D e n t a l O f f i c e DESIGN PROCESS www.desergo.com SITE PURCHASE An overview of ownership-oriented Dental Office Design projects, both Ground Up Construction and Building Purchase and Improvement. Key steps and time-lines critical to successfully building the Practice of Your Dreams.

Upload: others

Post on 04-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

D e n t a l O f f i c e

DESIGN PROCESS

w w w . d e s e r g o . c o m

SITE PURCHASEAn overview of ownership-oriented Dental Office Design projects, both Ground Up Construction and Building Purchase and Improvement. Key steps and time-lines critical to successfully building the Practice of Your Dreams.

Page 2: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 2 –6.26.18

Whether you’re planning your first practice straight out of Associateship, or launching your 10th in a growing group empire, building a dental office is an extraordinary process - and at times both challenging and exacting.

This document outlines key steps & highlights project mile-stones – and provides significant detail on Design Ergonomics’ development strategies and processes.

Your office will have an enormous impact on your future; it’s where you’ll spend much of your time, determines your financial security, and allows you to bring health and well-being to the community. We are honored to be part of the creation process.Please note that this document addresses issues specific to purchasing a lot for Ground Up Construction or an Existing Building for develop-ment. If you are considering leasing a space, please see “Dental Office Design Process - Tenant Improvement”, also available on our website.

INTRODUCTION

Page 3: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 3 –6.26.18

OVERVIEW

Define Goals and RequirementsGather Your TeamRough Budgeting

Phase ONEEARLY PLANNING

Site SelectionNegotiations & Due DiligencePreliminary Site Engineering

Phase TWO PROPERTY ACQUISITION

Conceptual • Consultation • Blocking Diagram & Operatory PlanningRefinement • Preliminary Floor Plan • Preliminary Exterior Design Concepts • Equipment Determinations & Final Floor PlanInterior Design

Phase THREEDESIGN

DEVELOPMENT

Construction Documents & EngineeringBiddingPermitting

Phase FOURDESIGN EXECUTION

ConstructionEquipment InstallationFinal Inspections & CO

Phase FIVECONSTRUCTION

Every building project has unique elements; however, most follow the general flow as outlined below. While this outline may appear simple at a glance, there are an enormous number of details to track and many people involved. (Note that “Gather Your Team” is one of the first things you should consider!)Design Ergonomics’ focus is Practice Development – locating the best possible site and designing the most efficient, comfortable and attractive office possible. While these tasks fall mainly under the Location and Design Phases (highlighted in red), we look forward to accompanying you on your entire journey.Where possible, a “Time Frame” will be given for each step in each phase. Please note that these ranges are rough estimates only and may be subject to significant variation depending on your particular project.

Page 4: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 4 –6.26.18

• Financial Advisor (may be beneficial during rough budgeting phase)• Banker/Lender• Attorney• Architectural & Interior Designers• Clinical Specialist (equipment decisions impact design, budget and time-lines)• Construction Team - Architect - Engineers (Civil, Mechanical, Electrical, Plumbing) - Contractor

Building a new office is a Team Effort - though the members on the team, and how much input each will have may vary considerably with each project. Key players include:

Depending on your project type, your Construction Team may be from one organization or several. We have developed a large network of trusted referral partners across all the areas listed above. Please don’t hesitate to ask if you would like advice or recommendations.

Define Goals and Requirements

Gather Your Team

P H A S E O N E • E A R LY P L A N N I N G Time Frame: Varies

Time Frame: Varies (but could be several weeks)

• How many ops do I need at opening?• How about 3 years from now? Or 10?• How long am I going to work in this office? - End-game retirement office? - Lay ground work for later expansion? - Plan on opening a second office later?• What’s important to me? - Location - Start-up costs or long term value - Efficiency & Productivity - Ease of bringing in Associates - Appearance• What are my BIG PICTURE Goals? - Personal Wealth, Charity, More Family Time? - I just love Dentistry and want to do more of it!

This is “Big Picture” thinking. You need to ask yourself a lot of questions. Then think about the answers – and ask them again. At this point, it’s easy to get lost in short term thinking and challenges, but the decisions you make today will affect your career for years to come. So, think long term.

Page 5: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 5 –6.26.18

P H A S E O N E • E A R LY P L A N N I N G

As your vision of the future comes into focus, you need to develop a realistic picture of what it will take to get there – and you need to start with a budget.Developing a reasonable budget (one that you can expect to attain) can be somewhat convoluted, and is impacted by a number of factors including:

This process often occurs as a cycle of propose, estimate, investigate, and refine – but it begins by examining your Goals and Requirements. A Financial Advisor and/or your Lender may be helpful in this process. Additionally, we have tools that can help suggest very rough costs for a variety of project types. These address such issues as operatory count, regional construction cost variation and level of finish treatment. Balancing what you want now, what you want for the future, and what you can reasonably afford can be a challenge. Fortunately, we’ve helped 1000’s of doctors through the process and one of Design Ergonomics’ greatest strengths lies in our ability to design very cost effective offices suited to a wide range of needs.

Rough Budgeting

• Your credit rating• Your project type (Building Purchase, Ground Up Build)• Complexity of design & level of finish treatments• Your current production levels• Ability to self-finance• Practice history• Practice ownership, and more...

FIRST FLOOR PLAN5338 SQ. FT.334 SQ. FT. PER TX. RM

PROJECT NUMBER: KEELAN - FP 2015DATE: 1/5/15DRAWN BY: JBCHECKED BY: GP

A 1.0

DR

. PA

UL

KEE

LAN

BU

TLER

, PA

198 Airport RdFall River, MA 02720

DN

9 Operatories?16 Ops and phase equipment?

Area to ExpandSpace to Lease Out

Development Potential

Time Frame: Varies

Page 6: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 6 –6.26.18

Site Selection

Finding the right location is absolutely critical to the success of your new practice; to maximize your investment, it’s got to be perfect. Obviously, enlisting the aid of a Realtor can help with this process. Howev-er, in 20 years of designing exclusively for the dental field, we’ve analyzed 1000’s of construction sites and have developed a deep understanding of what works. There are issues unique to the dental industry that even a com-mercial real estate specialist may not be aware of.

We offer a range of service options to help you make an in-formed decision on just the right spot to build the practice of your dreams. All options utilize an algorithm we’ve developed to analyze and quantify nearly a hundred variables, including:

If you’re having trouble finding an appropriate location – or would like us to review and compare locations you have found – please ask your Design Specialist for more informa-tion.Finally, you may want to determine feasibility of potential sites. Many clients utilize our Blocking Diagram design ser-vice to accomplish this. It is affordable, flexible and fast (see Phase Three, Design Development for details).

• Maximum exposure to your preferred demographic.

• Municipal or infrastructure hurdles that cause delays and cost-overruns.

• Visibility, traffic and access factors that work for you, not against you.

• Analysis of existing improvements (structures, etc.)

High Visibility

Exceptional Demographics

Strong Business Synergies

PHASE TWO • PROPERTY ACQUISITIONTime Frame: 4-12 weeks

Page 7: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 7 –6.26.18

Negotiations & Due Diligence

Preliminary Site Engineering & “As Builts”

You’ll want an attorney on your team at this point; it’s better to have one familiar with you and your project now, than to wait until you really need one because something unexpected has come up. He or she can provide critical input at loan, purchase or contract review times throughout the process.At negotiations you will determine your Due Diligence period. During this time, you will have a Civil Engineer investigate the site to reveal any issues that might cause it to be non-viable. Should such issues become apparent, you may be able to pull out of the sale and still retain your escrow. Again, consult your attorney.Launching the Conceptual Design process during (or even before) the Due Diligence period may also prove useful. Blocking Diagrams (see next section) can help determine the land or structure valuation. Establishing the scale of practice that the property can support will give you a clearer sense of the potential return on your investment – and hence, what the property is worth to you.

During the Due Diligence period, have a Civil Engineer prepare a preliminary Site Engineering survey during the Due Diligence period.This is a basic survey, and items covered will depend on the nature of the particular site. Such items may include a preliminary site plan, rough building location and allowable footprint, soil & environmental testing, water remediation strategies etc. A much more comprehen-sive study will be performed at a later date, which will be included with the Construction Documentation.As Builts - If you are purchasing an existing structure in which to build your Office, you will need current drawings of the site. These plans are known as “As Builts” and detail all the dimensional and structural elements of a location as it currently exists. While we can create a Conceptual schematic of how a space might be utilized (see Blocking Diagram, page 9), the accuracy of such a drawing depends heavily on what we have to work from. Outdated or in-complete drawings may require changes or incur significant costs when detailed design work begins. Your Realtor can request As Builts from the seller. If they are not available, you will need to make arrangements to have them created before any reliable design work can be done on the space.

