www.gov.uk/defra Air Quality Plan for the achievement of EU air quality limit value for nitrogen dioxide (NO 2 ) in West Midlands (UK0035) December 2015 This information is out of date.

Upload: others

Post on 25-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

www.gov.uk/defra

Air Quality Plan for the achievement of EU airquality limit value for nitrogen dioxide (NO2) inWest Midlands (UK0035)

December 2015

This in

formati

on is

out o

f date

.

Page 2: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

© Crown copyright 2015

You may re-use this information (excluding logos) free of charge in any format or medium, under theterms of the Open Government Licence v.3. To view this licence visit www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or email [email protected]

Any enquiries regarding this publication should be sent to us at:

[email protected]

1

This in

formati

on is

out o

f date

.

Page 3: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Contents

1 Introduction 3

1.1 This document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

1.2 Context . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

1.3 Zone status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

1.4 Plan structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2 General Information About the Zone 4

2.1 Administrative information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2.2 Assessment details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

2.3 Reporting under European Directives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

3 Overall Picture for 2013 Reference Year 9

3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

3.2 Reference year: NO2_UK0035_Annual_1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

4 Measures 14

4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

4.2 Source apportionment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

4.3 Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

4.4 Measures timescales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

5 Baseline Model Projections 15

5.1 Overview of model projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

5.2 Baseline projections: NO2_UK0035_Annual_1 . . . . . . . . . . . . . . . . . . . . . . . . . 16

Annexes 20

A References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

B Source apportionment graphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

C Tables of measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2

This in

formati

on is

out o

f date

.

Page 4: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

1 Introduction

1.1 This document

This document is the West Midlands non-agglomeration zone (UK0035) updated air quality plan for theachievement of the EU air quality limit values for nitrogen dioxide (NO2). This is an update to the air qualityplan published in September 2011 (http://uk-air.defra.gov.uk/library/no2ten/).

This plan presents the following information:

• General information regarding the West Midlands non-agglomeration zone• Details of the NO2 exceedance situation within the West Midlands non-agglomeration zone• Details of local air quality measures that have been implemented, will be implemented or are beingconsidered for implementation in this non-agglomeration zone

This air quality plan for the West Midlands non-agglomeration zone should be read in conjunction with theseparate UK overview document and the list of UK and national measures. The UK overview document setsout, amongst other things, the authorities responsible for delivering air quality improvements and the list of UKand national measures that are applied in some or all UK zones. The measures presented in this zone plan, theaccompanying UK overview document and the list of UK and national measures show how the UK will ensurethat compliance with the NO2 limit values is achieved in the shortest possible time.

This plan should also be read in conjunction with the supporting UK Technical Report which presents informationon assessment methods, input data and emissions inventories used in the analysis presented in this plan.

1.2 Context

Two NO2 limit values for the protection of human health have been set in the Air Quality Directive (2008/50/EC).These are:

• The annual mean limit value: an annual mean concentration of no more than 40 µgm-3

• The hourly limit value: no more than 18 exceedances of 200 µgm-3 in a calendar year

The Air Quality Directive stipulates that compliance with the NO2 limit values will be achieved by 01/01/2010.

1.3 Zone status

The assessment undertaken for theWest Midlands non-agglomeration zone indicates that the annual limit valuewas exceeded in 2013 but is likely to be achieved before 2020 through the introduction of measures includedin the baseline.

1.4 Plan structure

General administrative information regarding this non-agglomeration zone is presented in section 2.

Section 3 then presents the overall picture with respect to NO2 levels in this non-agglomeration zone for the2013 reference year of this air quality plan. This includes a declaration of exceedance situations within thenon-agglomeration zone and presentation of a detailed source apportionment for each exceedance situation.

3

This in

formati

on is

out o

f date

.

Page 5: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

An overview of the measures already taken and to be taken within the non-agglomeration zone both before andafter 2013 is given in section 4.

Baseline modelled projections for 2020, 2025 and 2030 for each exceedance situation are presented in section5. The baseline projections presented here include, where possible, the impact of measures that have alreadybeen taken and measures for which the relevant authority has made a firm commitment to implement. However,it has not been possible to quantify the impact of all the measures. This section therefore also explains whichmeasures have been quantified, and hence included in the model projections, and which measures have notbeen quantified.

2 General Information About the Zone

2.1 Administrative information

Zone name: West MidlandsZone code: UK0035Type of zone: non-agglomeration zoneReference year: 2013Extent of zone: Figure 1 shows the area covered by the West Midlands non-agglomeration zone.Local Authorities within the zone: Figure 2 shows the location of Local Authorities within the non-agglomerationzone. A list of these Local Authorities is also given below. The numbers in the list correspond to the numbersin Figure 2.

1. Birmingham City Council2. Bromsgrove District Council3. Cannock Chase District Council4. Coventry City Council5. Dudley Metropolitan Borough Council6. East Staffordshire Borough Council7. Herefordshire Council8. Lichfield City Council9. Malvern Hills District Council10. Newcastle-under-Lyme Borough Council11. North Warwickshire Borough Council12. Nuneaton and Bedworth Borough Council13. Redditch Borough Council14. Rugby Borough Council15. Sandwell Metropolitan Borough Council16. Shropshire Council17. Solihull Metropolitan Borough Council18. South Staffordshire District Council19. Stafford Borough Council20. Staffordshire Moorlands District Council21. Stoke-on-Trent City Council22. Stratford on Avon District Council23. Tamworth Borough Council24. Telford & Wrekin Council

4

This in

formati

on is

out o

f date

.

Page 6: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

25. Walsall Metropolitan Borough Council26. Warwick District Council27. Wolverhampton City Council28. Worcester City Council29. Wychavon District Council30. Wyre Forest District Council

(Note: Local Authority boundaries do not necessarily coincide with zone boundaries. Hence Local Authoritiesmay be listed within more than one zone plan.)

5

This in

formati

on is

out o

f date

.

Page 7: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure 1: Map showing the extent of the West Midlands non-agglomeration zone (UK0035).

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

Figure 2: Map showing Local Authorities within the West Midlands non-agglomeration zone (UK0035).

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

6

This in

formati

on is

out o

f date

.

Page 8: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

2.2 Assessment details

MeasurementsNO2 measurements in this zone were available in 2013 from the following national network monitoring stations(NO2 data capture for each station in 2013 shown in brackets):

1. Leamington Spa GB0643A (53%)2. Leamington Spa Rugby Road GB1018A (98%)3. Leominster GB0861A (81%)

Full details of monitoring stations within the West Midlands non-agglomeration zone are available from http://uk-air.defra.gov.uk/networks/network-info?view=aurn.

ModellingModelling for the 2013 reference year has been carried out for the whole of the UK. This modelling covers thefollowing extent within this zone:

• Total background area within zone (approx): 12,221 km2

• Total population within zone (approx): 2,713,684 people• Total road length where an assessment of NO2 concentrations has been made: 523 km in 2013 (andsimilar lengths in previous years)

Zone mapsFigure 3 presents the location of the NO2 monitoring stations within this zone for 2013 and the roads for whichNO2 concentrations have been modelled. NO2 concentrations at background locations have been modelledacross the entire zone at a 1 km x 1 km resolution.

7

This in

formati

on is

out o

f date

.

Page 9: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure 3: Map showing the location of the NO2 monitoring stations with valid data in 2013 and roadswhere concentrations have been modelled within the West Midlands (UK0035) non-agglomeration zone.

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

8

This in

formati

on is

out o

f date

.

Page 10: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

2.3 Reporting under European Directives

From 2001 to 2012 the UK has reported annually on air quality concentrations using a standard Excelquestionnaire (Decision 2004/461/EC). These questionnaires are available online from http://cdr.eionet.europa.eu/gb/eu/annualair. Since 2013 reporting has been via an e-reporting system (Decision 2011/850/EU)http://cdr.eionet.europa.eu/gb/eu/.

In addition, the UK has reported on air quality plans and programmes (Decision 2004/224/EC) since 2003.Historic plans and programmes are available on http://cdr.eionet.europa.eu/gb/eu/aqpp.

3 Overall Picture for 2013 Reference Year

3.1 Introduction

There are two limit values for the protection of health for NO2. These are:

• The annual limit value (annual mean concentration of no more than 40 µgm-3)• The hourly limit value (no more than 18 hourly exceedances of 200 µgm-3 in a calendar year)

Within the West Midlands non-agglomeration zone the annual limit value was exceeded in 2013. Hence, oneexceedance situation for this zone has been defined, NO2_UK0035_Annual_1, which covers exceedances ofthe annual limit value. This exceedance situation is described below.

3.2 Reference year: NO2_UK0035_Annual_1

The NO2_UK0035_Annual_1 exceedance situation covers all exceedances of the annual mean limit value inthe West Midlands non-agglomeration zone in 2013.

Compliance with the annual limit value in this exceedance situation has been assessed using a combinationof air quality measurements and modelling. Table 1 presents measured annual concentrations at nationalnetwork stations in this exceedance situation since the 1st Daughter Directive (1999/30/EC) came into forcein 2001. This shows that there were no measured exceedances of the annual limit value in this zone in 2013.Table 2 summarises modelled annual mean NO2 concentrations in this exceedance situation for the same timeperiod. This table shows that, in 2013, 43.3 km of road length was modelled to exceed the annual limit value.There were nomodelled background exceedances of the annual limit value. Maps showing the modelled annualmean NO2 concentrations for 2013 at background and at roadside locations are presented in Figures 4 and 5respectively. All modelled exceedances of the annual limit value are coloured orange or red in the maps.

The maximummeasured concentration in the zone varies due to changes in emissions and varying meteorologyin different years. However, the models are also updated each year to take into account the most up-to-datescience, so the modelled results for different years may not be directly comparable.

The modelling carried out for this exceedance situation has also been used to determine the annual mean NOxsource apportionment for all modelled locations. Emissions to air are regulated in terms of oxides of nitrogen(NOx), which is the term used to describe the sum of nitrogen dioxide (NO2) and nitric oxide (NO). AmbientNO2 concentrations include contributions from both directly emitted primary NO2 and secondary NO2 formedin the atmosphere by the oxidation of NO. As such, it is not possible to calculate an unambiguous sourceapportionment specifically for NO2 concentrations; therefore the source apportionment in this plan is presentedfor NOx, rather than for NO2 (for further details please see the UK Technical Report). Table 3 summarises the

9

This in

formati

on is

out o

f date

.

Page 11: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

modelled NOx source apportionment for the section of road with the highest modelled NO2 concentration in thisexceedance situation in 2013. This is important information because it shows which sources need to be tackledat the location with the largest compliance gap in the exceedance situation.

Figure B.1 in Annex B presents the annual mean NOx source apportionment for each section of road within theNO2_UK0035_Annual_1 exceedance situation (i.e. the source apportionment for all exceeding roads only) in2013. In this figure roads have been grouped into motorways, primary roads (major roads managed by localauthorities) and trunk roads (major roads managed by highways authorities).

10

This in

formati

on is

out o

f date

.

Page 12: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Table 1: Measured annual mean NO2 concentrations at national network stations in NO2_UK0035_Annual_1 for 2001 onwards, µgm-3 (a). Data captureshown in brackets.

Site name (EOI code) 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Leamington Spa(GB0643A)

31 (91) 29 (96) 33 (67) 25 (94) 25 (70) 20 (73) 25 (71) 27 (86) 27 (92) 28 (99) 21 (98) 21 (94) 23 (53)

Leamington Spa RugbyRoad (GB1018A)

17 (63) 22 (98)

Leominster (GB0861A) 14 (42) 12 (92) 13 (94) 11 (95) 11 (99) 15 (83) 10 (98) 9 (97) 9 (81)

(a) Annual Mean Limit Value = 40 µgm-3

Table 2: Annual mean NO2 model results in NO2_UK0035_Annual_1 for 2001 onwards.

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Road length exceeding (km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3

Background exceeding (km2) 22 7 14 0 0 0 0 0 2 10 1 1 0

Maximum modelledconcentration (µgm-3) (a)

70.4 64.0 74.6 74.6 83.7 77.6 76.8 86.5 83.5 92.8 73 78 60

(a) Annual Mean Limit Value = 40 µgm-3

11

This in

formati

on is

out o

f date

.

Page 13: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Table 3: Modelled annualmeanNOx source apportionment at the traffic count point with the highestmodelled concentration in 2013 in NO2_UK0035_Annual_1(µgm-3) (traffic count point 99234 on the A452; OS grid (m): 413880, 290300).

Spatial scale Component Concentration at highest road link (a)

Regional background sources NOx (i.e. contributions fromdistant sources of > 30 km from the receptor).

Total 10.8From within the UK 6.3From transboundary sources (includes shipping and other EUmember states)

4.5

Urban background sources NOx (i.e. sourceslocated within 0.3 - 30 km from the receptor).

Total 55.3From road traffic sources 30.9From industry (including heat and power generation) 4.4From agriculture NAFrom commercial/residential sources 3.4From shipping 0.0From off road mobile machinery 10.3From natural sources NAFrom transboundary sources NAFrom other urban background sources 6.3

Local sources NOx (i.e. contributions from sources< 0.3 km from the receptor).

Total 95.6From petrol cars 10.1From diesel cars 36.2From HGV rigid (b) 11.4From HGV articulated (b) 13.0From buses 11.4From petrol LGVs (c) 0.2From diesel LGVs (c) 13.3From motorcycles 0.1From London taxis 0.0

Total NOx (i.e. regional background + urban background + local components) 161.7Total NO2 (i.e. regional background + urban background + local components) 60

(a) Components are listed with NOx concentration of NA when there is no source from this sector.(b) HGV = heavy goods vehicle(c) LGV = light goods vehicle

12

This in

formati

on is

out o

f date

.

Page 14: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure 4: Map of modelled background annual mean NO2 concentrations 2013. Modelled exceedancesof the annual limit value are shown in orange and red.

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

Figure 5: Map of modelled roadside annual mean NO2 concentrations 2013. Modelled exceedances ofthe annual limit value are shown in orange and red.

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

13

This in

formati

on is

out o

f date

.

Page 15: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

4 Measures

4.1 Introduction

This section gives details of measures that address exceedances of the NO2 limit values within West Midlandsnon-agglomeration zone. This includes both measures that have already been taken and measures for whichthere is a firm commitment that they will be taken.

Section 5 then explains the extent to which it has been possible to incorporate the impacts of these measuresinto the baseline modelling carried out for this assessment.

4.2 Source apportionment

It is important to understand which sources are responsible for causing the exceedance in order to mosteffectively tailor measures to address the NO2 exceedance situation described in section 3 above. This can beachieved by considering the source apportionment for the exceedance situation, also presented in section 3. Asummary of what the source apportionment shows and the implications for which measures would therefore beappropriate is given here.

Local road traffic was the dominant source in this exceedance location in the reference year. The largestcontribution was from cars at the location of maximum exceedance with a contribution of 46.3 µgm-3 of NOxout of a total of 161.7 µgm-3 of NOx. Cars, articulated HGVs, rigid HGVs and LGVs were important sourceson the motorway roads with the highest concentrations in this exceedance situation. Cars, articulated HGVs,rigid HGVs, LGVs and on some roads buses were important sources on the primary roads with the highestconcentrations. Cars, articulated HGVs and rigid HGVs were important sources on the trunk roads with thehighest concentrations. For all road links concentrations of NOx from diesel cars were approximately four timesgreater than NOx emissions from petrol cars. NOx concentrations from petrol LGVs are a small component oftotal NOx concentrations and less than 2% of total NOx from LGVs.

This indicates that appropriate measures should impact on local road traffic sources in this zone. Othermeasures to address the urban background sources may also be beneficial.

4.3 Measures

Measures potentially affecting NO2 in this non-agglomeration zone have been taken and/or are planned at arange of administrative levels. These are:

• European Union• National (i.e. England, Scotland, Wales, Northern Ireland or whole UK)• Local (i.e. UK Local Authorities)

Details of European Union measures (e.g. Euro Standards, Fuel Quality Directives, Integrated PollutionPrevention and Control) can be found on the European Commission’s website (http://ec.europa.eu/environment/air/index_en.htm). Details of national measures are given in the UK overview document and the list of UK andnational measures.

Relevant Local Authority measures within this exceedance situation are listed in Table C.1 (see Annex C). TableC.1 lists measures which a local authority has carried out or is in the process of carrying out, plus additional

14

This in

formati

on is

out o

f date

.

Page 16: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

measures which the local authority is committed to carrying out or is investigating with the expectation of carryingout in the future.

There are common themes throughout the non-agglomeration zone on the type of measures identified by localauthorities to achieve improved air quality. The main themes focus on improving emissions and concentrationsof pollutants by encouraging transport modal shift from using private cars to more sustainable methods oftransport such as cycling and walking. There are some low emission strategies in place so that the vehicle fleetcan be transformed into using greener fuels and technology.

Park and rides will also help to improve air quality as it will reduce car use as will improvements to bus emissionsthrough fleet renewal. This will involve transformation to using electric vehicles.

4.4 Measures timescales

Timescales for national measures are given in the UK overview document and list of UK and national measures.

Local Authorities report on progress with the implementation of their action plans annually and review actionplan measures regularly. Information on local measures was collected in February/March 2015. Hence, anyLocal Authority action plans and measures adopted by Local Authorities after this time have not been includedin this air quality plan, unless additional information was provided during the consultation process.

The reference year for this air quality plan is 2013. Where measures started and finished before 2013, then theimprovement in air quality resulting from these measures will have already taken place before the referenceyear and the impact of these measures will have been included in the assessment where the measure has hadan impact on the statistics used to compile the emission inventory. Many measures started before the referenceyear and will continue to have a beneficial impact on air quality well beyond the reference year. Measures with astart date before 2013 and an end date after 2013 may have an impact on concentrations in the reference yearand a further impact in subsequent years. Where the Status column in Annex C is ‘Implementation’, this showsthat this measure is already underway or that there is a commitment for this measure to go ahead. Where theStatus is ‘Planning’, ‘Preparation’ or ‘Other’ the level of commitment is less clear and it is possible some of thesemeasures may not go ahead.

5 Baseline Model Projections

5.1 Overview of model projections

Model projections for 2020, 2025 and 2030, starting from the 2013 reference year described in section 3, havebeen calculated in order to determine when compliance with the NO2 limit values is likely to be achieved onthe basis of EU, regional and local measures currently planned. Details of the methods used for the baselineemissions and projections modelling are provided in the UK technical report.

For national measures, it has not been possible to quantify the impact of all measures on emissions and ambientconcentrations. The impact for all quantifiable measures has been included in the baseline projections.

