Deluge systems are fixed fire protection systems with open discharge devicessystems with open discharge devices.

The water supply is held back by a deluge valve, which is controlled by a g , yrelease system.

When the release system operates, the y pdeluge valve opens and water discharges from every outlet connected to the sprinkler piping.

© Viking Page 2

Page 3: Deluge Valve System

Deluge Systems

Deluge systems are installed in areas or hazards that require total floodinghazards that require total flooding.

Examples of where deluge systems are installed:

• Aircraft Hangars• Petro-chemical facilities• Oil filled transformers• Coal conveyors• Bulk storage of flammable/combustible• liquids• Stage Prosceniums• Engine Test Rooms

© Viking Page 3

Page 4: Deluge Valve System

Deluge Systems

© Viking Page 4

Page 5: Deluge Valve System

Deluge Systems

© Viking Page 5

Page 6: Deluge Valve System

Deluge Systems

Empty Loading area duringarea during foam/water discharge

© Viking Page 6

Page 7: Deluge Valve System

Deluge Systems

Occupied Loading area during foam/waterduring foam/water discharge

© Viking Page 7

Page 8: Deluge Valve System

Deluge Valvesg

© Viking Page 8 © Viking

Page 9: Deluge Valve System

Deluge Valves

D l l d iDeluge valves are used in deluge systems and pre-action systems.

Viking deluge valves have one moving part, which is the clapperclapper.

Viking produces (2) styles of deluge valves a straightdeluge valves, a straight through Model F-1 and anangle style, a Model E-1.

Their operation is the same.

Both valves are listed and

Model EModel F

© Viking Page 9

approved for 250 psi.

Page 10: Deluge Valve System

Deluge Valves

Clapper Diaphragm Clamp RingValve Cover

Replaceable parts

Clapper Diaphragm

Teflon Coated Clapper

Clapper Seat Ring

Valve Seat

pp g

© Viking Page 12Valve Body

Page 11: Deluge Valve System

Deluge Valves

Outlet

Priming Chamber

Chamber

Priming Chamber

Inlet Chamber

© Viking Page 13

Page 12: Deluge Valve System

F-1 Deluge Valve Set-up

Step #1: Place PrimingStep #1: Place Priming Water in the Priming Chamber

Water pressure provided

© Viking Page 14

to the priming chamberis supplied upstream of awater supply control valve.

Page 13: Deluge Valve System

F-1 Deluge Valve Set-up

Step #2: Open the water supplyStep #2: Open the water supplycontrol valve to bring water intothe inlet chamber.

This is the normal condition

© Viking Page 15

for a deluge valve. The outletchamber has only atmospheric pressure.

Page 14: Deluge Valve System

Valve Operation

Outlet

Priming Chamber

Chamber

Priming Chamber

Once the release system operates,water drains from the primingchamber, allowing the valve clapperto open Water is directed fromInlet Chamber to open. Water is directed from the inlet chamber to the outlet chamber

© Viking Page 16

Page 15: Deluge Valve System

Valve Operation

Water fills the discharge chamberd i h l d fill hand exits the valve and fills the

sprinkler piping. Water dischargesfrom all open outlets connected to the sprinkler piping.the sprinkler piping.

Water discharges through

© Viking Page 17

system until water supplycontrol valve is closed.

Page 16: Deluge Valve System

Deluge System Releases

Release SystemsyThere are (3) primary release systemsThat control Deluge Systems:g y

1.Hydraulic Release – Mechanical releasey2.Pneumatic Release – Mechanical release3.Electric Release

© Viking Page 18

Page 17: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Ensure that the water supply control valve is closed and that the releasesystem piping is in working ordersystem piping is in working order.

© Viking Page 42

Water Supply Control Valve

Page 18: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Open Priming water supply controlvalve. Water will enter the valvetrimtrim.

Priming WaterSupply Control

Valve

© Viking Page 43

Page 19: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Open Priming water supply controlvalve. Water will enter the valvetrimtrim.

© Viking Page 44

Page 20: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Open Priming water supply controlvalve. Water will enter the valvetrim priming chambertrim, priming chamber,and the hydraulic release line.

Priming

© Viking Page 45

Priming Chamber

Page 21: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Open Priming water supply controlvalve. Water will enter the valvetrim and the hydraulic release linetrim and the hydraulic release line.

