Delsky Sjukri Irrigation Construction Specialist L - 4 FORM ORM T TECH ECH 6 – C 6 – C URRICULUM URRICULUM V VITAE ITAE (CV) F (CV) F OR OR P PROPOSED ROPOSED P PROFESSIONAL ROFESSIONAL STAFF TAFF 1. Proposed : Irrigation Construction Specialist 2. Name of Firm : SMEC International Pty Ltd 3. Name of Staff : DELSY SJUKRI 4. Date of Birth : December 10, 1956 Nationality : Indonesia 5. Education: Graduated of Civil Engineering, Institut Teknologi 10 November Surabaya, 1984 6. Membership of Professional Associations: Indonesian Road Development Association (HPJI) 7. Other Training: Training and Certification of Supervision Road and Bridge (HPJI) East Java, 2005 8. Countries of Work Experience: Indonesia 9. Languages : Speaking Reading Writing English Good Good Good Indonesi an Mother tongue Mother tongue Mother tongue 10. Employment Record : From August 2006 : TO March 2007 ( 8 months) Employer : Nippon Koei Co. Ltd Position Held : Construction Engineer From August 2005 : TO July 2006 ( 12 months) Employer : PT. TUKADMAS GS Position Held : General Superintendent From January 2005 : TO July 2005 ( 7 months) Employer : PT Supra Surya Indonesia Position Held : General Superintendent From September 2004 : TO December 2004 ( 4 months) Employer : Mono Heksa Consultant Position Held : Site Engineer From August 2001 : TO August 2004 ( 36 months) Employer : Nippon Koei Co. Ltd Position Held : Construction Engineer From July 2000 : TO April 2001 ( 10 months) Employer : PT. Wilis Nusacitra Position Held : Site Engineer Supervision of Rehabilitation and Improvement of Irrigation and Drainage Infrastructure in Page 1 of 7 Jatiluhur Irrigation System Loand No: IBRD 80270-ID for WISMP-2

Upload: cherie-mcmillan

Post on 29-Sep-2015

214 views

Category:

Documents


0 download

DESCRIPTION

Delsy Sjukri

TRANSCRIPT

FORM TECH 6 CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

Delsky SjukriIrrigation Construction Specialist

L - 4

Form Tech 6 Curriculum Vitae (CV) For Proposed Professional Staff1.Proposed Position:Irrigation Construction Specialist

2.Name of Firm:SMEC International Pty Ltd

3.Name of Staff:DELSY SJUKRI

4.Date of Birth:December 10, 1956Nationality :Indonesia

5.Education:

Graduated of Civil Engineering, Institut Teknologi 10 November Surabaya, 1984

6.Membership of Professional Associations:

Indonesian Road Development Association (HPJI)

7.Other Training:

Training and Certification of Supervision Road and Bridge (HPJI) East Java, 2005

8.Countries of Work Experience:

Indonesia

9.Languages:SpeakingReadingWriting

EnglishGoodGoodGood

IndonesianMother tongueMother tongueMother tongue

10.Employment Record:

From August 2006

:TO March 2007 ( 8 months)

Employer:Nippon Koei Co. Ltd

Position Held :Construction Engineer

From August 2005:TO July 2006 ( 12 months)

Employer:PT. TUKADMAS GS

Position Held :General Superintendent

From January 2005:TO July 2005 ( 7 months)

Employer:PT Supra Surya Indonesia

Position Held :General Superintendent

From September 2004:TO December 2004 ( 4 months)

Employer:Mono Heksa Consultant

Position Held :Site Engineer

From August 2001:TO August 2004 ( 36 months)

Employer:Nippon Koei Co. Ltd

Position Held :Construction Engineer

From July 2000:TO April 2001 ( 10 months)

Employer:PT. Wilis Nusacitra

Position Held :Site Engineer

From November 1999:TO June 2000 ( 8 months)

Employer:PT. Tukadmas G.C

Position Held :Site Engineer

From April 1999:TO October 1999 ( 7 months)

Employer:PT. Tukadmas G.C

Position Held :Site Engineer

From January 1998:TO March 1999 ( 14 months)

Employer:PT Etika Dharma Sejahtera

Position Held :Site Engineer

From January 1997:TO October 1997 ( 10 months)

Employer:PT Wilis Nusacitra

Position Held :Project Manager

From February 1996:TO January 1997 ( 12 months)

Employer:PT. Tukadmas G.C

Position Held :Project Manager

From February 1995:TO February 1996 ( 13 months)

Employer:PT Supra Surya Indonesia

Position Held :Site Engineer

From February 1992:TO February 1995 ( 36 months)

Employer:PT Tukadmas G.C

Position Held :Project Manager

From January 1991:TO February 1992 ( 14 months)

Employer:PT. Tukadmas G.C

Position Held :General Superintendent

From February 1990:TO January 1991 ( 12 months)

Employer:PT. Supra Surya Indonesia

Position Held :Project Manager

From September 1988:TO January 1990 ( 16 months)

Employer:PT. Tukadmas G.C

Position Held :General Superintendent

From September 1985:TO September 1988 ( 36 months)

Employer:PT. Tukadmas G.C

Position Held :General Superintendent

From April 1984:TO July 1985 ( 16 months)

Employer:PT Delta Vena

Position Held :Site Manager

11.Detailed Tasks Assigned12.Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

12.1

Name of assignment or project:

REHABILITATION OF INFRASTRUCTURE IRRIGATION PROJECTYear: August 2006 Maret 2007 ( 8 Months )Location: Tolinggula, Gorontalo Province

Client: Ministry of Public WorkMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment

Submit the project evaluation and report it to Director in line of cash out and cash in flow of Project

Related to Task:

12.2Name of assignment or project:

BRIDGE AND ROAD DEVELOPMENT PROJECT.Year: August 2005 July 2006 ( 12 Months )Location: Malang, East Java ProvinceClient: Ministry of Public Work, Directorate of HighwayMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment Submit the project evaluation and report it toDirector in line of cash out and cash in flow of ProjectRelated to Task:

12.3Name of assignment or project:

KELANIS II PROJECT.

