oxford St.

& Euclid Ave/Cornell St.

Intersection Improvement $550,000 $860,590 $1,410,590 G.O. Bonds

Des Moines City-wide UPRR Crossings

Closures Mitigation $950,000 $1,000,000 $1,950,000 Railroad, State

Des Moines City-wide Various Locations

RR Crossing Repairs and

Signal Improvements

$50,000 $50,000 $100,000** G.O. Bonds

Johnston MHR & 62nd MHR & 62nd St. Intersection Improvement $300,000 $2,000,000 $2,300,000 TIF

Johnston 54th and 100th 54th and 100th Intersection Improvement $1,000,000 $1,000,000 TIF

Norwalk Beardsley St/ Hwy 28

Beardsley St/ Hwy 28

Intersection Improvements $250,000 $250,000 TIF

Urbandale

I35/80 and Hwy 141/NW

Urbandale /Meredith

I35/80 and Hwy 141/NW

Urbandale /Meredith

Intersection Modifications $1,000,000 $33,900,000 $34,900,000

Private, TIF, IDOT

Urbandale 75th St./ Douglas Ave.

75th St./ Douglas Ave. Turn Lanes $66,000 $590,000 $656,000 G.O. Bonds

Urbandale 83rd

St./Douglas Ave.

83rd St./ Douglas Ave. Turn Lane $75,000 $75,000 G.O. Bonds

12

Page 55: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: INTERSECTIONS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Urbandale 100th St. I35/80 Interchange

Intersection Construction $750,000 $750,000 TIF, IDOT

Waukee Alice’s Rd & University Ave.

Alice’s Rd & University Ave.

Intersection Improvement $2,540,000 $2,540,000

G.O. Bonds, TIF

Waukee Warrior Ln & Hickman Rd

Warrior Lane & Hickman Rd

Intersection Improvement $295,000 $295,000

G.O. Bonds, TIF

Waukee Warrior Ln & Ashworth Dr.

Warrior Ln & Ashworth Dr.

Intersection Improvement $1,300,000 $1,300,000

G.O. Bonds, TIF

West Des Moines City-wide Various

Locations Railroad

Crossings $15,000 $15,000 $30,000 RUT

TOTAL $6,646,000 $38,025,590 $2,179,700 $2,155,000 $49,006,290

13

Page 56: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: SIDEWALK/STREETSCAPE

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Ankeny City-wide Various Locations

Annual Sidewalk/Trail Construction

Program Total

$230,000 $270,000 $230,000 $260,000 $990,000 G.O. Bonds

Carlisle City-wide Various Locations

Sidewalk Improvements $30,000 $30,000 $30,000 $30,000 $120,000

Spc Assmt, RUT

Des Moines City-wide Various Locations

Sidewalks - School and

Priority Routes $100,000 $100,000 $105,000 $110,000 $415,000

Assessments, G.O. Bonds

Des Moines City-wide Various Locations

Sidewalk Replacement $550,000 $575,000 $600,000 $625,000 $2,350,000 G.O. Bonds

Des Moines City-wide Various Locations

Sidewalk ADA Compliance $1,000,000 $1,500,000 $1,500,000 $1,500,000 $5,500,000 G.O. Bonds

Des Moines City-wide Various Locations

Skywalk System $400,000 $150,000 $155,000 $155,000 $860,000

Tax Increment Bonds

Des Moines City-wide Various Locations

Streetscape Improvements $284,828 $1,000,000 $1,000,000 $1,000,000 $3,284,828 G.O. Bonds

Norwalk Brownie Park Connection to Easter Library

Sidewalk Construction $15,000 $15,000 Grant

Norwalk Hwy 28 Along Hwy 28 Streetscape $10,000 $40,000 $40,000 $40,000 $130,000 RUT

Urbandale City-wide Various Locations

Sidewalk Construction $100,000 $100,000 $100,000 $100,000 $400,000 Spc Assmt,

Urbandale Hickman Rd

Deer Creek Trail to

Raccoon Valley Trail

New Construction $190,000 $190,000 G.O. Bonds

Urbandale Douglas Ave./ 70th St.

Douglas Ave./ 70th St.

Streetscape Improvements $225,000 $225,000 G.O. Bonds

Waukee Alice’s Rd/ University Ave

Alice’s Rd/ University Ave Streetscape $500,000 $500,000

G.O. Bonds, TIF

14

Page 57: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: SIDEWALK/STREETSCAPE

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Waukee Alice’s Rd/ Hickman Rd

Alice’s Rd/ Hickman Rd Streetscape $500,000 $500,000

G.O. Bonds, TIF

West Des Moines City-wide Various

Locations

Sidewalk Placement and

Repair Program

$110,000 $120,000 $230,000 RUT

West Des Moines Valley Junction Alleys Redevelopment $500,000 $500,000 $1,000,000

RUT, Stormwater Utility Fee

West Des Moines City-wide Various

Locations Median

Renovation $20,000 $10,000 $30,000 General

Funds, Capital Improvements

Windsor Heights 73rd St. Buffalo Rd. to

Center St. Sidewalk

Maintenance $500,000 $500,000 TIF/GF

Windsor Heights 63rd St. 63rd St. north to

College Dr. Sidewalk

Maintenance $285,000 $285,000 G.O. Bonds,

SOB, GF

Windsor Heights Hickman Rd. Hickman Rd. Streetscape $525,000 $525,000 TIF/GF

TOTAL $3,334,828 $5,110,000 $5,260,000 $4,345,000 $18,049,828

15

Page 58: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: TRAFFIC SAFETY

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Altoona Prairie Meadows Dr.

