Dennis G. Lambert, P.E., MASCE POSITION: Chief Market Manager, COWI Marine North America SPECIALIZATION: Coastal, Marine and Environmental Engineering YEARS EXPERIENCE: 27 EDUCATION: 2000 M.S., Environmental Engineering: Numerical Modeling, Tulane University 1996 B.S., Civil Engineering: Structural Emphasis, Tulane University 1996 B.S., Environmental Engineering: Numerical Modeling, Tulane University REGISTRATIONS: Registered Civil Engineer, 2000, LA PE.0029326 Registered Environmental Engineer, 2000, LA PE.0029326 MEMBER: Member of the American Society of Civil Engineers (1988) Member of the ASCE Coasts, Oceans Ports, & Rivers Institute (2001) ASCE T&DI Louisiana Chapter Executive Committee (2008) ASCE COPRI Louisiana Chapter Executive Committee (2012) ASCE COPRI Waterways Committee (2014) ASCE COPRI Ports & Harbors Committee (2014) ASCE COPRI P3 for Waterways Chair (2014) Louisiana Civil Engineering Conference & Show Committee Member Tulane School of Science & Engineering Council Louisiana Engineering Society Construction Specifications Institute Prestressed Concrete Institute Society of Tulane Engineers / Tulane Engineering Forum Planning Committee American Consulting Engineering Council's Environmental Committee NCEES Environmental Engineering PE Exam Committee Member Louisiana Coastal Sand Management Working Group KEY QUALIFICATIONS Mr. Lambert's work has focused on coastal, marine & environmental engineering including the interface between navigation and ecosystem restoration, navigation and flood protection, marine design, basinwide modeling and barrier island restoration. His marine experience includes marine terminals, marinas, boat launches and bulkheads, docks and wharfs, dredging, barge loading and unloading, barge traffic analysis and vessel collision.

Upload: dennis-lambert

Post on 13-Apr-2017

434 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Dennis Lambert Diversions

 

Dennis G. Lambert, P.E., MASCE 

 

 

POSITION:    Chief Market Manager, COWI Marine North America  SPECIALIZATION:  Coastal, Marine and Environmental Engineering   YEARS EXPERIENCE:  27  EDUCATION:               

2000          M.S., Environmental Engineering: Numerical Modeling, Tulane University         

1996           B.S., Civil Engineering: Structural Emphasis, Tulane University 1996           B.S., Environmental Engineering: Numerical Modeling, Tulane 

University  REGISTRATIONS:                    

Registered Civil Engineer, 2000, LA PE.0029326 Registered Environmental Engineer, 2000, LA PE.0029326 

 MEMBER:                    

Member of the American Society of Civil Engineers (1988)   Member of the ASCE Coasts, Oceans Ports, & Rivers Institute (2001) ASCE T&DI Louisiana Chapter Executive Committee (2008) ASCE COPRI Louisiana Chapter Executive Committee (2012) ASCE COPRI Waterways Committee (2014) ASCE COPRI Ports & Harbors Committee (2014) ASCE COPRI P3 for Waterways Chair (2014)  Louisiana Civil Engineering Conference & Show Committee Member Tulane School of Science & Engineering Council Louisiana Engineering Society Construction Specifications Institute  Prestressed Concrete Institute  Society of Tulane Engineers / Tulane Engineering Forum Planning Committee  American Consulting Engineering Council's Environmental Committee  NCEES Environmental Engineering PE Exam Committee Member   Louisiana Coastal Sand Management Working Group 

 

KEY QUALIFICATIONS 

Mr.  Lambert's  work  has  focused  on  coastal,  marine  &  environmental  engineering 

including the interface between navigation and ecosystem restoration, navigation and 

flood protection, marine design, basin‐wide modeling and barrier  island  restoration. 

His  marine  experience  includes  marine  terminals,  marinas,  boat  launches  and 

bulkheads,  docks  and  wharfs,  dredging,  barge  loading  and  unloading,  barge  traffic 

analysis and vessel collision. 

 

 

 

Page 2: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

2/13  

DIVERSIONS,  ECOSYSTEM  RESTORATION,  FLOOD 

PROTECTION & HYDRAULIC ENGINEERING  

Lower  Mississippi  River  Diversion,  Mid  Barataria 

Sediment  Diversion,  BA‐153,  Plaquemines  Parish,  LA, 

2014  ‐  Date.  Independent  Technical  Review  Team 

Member  responsible  for  reviewing  and  optimizing 

design  for  this  keystone  ecosystem  restoration  project 

including  hydraulic  modeling  and  ship  simulation 

modeling. 

Lower Mississippi  River Diversion, Mid  Breton,  Lower 

Barataria  and  Lower  Breton  Sediment  Diversion,  BA‐

153, Plaquemines Parish, LA, 2014  ‐ Date. Independent 

Technical  Review  Team  Member  responsible  for 

reviewing  and  optimizing  design  for  this  keystone 

ecosystem  restoration  project  including  hydraulic 

modeling and ship simulation modeling. 

Lower  Mississippi  River  Diversion,  Delta  Building  at 

Myrtle  Grove,  BA‐33,  LaFourche,  Jefferson  and 

Plaquemines Parishes, LA, 2005. Project Team Member 

and  coordinated  NEPA  EIS  scoping  for  this  large  civil 

works  ecosystem  restoration  project  and  basin  wide 

modeling under LCA including navigation impacts. 

Lower  Mississippi  River  Diversion,  Small  Freshwater 

Diversion to the Northwestern Barataria Basin  (BA‐34, 

PPL10)  Project  Area  and  Vicinity,  St.  James  and 

Lafourche  Parishes,  LA,  2005.  Project  Team  Member 

and  coordinated  initial  surveying  and  data  collection 

efforts  to  restore and maintain  selected  cypress‐tupelo 

swamp tracts in the upper Barataria Basin. 

Barataria  Bay,  Basin  Hydrodynamic Model  Review  & 

Development  of New Model,  LaFourche,  Jefferson, & 

Plaquemines  Parishes,  LA,  2003‐2005.  Project  Team 

Member and coordinated with  the USACE on exchange 

of  Bathymetric  Data  included  meetings  with  the 

Hydraulic  Branch  of  the  New  Orleans  District  and 

collaboration  between  the  Donaldsonville  to  the  Gulf 

and Morganza to the Gulf levee projects and LCA. 

Design  and  Construction  of  Improvements  to  the 

Bonnabel  Canal,  Jefferson  Parish,  LA,  2008‐2012. 

Project  Team  Member  and  provided  engineering 

support  services  on  the  project,  which  includes  the 

construction  of  concrete  box  culverts/concrete  flume, 

design of two off‐system bridge replacements, road‐way 

replacement,  and  miscellaneous  public  utilities  (water 

and  sewer)  from  the  south  end  of  Veterans  Blvd.  to 

West  Esplanade  Ave.  Additional  project  elements 

include  surveying,  geotechnical,  electrical  (street 

lighting), preparation of right‐of‐way plans (as required), 

and traffic engineering related services. The box culvert 

is within  tight drainage servitude across various private 

utility  and  State R/Ws.  The  conveyances  are  approx.  1 

mile. 