The impacts of the individual Local Authority measures have not been explicitly included in the baseline modelprojections. However, measures may have been included implicitly if they have influenced the traffic countsfor 2012 (used as a basis for the compilation of the emission inventory) or in the traffic activity projections to2020 and beyond (used to calculate the emissions projections). It should be recognised that these measureswill have a beneficial impact on air quality, even if it has not been possible to quantify this impact here.

15

This in

formati

on is

out o

f date

.

Page 17: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

5.2 Baseline projections: NO2_UK0035_Annual_1

Table 4 presents summary results for the baseline model projections for 2020, 2025 and 2030 for theNO2_UK0035_Annual_1 exceedance situation. This shows that the maximum modelled annual mean NO2

concentration predicted for 2020 in this exceedance situation is 39 µgm-3. Hence, the model results suggestthat compliance with the NO2 annual limit value is likely to be achieved before 2020 under baseline conditionsin this exceedance situation.

Figures 6 and 7 show maps of projected annual mean NO2 concentrations in 2020, 2025 and 2030 forbackground and roadside locations respectively. Maps for 2013 are also presented here for reference.

It should be noted that the baseline projections presented here include the impacts of some measures, wherethey can be quantified, that have already been or will be implemented.

16

This in

formati

on is

out o

f date

.

Page 18: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Table 4: Annual mean NO2 model results in NO2_UK0035_Annual_1.

2013 2020 2025 2030

Road length exceeding (km) 43.3 0.0 0.0 0.0

Background exceeding (km2) 0 0 0 0

Maximum modelled concentration NO2

(µgm-3) (a)60 39 32 30

Corresponding modelled concentration NOx(µgm-3) (b)

162 93 74 67

(a) Annual Mean Limit Value = 40 µgm-3

(b) NOx is recorded here for comparison with the NOx source apportionment graphs for 2013 presented in Annex B of this plan.Limit values for EU directive purposes are based on NO2.

17

This in

formati

on is

out o

f date

.

Page 19: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure 6: Background baseline projections of annual mean NO2 concentrations in 2020, 2025 and 2030. 2013 is also included here for reference. Modelledexceedances of the annual limit value are shown in orange and red.

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

18

This in

formati

on is

out o

f date

.

Page 20: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure 7: Roadside baseline projections of annual mean NO2 concentrations in 2020, 2025 and 2030. 2013 is also included here for reference. Modelledexceedances of the annual limit value are shown in orange and red.

© Crown copyright. All rights reserved Defra, License number 100022861 [2015]

19

This in

formati

on is

out o

f date

.

Page 21: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Annexes

A References

Air Quality Expert Group (AQEG, 2004). Nitrogen Dioxide in the United Kingdom. http://uk-air.defra.gov.uk/library/aqeg/publications

Decision 2004/224/EC. Commission Decision of 20 February 2004 laying down arrangements for thesubmission of information on plans or programmes required under Council Directive 96/62/EC in relation tolimit values for certain pollutants in ambient air. From the Official Journal of the European Union, 6.3.2004, Enseries, L68/27

Decision 2004/461/EC. Commission Decision of 29 April 2004 laying down a questionnaire to be used forannual reporting on ambient air quality assessment under Council Directives 96/62/EC and 1999/30/EC andunder Directives 2000/69/EC and 2002/3/EC of the European Parliament and of the Council. From the OfficialJournal of the European Union, 30.4.2004, En series, L156/78

Decision 2011/850/EU Commission Implementing Decision of 12 December 2011 laying down rules forDirectives 2004/107/EC and 2008/50/EC of the European Parliament and of the Council as regards thereciprocal exchange of information and reporting on ambient air quality. From the Official Journal of theEuropean Union, 17.12.2011,En series, L335/86

CDR Central Data Repository. http://cdr.eionet.europa.eu/

Air Quality Directive 2008/50/EC. Council Directive 2008/50/EC, of 21 May 2008. On ambient air quality andcleaner air for Europe. From the Official Journal of the European Union, 11.6.2008, En series, L152/1

1st Daughter Directive 1999/30/EC. Council Directive 1999/30/EC, of 22 April 1999 relating to limit values forsulphur dioxide, nitrogen dioxide and oxides of nitrogen, particulate matter and lead in ambient air (The FirstDaughter Directive). From the Official Journal of the European Communities, 29.6.1999, En Series, L163/41.

UK overview document, List of UK and National Measures and the UK technical report are available at: http://www.gov.uk/defra.

20

This in

formati

on is

out o

f date

.

Page 22: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

B Source apportionment graphs

Page left blank.

21

This in

formati

on is

out o

f date

.

Page 23: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Figure B.1: Annual mean roadside NOX source apportionment plots for all roads exceeding the annual mean NO2 limit value in 2013.

'MU

', 'M

6', 8

437,

54

'MU

', 'M

6', 7

3318

, 52

'MU

', 'M

5', 7

3920

, 51

'MU

', 'M

6', 1

6027

, 49

'MU

', 'M

6', 3

8071

, 48

'MU

', 'M

6', 7

3921

, 44

'PU

', 'A

452'

, 992

34, 6

0

'PU

', 'A

45',

9917

5, 5

0

'PU

', 'A

34',

1633

0, 4

8

'PU

', 'A

452'

, 271

92, 4

6

'PU

', 'A

461'

, 372

47, 4

5

'PU

', 'A

444'

, 649

1, 4

4

'PU

', 'A

4041

', 56

980,

44

'PU

', 'A

444'

, 387

96, 4

4

'PU

', 'A

4082

', 71

03, 4

3

'PU

', 'A

41',

6450

, 43

'PU

', 'A

45',

1644

6, 4

3

'PU

', 'A

4114

', 27

132,

43

'PU

', 'A

444'

, 733

19, 4

2

'PU

', 'A

444'

, 480

81, 4

1

'PU

', 'A

34',

3636

4, 4

1

'PU

', 'A

38',

3831

2, 4

1

'TU

', 'A

50',

9932

9, 5

6

'TU

', 'A

500'

, 754

18, 5

5

'TU

', 'A

50',

7748

4, 5

3

'TU

', 'A

500'

, 754

21, 5

2

'TU

', 'A

500'

, 577

83, 5

1

'TU

', 'A

500'

, 181

31, 4

9

'TU

', 'A

38',

6388

, 43

'TU

', 'A

5', 2

6136

, 42

London taxisMotorcyclesLGVs dieselLGVs petrolBusesHGVa

HGVrCars dieselCars petrolUB: TrafficUB: Non trafficRegional background

Mod

elle

d N

Ox

conc

entr

atio

n (N

Ox

as N

O2,

µgm

−3)

050

100

150

200

250

300

West Midlands (UK0035): 2013

Road class (MU = motorway, PU = primary road, TU = trunk road), road number, census id 12 and modelled NO2 concentration (µgm−3)

22

This in

formati

on is

out o

f date

.

Page 24: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

C Tables of measures

Page left blank.

23

This in

formati

on is

out o

f date

.

Page 25: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Table C.1 Relevant Local Authority measures within West Midlands (UK0035)

Measure code Description Focus Classification Status Other information

Birmingham City Council_AQAP 1-1 Feasibility Study into a Low EmissionZone within City Centre

Reduce emissions from vehicleswithin a geographically specified area

Traffic planning and management:Low emission zones

Evaluation Start date: 2013Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Exclusion of all vehicleswithin a specific area that do not meetEuro 6 (or equivalent) emissions limitsTarget emissions reduction: No target

Birmingham City Council_AQAP 1-2 LEZ Trial to demonstrate operationsand define parameters

Reduce emissions from vehicleswithin a geographically specified area

Traffic planning and management:Low emission zones

Evaluation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Exclusion of all vehicleswithin a specific area that do not meetEuro 6 (or equivalent) emissions limitsTarget emissions reduction: No target

Birmingham City Council_AQAP 3 Extend the network of Red Routesand assess effectiveness

Improve traffic management on busyroutes into and out of city

Traffic planning and management:Management of parking places

Implementation Start date: 2014Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: Improved vehicle journeytimes and reliability. Less congestion inspecific areas.Target emissions reduction: No target

Birmingham City Council_AQAP 4-1 Highway Improvements to promoteeffective traffic management

Improve road capacity and trafficmanagement within a specific area

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Improved vehicle journeytimes. Less congestion in specific areaTarget emissions reduction: No target

Birmingham City Council_AQAP 5 Development of Air quality &Planning policy

Planning applications assessed in astrategic manner for impact on localair quality

Other measure: Other measure Implementation Start date: 2005Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Strategic, consistent andtransparent approach to assessingplanning applications on AQ groundsTarget emissions reduction: No target

24

This in

formati

on is

out o

f date

.

Page 26: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_AQAP 6 Regulation of Industry underEnvironmental Permitting regime

Industry regulated underEnvironmental Permitting regime

Permit systems and economicinstruments: Other measure

Implementation Start date: 2005Expected end date: 2030Spatial scale: LocalSource affected: Industry includingheat and power productionIndicator: Annual Defra returnTarget emissions reduction: No target

Birmingham City Council_AQAP 8 To increase the number and use ofpark & ride schemes in accord withthe CENTRO Environment Strategy2009-2014

Extend number of spaces at KingsNorton Car Park.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2009Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Increase in Park & RideusageTarget emissions reduction: No target

Birmingham City Council_AQAP 9-1 Improvement of the council fleet To improve the council run fleet toelectric/LPG or low emission vehiclesthrough a procurement policy

Public procurement: Other measure Implementation Start date: 2012Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: Replacement of council fleetvehicles through procurement strategyTarget emissions reduction: No target

Birmingham City Council_AQAP 10-1 Support the CABLED project as astaging point for the furtherdevelopment of ultra-low carbonvehicles and supportinginfrastructure

To engage with partners to introducethe infrastructure for electric or LPGgas powered vehicles

Public procurement: Other measure Implementation Start date: 2012Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Infrastructure to encouragethe use of electric and gas poweredvehiclesTarget emissions reduction: No target

Birmingham City Council_AQAP 11 Support the programme forreplacement buses as outlined byCENTRO’s Environmental Strategy2009-2014

To engage with partners to introducea bus quality partnership. The aim ofwhich will be the introduction of lowemission vehicles over a period oftime

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2012Expected end date: 2022Spatial scale: Whole town or citySource affected: TransportIndicator: Replacement of the bus fleetwith low emitting vehiclesTarget emissions reduction: No target

Birmingham City Council_AQAP 12-1 Development of a Taxi EmissionStrategy

To introduce a Taxi emission policylinked to emissions.

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2016Expected end date: 2020Spatial scale: Whole town or citySource affected: TransportIndicator: Replacement of taxi fleet withvehicles with low emissionsTarget emissions reduction: No target

25

This in

formati

on is

out o

f date

.

Page 27: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_AQAP 9-2 Improvement of the Council fleet - EV Introduction of EV vehicles Public procurement: New vehicles,including low emission vehicles

Preparation Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Delivery of 7 new EV andassociated infrastructureTarget emissions reduction: No target

Birmingham City Council_AQAP 10-2 Feasibility study covering thedevelopment of gas infrastructure - 4sites

Region wide gas infrastructure tosupport public and private sector viaOLEV funding

Public procurement: Other measure Preparation Start date: 2015Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

Birmingham City Council_AQAP 10-3 Delivery of gas refuellinginfrastructure - 4 sites

Region wide gas infrastructure tosupport public and private sector viaOLEV funding

Public procurement: Other measure Planning Start date: 2016Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Delivery of 4 gas refuellingsites (dependent upon the FS)Target emissions reduction: No target

Birmingham City Council_AQAP 10-4 Engineering study into H2 supply andrefuelling facilities for bus fleet

Feasibility into conversion of busesto H2

Public procurement: Other measure Planning Start date: 2014Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

Birmingham City Council_AQAP 10-5 Delivery of H2 refuellinginfrastructure

H2 infrastructure to support bus fleet Public procurement: Other measure Planning Start date: 2017Expected end date: 2018Spatial scale: Whole agglomerationSource affected: TransportIndicator: Delivery of refuelling depot(dependent upon the FS)Target emissions reduction: No target

Birmingham City Council_AQAP 10-6 Climate KIC funded Engineeringstudy into EV supply and refuellingfacilities for bus fleet

Feasibility into infrastructure tosupport EV bus conversion /purchase

Public procurement: Other measure Planning Start date: 2015Expected end date: 2016Spatial scale: Whole agglomerationSource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

Birmingham City Council_LETCP1 Development of a regional LES To develop a regional LES toshowcase good practice and providea road map for future action

Other measure: Other measure Preparation Start date: 2012Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Completion of LESTarget emissions reduction: No target

26

This in

formati

on is

out o

f date

.

Page 28: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_LETCP2 Development of a Best PracticeGuidance on Air Quality andProcurement

To devise a policy for using theprocurement power of a LA toincentivise the uptake of cleanervehicle technology

Other measure: Other measure Implementation Start date: 2012Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Completion of BPGTarget emissions reduction: No target

Birmingham City Council_LETCP3 Development of a Best PracticeGuidance on Air Quality andPlanning

To devise a policy for using theplanning process to reduce theimpact from transport basedemissions arising from newdevelopment

Other measure: Other measure Implementation Start date: 2012Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Completion of BPGTarget emissions reduction: No target

Birmingham City Council_AQAP 10-7 OLEV City Scheme to fund regionalcharging infrastructure

To provide a WM wide charginginfrastructure consideringinteroperability, universal access,park & ride, grid balancing.

Public procurement: Other measure Planning Start date: 2014Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Estimate strategic installationof 40 charging points (rapid / 4 hrcombination) combined with park andride facilitiesTarget emissions reduction: No target

Birmingham City Council_CENTRO1 Develop a new Statutory Bus QualityPartnership Scheme

To update the existing SBQPS toimprove the bus fleet entering thecity centre in line with outputs fromthe LEZ TFS (AQAP1)

Public procurement: New vehicles,including low emission vehicles

Preparation Start date: 2014Expected end date: 2016Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduce the number of higheremitting buses entering the city centrefocusing on Euro IV and Euro IV orconvertedTarget emissions reduction:Comparison with existing SBQPS

Birmingham City Council_AQAP 10-8 Feasibility Study to support thedevelopment of car clubs inemployment areas for SME take up

Car clubs for SME in employmentareas where access to parkinginfrastructure restricted.

Other measure: Other measure Planning Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

Birmingham City Council_Freight 1 Feasibility Study under Horizon 2020in partnership with IBM to identifysites suitable for freight consolidationcentres

Consideration of ‘crowd sourcing’technology to route plan HGVmovements to show most suitablelocations for freight centre

Traffic planning and management:Freight transport measure

Planning Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

27

This in

formati

on is

out o

f date

.

Page 29: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_Rail 1 HS2 rail development including newstation in the City centre

HS2 rail Traffic planning and management:Improvement of public transport

Planning Start date: 2017Expected end date: 2026Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of HS2Target emissions reduction: No target

Birmingham City Council_Taxi 1 Increase LPG refuellinginfrastructure for Hackney Carriages

Double LPG refuelling depots forHackney Carriages from 6 to 12

Public procurement: Other measure Planning Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase the number of LPGrefuelling sites for Hackney CarriagesTarget emissions reduction: No target

Birmingham City Council_Taxi 2 Conversion of taxis to LPG Conversion of 80 taxis from diesel toLPG

Public procurement: Other measure Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Convert 80 taxis from dieselto LPGTarget emissions reduction: No target

Birmingham City Council_AQAP 10-9 Installation of rapid recharginginfrastructure in shopping centres

8 new rapid recharging points inshopping centres

Public procurement: Other measure Planning Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Delivery of 8 new rapidcharging pointsTarget emissions reduction: No target

Birmingham City Council_AQAP 12-2 Incentivising cleaner taxi usage atNew Street Station

Priority parking scheme for LE taxisat New Street Station

Public procurement: Other measure Preparation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Scheme establishedTarget emissions reduction: No target

Birmingham City Council_Water 1 Feasibility study to support the use ofthe waterways to transport waste toenergy centres

Use of canals to transport waste forenergy conversion

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of FSTarget emissions reduction: No target

Birmingham City Council_AQAP 4-2 Major scheme works (£26 million) toupgrade signalling to improve trafficflow.

Scoot & Mover projects.Consideration of further bus andfreight prioritisation.

Traffic planning and management:Other measure

Implementation Start date: 2015Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Continued improvementsTarget emissions reduction: No target

28

This in

formati

on is

out o

f date

.

Page 30: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_ROAD 1 Trial of 20mph zones Smooth traffic flow and promotesafety

Traffic planning and management:Reduction of speed limits and control

Implementation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Completion of trialsTarget emissions reduction: No target

Birmingham City Council_ROAD 2 Workplace parking levy Incentivise modal shift Traffic planning and management:Management of parking places

Implementation Start date: 2017Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Introduction of schemeTarget emissions reduction: No target

Birmingham City Council_POLICY 1 Free on-street parking / charging forEV users

Incentivise the uptake of cleanervehicle technology

Other measure: Other measure Implementation Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Policy positionTarget emissions reduction: No target

Birmingham City Council_POLICY 2 Birmingham Connected Umbrella policy for all transportplanning activity across the cityunderpinned by the BirminghamConnected White Paper

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Various indicatorsTarget emissions reduction: No target

Birmingham City Council_LETCP 4 Continuance of the LETCP acrossthe WM Urban Area (7 localauthorities)

Policy guidance and regional workingacross many different professionalfields

Other measure: Other measure Implementation Start date: 2012Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Continued workingTarget emissions reduction: No target

Birmingham City Council_POLICY 3 Midlands Connect InfrastructureStrategy covering the West & EastMidlands

Lobbying of Government to promoteinvestment in transport sectors topromote economic growth andsustainability

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Economic Growth as a resultof strategic transport investmentTarget emissions reduction: N/A

29

This in

formati

on is

out o

f date

.

Page 31: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_FREIGHT2

Development of freight partnershipfor city centre deliveries

Joint working with Colmore BID toconsolidate deliveries andprocurement to combine orders andreduce deliveries

Traffic planning and management:Freight transport measure

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Reduction in number ofservicing and logistics vehicles enteringBID. Reduced traffic flows, air qualitybenefits etc.Target emissions reduction: N/A

Birmingham City Council_RAIL 2 Reinstatement of Camp Hill andSutton Park rail lines

Lobbying of DfT and Network Rail toreopen lines, including 7 new stations

Traffic planning and management:Improvement of public transport

Planning Start date: 2014Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Mode shift to rail.Target emissions reduction: N/A

Birmingham City Council_RAIL 3 Upgrading of University andLongbridge stations

Improving the rail stations to promotemodal shift

Traffic planning and management:Improvement of public transport

Preparation Start date: 2016Expected end date: 2019Spatial scale: LocalSource affected: TransportIndicator: Completion of upgradesTarget emissions reduction: No target

Birmingham City Council_CYCLE 1 Birmingham Cycle Revolution (BCR)- £60 million to upgrade infrastructure

Improve infrastructure (new cycleroutes) to promote cycling

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2015Expected end date: 2019Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of BCRprogrammeTarget emissions reduction: No target

Birmingham City Council_CYCLE 2 Big Birmingham Bikes 5000 new bikes for deprived areas ofcity

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of BCRprogrammeTarget emissions reduction: No target

Birmingham City Council_POLICY 4 Feasibility Study into mechanism formonitoring / enforcing workplacetravel plans

Workplace travel plans monitoringand enforcement

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2017Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of FeasibilityStudyTarget emissions reduction: No target

30

This in

formati

on is

out o

f date

.