Prairie Meadows Dr. &

8th St. SW

Update Traffic Controls $50,000 $50,000 G.O. Bonds

Altoona 17th Ave SW Willowbrook Elementary

Replace School Reduced Speed

Indicators $10,000 $10,000 RUT

Altoona City-wide Various Locations

Upgrade Signalized

Intersection Detectors to

Cameras

$30,000 $30,000 $30,000 $90,000 G.O. Bonds

Altoona City-wide Various Locations

Flashing Yellow Traffic Control

Update $100,000 $100,000 G.O. Bonds

Altoona 5th Ave SW 5th Ave SW Intersection

Communication Improvements

$50,000 $50,000 G.O. Bonds

Ankeny City-wide Various Locations

Annual Traffic Signal

Improvements $280,000 $315,000 $275,000 $275,000 $1,145,000

Capital Project Cash

Balances, G.O. Bonds

Carlisle City-wide Various Locations

Traffic Signal Convert to LED $15,000 $15,000 Enterprise

Clive City-wide Various Locations

Annual Traffic Improvement &

Safety $300,000 $300,000 $300,000 $300,000 $1,200,000 G.O. Bonds

Des Moines City-wide Various Locations

Traffic Control Neighborhood

Program $360,000 $30,000 $35,000 $40,000 $465,000**

G.O. Bonds, State

Des Moines City-wide Various Locations

Traffic Median Island

Replacement $80,000 $80,000 G.O. Bonds

16

Page 59: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: TRAFFIC SAFETY

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Des Moines City-wide Various Locations

Traffic Signals, Channelization,

and School Crossings

$1,150,000 $440,000 $460,000 $465,000 $2,515,000** Cash Balance, G.O. Bonds,

State

Des Moines City-wide Various Locations

Traffic Signal LED

Replacement $20,000 $20,000 $30,000 $20,000 $90,000 G.O. Bonds

Des Moines City-wide Various Location

Traffic Sign Inventory $470,000 $60,000 $20,000 $25,000 $575,000 G.O. Bonds

Polk County NW 26th St. At Hwy 415 Traffic Safety $600,000 $600,000 Traffic Safety,

Other

Polk County NE 56th St. NE 78th Ave. Traffic Safety $400,000 $400,000 Traffic Safety

Polk County NE 56th St. NE 62nd Ave. Traffic Safety $400,000 $400,000 Traffic Safety

Polk County NE Oak Hill Dr. NE 56th St. Traffic Safety $180,000 $180,000 Other

Polk County NW 142nd Ave NW 58th St. Traffic Safety $500,000 $500,000 Traffic Safety

Norwalk Chatham Intersection Traffic Signal $350,000 $350,000 TIF

Norwalk Echo Valley Drive Intersection Traffic Signal $350,000 $350,000 TIF

Norwalk Echo Drive Along Echo Drive Street Lights $16,572 $16,572 TIF

Norwalk Colonial Parkway

Along Colonial Pkwy Street Lights $38,880 $38,880 TIF

Urbandale Douglas Parkway

Pilot Truck Stop Traffic Signal $160,000 $160,000 Spc Assmt, TIF

Urbandale Hickman Rd Deerfield Retirement Traffic Signal $140,000 $140,000 Private

Urbandale Meredith Dr. 91st St. and 94th St. Traffic Signal $180,000 $180,000 G.O. Bonds

17

Page 60: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: TRAFFIC SAFETY

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local Funding

Urbandale 75th

St./Douglas Ave.

75th St./Douglas

Ave. Traffic Signal $140,000 $140,000 G.O. Bonds

Urbandale 128th St./ Aurora Ave.

128th St./Aurora Ave. Traffic Signal $145,000 $145,000 G.O. Bonds

Urbandale 128th St./ Plum Dr.

128th St./ Plum Dr. Traffic Signal $15,000 $120,000 $135,000 Private

Urbandale 156th

St./Douglas Pkwy

156th St./Douglas

Pkwy Traffic Signal $155,000 $155,000 G.O. Bonds

Urbandale 156th St./ Meredith Dr.

156th St./Meredith

Dr. Traffic Signal $15,000 $140,000 $155,000 G.O. Bonds

Waukee Dartmoor Dr./ Hickman Rd.

Dartmoor Dr./ Hickman Rd. Traffic Signal $180,000 $180,000

G.O. Bonds, TIF

West Des Moines City-wide Various

Locations Traffic Signal Maintenance $380,000 $190,000 $570,000 RUT

West Des Moines City-wide Various

Location Traffic Signals $200,000 $200,000 RUT

West Des Moines City-wide Various

Locations

Durable Pavement Markings

$70,000 $80,000 $150,000 RUT

West Des Moines City-wide Various

Locations

New Street Light

Installation $70,000 $75,000 $145,000 RUT

TOTAL $4,415,452 $3,265,000 $2,560,000 $1,435,000 $11,675,452

18

Page 61: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Altoona 8th St SW 8th St. SW Bypass to

Venbury Dr. Road and Joint Repair $125,000 $125,000 $175,000 $250,000 $675,000 G.O. Bonds

Altoona City-wide Various Locations Street Resurfacing $50,000 $50,000 $60,000 $60,000 $220,000 RUT

Altoona City-wide Various Locations

Street Repair Annual Project $150,000 $100,000 $100,000 $60,000 $410,000

RUT, G.O. Bonds

Ankeny SW Des Moines

St./Pkwy

SW Prairie Trail Pkwy to SW Ordnance

Rd.

Extension $1,600,000 $1,400,000 $2,800,000 $5,800,000 G.O. Bonds, TIF Abated

Ankeny City-wide Various Locations

Annual PCC Street Patching Program $500,000 $500,000 $500,000 $500,000 $2,000,000 G.O. Bonds

Ankeny City-wide Various Locations

Annual Asphalt St. Resurfacing Program $450,000 $465,000 $480,000 $450,000 $1,845,000 G.O. Bonds

Ankeny City-wide Various Locations

Annual Pavement Preservation Program $150,000 $150,000 $150,000 $150,000 $600,000 G.O. Bonds

Ankeny City-wide Various Locations

Annual St. Replacement Program $450,000 $350,000 $400,000 $375,000 $1,575,000 G.O. Bonds

Ankeny SE Creekview Dr.

E 1st St. To SE Magazine

Rd. Paving $300,000 $1,500,000 $1,800,000

G.O. Bonds, TIF Abated

Ankeny Prairie Trail District

Various Locations

Utilities & Paving of Streets $1,200,000 $1,500,000 $2,700,000

G.O. Bonds TIF Abated

Ankeny SW Vintage Pkwy

SW College Avenue to SW Irvinedale Dr.