Flood Risk Assessment and Hazard Mitigation Plan  for 

the Sewerage & Water Board of New Orleans (S&WB), 

New  Orleans,  LA,  2008‐2012.  Project  Manager  – 

provided  a  Hazard  Mitigation  Plan  to  include 

vulnerability  assessments,  risk  analysis  and 

identifications of hazards to critical  facilities,  identifying 

repetitive  losses  and  how  to  reduce  those  losses  and 

decrease  the  response  time  to  a natural or man‐made 

hazards. The purpose of  the plan was also  to  integrate 

risk and hazard mitigation strategies into the day‐to‐day 

activities.  The plan was  prepared  to meet  the Disaster 

Mitigation  Act  of  2000  (DMA  2000)  requirements  in 

order  to maintain  the S&WB’s eligibility  for  the Federal 

Emergency  Management  Agency  (FEMA)  Pre‐Disaster 

Mitigation (PDM) and Hazard Mitigation Grant Programs 

(HMGP). The review  included the Emergency Operation 

Plan, the Operation and Maintenance Plan, the Orleans 

Parish  Hazard  Mitigation  Plan,  the  Louisiana  Hazard 

Mitigation  Plan,  Storm  proofing  Pumping  Stations  to 

improve  resiliency  of  pump  stations  during  and  after 

hazard  occurrences,  reduce  the  impact  of  flood  and 

flood related hazards on critical pumping infrastructure, 

retrofit  pump  stations  to  protect  components  from 

damage,  Enhance/Expand  Power  Generation  including 

expanded  power  generation  capability  ensuring 

continuous  operating  capability  of  pump  and  drainage 

facilities, as well as water and sewer operations, reduce 

the  risk of hazard caused power outages  that  interrupt 

critical  operations  and  protect  critical  network 

components to  implement specific protective measures 

to  fortify  critical  facilities,  reduce  the  risk  of  flood 

related  hazards  and  ensure  continued  operation.  The 

Page 3: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

3/13  

plan ultimately assisted the S&WB in securing $141M in 

hazard  mitigation  grant  funds  for  the  Retrofit  Power 

Plant Hazard Mitigation Grant Project. 

Canal Bank Rehabilitation (Hurricane Gustav) District 5, 

Jefferson  Parish,  LA,  2010.  Project Manager,  provided 

design  engineering  services  to  prepare  plans  and 

specifications,  including  topographic  survey, 

geotechnical  and  resident  inspection  for  repairs  and 

restoration of  certain  canal banks and waterways  from 

damage caused by Hurricane Gustav. The restoration of 

these  banks  is  being  funded  by  the  USDA‐NCRSEWP, 

whereby Damage Survey Reports (DSRs) were generated 

identifying  said banks. The DSRs  included  in  this  scope 

are  DSR  Nos.  051‐08‐042G,  051‐08‐008G  and  051‐08‐

001G.  

Lake  Cataouatche  Levee  Basin,  Jefferson  Parish,  LA, 

2005‐2007.  Project  Manager,  responsible  for 

Watershed/Master 404 Services for 9,500+ acres, which 

includes  hydraulic  and  hydrodynamic modeling,  storm 

surge modeling  and wetland  delineations. Master  404 

Services  for  9500+  acres  which  includes  hydraulic  & 

hydrodynamic modeling, storm surge modeling, wetland 

delineations, soil identification, plant identification, base 

flood  elevations,  topographical  interpolation/LIDAR, 

borrow pit coordination with USACE, geotechnical data 

analysis,  coordination  with  USACE  HTRW  studies  and 

coordination with cultural resource studies. 

Terrebonne  Bay,  Whiskey  Island  West  Flank 

Restoration; Terrebonne Parish, LA, 2004‐2005. Project 

Manager,  providing  coastal  engineering  support  for  a 

study to restore the west flank of Whiskey Island (one of 

five barrier islands comprising Louisiana’s Isles Dernieres 

barrier  island  chain).  The  chain  of  barrier  islands  is 

experiencing continued land loss and fragmentation as a 

result  of  both  natural  processes  and  human  activity. 

Coastal  engineering,  modeling,  and  design  framework 

based  on  the  adaptive  management  approach  as 

recommended  is  the  recently  released  LCA Report was 

developed. This framework incorporated lessons learned 

from  the  design,  construction  and  monitoring  of 

previous  coastal  restoration  projects  in  Louisiana, 

including coastal modeling efforts, restoration template 

designs,  and  construction  methodologies.  A  suite  of 

analytical and numerical modeling tools (using the DELFT 

morphological  model)  to  investigate  a  number  of 

important  coastal  processes,  including:  morphological 

evolution,  overwash,  dune  “rollover”  and  island 

breaching  during  extreme  events,  sea  level  rise, 

sediment  losses  to  adjacent  channels  and  shoals,  and 

cross‐shore profile equilibration was adapted. 

FEMA/USACE  Riverine  Flood  Insurance  Studies, 

Orleans,  Jefferson,  Rapides,  Calcasieu,  Ascension  and 

St.  Tammany  Parishes,  LA,  2003‐2005.  Project  Team 

Member  and  coordinated  with  FEMA  Region  VI  for 

FEMA’s  Map  Modernization  Program.  Storm  surge 

modeling  includes  Lake  Pontchartrain,  Lake  Borgne, 

Barataria  Bay  and  Calcasieu  Lake  and  compiled  SELA 

hydraulic  models  for  Orleans  &  Jefferson  Parishes 

including  SWMM,  HEC  models  and  previously  UNET 

models. 

Ormond  Lakes  Hydraulic  Analysis,  St.  Charles  Parish 

Project  No.  P030305;  St.  Charles  Parish,  LA,  2004. 

Project Manager,  performed  hydraulic  analysis  of  the 

Lake Drainage System and Pumping Station  included an 

evaluation of the hydrological and hydraulic  features of 

the Lake Drainage System. Accompanying the evaluation 

is a  recommendation  for  improvements which  included 

dredging  as  alternative  and  those  elements  of  the 

system that will have the greatest positive effect on the 

system, while minimizing capital outlay. 

Barataria/Plaquemines  Barrier  Shoreline  Restoration, 

Peer  Review  for  the National Oceanic & Atmospheric 

Administration  (NOAA),  Lafourche,  Jefferson  and 

Plaquemines  Parish,  LA,  2003.  Project  Team Member 

and  coordinated  performance  assessment  of  two 

modeling  projects  which  included  Project  Area  #1: 

Chaland Headland  –  Pass  La Mer  to  Chaland  Pass  and 

Project  Area  #2:  Pelican  Island  –  Pass  Fontanelle  to 

Scofield Pass. 

