. . 2556 16-18 2556 Defect reduction in the Cover timming manufacturing process by using Kaizen. 1* 2 1,2 E-mail: [email protected] * Chakat chueadee 1* Kittin Ruengluecha 2 1,2 Department of Industrial Engineering, Faculty of Engineering and Architecture Rajamangala University of Technology Isan E-mail: [email protected] * . . 2554 3,069 93.20 3,292 2 Abstract This research aimed to reduce the waste in the Cover timing manufacturing process by using Kaizen Techniques. The study was started by gathering and checking the Cover timing manufacturing data from August to October 2011. The data showed the several defects cause in the process of production, the most one was focused on was the specimen buckling because of the amount of 3,069 of 3,292 pieces or 93.20 percent of the whole defects occurred. All specimen buckling have been reworked by striking them on the base metal, knocking off the scrap metal, and control the metal water runner by manual which wasted much time and added man without any decrease of the defects. Kaizen Techniques was applied to investigate the cause of the main problem and found that the injection of metal water into the mould is unable to be completely cut when the first process was finished. As for the solution was to use the

Upload: others

Post on 01-May-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

Defect reduction in the Cover timming manufacturing process

by using Kaizen.

1* 2 1,2

E-mail: [email protected]*

Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty of Engineering and Architecture

Rajamangala University of Technology Isan

E-mail: [email protected]*

. . 2554

3,069 93.20 3,292

2

Abstract

This research aimed to reduce the waste in the Cover timing manufacturing process by using Kaizen

Techniques. The study was started by gathering and checking the Cover timing manufacturing data from August to October 2011. The data showed the several defects cause in the process of production, the

most one was focused on was the specimen buckling because of the amount of 3,069 of 3,292 pieces or 93.20 percent of the whole defects occurred. All specimen buckling have been reworked by striking them

on the base metal, knocking off the scrap metal, and control the metal water runner by manual which wasted much time and added man without any decrease of the defects. Kaizen Techniques was applied

to investigate the cause of the main problem and found that the injection of metal water into the mould is unable to be completely cut when the first process was finished. As for the solution was to use the

Page 2: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

reworking machine which able to completely cut the running of metal water during the process instead of manual. The result of changing into the machine showed that the new machine was not only able to

decrease the defects but also give up the rework stations together with 2 workers.

Keywords: Defect, Running of metal water, Specimen buckling, Cover timming

1.

(Cover Timing) 10,000

. .2554

32,589 3,292 3,069

93.2 164 5.0

164 1.8

(Kaizen)

2.

3.

30

4.

4.1

4.2

5.

5.1 (Kaizen)

(2550 : 27)

(Improvement)

(Continuous Improvement)

4

: (2550 : 27)

5.1.1

1.

(Quantum Jumps in Productivity)

2.

5.1.2

(System approach)

PDCA (Plan-Do-Check-Action)

Page 3: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

1.

2.

3. 4.

5. 6.

7.

(PDCA) 1. P-Plan

(Key Metrics)

2. D-Do

3. C-Check

4. A-Act

E C R S

E = Eliminate

C = Combine

R = Rearrange

S = Simplify

5.1.3 (2550 : 42)

5W 1 H

What?

When?

Where?

Who?

How?

Why? 2

5.1.4

6.

6.1

3.1

5

5

6.1.1 (Die cast)

6

Go

No

#

Page 4: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

6

6.1.2 7

7

6.1.3

8

6.1.4

9

6.1.5 (Surface)

10

10

6.1.6

11

11

6.1.7

(Inspections)

5 7

5 12

12

6.1.8 (Packaging)

13

13

Page 5: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

6.2

1

. .2554 ( : )

1

14

14

6.3 7

6.3.1

15 16

15

15

5

16

16 2 5 7 5

5

6.3.2

10 6.3.3

2 Why?

Why ?

Why ?

Why ?

Why ?

2

6.3.4

6.3.5

6.3.6

17

10,857 1,007 48 18 1,073

10,784 903 61 25 989

10,948 1,159 55 16 1,230

32,589 3,069 164 59 3,292

(%) 93.20 5.00 1.80 100

Page 6: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

17

6.3.7

7.

7.1

18

18

1.

-

- -

2 ( A B)

2.

3

. . 2555 ( : )

3

7.2 4

. . -

. .54

. . -

. . 55

(

)

(

)

32,589 31,751

3,292 10.1 100 157 0.49 100

3,069 9.41 93.2 0 0 0

164 0.5 5 92 0.29 58.6

59 0.19 1.8 65 0.2 41.4

4

19

10,876 0 22 19 41

10,234 0 33 22 55

10,641 0 37 24 61

31,751 0 92 65 157

% 0 58.6 41.4 100

Go

No

Page 7: Defect reduction in the Cover timming manufacturing process by using … · 2014. 4. 22. · Chakat chueadee1* Kittin Ruengluecha2 1,2Department of Industrial Engineering, Faculty

. . 2556 16-18 2556

8.

8.1

1. 100

2.

3. 2 ( A B)

2 4.

700,000 200,000 /

2 28,000 /

8.2

1.

2.

(Robot) 2

-

[1] . 2550 . . :

.