Extension and Reconstruction $1,950,000 $1,950,000

G.O. Bonds, TIF Abated

Ankeny SW Plaza Parkway

SW White Birch to SW College Ave

Extension $950,000 $950,000 G.O. Bonds, TIF Abated

19

Page 62: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Ankeny SW Prairie Trail Pkwy

Cascade Falls Aquatic Center

to SW Irvinedale

Extension/New Construction $1,200,000 $2,800,000 $4,000,000

G.O. Bonds, TIF Abated

Ankeny SW White Birch Drive

SW White Birch Dr. to SW Plaza

Parkway N.

Extension $1,200,000 $1,200,000 G.O. Bonds, TIF Abated

Ankeny SW College Avenue

S of SW Prairie Trail

Pkwy Extension $450,000 $450,000

G.O. Bonds, TIF Abated

Ankeny NE Trilein Dr NE Elementary School Widening/Turn Lane $75,000 $75,000 G.O. Bonds

Carlisle Lindhardt Park Within Park Construction of New Entrance $160,000 $160,000 G.O. Bonds

Carlisle Lindhardt Park E&W Parking

Lots Within Park Overlay/Paving $140,000 $140,000 G.O. Bonds

Carlisle School St. Lindhardt to R/R Reconstruction $800,000 $800,000 G.O. Bonds

Carlisle 8th St/Cole St./ Ash St.

8th St/Cole St./ Ash St. Reconstruction $704,468 $704,468

Assessments, G.O. Bonds

Carlisle Ash St. Ash St. Ash Street Project $200,000 $200,000 G.O. Bonds

Clive City-wide Various Locations

Annual Pavement Rehabilitation $44,000 $490,000 $683,900 $1,217,900

Gas/Electric Franchise Fee

Clive NW 100th Place/NW 103rd St.

NW 100th Place/NW

103rd St. and Clark

St./Lincoln Ave.

Pavement Rehabilitation $695,000 $535,000 $374,000 $1,604,000

Storm Water Utility,

Gas/Electric Franchise

20

Page 63: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Des Moines City-wide Various Locations

Asphaltic Paving Restoration Program $1,115,000 $1,050,000 $1,075,000 1,110,000 4,350,000

G.O. Bonds, Tax Increment

Bonds

Des Moines City-wide Various Locations

Concrete Curb Replacement Program $675,000 $685,000 $690,000 $725,000 $2,775,000 G.O. Bonds

Des Moines City-wide Various Locations

Concrete Paving Restoration Program $700,000 $725,000 $755,000 $780,000 $2,960,000 G.O. Bonds

Des Moines Easton Blvd E 34th St. to Four Mile

Creek Bridge Construct Curb $100,000 $100,000 G.O. Bonds

Des Moines Indianola Ave. E. Army Post Rd to Hwy 69 Widening $250,000 $250,000 $500,000** G.O. Bonds

Des Moines McKinley Ave. Fleur Dr. to E. Indianola Ave. Widening $100,000 $1,100,000 $1,300,000 $200,000 $2,700,000 G.O. Bonds

Des Moines Merle Hay Rd. Boston Ave. to Douglas Ave. Widening $200,000 $500,000 $700,000

G.O. Bonds, State

Des Moines City-wide Various Locations

Neighborhood Infrastructure Rehab

Program $1,375,000 $1,190,000 $1,235,000 $1,330,000 $5,130,000** G.O. Bonds

Des Moines City-wide Various Locations

PCC Pavement Replacement Program $225,000 $225,000 $450,000 G.O. Bonds

Des Moines City-wide Various Locations

Rehab and Preservation of Major

Roadways $272,744 $272,744** G.O. Bonds

Des Moines City-wide Various Locations

Residential Paving Program $100,000 $1,000,000 $1,000,000 $1,025,000 $3,125,000

Assessment, G.O. Bonds

Des Moines City-wide Various Locations

Special City-wide St. Improvements $2,685,000 $2,685,000 $2,685,000 $2,685,000 $10,740,000

Gaming Monies

Des Moines 31st St. I-235 to University Ave. Widening $200,000 $1,200,000 $1,400,000 G.O. Bonds

21

Page 64: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Des Moines Walnut St. Walnut St. Transit Mall Repair/Rehab $1,150,000 $2,500,000 $500,000 $4,150,000

Private, Tax Increment

Bonds

Des Moines University Ave. 6th Ave. to 10th St. Widening $200,000 $200,000 $400,000** G.O. Bonds

Des Moines City-wide City Cemetery, Park and Open Space System

Road, Sidewalk, and Utility Improvements $100,000 $300,000 $300,000 $400,000 $1,100,000 G.O. Bonds

Des Moines 5th and Walnut Parking Garage

Demo/Construction: Intermodal Surface

Lot $750,000 $750,000 Cash Balance

Des Moines City-wide City Parking Facilities

Rehab/Repair Program $250,000 $1,600,000 $1,500,000 $1,250,000 $4,600,000

Parking Fund, Parking Bonds

Des Moines City-wide City Parking System

Surface Parking Program Expansion $775,000 $775,000 Sale of Land

Johnston NW 62nd St. 103rd to City Limits Construction $1,500,000 $1,500,000 TIF

Johnston NW 100th NW 62nd – NW 70th

Design/ Construction $962,000 $4,328,000 $5,290,000 G.O. Bonds

Johnston NW Beaver Dr. Johnston Dr. to NW 62nd

Ave. Construction $4,300,000 $4,300,000 TIF

Johnston 70th Ave 86th St. to 107th St. Design/Reconstruction $600,000 $6,800,000 $7,400,000 G. O. Bonds

Johnston Merle Hay Rd. Areas E of

MHR/55th Ave. to 62nd Ave.

Phases 1-3 Infrastructure Improvements

$1,970,000 $1,970,000 $1,990,000 $5,930,000 G. O. Bonds

Johnston 54th Ave 88th St to 100th St Reconstruction $3,000,000 $3,000,000

G.O. Bonds, TIF

Norwalk County Line Rd.