Lower  Mississippi  River  Siphon,  LDNR  2503‐01‐03, 

Plaquemines  Parish,  LA,  2001‐2003.  Project  Team 

Member and coordinated engineering evaluation for the 

Naomi  Siphon  (BA‐03)  and  West  Point  A  La  Hache 

Siphon (BA‐04) in Plaquemines Parish. 

Page 4: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

4/13  

MARINE, WATERWAYS, PORTS & HARBORS 

Lower Mississippi  River,  Port  of New Orleans,  Fender 

Piling  Feasibility  Study,  Poland‐Pauline  Wharfs,  New 

Orleans,  LA,  2014.  Project  Manager,  prepared  a 

feasibility  report  for  fender  piling  and  the  Poland‐

Pauline Wharfs. The facility consists of five berths within 

the  Poland  Street Wharf  and  one  berth  referred  to  as 

Pauline  Street  which  were  all  built  at  different  times 

(1923‐1940). Berths 1, 2, and 3  are  the permanent  lay 

berth for the Cape Kennedy and Cape Knox RRF vessels. 

These  vessels  are moored  IA W  Navy  Heavy Weather 

Mooring Service Type III requirements and do not sortie 

from the berth during severe weather. The Port of New 

Orleans  is currently designing a  third cruise  terminal at 

the  Poland‐Pauline Wharfs  for  the AIDA Cruise  Line  to 

berth the ship VITA for several port of call cruises to be 

berthed  at  Poland  Avenue  Berths  4  and  5.  The  VITA 

carries  1,266  passengers,  is  42,289 GT,  is  665  ft.  long, 

and needs at least 21 ft. of draft. In its present condition, 

due to barge traffic and tug boats  in the area, about 58 

out of 133 fender piles are missing in this 800 linear feet 

berth. The VITA berth has many fender piles are missing, 

leaving the wharf substructure vulnerable to damage by 

vessel  collisions.  Pilings  are  to  be  embedded  in  the 

riverbed  varying  between  El.  ‐35  ft.  and  El  ‐65  ft. 

Evaluation  of  inspection  reports  were  performed  in 

accordance  with  "American  Society  of  Civil  Engineers 

(ASCE) Manuals and Reports on Engineering Practice No. 

101,  Underwater  Investigations  and  Standard  Practice 

Manual"  and  Department  of  Defense  Handbook 

MOORING DESIGN MIL‐HDBK‐1026/4. 

Lower Mississippi River & Inland Waterway Navigation 

Study, New Orleans,  LA,  2013.  Project  Team Member 

and coordinated with shallow draft vessel fleet through 

Greater  New  Orleans  area  and  assisted  in  design 

guidance  for  application  to  mooring  facilities  and 

anchorages  intended to secure vessels during hurricane 

events  along  the  Lower  Mississippi  River,  IHNC  and 

Harvey/Algiers  Canals.  Coordination  included  the 

Greater New Orleans Barge Fleet Association, American 

Waterways  Operators,  Gulf  Intercoastal  Waterway 

Association, US Coast Guard, Port of New Orleans, Canal 

Barge, Ingram Barge, Kirby Inland Marine, Turn Services 

/ Associated Terminals and various marine terminals and 

barge  fleeting  operators  utilizing  dead  man  moored 

vessels. Mooring criteria evaluated  included TN N‐1628 

(1982) Wind‐Induced  Steady  Loads  on  Ships;  DM  26.4 

(1986) Fixed Moorings; DM 26.5 (1985) Fleet Moorings; 

TR‐6003‐OCN (1997) Wind and Current Forces/Moments 

on  Multi‐ple  Ships;  UFC  4‐159‐03  (2005)  Design: 

Moorings;  OCIMF  (1992,  1997,  2008).  Mooring 

Equipment Guidelines; BS 6349‐1 (1989) Part 1: Code of 

practice  for  general  criteria;  BS  6349‐6  (1989)  Part  6: 

Design  of  inshore  moorings  and  floating  structures; 

DNV‐RP‐C205  (2010)  Environmental  Conditions  and 

Environ‐mental  Loads;  PrEN  1991‐1‐4.  Eurocode  1: 

Actions  on  structures  –  Wind  actions;  PIANC  (1995) 

Criteria  for Movements  of Moored  Ships  in  Harbours; 

API  RP  2SK  (2005)  Stationkeeping  Systems  for  Floating 

Structures. 

Lake  Pontchartrain,  New  Orleans  Municipal  Yacht 

Harbor, FEMA PW(s) 11698, 11803, 11841, 11160, 7208, 

7393  &  7396  Orleans  Parish,  LA,  2009‐2010.  Project 

Manager,  including  sediment  sampling,  bathymetry, 

tidal  data,  topographical  surveys,  applications  for 

Section 404, Section 10 and Coastal Use Permits, dredge 

design  including  all  cross‐sections,  structural  pier 

assessments in accordance with PIANC, UFC, USACE and 

ASCE  (Report  50)  standards.  The  undertaking  included 

development  of  three  Preliminary  Design  Alternatives, 

Hydrodynamic  and  Storm  Surge Modeling  and  Coastal 

Engineering,  producing  Final  Deliverable,  Plans  & 

Specifications,  providing  Inland  Testing Manuel  Tier  II 

Sampling & Analysis and Recap  in accordance with  the 

USEPA,  LDEQ  and  USACE  guidelines,  providing  all 

permitting  services  for  LDNR,  LDEQ  and  USACE, 

providing  oversight  of  the  geotechnical,  hazard, 

bathymetric  and  land‐side  surveying  services.  Also 

performed a Phase II ESA on the New Orleans Municipal 

Yacht Harbor (MYH) sediments where the sediment was 

tested  and  compared  to  risk  assessment  (RECAP) 

standards.  A  total  of  18  boreholes  were  advanced. 

Samples  were  collected  at  established  intervals.  Field 

boring  logs  and  office  generated  boring  logs  for  the 

same  boreholes  were  checked  where  a  QA/QC  was 

performed between the two field geologist logs. 

Page 5: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

5/13  

Lower Mississippi River  Sand Mining  /  Scofield  Island 

Restoration  (BA‐40),  Scoping  Phase,  Plaquemines 

Parish, LA, 2006. Project Team Member and coordinated 

the scoping of the design & permitting of this proposed 

sand mining  operation  located  in  Plaquemines  Parish. 

The  volume  of  the  sand  to  be  mined  is  estimated 

between  3Mcy  and  4Mcy.  The  Limits  of  Permissible 

Excavation  in  the  river  will  be  compliant  with  MVN 

Standard Drawing File No. H‐8‐45755. Further, all access 

to the batture near the borrow site will be proposed by 

levee ramps complaint with MVN Standard Drawing File 

No. H‐18‐24854. All anchorages and barge fleeting areas 

along with riverbank revetments were identified. 