A N

ew O

ffic

e Si

te F

orSm

ile M

aker

s Fa

mily

& C

osm

etic

Den

tris

try

MO

NTG

OM

ERY

, ALA

BAM

A

CMGM-150

040

Subm

ittal

05.

25.2

015

Con

stru

ctio

n D

raw

ings

02.

18.2

016

Revi

sed

05.

04.

2016

GRA

DING

PLAN C5 5

0 30' 60'

Scale: 1" = 30'

T:\Montgomery\CMGM Dwg\SMILE MAKERS\150040-DENTAL OFFICE\+PLANS\C5-GRADING.dwg

PHASE TWO • PROPERTY ACQUISITIONTime Frame: 1-2 weeks, but may vary

Time Frame: 2-4 weeks

Page 8: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 8 –6.26.18

Conceptual - Consultation

If you worked with us on Site Selection, then we’ve developed a good relationship at this point. Otherwise, we need to get to know more about you; your goals, how you perform dentistry and your project expectations. To start this process, you’ll be asked to fill out our Dental Office Planner (“DOP”), This is a fairly quick online form that will give us the basic information we need to build an early profile of your project. We will also schedule a Consult Call with you. Design is a visual medium. Whenever possible, we conduct Consultation and Plan Reviews via Screen Share. We’ve found this to be the most effective method to relay our design philosophies to our clients, while providing them the opportunity for immediate feedback and commentary. During the Design Consult Call, we’ll review your long term goals and desires, focusing on the scope of your project. While operatory count, number of floors, basement amenities and other architectural elements are critical to this discussion, they are not the only elements under consideration. We’ll also investigate your preferred patient demographic, staffing levels, and clinical systems (current and desired).Operatory equipment has a significant impact on design and the practice development process – including budgetary considerations. How rooms are utilized plays a role in their size and arrangement; dedicated hygiene rooms, surgical suites, plumbed vs mobile nitrous, hand-held X-rays and a number of other factors need to be taken into account to create the most efficient and effective design for both patient and doctor. To this end, we will also introduce you to one of our Clinical Specialists. This member of your team will guide you on what equipment decisions need to be made and when.

PHASE THREE • DESIGN DEVELOPMENTTime Frame: 1 week or faster

Page 9: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 9 –6.26.18

Conceptual - Blocking Diagram & Op Planning

Now the Design Process launches in earnest, and we begin with a conceptual Blocking Diagram.

A dental practice is a system. Before you define the walls, it’s crit-ical to layout the flow of that sys-tem – understanding the functional demands of each space and how they relate to one another. This fast, flexible, and responsive design approach will clarify your goals for the future and solidify your vision of the perfect practice.

Complex Issues SimplifiedThe Blocking Diagram is a preliminary space/plan concept used to outline the layout and flow of your future practice. Using simplified square footage calculations and geometric space planning, we cre-ate a schematic diagram representing one possible configuration of your space.At this stage, we focus on maximizing the efficiency, capacity and comfort of your practice as a whole. While the result looks simple, your Blocking Diagram represents 20 years of research maxi-mizing dental office productivity and cost-effective design execution.As schematics, these proposals are flexible and highly responsive to your input. This creates a de-velopment and revision process that is faster and more effective than traditional floor planning tech-niques – and at a much lower cost.

IterationsOur standard Blocking Diagram service includes up to four design iterations. These may be used to refine concepts within a single design theme, or to experiment with different approaches. They may even be used to assess multiple spaces. Each iteration will be presented via Screen Share. This allows us to show how design concepts may look in the real world and to make minor changes for immediate approval based on your input.Depending the on the number of iterations required, the Blocking Diagram phase of Design Develop-ment can be done quite quickly – sometimes in just a few days. Once you are satisfied, the approved design can move to the next step in Design Development: the Floor Plan.

FILENAME:

ISSUED: DRAWN BY: CHECKED BY:

PROJECT NUMBER:

PJL DJA

PR

OP

OS

ED

DE

NTA

L O

FFIC

E F

OR

LAK

E O

CO

NE

E D

EN

TIS

TRY

= DAYLIGHT

P = PLUMBING REQUIRED

= ACOUSTICS HIGH IMPORTANCE

PROPOSED BLOCKING DIAGRAM V2SCALE = N.T.S

APPROX 4972 sq.ft. 331 sq.ft/Tx.Rm

THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN1.Clearly identifiable patient entrance.2. Staff entrance screened from view. Prevents entry confusion.3. Immediate visual and physical access to the front desk upon office entry.4. Waiting room seating removed from primary circulation or traffic flow.5. Patient bathroom visible to, but removed from, waiting room seating.6. The major proportion of the open front desk does not face the waiting room seating.7. Conference room accessible by the doctor without passing into the front desk space. 8. Conference room location minimally exposes patient to treatment room noises.9. Treatment rooms isolated from the front desk.10. Compact treatment area minimizing segregation of doctor and hygiene staff.11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities.12. Space for mobilization of technology.13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms.14. Radiology areas do not block traffic flow when in use.15. Staff lounge isolated from clinical and business zones.16. Treatment room alignment does not channel noises from room to room.

= PRIVATE SPACES

= TREATMENTSPACES

= PUBLIC SPACES

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)DOCTOR

TREATMENTROOM

“P”(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DENTALMECH

CLOSET

WAITINGROOM

(16+ SEATS)

WAITINGROOM

(11+ SEATS)

CAFEAREA

(5+ SEATS)

CLOSET

PATIENTRESTROOM

“P”

PATIENTRESTROOM

“P”

STAFFRESTROOM

“P”

SEDATIONRESTROOM

“P”

SEMI-PRIVATECHECKOUT

AREA

SEMI-PRIVATECHECKOUT

AREA

CONSULTROOM

CONSULTROOM

X-RAY &IMAGING

ROOM

CO

MPU

TERSTATIO

N

STERILIZATIONRESUPPLY &

STORAGE“P”

STAFFLOUNGE

“P”

JANITORCLOSET

“P”

LAB &MODEL

STORAGE

GREETINGAREA

(2 STATIONS)LOG

O W

ALL

CHECKOUTSTATIONS

STAIRS UP

REFR

ESH

MEN

TS

PLAYAREA

MOBILE TECH

MOBILE TECH

PHASE THREE • DESIGN DEVELOPMENTTime Frame: 1-2 weeks

Page 10: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 10 –6.26.18

Refinement - Preliminary Floor Plan

PHASE THREE • DESIGN DEVELOPMENTTime Frame: 1-2 weeks

A Floor Plan is created by translating the conceptual elements that were established during the Blocking Diagram process – patient flow, clinical sys-tems, sterilization, inventory and storage – into a formal drawing. As the basis from which all other documents are created, it must accurately depict the specific details that allow the Blocking concepts to be realized. Missteps and oversights at this stage can snowball into costly changes down the road. Simply changing the location of a door, or the orientation of a room – which are trivial matters to an Architect – can have dramatic and detrimen-tal impact on traffic flow in a dental environment.

Most Architects don’t design exclusively for the dental industry. We do. As the nation’s largest independent dental office design firm, we’ve had the opportunity to help develop 1000’s of practices, and have seen what works – and what doesn’t. While our Blocking Dia-grams establish the scheme for an incredibly effective practice, they truly are conceptual frameworks only.

To avoid potential issues, we strongly recommend having our design team take your approved Blocking Diagram to Floor Plan (initial, and then final).We will ensure critical design elements are maintained, as well as provide additional drawing details which accurately define Operatory, Sterilization, Resupply and other clinical considerations unique to a dental practice.

FILENAME:

ISSUED: DRAWN BY: CHECKED BY:

PROJECT NUMBER:

PJL DJA

PR

OP

OS

ED

DE

NTA

L O

FFIC

E F

OR

LAK

E O

CO

NE

E D

EN

TIS

TRY

= DAYLIGHT

P = PLUMBING REQUIRED

= ACOUSTICS HIGH IMPORTANCE

PROPOSED BLOCKING DIAGRAM V2SCALE = N.T.S

APPROX 4972 sq.ft. 331 sq.ft/Tx.Rm

THE 16 ELEMENTS OF AN IDEAL FLOOR PLAN1.Clearly identifiable patient entrance.2. Staff entrance screened from view. Prevents entry confusion.3. Immediate visual and physical access to the front desk upon office entry.4. Waiting room seating removed from primary circulation or traffic flow.5. Patient bathroom visible to, but removed from, waiting room seating.6. The major proportion of the open front desk does not face the waiting room seating.7. Conference room accessible by the doctor without passing into the front desk space. 8. Conference room location minimally exposes patient to treatment room noises.9. Treatment rooms isolated from the front desk.10. Compact treatment area minimizing segregation of doctor and hygiene staff.11. Doctor’s office within proximity of treatment rooms, to keep a pulse on clinical activities.12. Space for mobilization of technology.13. Sterilization, lab and re-supply areas in close physical proximity to treatment rooms.14. Radiology areas do not block traffic flow when in use.15. Staff lounge isolated from clinical and business zones.16. Treatment room alignment does not channel noises from room to room.

