December 31, 2010 Traffic Operations Program Integration Review Strategic Plan Executive Summary

Upload: ahanu

Post on 05-Feb-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Traffic Operations Program Integration Review Strategic Plan Executive Summary. December 31, 2010. Purpose for Integration Review. To evaluate existing WisDOT Traffic Operations organizational functionality, operations, ITS maintenance, and technical capacities - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: December 31, 2010

December 31, 2010

Traffic OperationsProgram Integration

ReviewStrategic Plan Executive Summary

Page 2: December 31, 2010

Purpose for Integration Review To evaluate existing WisDOT Traffic Operations

organizational functionality, operations, ITS maintenance, and technical capacities

Identify opportunities for program structure efficiencies, improved resource utilization, potential cost-savings, and streamlining processes and methodologies

Timing was key opportunity New WisDOT Bureau of Traffic Operations New State Administration Focused approach to resource needs, operational synergy, and

linking traffic operations to broader economic sustainability issues

Page 3: December 31, 2010

Process to Develop the Strategic Plan Incorporated key synergies from concurrent initiatives Relevant documentation were reviewed Stakeholders were included in reviews, one-on-one

meetings, and workshops Two stand-alone documents were prepared

STOC Operations Model Assessment ITS Maintenance Program Review

Relevant recommendations from these efforts have been carried forward into the Integration Review Strategic Plan

Page 4: December 31, 2010
Page 5: December 31, 2010

Inputs to Process

Page 6: December 31, 2010

S-W-O-T Strengths-Weaknesses-Opportunities-Threats (SWOT) Guide development and prioritization of strategic

initiatives Identifies the gaps and issues from an internal

perspective and an external partnership/support perspective

The outcomes of the SWOT, the weaknesses and opportunities, were carried forward to develop the Program Focus Areas

Page 7: December 31, 2010

Program Focus Areas External Focus (Traveler and Taxpayer) Performance Management Operations and Sustainability of Operations System Integrity and Reliability Operations Programmatic Alignment Culture

Page 8: December 31, 2010

Timeframes/Priority Recommendations Strategic recommendations will allow WisDOT’s BTO to

become postured organizationally to benefit the most from established programs and relationships

Encourages future planning strategies through systems engineering based approaches

Timeframes for recommendations: Near-term (0-1 year) – Foundation Activities Mid-term (1-4 years) – Stabilize Operations Model Long-term (4+ years) – Operational Sustainability

Page 9: December 31, 2010
Page 10: December 31, 2010

Performance Management and Metrics Internal – Operational Efficiency

System and device reliability Device maintenance metrics Contractor metrics

External – Impacts to Network Performance and Customer

Mobility, travel time, safety Work zone delay Customer awareness and satisfaction

BTO needs to measure both internal and external measures

Page 11: December 31, 2010
Page 12: December 31, 2010

Using and Applying Outcomes from the Plan The Strategic Plan should be used as a reference during

annualized process reviews and plan/funding activities Provides input to BTO processes currently being

established Synergies among other group/Bureau/Division

processes: Safety and SHSP SHIP and Project Development Work Zone Annualized process, TMP requirements and policy

Page 13: December 31, 2010

Statewide and Regional Relationships

Page 14: December 31, 2010

Sketch Planning Tool

Page 15: December 31, 2010

Project ContactsJohn Corbin, P.E., WiSDOT [email protected]

Lisa Burgess – Consultant [email protected]