Page 32: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Birmingham City Council_WALK 1 Walking Cities Fund of £2 million topromote walking

Engagement with schools toencourage walking and adjust travelpatterns

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Various - number of walkingtrips and distance, air quality, CO2Target emissions reduction: No target

Birmingham City Council_WALK 2 Improvement to public rights of way Mapping to identify requiredimprovement to public rights of way

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Various - number of walkingtrips and distance, air quality, CO2Target emissions reduction: No target

Bromsgrove District Council_5.1.1 Alteration to phasing of traffic lightsystems

Traffic exiting from junction causesdelays in traffic flow in both directionsalong the A38. Proposed action is tomake junction no right turn.

Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Decrease in obstruction totraffic flowTarget emissions reduction: 0.01

Bromsgrove District Council_5.2.2 Freight Quality Partnership Encourage freight vehicles to avoidAQMA and find alternative routes

Traffic planning and management:Freight transport measure

Planning Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased in freightmovements through AQMATarget emissions reduction: 2-5%

Bromsgrove District Council_KR5 Significant queuing traffic observedin both directions on A456 headingfor A491 Stourbridge Road. Action -junction review

Propose WCC undertake a junctionreview to ascertain improvements tocurrent and future predicted flows

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Reduction in number ofqueuing vehiclesTarget emissions reduction: 0.01

Bromsgrove District Council_5.1.8 Introduction of traffic signals atroundabouts

Introduction of traffic signals atroundabouts to improve traffic flow.Traffic flow held at more strategicpoint to improve flow through theAQMA.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flowTarget emissions reduction: 0.01

31

This in

formati

on is

out o

f date

.

Page 33: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Bromsgrove District Council_5.1.4 Variable Message Signage (includetraffic info, car park info, bus and railconnection info etc.) Could be usedin combination with Park and Rideschemes etc.

Use of VMS to encourage use ofalternative modes of transport ordirect drivers to car parks withspaces to avoid unnecessaryjourneys between car parks

Traffic planning and management:Other measure

Other Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Decreased in trafficmovements through AQMATarget emissions reduction: 0.01

Bromsgrove District Council_5.5.4 Encourage developers to providesustainable transport facilities andlinks serving new developments

Encourage and facilitate uptake ofsustainable modes of transportwhere new developments areproposed

Other measure: Other measure Preparation Start date: 2013Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Greater provision ofsustainable transport facilities and linksservicing new developmentsTarget emissions reduction: 0.01

Bromsgrove District Council_5.3.2 Encourage car sharing Promote car sharing services withinBromsgrove

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number of peoplecar sharingTarget emissions reduction: 0.01

Bromsgrove District Council_5.2.5 Greening Council and BusinessFleets

Secure use of “cleaner” fuels/higherEuro standard vehicles for Counciland Business fleets. Support bid forinstallation of CNG facility inWorcestershire

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Increase in number ofCouncil and business fleet vehicles ofhigher Euro Standard and/or utilisingalternative fuelsTarget emissions reduction: 0.01

Bromsgrove District Council_5.2.10 Installing electric vehicle chargingpoints

Encourage and facilitate use ofelectric vehicles through provision ofcharging points in city

Other measure: Other measure Preparation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Increase in availability of EVcharging points and correspondingincrease in use of electric vehiclesTarget emissions reduction: 0.01

32

This in

formati

on is

out o

f date

.

Page 34: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Bromsgrove District Council_5.5.3 Encourage uptake of employer andresidential travel plans for majoremployers and new developments toarea

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: 0.01

Bromsgrove District Council_5.3.1 Travel Planning Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: 0.01

Bromsgrove District Council_5.4.5 Raise the profile and increaseawareness of air quality within theregion

Publication campaign relating to airquality to publicise and raiseawareness of air quality and itsimplications

Public information and Education:Other mechanisms

Evaluation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased awareness atDistrict, County and general publiclevels of air quality issues across theCountyTarget emissions reduction: 0.01

Bromsgrove District Council_5.3.9 Smarter Choices - Choose How YouMove marketing initiatives

Use of marketing and informationmethods to encourage use ofsustainable travel modes andtypically include workplace, school,residential, community, travelplanning, car sharing and clubs, andawareness raising campaigns

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour towardsmore sustainable modes of transport.Target emissions reduction: 0.01

Bromsgrove District Council_5.4.4 Make air quality information moreavailable and accessible

WRS to make all air qualitydocuments available to the generalpublic for access from the website

Public information and Education:Internet

Evaluation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved availability of airquality information. More informationproactively published on website.Target emissions reduction: 0.01

33

This in

formati

on is

out o

f date

.

Page 35: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Bromsgrove District Council_5.5.1 Produce Air Quality SupplementaryPlanning Document

Document providing transparent andconsistent advice to developmentcontrol departments and developersrelating to air quality

Other measure: Other measure Preparation Start date: 2015Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Formally adopted and utilisedAQ SPD at all six LPAs acrossWorcestershireTarget emissions reduction: 0.01

Bromsgrove District Council_5.6.3 Air Quality Networks Group of councils working inpartnership to address air qualityissues across those areas

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved cross boundaryworking between local authorities inWorcestershireTarget emissions reduction: 0.01

Bromsgrove District Council_5.6.8 Forge closer links with local healthagencies

Aiming to forge partnership with localhealth authorities such as PublicHealth England to improveknowledge and understanding oflocal air quality and associatedhealth risks

Other measure: Other measure Other Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Participation of relevanthealth agencies in the WorcestershireAir Quality Steering GroupTarget emissions reduction: 0.01

Bromsgrove District Council_5.3.4 Promote flexible workingarrangements

Promotion of flexible workingarrangements with local businessesto include working from homeopportunities, staggered start timesetc.

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in use of flexibleworking arrangements with localbusinesses.Target emissions reduction: 0.01

Bromsgrove District Council_5.3.8 Promote and support walking andcycling initiatives in Worcestershire

Initiative to encourage the uptake ofwalking and cycling by promoting thebenefits using various packagessuch as The Chose How You MoveInitiative

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Change in behaviour to moresustainable modes of transporte.g. walking, cycling, public transportTarget emissions reduction: 0.01

34

This in

formati

on is

out o

f date

.

Page 36: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Bromsgrove District Council_LE6 Traffic exiting Barnsley Hall Roadright. Action - no right turn restriction

Traffic exiting from junction causesdelays in traffic flow in both directionsalong the A38. Proposed action is tomake junction no right turn.

Traffic planning and management:Other measure

Other Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Decrease in obstruction totraffic flowTarget emissions reduction: 0.01

Bromsgrove District Council_LE7 Turning right into Harvester PH fromA38 south. Action - no right turnrestriction

Traffic turning right into Harvester PHfrom the A38 causes a delay in trafficflow

Traffic planning and management:Other measure

Other Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flow andreduction in NO2Target emissions reduction: 0.01

Bromsgrove District Council_LE4 Narrowing of two lanes into onecauses bottleneck at top of A38south. Action - junction review

Two lanes changing into one at thetop of the A38 southbound causingbottleneck and slowing of traffic.Action is to review and improve trafficsystem.

Traffic planning and management:Other measure

Other Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flow andreduction in NO2Target emissions reduction: 0.03

Bromsgrove District Council_NABD1 Expansion of motorway junction Major expansion to junction toaccommodate volume of traffic

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Expansion of junctionTarget emissions reduction: 5-10%

Bromsgrove District Council_NABD2 Investment in capacity enhancementof the A38 (Bromsgrove EasternBypass) Corridor

As part of the Bromsgrove DistrictPlan and Worcestershire StrategicEconomic Plan, it has been identifiedthat major investment will be requiredin the A38 Bromsgrove EasternBypass to support developmentgrowth and improve the efficiency ofthis corridor.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Improvement of A38Bromsgrove Eastern BypassTarget emissions reduction: 5-10%

Bromsgrove District Council_NABD3 Stopping up of the B4096 (AlcesterRoad/Old Birmingham Road)

The B4096 leads to residential areaseither side of Junction 1 of the M42.Stopping up these accesses couldsignificantly improve the efficiency ofthis junction, by reducing theaccesses to the roundabout to onlyfour arms.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Removal of B4096 fromJunction 1 of the M42Target emissions reduction: 2-5%

35

This in

formati

on is

out o

f date

.

Page 37: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Bromsgrove District Council_RR7 Two in road bus stops oncarriageway either side of centralstreet canyon

Move to further along the road withmore desirable pull in places

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: New location of bus stops,reduction in queuing trafficTarget emissions reduction: 0.01

Bromsgrove District Council_WR3 Zebra crossing at HanoverStreet/Worcester Road causescongestion

Replace zebra crossing withfootbridge if considered feasible

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flow in area.Increased number of pedestrians usingfootbridge.Target emissions reduction: 0.02

Bromsgrove District Council_WR9 Local and school traffic causescongestion exiting Shrubbery Roadjunction. Action - junction review

Propose WCC undertake a junctionreview to ascertain improvements tocurrent and future predicted flows.Also relates to generic action ofschool travel plan

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flow in areaof Shrubery Road junction.Target emissions reduction: 0.01

Cannock Chase District Council_1 Junction Improvements atChurchbridge traffic island, A5

Reduced congestion will reduceemissions from the east bound laneof the A5 in Bridgtown, wherestanding traffic is in close proximity toresidential property frontages. This inturn will hopefully improve air quality.Completion is due by summer 2015.

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Completion by Summer 2015Target emissions reduction: Notidentified. Likely to have moderateeffect on congestion and air quality onapproach roads. Approx 1ug/m3.

Cannock Chase District Council_2 ECO Stars Fleet RecognitionScheme

Reduce commercial fleet emissions Other measure: Other measure Preparation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Membership ofTarget emissions reduction: Based onother ECO Stars schemes, estimatedemission reductions of 14 tonnes NOx /yr 0.55 tonnes PM10 / yr 1428 tonnesCO2 /yr can be expected for district.

36

This in

formati

on is

out o

f date

.

Page 38: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Cannock Chase District Council_3 Work with partners to encourageoptimal utilisation of the M6toll road

Remove HGVs from AQMA on A5 Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Vehicle countsTarget emissions reduction: Notidentified.

Cannock Chase District Council_4 Junction Improvements at A5 /Walkmill Lane / North Street junction

Remove right hand turn, therebyproviding lane for through traffic,positioned further from residentialproperties.

Traffic planning and management:Other measure

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Completion of improvements.Target emissions reduction: >1 ug/m3reduction at receptor location. Emissionreduction not calculated.

Cannock Chase District Council_5 Publicise VOSA ‘Smoky VehicleHotline’

Addressing excessive particulateemissions from individual vehicles

Public information and Education:Internet

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: None available. VOSAunable to provide relevant data.Target emissions reduction: Small - Notquantifiable

Cannock Chase District Council_6 Staffordshire Share-a-Lift Scheme Encourage car sharing forcommuters

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: None.Target emissions reduction: Small - Notquantified.

Cannock Chase District Council_7 Review of the road hierarchy andspeed limits.

Improve traffic flow and address roadsafety issues

Traffic planning and management:Reduction of speed limits and control

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Not known.Target emissions reduction: Small - Notquantified.

Cannock Chase District Council_8 Encourage Provision of Cycleways Modal shift from motor vehicles Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: NoneTarget emissions reduction: Small - Notquantified

37

This in

formati

on is

out o

f date

.

Page 39: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Cannock Chase District Council_9 Develop a design guidance for localdevelopers in the Churchbridge toLongford area.

Planning Department led initiative togenerally improve the environment inthe vicinity of the AQMA.

Other measure: Other measure Preparation Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: Other, please specifyIndicator: NoneTarget emissions reduction: Small - Notquantified.

Cannock Chase District Council_10 Control industrial emissions throughcurrent regulatory system.

Control industrial emissions Permit systems and economicinstruments: Other measure

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: Industry includingheat and power productionIndicator: Statutory requirementsTarget emissions reduction: Notidentified

Cannock Chase District Council_11 LDV/HDV advice on routing Provision of vehicle operated signalsat Churchbridge Traffic Islands toencourage traffic to use Lodge Lanein preference to A5 at busy times:Highways Agency to consider /model potential benefits and tocontinue to work to secure fundingfor this option.

Traffic planning and management:Other measure

Implementation Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Completion of schemeTarget emissions reduction: Notidentified

Coventry City Council_1 Cycle Coventry New cycle routes, parking Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cyclingTarget emissions reduction: N/A

Coventry City Council_2 Pinch Point Road Junction improvements Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2015Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_3 Investment in Urban Traffic Control(UTMC)

Hi-tech traffic managementtechnology

Traffic planning and management:Other measure

Implementation Start date: 2010Expected end date: 2014Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

38

This in

formati

on is

out o

f date

.

Page 40: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_4 Junction A45/Kenilworth Roadimprovements

Upgrade has reduced congestion atbusy junction

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduced traffic congestionTarget emissions reduction: N/A

Coventry City Council_5 Ring road junction 1 improvements Improve traffic flow andpedestrian/cycle crossing at busyjunction 1

Traffic planning and management:Other measure

Planning Start date: 2014Expected end date: 2016Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_6 Public Realm City Centre sustainable travelinitiative

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

Coventry City Council_7 NUCKLE Improved rail services on majorcommuter corridor

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2015Spatial scale: NationalSource affected: TransportIndicator: Increased rail journeysTarget emissions reduction: N/A

Coventry City Council_8 Whitley bridge construction Reduce queuing at Jaguar/LandRover site

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2015Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_9 Friargate bridge construction New bridge deck over ring road forsustainable travel

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

Coventry City Council_10 Coventry Station Access Scheme Access improvements to encouragerail use

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2019Spatial scale: Whole agglomerationSource affected: TransportIndicator: Increased rail journeysTarget emissions reduction: N/A

39

This in

formati

on is

out o

f date

.

Page 41: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_11 Electric vehicles On-going trial of Low emissionsvehicles within the City Councils fleetsuch as electric cars and hybridtechnology

Public procurement: New vehicles,including low emission vehicles

Implementation Start date: 2010Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased LEV journeysTarget emissions reduction: N/A

Coventry City Council_12 Park and Ride South Reduce car use. The servicecurrently uses electric buses.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2009Expected end date: 2010Spatial scale: Whole agglomerationSource affected: TransportIndicator: Decreased car journeysTarget emissions reduction: N/A

Coventry City Council_13 M6 Active Traffic Management Joint working to reduce trafficcongestion

Traffic planning and management:Other measure

Implementation Start date: 2010Expected end date: 2015Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_14 Tollbar Island Reconstruction Joint working to reduce queuing onA46/A45.

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2016Spatial scale: NationalSource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_15 Heatline Low carbon energy from waste Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduced Carbon/NO2Target emissions reduction: N/A

Coventry City Council_16 Electric City Charging points, driverless carinitiatives

Public procurement: Other measure Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Increased LEV journeysTarget emissions reduction: N/A

Coventry City Council_17 Greener City Green spine to City Centre -promoting walking, cycling

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

40

This in

formati

on is

out o

f date

.

Page 42: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_18 Deculverting Introduce more blue infrastructure toCity Centre

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

Coventry City Council_19 Broadgate square Pedestrianisation and public openspace

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2012Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

Coventry City Council_20 Council House Square Road narrowing and one-way system Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2013Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: Increased cycling/walkingTarget emissions reduction: N/A

Coventry City Council_21 Liddice Place Alterations to road junctions toimprove traffic flow, widening andre-laying of new pedestrianfootpaths.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2012Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_22 Gosford Street Alterations to some road junctions toimprove traffic flow and journeytimes, and widening and re-laying ofnew pedestrian footpaths.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2012Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_23 Belgrade Square Alterations to some road junctions toimprove traffic flow and journeytimes, and widening and re-laying ofnew pedestrian footpaths.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2012Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased CongestionTarget emissions reduction: N/A

Coventry City Council_24 Fuel Poverty Initiatives Reduced emissions from domesticboilers

Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2013Expected end date: 2015Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

41

This in

formati

on is

out o

f date

.

Page 43: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_25 Climate change Strategy To reduce carbon dioxide emissionsby 27.5 per cent. Anticipated similarreduction in NOx

Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2008Expected end date: 2020Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_26 OLEV bid Large-scale roll out of ultra lowemission vehicles across Coventry’stravel to work area

Public procurement: Other measure Planning Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased LEV journeysTarget emissions reduction: N/A

Coventry City Council_27 Smarter Network, Smarter Choices Sustainable Local Transport Fundbid - reducing shorter journeys

Public procurement: Other measure Planning Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_28 Workplace Travel Plans Monitor and advice service leading tocoordination for all major employers

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased congestionTarget emissions reduction: N/A

Coventry City Council_29 Devise Procurement Policy for fleetoperators

Encourage low carbon vehiclepurchase

Public procurement: New vehicles,including low emission vehicles

Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased low carbon vehiclejourneysTarget emissions reduction: N/A

Coventry City Council_30 Biofuels in Council fleet Feasibility study completed Public procurement: New vehicles,including low emission vehicles

Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased low carbon vehiclejourneysTarget emissions reduction: N/A

Coventry City Council_31 EV charging points Expand City network Public procurement: Other measure Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased LEV journeysTarget emissions reduction: N/A

42

This in

formati

on is

out o

f date

.

Page 44: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_32 City wide low carbon procurementcode

Supply chain development toenhance sustainability

Public procurement: Other measure Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increased low carbon vehiclejourneysTarget emissions reduction: N/A

Coventry City Council_33 Street Lighting PFI Centrally controlled dimming streetlighting

Other measure: Other measure Implementation Start date: 2012Expected end date: 2012Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Reduced Carbon/NO2Target emissions reduction: N/A

Coventry City Council_34 Heatline N/A Other measure: Other measure N/A Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduced Carbon/NO2Target emissions reduction: N/A

Coventry City Council_35 Traffic Regulation Order Prohibit Euro I and Euro II busesfrom passing through the AQMA

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_36 Pool Meadow Better sustainable transport accessto main bus station -greater use ofPool Meadow Bus Station bycreating a two-way bus and bicycleonly route across the currentlypedestrianised areas

Traffic planning and management:Improvement of public transport

Implementation Start date: 2011Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Reduced congestionTarget emissions reduction: N/A

Coventry City Council_37 Relocation of Taxi ranking Remove source of emissions inpriority areas congested streetcanyon

Traffic planning and management:Improvement of public transport

Implementation Start date: 2011Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_38 Bus Showcase Route Showcase service along criticalroutes Walsgrave / Ansty Roadcorridor

Traffic planning and management:Improvement of public transport

Implementation Start date: 2011Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Increased bus journeysTarget emissions reduction: N/A

43

This in

formati

on is

out o

f date

.