County Line Rd. Seal Coat $17,000 $17,000 TIF

22

Page 65: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Norwalk Knoll Dr. Entire distance Street Overlay $65,000 $65,000 General

Fund/RUT

Norwalk City-wide Roads to be overlaid Street Overlay $150,000 $150,000

General Fund/RUT

Norwalk Holly Dr. Knoll Dr. to Shady Lane

Dr. Reconstruction $918,836 $918,836 Bond

Norwalk Lexington Dr. Billy O. Phillips Park

Parking Lot Construction $50,000 $50,000 TIF

Norwalk Wright Rd McAninch

Sports Complex

Parking Lot Design/Construction $90,000 $90,000 TIF

Norwalk Wakonda Dr. Lakewood Dr. to Maplecrest

Dr. Reconstruction $1,326,143 $1,326,143 Bond

Norwalk Wakonda Dr. Maplecrest Dr. to Hwy 28 Reconstruction $740,632 $740,632 Bond

Norwalk Colonial Circle Colonial Circle Construction $334,000 $334,000 TIF

Norwalk Lakewood Dr. Candlewick Dr to Oakwood Dr Reconstruction $1,272,767 $1,272,767 Bond

Polk County NW 82nd

Ave/NW 121st St.

NW 128th St. to Hwy 141 Resurfacing $452,000 $452,000

Local, Grimes Share

Polk County NE 80th St. NE 46th Ave to NE 78th Ave Resurfacing $680,000 $680,000

Local, Altoona Bond Share

Polk County NE 62nd Ave NE 88th St. to NE 112th St. Resurfacing $495,000 $495,000

Local, Mitchellville

Share

Polk County SE 9th Ave SE 72nd St. to SE 80th St. Resurfacing $167,000 $167,000 Local

23

Page 66: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Polk County SE 32nd Ave. SE 78th St. to SE 104th St. Resurfacing $536,000 $536,000 Local

Polk County NW Lower Beaver Rd.

NW Beaver Dr. to Des Moines

City Limits Resurfacing $94,000 $94,000

Local, Des Moines

Share

Polk County NE 60th Ave. NE 14th St. to NW 6th Dr. Resurfacing $248,000 $248,000 Local

Polk County NW 26th St. N. of I-35/80 to NW 66th Ave Resurfacing $342,000 $342,000 Local

Polk County NE 70th Ave NE 80th St. to NE 112th St. Resurfacing $776,000 $776,000 Local, Other

Polk County NW 86th St/NW 142nd Ave

Big Creek Entrance. To NW 58th St.

Resurfacing $425,000 $425,000 Local

Polk County NW 26th St NW 84th Ave to NW Polk City

Dr. Resurfacing $87,000 $87,000 Local

Polk County NE 62nd Dr./NE 88th St.

NE 80th St to NE 54th Ave Resurfacing $340,000 $340,000 Local

Polk County NE 120th St. NE 70th Ave to I-80 Resurfacing $86,000 $86,000

Local, Jasper County

Polk County NE 120th St. NE 58th Ave to NE 54th Ave Resurfacing $86,000 $86,000

Local, Jasper County

Polk County Saylor

Township Area Roads

S. of I-35/80 Resurfacing $1,553,000 $1,553,000 Local,

Des Moines

Polk County NE 46th St.

NE 62nd Ave/ NE 78th

Ave/Dead End St.

Resurfacing $340,000 $128,000 $468,000 Local

24

Page 67: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Polk County NE 3rd St. NE 60th Ave to NE 42nd Ave. Resurfacing $403,000 $403,000 Local

Polk County NE 126th Ave/ NE Yoder Dr./ NE 134th Ave

Elkhart C.L. to NE 112th St. Resurfacing $1,408,000 $1,408,000

Farm to Market

Polk County NE Rising Sun NE 64th St. to NE 70th St. Resurfacing $184,000 $184,000

Local, Pleasant Hill

Polk County NE 38th St. NE 126th Ave to NE 150th

Ave Resurfacing $515,000 $515,000 Local

Polk County NW 44th St. Hwy 415 to NW 118th Ave Resurfacing $343,000 $343,000 Local

Polk County NE 88th St. Hwy 65 to NE 94th Ave Resurfacing $170,000 $170,000 Local

Polk County NW 6th Dr. NW 72nd Ave to NW 16th St. Resurfacing $119,000 $119,000 Local

Polk County NE 40th Ave/ NE Devoite Dr.

NE 96th St. to NE 108th St. Resurfacing $260,000 $260,000 Local

Polk County NE 38th Ave NE 80th St to NE 96th St Resurfacing $340,000 $340,000 Local

Polk County NE 23rd Ave NE 112th St. to NE 120th St. Resurfacing $155,000 $155,000 Local

Polk County NE 96th St. NE 46th Ave to NE 78th Ave Resurfacing $680,000 $680,000 Local

Polk County NE 58th Ave NE 14th St to NE 22nd St Resurfacing $172,000 $172,000 Local

Polk County NE 108th St. Hwy 163 to NE 46th Ave Resurfacing $510,000 $510,000 Local

Polk County NE 27th Ave/ NE 88th St.

Hwy 163 to NE 96th St Resurfacing $401,000 $401,000 Local

25

Page 68: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Polk County NW 44th St. NW 142nd Ave to NW 166th

Ave Resurfacing $510,000 $510,000 Local

Polk County Iowa Fund Roads

S. of NE 54th Ave Resurfacing $468,000 $468,000 Local

Urbandale 101st St/ Meredith Dr.

UGRA Softball/Soccer

Complex

Parking Lot Construction $675,000 $675,000

G.O. Bonds, Private

Urbandale Walker Johnston Park Parking Lot Parking Lot Expansion $40,000 $40,000 G.O. Bonds

Urbandale Aurora Ave

Walnut Creek Regional Park

Roadway System

Road Construction $392,500 $392,500 G.O. Bonds

Urbandale City-wide Various Locations

Annual Street Rehabilitation

Program $529,800 $858,600 $888,700 $920,000 $3,197,100

G.O. Bonds, RUT

Urbandale Meredith Dr. 128th St. to 142nd St. Widening $4,237,900 $4,237,900

G.O. Bonds, Spc Assmt,

Grimes

Urbandale Meredith Dr. 170th St. to 184th St. Resurfacing $500,000 $500,000

Capital Project Funds, Clive

Urbandale Northpark Dr. 86th St. to 100th St. Widening $1,125,000 $1,125,000 TIF

Urbandale NW Urbandale Dr.

