5D BIM: Today’s Workflow for Cost Certainty
3rd Annual BIM Summit Sydney 26th August 2013
![Page 2: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/2.jpg)
Discussion
How Uncertain are Construction Costs?
What Level of Certainty can be Achieved?
How do I Create Savings?
What Skills does a 5D QS need?
5D BIM Execution Plan
Deliverables SCUH
![Page 3: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/3.jpg)
How Uncertain are Construction Costs?
![Page 4: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/4.jpg)
How Uncertain is the Market?
Research by Evans & Peck, University of Melbourne (2009) • Victorian alliance projects • Average cost increases:
• Business Case v TOC +35 - 45% • TOC v Final Cost +5 – 10%
Research by Flyvbjerg et al (2003) • 258 projects in 20 nations • 90% of projects had cost overruns • Average cost increase +28%
Source: “In Pursuit of Additional Value” - Evans & Peck + The University of Melbourne, Oct 2009 : http://maxwellsci.com/print/rjaset/v5-2621-2629.pdf
![Page 5: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/5.jpg)
Source: Mitchell Brandtman
MB Brisbane - Financier Watching Brief
1,100 Private Sector Financed Projects: • Procurement Type:
• 64% Lump Sum • 17% Owner Builder
• Project Type:
• 54% Residential • 16% Industrial
• Cost Overruns:
• Range -13% to +321% • 1 in 4 Projects > +5%
-25.0
0.0
25.0
50.0
75.0
100.0
![Page 6: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/6.jpg)
What Level of Cost Certainty can be Achieved?
![Page 7: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/7.jpg)
Structural Steel Shop Drawings Structural Steel Fabrication & Erection
![Page 8: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/8.jpg)
Final Costs & Time – Structural Steel v Entire Contract
% Change
Entire Contract:
Extensions of Time (38 No) + 57%
Variations (321 Claims) + 27%
Structural Steel Component (15%):
Extensions of Time (zero) + 0%
Variations (5 Claims) + 2%
Source: Mitchell Brandtman
![Page 9: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/9.jpg)
How do I Create Savings?
![Page 10: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/10.jpg)
Head Contractors v Sub Contractors
83.0% Subcontract
14.0% Head Contractor -Preliminaries
1.2% Head Contractor -Overheads
1.8% Head Contractor -Profit
15% Profit
68% Labour & Materials
Source: Mitchell Brandtman
![Page 11: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/11.jpg)
Who Owns the Savings?
PHASE & SAVING TYPE
SAVING OWNERSHIP
Designer Owner D&C
Contractor D-B-B
Contractor D&C
Sub-Con D-B-B
Sub-Con
LOD 100 - CONCEPT DESIGN
Functional efficiency 100% 100%
Mass and form optimisation 100% 100%
LOD 200 - SCHEMATIC DESIGN
Design workflow efficiency 100%
Alternative methods & systems 100% 100%
LOD 300 - DEVELOPED DESIGN
Design workflow efficiency 100% 100%
Alternative materials & products 100% 100% 100%
Accurate contract documents 5% 100% 100% 100% 100%
LOD 300 - "FOR CONSTRUCTION"
Accurate "for construction" documents 5% 5% 5% 100% 100%
VDC - Construction scheduling, operations & safety 5% 17% 17% 83% 83%
LOD 400 - CONSTRUCTION
Administrative workflow efficiency 17% 17% 83% 83%
Site efficiency 17% 17% 83% 83%
Risk reduction 5% 100%
LOD 500 - OPERATION
Administrative workflow efficiency 100%
Materials & equipment optimisation 100%
Source: Mitchell Brandtman
Designer Owner
D&C
Contractor
D-B-B
Contractor
D&C
Subcontor
D-B-B
Subcontor
LOD 100 CONCEPT DESIGN
Functional efficiencyMass and form optimisation
LOD 200 SCHEMATIC DESIGN
Design workflow efficiencyAlternative methods & systems
LOD 300 DEVELOPED DESIGN
Design workflow efficiency
Alternative materials & productsAccurate contract documents
LOD 300 "FOR CONSTRUCTION"
Accurate "for construction" documentsVDC - Construction scheduling, operations &
LOD 400 CONSTRUCTION
Administrative workflow efficiency
Site efficiencyRisk reduction
LOD 500 OPERATION
Administrative workflow efficiencyMaterials & equipment optimisation
PHASE & SAVING TYPE
SAVING OWNERSHIP
hea
d c
on
trac
t le
t
sub
con
trac
t le
t
White No ownership
Red Low ownership
Orange Medium ownership
Yellow High ownership
Green Complete ownership
![Page 12: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/12.jpg)
Design & Bid Pre-Construction (1 month) Construction
Arch LOD 300
Struc LOD 300
QS Model Map
MEP LOD 200
4D Info
5D Info
MEP LOD 300
Steel LOD 400
Prefab
LOD 400
4D Time
5D Costs
Designers - Coordination &
Clash
Builder - Coordination,
Clash, Activities & Rates
Star
t C
on
stru
ctio
n
For Tender
Federated Model
For Construction
Federated Model
Plan to Build & Nominated SC
Sele
ct P
refe
rred
Bid
![Page 13: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/13.jpg)
Lean Construction & BIM
• Waiting – for materials or specifications • Over Production – producing more than is required • Rework – any work that has to be rectified • Inventory – too much or too little inventory • Transportation – double handling and moving equipment or materials
Source: "Recommended Practices for the Application of LEAN Construction Methods to Building New Australian LNG Capacity" by Engineers Australia (Western Australia Division)
![Page 14: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/14.jpg)
What Skills does a 5D QS need?
![Page 15: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/15.jpg)
Pulling Information
![Page 16: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/16.jpg)
Improve Information – No need for QSID or Codes
Add Parameters
![Page 17: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/17.jpg)
Mapping – BQ Level of Detail
![Page 18: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/18.jpg)
Pushing Information & Round Tripping
![Page 19: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/19.jpg)
Negotiations & Price Transparency
• Revised • New • Deleted
![Page 20: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/20.jpg)
Revisioning
• Revised • New • Deleted
![Page 21: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/21.jpg)
5D BIM Execution Plan
![Page 22: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/22.jpg)
BIM Execution Plan
![Page 23: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/23.jpg)
Sunshine Coast University Hospital
![Page 24: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/24.jpg)
Deliverables - Revisioning
• Revised • New • Deleted
![Page 25: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/25.jpg)
Deliverables – Visual Subcontract Qtys for Tender
![Page 26: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/26.jpg)
Trade Package Quantities - 3D v 2D
94% 3D
6% 2D
Source: Mitchell Brandtman
3D v 2D by Cost
61% 3D
39% 2D
3D v 2D by No of Items
![Page 27: David Mitchell](https://reader031.vdocuments.mx/reader031/viewer/2022012308/5561d99bd8b42ab33f8b5c33/html5/thumbnails/27.jpg)
Final Words
5D creates better buildings by:
• Enabling early cost decisions
• Targeting money in a transparent way
5D QS creates cost certainty by applying:
• Wisdom – know how
• Intelligence – templates, maps & data
• Technology – weekly revisioning