Page 45: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_39 On-street parking enforcement Reduce illegal parking which restrictstraffic flows

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Reduced CongestionTarget emissions reduction: N/A

Coventry City Council_40 Improvements in taxi fleet Introduce newer vehicles with lessemissions

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_41 Control of Industrial emissions Active regulation its processes underthe Pollution Prevention and ControlAct 2000.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: Industry includingheat and power productionIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_42 Emissions from domestic sources Enforce the provisions of the CleanAir Act 1993 as applied to stackheight provision and dark smokeoffences

Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_43 Bonfires Enforce the provisions of the CleanAir Act 1993 etc.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_44 Public Information Raise public awareness of airpollution through newsletters anddisplays around the city

Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_45 Rush hour challenge High profile Corporate sustainabletransport event

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Reduced congestionTarget emissions reduction: N/A

44

This in

formati

on is

out o

f date

.

Page 46: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_46 Sustainable Schools Steering Group Education on sustainability to schools Low emission fuels for stationary andmobile sources: Other measure

Implementation Start date: 2011Expected end date: 2011Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Reduced NO2 emissionTarget emissions reduction: N/A

Coventry City Council_47 Low Emission Strategy Overarching Low Emission Strategyfor the 7 West Midlands Authoritiesto improve emissions andconcentrations of NO2 andparticulates while also seeking toexploit the synergies of CO2 andnoise reduction, where possible,through the transformation of theWest Midlands vehicle fleet

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Adoption of the Low EmissionStrategy within each Local Authorityarea.Target emissions reduction: N/A

Coventry City Council_48 Planning Guidance Develop a regional Good PracticePlanning Guidance which protectresidents of future developmentschemes from exposure to airpollution. The Guidance promote asimplified assessment criteria anddefinition of sustainability,Incorporates mitigation as standardto help counter cumulative impacts.Applies a procedure for evaluatingadditional requirements for mitigationand compensation using costdamage analysis.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: N/A

Coventry City Council_49 Procurement Guidance Develop a regional Good PracticeProcurement document with thefollowing key policies and benefits:Local sourcing (reduced vehiclemileage), Sustainable fleetdemonstration, specification andcontract award criteria, includingGovernment Buying Standardsconsiderations. Development ofWhole Life Cost model, includingdamage costs of environmentalimpact. Innovative procurement.Development of public privatepartnerships.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: N/A

45

This in

formati

on is

out o

f date

.

Page 47: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Coventry City Council_50 Low Emission Zone Feasibility A technical study into the feasibility ofcreating a transferable LEZ model forthe West Midlands. A range ofscenarios were selected (City Centre/ Motorway / Street Canyon andUrban Corridor).The study assessthe benefits and dis-benefits ofemission control policies on keyvehicle types for each scenario,including cost benefit analysis andpotential costing for implementation,as well as Health Impact Assessment(HIA) of the most effectiveintervention measures

Traffic planning and management:Low emission zones

Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions/pollutantconcentrations.Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_1

AP1 Road Network Improvements Netherton, Traffic SignalImprovements

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

46

This in

formati

on is

out o

f date

.

Page 48: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_2

AP1 Road Network Improvements Windmill Hill, Highway andPedestrian Improvements

Traffic planning and management:Reduction of speed limits and control

Implementation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_3

AP1 Road Network Improvements Pensnett, High Street, highwaysalterations to improve traffic flow.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2017Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

47

This in

formati

on is

out o

f date

.

Page 49: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_4

AP1 Road Network Improvements Traffic Signal Improvements andUpgrade of Pedestrian CrossingFacilities in the Quarry Bank Area

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_5

AP1 Road Network Improvements The Installation of Urban TrafficControl CCTV Cameras at KeyJunctions

Traffic planning and management:Other measure

Implementation Start date: 2009Expected end date: 2012Spatial scale: Whole agglomerationSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

48

This in

formati

on is

out o

f date

.

Page 50: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_6

AP1 Road Network Improvements The Installation of a Right TurningLane at the Junction between DudleySt and Vicar St., Sedgley

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_7

AP1 Road Network Improvements The Installation of a PedestrianCrossing in Priory Road, Dudley

Traffic planning and management:Improvement of public transport

Evaluation Start date: 2013Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

49

This in

formati

on is

out o

f date

.

Page 51: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_8

AP1 Road Network Improvements Upgrade of Traffic Signals at theB4175/B4176 Junction

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_9

AP1 Road Network Improvements Minor Road and JunctionImprovements at Stourbridge Road,Halesowen and Vicarage Road,Amblecote

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

50

This in

formati

on is

out o

f date

.

Page 52: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_10

AP1 Road Network Improvements Major Junction Improvement at BurntTree Island

Traffic planning and management:Other measure

Evaluation Start date: 2011Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_11

AP1 Road Network Improvements Completion of Minor ElementsAssociated With the Brierley HillSustainable Access Network(BHSAN)

Traffic planning and management:Other measure

Implementation Start date: 2008Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

51

This in

formati

on is

out o

f date

.

Page 53: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_12

AP 2Improving Public Transport &Rail Freight Facilities

Developing and Delivering BusInfrastructure Improvements viaImplementation of Voluntary BusPartnership Commitments.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2010Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_13

AP 2 Improving Public Transport &Rail Freight Facilities

Extending the WM metro link toMerry Hill

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

52

This in

formati

on is

out o

f date

.

Page 54: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_14

AP 2 Improving Public Transport &Rail Freight Facilities

Improving Rail Freight Capabilities Traffic planning and management:Freight transport measure

Other Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_15

AP 2 Improving Public Transport &Rail Freight Facilities

Provision of Better Information forPassengers at Key RailwayInterchange Facilities, e.g. Cradley

Public information and Education:Other mechanisms

Implementation Start date: 2014Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: 1. Maintain average AM peakjourney speeds on the Met-wide LocalAuthority “A” road network at recentlevels through to 2015/16. 2011/12Figure 20.0mph (+0.5%) - On target. 2.Increase the proportion of trips bypublic transport into the 9 strategic LTPcentres as a whole during the AM peakto 50% by 2015/16. 2011/2012 Figure48.0% (up by 1% on baseline)- OnTarget. 3. To limit annual road trafficgrowth to between 3% and 6% between2009 and 2015. 2011/2012 Figure-0.3%- On TargetTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

53

This in

formati

on is

out o

f date

.

Page 55: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_16

AP 3 Reducing Vehicle Emissions Roadside Emission Testing (RET) Other measure: Other measure Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: RET feasibility study to becompleted and reported to the head ofservice by 31/03/11.Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_17

AP 3 Reducing Vehicle Emissions Improving the DMBC Fleet Other measure: Other measure Planning Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_18

AP 3 Reducing Vehicle Emissions Reducing Idling Emissions Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Feasibility study for reducingidling emissions to be completed andreported to the head of service by31/03/11. Website upgrade,preparation and distribution ofpromotional material including signagefor bus stations and layover points andCouncil driver training will be completedby 31/03/2013.Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_19

AP 3 Reducing Vehicle Emissions Encouraging the Uptake of LowEmissions Vehicles

Traffic planning and management:Differentiation of parking fees

Other Start date: 2011Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: The investigation intoencouraging the uptake of low emissionvehicles has been completed andreported to the head of service by31/03/12 as identified in the EP ServicePlan.Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_20

AP 3 Reducing Vehicle Emissions Reporting Smoky Vehicles Traffic planning and management:Other measure

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: EP Service Plan 2010 / 11, toupgrade the web site by 31 03 10.Target emissions reduction: N/A

54

This in

formati

on is

out o

f date

.

Page 56: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_21

AP4 Land Use Planning Initiatives Revision of Planning ObligationsSupplementary Planning Document

Other measure: Other measure Implementation Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: To have the modifiedPlanning Obligations SPD adopted byDMBC by 31/12/11.Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_22

AP4 Land Use Planning Initiatives Member and Officer Training Other measure: Other measure Implementation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: To complete officer trainingby 31/03/13 - the EP Service Plan(Amended target)Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_23

AP4 Land Use Planning Initiatives Monitoring the Effectiveness of AirQuality Planning Recommendations

Other measure: Other measure Implementation Start date: 2011Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: To meet the Black CountryCore Strategy target LOIENV8-proportion of planning permissionsgranted in accordance with air qualitysections recommendations – 100%Target emissions reduction: N/A

Dudley Metropolitan BoroughCouncil_24

AP4 Land Use Planning Initiatives Providing Professional Advice toDevelopment Control

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: To update Air Quality AdviceNote, produce modelled map of theborough and disseminate theinformation to planning officers by the31/09/12 - the EP Service PlanTarget emissions reduction: N/A

55

This in

formati

on is

out o

f date

.

Page 57: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_25

AP6 Information & AwarenessRaising

Publicity for Air Quality & EffectiveUse of Websites

Public information and Education:Internet

Implementation Start date: 2011Expected end date: 2013Spatial scale: LocalSource affected: TransportIndicator: To ensure that ratified NO2data is provided via The Councilwebsite and updated on an annualbasis no later than 31st May each year.To carry out the schools educationinitiative and deploy NOx diffusiontubes at a minimum of 5 schools peryear.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_26

AP6 Information & AwarenessRaising

Awareness Raising of Air QualityIssues at Schools within Dudley

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: To complete theredevelopment of the DMBC schoolswebsite by 31/06/11.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_27

AP 7 Encouraging Changes in TravelBehaviour

DMBC Travel Plans for Employees.Increase the number of employeesworking in companies with a TravelPlan to 18%- The amended Trafficand Transportation Service Plan.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Increase the number ofemployees working in companies with aTravel Plan to 18%- The amendedTraffic and Transportation Service Plan.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

56

This in

formati

on is

out o

f date

.

Page 58: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_28

AP 7 Encouraging Changes in TravelBehaviour

New Developments and VoluntaryUptake by Businesses. Increase thenumber of employees working incompanies with a Travel Plan to18%- The amended Traffic andTransportation Service Plan.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Increase the number ofemployees working in companies with aTravel Plan to 18%- The amendedTraffic and Transportation Service Plan.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_29

AP 7 Encouraging Changes in TravelBehaviour

Cycle Purchase Scheme for DMBCEmployees

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Increase the West MidlandsActive Travel index by 5% from the2010/11 baseline of 100 by 2015/16Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_30

AP 7 Encouraging Changes in TravelBehaviour

Travelwise for the General PublicSchools and Businesses. 100% ofschools to have travel plans by 2011and to at least maintain theproportion of children (aged 5 to 15)travelling to school by non-car modesbetween 09/10 and 15/16.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2007Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: 100% of schools to havetravel plans by 2011 and to at leastmaintain the proportion of children(aged 5 to 15) travelling to school bynon-car modes between 09/10 and15/16.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

57

This in

formati

on is

out o

f date

.

Page 59: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_31

Low Emission Strategy- WestMidlands LETC Programme

Overarching Low Emission Strategyfor the 7 West Midlands Authoritiesto improve emissions andconcentrations of NO2 andparticulates while also seeking toexploit the synergies of CO2 andnoise reduction, where possible,through the transformation of theWest Midlands vehicle fleet

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Adoption of the Low EmissionStrategy within each Local Authorityarea.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_32

Planning Guidance - West MidlandsLETC Programme

Develop a regional Good PracticePlanning Guidance which protectsresidents of future developmentschemes from exposure to airpollution. The Guidance promotes asimplified assessment criteria anddefinition of sustainability,Incorporates mitigation as standardto help counter cumulative impacts.Applies a procedure for evaluatingadditional requirements for mitigationand compensation using costdamage analysis.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_33

Procurement Guidance - WestMidlands LETC Programme

Develop a regional Good PracticeProcurement document with thefollowing key policies and benefits:Local sourcing (reduced vehiclemileage), Sustainable fleetdemonstration, specification andcontract award criteria, includingGovernment Buying Standardsconsiderations. Development ofWhole Life Cost model, includingdamage costs of environmentalimpact. Innovative procurement.Development of public privatepartnerships.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

58

This in

formati

on is

out o

f date

.

Page 60: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_34

Low Emission Zone Feasibility -West Midlands LETC Programme

A technical study into the feasibility ofcreating a transferable LEZ model forthe West Midlands. A range ofscenarios were selected (City Centre/ Motorway / Street Canyon andUrban Corridor).The study assessesthe benefits and dis-benefits ofemission control policies on keyvehicle types for each scenario,including cost benefit analysis andpotential costing for implementation,as well as Health Impact Assessment(HIA) of the most effectiveintervention measures

Traffic planning and management:Low emission zones

Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions /pollutantconcentrations.Target emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_35

Parking standards SPD Requirement for EV charging Other measure: Other measure Implementation Start date: 2011Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: EV charging installedTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_36

Black country AQ SPD Mitigation for development proposals.Operates in unison with measureDudley Metropolitan BoroughCouncil_32.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: SPD AdoptedTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

Dudley Metropolitan BoroughCouncil_37

CVTF Lower emissions from school andcollege transport

Retrofitting: Retrofitting emissioncontrol equipment to vehicles

Implementation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Coaches retrofittedTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

59

This in

formati

on is

out o

f date

.

Page 61: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Dudley Metropolitan BoroughCouncil_38

Defra AQ grant 2014/15 The encouragement of cycling andwalking and traffic managementissues

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Crossing and cycle wayinstalledTarget emissions reduction: Todemonstrate an ongoing reduction of atleast 1% in average roadside NO2concs. over a rolling five year period.2010-2014 (provisional) figure =2.1%.On track.

East Staffordshire BoroughCouncil_1

To investigate the feasibility of RealTime Passenger Information (RTPI)for buses

Installation of RTPI would give liveinformation on bus routes , times,delays etc. to help improveconnectivity within the town and takeup of alternative transport modes

Traffic planning and management:Improvement of public transport

Planning Start date: 2010Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Bus Information & AwarenessTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_2

To increase bus access, reliabilityand promote the enforcement ofbus/cycle only access, in turnimproving pedestrian safety

To implement measures on HighStreet, New Street and Union Streetin Burton upon Trent

Traffic planning and management:Improvement of public transport

Implementation Start date: 2008Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Bus PriorityTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_3

To promote and publicise newsustainable transport facilities.

To encourage existing companies toimplement Travel Plans and toimplement wider travel plans for newlocal developments

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2031Spatial scale: LocalSource affected: TransportIndicator: Promoting smarter travelTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_4

To make improvements to bus routesand infrastructure along designatedroutes through the town.

Improvements to bus access, busstop infrastructure improvements,information provision, raised kerbsand low floor vehicles

Traffic planning and management:Improvement of public transport

Implementation Start date: 2008Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Public Transport PartnershipRoutes (PTPR)Target emissions reduction: QuantityUnknown

60

This in

formati

on is

out o

f date

.

Page 62: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

East Staffordshire BoroughCouncil_5

To expand cycling provision in Burton Introduce new National CycleNetwork (NCN’s) routes and severallocal links

Traffic planning and management:Expansion of bicycle and pedestrianinfrastructure

Implementation Start date: 2008Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Cycle links and crossingsTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_6

To promote and publicise newsustainable transport facilities.

Designated pedestrian routes at keypoints within the AQMA

Traffic planning and management:Other measure

Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Pedestrian ImprovementsTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_7

Burton Railway Station forecourtimprovements

To upgrade and improve the layoutof Burton Railway Station and bridgestrengthening works

Traffic planning and management:Improvement of public transport

Implementation Start date: 2010Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Railway station infrastructure& accessTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_8

Improve traffic flow on key routesthrough the Town

A511 and A5189 Route Strategies Traffic planning and management:Other measure

Implementation Start date: 2008Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Junction ImprovementsTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_9

To improve traffic flow along theWellington Road corridor

Signalisation and widening of thehighway

Traffic planning and management:Other measure

Implementation Start date: 2008Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Highway capacityimprovementsTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_10

Travel Plan To review and bring up to date theTravel Plan for East StaffordshireBorough Council staff

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2008Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Promoting smarter travelTarget emissions reduction: Exactquantity unknown

61

This in

formati

on is

out o

f date

.

Page 63: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

East Staffordshire BoroughCouncil_11

Council waste fleet route review To review current waste fleet routesand implement more efficient routing

Other measure: Other measure Implementation Start date: 2008Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Route optimisationTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_12

Home Working Policy To review the current policy for staffworking from home

Other measure: Other measure Implementation Start date: 2009Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Home WorkingTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_13

Promoting public transport Free bus taster tickets for EastStaffordshire Borough Council Staff

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2009Expected end date: 2009Spatial scale: Whole town or citySource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: QuantityUnknown

East Staffordshire BoroughCouncil_14

Eco-driving promotion Article published in the Councilnewsletter and Taxi Licensingnewsletter to promote eco-driving

Public information and Education:Other mechanisms

Implementation Start date: 2009Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: Minimalimpact

East Staffordshire BoroughCouncil_15

Electric bikes Trialled and purchased 1 electric bikefor neighbourhood wardens

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2010Spatial scale: Whole town or citySource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: Minimalimpact

East Staffordshire BoroughCouncil_16

Promoting car-sharing A car-sharing database wasimplemented for Council Staff

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: Minimalimpact

62

This in

formati

on is

out o

f date

.

Page 64: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

East Staffordshire BoroughCouncil_17

Promoting alternatives to single caroccupancy

Staff were tasked with findingalternatives to single car occupancyfor 10% of their time over 3 months

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: Minimalimpact

East Staffordshire BoroughCouncil_18

Promoting cycling Promotion of cycle scheme duringworkplace health days

Other measure: Other measure Implementation Start date: 2011Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: Take upunknown

East Staffordshire BoroughCouncil_19

Green Travel Promotion Alternative travel options promoted topublic within an exemplar property

Public information and Education:Other mechanisms

Implementation Start date: 2012Expected end date: 2012Spatial scale: Whole town or citySource affected: TransportIndicator: Promotional CampaignTarget emissions reduction: N/A

East Staffordshire BoroughCouncil_20

Eco-Stars Recognition Scheme ECO Stars proactively encouragescommercial vehicle operators tooperate cleaner vehicles andimplement robust fuel managementprogrammes, including elements ofdriver skills development, vehiclespecification and maintenance, useof support systems and performancemonitoring and targeting.