I35/80 to Meredith Dr.

Reconstruction/Widen Intersection $2,340,000 $2,340,000 IDOT, TIF

Urbandale NW 54th Ave.

1/2 mile east of 100th St. to 1/3 mile west of 100th St.

New Construction $731,000 $1,150,600 $1,881,600

TIF, Spc Assmt, Grimes,

Johnston

26

Page 69: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Urbandale 142nd St. Hickman Rd.

to Walnut Creek Bridge

Widening $1,370,000 $1,370,000 G.O. Bonds

Urbandale 156th St. Meredith Dr. to Waterford Rd. New Construction $350,000 $3,837,900 $4,187,900

G.O. Bonds Spc Assmt

Waukee University Ave 6th St. to Waukee PW Paving $500,000 $500,000

G.O. Bonds, TIF

Waukee Warrior Ln Ashworth Dr. to Hickman Rd Widening $1,850,000 $1,850,000

G.O. Bonds, TIF

Waukee Corene Acres Various Locations Resurfacing $300,000 $370,000 $425,000 $1,095,000

G.O. Bonds, TIF

West Des Moines City-wide Various

Locations

Pavement Rehabilitation

Program $3,100,000 $3,200,000 $3,300,000 $3,400,000 $13,000,000

RUT, G.O. Bonds

West Des Moines City-wide Various City

Parking Lots Parking Lot Repairs $320,000 $330,000 $650,000 G.O. Bonds

West Des Moines City-Wide Various

Locations

N’hood Improvement Program – Streets &

Curbs $35,000 $40,000 $75,000 RUT

West Des Moines S 39th St. North of EP

True Street Improvements $150,000 $1,350,000 $1,500,000 RUT

West Des Moines 105th St South to MCP

Interchange Construction and Rest

Area Removal $5,800,000 $4,200,000 $10,000,000 G.O. Bonds

West Des Moines Grand Ave. Raccoon River

Park Construction of New

Entrance $40,000 $40,000 G.O. Bonds

West Des Moines VV & HP Parks VV & HP

Parks Parking Lot Renovation $45,000 $45,000 G.O. Bonds

27

Page 70: Des Moines Area Metropolitan Planning Organization (MPO

*City-wide projects may not have specific termini and/or funding. ** Project may include federal funding outside of FY 14-17.

Transportation Capital Improvement Program: ROADS/PARKING LOTS

Funding By Fiscal Year

Jurisdiction Street or

Route Termini Type of Work 2014 2015 2016 2017

2014-2017 Total

Source of Local

Funding

Windsor Heights Sunrise Blvd. 73rd St. to 70th

St. Resurfacing $75,000 $75,000 RUT/GF

Windsor Heights

64th St./Franklin

Ave.

Northwest Dr. to Lincoln

Ave/64th St to dead end

Resurfacing $100,000 $100,000 RUT/GF

Windsor Heights

Sunset Terrace

73rd St. to 68th St. Resurfacing $125,000 $125,000 RUT/GF

Windsor Heights 68th St.

University Ave. to Washington

Ave. Resurfacing $300,000 $300,000 RUT/GF

Windsor Heights 73rd St.

Whilshire Blvd. to Hickman

Rd. Street Reconstruction $485,000 $485,000 Grant/GF

Windsor Heights 68th St. Timmons to

Hickman Rd. Street Reconstruction $300,000 $300,000 RUT/GF

Windsor Heights

University Blvd.

West to 73rd St. Street Reconstruction $125,000 $125,000 Grant/TIF

TOTAL $42,132,768 $57,069,823 $43,499,232 $31,421,667 $174,123,490

28

Page 71: Des Moines Area Metropolitan Planning Organization (MPO

Fiscal Years 2014-2017 Transportation Capital Improvement Program

E

EE

EE

E

EE

E

EEE

E")

")

")

")

")

")

")

") ")

")

")")")

")

")")

")

")

")") ")

") ")

")

")

")

")

")")

")

")

")

")

")")

")

")

")

")

Polk

Dallas

WarrenMadison

Des Moines

Ankeny

West Des Moines

Urbandale

Johnston

Waukee

Grimes

Clive

Norwalk

Altoona

Bondurant

Carlisle

Pleasant Hill

Polk City

Cumming

Mitchellville

Windsor Heights

¥¦80

¥¦35

¥¦80

¥¦35¥¦80

¥¦35

¥¦235

¥¦235

R-22

Meredith Drive

Grand AvenueNE

29th

Stree

t

G-14

R-57

86th

Stree

t

R-63

NE 46

th Str

eet

NE 80

th Str

eet

Vandalia Road

W Av

enue

NE 22

nd St

reet

NE 94th Avenue

NW Beaver Drive

Fleur

Drive

Army Post Road

Park Avenue

50th

Stree

t

Alice

's Roa

d

SW Connector

NE 96

th Str

eet

Raccoon River Drive

County Line Road

60th

Stree

t

E 56th

Stree

t

Ashworth Road

University Avenue

6th Av

enue

NE 78th Avenue

Scott Avenue

NW 118th Avenue

NW 6th Drive

NE 56

th Str

eet

SW 9t

h Stre

et

120th Street

NE 46th Avenue

E 29th

Stree

t

NW 12

1st S

treet

70th

Stree

t

NW 18

2nd A

venu

e

Hickman Road

110th

Aven

ue

NW 70th Avenue

NE 62nd Avenue

NE 27th Avenue

NW 54th Avenue NW 26

th Str

eet

335th Street

NE 10

8th St

reet

North Avenue

Vine Street

S Ave

nue

S Unio

n Stre

et

NW 126th Avenue

SE 72

nd St

reetDean Avenue

NE 70th Avenue

Hull Avenue E

SE 64th Avenue

Walnut Street

113th

Aven

ue

NE 3r

d Stre

et

100th

Stree

t

Badg

er Cr

eek R

oad

Gran

t Stre

et S

43rd

Aven

ue

NW 110th Avenue

Pine AvenueMaffitt Lake Road

NW 18th Street

E 33rd

Stree

t NE 11

6th St

reet

NE 11

2th St

reet

95th Avenue

NW 14

2nd S

treet

SE 32nd Avenue16

5th Pl

ace

SW Irvinedale Drive

Easter Lake Drive

E 42n

d Stre

et

NW 142nd Avenue

NE D

elawa

re Av

enue

NE 88

th Str

eet

365th Street

Boon

e Driv

e

33rd

Aven

ue

85th

Aven

ue

NE 86th Avenue

Ashworth Road

Army Post Road

PROJECT LOCATIONS

©2013 Des Moines Area Metropolitan Planning Organization.Please call (515) 334-0075 for permission to use.a 0 2 4 61