Lower  Mississippi  River,  Marine  Terminal  and  Dock, 

Vopak Terminal, Westwego, LA, 2006. Project Manager, 

dredge design for marine terminal and dock. The Limits 

of  Permissible  Excavation  in  the  river  were  compliant 

with  MVN  Standard  Drawing  File  No.  H‐8‐45755. 

Further, all access  to  the marine  terminal and dock via 

levee  ramps  were  designed  complaint  with  MVN 

Standard  Drawing  File No.  H‐18‐24854.  All  anchorages 

and  barge  fleeting  areas  along  with  riverbank 

revetments were identified. 

Empire Water Way Boat Hoist, Pier and Bulkhead with 

Incidental  Dredging,  EN‐20‐010‐2415  &  P20001891; 

Plaquemines  Parish,  LA,  2005.  Project  Manager, 

responsible  for  the  design &  permitting of  a  proposed 

pier  and  bulk‐head  on  the  Empire  Waterway  that 

included dredging.  Task(s)  included  super‐imposing  the 

right‐of‐way maps of the Empire Waterway onto the site 

survey and cross‐sections. Design  included 8” steel pipe 

and decking. 

Lower  Mississippi  River  Sand  Mining  Design  & 

Permitting  –  Westwego  Facility  (EI‐20‐020‐0695), 

Jefferson  Parish,  LA,  2001  &  2006.  Project Manager, 

responsible  for  the  design &  permitting  of  these  sand 

mining operation  located  in Westwego. The capacity of 

the  stockpile  is 200,000  cubic  yards  at West‐wego  and 

pumped twice a year. The capacity of the borrow area is 

1,500,000  cubic  yards  at  Westwego.  The  Limits  of 

Permissible  Stockpile  on  the  riverbank were  compliant 

with MVN  Standard  Drawing  File  No.  H‐8‐45756.  The 

Limits  of  Permissible  Excavation  in  the  river  were 

compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐

45755. Further, all access to the batture by levee ramps 

were  designed  complaint with MVN  Standard Drawing 

File No. H‐18‐24854. All  anchorages  and barge  fleeting 

areas along with riverbank revetments were identified. 

Lower  Mississippi  River  Sand  Mining  Design  & 

Permitting  –  Lower  Coast  Algiers  (EI‐20‐020‐0693), 

Algiers, LA, 2001 & 2006. Project Manager, responsible 

for  the  design  &  permitting  of  these  sand  mining 

operation located in Lower Coast Algiers. The capacity of 

the stockpile at Lower Coast Algiers area was calculated 

to be 195,000 cubic yards and the pit is pumped twice a 

year. The  capacity of  the borrow  area  for  Lower Coast 

Algiers was calculated  to be 3,300,000 cubic yards. The 

Limits  of  Permissible  Stockpile  on  the  riverbank  were 

compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐

45756. The Limits of Permissible Excavation  in the river 

were compliant with MVN Standard Drawing File No. H‐

8‐45755.  Further,  all  access  to  the  batture  by  levee 

ramps  were  designed  complaint  with  MVN  Standard 

Drawing File No. H‐18‐24854. All anchorages and barge 

fleeting  areas  along  with  riverbank  revetments  were 

identified. 

Inland Bay Oil Platform / Marine Terminal SPCC/NPDES 

Evaluation,  June  Energy,  Inc./TORCH,  Grand  Coquille 

Bay and Empire, LA, 1998.  Project Manager, regulatory 

Evaluation  of  offshore  platform  including  dock  and 

closure of 29‐B Production Operations. 

Marine  Terminal  Evaluation  with  Hazardous  Waste 

Above‐ground  Storage  Tanks,  Solid  Waste 

Management  Units  and Wastewater  Treatment  Unit, 

Exxon  Chemical  (USA),  Inc.,  Baton  Rouge,  LA,  1992. 

Project  Team  Member  and  coordinated  regulatory 

Evaluation  of  Hazardous Waste  Above‐ground  Storage 

Tanks, Solid Waste Management Units and Wastewater 

Treatment Unit 

Marine  Oil  Terminal  Assessment  with  Bulk  Liquid 

Storage,  BP Oil,  Port  Sulphur,  LA,  1991.  Project  Team 

Member  and  coordinated  regulatory  Evaluation  of 

Hazardous  and  Solid Waste Management  and Marine 

Terminal Operations. 

Page 6: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

6/13  

Marine  Terminal  Evaluation with  Bulk  Liquid  Storage 

and  Magnesium  Ox‐ide  Solids  Centrifuge  Rejects, 

WITCO  Corporation,  Gretna,  LA,  1991.  Project  Team 

Member  and  coordinated  regulatory  Evaluation  of 

Magnesium Oxide Solids Centrifuge Rejects and Marine 

Terminal Operations. 

Marine  Terminal  Evaluation  of  Barge,  Rail  and  Truck 

Loading/Unloading  Operations,  Westlake  Styrene, 

Sulphur,  LA,  1990.  Project  Team  Member  and 

coordinated  regulatory  Evaluation  of  Barge,  Rail  and 

Truck Loading Operations. 

Marine  Terminal  Evaluation  for NEPA  EIS  of  Formosa 

Plastics  $1.5B  Plant  Expansion  including  Waterway 

Impacts,  Pointe  Comfort,  TX,  1990.  Project  Team 

Member  and  coordinated  evaluation  of  Sodium 

Hydroxide  Accidental  Release  (by  rail,  truck  and 

barge/ship) as part of a NEPA EIS  in conjunction with a 

NPDES  permit(s)  application  and  included  barge 

operations along the GIWW and berthing facility. 

Marine  Oil  Terminal  with  Bulk  Liquid  Storage  and 

Remedial  RCRA  Investigation/Feasibility  Study,  Delta 

Commodities,  Inc.,  Harvey,  LA,  1988.  Project  Team 

Member and coordinated  soil  sampling and monitoring 

well  installation  in  tank  farm  serviced  by  marine 

terminal loading/off‐loading. 

Marine  Oil  Terminal  with  Bulk  Liquid  Rail  and  Tank 

Farm,  Southern  Pacific  Railroad,  Avondale,  LA,  1988. 

Project Manager  at  Leaking  Oilfield  Tank  Battery  near 

Bayou Sauvage National Wildlife Refuge. 

VESSEL COLLISION AND WATERWAY CROSSING OF 

HYDRAULIC STRUCTURES 

Bayou St. John (Park Island) Bridge, Orleans Parish, LA, 

2010‐2012.  Project Manager,  providing  construction & 

inspection services for the bridge crossing over Bayou St. 