= PRIVATE SPACES

= TREATMENTSPACES

= PUBLIC SPACES

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

QUIETDOCTOR

TREATMENTROOM

“P”(16’-0”X9’-0”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)DOCTOR

TREATMENTROOM

“P”(11’-0”X8’-4”)

DOCTORTREATMENT

ROOM“P”

(11’-0”X8’-4”)

DENTALMECH

CLOSET

WAITINGROOM

(16+ SEATS)

WAITINGROOM

(11+ SEATS)

CAFEAREA

(5+ SEATS)

CLOSET

PATIENTRESTROOM

“P”

PATIENTRESTROOM

“P”

STAFFRESTROOM

“P”

SEDATIONRESTROOM

“P”

SEMI-PRIVATECHECKOUT

AREA

SEMI-PRIVATECHECKOUT

AREA

CONSULTROOM

CONSULTROOM

X-RAY &IMAGING

ROOM

CO

MPU

TERSTATIO

N

STERILIZATIONRESUPPLY &

STORAGE“P”

STAFFLOUNGE

“P”

JANITORCLOSET

“P”

LAB &MODEL

STORAGE

GREETINGAREA

(2 STATIONS)LOG

O W

ALL

CHECKOUTSTATIONS

STAIRS UP

REFR

ESH

MEN

TS

PLAYAREA

MOBILE TECH

MOBILE TECH

Your Floor Plan is the single most important

document in the Design Development process

by virtue of the fact that it is the reference

point for all subsequent Construction

Documentation.

Page 11: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 11 –6.26.18

Refinement - Equipment & Final Floor Plan

Before Design Ergonomics or your Architect can produce a Final Floor plan, you must finalize many decisions regarding equipment; certain structural, electrical and plumbing elements that need to be delineated at this point depend on these decisions. Where possible, Design Ergonomics will provide drawing details that will become part of the eventual plan set (“Construction Drawings”) that your Construction Partner will use to build your office and install the equipment that drives it. Typically, these include one or more Operato-ry designs as well as Sterilization.

Here again, we invite you to make use of our Clinical Specialists. No matter what your equipment selections are, they will have valuable insight on a broad range of topics - from HVAC to autoclaves.From your Initial Floor Plan through Final, we will consult and review with you, making changes as needed. Initial Floor Plan presentation may take place via Screen Share. However, changes at this point tend to be minor (though precise) and are often handled through email.Once approved, we will create a document package for your Final Floor Plan that includes:

TY

P.

4' -

2 1

/16

"

X-RAY UNIT: SINGLE STUD MOUNTMODEL T.B.D. BY OWNERSEE ELECTRICAL SHEETS FORFURTHER INFORMATION

L3

S1

D1

N16

N4

C3

C4

OPERATORY GENERAL& PATIENT LIGHT

CENTER OF HEAD

CE

NT

ER

OF

HE

AD

5' - 5"

4' - 0"

A5.63

2

A5.6

2' - 3 1/4"

FINISHED FLOOR

E/P COMPUTER STORAGECABINENTSUPPLIED BY OWNERINSTALLEDBY G.C.

DR. AND ASSISTANT COMPUTERMONITOR BY OWNER LOCATE ACCORDINGDR. PREFRENCE 19"-21" MAX. (DIAG.)

SLAT WALL STORAGE SYSTEMSUPPLIED BY OWNER.INSTALLED BY G.C.

E/P UNIVERSALWALL WORKCENTER (C4)SUPPLIED BY OWNER,INSTALLED BY G.C

C4

C9

C8

UTILITY ACCESSVALENCE PANEL

2' -

4"

5' -

0"

7' -

0"7' -

6"

8' - 4"

3' - 0" 3' - 0" 2' - 4"

6

A5.6

7

A5.6

SEE 4/A5.6 FOR FRAMING DETAIL

SEE 5/A5.6 FOR DRYWALL PREP

INSTALLSTRAIGHT STOPSON ALL DOMESTICWATER LINES

FIN. FLOOR

1-1/2" SPARE CONDUIT(TO TOE OF CHAIR J-BOX)

2' - 10 3/4"

2X6 BLOCKING

2X6 BLOCKING

2X6 BLOCKING

2X6 BLOCKING

2X

4 N

AIL

ER

2X

4 N

AIL

ER

10

1/4

"4

1/2

"

DOORWAY HEADERAS REQ'D

DOORWAY HEADERAS REQ'D

DUPLEX OUTLET

DATA PORT

SPARE (OPEN) J-BOX(FOR USBCONNECTIONS)

1-1/2" CONDUIT FORUSB CONNECTIONS

5' -

3"

2' -

4"

6' -

0"7

' - 0

5/8

"

7' -

6"

REF PLUMBING FORVACUUM, WATER, ANDAIR LINES REQUIRED

FIN. FLOOR

7' -

0"

5' -

6"

1' -

2"

1' - 3"1' - 3"

2' - 6"

6"

10

"

1' - 7"

C3 CABINET BACK

C4 CABINET BACK

BACK CUTAWAY FORELECTRICAL AND DATABY GC

DRYWALLCUTAWAY AREABY GC

4"

1' -

5 1

/2"2' -

4"

5' -

0"

7' -

6"

FINISHED FLOORFINISHED FLOOR

C4

C3

C8

6 1/2"

5 1/2"

2 1

/4"

5 1

/4"

8 1

/4"

3"

SOLID WOODBLOCKING (REF.

DETAIL)

1/2" VACUUM

1/2" DENTAL WATER

1/2" COMPRESSED AIR

5/8" GYP. BOARD

2X FRAMING (TYP.)

REF PLUMBING FOR VACUUM,WATER, AND AIR LINES REQUIRED

FINISHED FLOOR

C4

C3

D1

S1

C8

L3 2X6 WOOD BLOCKINGFOR FASTENINGCABINETRY (BY G.C.TYP.) - SEE DETAIL 5/A3.0

SE

E R

EF

LE

CT

ED

CE

ILIN

G P

LA

N

SE

E L

IGH

T F

IXT

UR

E M

AN

UA

L

2' -

4"

4"

1' -

5 1

/2"

2' -

8"

2' -

6"

HUBBELL FLUSH MOUNT FLOOR BOX W/POWER, & AUDIO, #HBLCF301 W/HBLTCGNTSW COVER (BY G.C.)

SEE LIGHT FIXTURE MANUAL FOR BLOCKING INFORMATION

SEE LIGHT FIXTURE MANUAL FOR MOUNTING DETAILS

2809 Ajax Avenue, Suite 100Rogers, Arkansas 72758

Phone: 479.636.3545Fax: 479.636.1209

Architect of RecordWilliam Douglas Hurley

Alabama License No. 5035Firm COA Number: CA-0011

Sheet:

CHECKED BY:

DRAWN BY:

DOCUMENT DATE:

JO

B N

UM

BE

R:

PR

OJE

CT

F

OR

:

PR

OJE

CT

AD

DR

ES

S:

ST

IPU

LA

TIO

N F

OR

RE

US

E

TH

IS D

RA

WIN

G W

AS

PR

EP

AR

ED

FO

R U

SE

ON

A S

PE

CIF

IC S

ITE

AT

MO

NT

GO

ME

RY

, AL

AB

AM

AC

ON

TE

MP

OR

AN

EO

US

LY

WIT

H IS

SU

E D

AT

EO

N , A

ND

IT

IS

NO

T S

UIT

AB

LE

FO

RU

SE

ON

A A

DIF

FE

RE

NT

PR

OJE

CT

SIT

E O

R A

TA

LA

TE

R T

IME

. U

SE

OF

TH

IS D

RA

WIN

G F

OR

RE

FE

RE

NC

E O

R E

XA

MP

LE

ON

AN

OT

HE

RP

RO

JE

CT

RE

QU

IRE

S T

HE

SE

RV

ICE

S O

FP

RO

PE

RLY

LIC

EN

SE

D A

RC

HIT

EC

TS

AN

DE

NG

INE

ER

S. R

EP

RO

DU

CT

ION

OF

TH

ISD

RA

WIN

G F

OR

RE

US

E O

N A

NO

TH

ER

PR

OJE

CT

IS

NO

T A

UT

HO

RIZ

ED

AN

D M

AY

BE

CO

NT

RA

RY

TO

TH

E L

AW

PRELIMINARYNOT FOR

CONSTRUCTION

PO

Box 3

630

767 M

ain

Road

Westp

ort

MA

02790

508 6

36 3

600

LA

ST

SA

VE

D:

FIL

E L

OC

AT

ION

:

08.18.15

8/2

4/2

015 8

:57:0

0 A

M

C:\

Users

\mic

haels

ides\D

ocu

men

ts\M

on

tgo

mery

AL

- D

en

tal C

lin

ic_m

ich

aels

ides.r

vt

A5.6

ENLARGEDTREATMENT

ROOM PLANS,ELEVATIONS,

SECTIONS ANDDETAILS

JMJ

JEB

MM/DD/YY

DR

S. F

RY

& B

AR

GA

NIE

R

F2015-0

102

EA

ST

CH

AS

E P

AR

KW

AY

MO

NT

GO

ME

RY

, A

L

MM

/DD

/YY

3/4" = 1'-0"1

ENLARGEMENT OF DOCTORTREATMENT ROOM

3/4" = 1'-0"3

C4/C3-9 - UTILITY WALL ELEVATION

3/4" = 1'-0"4

C4/C3-9 - HEADWALL FRAMING - NONITROUS

3/4" = 1'-0"5

C4/C3 - DRYWALL PREP 3/4" = 1'-0"

6C4/C3-9 - UTILITY WALL SECTION

1 1/2" = 1'-0"7

HEAD WALL DETAIL - WITH WATER LINE

3/4" = 1'-0"2

DR. ROOM SECTION

ISSUE BLOCK

DW

A5.1

6

5

A5.12

3

4

20' - 1"

6' -

9 7

/8"

3' - 0 5/8"8' - 9 1/4"

13' - 11 1/4" 11' - 10 1/2"

15' - 10 3/4" 9' - 2 3/8" 8' - 11 3/4"

2' -

8 1

/8"

2' -

7 1

/4"

8' -

6 3

/4"

13' - 11 1/4"

4' -

8 1

/8"

STERILIZATION,RESTOCK &RESUPPLY

128

LAB & MODELSTORAGE

131

1

A5.5

FIRST FLOOR0"

DROP CEILING10' - 0"

5' -

2"

2' -

10

"

3' - 0" 3' - 0"

8' -

0"

7' - 11 7/8"

PL1

PL4

AL 2000 PLUGMOLDSTRIP; 12" O.C.;REF ELECTRICAL

ADJUSTABLE SHELVESPLASTIC LAMINATECOLOR: TBD(BY G.C.)

1' - 11 3/16"

FIRST FLOOR0"

DROP CEILING10' - 0"

2' -

10

"5

' - 2

"

2' -

6"

3' - 0" 8' - 5"

8' -

0"

13' - 3 7/8"

SINK BASE CABINET;PLASTIC LAMINATECOLOR: TBD

PL4

AL 2000 PLUGMOLDSTRIP; 12" O.C.;REF ELECTRICAL

ADJUSTABLE SHELVESPLASTIC LAMINATECOLOR: TBD(BY G.C.)

1' - 11 1/2"

FIRST FLOOR0"

DROP CEILING10' - 0"

8' -

0"

5' -

2"

2' -

10

"

2' -

6"

HAFELE BRACKETS;287.45.468 (BY MILLWORK)

PL4

ADJUSTABLE SHELVESPLASTIC LAMINATECOLOR: TBD (BY G.C.)

FIRST FLOOR0"

DROP CEILING10' - 0"

3' -

6"

1' -

8"

2' -

10

"

1' - 8"

1' - 8"

2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"

8' -

0"

18' - 4 1/4"

2' - 6" 2' - 6"

1' - 6" 4' - 9 1/2"1' - 6"1' - 8"

5' -

2"

2' -

10

"

1' - 3"

ERGONOMIC PRODUCTS PULL DOWN UNITS(BY OWNER)

ERGONOMIC PRODUCTS PULLDOWN UNITS(BY OWNER)

AL 2000 PLUGMOLDSTRIP; 12" O.C.;REF ELECTRICAL

HAFELE BRACKETS;287.45.468(BY MILLWORK)

TOEKICK; PLASTIC LAMINATE;BY G.C.

PL1

PL4

FIRST FLOOR0"

DROP CEILING10' - 0"

2' - 6"3' - 0" 1' - 6"2' - 0"

2' -

10

"1

' - 8

"3

' - 6

"

8' -

0"

3' - 0" 3' - 0" 3' - 0" 2' - 6" 2' - 6"

2' - 6" 2' - 6"

A5.18

A5.17

1' - 6"

1' - 6"

8' - 9 5/8" 15' - 6"

2' - 6 1/8"

4' -

0"

4' -

0"

3

A3

ERGONOMIC PRODUCTS PULLDOWN UNITS(BY OWNER)

AL 2000 PLUGMOLDSTRIP, 12" O.C.REF ELECTRICAL

PL4

HAFELE BRACKETS;287.45.468(BY MILLWORK)

TOEKICK PLASTICLAMINATE;BY G.C.

DISHWASHER(BY OWNER)

RANGE HOOD(BY G.C.)

AUTOCLAVES(BY OWNER)

PANTRY-STYLECABINETS WITHGLASS DOORS;PL1

2' - 6"2' - 6"2' - 6"1' - 3 5/8" PL1

A&M HARDWARE SHELF SUPPORTBRACKETS SIZED AS NEEDED

ACCURIDE MODEL 301-2590/130lbsFULL EXTENSION HEAVY DUTYDRAWER SLIDE BY OTHERS

3/4" MARINE GRADE PLYWOODAPPROVED FRO DAMP CONDITIONS

FINISHED FLOOR

FINISHED CEILING

2' -

9 1

/4"

2' - 0"

S T

6"

8"

GREENO MFG.:# TCSCH-LSHARPS HOLDER

6" DIA TRASHCHUTE BYCABINENT MAKER

PLASTIC WASTEBIN (BY OWNER)

REV-A-SHELF (OREQUIVALENT) FULLHEIGHT PULL OUTWASTE BIN

2809 Ajax Avenue, Suite 100Rogers, Arkansas 72758

Phone: 479.636.3545Fax: 479.636.1209

Architect of RecordWilliam Douglas Hurley

Alabama License No. 5035Firm COA Number: CA-0011

Sheet:

CHECKED BY:

DRAWN BY:

DOCUMENT DATE:

JO

B N

UM

BE

R:

PR

OJE

CT

F

OR

:

PR

OJE

CT

AD

DR

ES

S:

ST

IPU

LA

TIO

N F

OR

RE

US

E

TH

IS D

RA

WIN

G W

AS

PR

EP

AR

ED

FO

R U

SE

ON

A S

PE

CIF

IC S

ITE

AT

MO

NT

GO

ME

RY

, AL

AB

AM

AC

ON

TE

MP

OR

AN

EO

US

LY

WIT

H IS

SU

E D

AT

EO

N , A

ND

IT

IS

NO

T S

UIT

AB

LE

FO

RU

SE

ON

A A

DIF

FE

RE

NT

PR

OJE

CT

SIT

E O

R A

TA

LA

TE

R T

IME

. U

SE

OF

TH

IS D

RA

WIN

G F

OR

RE

FE

RE

NC

E O

R E

XA

MP

LE

ON

AN

OT

HE

RP

RO

JE

CT

RE

QU

IRE

S T

HE

SE

RV

ICE

S O

FP

RO

PE

RLY

LIC

EN

SE

D A

RC

HIT

EC

TS

AN

DE

NG

INE

ER

S. R

EP

RO

DU

CT

ION

OF

TH

ISD

RA

WIN

G F

OR

RE

US

E O

N A

NO

TH

ER

PR

OJE

CT

IS

NO

T A

UT

HO

RIZ

ED

AN

D M

AY

BE

CO

NT

RA

RY

TO

TH

E L

AW

PRELIMINARYNOT FOR

CONSTRUCTION

PO

Box 3

630

767 M

ain

Road

Westp

ort

MA

02790

508 6

36 3

600

LA

ST

SA

VE

D:

FIL

E L

OC

AT

ION

:

08.18.15

8/2

4/2

015 8

:56:5

1 A

M

C:\

Users

\mic

haels

ides\D

ocu

men

ts\M

on

tgo

mery

AL

- D

en

tal C

lin

ic_m

ich

aels

ides.r

vt

A5.1

ENLARGEDPLANS,

INTERIORELEVATIONS,AND DETAILS

JMJ

JEB

MM/DD/YY

DR

S. F

RY

& B

AR

GA

NIE

R

F2015-0

102

EA

ST

CH

AS

E P

AR

KW

AY

MO

NT

GO

ME

RY

, A

L

MM

/DD

/YY

1/2" = 1'-0"1

ENLARGED STERILIZATION / RESTOCK &RESUPPLY, AND LAB & MODEL STORAGE

1/2" = 1'-0"2

LAB & MODEL STORAGE - A

1/2" = 1'-0"3

LAB & MODEL STORAGE - B

1/2" = 1'-0"4

LAB & MODEL STORAGE - C 1/2" = 1'-0"

5RESUPPLY

1/2" = 1'-0"6

STERILIZATION 3" = 1'-0"

7SLIDING SHELF - DETAIL

1/2" = 1'-0"8

PULL-OUT TRASH CABINET - SECTION

SHEET NOTES

1. ALL MILLWORK PROVIDED AND INSTALLED BYCONTRACTOR.

2. MILLWORK SUPLLIER TO FINALIZE ALL FINISHESAND HARDWARE WITH OWNER PRIOR TOFABRICATION.

3. PROVIDE 2x8 BLOCKING IN WALLS AT TOP ANDBOTTOM OF WALL MOUNTED MILLWORK/FIXTURESAND AT TOP OF MILLWORK THAT IS GROUNDSUPPORTED. REFERENCE ELEVATIONS FORLOCATIONS.

4. PROVIDE BEAD OF SILICONE SEALANT AT ALLEXPOSED EDGES OF MILLWORK ANDCOUTNERTOPS WHERE CONNECTED TO WALL ANDFLOORS.

5. REFERENCE FINISH SCHEDULE SHEET A4 FOR ALLFINAL FINISHES.

6. FIELD VERIFY ALL MILLWORK DIMENSIONS PRIOR TOFABRICATION.

7. REF DOOR SCHEDULE SHEET A4.1 FOR DOOR STYLETYPE.

ISSUE BLOCK

• First Floor Design Plan (sheet A1.0)

• First Floor Dimensioned Plan (sheet A1.1)

• Sterilization Elevation

• Equipment Detail Drawings (as available)

• CAD files of all drawings supplied

PHASE THREE • DESIGN DEVELOPMENTTime Frame: 1-2 weeks

Page 12: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 12 –6.26.18

Interior Design

Interior Design (“ID”) is listed here at the end of the Design Development Phase only because a Final ID Package includes drawings that require an approved Floor Plan to create. That said, the ID process, style, and level of finish need to be top-of-mind from the very beginning. Finish treatments can have a significant impact on your overall costs, and these considerations need to be included (at least in a general sense) when you’re developing an initial budget.A critical point worth noting; ID – especially in a medical environment – is not for amateurs. Why?

Interior Design is as much Science and Business as it is an Art Form.There is a deep psychology specific to creating a calming, reassuring flow in a dental office – an environment that fills many people with anxiety. Additionally, building codes regarding medical facility finishes can be stringent, and those out-side the industry may not have access to commercial grade materials required. Finally, formal ID demands a significant degree of professional drafting expertise and requires a large investment in time.

The ID ProcessDesign Ergonomics offers multiple levels of Interior Design, from a selection of pre-formatted options to full custom package development. Regardless of level, we start with a complimentary consultation call. To prepare for this call, think about styles and finishes that appeal to you. Find examples if pos-sible; not just on the ID and Portfolio sections of our site, but on Pinterest, in magazines and other visual sources. Your ID specialist will guide you through the process, but we value your ideas and need your input to tailor a package that best suits your goals, aesthetics and budget.

PHASE THREE • DESIGN DEVELOPMENTTime Frame: Throughout (complete ID docs by Bid submission)

Page 13: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 13 –6.26.18

Interior Design con’t

Throughout Blocking and Floor Plan, we’ll work with you to develop an aesthetics and materials package via email, screen shares and shipments of physical samples. The first deliverable in this pro-cess will be a Design Board, which represents color schemes, materials and texture expressions to be used throughout your practice for a cohesive and professional look.

With an approved Design Board, we can begin to gather all the relevant material and finish information your Construction Part-ner will require for a bid set and eventual execution.

During this process, we’ll also consult with you on a variety of architectural issues related specifically to Interior Design. These include the Reception Desk design, Door & Cabinet styles, Dec-orative Lighting styles and more. The final package includes:

As with the Operatory and Sterilization details, these drawings and schedules will be folded into the final Construction Documents prepared by your Architect. Your designer will also be available during the construction phase to review materials with your Contractor or discuss changes that may arise.

ELEVATOR

A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0"

A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0" A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.13' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"A.F.F.10' - 0"

A.F.F.10' - 0"

1A 6.3

TYP.

2A 6.3

TYP.

A.F.F.10' - 0"

2A 6.3

TYP.2

A 6.3

TYP.

A.F.F.10' - 0"

A.F.F.10' - 0"

2A 6.3

TYP.

5A 6.3

TYP.

5A 6.3

TYP.

TYP.

TYP.

CHANDELIER -SEE LIGHT FIXTURE SCHEDULEFOR SPEC

TYP.

6A 6.3

TYP.

3A 6.3

TYP.

1A 6.3

TYP.

TBL LIGHT SYSTEM - REF. MANUAL (TYP. ALL TREATMENT ROOMS)

TBL LIGHT SYSTEM - REF. MANUAL (TYP. ALL TREATMENT ROOMS)

8A 6.3

TYP.2'-6

3/8"

2'-0

"2'

-0"

A.F.F.10' - 0" A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"A.F.F.9' - 0"A.F.F.8' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

1A 6.3

TYP.

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.8' - 0"

PENDANT

TROFFER 2X2 PARABOLIC

WALL SCONCE

TROFFER 2X4 PARABOLIC

6" RECESSED SPOT LIGHT

6" RECESSED CAN

RESTROOM VANITY

FLUORESCENT STRIP

A.F.F.9' - 0"

A.F.F.9' - 0"

PROVIDESURFACE-MOUNTEDLIGHTS BELOW STAIRS

Scale

Date

Drawn By

Checked By

Project Number

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

www.desergo.com

PO Box 3630767 Main Road

Westport MA 02790508 636 3600

© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION

DO NOT SCALE

1/4" = 1'-0"

11/7

/201

7 11

:11:

01 A

M

A 6.2

REFLECTEDCEILING PLANS

GPJB

5/13/16

1/4" = 1'-0"1 1ST FLOOR PLAN

1/4" = 1'-0"2 2ND FLOOR PLAN

1/4" = 1'-0"LIGHT LEGEND

1/4" = 1'-0"3 BASEMENT PLAN

No. Description Date

P1

P2

P3

PAINT

PAINT

PAINT

SHERWIN WILLIAMS-DURATION HOMEMATTE

P4 PAINT

P5 PAINT

CANVAS TAN SW7531

REQUISITE GRAY SW7023

UPWARD SW6239

JUBILEE SW6248

ANTIQUE WHITE SW6119

PL1

CT1 CERAMIC FIELD TILE MANNINGTON SEASCAPE 12"X24"

DESCRIPTION

MATERIALS & FINISH LEGEND

MANUFACTURERPC STYLE/COLOR NOTES

C1 CARPET TILE-LEVEL 1 BEACH HAUS 00173

PARISIAN PINE-AROW7860

FOUNDATION PAR203

PATCRAFT-INTRINSIC

VPT1 VINYL WOOD-LOOK VINYL PLANK TILE MANNINGTON-AMTICO 4.5"X36" PLANK

SV1 SHEET VINYL MANNINGTON

SS1

SS2

SOLID SURFACE

SOLID SURFACE

DUPONT ZODIAQ

DUPONT CORIAN

BOARDWALK OAK-7983PLASTIC LAMINATE NEVAMAR

WINDRIFT

CLOUD WHITE

HAZELNUT

FLOW GRAY FT12491112X24

BLACK

BLACK

WINDRIFT

PL2

PL3

PLASTIC LAMINATE

PLASTIC LAMINATE

WILSONART

ASTRO STRANDZ-4940

ANTIQUE WHITE

B1 BASEBOARD-MILLWORK JOHNSONITE-RUBBER-OBLIQUE

B2 BASEBOARD-COVE JOHSONITE- 1/8" RUBBER COVE

B3 BASEBOARD-TILE COVE MANNINGTON-SEASCAPE 6"X24"