Other measure: Other measure Planning Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Eco-Stars Fleet RecognitionSchemeTarget emissions reduction: 14 tonnesNOx / yr 0.55 tonnes PM10 / yr 1428tonnes CO2 /yr

Lichfield City Council_1 Muckley Corner ImprovementScheme

Reducing congestion at MuckleyCorner roundabout

Traffic planning and management:Other measure

Other Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Muckley CornerAQMATarget emissions reduction: 0.025

Lichfield City Council_2 A5/A5148 Wall Island RoundaboutImprovement Scheme

Reducing congestion at theA5/A5148 roundabout. This will alsoreduce congestion at the MuckleyCorner roundabout

Traffic planning and management:Other measure

Preparation Start date: 2014Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Muckley CornerAQMATarget emissions reduction: 0.025

63

This in

formati

on is

out o

f date

.

Page 65: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Lichfield City Council_3 Completion of the Lichfield SouthernBypass (link between the A5206London Road and the A461 WalsallRoad) - Phase 3

Reducing congestion in Lichfield. Traffic planning and management:Other measure

Preparation Start date: 2013Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMATarget emissions reduction: 0.005

Lichfield City Council_4 New or extended bus services to theCity

Reducing congestion in Lichfield (inc.Fradley)

Traffic planning and management:Improvement of public transport

Preparation Start date: 2013Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.005

Lichfield City Council_5 Local walking and cycling links Reducing congestion in Lichfield (inc.Fradley)

Traffic planning and management:Expansion of bicycle and pedestrianinfrastructure

Preparation Start date: 2013Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.005

Lichfield City Council_6 Reopening of the Walsall to Lichfieldrail line and provision of rail servicesbetween Lichfield, Burton and Derbywith a new station at Alrewas

Reducing congestion in Lichfield (inc.Fradley)

Traffic planning and management:Improvement of public transport

Preparation Start date: 2013Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.005

Lichfield City Council_7 Urban traffic control and junctionimprovements on A5127

Reducing congestion in Lichfield (inc.Fradley)

Traffic planning and management:Other measure

Preparation Start date: 2013Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.005

64

This in

formati

on is

out o

f date

.

Page 66: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Lichfield City Council_8 Electric charging points Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Other measure

Preparation Start date: 2013Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.005

Lichfield City Council_9 Carry out regular emissions testing ofCouncil vehicle fleet to ensure that allvehicles comply with the law

Reducing transport emissions inLichfield (inc. Fradley)

Other measure: Other measure Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_10 Fit pollution abatement equipment ifnecessary to older Heavy GoodsVehicles to help minimise pollution

Reducing transport emissions inLichfield (inc. Fradley)

Retrofitting: Retrofitting emissioncontrol equipment to vehicles

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_11 Promote the use of cleaner oralternative fuels where possibleincluding the introduction ofelectrically powered vans

Reducing transport emissions inLichfield (inc. Fradley)

Public procurement: Cleaner vehicletransport services

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_12 Improve the Council’s vehicle fuelconsumption efficiency by bettermanagement of fleet activities

Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Freight transport measure

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

65

This in

formati

on is

out o

f date

.

Page 67: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Lichfield City Council_13 Investigate options for better travelplanning amongst Lichfield DistrictCouncil employees

Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Freight transport measure

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_14 Staffordshire ECO Stars scheme Reducing transport emissions inLichfield (inc. Fradley)

Other measure: Other measure Preparation Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_15 Implement initiatives to educatecommunities on air pollution issuesand ways to minimise impacts on airquality

Reducing transport emissions inLichfield (inc. Fradley)

Public information and Education:Internet

Preparation Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_16 Encourage Lichfield District Councilemployees to consider the use ofbicycles in their daily duties byproviding cycle usage mileage

Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Lichfield City Council_17 Provide public with ‘real time’ traveland air quality information

Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

66

This in

formati

on is

out o

f date

.

Page 68: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Lichfield City Council_18 Work in partnership with the CountyCouncil to increase uptake andimplementation of School TravelPlans, Workplace Travel Plans andResidential Travel Plans

Reducing transport emissions inLichfield (inc. Fradley)

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2016Expected end date: 2028Spatial scale: LocalSource affected: TransportIndicator: Annual mean NO2concentrations in Lichfield includingAQMA and Fradley areaTarget emissions reduction: 0.001

Newcastle-under-Lyme BoroughCouncil_1

Staffordshire ECO-Stars Scheme Fleet operators Other measure: Other measure Preparation Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_2

Air Quality action plan - Newcastleunder Lyme Town Centre

NO2 reduction Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_3

Air Quality Action plan - KidsgroveTown Centre

NO2 reduction Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_4

Air Quality action plan - Maybank,Wolstanton, Porthill

N02 reduction Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_5

Air Quality action plan - LittleMadeley

N02 reduction Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_6

Identification of premises requiringan Environmental Permit

Compliance with statutory obligations Permit systems and economicinstruments: Other measure

Other Start date: 2015Expected end date: 2030Spatial scale: NationalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

67

This in

formati

on is

out o

f date

.

Page 69: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Newcastle-under-Lyme BoroughCouncil_7

Development of Air Quality Strategyfor Newcastle under Lyme

Compliance and improvement andmaintenance of aq

Other measure: Other measure Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_8

Supplementary planning guidance /developers guidance relating to AQincluding potential damage costmitigation formula

Compliance Other measure: Other measure Preparation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_9

Identification of AQ related policiessupported by evidence for inclusionin New Newcastle under Lyme andStoke on Trent joint local plan

Compliance and improvement andmaintenance of aq

Other measure: Other measure Other Start date: 2018Expected end date: 2030Spatial scale: LocalSource affected: AgricultureIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_10

Improving access to rail services atKidsgrove by installing an accessibleto all footbridge/ Improved Bus / RailInterchange and waiting facilities withRTPI, safer pedestrian and cycleaccess routes and taxi facilities

Rail users Traffic planning and management:Improvement of public transport

Planning Start date: 2017Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_11

Barracks Road Bus Priority Bus users Public information and Education:Other mechanisms

Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_12

Improved bus facilities at KeeleUniversity

N/A Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_13

SMART Bus Ticket Multi-operator) Bus users Other measure: Other measure Implementation Start date: 2010Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

68

This in

formati

on is

out o

f date

.

Page 70: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Newcastle-under-Lyme BoroughCouncil_14

Real Time Passenger informationsystem at Bus Stops on Keele toHanley Route

Bus users Public information and Education:Other mechanisms

Implementation Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_15

Bus service improvements acrossthe Borough

Bus users Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_16

Stoking Employment in NorthStaffordshire to improve sustainabletransport in the major employmentsites at Keele University Science andBusiness Park, Chatterley Valley andEtruria Valley including enhancedtraffic management, bus priority,passenger information, safepedestrian environments. LSTFfunded measures

Sustainable transport choices Traffic planning and management:Improvement of public transport

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_17

Availability of information andimplementation of walking / cyclinginitiatives

N/A Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_18

Newcastle Greenway improvementsto support and encourage walkingand cycling along a connectednetwork of walking and cycling routes

N/A Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_19

Safer Routes to School -enforcement and engineeringmeasures to reduce reliance on carsand encourage sustainable transport

N/A Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

69

This in

formati

on is

out o

f date

.

Page 71: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Newcastle-under-Lyme BoroughCouncil_20

Discretionary Travel Allowancescheme free 24/7 bus transport topeople of pensionable age or with adisability, plus carer and under 20’stravel for £1 per journey

Bus users Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_21

Etruria Valley Link Road and EtruriaValley Development Enterprise Zonewhich will in part reduce congestionon the local highway network andreduce severance for transport users.This will involve four phases 1. A newbridge over the west coast mainlinefrom the Wolstanton Junction of theA500. 2. Improvements to existingroundabouts on the A500 atWolstanton. 3. Widening the A500 tothree lanes between Porthill andWolstanton

Sustainable transport choices Traffic planning and management:Other measure

Other Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_22

(Cycle Network : National and Local)Improving and closing gaps in theNational Cycle Network 5 / 555 andlinks to employment and servicesaround Keele University whichcurrently forces people onto theA525 Keele Road and closing thegap North of Chatterley Valleyemployment area on Lowland’s Road

Sustainable transport choices Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_25

Newcastle Town Centre LocalTransport Package: Package ofmeasures to improve the publicrealm and improve links topedestrians and cyclists across thering road and to accommodateresidual traffic and improve bus linksand bus priority measures.

Sustainable transport choices Other measure: Other measure Implementation Start date: 2013Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Newcastle-under-Lyme BoroughCouncil_26

Chatterley Valley sustainabletransport package: To utilise adeveloper funding pot once theChatterley Valley site is developed,supported to improve access bycycle, walking and facilitate travelplanning and smarter choice projects.

N/A Other measure: Other measure Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

70

This in

formati

on is

out o

f date

.

Page 72: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Nuneaton and Bedworth BoroughCouncil_1

Identify and bring forward trafficmanagement improvements inNuneaton town centre, particularlywhere they will benefit the twoAQMAs.

N/A Traffic planning and management:Other measure

Preparation Start date: 2012Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Number of measuresimplemented or startedTarget emissions reduction: 1-2 μg/m3

Nuneaton and Bedworth BoroughCouncil_2

Identify measures to reduce theimpact of HGV movements within thearea.

N/A Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Measures to reduce HGVmovements Number of measuresapproved by WCC Number ofmeasures implemented/startedTarget emissions reduction: 0.2 – 0.5μg/m3

Nuneaton and Bedworth BoroughCouncil_3

Improvements for pedestrians andcyclists within the area.

N/A Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2005Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Metres of paths improved /developed for pedestrians and cyclistsin Nuneaton particularly in AQMAs.Target emissions reduction: 0.2 – 0.5μg/m3

Nuneaton and Bedworth BoroughCouncil_4

Integration of public transport inNuneaton, including improvementsfor bus, rail and community transportinfrastructure and services.

N/A Other measure: Other measure Implementation Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: No. of improvementTarget emissions reduction: 0.2 – 0.5μg/m3

Nuneaton and Bedworth BoroughCouncil_5

School and Workplace Travel Plans N/A Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2008Expected end date: 2020Spatial scale: Whole town or citySource affected: TransportIndicator: Number of new travel plansin place.Target emissions reduction: 0.2 – 0.5μg/m3

71

This in

formati

on is

out o

f date

.

Page 73: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Nuneaton and Bedworth BoroughCouncil_6

Work with partners to deliverimprovements in vehicle emissions.

N/A Public procurement: Cleaner vehicletransport services

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Number of new / improvedvehicles within fleetsTarget emissions reduction: 1-2 μg/m3

Nuneaton and Bedworth BoroughCouncil_7

Work together with partners topromote and implement energyefficiency measures

N/A Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Number of consultationsprovided Council’s energy efficiencyfiguresTarget emissions reduction: 0 - 0.2μg/m3

Rugby Borough Council_1 Rugby Western Relief Road Serve new development at Cawston,Swift Valley, Malpass Farm andCoton Park, and reduce the impact oftraffic within the town centre.

Traffic planning and management:Other measure

Evaluation Start date: 2007Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Implementation of thescheme in fullTarget emissions reduction: 0.12

Rugby Borough Council_2 Warwick Street GyratoryImprovements

Manage the impact of trafficaccessing and passing through thetown centre, along with plannedhousing and employment growthwithin the town.

Traffic planning and management:Other measure

Implementation Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Implementation of thescheme in fullTarget emissions reduction: Notspecified

Rugby Borough Council_3 Improvements to ChurchStreet/North Street

Reduce the impact of traffic on thetown centre, and allow better accessfor pedestrians and cyclists.

Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Implementation of thescheme in fullTarget emissions reduction: Notspecified

72

This in

formati

on is

out o

f date

.

Page 74: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Rugby Borough Council_4 Decriminalisation of ParkingEnforcement within Rugby Borough

Improve the management of trafficwithin the town centre and the impactof illegal parking.

Traffic planning and management:Management of parking places

Evaluation Start date: 2006Expected end date: 2006Spatial scale: Whole town or citySource affected: TransportIndicator: Implementation of thescheme in fullTarget emissions reduction: Notspecified

Rugby Borough Council_5 Rugby Town Centre 20:20 Vision Improve public transport. Traffic planning and management:Improvement of public transport

Planning Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: Notspecified

Rugby Borough Council_6 Re-routing traffic – Lorry Route Mapsand agreements

Reduce the impact of heavy goodsvehicles on the transport network ofthe Borough.

Traffic planning and management:Freight transport measure

Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Reduction in complaintsregarding inappropriate lorrymovementsTarget emissions reduction: Notspecified

Rugby Borough Council_7 Variable Message Signing Reduce the impact of circulatingtraffic seeking access to the towncentre car parks.

Traffic planning and management:Other measure

Implementation Start date: 2009Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Implementation of thescheme in fullTarget emissions reduction: Notspecified

Rugby Borough Council_8 Enforcement of Idling VehicleLegislation

Reduce number of idling vehicleimproving local air quality byreducing emissions to air.

Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Currently N/ATarget emissions reduction: CurrentlyN/A

Rugby Borough Council_9 Improve the Borough Council Fleet(interims of emissions)

As vehicles are replaced, they arereplaced with lower emissionvehicles.

Other measure: Other measure Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Not specifiedTarget emissions reduction: Notspecified

73

This in

formati

on is

out o

f date

.

Page 75: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Rugby Borough Council_10 Improve Bus Emissions The County Council is working withthe principal bus operators within thetown to reduce bus emissionsthrough their fleet renewal process,and on individual routes when theyare upgraded to QBC status.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Not specified.Target emissions reduction: Notspecified

Rugby Borough Council_11 Cycling Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in cycling as a resultof individual scheme implementationTarget emissions reduction: Notspecified

Rugby Borough Council_12 Walking Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in walking (footfall)as a result of individual schemeimplementationTarget emissions reduction: Notspecified

Rugby Borough Council_13 Workplace Travel Plans Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Number of Travel Plansagreed with existing employers and aspart of new developmentTarget emissions reduction: Notspecified

Rugby Borough Council_14 School Travel Plans and SaferRoutes to School

Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Reduction in the number ofcar-based journeys to schoolTarget emissions reduction: Notspecified

74

This in

formati

on is

out o

f date

.

Page 76: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Rugby Borough Council_15 Public Transport Strategy, includingthe Bus Strategy

Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in bus patronageTarget emissions reduction: Notspecified

Rugby Borough Council_16 Travel Awareness Campaigns Reduce the impact of traffic on thetransport network of the Borough(particularly within the urban area ofRugby) by encouraging a shifttowards sustainable modes oftransport.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Reduction in the number ofcar-based journeys being made withinthe BoroughTarget emissions reduction: Notspecified

Rugby Borough Council_17 Energy efficiency improvements toRugby housing & the reduction offuel poverty. Corporate Property

Reduction of carbon emissions fromdomestic dwellings, the reduction ofresidents’ fuel bills & the alleviation ofill health due to cold, damp housing.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2020Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: HECA report publishedMarch 13, and will be updated at twoyearly intervals..Target emissions reduction: We aim toreduce CO2 emissions in the housingsector to 165.8kt CO2 of 2009 (207.3ktCO2) levels by 2020. This will beequivalent to a 20% reduction.

Rugby Borough Council_18 Control Of Industrial Emissions Reduce the environmental impact ofindustrial processes through pollutioncontrol regulation

Permit systems and economicinstruments: IPPC permits

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: Industry includingheat and power productionIndicator: 99.24% complianceimprovementsTarget emissions reduction: Notspecified

Rugby Borough Council_19 Emissions from Domestic andCommercial Sources

Prevent and/or reduce environmentalimpacts from domestic andcommercial emissions.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: Reduction in complaints.Target emissions reduction: Notspecified

75

This in

formati

on is

out o

f date

.

Page 77: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Rugby Borough Council_20 Control of Bonfires Prevent and/or reduce environmentalimpacts from domestic andcommercial emissions.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Reduction in complaintsTarget emissions reduction: Notspecified

Rugby Borough Council_21 Planning Development and PlanningApplications

Air quality assessments have beenrequested for land use planningdevelopments that meet AQMAthresholds in the Rugby BoroughLocal Plan (July 2006. Therequirements for future assessmentshave now been embodied in a newPlanning Obligations SupplementaryPlanning Document adopted inMarch 2012. This is to ensure thatnew development does not result in asignificant increase in the productionof air pollutants and thatopportunities are taken to improve airquality, where possible. In someinstances where an AQMA thresholdhas not been met, officerdiscretionary measures have beenutilised where it is felt that aproposed land use development haspotential to impact on air quality andshould be a material consideration.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Not specifiedTarget emissions reduction: Notspecified

Sandwell Metropolitan BoroughCouncil_1

Birmingham Road (A457) Oldbury -Possible Relocation of ExistingResidential Receptors

Removal of residents from identifiedNO2 exceedance area

Other measure: Other measure Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: Other, please specifyIndicator: Reduction in residentialexposureTarget emissions reduction: NoReduction identified

Sandwell Metropolitan BoroughCouncil_2

Birmingham Road (A457) Oldbury -Red Route treatment including thecontrol of parking to ease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Reduction in NO2 and PM10ConcentrationsTarget emissions reduction: N/A

76

This in

formati

on is

out o

f date

.

Page 78: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_3

Dudley Road East /Roway LaneOldbury - Red Route treatmentincluding the control of parking toease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Reduction in NO2 and PM10ConcentrationsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_4

M5 J1-J2, Oldbury & West Bromwich& M6 J7-J8/M5, Great Barr & YewTree

Improvements to traffic flow on M6through implementing a programmeto reduce incident response times to20 minutes (from 60 minutes) 24hours a day, seven days a week

Traffic planning and management:Other measure

Evaluation Start date: 2009Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Reduction in IncidentResponse TimeTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_5

M5 J1-J2, Oldbury & West Bromwich& M6 J7-J8/M5, Great Barr & YewTree

An improved system of contingencyplanning for the motorway network toimprove traffic flows

Traffic planning and management:Other measure

Evaluation Start date: 2009Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Improved planning - Regularreview of procedures and policiesTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_6

M5 J1-J2, Oldbury & West Bromwich& M6 J7-J8/M5, Great Barr & YewTree

Evaluate the suitability of activetraffic management to improve trafficflows on the M6

Traffic planning and management:Other measure

Evaluation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Improved Traffic Flows andEmission ReductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_7

Regional Motorway Improvements A planned link between the M54 andM6/M6 Toll to relieve congestion onM6 Junctions 8-10A

Traffic planning and management:Other measure

Planning Start date: 2013Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: Improved Traffic Flows andEmission ReductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_8

M5 J1-J2, Oldbury & West Bromwich& M6 J7-J8/M5, Great Barr & YewTree

Ramp metering of junctions 1&2 M5and junctions 11&16 M6

Traffic planning and management:Other measure

Evaluation Start date: 2008Expected end date: 2008Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

77

This in

formati

on is

out o

f date

.