John,  a  designated  Louisiana  Historic  and  Scenic  River 

(Act 267, Enacted by the Legislature of Louisiana July 18, 

1982) 

Florida Avenue Bridge – Poland Avenue/Alvar Streetto 

Tupelo  Street,  Orleans  Parish,  LA,  2005‐2007.  Project 

Manager, peer  review of preliminary &  final plans  and 

specifications  for  the Florida Ave Bridge over  the  Inner 

Harbor Navigational Canal. Tasks include constructability 

review  and  research,  use  of  Accelerated  Construction 

Technology  Transfer  (ACTT)  techniques,  and 

investigation/preparation  to  reduce  impact  on  traffic 

disruptions  on  rehabilitation  segments  along  with 

identifying all utilities such as a 48" water main. Vessel 

collisions  guidelines  considered  under  AASHTO  Guide 

Specifications  and  Commentary  for  Vessel  Collision 

Design  of  Highway  Bridges,  2nd  Edition,  with  2010 

Interim Revisions. 

Bayou Dularge Bridge Pier Protection System (includes 

Bridge  Hydraulic  Analysis,  Marine  Structural 

Assessment/Vessel  Collision)  Terrebonne  Parish,  LA, 

2000‐2001.  Project  Team  Member  and  coordinated 

preparation  of  a  Claim  for  Equitable  Adjustment  on 

behalf of the contractor. The basis of the claim was due 

to a gross benchmark error in hydraulic data discovered 

during  construction  oversight.  The  DOTD  reported  the 

benchmark as the vertical control point at elevation +9.0 

NAVD  88.  Subsequent  surveys  by  CMC  and  LDOTD 

proved the correct elevation to be at +7.3 NAVD 88, an 

error of 1.7 feet. Claim included:  Significant error in the 

vertical  control  point  elevation  affecting  Item  No. 

805(07), Class S Concrete,  Item No. 805(02), Class A(m) 

Concrete,  Item No. 806(01) Deformed Reinforced  Steel 

and Item No. 804(04)J, Pipe Piles;  Failure to convert the 

datum  properly  affecting  Item  No.  805(07),  Class  S 

Concrete,  Item No. 805(02), Class A(m) Concrete,  Item 

No.  806(01)  Deformed  Reinforced  Steel  and  Item  No. 

804(04)J, Pipe Piles; Lack of historical data  for high tide 

and  low  tide  between  circa  1975  and  1998  affecting 

Item No.  805(07),  Class  S  Concrete,  Item No.  805(02), 

Class  A(m)  Concrete,  Item  No.  806(01)  Deformed 

Reinforced  Steel  and  Item No.  804(04)J,  Pipe  Piles;  In‐

correct number of units on  Item No. 202(02)I, Removal 

of  Existing  Timber  Fender  System;  Unforeseen 

conditions,  such  as  obstructions  and welded  structural 

elements,  to  Item  No.  202(02)J,  Removal  of  Existing 

Dolphins.  Vessel  collision  guidelines  considered  under 

1991 AASHTO Guide Specifications and Commentary for 

Vessel. 

Page 7: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

7/13  

Bridge Load Rating LFM Update contract for District 02 

& 07, LA, 1999. Project Team Member and coordinated 

categorizing 93 existing steel and pre‐stressed concreted 

bridge structures by District, Structure No., Route, Recall 

No.,  Type,  Year  and  Design  Load.  Each  drawing  was 

obtained  through  DOTD  General  Files  and  all  roll 

numbers  were  marked.  All  data  was  placed  in  a 

spreadsheet  to  prioritize  prior  to  running  the  Bridge 

Loading software. Vessel collision guidelines considered 

under  1991  AASHTO  Guide  Specifications  and 

Commentary for Vessel. 

Bayou  Segnette  ‐  Lapalco  Blvd.  Bridge  (US90  to 

Westwood Dr.), Jefferson Parish, LA, 1998‐1999. Project 

Manager,  provided  impact  modeling  and  Section  4(f) 

Evaluation  including  new  Bridge  over  navigable 

waterway,  Bayou  Segnette  for  Section  10  permitting 

through  the  Bayou  Segnette  State  Park  of  a  two‐lane 

widening  and  navigable  canal  crossing  using  1991 

AASHTO  Guide  Specifications  and  Commentary  for 

Vessel. 

NEPA  AND  DESIGN  OF  TRANSPORTATION  & 

TRANSIT SYSTEMS  

DOTD  S.P.  700‐26‐0289,  NEPA  Environmental 

Assessment,  Veterans Memorial  Boulevard Widening, 

Jefferson Parish,  LA, 2009‐2011. Provided NEPA EA  for 

this  road  improvement  under  the  Urban  Systems 

Program  for  the  DOTD  and  the  Regional  Planning 

Commission.  Includes  a  Phase  I  ESA,  Wet‐land 

Delineation, Noise Study and familiarity with 24 CFR Part 

58, and other federal laws and authorities, including the 

National  Historic  Preservation  Act,  Executive  Order 

11988 (Floodplain Management), Executive Order 11990 

(Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51, 

Executive Order 12898  (Environmental  Justice), Coastal 

Zone  Management  Act  of  1972,  Coastal  Barrier 

Resources Act of 1982, Endangered Species Act of 1973, 

and Wild and Scenic Rivers Act of 1968. 

DOTD  S.P.  736‐26‐0001,  NEPA  Environmental 

Assessment,  Earhart  Expressway/Causeway 

Interchange, Route LA 3139, Jefferson Parish, LA, 2005‐

2007.  Preparation  of  NEPA  documentation  to  support 

LADOTD’s  Feasibility  Study  for  interchange  to  connect 

the two highways included noise & air quality modeling. 

DOTD  S.P.  700‐26‐0254,  NEPA  Environmental 

Assessment,  Harvey  Boulevard  (Wall  Boulevard  to 

Peters Road), Jefferson Parish, LA, 2003‐2006. Provided 

NEPA  EA  for  this  road  improvement  under  the  Urban 

Systems  Pro‐gram  for  the  DOTD  and  the  Regional 

Planning Commission.  Includes  a  Phase  I  ESA, Wetland 

Delineation, Noise Study and familiarity with 24 CFR Part 

58, and other federal laws and authorities, including the 

National  Historic  Preservation  Act,  Executive  Order 

11988 (Floodplain Management), Executive Order 11990 

(Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51, 

Executive Order 12898  (Environmental  Justice), Coastal 

Zone  Management  Act  of  1972,  Coastal  Barrier 

Resources Act of 1982, Endangered Species Act of 1973, 

and Wild and Scenic Rivers Act of 1968. 

DOTD  S.P.  700‐08‐0123,  NEPA  Environmental 

Assessment,  Hamilton  Road  (I‐20  to  Benton  Road), 

Bossier  Parish,  LA,  2004‐2006.  Provide  air  quality  and 

noise  modeling  as  part  of  preparation  of  EA  during 

project  planning.  Examined  multiple  alignments  and 

various  types  of  roadways  (divided,  curb‐and‐gutter, 

etc.)  

DOTD  S.P.  700‐52‐0124  (TIMED); NEPA  Environmental 

Impact Statement (EIS); I‐12 to Bush, Route LA 3241, St. 

Tammany  Parish,  LA,  2003‐2006.  Preparation  of 

Environmental  Assessment  during  project  planning. 

Examined  multiple  alignments  and  various  types  of 

roadways (divided, curb and gutter, etc.)  included noise 

and air quality modeling. 

