department - gwinnett county, georgia · •sr 124 (scenic highway) widening, from us 78 to...
TRANSCRIPT
Today’s Agenda
Mission
Department Overview
Planning Initiatives
Commission Priorities and 2018 Budget Requests
Five-year Plan
Department of Transportation Mission
The mission of the Gwinnett County Department of
Transportation is to enhance quality of life by facilitating
the mobility of people and goods safely and efficiently.
Mobility Safely Efficiently
Department Overview
Program Delivery
Pre-construction
Construction
Operations, Maintenance, and Traffic Engineering
Operations and
Maintenance
Traffic Engineering
Contracted Operations
Transit
Aviation
Department Overview – Program Delivery
Public Outreach
Engineering
Permitting Acquisition
Construction
• Special Purpose Local
Option Sales Tax
(SPLOST)
• More than $2 billion in
projects since 1986
General Obligation
Bond
Department Overview – Operations, Maintenance and Traffic Engineering
2,550 centerline miles of roadway
180 bridges and bridge culverts
20,000 traffic control signs
2,500 miles of sidewalk
716 traffic signals
230 miles of fiber optic cable
265 Closed Circuit Television cameras
200 flashing beacon locations
1,300 speed humps
Department Overview - Transit
Express
• Weekday • 44 Trips am peak • 51 Trips pm peak • 5 Routes from Park
and Ride lots to downtown and midtown Atlanta and Emory/CDC
Local
• Monday – Saturday • 27 buses during
daily peak • 6 routes – Primarily
serving western part of the county, connecting Lawrenceville, Duluth, Lilburn and Norcross to MARTA Doraville Station
Paratransit
• Monday – Saturday
• 8 Transport vehicles during daily peak
• Complementary service for persons unable to access bus stops or ride independently within ¾ of a mile of the 6 local routes
Department Overview - Airport
More than 85,000 airport operations (take-offs/landings) in 2016
4th busiest airport in Georgia
Approximately 300 based aircraft
Maintain electrical systems and navigational aids
Maintain more than 400 acres of airport property
Manage master plans and capital projects
Planning Initiatives – Comprehensive Transportation Plan
• Improve Connectivity
• Leverage the County’s Transportation System to Improve
Economic Vitality and Quality of Life
• Improve Safety and Mobility for All People Across All
Modes of Travel
• Proactively Embrace Future Transportation Opportunities
• Continue to Serve as Responsible Stewards of
Transportation Resources
Planning Initiatives – Comprehensive Transportation Plan
9,673
7,197
6,576
6,397
5,811
5,185
4,769
4,442
0 2,000 4,000 6,000 8,000 10,000 12,000
Vehicular Travel
Connectivity
Transit Service
Transportation Safety
Maintenance
Walking/Biking
Economic Vitality
Access to Transportation
Citizen Priority Rankings (Weighted)
Planning Initiatives - Targeted Efforts
Comprehensive Transit Development Plan
Countywide Trails Master Plan
Signal System Evaluation and Traffic Management System Master Plan
Commission Priorities – Mobility and Access
Inflow/Outflow Job Counts in 2013
185,754 – Employed in Gwinnett, Live Outside of Gwinnett
206,899 – Live in Gwinnett, Employed Outside of Gwinnett
135,908 – Employed and Live in Gwinnett
Commission Priorities – Mobility and Access
Gwinnett County Transit Recent Improvements
Restored Saturday Service to All Local Routes
Added Sweeper Buses to Express Service
Provided Additional Express Service from Sugarloaf
Added New Emory/CDC Express Service from Indian Trail and Sugarloaf
Made Local Service Schedule Adjustments and Additional Trips
Commission Priorities – Mobility and Access
Gwinnett County Transit Recent Improvements
Adding Wi-Fi to Half of the Fleet
Replacing and Overhauling Fleet
Upgraded Sugarloaf Park and Ride Lot
Established Passenger Trip Planning
Promoting Transit Through Education and Outreach
Commission Priorities – Mobility and Access
• Improved On-time Performance by Approximately 20%
• Increased Ridership by Approximately 8%
Commission Priorities – Mobility and Access
2018 Decision Package #2 – Transit Wi-Fi on remaining
half of fleet
• Allow Passengers Access to Wi-Fi to Improve Overall Transit
Experience
• Incentive to Choose Transit over a Personal Automobile for
Commuting and other Travel Needs
• Ensure GCT Remains Competitive with other Transit
Services/Agencies that Offer Free Public Wi-Fi
Total Request: $236,900
____ Projects In Design
____ Existing
Commission Priorities – Mobility and Access
More than
265 Closed
Circuit Cameras
More than 230 Miles of
Fiberoptic Cable
Commission Priorities – Mobility and Access
2018 Decision Package #3 – Traffic Engineer
Gwinnett
County
Current
Gwinnett
County
Proposed
Cobb
County
Baltimore,
MD
Macomb
County,
MI
Ga DOT
(RTOP)
Total Signals 716 716 550 1,550 750 1,200
Engineers 3 4 4 14 6 23
Signals /
Engineer 239 179 138 110 125 60
Commission Priorities – Mobility and Access
2018 Decision Package #3 – Traffic Engineer
• Update individual signal and connected corridor timing
• Manage design and construction of new locations