Page 79: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_9

Newton Rd / Birmingham Rd (A34)Great Barr - Red Route treatmentincluding the control of parking toease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2009Expected end date: 2010Spatial scale: LocalSource affected: TransportIndicator: Improved Traffic Flows andEmission ReductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_10

Metro Extension (Phase 2 VarsityNorth)

Enlarging Metro network andincreasing patronage

Traffic planning and management:Improvement of public transport

Other Start date: 2014Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: New route introduced andincrease in patronage.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_11

Bearwood Road - Bus Showcase Upgrade bus infrastructure toimprove patron experience andpatronage.

Traffic planning and management:Improvement of public transport

Evaluation Start date: 2008Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Increases bus patronageTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_12

Metro Extension (Birmingham Westroute - Hagley Road)

Enlarging Metro network andincreasing patronage

Traffic planning and management:Improvement of public transport

Evaluation Start date: 2014Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduction in congestion dueto extra routes and patronageTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_13

Hagley Road (A456) Bearwood - RedRoute treatment including the controlof parking to ease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_14

Blackheath Bypass New bypass, plus implementation ofscheme to maximise use of bypass.Potential 40% reduction in emissionmay be achieved in town centre

Traffic planning and management:Other measure

Evaluation Start date: 2005Expected end date: 2006Spatial scale: LocalSource affected: TransportIndicator: Reduction in vehicles inTown CentreTarget emissions reduction: N/A

78

This in

formati

on is

out o

f date

.

Page 80: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_15

Blackheath - ‘In Town Without MyCar Day’

Encourage Town centres users totravel by alternative methods.

Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Reduction in vehicles inTown CentreTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_16

High Street / Powke Lane Blackheath- Red Route treatment including thecontrol of parking to ease congestion.

Improving traffic flow Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_17

Bromford Lane (Inc Kelvin Way /Brandon Way) West Bromwich - RedRoute treatment including the controlof parking to ease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2012Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_18

Trinity Way / Kenrick Way WestBromwich - Red Route treatmentincluding the control of parking toease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2012Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Improved Traffic Flows andEmission ReductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_19

All Saints Way / Expressway (A41)West Bromwich junctionimprovements

Construction of an underpassbeneath existing junction.

Traffic planning and management:Other measure

Evaluation Start date: 2010Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_20

All Saints Way / Expressway (A41)West Bromwich - Red Routetreatment including the control ofparking to ease congestion.

Improving traffic flow Traffic planning and management:Other measure

Evaluation Start date: 2010Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reductionTarget emissions reduction: N/A

79

This in

formati

on is

out o

f date

.

Page 81: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_21

Sedgley Road East /Dudley PortTipton - Red Route treatmentincluding the control of parking toease congestion.

Improving traffic flow Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_22

Soho Way /Grove Lane / CranfordStreet - Red Route treatmentincluding the control of parking toease congestion.

Improving traffic flow Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_23

Reducing Council Vehicle Emissions Purchased vehicles to meetprogressively tighter emissioncontrols

Other measure: Other measure Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved Vehicle FleetMakeupTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_24

Promotion of Eco -Driving Develop strategy to encouragedrivers to drive economically

Public information and Education:Other mechanisms

Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_25

Anti -Idling Encourage drivers to switch offengines when stationary

Traffic planning and management:Other measure

Other Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved vehicle emissionsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_26

Vehicle Emission Testing Establish a programme of vehicleemission testing

Other measure: Other measure Other Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved vehicle emissionsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_27

Improving Public Transport Showcase Bus Route Improvements Traffic planning and management:Improvement of public transport

Evaluation Start date: 2007Expected end date: 2009Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

80

This in

formati

on is

out o

f date

.

Page 82: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_28

Improving Public Transport Branding Ongoing programme of brandimprovement and public awarenessincluding Safer Network, ImprovedConnections, Signage and Access.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2008Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: Improved user patronage /user surveysTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_29

Improving Public TransportInformation

Implementation of the CENTRONetwork ‘N’ Brand increasesawareness of transport availability,interconnectivity of transport types,information available online and attransport stops.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: Improved user patronage /user surveysTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_30

Expansion of Midland Metro Midland Metro ExtensionWednesbury to Brierly Hill

Traffic planning and management:Improvement of public transport

Other Start date: 2014Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Implementation of route andincreasing patronage.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_31

Expansion of Midland Metro Midland Metro Extension ’5W’s lineWednesbury to Walsall

Traffic planning and management:Improvement of public transport

Other Start date: 2014Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Implementation of route andincreasing patronage.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_32

Increased Bus Lane Enforcements Increased number of bus laneenforcement cameras

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: Increased enforcementactionsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_33

Urban Traffic Control Systems UTC System aimed at reducingcongestion

Traffic planning and management:Other measure

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: Improved traffic flows andemission reduction.Target emissions reduction: N/A

81

This in

formati

on is

out o

f date

.

Page 83: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_34

Burnt Tree Junction Improvements Traffic light controlled junctionreplacing existing roundabout.

Traffic planning and management:Other measure

Evaluation Start date: 2009Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows,reduced queue lengths / trip times andemission reduction.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_35

Owen Street Railway Crossing Closure of level crossing andconstruction of alternative road routeincluding tunnel.

Traffic planning and management:Other measure

Evaluation Start date: 2009Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andcongestion / emission reductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_36

Cradley Heath Bypass Construction of bypass to re-routethrough traffic away from High Street

Traffic planning and management:Other measure

Evaluation Start date: 2006Expected end date: 2007Spatial scale: LocalSource affected: TransportIndicator: Improved traffic flows andemission reductionTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_37

Air Quality considerations to beincluded in the Local DevelopmentFramework.

Policies seek to reduce the need totravel and promote the use ofalternative travel modes

Other measure: Other measure Implementation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduction in emissions andrecorded pollutant concentrationsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_38

Section 106 Agreements Investigate practicality of section 106agreements to secure monitoring forfunding and mitigation where AirQuality issues are identified

Other measure: Other measure Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: Section 106 AgreementssecuredTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_39

Air Quality Guidance for Developers Air Quality Guidance for Developersto follow when submitting planningapplications

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: Other, please specifyIndicator: Production of Guidance andongoing use by developersTarget emissions reduction: N/A

82

This in

formati

on is

out o

f date

.

Page 84: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_40

Stourbridge to Walsall Freight Line Council to support the reopening ofthe line for freight

Traffic planning and management:Freight transport measure

Other Start date: 2014Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Re-opening of the lineTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_41

Congestion Charging Council to continue to monitor theimplications and effectiveness ofcongestion charging proposals

Traffic planning and management:Low emission zones

Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_42

Energy Efficiency Advice Continuation of Sandwell’s EnergyEfficiency Advice Centre

Public information and Education:Other mechanisms

Implementation Start date: 2009Expected end date: 2030Spatial scale: LocalSource affected: Commercial andresidential sourcesIndicator: Uptake of adviceTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_43

Promotion of Walking Development of a Walking Strategyto encourage uptake of walking as apositive alternative to private car use.Improved health and reduction inpollutant emissions.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2013Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: Adoption of Walking strategyand increase in walking initiativesTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_44

Promotion of Cycling Development of a Cycling Strategy toimprove cycling update

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Adoption of Cycling Strategyand uptake of cyclingTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_45

Travel Plans Encourage Travel Plans forEmployers, Schools and Hospitals

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2006Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Development and Adoptionof Travel PlansTarget emissions reduction: N/A

83

This in

formati

on is

out o

f date

.

Page 85: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_46

Website Air Quality Information Update Council website to publishand promote air quality information

Public information and Education:Internet

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Update of website at regularintervalsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_47

Car Sharing Promote Car Sharing for Sandwellresidents and businesses

Other measure: Other measure Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Number of members signedup and using car sharing schemeTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_48

Sustainable School Travel Provide air quality information andpromote sustainable travel in schools

Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2009Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Uptake of advice in schoolsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_49

Low Emission Strategy Overarching Low Emission Strategyfor the 7 West Midlands Authoritiesto improve emissions andconcentrations of NO2 andparticulates while also seeking toexploit the synergies of CO2 andnoise reduction, where possible,through the transformation of theWest Midlands vehicle fleet

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Adoption of the Low EmissionStrategy within each Local Authorityarea.Target emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_50

Planning Guidance Develop a regional Good PracticePlanning Guidance which protectresidents of future developmentschemes from exposure to airpollution. The Guidance promote asimplified assessment criteria anddefinition of sustainability,Incorporates mitigation as standardto help counter cumulative impacts.Applies a procedure for evaluatingadditional requirements for mitigationand compensation using costdamage analysis.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: N/A

84

This in

formati

on is

out o

f date

.

Page 86: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Sandwell Metropolitan BoroughCouncil_51

Procurement Guidance Develop a regional Good PracticeProcurement document with thefollowing key policies and benefits:Local sourcing (reduced vehiclemileage), Sustainable fleetdemonstration, specification andcontract award criteria, includingGovernment Buying Standardsconsiderations. Development ofWhole Life Cost model, includingdamage costs of environmentalimpact. Innovative procurement.Development of public privatepartnerships.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: N/A

Sandwell Metropolitan BoroughCouncil_52

Low Emission Zone Feasibility A technical study into the feasibility ofcreating a transferable LEZ model forthe West Midlands. A range ofscenarios were selected (City Centre/ Motorway / Street Canyon andUrban Corridor).The study assessthe benefits and dis-benefits ofemission control policies on keyvehicle types for each scenario,including cost benefit analysis andpotential costing for implementation,as well as Health Impact Assessment(HIA) of the most effectiveintervention measures

Traffic planning and management:Low emission zones

Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions/pollutantconcentrations.Target emissions reduction: N/A

Shropshire Council_1 Taxi Policy emission standards. Emission standards brought in forPrivate Hire Vehicles and HackneyCarriages through Licensing Policy.Previously no standards or agerestrictions. Expected to achieve abetterment in town centre locations.

Permit systems and economicinstruments: Introduction/increase ofenvironment taxes

Implementation Start date: 2015Expected end date: 2019Spatial scale: Whole agglomerationSource affected: TransportIndicator: Elimination of Euro 4, 3 andolder taxis by 2019Target emissions reduction: 1-2%

Shropshire Council_2.1 Northern Gateway Project (roadlayout)

Road layout improvements to enableincreased flow of traffic through theShrewsbury Train Station gyratoryincluding relocation of bus stopswhich caused blockages to flow.

Traffic planning and management:Other measure

Implementation Start date: 2011Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Improved flow rates through acongested junction in an urban canyonTarget emissions reduction: Unknown

85

This in

formati

on is

out o

f date

.

Page 87: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_2.2 Northern Gateway Project (activetransport promotion)

Cycle paths in area by ShrewsburyTrain Station taken off roadincreasing safety and encouraginguptake of active transport. Footpathwidening and resurfacing to improvethe area and encourage walking.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Increased cycling andpedestrian footfallTarget emissions reduction: Generalbetterment expected but notquantifiable

Shropshire Council_2.3 Northern Gateway Project (trafficsignalling measures)

Standard traffic signals upgraded toMOVA and SCOOT capability

Traffic planning and management:Other measure

Evaluation Start date: 2011Expected end date: 2012Spatial scale: LocalSource affected: TransportIndicator: Improved travel timesthrough Shrewsbury Train StationgyratoryTarget emissions reduction: 5-10%

Shropshire Council_3 Traffic signalling improvements Traffic signalling improvements byintroducing MOVA and SCOOTability to main feeder road intoShrewsbury Town Centre from theNorth. Signals included through toouter ring road.

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Potential to hold traffic out ofcongested densely urbanised areasand AQMAs and reduced travel timeswhere appropriateTarget emissions reduction: Generalbetterment not quantified. Part of awider initiative to stop travel through thetown centre and encourage use of theinner ring roads.

Shropshire Council_4 Heathgates RoundaboutImprovements

Roundabout covered by AQMA tonorth of Shrewsbury reworked toreduce congestion and reduce traveltimes through the junction

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved travel timesthrough the junctionTarget emissions reduction: Unknown

Shropshire Council_5.1 Shrewsbury Integrated TransportPlan (inner ring road)

Improvements to six inner ring roadjunctions in Shrewsbury to reducetravel times through the junctionsand encourage transport to use theinner ring road rather than travellingthrough the town centre.

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Reduced through traffic,reduced travel times through inner ringroad junctionsTarget emissions reduction: Up to 5%through interventions 5.1-5.4

86

This in

formati

on is

out o

f date

.

Page 88: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_5.2 Shrewsbury Integrated TransportPlan (signalling improvements)

Upgrade traffic signals along innerring road and main entrance toShrewsbury Town Centre to the Eastof the town to further encourage useof inner ring road

Traffic planning and management:Other measure

Planning Start date: 2017Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Increased use of inner ringroad, reduced traffic through towncentreTarget emissions reduction: Up to 5%through interventials 5.1-5.4

Shropshire Council_5.3 Shrewsbury Integrated TransportPlan (communication to road users)

VMS signalling to prioritise outer andinner ring roads and reduce trafficcrossing through town centre

Public information and Education:Other mechanisms

Planning Start date: 2017Expected end date: 2019Spatial scale: LocalSource affected: TransportIndicator: Increased flows of traffic onpriority routes, reduced through trafficTarget emissions reduction: Up to 5%through interventials 5.1-5.4

Shropshire Council_5.4 Shrewsbury Integrated TransportPlan (shared space)

Shared spaces in Shrewsbury TownCentre to encourage pedestrian andcycle use. To include better crossingfacilitates (especially along the innerrelief road) and removing barriers towalking and cycling. This will beaimed at improving the accessibilityof the town centre by active modesfrom outlying suburbs andinter-suburb trips therefore reducingthe need for vehicular travel,pedestrian wayfinding improvementswill be made through better signage,clearer routing and potentiallyintelligent technologies to informvisitors and residents, traffic speedreductions and enforcement, trafficrerouting and priority changes atsignalling junctions.

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2017Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Increased footfall in towncentre,Target emissions reduction: Up to 5%through interventials 5.1-5.4

Shropshire Council_6 Northern Ring Road Complete the outer bypass aroundShrewsbury into a complete ringroad: Phase one additional link tonorth of Myttonoak Road joining lastroundabout on existing outer reliefroad. This will encourage furtherdevelopment to complete the “ring” infuture.

Traffic planning and management:Other measure

Preparation Start date: 2017Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Reduce traffic on existingroads heading into the town centre,encourage transport around towncentre rather than through in the longterm.Target emissions reduction: Noincrease in town centre emissions

87

This in

formati

on is

out o

f date

.

Page 89: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_7 Air Quality Grant (UTMC) Install real time monitoring intoShrewsbury Town Centre hotspotarea. Data feeds back through acommon database which is alsolinked to traffic signalling. Signallingcould be altered or staff alerted topollution events where a targetthreshold is breeched allowingadjustments to be made to clear theissue asap.

Traffic planning and management:Other measure

Implementation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Number of times a triggercaused an intervention. Reduced NO2in the area or no increase withincreased number of vehicles on thenetwork or less negative impact thanexpected due to additional vehicles inthe area. Also reduced travel timesthrough the area of focus.Target emissions reduction: Not starteddue to too many variables. Being usedas a trial to see if a betterment can befound and to enhance existingequipment

88

This in

formati

on is

out o

f date

.

Page 90: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_8 Idling campaign Shrewsbury Town Centre roadnetwork within the river Severn loopis controlled at most major junctionsby traffic signals. The signals havehad significant upgrades in recentyears and remaining signals arescheduled for improvements (seeintervention numbers 2.3, 3 and 5.2above). However, there will still be abuild up of traffic at signals due to theweight of traffic at peak travel times.By introducing a behavioural changeintervention targeting general roadusers it is expected that pollutants inthe town centre could be reduced. Asecond phase to this is to encourageno idling by buses at the bas depotwhich is in the centre of a congestedarea. The final phase is to discussno idling by trains at the train stationwhich is also situated in an area ofpoor air quality. Each phase will runconcurrently. Anti-idling enforcementwill be considered where applicablehowever not an essential part of theintervention. This project will look atthe possibility of a social mediacampaign, school talks anddiscussions, signage, leafletting andany other options identified throughthe planning stage. A campaigncalled Turn-it-off in Canada noted a32% reduction in number of vehiclesidling and an overall with a 73%reduction in idling time noted byvehicles which turned off theirengines. Noise reduction would bean added potential benefit if thisscheme is successful.

Public information and Education:Internet

Preparation Start date: 2016Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Reduced number of vehiclesin each phase idlingTarget emissions reduction: Generalbetterment expected. Still at earlyplanning stage therefore no figurescompiled to date.

89

This in

formati

on is

out o

f date

.

Page 91: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_9 Green infrastructure Shrewsbury town centre has areaswhere there are large expanses ofbare walls in areas of significantnitrogen dioxide concentrations.Work with biodiversity officers hasestablished a win-win scenario byintroducing green/living walls into thearea to increase biodiversity andreduce air pollutants. Furtherdiscussions with economicdevelopment are required asevidence suggests increased spendin green areas. Overall aim is toovercome funding and logistic issuesand install a large green wall into thearea close to the train station. Thiswould give an aesthetic lift to thearea and as such hopes to alsoincrease footfall in the area.

Public information and Education:Other mechanisms

Planning Start date: 2018Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Reduced NO2 concentrationsat the diffusion tube monitoring locationunder the railway bridges inShrewsbury Town Centre. Increasedbiodiversity in the area.Target emissions reduction: NAresearch is not complete in this area.Also due to a significant number ofother interventions in the area it wouldbe difficult to indicate reductions as adirect result of this intervention.

Shropshire Council_10 Active Travel to Education Supporting schools in Bridgnortharea to implement initiatives thatreduce single child car journeys toschools, promote walking busses,cycle training, installation of scooterracks and bike racks.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2009Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Increased uptake of activetravelTarget emissions reduction: NA, focuson access to active transport andprovisions initially. Evaluation requiredin future

Shropshire Council_11 Cycle route improvements Cycle routes in Shrewsbury TownCentre, off road route to the northalong old canal

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2009Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Increased uptake of activetransportTarget emissions reduction: Noincrease in town centre. By removing anumber of motor vehicles by increaseduptake of active travel thiscompensates for predicted increases innumbers of motorised vehicles on theroad.

90

This in

formati

on is

out o

f date

.

Page 92: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_12 Ludlow traffic signal improvements Introduce MOVa signalling throughupdated traffic signalling in an areaof Ludlow within 10% of the NO2annual average objective level.

Traffic planning and management:Other measure

Preparation Start date: 2014Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Reduced NO2 at existingdiffusion tube monitoring locationTarget emissions reduction: 0.05

Shropshire Council_13 Pedestrian crossing improvements:Bridgnorth Underhill Road

Change current pedestrian crossingfrom a pelican to a puffin crossingwith smart technology to stop trafficsignals turning red if no pedestriansat the crossing.

Traffic planning and management:Other measure

Planning Start date: 2014Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Reduced stop time for trafficTarget emissions reduction: Unknownbut general betterment due to reducedidling in the area and traffic stoppingand accelerating away from thecrossing.