DOTD  S.P.  700‐10‐0139,  NEPA  Environmental 

Assessment,  Relocated  LA  1138‐2,  Route  LA  1138‐2, 

Calcasieu,  LA,  2004‐2006.  Preparation  of  NEPA 

documentation  to  support DOTD’s  Feasibility  Study  for 

interchange to connect the two highways included noise 

and air quality modeling. 

DOTD  S.P.  700‐26‐0078,  NEPA  Environmental 

Assessment,  Jones  Creek  Road,  East  Baton  Rouge 

Parish, LA, 2004‐2005. Preparation of the Environmental 

Assessment. Project involved widening an existing urban 

Page 8: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

8/13  

two‐lane facility to five‐lane facility  included noise & air 

quality modeling. 

DOTD  S.P.  700‐26‐0258,  NEPA  Environmental 

Assessment,  Peters  Road Widening,  Jefferson  Parish, 

LA,  2004‐2006.  Preparation  of  Environmental 

Assessment during project planning. Examined multiple 

alignments and various types of roadways (divided, curb 

and gutter, etc.) included noise and air quality modeling. 

DOTD  S.P.  700‐17‐0169,  NEPA  Environmental 

Assessment, Central Thruway, East Baton Rouge Parish, 

LA,  2002‐2003.  Noise  modeling  for  new  four‐lane, 

divided facility. 

DOTD  S.P.  742‐26‐0030,  NEPA  Environmental 

Assessment,  Lapalco  Blvd.  Extension  (US90  to 

Westwood  Dr.),  Jefferson  Parish,  LA,  1998‐1999. 

Provided  air,  noise  and  hydrologic  impact  modeling, 

Phase  I  ESAs,  oversaw wet‐land  and  historical/cultural 

resources surveys, traffic projects,  line & grade, Section 

4(f)  Evaluation  including  new  Bridge  over  Bayou 

Segnette (Section 10) through the Bayou Segnette State 

Park and two‐lane widening, etc. 

DOTD  S.P.  742‐26‐0029,  NEPA  Environmental 

Assessment, Lapalco Blvd. Extension (Westwood Dr. to 

Barataria Boulevard),  Jefferson  Parish,  LA,  1998‐1999. 

Provided  air,  noise  and  hydrologic  impact  modeling, 

Phase  I  ESAs,  oversaw  wetland  and  historical/cultural 

resources surveys, traffic projections, line & grade, for a 

two‐lane widening, etc. 

Canal Street Streetcar (Redline) Emergency Installation 

of  a  Portable  Electric  Substation  provide  by  the 

Massachusetts  Bay  Transportation  Authority  (MBTA), 

Regional Transit Authority, Orleans Parish, LA, 2006. A 

22‐year‐old  portable  electric  substation  contained  in  a 

60ft tractor trailer was  loaned by the MBTA to the RTA 

to  run  the  Redline  along  Canal  Street.  The  station 

contained  rectifiers  that  converted  alternating‐current 

electricity  into  the  direct  current.  Provided  permitting 

and oversight for the installation of the unit adjacent to 

the RTA Canal Street Facility along N. White Street.  

Canal Boulevard Streetcar & Bus Terminal, Fatal Flaws 

and  FTA  Categorical  Exclusion  Checklist, 

LA030072.1065.1372102T4, Regional Transit Authority, 

Orleans Parish,  LA, 2005. Review of  conceptual design 

for  the  terminal;  Review  of  the  NEPA  Environmental 

Impact  Statement  for  the  Canal  Street  Streetcar 

prepared  in  July  of  1997;  Review  of  the  Major 

Investment Study and  the Canal Street Corridor Project 

prepared in March of 1995; Review of Geotechnical Data 

obtained  for evaluation with  respect  to  the  conceptual 

design; Review of the funding sources for the extension 

project  and  its  compliance under  Section 303(a)(51) of 

TEA‐21,  the  Full  Funding Grant Agreement and  Section 

5309  New  Starts  funding  requirements;  Reviewed  the 

System  Linkage,  Streetcar  Capacity,  Transportation 

Demand,  and Governmental Authority  and  Funding  (as 

discussed  above);  Prepared  the  Environmental  Fatal 

Flaws  Analysis  of  the  project;  Prepared  the  Technical 

Feasibility  of  the  project;  and  Prepared  the  Financial 

Implications of the project. Prepared the Supplement to 

the Categorical Exclusion Checklist  (Section 771.117(d)) 

which  included: Detailed  Project Description;  Location; 

Metropolitan  Planning  and  Air  Quality  Conformity; 

Zoning;  Traffic  Impacts;  CO  Hot  Spots;  Historic 

Resources; Noise; Vibration; Acquisitions & Relocations; 

Hazardous  Materials;  Community  Disruption  and 

Environmental  Justice;  Use  of  Public  Parkland  and 

Recreation  Areas;  Impact  on  Wetlands;  Floodplain 

Impacts;  Impacts  on  Water  Quality,  Navigable 

Waterways  &  Coastal  Zone;  Impacts  on  Ecologically‐

Sensitive  Areas  and  Endangered  Species;  Impacts  on 

Safety  and  Security;  and  Impacts  Caused  by 

Construction.  

NOAB 15‐07‐01, North Perimeter Road  Improvements 

and  Runway  6‐24  Conversion  Design  Services,  Louis 

Armstrong  International  Airport,  2009‐2011.  Provided 

design  engineering  services  for  North  Perimeter  Road 

and the conversion of Runway 6‐24 to a Taxiway. 

DPW 2005‐E02, Design of Old Spanish Trail, City of New 

Orleans, LA, 2008‐2012. Provided design services for the 

project,  which  involved  total  reconstruction,  concrete 

and asphalt and all utilities (water, sewer and drainage). 

DOTD  S.P.  H.007213,  Veterans  Memorial  Boulevard 

Expansion,  City  of  Kenner,  LA,  2008‐2012.  Provide 

Page 9: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

9/13  

design  services  for  the widening of Veterans Memorial 

Boulevard  (four‐lane  Boulevard)  from  Loyola  Drive  to 

the  St.  Charles  Parish  line.  The  project  also  includes 

bridge replacement. 

DOTD  S.P.  742‐26‐0056,  Lapalco  Boulevard  Overlay 

(Murphy Canal  to Brooklyn Avenue),  Jefferson Parish, 

LA,  2005‐2007.  Provided  design  services  for  asphalt 

overlay and curb & gutter reconstruction. 

DOTD S.P. 713‐36‐0100  [Construction  Inspection]; Off‐

System Highway Bridge Program, Bayou St. John (Park 

Island),  Orleans  Parish,  LA,  2010‐2012.  Providing 

construction & inspection services for the project. 

DOTD S.P. 742‐36‐0116  [Construction  Inspection], FAP 

No.  STE‐3602(512);  Fleur  de  Lis  Drive  Improvements, 

Phase  I;  Orleans  Parish,  LA,  2007‐2009.  Provided 

construction inspection services for this project. 