Year: January 2005 July 2005 ( 7 Month )Location: Central kalimantan ProvinceClient: PT Adaro IndonesiaMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment Submit the project evaluation and report it to Director in line of cash out and cash in flow of ProjectRelated to Task:

12.4Name of assignment or project:

BRIDGES REDEVELOPMENT PROJECT.

Year: September 2004 December 2004 ( 4 Month )Location: Mojokerto, East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.5Name of assignment or project:

IRRIGATION INFRASTRUCTURE DEVELOPMENT PROJECT.

Year: August 2001 August 2004 ( 36 Months )

Location: Konawe, Southeast Sulawesi ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Construction EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.6Name of assignment or project:

IRRIGATION REHABILITATION PROJECT

Year: July 2000 April 2001 ( 10 Months )

Location: Pinrang, South Sulawesi ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for Contractor

Related to Task:

12.7Name of assignment or project:

REHABILITATION OF SECONDARY IRRIGATION PROJECT

Year: November 1999 June 2000 ( 8 Months )

Location: Lamongan, East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.8Name of assignment or project:

REHABILITATION OF PRIMARY IRRIGATION PROJECT.

Year: April 1999 October 1999 ( 7 Months )

Location: Lamongan, East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.9Name of assignment or project:

FACTORY DEVELOPMENT PROJECT.

Year: January 1998 March 1999 ( 14 Months )

Location: Pasuruan, East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.10Name of assignment or project:

REHABILITATION AND UPGRADE OF IRRIGATION AREA PROJECT.

Year: January 1997 October 1997 ( 10 Months )

Location: : Mangondow, North Sulawesi ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Project managerActivities performed:

Responsible for contruction management Budgeting, schedulling, supervising and site coordination Material selecting and construction final report.Related to Task:

12.11Name of assignment or project:

CONSTRUCTION OF PRIMARY DRAINAGE PROJECT.

Year: February 1996 January 1997 ( 12 Months )

Location: DKI JakartaClient: PAM JayaMain project features: ConstructionPositions held: Project managerActivities performed:

Responsible for contruction management Budgeting, schedulling, supervising and site coordination Material selecting and construction final report.Related to Task:

12.12Name of assignment or project:

WARE HOUSE BUILDING CONSTRUCTION PROJECT.

Year: February 1995 February 1996 ( 13 Months )

Location: Mojokerto, East Java ProvinceClient: PT Pabrik Kertas Tjiwi KimiaMain project features: ConstructionPositions held: Site EngineerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for ContractorRelated to Task:

12.13Name of assignment or project:

THE CONSTRUCTION OF LEFT BANK IRRIGATION SYSTEM.

Year: February 1992 February 1995 ( 36 Months )

Location: Wajo, South Sulawesi ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: : Project managerActivities performed:

Responsible for contruction management Budgeting, schedulling, supervising and site coordination Material selecting and construction final report.Related to Task:

12.14Name of assignment or project:

BRIDGE REPLACEMENT PROJECT.Year: January 1991 February 1992 ( 14 Months )

Location: East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment Submit the project evaluation and report it to Director in line of cash out and cash in flow of Project

Related to Task:

12.15Name of assignment or project:

BUILDING DEVELOPMENT PROJECT.

Year: February 1990 January 1991 ( 12 Months )

Location: East Java ProvinceClient: PT Bentoel MalangMain project features: ConstructionPositions held: Project managerActivities performed:

Responsible for contruction management Budgeting, schedulling, supervising and site coordination Material selecting and construction final report.Related to Task:

12.16Name of assignment or project:

BRIDGE REPLACEMENT PROJECT.

Year: September 1988 February 1990 ( 16 Months )

Location: Kediri, East Java ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment Submit the project evaluation and report it to Director in line of cash out and cash in flow of Project

Related to Task:

12.17Name of assignment or project:

BRIDGE REPLACEMENT PROJECT.

Year: September 1985 September 1988 ( 36 Months )

Location: South Kalimantan ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: General SuperintendentActivities performed:

To organize and regulate daily activities of Contractor such as supervising, quantity measuring, quality control and logistic

Carry out project administration as daily, weekly and monthly report

Prepare the project schedule and budget cost

Report the progress ang prepare the suportting data in line with requested payment Submit the project evaluation and report it to Director in line of cash out and cash in flow of Project

Related to Task:

12.18Name of assignment or project:

IRRIGATION DEVELOPMENT PROJECT.

Year: April 1984 July 1985 ( 16 Months )

Location: Pasaman, West Sumatera ProvinceClient: Ministry of Public WorkMain project features: ConstructionPositions held: Site ManagerActivities performed:

Check Contract Document.

Involved and supervise together the team for Field Engineering Survey.

Review the Drawing and Quantity calculation as per actual field condition including preparation of Contract Change Order

Ensured good work performance of contractor.

Ensuring the quantity of material and workmanship of contractors meets the specified requirement.

Check the final quantity of progres and payment. Prepare Monthly Certificate and monitoring payment for Contractor.Related to Task:

13.Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date: November 2013

[Signature of staff member or authorized representative of staff]Day / Month / Year

Full name of authorized representative:Antonius Rainier Haryanto