MilesPrepared by: Des Moines Area MPOCreated: July 30, 2013

")

")

")

9th Street7th Street

3rd Street

Walnut Street

University Avenue

E 6th Street

2nd A

venu

e

6th Av

enue

Grand Avenue

M.L.K

ing, J

r. Park

way

5th Avenue

Fleur

Drive

19th

Stree

t

15th Street

Keosauqua Way E Grand Avenue

SE 6t

h Stre

et

SE 1s

t Stre

et

SW 11th Street

Inset: Des Moines CBD

a 0 0.750.375Miles

Legend") Traffic Safety") Bridges") Parking LotsE Intersections

RoadsSidewalk/StreetscapeTrailsMPO Planning Area

Page 72: Des Moines Area Metropolitan Planning Organization (MPO

CONGESTION

MANAGEMENT

PROCESS

JULY 2013

DRAFT

Page 73: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 1

Table of Contents 1| Executive Summary ............................................................................................................................... 2

2| Background ........................................................................................................................................... 3

2.1 Des Moines Area Metropolitan Planning Organization ..................................................................... 3

2.2 Congestion Management Process ...................................................................................................... 4

3| Congestion Management Objectives .................................................................................................... 5

3.1 HY 2035 MTP Vision Statement: ........................................................................................................ 5

3.3 HY 2035 MTP Objectives: ................................................................................................................... 6

3.4 CMP Objectives: ................................................................................................................................. 6

4| System Definition .................................................................................................................................. 6

5| Developing and Using Performance Measures ..................................................................................... 7

5.1 CMP Performance Measures: ............................................................................................................. 7

6| Performance Monitoring Plan .............................................................................................................. 7

7| Identification and Evaluation Strategies ............................................................................................... 9

7.1 Operational Management Strategies ................................................................................................ 9

7.2 Capital Intensive Strategies .............................................................................................................. 10

8| Implementation and Management ..................................................................................................... 11

9| Strategy Effectiveness ......................................................................................................................... 11

DRAFT

Page 74: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 2

1| Executive Summary

The Congestion Management Process (CMP) provides the Des Moines Area Metropolitan Planning

Organization (MPO) and its members with information and guidance on operation of the transportation

network. Fortunately in the MPO area congestion is not a major issue at the present time. The

objective of this document is to stay ahead of any potential problems with the network so that the

system continues to operate effectively.

There are 12 primary objectives contained in this document that will assist the MPO in maintaining an

efficient and effective transportation network. These 12 objectives are directly linked to goals in the

2035 Metropolitan Transportation Plan (MTP). The MTP contains goals that are very long term. The

CMP offers shorter term objectives that the MPO can measure more often to determine if current

strategies are working and adjust accordingly without compromising the MTP.

DRAFT

Page 75: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 3

2| Background

2.1 Des Moines Area Metropolitan Planning Organization The MPO acts as the formal transportation body for the greater Des Moines metropolitan area (see

Figure 1 below). The MPO exceeds the population threshold of 200,000 qualifying the area as a

Transportation Management Area (TMA). The MPO is committed to implementing a comprehensive,

coordinated, and continuing multimodal transportation planning process for the greater Des Moines

metropolitan area.

The MPO provides a regional forum to ensure coordination between local, state, and federal agencies in

regard to planning issues and to prepare transportation plans and programs. The MPO develops both

long and short-range multimodal transportation plans, selects and approves projects for federal funding

based upon regional priorities, and develops methods to reduce traffic congestion.

The MPO structure is comprised of three committees: the Executive Committee, the Transportation

Technical Committee (TTC), and the MPO, which functions as the policy committee (see Figure 2 below).

The TTC is comprised primarily of technical staff members, including planners, engineers, and city

administrators, representing member governments and participating agencies. The MPO includes

elected officials, such as county supervisors, mayors, and city council members, and city managers. The

MPO elects officers and at-large representatives to form the Executive Committee. MPO staff supports

these three committees.

Figure 1

DRAFT

Page 76: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 4

1 •Development of Congestion Management Objectives

2 •Identification of an Area of Application

3 •Defining the System or Network of Interest

4 •Development of Performance Measures

5 •Institution of a System Performance Monitoring Plan

6 •Identification and Evaluation of Strategies

7 •Implementation of Selected Strategies and Management of Transportation System

8 •Monitoring Strategy Effectiveness

2.2 Congestion Management Process The Congestion Management Process (CMP) is a systematic approach, collaboratively developed and

implemented throughout a metropolitan region that provides for the safe and effective management

and operation of new and existing transportation facilities through the use of demand reduction and

operational management strategies. The CMP is required to be developed and implemented as an

integral part of the metropolitan planning process in TMA. The CMP is a multi-step process that

typically includes:

Figure 2

DRAFT

Page 77: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 5

3| Congestion Management Objectives

The MPO’s Horizon Year 2035 Metropolitan Transportation Plan (HY 2035 MTP) identifies a vision, goals,

and objectives for the Metropolitan Planning Area (MPA). The vision, goals, and objectives establish the

framework for achieving the desired transportation system.

Mobility is often closely tied to travel times and congestion, and is commonly defined as the ease in

which a user is able to make a trip. The HY 2035 MTP identified a number of goals and objectives to

maintain and/or improve the performance and/or mobility of the transportation system through

efficient congestion management. In order to accomplish these goals and objectives the CMP provides

additional analytical methods to monitor and evaluate system performance in dealing with congestion.