• Employ traffic-responsive technology on additional corridors
• Implement technology to better detect equipment failures
• Apply smart corridor technology
• Make real-time adjustments to traffic signal operations
Total Request: $108,620
Commission Priorities – Safe & Healthy Community
2018 Decision Package #1 – Traffic Analyst
• Restore position in Operations and Maintenance
• Current and new position would split duties between northern and
southern sections of the County
Total Request: $58,694
Commission Priorities – Safe & Healthy Community
Inspection of all signage and striping
Road closures and detours
No Parking signage coordination
Special Events permits
New development coordination
Utility locates and ROW verification
2018 Decision
Package #1
Traffic Analyst
Over 200 traffic control
flashing beacon locations
Commission Priorities – Safe & Healthy Community
Over 1,300 speed humps
on 280 streets
Commission Priorities – Safe & Healthy Community
2018 Decision Package #5 – Street Lighting
• Program for newer neighborhoods and some commercial areas using
special assessment fees
• Recently established programs using SPLOST funds to install and
assessment fees to operate in older residential neighborhoods and
Community Improvement Districts
• County funds the operating costs for limited number of high-hazard
street lights in various locations
Commission Priorities – Safe & Healthy Community
2018 Decision Package #5 – Street Lighting
• Request an increase of $50,000 in Traffic Operations to
provide for the installation and operation of additional
streetlights along collector and arterial streets
• Identify areas not currently covered by existing street lighting
programs to improve nighttime and early morning travel for
vehicles and pedestrians
Commission Priorities Smart & Sustainable Government
Atlanta Regional Commission Call for Projects – total request
$69,941,766 including:
• SR 124 (Scenic Highway) widening, from US 78 to Sugarloaf
Parkway – $4,800,000 (engineering)
• Western Gwinnett Bikeway Extension – $3,000,000 (construction)
• Traffic Management System Expansion Phase 1 – $3,910,000
• Resurfacing various major roads – $5,243,200
• Gwinnett Transit Service Expansion - $10,272,000
(first 3 years of operations)
Commission Priorities Smart & Sustainable Government
Estimated resurfacing cost over six years to raise Pavement
Condition Index (PCI) to 65
• Approximate annual cost of $25 million per year for a total
six-year cost of $150 million
• A deterioration rate of 3 PCI points a year was assumed
• An inflation factor of 3% per year was used
• 2017 SPLOST provides $19 million per year. Georgia DOT
currently provides approximately $6 million per year.
Commission Priorities Strong & Vibrant Local Economy
2018 Decision
Package #4 ROW
Mowing, Trimming
and Sweeping
Commission Priorities Strong & Vibrant Local Economy
2018 Decision Package #4 – ROW Mowing, Trimming and Sweeping
• Shoulder Mowing – $414,000
– Increase frequency of mowing from every six weeks to every
three weeks
• Landscape Trimming – $100,000
– Trim landscaped median, shoulder and ramp areas
• Sweeping - $30,000
– Increase curb sweeping by 100 miles
– Increase intersection sweeping by 75 locations
2018 Budget DOT Decision Package Summary
• Traffic Analyst Position in Traffic Operations – $58,694
• Wi-Fi on all Transit Vehicles – $236,900
• Traffic Engineer Position in Traffic Signals – $108,620
• Mowing, Trimming and Sweeping – $544,000
• Street Lighting – $50,000
DOT 2018 Operating
2017 2018
General Fund $18,801,475 $20,211,497
Street Lighting $7,455,115 $7,541,420
Speed Hump $160,215 $161,783
Transit $12,312,083 $14,148,044
Airport $1,309,810 $1,134,699
$40,038,698 $43,197,443
Five-Year Plan
Secure Additional Funding for Major Road Projects
• Sugarloaf Parkway Extension
• I-85 improvements from southern County line to SR 316
• SR 124 / Scenic Highway widening
• Killian Hill Road widening
• SR 124 / Braselton Highway widening
• Crossings of I-85 and SR 316
Five-Year Plan
Expand transit local service options by increasing frequency
of service, extending service hours and adding one new
route
• Federal startup funds requested for 80% of operating
costs for first three years of service
• $3,424,000 Federal / $856,000 Local per year
• By year four, fare box collections and federal formula
funds will replace majority of expiring startup funds
Five-Year Plan
Prepare for expansion of transit options based on recommendations
from the Comprehensive Transit Development Plan
• Further evaluate and optimize existing service and make structural
improvements
• Balance mode, frequency and coverage
• Determine what areas are not being served and what new or better
connections should be made
• Assess need and location for high-capacity transit in dedicated
space
• Identify funding for implementation
Five-Year Plan
Address personnel needs in key areas
• Retention of field personnel
• Trades Tech IV and other critical Traffic Engineering
positions
• Right of Way and Asset Manager
• Assistant Utility Coordinator