Shropshire Council_14 Bridgnorth new road and one-waysystem

TROs to stop disabled and deliveryon the High Street in Bridgnorthwhich in turn stops congestionassociated with large vehicles notbeing able to turn onto the HighStreet leading to vehicles backing upinto an AQMA. One way system putin place to ease traffic flow throughthe area and new road created todivert traffic displaced by one waysystem.

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2006Expected end date: 2008Spatial scale: LocalSource affected: TransportIndicator: Reduction in NO2 recordedat diffusion tubes.Target emissions reduction: 5% onWhitburn street and high street junction

Shropshire Council_15 Bridgnorth TROs Traffic Regulation Orders on HighStreet Bridgnorth to stop deliveryvehicles and disabled badge parkingin areas which stop large vehiclestravelling down Whitburn Street andturning onto High Street whichcaused significant congestion and airquality detriment.

Traffic planning and management:Management of parking places

Evaluation Start date: 2009Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Reduced NO2 at existingdiffusion tube monitoring locationTarget emissions reduction: 10%reduction at junction of interest. Smallimpact at AQMA as a result of reducedcongestion backing up to the AQMA

91

This in

formati

on is

out o

f date

.

Page 93: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Shropshire Council_16 Bridgnorth TRO Whitburn Street one way systemcongested due to parking anddeliveries causing issues. Looking tointroduce TRO to allow enforcementoptions to be available to stopunsuitable parking arrangementscausing unnecessary congestion.Traffic on occasion backs up to theAQMA therefore this action plans tostop this occurring allowing traffic toflow more easily through the AQMA.

Traffic planning and management:Management of parking places

Planning Start date: 2014Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Reduced congestion onWhitburn Street alleviating traffic flowaround the AQMATarget emissions reduction: Small andunquantifiable

Shropshire Council_17 Busses/coaches and schooltransport

Project to ensure that the Councilonly procure vehicles which hit aspecific emission standard by writingthis into the tendering process.

Public procurement: Cleaner vehicletransport services

Planning Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: A betterment in the emissionstandards of vehicles procured forschool transport and on services wherethe Council subsidises routes.Target emissions reduction: Low butgeneral widespread improvements.

South Staffordshire DistrictCouncil_1

Manage bus emissions Reduce unit emissions in the AQMAusing Bus Quality PartnershipAgreements (BQPA)

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2014Expected end date: 2011Spatial scale: LocalSource affected: TransportIndicator: Elimination of Euro I and IIbuses by 2014Target emissions reduction: 0.02

South Staffordshire DistrictCouncil_2

Manage HGV emissions Sign up to ECO Stars Other measure: Other measure Implementation Start date: 2015Expected end date: 2030Spatial scale: NationalSource affected: Commercial andresidential sourcesIndicator: Reduction in emissions ofNOxTarget emissions reduction: 14t / yr

Stafford Borough Council_1 ECO Stars Fleet RecognitionScheme

Reduce commercial fleet emissions Other measure: Other measure Preparation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: MembershipTarget emissions reduction: Based onother ECO Stars schemes, estimatedemission reductions of 14 tonnes NOx /yr 0.55 tonnes PM10 / yr 1428 tonnesCO2 /yr can be expected for borough.

92

This in

formati

on is

out o

f date

.

Page 94: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stafford Borough Council_2 Publicise VOSA Smoky VehicleHotline

Addressing excessive vehicleemissions

Public information and Education:Internet

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: NoneTarget emissions reduction: Small -NotQuantified

Stafford Borough Council_3 Staffordshire Share a Lift Scheme Encourage car sharing at peak times Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: NoneTarget emissions reduction: Small -NotQuantified

Stafford Borough Council_4 Provision of Cycleways Modal Shift from cars Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2001Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: NoneTarget emissions reduction: Small -NotQuantified

Staffordshire Moorlands DistrictCouncil_0

Manage Commercial Fleet VehicleEmissions

Reduce emissions from commercialfleet vehicles using ECO Stars FleetRecognition Scheme

Other measure: Other measure Planning Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Number of members of EcoStars SchemeTarget emissions reduction: 14 tonnesNOx/yr ; 0.55 Tons PM10 / yr; 1428CO2 /yr

Staffordshire Moorlands DistrictCouncil_1

Reduce air quality impacts fromdevelopment. SMDC Adopted CoreStrategy SP4

Ensure that the effects of pollution(air, land, noise, water, light) areavoided or mitigated by refusingschemes which are deemed to be(individually or cumulatively)environmentally unacceptable and byavoiding unacceptable amenityimpacts by refusing schemes whichare pollution-sensitive adjacent topolluting developments, or pollutingschemes adjacent to pollutionsensitive areas, in accordance withnational guidance.

Other measure: Other measure Implementation Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Number of planningconsultations regarding AQTarget emissions reduction: N/A

93

This in

formati

on is

out o

f date

.

Page 95: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Staffordshire Moorlands DistrictCouncil_2

Reduce our own road transportemissions (SMDC EnvironmentalPolicy)

Reduce fleet vehicle emissions Other measure: Other measure Implementation Start date: 2012Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Mileage /Per capita roadtransport emissions (CO2)Target emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_3

Promote alternatives to private motorvehicles (LTP Policy 5.2)

Reduce emissions from roadtransport & Respond to current andfuture climatic conditions

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Bus patronage numbers/ Percapita road transport emissions (CO2)Target emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_4

Promote the use of low-emittingvehicles and vehicle efficiency (LTPPolicy 5.3)

Reduce emissions from roadtransport & Respond to current andfuture climatic conditions

Public procurement: Cleaner vehicletransport services

Implementation Start date: 2012Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_5

Reduce our own road transportemissions LTP (Policy 5.4)

Reduce emissions from roadtransport & Respond to current andfuture climatic conditions

Other measure: Other measure Implementation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Road mileage travelledTarget emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_6

Raise awareness of environmentalissues and encourage people to leadmore sustainable lifestyles helping toreduce carbon emission

Promoting sustainable travel andschool travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Bus patronage numbers/ Percapita road transport emissions (CO2)Target emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_7

Local Transport Plan Freight Strategy Careful consideration of anyrequests to restrict lorry movementsin line with actions and priorities inthe Local Transport Plan FreightStrategy (2011)

Other measure: Other measure Implementation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Per capita road transportemissions (CO2)Target emissions reduction: N/A

94

This in

formati

on is

out o

f date

.

Page 96: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Staffordshire Moorlands DistrictCouncil_8

Staffordshire Moorlands DistrictCouncil’s Leek Town CentreMasterplan

Improve Traffic Flows through Leektown Centre : reconfigured busstation with associated accessimprovements to key town centreroutes, improved pedestrian linksinto the town centre, public realmenhancements within the retail core,further junction modifications andpotential new highway capacity southof the town centre to unlock theCornhill and Barnfields regenerationarea

Other measure: Other measure Implementation Start date: 2012Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Traffic Flows / CongestionTarget emissions reduction: N/A

Staffordshire Moorlands DistrictCouncil_9

A50 growth Corridor improvements Improve road flows through the A50truck road (major road in south ofdistrict)

Other measure: Other measure Planning Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Traffic Flows / CongestionTarget emissions reduction: N/A

Stoke-on-Trent City Council_AQ1 Burslem Town Centre TrafficManagement Improvements

Reduce unit emissions in the AQMAusing traffic managementimprovements

Traffic planning and management:Other measure

Evaluation Start date: 2014Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 299 kg/yr

Stoke-on-Trent City Council_AQ2 Cobridge Traffic ManagementImprovements (including WaterlooRoad Corridor)

Reduce unit emissions in the AQMAby improved traffic flow along astrategic road corridor.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2013Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 389 kg/yr

95

This in

formati

on is

out o

f date

.

Page 97: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_AQ3 Victoria Road Corridor Improvements Reduce unit emissions on VictoriaRoad, Fenton

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2013Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 297 kg/yr

Stoke-on-Trent City Council_AQ4a Lichfield Street Improvements Reduce unit emissions in the AQMAthrough improved traffic flow andimproved sustainable transport offer.

Traffic planning and management:Improvement of public transport

Preparation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 322 kg/yr

Stoke-on-Trent City Council_AQ4b Leek Road / Victoria Road Junction -Safety Scheme

21 road traffic incidents in threeyears resulted in this scheme beingassessed for possible interventionmeasures.

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: CalculatedAnnual NOx Reductions 321 kg/yr

Stoke-on-Trent City Council_AQ4c City Road Corridor Improvements Reduce unit emissions in the AQMAby improved traffic flow, improvedmeasures for walking/cycling andimproved road safety between LeekRoad & Victoria Road.

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 266 kg/yr

Stoke-on-Trent City Council_AQ5a Station Gateway (Phase 1),University Quarter (Phase 2) and UniBoulevard (Phase 3)

N/A Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: CalculatedAnnual NOx Reductions 480 kg/yr

96

This in

formati

on is

out o

f date

.

Page 98: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_AQ5b Leek Road Traffic ManagementImprovements

Reduce unit emissions in the AQMAthrough improved vehicular flow.This project will complement theproposed improvements to theInvestment Plan project for theStation Gateway.

Traffic planning and management:Other measure

Evaluation Start date: 2014Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: N/ATarget emissions reduction: CalculatedAnnual NOx Reductions 480 kg/yr

Stoke-on-Trent City Council_AQ6 Victoria Street / Shelton New RoadJunction Improvement

Reduce unit emissions in the AQMAthrough a junction improvementscheme which introduces pedestriancrossing facilities & trafficmanagement improvementsincluding banned right turns on allarms.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2013Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 21 kg/yr

Stoke-on-Trent City Council_AQ7a Parking restrictions outside schools Reduce unit emissions in the AQMAby improving peak period trafficflows, average congestion (miles perminute), journey times, mode shareof journey, access by publictransport, bus punctuality times.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 272 kg/yr

Stoke-on-Trent City Council_AQ7b Walk to School Outreach– LivingStreets

Reduce unit emissions in the AQMAby reducing negative impact of the‘school run’ on congestion, journeytimes and economic growth, byremoving barriers to walking anddelivery of proven school-basedinterventions for schools in the southand east of Stoke-on-Trent whichhave large numbers of childrendriven short distances to school bycar.

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 272 kg/yr

97

This in

formati

on is

out o

f date

.

Page 99: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_AQ7c Access to Education - Sustrans Reduce unit emissions in the AQMAthrough work with Sustrans tosupport economic growth by tacklinglocal congestion problems caused byjourneys to schools. It includesfunding to promote walking andcycling to 21 primary schools and 7secondary schools in the north andeast of Stoke-on-Trent.

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 272 kg/yr

Stoke-on-Trent City Council_AQ8 Stoking Employment in NorthStaffordshire

Reduce unit emissions in the AQMAby assisting shift to sustainabletransport modes on the existing andgrowing employment areas atChatterley Valley, Etruria Valley,Trentham Lakes, the UniversityQuarter (UniQ) and Keele University& Science and Business Park. Thesesites currently provide 13,700 jobswith the potential to unlock a further8,000 jobs by April 2015.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2012Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 17,750 kg/yr

Stoke-on-Trent City Council_AQ9 Clean Air Grant Reduce unit emissions in the AQMAby providing additional support tobusiness for staff travel plans,growing the existing WorkplaceTravel Plan Grant into a local CleanAir Grant.

Public procurement: Other measure Implementation Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: CalculatedAnnual NOx Reductions 57 kg/yr

Stoke-on-Trent City Council_AQ10 Staffordshire ECO Stars FleetRecognition Scheme

Reduce unit emissions in theconurbation – specifically targetingcommercial vehicles (HGV, vans,buses and coaches) to reducevehicle emissions and, ultimately, airquality problems that are directlyrelated to their contribution to roadtraffic.

Other measure: Other measure Preparation Start date: 2015Expected end date: 2016Spatial scale: Whole agglomerationSource affected: TransportIndicator: Reduced emissionsTarget emissions reduction: Expectedemission reduction 7 tonne NOx/yr,2.22 tonne PM10/yr, 11615 tonneCO2/yr

98

This in

formati

on is

out o

f date

.

Page 100: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_HDS1 Real Time Bus Information Reduce unit emissions in the AQMAby assisting shift to sustainabletransport modes on the existing andgrowing employment areas

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS2 Improved Access to Health andLeisure facilities

Reduce unit emissions in the AQMAthrough improved pedestrian andcyclist accessibility to the City’sHealth & Leisure Facilities,e.g. Parks, Health Centres, SportsCentres, Museums, Libraries etc.

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS3 Programme of Bus StopImprovements

Reduce unit emissions in the AQMAthrough improved accessibility topublic transport, higher qualityinfrastructure

Traffic planning and management:Improvement of public transport

Implementation Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS4 Wilson Road / New Inn LaneJunction Improvement

Reduce unit emissions in the AQMAthrough improved pedestrian andcyclist accessibility to the City’sHealth & Leisure Facilities,e.g. Parks, Health Centres, SportsCentres, Museums, Libraries etc.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

99

This in

formati

on is

out o

f date

.

Page 101: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_HDS5 Etruria Valley Major Highway &Transport Scheme

Reduce unit emissions in the AQMAthrough major new transportinfrastructure scheme linking theA500 to the City Centre, reducingcongestion on the A53, the A500 andthe wider conurbation

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2019Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS6 Leek Road CorridorImprovements(Growth Deal)

Reduce unit emissions in the AQMAthrough a new junction improvementand traffic management measuresalong this arterial route through theCity

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS7 Etruria Road CorridorImprovements(Growth Deal)

Reduce unit emissions in the AQMAthrough re-allocation of road space,traffic management and public realmmeasures along this arterial routeinto the City Centre

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved mode share of journey.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS8 City Centre Ring Road (completion) Reduce unit emissions in the AQMAthrough the delivery of the final‘quarter’ of the City Centre RingRoad. This will reduce congestion onthe routes into the City Centre byre-directing through traffic onto theRing Road

Traffic planning and management:Other measure

Planning Start date: 2017Expected end date: 2019Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

100

This in

formati

on is

out o

f date

.

Page 102: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_HDS9 Arbourfield Drive / Dividy Rd JunctionImprovement

Reduce unit emissions in the AQMAthrough a junction improvementscheme, with UTC measures aimedat reducing congestion on theapproaches to this junction and trafficflow overall by linking existing trafficsignal installations

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS10 Trentham Lakes / A50 StrategicSigning

Reduce unit emissions in the AQMAthrough a change to the StrategicSigning from the A50 Trunk Road,reducing HGV traffic using the localroad network.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HDS11 Potteries Way / Bucknall Rd JunctionImprovement

Reduce unit emissions in the AQMAthrough a major new junctionimprovement on the Potteries WayCity Centre Ring Road, updating theoperation of the signallingarrangements, introduction of UTCand improved junction capacity.

Traffic planning and management:Other measure

Evaluation Start date: 2017Expected end date: 2019Spatial scale: LocalSource affected: TransportIndicator: Improved journey times.Improved average congestion(miles/minute)Target emissions reduction: Notcalculated

Stoke-on-Trent City Council_HBE1 Community Rail Partnership Encouraging more use of local railservices by improving service andstation quality, awareness andpromotion campaigns

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2005Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased use of local railservicesTarget emissions reduction: Notcalculated

Stoke-on-Trent City Council_HBE2 Concessionary Bus Pass Scheme Providing free bus travel to thoseeligible

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Maintaining use of local busservicesTarget emissions reduction: Notcalculated

101

This in

formati

on is

out o

f date

.

Page 103: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Stoke-on-Trent City Council_HBE3 Home to Work Scheme Providing transport assistance tothose with job offers

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Number of clients assistedTarget emissions reduction: Notcalculated

Walsall Metropolitan BoroughCouncil_1

Darlaston Strategic DevelopmentArea

Creation of improved road/accessinfrastructure.

Traffic planning and management:Other measure

Preparation Start date: 2016Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40ìg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

Walsall Metropolitan BoroughCouncil_2

West Midlands Low EmissionsTowns & Cities Program (LETCP)

The Defra funded LETCP seeks topromote joint working across theWest Midlands to reduce roadtransport emissions (e.g. NO2 andPM)

Other measure: Other measure Other Start date: 2007Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Delivery of work streamsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

102

This in

formati

on is

out o

f date

.

Page 104: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_3

Low Emission Strategy The Defra funded LETCP seeks topromote joint working across theWest Midlands to reduce roadtransport emissions (e.g. NO2 andPM)

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Adoption of the Low EmissionStrategy within each Local Authorityarea, subject to cabinet approvals.Target emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40ìg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

Walsall Metropolitan BoroughCouncil_4

Planning Guidance Develop West Midlands-wide GoodPractice Planning Guidance whichreduces exposure of residents to airpollution. The guidance promotes asimplified assessment criteria anddefinition of sustainability, andincorporates mitigation as standardto help counter cumulative impacts.It applies a procedure for evaluatingadditional requirements for mitigationand compensation using costdamage analysis.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40ìg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

103

This in

formati

on is

out o

f date

.

Page 105: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_5

Procurement Guidance Develop West Midlands-wide GoodPractice Procurement document withthe following key policies andbenefits: Local sourcing (reducedvehicle mileage), Sustainable fleetdemonstration, specification andcontract award criteria, includingGovernment Buying Standardsconsiderations. Development ofWhole Life Cost model, includingdamage costs of environmentalimpact. Innovative procurement.Development of public-privatepartnerships.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

Walsall Metropolitan BoroughCouncil_6

Low Emission Zone Feasibility Low Emission Towns and CitiesBoard -Representatives from 7 LocalAuthorities. Lead Authority fordocument is Birmingham CC

Other measure: Other measure Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions / pollutantconcentrations.Target emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

104

This in

formati

on is

out o

f date

.

Page 106: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_7

Low Emission Zone Feasibility A Technical Study (ScenarioModelling) into the feasibility ofcreating a transferable LEZ model forthe West Midlands. A range ofscenarios were selected (City Centre/ Motorway / Street Canyon andUrban Corridor).The study assessesthe benefits and disadvantages ofemission control policies on keyvehicle types for each scenario,including cost benefit analysis andpotential costing for implementation,as well as Health Impact Assessment(HIA) of the most effectiveintervention measures.

Other measure: Other measure Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions /pollutantconcentrations.Target emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

Walsall Metropolitan BoroughCouncil_8

OLEV Go Ultra Low City StatusScheme

Submission of a bid for promotion oflow emission vehicles andestablishment of charginginfrastructure.

Public procurement: Other measure Other Start date: 2014Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Success of the bidTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

105

This in

formati

on is

out o

f date

.

Page 107: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_9

Local sustainable transport initiatives Support the broader aims of OLEVby promoting alternative modes oftransport

Public procurement: Other measure Other Start date: 2014Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40μg/m3 between2008 (baseline) and 2015” andcompliance with relevant air qualityobjective.