3.1 HY 2035 MTP Vision Statement:

“Preserve and promote the quality of life and the economic vitality of the greater Des Moines

metropolitan area by providing an accessible, integrated, efficient, safe, and environmentally responsible

multimodal transportation system that supports balanced growth by encouraging economic

development in all areas of the metropolitan region.”

3.2 HY 2035 MTP Goals:

*Goals 2, 3, and 4 contain objectives that impact the CMP

Maintain and improve the regional transportation system

Improve the accessibility, connectivity, and mobility of the transportation system, for people of freight, for all modes of transportation in and through the region

Maintain quality performance of the regional transportation system through efficient congestion management and operations techniques

Improve the safety and security of the regional transportation system for all users

Preserve, protect, and enhance the natural and human environment

1

2

3

4

5 DRAFT

Page 78: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 6

3.3 HY 2035 MTP Objectives:

Objectives from the HY 2035 MTP that impact the CMP include: Objectives 2.1 through 2.11, 3.1 through

3.3, and 4.1 through 4.6.

3.4 CMP Objectives: The following objectives are derived from the MTP and are specific to the CMP.

Re-Occurring Congestion – Peak Hours

A.1 Autos: Achieve level of service “D” system wide during peak hours. A.2 Public Transportation: Increase ridership by 10% by 2022. A.3 Personal Transportation: Increase the number of bicycle/pedestrian trips by 2% by

2022.

Re-Occurring Congestion – Non Peak Hours

B.1 Autos: Achieve level of service “B” during non-peak hours. B.2 Public Transportation: Increase the hours of operation on fixed routes by 10% by

2022. B.3 Personal Transportation: Expand bicycle/pedestrian facilities by 10% by 2022.

Non Re-Occurring Congestion

C.1 Traffic incidents: Decrease incident clearance times by 10% by 2017. C.2 TDM-10: Increase carpooling by 10% by 2017. C.3 Work Zones: Utilize Intelligent Transportation Systems (ITS) network for all

construction projects with peak hour impacts by 2017. C.4 Weather: Utilize ITS to relay National Weather Service updates that will have

potential traffic impacts by 2017. C.5 Special Events: Develop alternative routes for through traffic near special events and

utilize ITS to assist in diverting traffic by 2017. C.6 Freight: Decrease identified impedances for freight by 10% by 2022.

4| System Definition

The Des Moines Area MPO’s CMP system includes two entities. One entity is the MPA’s Principal

Arterial System as defined by the MPO’s Federal Functional Classification System (FFCS). The FFCS

establishes a classification hierarchy among streets and highways in the MPA. Interstate Highways and

Principal Arterials are situated atop the hierarchy, and tend to carry the major portion of trips and serve

the major centers of activity. The roadway network is depicted in Figure 1.

The other entity of the CMP system includes the area’s transit system operated by the Des Moines Area

Regional Transit Authority (DART). DART serves 19 area communities in and around Polk County with

varying levels of service. Service includes local routes, express routes, shuttles and on-call service.

DART plans to add Bus Rapid Transit (BRT) in the near future through the implementation of the DART

Forward 2035 Transit Services Plan.

DRAFT

Page 79: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 7

5| Developing and Using Performance Measures

5.1 CMP Performance Measures:

Accessibility Measures

Delay (intersection)

Freight Measures

Incident Clearance Times

Land Use Measures

Level of Service (volume/capacity)

Multimodal Measures

Speeds (freeways via TMC)

Transit System Measures

Travel Times (arterial corridors via travel time survey)

Variability/Reliability

Volume to Capacity Measures

*Items in bold are currently utilized by the MPO

Performance measures allow the MPO to define, measure, and communicate levels of congestion based

on both spatial and time oriented criteria. Many of the measures are segment-or site-specific, such as

level of service, and intersection delay. Congested roadways were mapped in the HY 2035 MTP using

this type of data.

6| Performance Monitoring Plan

The MPO will monitor system performance through various means.

Travel Time Survey

The MPO annually performs a travel time survey to gauge the level of congestion, in terms of delay or

reduction in free flow travel speeds, on the Principal Arterial System. The MPO performs the Travel

Time Survey (TTS) by utilizing Global Positioning System (GPS) equipment to actively survey a designated

corridor. The recorded GPS data is analyzed and summarized into an annual report. The annual report

documents the findings and compares the survey’s results to historic survey results to gauge changes in

travel speeds. The TTS is conducted on an annual basis in the fall.

Vehicle Occupancy Survey

The MPO annually performs a Vehicle Occupancy Survey (VOS) to assist in evaluating both the number

of people per vehicle and the percentage of people utilizing various modes of transportation. This data

is collected manually by Des Moines Area MPO staff at various pre-determined key areas throughout the

area. The annual report documents the findings and compares the survey’s results to historic survey

results to evaluate changes in occupancy and mode. The VOS is conducted on an annual basis in the fall. DRAFT

Page 80: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 8

Traffic Management Center

The MPO summarizes and analyzes traffic data from the Iowa Department of Transportation’s (DOT)

Traffic Management Center (TMC) on a quarterly basis. The Iowa DOT’s TMC monitors the Intelligent

Transportation System (ITS) infrastructure. This ITS infrastructure is comprised of a series of cameras,

sensors, and digital message signs. The data is processed and relayed to a website, www.iowa511.org.

The TMC collects traffic data from the numerous sensors along the freeway system, and includes traffic

speeds and volumes. The data is summarized into 15-minute intervals at each sensor location.

Travel Demand Modeling

The Travel Demand Model (TDM) is operated and maintained by the MPO on an ongoing basis. The

TDM is utilized to provide data related to volume and capacity of the transportation network. The TDM

undergoes periodic reviews to ensure that the data collected is the most accurate and up to date data

available.

Traffic Counts

Each jurisdiction in the MPO boundary conducts traffic counts on an independent basis. There is a need

in the region to engage in a more coordinated effort with traffic counts and other related data, such as

traffic signal timing that have significant impacts on the regional traffic patterns.

DART Ridership

DART ridership is compiled and reported to the MPO each spring. The MPO uses this data in the TDM as

well as reporting the data to the various committee’s each month to obtain feedback on potential

improvements to the transit system.