DOTD S.P. 700‐92‐0016 (TIMED); Florida Avenue Bridge 

– Poland Avenue/Alvar Streetto Tupelo Street, Orleans 

Parish,  LA,  2005‐2007.  Preliminary  &  final  plans  and 

specifications peer  review &  constructability  review  for 

the  Florida  Ave  Bridge  over  the  Inner  Harbor 

Navigational  Canal.  Tasks  include  constructability 

research,  use  of  Accelerated  Construction  Technology 

Transfer (ACTT), and investigation/preparation to reduce 

impact on traffic disruptions on rehabilitation segments 

along with  identifying  all  utilities  such  as  a  48" water 

main. 

I‐49 Alignment Coordination for Jefferson Parish, Bayou 

Segnette/Lake  Cataouatche  Study  Area,  Jefferson 

Parish, LA, 2005‐2007. Alignment review:  future street, 

sewer, drainage, and water evaluation. 

31st  Street  Design  –  Overlay  &  Total  Reconstruction 

Design/Construction Engineering & Inspection Services, 

City  of  Kenner,  LA,  2002‐2003.  Design  the  overlay  & 

total reconstruct segments of 31st Street which includes 

an analysis of the drainage System and pumping Station 

present.  The  analysis  consisted  of  an  evaluation  of  all 

utilities  including  waterlines.  Features  of  the  drainage 

system  and  subsequent  evaluation  recommended  the 

need  for  improvements  which  included  waterlines  & 

other utilities with the greatest impact/positive effect on 

the  system,  while  minimizing  capital  outlay. 

Recommendations were made for  improvements to the 

Drainage  System  using  StormCAD  and  checked  against 

the  Rational  Method.  Also  provided  construction 

administration. 

Rio Vista Subdivision Design, Jefferson Parish, LA, 2005‐

2007. Designed a 34  Lot Subdivision which  includes an 

analysis of new drainage, water and sewer infrastructure 

and  tie‐in.  Analysis  consisted  of  an  evaluation  of  the 

hydrological and hydraulic features of the three systems. 

Accompanying  the evaluation  is  a  recommendation  for 

the  improvement  which  included  elements  of  the 

system that will have the greatest positive effect on the 

system, while minimizing capital investment. 

DOTD  S.P.  744‐52‐0020;  Tammany  Trace  Bicycle 

Tunnel,  St.  Tammany  Parish,  LA,  2001‐2002.  Prepared 

the Tammany Trace Bicycle Tunnel Traffic Plan. 

DOTD S.P. 245‐90‐0051; Bayou Dularge Pier Protection 

System  (includes  Bridge  Hydraulic  Analysis,  Marine 

Structural  Assessment/Vessel  Collision)  Terrebonne 

Parish,  LA,  2000‐2001.  Prepared  a  Claim  for  Equitable 

Adjustment on behalf of the contractor. The basis of the 

claim was due  to a gross benchmark error  in hydraulic 

data  discovered  during  construction  oversight.  The 

DOTD  reported  the  benchmark  as  the  vertical  control 

point at elevation +9.0 NAVD 88. Subsequent surveys by 

CMC and  LDOTD proved  the  correct elevation  to be at 

+7.3  NAVD  88,  an  error  of  1.7  feet.  Claim  included:  

Significant  error  in  the  vertical  control  point  elevation 

affecting  Item No.  805(07),  Class  S  Concrete,  Item No. 

805(02),  Class  A(m)  Concrete,  Item  No.  806(01) 

Deformed Reinforced Steel and  Item No. 804(04)J, Pipe 

Piles;    Failure  to  convert  the  datum  properly  affecting 

Item No.  805(07),  Class  S  Concrete,  Item No.  805(02), 

Class  A(m)  Concrete,  Item  No.  806(01)  Deformed 

Reinforced Steel and  Item No. 804(04)J, Pipe Piles; Lack 

of  historical  data  for  high  tide  and  low  tide  between 

circa 1975 and 1998 affecting  Item No. 805(07), Class S 

Concrete,  Item No. 805(02), Class A(m) Concrete,  Item 

No.  806(01)  Deformed  Reinforced  Steel  and  Item  No. 

804(04)J, Pipe Piles;  Incorrect number of units on  Item 

No. 202(02)I, Removal of Existing Timber Fender System; 

Page 10: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

10/13  

Unforeseen conditions, such as obstructions and welded 

structural  elements,  to  Item  No.  202(02)J,  Removal  of 

Existing Dolphins. 

DOTD  S.P.  700‐99‐0197;  Bridge  Load  Rating  LFM 

Update contract for District 02 & 07, 1999. Responsible 

for  categorizing  93  existing  steel  and  pre‐stressed 

concreted  bridge  structures  by  District,  Structure  No., 

Route,  Recall  No.,  Type,  Year  and  Design  Load.  Each 

drawing was obtained  through DOTD General Files and 

all  roll numbers were marked. All data was placed  in a 

spreadsheet  to  prioritize  prior  to  running  the  Bridge 

Loading software. 

MUNICIPAL & PUBLIC WORKS/UTILITIES 

Hazard  Mitigation  Plan  for  the  Sewerage  &  Water 

Board  of  New  Orleans,  Sewerage  & Water  Board  of 

New Orleans Office of Emergency Management and the 

Environmental Affairs Division, New Orleans, LA, 2008‐

2010.  Provided  a  Hazard  Mitigation  Plan  to  include 

vulnerability  analysis  and  hazards  to  critical  facilities, 

identifying  repetitive  losses  and  how  to  reduce  those 

losses  and  decrease  the  response  time  to  a  natural or 

man‐made  hazards.  The  purpose of  the  Plan  is  also  to 

integrate  Hazard Mitigation  strategies  into  the  day‐to‐

day activities and programs of the Sewerage and Water 

Board of New Orleans  (S&WB). The plan was prepared 

to meet the Disaster Mitigation Act of 2000 (DMA 2000) 

requirements in order to maintain the S&WB’s eligibility 

for the Federal Emergency Management Agency (FEMA) 

Pre‐Disaster  Mitigation  (PDM)  and  Hazard  Mitigation 

Grant  Programs  (HMGP).  More  importantly,  the  plan 

and  planning  process  lays  out  the  strategy  that  will 

enable  the  S&WB  to  become  less  vulnerable  to  future 

disaster losses. 

Sewer  Improvement  Program  ‐  42nd  &  Illinois  Force 

Main  Design,  City  of  Kenner,  LA,  2009‐2010.  Provide 

design  services  for  the  replacement  of  an  existing  12” 

sewer  force  main  approximately  2  miles  from  42nd 

Street to Illinois Street. The project, which encompasses 

approximately  $800,000  in  construction,  includes 

analysis  of  the  existing  condition  of  the  sewer  force 

main  defined  and  recommendations  (replace  where 

applicable  and  required).  It  further  includes  the design 

of a  canal  crossing where appropriate  (either above or 

below canal cross‐section) and utility conflicts with other 

utilities such as waterlines. 