CT2 CERAMIC WALL TILE FLORIDA TILE-SOUL SERIES

SF1SPECIALTY FINISHSTACKED STONE

FAUX STONE SHEETSSTACKED STONE GRANDE 2'X4'

ACT1 SUSPENDED GRID ACOUSTICAL TILE

ARMSTRONG 2'X2' OPTIMA 3250 WHITE

ACT2 SUSPENDED GRID ACOUSTICAL TILE ARMSTRONG 2'X2' ULTIMA 1912 WHITE

P6 PAINT SHERWIN WILLIAMS-DURATION HOME SEMIGLOSS

PURE WHITE SW7005

WILSONART

PEPPERDUST-D327

BLACKST1 STAIR TREAD JOHNSONITE VINYL-ST-XXX-SQ

SHERWIN WILLIAMS-DURATION HOMEMATTESHERWIN WILLIAMS-DURATION HOMEMATTE

SHERWIN WILLIAMS-DURATION HOMEMATTESHERWIN WILLIAMS-DURATION HOMEMATTE

TO BE CONFIRMED ON SITE

TO BE CONFIRMED ON SITE

TO BE CONFIRMED ON SITE

TO BE CONFIRMED ON SITE

TO BE CONFIRMED ON SITE

POPLAR F121-16SF2 WALL COVERING KOROSEAL

CONFIRMED 4-1-16

CONFIRMED 4-1-16

CONFIRMED 4-1-16

CONFIRMED 4-1-16

CONFIRMED 4-1-16

CONFIRMED 4-1-16

PARTITION LEGENDDETAIL:

XXX

SHEET

DETAIL PLAN:

A612

NUMBER INDICATES STUD HEIGHTNO NUMBER INDICATES STUD HEIGHT TO BOTTOM OF FRAMING ABOVE

NUMBER INDICATES STUD SIZE AS FOLLOWS:

REFERENCE SIDE

OPPOSITE SIDE

LETTER INDICATES PARTITION TYPE

4 - 2x4 NOMINAL WOOD STUD6 - 2x6 NOMINAL WOOD STUD

NON RATED WALL

STRUCTURAL SHEAR WALL

1 HR FIRE RATED WALL

PARTITION TYPES

A

2X4" WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD

C

B

5/8" GYPSUM BOARD

2x4 WOOD STUDS STAGGERED @ 16" OC

5/8" GYPSUM BOARD

2x4 WOOD STUDS @ 16" OC5/8" GYPSUM BOARD

2x4 WOOD STUDS STAGGERED @ 16" OC

REFERENCE SIDE OPPOSITE SIDE

E

2x6 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

0'-4

3/4"

0'-6

3/4"

0'-6

3/4"

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

D

2x4 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD2x4 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD

0'-4

3/4"

FOR ALL PARTITION TYPES, FINISHES ARE TO EXTEND A MINIMUM OF 4" ABOVE FINISHED CEILING AS SCHEDULED. WHERE THERE IS NOT A SCHEDULE CEILING, FINISHES TO CONTINUE TO BOTTOM OF DECK. PROVIDE CONTINUOUS SEAL AT CONNECTION TO BOTTOM OF DECK

2x6 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD (TYPICAL)5/8" GYPSUM

BOARD (TYPICAL)

2x6 WOOD STUDS @ 16" OC

F

2x6 WOOD STUDS @16" OC

5/8" GYPSUM BOARD5/8" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

0'-7

3/8"

G

2x4 WOOD STUDS @16" OC

5/8" TYPE "X" GYPSUM BOARD5/8" TYPE "X" GYPSUM BOARD

2x4 WOOD STUDS @ 16" OC

0'-4

3/4"

H

2x6 WOOD STUDS @ 16" OC

5/8" TYPE "X" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

5/8" TYPE "X" GYPSUM BOARD

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

0'-6

3/4"

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

OSB SHEATHING REF STRUCTURAL

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

OSB SHEATHING REF STRUCTURAL

J

2x4 WOOD STUDS @16" OC

5/8" TYPE "X" GYPSUM BOARD5/8" TYPE "X" GYPSUM BOARD

2x4 WOOD STUDS @ 16" OC

0'-5

3/8"

OSB SHEATHING REF STRUCTURAL

OSB SHEATHING REF STRUCTURAL

K

2x4 WOOD STUDS @16" OC

5/8" TYPE "X" GYPSUM BOARD5/8" TYPE "X" GYPSUM BOARD

2x4 WOOD STUDS @ 16" OC

0'-5

3/8"

OSB SHEATHING REF STRUCTURAL

OSB SHEATHING REF STRUCTURAL

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

GENERAL CONTRACTOR TO VERIFY WALL CONSTRUCTION FOR ANY REQUIRED SHIELDING AT ROOMS CONTAINING DENTAL IMAGING EQUIPMENT WITH MANUFACTURER/SUPPLIER AND ASSOCIATED REGULATIONS.

UL DESIGN NO. U305

0'-6

3/4"

L

2x4 WOOD STUDS @ 16" OC

5/8" TYPE "X" GYPSUM BOARD

2x4 WOOD STUDS @ 16" OC

5/8" TYPE "X" GYPSUM BOARD

0'-8

7/8"

5/8" GYPSUM BOARD

5/8" GYPSUM BOARD

UL DESIGN NO. U305 AT RATED PARTION

REFERENCE SIDE OPPOSITE SIDE

M

2x6 WOOD STUDS @16" OC

5/8" TYPE "X" GYPSUM BOARD5/8" TYPE "X" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

0'-7

3/8"

OSB SHEATHING REF STRUCTURAL

OSB SHEATHING REF STRUCTURAL

N

2x6 WOOD STUDS @16" OC

5/8" GYPSUM BOARD5/8" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

0'-7

3/8"

OSB SHEATHING REF STRUCTURAL

OSB SHEATHING REF STRUCTURAL

P

5/8" GYPSUM BOARD

2x4 WOOD STUDS STAGGERED @ 16" OC

5/8" GYPSUM BOARD

2x4 WOOD STUDS STAGGERED @ 16" OC3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

3 1/2" OWENS CORNING "QUIET ZONE" FIBERGLASS INSULATION

OSB SHEATHING REF STRUCTURAL

0'-7

7/8"

OSB SHEATHING REF STRUCTURAL

ALL GYPSUM BOARD TO BE ORANGE PEEL FINISH

1

Q

2x6 WOOD STUDS @16" OC

5/8" GYPSUM BOARD5/8" TYPE "X" GYPSUM BOARD

2x6 WOOD STUDS @ 16" OC

0'-1

11/

2"

OSB SHEATHING REF STRUCTURAL

OSB SHEATHING REF STRUCTURAL

UL DESIGN NO. U305 AT RATED PARTITION

UL DESIGN NO. U305 AT RATED PARTITION

2x4 WOOD STUDS @ 16" OC

5/8" GYPSUM BOARD

2x4 WOOD STUDS @16" OC

5/8" TYPE "X" GYPSUM BOARD

Scale

Date

Drawn By

Checked By

Project Number

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

www.desergo.com

PO Box 3630767 Main Road

Westport MA 02790508 636 3600

© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION

DO NOT SCALE

As indicated

11/7

/201

7 11

:11:

01 A

M

A 7.0

FINISHSCHEDULE,

PARTITION TYPESAND DETAILS

GPJB

5/13/16

3/16" = 1'-0"Materials & Finish Legend

PLANREFERENCE

ORIENTATIONROOM FINISH SCHEDULE

RM # ROOM NAME

FLOOR WALL CEILING

NOTESFINISH

A B C D

MAT P/CHEIGHT BASE

WALLMAT

WALLFINISH P/C BASE

WALLMAT

WALLFINISH P/C

BASE

WALLMAT

WALLFINISH P/C BASE

WALLMAT

WALLFINISH P/C

001 EQUIPMENT, STORAGE, & UTILITY TBD SUSPD ACT ACT2 A.F.F.002 ELEVATOR MECHANICALS TBD SUSPD ACT ACT2 A.F.F.003 DENTAL MECH TBD SUSPD ACT ACT1 A.F.F.004 STAIRWELL 'A' SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.100 VESTIBULE CT1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F.101 WAITING ROOM C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.102 RECEPTION CT1,C1 B3,B1 GYP PAINT P B1 GYP PAINT SF1 B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.104 BUSINESS C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.105 EXIT CORRIDOR C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.106 SERVER CLOSET C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F.107 ON-DECK OFFICE #3 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.108 SPRINKLER ROOM TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P GYP. P A.F.F.109 STAIRWELL 'B' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.110 SHIPPING & RECEIVING CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.112 WAITING RESTROOM CT1 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 B1 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.113 TREATMENT ROOM #1 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.114 TREATMENT ROOM #2 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.115 TREATMENT ROOM #3 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.116 TREATMENT ROOM #4 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.117 TREATMENT ROOM #5 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.118 TREATMENT ROOM #6 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.119 TREATMENT ROOM #7 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.120 TREATMENT HALLWAY #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.121 QUIET WAITING AREA C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.122 STAIRWELL 'A' SV1;ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.123 TREATMENT HALLWAY #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.124 TREATMENT ROOM #9 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.125 TREATMENT ROOM #10 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.126 TREATMENT ROOM #11 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.127 TREATMENT ROOM #12 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.128 TREATMENT ROOM #13 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.129 TREATMENT ROOM #14 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.130 TREATMENT ROOM #15 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.131 TREATMENT ROOM #16 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.132 TREATMENT ROOM #17 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.133 TREATMENT ROOM #18 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.134 TREATMENT ROOM #19 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.135 QUIET TREATMENT ROOM #20 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.136 CONSULT ROOM #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F.137 PAN X-RAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.138 CONSULT ROOM #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP SF2 P SUSPD ACT ACT2 A.F.F.139 CLIINICAL RESTROOM #2 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.140 STERILIZATION RESUPPLY &

STORAGESV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.

141 CROSSOVER HALLWAY C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.142 ON-DECK OFFICE #1 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.144 MED GAS C1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P SUSPD ACT ACT2 A.F.F.145 BREAK ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.146 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.147 STAFF RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.148 CLINICAL RESTROOM #1 CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.149 LAB & MODEL STORAGE SV1 B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P B3 GYP PAINT P SUSPD ACT ACT2 A.F.F.150 MOBILE TECH C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P GYP. P A.F.F.151 QUIET TREATMENT ROOM #8 VPT1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT1 A.F.F.152 ON-DECK OFFICE #2 C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.153 ELEVATOR TBD TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD GYP PAINT P TBD TBD A.F.F.154 ELECTRICAL SV1 N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P N/A GYP PAINT P TBD TBD A.F.F.200 STAFF LOUNGE & CONFERENCE CI,SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.201 OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.202 COMMAND CENTER C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.203 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.204 RESTROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT PP SUSPD ACT ACT2 A.F.F.205 PRIVATE OFFICE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.206 ATTIC EAST TBD N/A TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F.207 PRIVATE RESTROOM CT1 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 B3 GYP PAINT;TILE P;CT2 SUSPD ACT ACT2 A.F.F.208 VESTIBULE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.209 LOCKER ROOM SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.210 STAIRWELL 'B' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.211 ASSOCIATE'S OFFICE C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.212 ELEVATOR VESTIBULE C1 B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P B1 GYP PAINT P SUSPD ACT ACT2 A.F.F.213 MARKETING DIRECTOR C1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.214 UTILITY CLOSET SV1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.215 ELEVATOR TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD A.F.F.216 STAIRWELL 'A' ST1 B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P B2 GYP PAINT P SUSPD ACT ACT2 A.F.F.

1/4" = 1'-0"1 PARTITION LEGEND (WOOD FRAMING) 1" = 1'-0"2 PARTITION TYPES (WOOD FRAMING)

No. Description Date1 Revision 1 Date 1

FINISHED FLOOR

3' -

7"

2' -

4 3/

4"

1' - 0"

0' - 5 1/2"

3/4" VOID FREE PLYWOOD;PL1

1' - 6"

PENCIL DRAWER ORGANIZERROCKLER #37399DIM: 13"Wx18"Dx2"H(OR EQUAL); BY MILLOWKR

(2) LAYERS 3/4" VOID FREE PLYWOOD;PL1

3/4" VOID FREE PLYWOOD;PL1

CUT OUT FOR WIRE MANGEMENT

TRANSACTION SURFACE:SS1ALIGN

DET

AIL

SEE

RC

PFO

R

FRAMING TO EXTEND TOUNDERSIDE OF SUPPORTS

SEE RCP FOR DETAIL

FINISHED CEILING

2x BLOCKING(AS REQ'D)

FRONT FACE;PL1

2x6 STUDS @ 16" O.C(CUT AS SHOWN)

1/2" PLYWOOD

TOE KICK LAMINATE

3/4" PLYWOODWIRED W/ OUTLETS FOR ACPOWER, PHONE, COMPUTER2x3 BOTTOM PLATE

COMPUTER MONITOR (BY OWNER)RECESS MONITORS

PENDANT LIGHT - SEE LIGHTING SCHEDULE

CHECK-OUTSTAFF

103

RECEPTION102

3A 3.0

A 5.0

4

A 5.0 3

A 5.0

8

7' - 10 3/4"

9' - 10 3/8"

7' - 10 3/4"

37.87°

12' - 2 5/8"

9'-5

3/4"

14' - 1 5/8"

24'-

33/

8"

5'-9

1/2"

0'-2

7/8"

5'-0

"0'

-27/

8"5'

-0"

0'-2

7/8"

7'-2

"

A 5.0

5

A 5.06

SF1

SS1

4" TOEKICK

3'-7

"

2'-6

"

5'-1

1"3'

-6"

2X2 ACT SYSTEM IN RECEPTION & WAITING AREA

13'-

0"

9'-6

"

0'-4

"

P1

7' - 0 7/8" 5' - 0" 5' - 0" 5' - 9 1/2"

3' - 7 3/8" 3' - 5 1/2" 0' - 2 7/8" 0' - 2 7/8"0' - 2 7/8"

PL1

SS1

4" TOEKICK

PL2

PL1

SS1

3'-7

"

2'-6

"

5'-6

"

PENDANT LIGHTS

ADA COMPLIANTCHECKOUT

SF1

1' - 5 1/2" 3' - 0"

SS1

PL1

GLASS FRONTBEVERAGE FRIDGE

(BY OWNER)

3'-6

"

FURR DOWNWITH RECESSEDLIGHTS; TBC

6'-8

"2'

-10"

6" SS TRASH CHUTEIN COUNTER;PULL-OUT TRASH BELOW

50" VIEWABLETV;BY OWNER;CONFIRM MOUNTINGHEIGT IN FIELD

PL1

SS1

PL2

UNDER-COUNTERPENCIL DRAWERS;(BY MILLWORK)

2'-6

"3'-7

"5'

-11"

0'-6

"

3A 3.0

2'-6

"3'-7

"

5' - 10 1/8" 5' - 0 5/8" 5' - 0 5/8"

3' - 6 1/4" 3' - 7 3/8"

5' - 7 5/8" 1' - 6"

1' - 6" 3' - 6 5/8"1' - 6" 4' - 4 1/8" 1' - 6" 3' - 6 5/8"

5'-6

"3'

-6"

1'-0

"

7' - 1 5/8"

PL1

SS1

PL2

PL1

UNDER-COUNTERPENCIL DRAWERS;(BY MILLWORK)

Scale

Date

Drawn By

Checked By

Project Number

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

Consultant AddressAddressAddressPhone

www.desergo.com

PO Box 3630767 Main Road

Westport MA 02790508 636 3600

© 2014 DESIGN ERGONOMICS INC. THESE DRAWINGS ARE THE PROPERTY OF DESIGN ERGONOMICS INC. AND MAY NOT BE SOLD, COPIED, OR USED IN ANYWAY WITHOUT OUR WRITTEN PERMISSION

DO NOT SCALE

As indicated

11/7

/201

7 11

:10:

49 A

M

A 5.0

ENLARGEDRECEPTION/

CHECKOUT PLANAND DETAILS

PJLDK

5/13/16

3/4" = 1'-0"1RECEPTION DESK - SECTION(PENDANT)

1/2" = 1'-0"2ENLARGED RECEPTION, BUSINESS, &CHECK-OUT

1/2" = 1'-0"4 RECEPTION

1/2" = 1'-0"3 CHECKOUT

1/2" = 1'-0"8 REFRESHMENTS

1/2" = 1'-0"5 RECEPTION - STAFF SIDE

1/2" = 1'-0"6 CHECKOUT - STAFF SIDE

No. Description Date

• Interior Elevation Drawings• Material & Finish Schedules

- Walls & Baseboards- Mill Work- Floor Coverings- Ceiling

• Door Schedule• Lighting Plan

PHASE THREE • DESIGN DEVELOPMENT

Exterior Design

Our design specialty lies in interiors – establishing unmatched clinical efficiencies & creating an excep-tional patient experience, with the most cost-effective use of space in the industry.While your Exterior Design will be dictated in part by the floor plans we may produce, your Architect will handle the details of design development. We will, however, work with them to ensure a cohesive exe-cution of your overall vision.