Trail Counters

The MPO provides and maintains a set of trail counters and a software program that analyzes the data

collected by the counters. Currently the program analyzes trail data at specific locations upon the

request of MPO member jurisdictions. The MPO is developing the methodology for a region wide

survey of trail data to be implemented in the near future. Data is collected on a monthly basis

throughout the year.

The Des Moines Area MPO staff summarizes all of the above data and identifies areas of concern as well

as areas that are performing well. This information is compiled in an annual report each spring.

DRAFT

Page 81: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 9

7| Identification and Evaluation Strategies

Data collected in the monitoring phase of the congestion management process will be evaluated. The

evaluation process for this data will utilize the strategies described in this section on a case by case

basis.

7.1 Operational Management Strategies

Traffic Operational Improvements

Traffic Operational Improvements, which include improvements in traffic signalization, channelization,

and highway geometrics, have been used extensively by MPO member governments, especially at

intersections. Such projects can provide significant congestion-related benefits with only small

investments in time, money, and labor. The MPO established a category in its Surface Transportation

Program (STP) project ranking criteria for Minor Construction, which includes Traffic Operational

Improvements. Each year the MPO spends between 5 percent and 15 percent of its annual STP

allocation for minor construction projects. Additionally, MPO member governments have often

constructed Traffic Operational Improvements projects without the assistance of Federal funding

sources.

Access Management

Access management principles, which typically involve standards for driveway spacing and median

openings, have customarily been incorporated into the design for construction of new streets and

highways and improvements to existing streets. In 2004, the Center for Transportation Research and

Education (CTRE) at Iowa State University completed the Development of the Des Moines Access

Management Plan, which provided recommendations for possible improvements and best access

management practices. The results of this study were shared with MPO member governments and

agencies. Iowa DOT and MPO member governments created an access management agreement along

U.S. Highway 6 (Hickman Road) to limit access along the corridor. Similar access management

agreements have been reviewed for other corridors in the MPA.

Incident Management

Incident management includes various activities that help mitigate non-recurring congestion, such as

rapid detection and response to accidents and stalled vehicles, provision of congestion-related

information to drivers, management of construction and maintenance activities, and management of

traffic for special events. In conjunction with the widening of I-235, the Iowa DOT implemented a

freeway incident management system that includes a traffic management center (TMC), variable

message signs, a Highway Advisory Radio station, a Highway Helper program, and video and

communications equipment. The MPO’s Transportation Management Advisory Committee (TMAC), a

multi-disciplinary inter-agency group, provides coordination for the deployment and operation of the

region’s incident management plans and programs.

DRAFT

Page 82: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 10

Intelligent Transportation System

ITS programs provide user services such as travel planning, traveler information, emergency

management, and advanced vehicle control. Many of the activities associated with ITS also may fall into

the Incident Management and Traffic Operational Improvements categories of the MTP. A Regional ITS

Architecture was developed and the necessary infrastructure was put into place, prior to the

reconstruction and widening of I-235. Currently, the Iowa DOT maintains an interactive traveler

information website, where users can find updated information about traffic conditions on major travel

corridors in the region. The TMAC provides coordination for the deployment and operation of the

MPA’s ITS programs. In 2006, the MPO programmed STP funds to assist in funding the Iowa DOT’s TMC.

7.2 Capital Intensive Strategies

Lane Additions

Objective 3.2 of the MTP states that prior to consideration of capital improvements to alleviate

congestion the MPO will consider the utilization of ITS and other operation improvements. However;

when alternative methods are not feasible, adding through travel lanes has continued to be a

widespread practice in the MPA for alleviating congestion and encouraging economic development.

Transit Capital Improvements

Transit capital improvements in the MPA mainly consist of the replacement of older buses in the DART

fleet and procurement of additional buses for expanded DART services. Few, if any, roadway projects

have been constructed with the intent of minimizing the impact of vehicle congestion for buses. No

rapid transit services currently operate in the MPA. However, DART currently is studying the feasibility

of BRT as part of the DART Forward 2035 Plan and is constructing a multimodal transit hub in the Des

Moines CBD. As noted in Chapter 5 of the 2035 Metropolitan Transportation Plan, the MPO did

commission a commuter rail feasibility study in 1999, which concluded the service was technically

feasible, but economically impractical at that time.

Complete Streets

Ensuring that lane addition/widening projects consider integrating Complete Street practices in the

design process can assist in congestion mitigation through providing additional opportunity for users to

choose alternative modes of transportation.

DRAFT

Page 83: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 11

8| Implementation and Management

Objectives in the CMP work in conjunction with the MTP to provide direction for future projects. Each

of the objectives is tied to an issue of critical concern for the Des Moines region and addressing these

issues is a priority. As part of the MTP update, being done as part of The Tomorrow Plan project, the

goals and objectives of this document shall be integrated.

Management of the CMP is the responsibility of MPO staff while implementation will be done through

the member entities.

9| Strategy Effectiveness

Objectives contained in the CMP all contain measurable criteria using data that is readily available.

Utilizing readily available data reduces costs and maintains a level of familiarity for the purposes of

continuity and stakeholder understanding. Each objective also includes a timeline as the CMP is

considered a living document that will be updated periodically as necessary.

The monitoring process would include MPO staff producing an annual report on the status of the

objectives in addition to the periodic updates of the document to add, remove or modify objectives on

an as needed basis. The annual report will be presented to and evaluated by the MPO boards, local

technical experts, and will be available to the general public on the MPO website.

DRAFT

Page 84: Des Moines Area Metropolitan Planning Organization (MPO

D e s M o i n e s A r e a M P O

Page 12

The Des Moines Area Metropolitan Planning Organization (MPO) has prepared this report with

partial funding from the United States Department of Transportation’s (DOT) Federal Highway

Administration (FHWA) and Federal Transit Administration (FTA), and in part through local

matching funds provided by the MPO member governments. These contents are the

responsibility of the MPO. United States Government and its agencies assume no liability for

the contents of this report or for the use of its contents.

© 2013 Des Moines Area Metropolitan Planning Organization

DRAFT