Iris  Avenue  Waterline  Replacement  Project,  Council 

District 2,  Jefferson Parish, LA, 2010‐2012. Provided  to 

provide  design  engineering  services  for  this  waterline 

replacement  project  in  Council  District  2  of  Jefferson 

Parish. 

Program  Management  for  Identifying  and  Obtaining 

Funding Sources  for New or Rehabilitated Facilities  to 

Restore  Infrastructure  damaged  by Hurricane Katrina, 

City  of  Gretna,  LA,  2009‐2011.  Services  included 

identifying  and  obtaining  funding  sources  for  new  or 

rehabilitated  facilities  to  restore  infrastructure  of  the 

City of Gretna  that was damaged by Hurricane Katrina. 

This  Program  Management  requires  knowledge  of 

policies,  procedures  and  programs  of  the  Federal 

Emergency  Management  Agency  (FEMA),  the 

Governor’s Office of Homeland Security  (GOSHEP), and 

the  Louisiana  Recovery  Authority  (LRA)  and  any  other 

agency  that  oversees  Hurricane  Recovery  programs  in 

the State of Louisiana. Reviewed of all waterline related 

PWs. 

Barataria  Waterline  Extension  (McMurtry  Street  to 

Trahan  Street,  Crown  Point),  JPPW  2001‐009‐WR, 

Crown Point, Jefferson Parish, LA, 2005‐2007. Provided 

design and construction administration services  for  this 

waterline project and resident inspection. 

ENVIRONMENTAL ENGINEERING 

Brownfields  Phase  I,  Phase  II  Environmental  Site 

Assessments,  RECAP  Study  and  QAPP,  Former 

Bennigan’s Restaurant  (Corner of Veterans & Severn), 

Jefferson  Parish,  LA,  2010‐2011.  Prepared  Phase  I  & 

Phase II ESA,  QAPP for Brownfields and RECAP Study. 

Brownfields  Phase  I  &  II  Environmental  Site 

Assessment, Old Davis Concrete Plant, Jefferson Parish, 

LA,  2009.  Performed  Phase  I  &  II  ESA  for  Old  Davis 

Concrete  Plant  from  Task  order  from  Res.  105956, 

Miscellaneous Environmental Services. 

Page 11: Dennis Lambert Diversions

Dennis G. Lambert, P.E., MASCE 

  

11/13  

South  New  Orleans  Subdivision  (Squares  6  &  7), 

Petroleum  Assessment  Grant,  Proj  #EPA‐BFS‐JP‐CS, 

Regional  Planning  Commission  Brown‐fields 

Redevelopment Program, Jefferson Parish, Harvey, LA, 

2007. Provided Phase I ESA 

Brownfields  Phase  II  Environmental  Site  Assessment, 

Midship Marine, Jefferson Parish, LA, 2004. Performed 

Phase  II ESA  for  the old Texaco/Chevron Pipe  Laydown 

yard on the Harvey Canal. 

Louisiana  National  Guard,  Camp  Beauregard  Training 

Facility  including  Firing  Ranges,  Pineville,  LA,  2003‐

2005.  Provided  engineering  &  planning  services 

(Environmental  Installation  Management  Plan), 

including  7  firing  ranges  and  various  other  military 

operations  included  noise  modeling  for  firing  ranges, 

roads and airport/heliport facilities. 

Louisiana National Guard, Camp Villere Training Facility 

including Firing Ranges, Slidell, LA, 2003‐2005. Provided 

engineering  &  planning  services  (Environmental 

Installation Management Plan),  including 4 firing ranges 

and  various  other  military  operations  included  noise 

modeling for firing ranges, roads and heliport facilities. 

Air  Quality  Technical  Consultant,  Shreveport‐Bossier 

City MSA  Caddo, Webster,  and  Bossier  Parishes,  LA, 

2003‐2004.  Responsible  for  inventories  of marine  and 

stationary  sources  based  on  the  U.S.  EPA  National 

Emission  Inventory,  Version  2  database.  Compiled 

emission inventories for stationary & mobile sources for 

this Early Action Compact Regional Air Quality Modeling 

included  seasonal and  temporal allocation  factors  from 

the  top  fifteen  15  nitrogen  oxide  (NOx)  industrial 

emission  point  sources  in  Bossier,  Caddo  and Webster 

Parishes.  The  plants  included  Minden  Gas  Plant, 

Springhill Compressor Station, ADA Plant and State Line 

Compressor  Station.  Also  responsible  for  input  in 

running  MOBILE6  with  average  in‐use  fleet  emission 

factors  for volatile organic compounds  (VOC), oxides of 

nitrogen  (NOx)  and  carbon  mon‐oxide  (CO)  for  eight 

categories of vehicles. 

Sempra  Energy  Resources:  Bonnet  Carré  Facility  Gas 

Turbine  Installation  (including  Railroad  ROW  Impact 

Assessment),  St.  John  the  Baptist  Parish,  LA,  2003. 

Provided noise modeling  for gas turbine plant  including 

rail noise. 

FEMA Debris  Inspection  for Hurricanes  Lili &  Isadore, 

Jefferson Parish, LA, 2002. Provided  inspection services 

for debris hauling. 

Churchill  Energy/CVS  Holding,  Starks  Gas  Field  Air 

Emissions Inventories and Title V Permitting, Starks, LA, 

2002‐2003.  Provided  emissions  estimates  for  flare, 

tanks,  glycol  reboilers  and  general  operations  at  the 

Starks Gas Field. 

Old  Matlack  Truck  Wash  (now  managed  by  Quality 

Carriers)  RECAP  Investigation  &  Voluntary  Cleanup 

Program,  St.  Rose,  LA,  2002.  RECAP  Investigation, 

includes  evaluation  of  foundations  (pilings,  reinforced 

concrete,  12‐inch  concrete  slag,  etc.)  surrounded  by 

diesel‐contaminated soils. 

Louisiana DEQ Type  III Permitting and Conditional Use 

Permit,  City  of  New  Orleans,  LA,  2002.  Provided 

permitting  of  construction  &  demolition  landfill  and 

supporting plans and drawings. 

Regional  Planning  Commission  ‐  Brownfields 

Redevelopment Initiative (originally for the Parishes of 

Jefferson,  Orleans,  Plaquemines,  St.  Bernard  and  St. 

Tammany, LA, 1999‐2000. Provided Phase I ESAs. 

QAPP  for  the David Drive  Jefferson Parish  Incinerator, 

Jefferson, LA, 2000. Provided QAPP for Phase II ESA. 

Landfill Gas Collection Plan & Title V Permitting, Kelvin 

Tract, Waggaman,  LA, 1998‐1999. Provided  landfill gas 

collection  design  services  and  air  permitting  for 

Jefferson Parish.