Time Frame: 1-2 Weeks

Page 14: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 14 –6.26.18

PHASE FOUR • DESIGN EXECUTIONConstruction Documents

At this point, the vision of your future practice is clear – but you can’t put up a building on vision alone. The documents created up to now have been schematics – accurate, but limited to layout. To move forward to the bidding & permitting pro-cesses and eventually to construction, you need a very comprehensive set of plans, referred to as “Construction Documents”.

Generating Construction Documents is a time consuming process. Be prepared for this phase to take up to 12 weeks. These documents are developed by your Architect in conjunction with a variety of engineers, including Mechanical/Plumbing, Electrical and Structural engineers.

As with your initial Floor Plan, the Construction Documents follow a development process from initial to final. Your architect will co-ordinate communications, and you will be asked to review and approve each step, as follows.

Progress Set (preliminary engineering schematics) Bid Set (used for Construction Estimates) MEP Final Approval (Finalized Construction Documents - “Permit Set”)

Bidding

Depending on your Contractor candidates, construction estimates may be based on Architectural drawings at varying levels of completion. Known as a “Bid Set”, you will provide this package to your chosen candidates (typically 3 or 4 com-panies).

When you have selected a Contractor, they will handle the next step, Permitting.

Permitting

The time frame to obtain Permits can vary widely – from as little as a few weeks, to 4 or 5 months. Minor design or engineering changes may require re-submittal (in whole or in part). However, the most common source of delay is the current work-load at your municipal building department.

We suggest you and/or your Contractor speak to the local agencies early in the process. Try to get a feel for how quickly they can move you through this step, as it can significantly impact your overall project time-line.

Time Frame: 8-12 weeks

Time Frame: 3-4 weeks

Time Frame: As little as 2 weeks, but may take several months

Page 15: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 15 –6.26.18

PHASE FIVE • CONSTRUCTIONConstruction

Equipment Installation

Final Inspection & CO

We’re committed to the success of your project, from start to finish.When you enter the Construction Phase, we’ll continue communicating with both you and your Contractor. We are happy to review progress photos, and in some cases, will make site visits if issues arise for which we can help advise or provide solutions.

Equipment installation – who does it, and what will it cost – will vary by item type and supplier. Your Contractor will generally handle non-clinical cabinetry, general lighting etc. This should have been clearly delineated in the bid-ding process.The installation of Clinical Equipment – Chairs, X-ray, Delivery, Compressor, Vacuum and more – is commonly done by the suppliers, and prices will vary significantly. Here again, your Clinical Specialist can provide valuable guidance.During this period, you will also be setting up ad-ministrative elements; clerical, computers, phone systems etc.

Everything is in place, but you need your local building authority to sign off on a wide range of items, including structural, mechanical, plumbing, electrical – even your clinical systems (lighting, motorized patient chairs). Your Contractor and Archi-tect should be on hand during the inspection to provide necessary information.When the inspection is complete, you’ll receive a Certificate of Occupancy (“CO”). Congratulations! You can now open for business...but have you considered how?

Page 4

Page 6

Time Frame: 6 months ±3 months (weather & other variables dependent)

Time Frame: 2-4 weeks

Time Frame: 2-4 weeks (post Install)

Page 16: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 16 –6.26.18

A Few Suggestions to Consider Before Your

GRAND OPENING...

Page 17: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 17 –6.26.18

Leave Adequate Time to Set Up Your Systems.

Try a Soft Opening with Friends and Family.

Want to Optimize? Get Help.

Your new office is beautiful, but it’s a blank slate. It won’t become a highly-efficient power-house of productivity until all the systems are up and running. And running together.It’s a new space, and it will take some time to pre-pare and settle in to a rhythm. Sterilization, phone systems, software, imaging...all the interdependent activities you’ve come to take for granted are going to be new to both you and your staff.

Before the balloons, confetti, press releases and ribbon-cutting – see some live patients! This will give you an opportunity to work the last of the equipment and system bugs out in a much more low-key fashion. Many of our clients run several days to a week or more seeing only friends and family. Performing a Soft Opening can help ease tensions in what is often an anxious time. This will also give you an opportunity to finalize any last-minute painting touch ups, art-work or furnishing acquisitions as well.

After opening thousands of offices, we realized that the Effi-ciency and Productivity guidance we give during design could be magnified tremendously with some hands-on instruction.To that end, we now offer Clinical Systems Training Programs.These programs can help practices during any stage of growth, but they provide truly remarkable results when applied to start ups.

Our certified Trainers will help establish Inventory, Steriliza-tion & Resupply systems now that will propel your practice to unparalleled heights in the years to come.

Page 18: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 18 –6.26.18

Thank You,again for the trust you’ve placed in Design Ergonomics.

Our goal is your complete satisfaction.

We realize an overview document such as this won’t answer every question you have now, or that will come up during the design process. Please don’t hesitate to call or email us if you need clarification on topics covered here. We’re part of your Team. If we don’t have the answers you’re looking for, we will work with you to find them.

We look forward to helping you turn the Practice of Your Dreams into a Reality.

Page 19: Dental Office DESIGN PROCESS - Design …...A New Office Site For Smile Makers Family & Cosmetic Dentristry MONTGOMERY, ALABAMA CMGM-150040 Submittal 05.25.2015 Construction Drawings

Dental Office DESIGN PROCESS

© 2018 Design Ergonomics, Fall River MA– 19 –6.26.18

GLOSSARY• As Builts - CAD drawings showing complete internal and external dimensions of an existing building (new

or previously built), including walls, load-bearing structures, stairs, doors, windows and utilities.

• Authority Having Jurisdiction (“AHJ”) - the governing body regulating construction and development of commercial enterprises in a specified region.

• CAD - “Computer Assisted Design,” an electronic file created by Architects, Designers and Draftsmen.

• Construction Documentation - The complete, formal set of plans required by the AHJ to construct an office, including but not limited to; floor-plans, interior and exterior elevations, ID elevations and materials schedules, mechanical/electrical/plumbing/structural plans, and site plans.

• Due Diligence - A period of time included in the P&S used by the purchaser to determine that the proper-ty is suited to their goals and that all elements of the sale as represented by the seller are true and accu-rate.

• Elevation - A architectural drawing showing the face of something (as opposed to a view from above). This may be a building exterior, or interior elements such as cabinetry, reception desks etc.

• Engineering Disciplines (as they relate to a Construction project)Civil, relating to environmental/exterior elements including landscaping, building and parking location and availability, utilities, water remediation, offsets, site entries/exits, and site planning approval.Mechanical/Plumbing, covers HVAC and all fluid flow systems. As a subset, Plumbing Engineers address water service connection to municipal infrastructure (feed and sewage) and develop all piping schematics including feed lines, venting, drainage and waste. In the dental industry, this also covers compressors, vacuum and plumbed nitrous.Electrical, addressing electrical loads, service, wiring schematics and electrical code compliance.

• Escrow - an amount of money or other documents kept in the custody of a third party, transfered only when a specified condition has been fulfilled (eg a Due Diligence period). Depending on the terms of the P&S, this is essentially a deposit which may be refundable during the Due Diligence period.

• HVAC - “Heating, Ventilation and Air Conditioning”

• Letter of Intent (“LOI”) - An informal agreement including an offer for purchase at an expressed amount. The LOI is the beginning of the Negotiation process and several rounds of offers and counter-offers may be required before both parties accept and sign the LOI.

• Purchase and Sale Agreement (“P&S”) - The agreed upon conditions relating to the transfer of a prop-erty from seller to buyer. This is typically drafted after the LOI has been accepted by both parties and includes relevant conditions such as the length and terms of the Due Diligence period and Escrow.

• Screen Share - An interactive method of presenting drawings and other material in which your computer monitor is set to mirror what your designer is presenting remotely.

• Site Engineering Survey - A comprehensive study of a lot including plat map generation/confirmation, topography, soil analysis, availability of utilities, parking concerns, abutment issues, water remediation and other environmental issues that may impact a lot’s suitability for development.

• Value Engineering (“VE”) - Determining the need – and evaluating the suitability – of alternative finish ma-terials. This may occur in the field during construction and will require the input of your Interior Designer.