The time to prime the valve isdependent upon the length anddepe de t upo t e e gt a dthe height of the hydraulic releaseline.

© Viking Page 46

Page 22: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

Open Priming water supply controlvalve. Water will enter the valvetrim and the hydraulic release linetrim and the hydraulic release line.

The time to prime the valve isdependent upon the length and

Release Line

depe de t upo t e e gt a dthe height of the hydraulic releaseline.

Once the trim and release line arefilled with priming water, the priming water pressure gage willindicate the static water supplypressure.

© Viking Page 47Priming WaterPressure Gage

Page 23: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

When the priming chamber ispressurized, the water supplycontrol valve may be opencontrol valve may be open. Prior to opening the watersupply control valve, openthe flow test valve to purge

Flow Test Valve

t e o test a e to pu geany air that may be presentin the inlet chamber whenthe water supply control valvepp yis opened.

© Viking Page 48

Water SupplyControl Valve

Page 24: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

When water flow is dischargingfrom the flow test valve, closethe flow test valve and fully openthe flow test valve and fully open the water supply control valve.Inlet water supply pressure willappear on the water supplyappea o t e ate supp ypressure gage.

The system is now in service.y

© Viking Page 49

Water Supply Pressure Gage

Page 25: Deluge Valve System

Hydraulic Release Deluge System - Placing in ServiceSystem Placing in Service

System Operation

© Viking Page 50

Page 26: Deluge Valve System

Hydraulic Release Deluge System - OperationSystem Operation

When a fire is present in thehazard area, the release deviceslocated in the hazard areawill be heated.

© Viking Page 51

Page 27: Deluge Valve System

Hydraulic Release Deluge System - Operation

If d t h t i t

System Operation

If adequate heat is present,the release devices will activate/open and drain

ater (priming) press re from thewater (priming) pressure from the release line.

© Viking Page 52

Page 28: Deluge Valve System

Hydraulic Release Deluge System - OperationSystem Operation

When enough water pressureis drained from the releaseline and the priming chamber, thedeluge valve clapper will openallowing water to flow into thedischarge outlet of the deluge

l d h h h i i ivalve and through the trim pipingattached to the outlet chamber.

© Viking Page 53

Page 29: Deluge Valve System

Water will discharge through allthe outlets on the system piping. Once the PORV is activated, waterwill no longer discharge throughthe release line because the PORVdrains priming pressure from the

l d i i i ivalve and trim prior to it enteringthe release line trim.

© Viking Page 54

PORV(Pressure Operated Relief Valve)

Page 30: Deluge Valve System

PORV Operation

© Viking Page 55

Page 31: Deluge Valve System

PORV Operation - Deluge Trim

Priming WaterPriming water closesthe PORV

To Drain

PORV Operation

From Intermediate Chamber

© Viking Page 56

PORV Operation

Page 32: Deluge Valve System

PORV Operation - Deluge Trim

Priming Water from gPriming trimWater pressure from

Intermediate pushesThe PORV open, draining

i i f t ipriming pressure from trimAnd priming chamberTo ensure the D l lDeluge valve Will not reset if theRelease system wereTo de activate

Water from discharge

To de-activate.

chamber once deluge valve activates

Sensing Side

To Open Drain

© Viking Page 57PORV OperationSensing Side

Page 33: Deluge Valve System

PORV Operation - Deluge Trim

Priming water dischargesg gfrom PORV untilthe water supply control valve is closedvalve is closedand the valveand trim is drained.

PORV Operation© Viking Page 58

PORV Operation

Page 34: Deluge Valve System

Hydraulic Release Deluge System - OperationSystem Operation

Water will discharge fromthe PORV to the drain cupas long as there is flow through the valve. The PORV ensures that thedeluge valve will not

l i d lclose in-advertently.

© Viking Page 59

Page 35: Deluge Valve System

Shut-down and Re-set Procedure

1. Close the water supply controlvalve.2. Drain system piping throughmain drain located on sprinkler piping.3. Open the Auxiliary drain valveto drain discharge chamberand all trim connected to thedi h h b (R lidischarge chamber. (Relievespressure from sensing side ofPORV)4 R t l t (R l4. Re-set release system (ReplaceAny damaged release devices andOpen priming valve)5 Open water supply control