Walsall Metropolitan BoroughCouncil_10

M6 Active Traffic Management -Birmingham Box.

Provision of 4 lane motorway runningfor south-bound and north-bound M6carriageways according to demandthroughout Walsall borough andbeyond

Traffic planning and management:Other measure

Implementation Start date: 2009Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances.Target emissions reduction: Nationalair quality objective compliance.

Walsall Metropolitan BoroughCouncil_11

Black Country SupplementaryPlanning Document for Air Quality.

Provision of simplified guidanceacross the Black Country for dealingwith air quality in context of theplanning system.

Other measure: Other measure Preparation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded.

Walsall Metropolitan BoroughCouncil_12

Junction 10 M6 Improvement. Increasing capacity and alignment toimprove traffic congestion.

Traffic planning and management:Other measure

Planning Start date: 2018Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impacts.Target emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded.

106

This in

formati

on is

out o

f date

.

Page 108: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_13

Chase Line Walsall - Rugeley railelectrification.

Electrification of railway network. Traffic planning and management:Improvement of public transport

Implementation Start date: 2013Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impacts.Target emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded.

Walsall Metropolitan BoroughCouncil_14

Walsall Red Route Network / BusLane Prioritisation.

Congestion easing Traffic planning and management:Other measure

Implementation Start date: 2010Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances; Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_15

Local Sustainable Transport Fund. Congestion easing e.g. Traffic signalupgrades Bus Route 4

Traffic planning and management:Other measure

Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances; Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_16

Managing Shorter Trips Fund Promoting Walking and Cycling anduse of public transport for shorterjourneys.

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

107

This in

formati

on is

out o

f date

.

Page 109: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_17

A’ Stars Schools Programme Promoting walking and cycling forschool journeys

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Cycling/Walking Levels.Health - Child ObesityTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_18

Cycle Network Improvement to Walsall CycleNetwork

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2003Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Levels of cycling.Target emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_19

20 mph Zones Reduction in vehicles speeds andassociated - road safety

Traffic planning and management:Reduction of speed limits and control

Implementation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Speed enforcement /accidents ratesTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_20

Cycle to Work Scheme. Promotion of alternative transport /reduce car usage

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Numbers of employeescycling to work / associated healthbenefitsTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_21

Walsall Town Centre TransportPackage

Strategic road improvements Traffic planning and management:Improvement of public transport

Evaluation Start date: 2009Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

108

This in

formati

on is

out o

f date

.

Page 110: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_22

Bus Lane, Pedestrian Crossings andSchool Clearways VehicleEnforcement

Congestion easing Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Number of infringementsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_23

Workplace Travel Plans. Sustainable Travel Options Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: LSTF Walsall Travel PlansTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_24

Emergency Service Local Media andBus Operator advanced notificationof highway disruption

Maintain traffic flow Public information and Education:Other mechanisms

Other Start date: 2001Expected end date: 2030Spatial scale: Whole agglomerationSource affected: TransportIndicator: N/ATarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_25

Public Health Notifications Public Protection Public information and Education:Internet

Implementation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: Other, please specifyIndicator: N/ATarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_26

Driver CPC training Statutory requirement for HGVDrivers

Other measure: Other measure Implementation Start date: 2011Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: 5 days training per 5 yearsper driverTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_27

Take Responsibility campaign Informative solution to road-rage andother issues

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Adverse comments /complaint numbersTarget emissions reduction: N/A

109

This in

formati

on is

out o

f date

.

Page 111: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_28

Voluntary Speed Limiters Control of maximum vehicles speeds- reduction in running costs andemissions

Other measure: Other measure Implementation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Vehicle TrackingTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_29

Greener Fleet Review Reducing emissions, costs savings Other measure: Other measure Other Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Fuel usage per vehicle / typeof vehicle / whole life costingsTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_30

Vehicle Replacement 7 year rolling replacement strategy Other measure: Other measure Preparation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Cost efficiency / repair costs /emissions / service life / maintenanceTarget emissions reduction: N/A

Walsall Metropolitan BoroughCouncil_31

Walsall Town Centre Area ActionPlan and Site Allocation Document

Long-term allocation of developmentsites within and beyond the towncentre; setting the planningframework for the town centre andother locations; and the basis onwhich planning decisions are madewithin the borough.

Other measure: Other measure Preparation Start date: 2016Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_32

Air quality considerations regardingallocation of land/land uses andextant AQMA

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for Walsall and theWest Midlands. This serves toidentify the best enhancementlinkages between the existingcentres and between the urbansystems and the HighwaysAgency/Highways England systems.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

110

This in

formati

on is

out o

f date

.

Page 112: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_33

West Midlands UTC Major Projects -ANPR Journey Time MonitoringSystem - c. 22 ANPR cameras(borough-wide strategic routes)

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for Walsall and theWest Midlands. This serves toidentify the best enhancementlinkages between the existingcentres and between the urbansystems and the HighwaysAgency/Highways England systems.

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_34

West Midlands UTC Major Projects -c. 24 Road Traffic Cameras onstrategic roads (road occupancy -congestion/vehicle counting/vehicleclassification)

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for Walsall and theWest Midlands. This serves toidentify the best enhancementlinkages between the existingcentres and between the urbansystems and the HighwaysAgency/Highways England systems.

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_35

West Midlands UTC Major Projects -Traffic signal communicationinfrastructure upgraded to internetprotocol (wireless-digital system)

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for the West Midlands.This has identified the bestenhancement linkages between theexisting centres and between theurban systems and the HighwaysAgency systems.

Traffic planning and management:Other measure

Evaluation Start date: 2012Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_36

West Midlands UTC Major Projects -UTC Common data base

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for the West Midlands.This has identified the bestenhancement linkages between theexisting centres and between theurban systems and the HighwaysAgency systems.

Traffic planning and management:Other measure

Implementation Start date: 2012Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

111

This in

formati

on is

out o

f date

.

Page 113: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Walsall Metropolitan BoroughCouncil_37

West Midlands UTC Major Projects -6 traffic signal upgrades(Mova/Scoot)

Walsall MBC will participate indevelopment of Urban Traffic Controlarrangements for Walsall and theWest Midlands. This serves toidentify the best enhancementlinkages between the existingcentres and between the urbansystems and the HighwaysAgency/Highways England systems.

Traffic planning and management:Other measure

Evaluation Start date: 2012Expected end date: 2020Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Walsall Metropolitan BoroughCouncil_38

West Midlands UTC Major Projects -‘ASTRID’

Walsall MBC will develop andimplement a system of Urban TrafficControl for the borough integratingair quality measurements and UTC

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2020Spatial scale: Whole town or citySource affected: TransportIndicator: Air QualityObjectives/exceedances. Significanceof impactsTarget emissions reduction: Relevantexposure to air quality where nationalobjectives are exceeded

Warwick District Council_1 Improvements to Junctions 13, 14,1nd 15 of the M40

Reduce queuing at motorwayjunctions

Traffic planning and management:Other measure

Implementation Start date: 2008Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Changes in traffic levels atjunctionsTarget emissions reduction: N/a

Warwick District Council_2 Completion of the Urban CycleNetwork within Warwick andLeamington Spa

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Changes in number of peoplecyclingTarget emissions reduction: No specifictargets set

Warwick District Council_3 Provision of secure on and off streetPTW parking facilities

Reduce reliance on car and reducequeuing time in AQMA

Other measure: Other measure Other Start date: 2030Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Changes in parking levels atdedicated facilitiesTarget emissions reduction: No specifictargets set

112

This in

formati

on is

out o

f date

.

Page 114: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Warwick District Council_4 Development of Intelligent TransportSystems

Reduce reliance on car and reducequeuing time in AQMA

Public information and Education:Other mechanisms

Implementation Start date: 2010Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: Changes in journey timesTarget emissions reduction: No specifictargets set

Warwick District Council_5 Improving the attractiveness of publictransport

Reduce reliance on car and reducequeuing time in AQMA

Other measure: Other measure Implementation Start date: 2006Expected end date: 2008Spatial scale: LocalSource affected: TransportIndicator: Delivery of the SPARK majorpublic transport schemeTarget emissions reduction: No specifictargets set

Warwick District Council_6 Implementation of the LTP PublicTransport Interchange

Implementing the measures toreduce queuing in AQMA

Traffic planning and management:Improvement of public transport

Implementation Start date: 2006Expected end date: 2009Spatial scale: LocalSource affected: TransportIndicator: Delivery of the schemesTarget emissions reduction: No specifictargets set

Warwick District Council_7 Improve and promote local busservices

Reduce unit emissions in AQMAusing Bus Quality PartnershipAgreements

Traffic planning and management:Improvement of public transport

Implementation Start date: 2006Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Delivery of the schemeswithin the bus strategy and LTPTarget emissions reduction: No specifictargets set

Warwick District Council_8 Implementation of LTP BusInformation Strategy

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Improvement of public transport

Preparation Start date: 2010Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Delivery of the schemeswithin the strategyTarget emissions reduction: No specifictargets set

Warwick District Council_9 Promotion of a passenger railnetwork including a new station inKenilworth

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Improvement of public transport

Planning Start date: 2013Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: New railway station atKenilworthTarget emissions reduction: Unknown

113

This in

formati

on is

out o

f date

.

Page 115: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Warwick District Council_10 Implementation of LTP ParkingStrategy

Implementing the measures toreduce queuing in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Delivery of the schemeswithin the strategyTarget emissions reduction: No specifictargets set

Warwick District Council_11 Promoting and encouraging differentforms of transport

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2010Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Modal shiftTarget emissions reduction: No specifictargets set

Warwick District Council_12 Improving the safety and quality ofcycling routes

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2014Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Changes in number of peoplecyclingTarget emissions reduction: No specifictargets set

Warwick District Council_13 Encouragement for schools to writeTravel Plans

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2006Expected end date: 2010Spatial scale: Whole town or citySource affected: TransportIndicator: Number of schoolssubmitting a planTarget emissions reduction: No specifictargets set

Warwick District Council_14 Implementation of the LTP Land Useand Transportation Strategy

Implementing the measures toreduce queuing in AQMA

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Number of planningapplications which include sustainabletransport measureTarget emissions reduction: No specifictargets set

114

This in

formati

on is

out o

f date

.

Page 116: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Warwick District Council_15 Implementation of the LTPSustainable Freight DistributionStrategy

Implementing the measures toreduce queuing in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Other Start date: 2030Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Delivery of the schemes inthe strategyTarget emissions reduction: No specifictargets set

Warwick District Council_16 LEZ Feasibility Study for towncentres

Analyse, decide on and implementbest option to reduce queuing inAQMA

Other measure: Other measure Implementation Start date: 2012Expected end date: 2013Spatial scale: Whole town or citySource affected: TransportIndicator: Produce feasibility reportTarget emissions reduction: No specifictargets set

Warwick District Council_17 LEZ Planning Guidance for newdevelopment

Avoid worsening air quality byadopting local planning policies

Other measure: Other measure Implementation Start date: 2013Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Policy adopted by CouncilTarget emissions reduction: No specifictargets set

Warwick District Council_18 Produce new Sustainable TransportStrategy for Warwick andLeamington Spa

Reduce reliance on car and reducequeuing time in AQMA

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Strategy adopted by CouncilTarget emissions reduction: Work inprogress

Warwick District Council_19 Review and update Air Quality ActionPlan

Improve ability to manage air qualityacross services

Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Action Plan approved byCouncilTarget emissions reduction: Work inprogress

115

This in

formati

on is

out o

f date

.

Page 117: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_1 Wolverhampton Interchange projectphase 1

Improve access into the main busstation. Provision of new accessroad directly from the ring road.Reduction in the number of buses inLichfield Street, Princess St, QueenSt and Stafford St

Traffic planning and management:Improvement of public transport

Implementation Start date: 2010Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_2 Midland Metro city centre extension. Part of the interchange project theMidland Metro system will beextended from its current terminus atBilston Street to link with the mainline railway station.

Traffic planning and management:Improvement of public transport

Planning Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_3 Wolverhampton City Centre Scheme Creation of a new one way system,pedestrian zones, rationalisation ofon street parking, bus lanes and newbus stops along Princess Street,Market Street and Queen Street

Traffic planning and management:Improvement of public transport

Other Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

116

This in

formati

on is

out o

f date

.

Page 118: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_4 Railway station access improvement Creation of a new access road to therailway station off Horesley Fields.Current access is from inside the ringroad leading to high levels of trafficwithin the city centre.

Traffic planning and management:Improvement of public transport

Other Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_5 Conduct a feasibility study ofroadside emission testing.

The City Council (WCC) will evaluatethe viability of the testing of vehicleemissions at the roadside. If testingproves to be viable, drivers whosevehicles fail the test could be issuedwith a fixed penalty notice.

Other measure: Other measure Evaluation Start date: 2006Expected end date: 2008Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_6 Improve the WCC Fleet. The City Council will continue tofavour low emission vehicles in itsown fleet.

Other measure: Other measure Implementation Start date: 2006Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

117

This in

formati

on is

out o

f date

.

Page 119: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_7 Discourage drivers from allowingtheir engines to idle unnecessarilywhen parked.

WCC to undertake a programme ofdriver awareness/ecodriving.

Other measure: Other measure Implementation Start date: 2006Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_8 Showcase route extension andimprovements.

The Council will implement aprogramme of enhanced bus routesfeaturing real time information at busstops, improved bus shelters andlighting at stops and bus priority atjunctions.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2006Expected end date: 2011Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_9 Increased bus lane enforcement. Fixed roadside cameras for bus laneenforcement.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

118

This in

formati

on is

out o

f date

.

Page 120: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_10 Increase in passenger capacity of railnetwork.

The City Interchange Project (seepoints 1 &2) forms a major newtransport interchange, based uponthe existing rail station and busstation. It will provide new linkagesand encourage modal shift,enhancing and improving City Centreaccess.

Traffic planning and management:Improvement of public transport

Implementation Start date: 2007Expected end date: 2016Spatial scale: Whole agglomerationSource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_11 The investigation of ‘Red Routes’ toease congestion.

WCC has completed ademonstration red route scheme onthe A449 Stafford Road.

Traffic planning and management:Improvement of public transport

Other Start date: 2006Expected end date: 2008Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_12 Improvement of Urban Traffic ControlSystems designed to reducecongestion.

WCC will participate in developmentof Urban Traffic Controlarrangements for the West Midlands.This has identified the bestenhancement linkages between theexisting centres and between theurban systems and the HighwaysAgency systems.

Traffic planning and management:Other measure

Implementation Start date: 2005Expected end date: 2014Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

119

This in

formati

on is

out o

f date

.

Page 121: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_13 Wolverhampton Car Share (WCS). WCC will facilitate a Car ShareCoordinator which aims to give thosetravelling to work an alternative traveloption.

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_14 Promotion of walking. The City Council has adopted aWalking Strategy as a requirement ofGovernment and the LTP. TheStrategy promotes facilities toencourage people to walk for morejourneys. It covers all aspects fromthe provision of pedestrian friendlyfacilities in new developments,education and promotion of walkingas a mode of transport, as well asthe maintenance of existing facilities.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2001Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_15 Promotion of cycling. WCC has adopted a Cycle Strategyand has an annual rolling programmefor cycle facilities. These provide aframework for the City Council topromote and provide additional safecycle routes, secure cycle parkingand training initiatives. The Councilwill also continue to ensure that newresidential and commercialdevelopments provide secure cyclestorage facilities and contribute to thecycle network.

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2001Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

120

This in

formati

on is

out o

f date

.

Page 122: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_16 West Midlands Low EmissionsTowns & Cities Program (LETCP)

The LETCP seeks to promote jointworking to reduce regulated roadtransport emissions, primarily oxidesof nitrogen (NOx) and particulatematter, as well as securingreductions in greenhouse gases andnoise emissions where practicable.Building on policies and measures todiscourage vehicle use andencourage a shift to sustainabletransport modes, the LETCP aims toachieve improvements in emissionsfrom the vehicle fleet through theaccelerated take-up of cleaner fuelsand technologies and bydiscouraging the use of highemission vehicles.

Other measure: Other measure Implementation Start date: 2007Expected end date: 2017Spatial scale: Whole agglomerationSource affected: TransportIndicator: Delivery of work streamsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_16a Low Emission Strategy Overarching Low Emission Strategyfor the 7 West Midlands Authoritiesto improve emissions andconcentrations of NO2 andparticulates while also seeking toexploit the synergies of CO2 andnoise reduction, where possible,through the transformation of theWest Midlands vehicle fleet

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Adoption of the Low EmissionStrategy within each Local Authorityarea.Target emissions reduction: N/A

Wolverhampton City Council_16b Planning Guidance Develop a regional Good PracticePlanning Guidance which protectsresidents of future developmentschemes from exposure to airpollution. The guidance promotes asimplified assessment criteria anddefinition of sustainability, andincorporates mitigation as standardto help counter cumulative impacts.It applies a procedure for evaluatingadditional requirements for mitigationand compensation using costdamage analysis.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2014Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

121

This in

formati

on is

out o

f date

.

Page 123: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_16c Procurement Guidance Develop a regional Good PracticeProcurement document with thefollowing key policies and benefits:Local sourcing (reduced vehiclemileage), Sustainable fleetdemonstration, specification andcontract award criteria, includingGovernment Buying Standardsconsiderations. Development ofWhole Life Cost model, includingdamage costs of environmentalimpact. Innovative procurement.Development of public privatepartnerships.

Other measure: Other measure Implementation Start date: 2011Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of Guidance andimplementation across the WestMidlandsTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_16d Low Emission Zone Feasibility A technical study into the feasibility ofcreating a transferable LEZ model forthe West Midlands. A range ofscenarios were selected (City Centre/ Motorway / Street Canyon andUrban Corridor).The study assessesthe benefits and disadvantages ofemission control policies on keyvehicle types for each scenario,including cost benefit analysis andpotential costing for implementation,as well as Health Impact Assessment(HIA) of the most effectiveintervention measures

Other measure: Other measure Evaluation Start date: 2013Expected end date: 2015Spatial scale: Whole agglomerationSource affected: TransportIndicator: Publication of feasibility studyand adoption of measures capable ofimproving emissions/pollutantconcentrations.Target emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_17 OLEV Go Ultra Low City StatusScheme

Submission of a bid for promotion oflow emission vehicles andestablishment of charginginfrastructure

Public procurement: Other measure Preparation Start date: 2014Expected end date: 2021Spatial scale: Whole agglomerationSource affected: TransportIndicator: Success of the bidTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

122

This in

formati

on is

out o

f date

.

Page 124: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_18 Green Fleet Review Carry out Green Fleet Review ofcouncil’s liveried and grey fleets.Plugged In Fleet Initiative (PIFI)review of potential for ULEV vehiclesincluding the introduction of staff poolvehicles.

Other measure: Other measure Preparation Start date: 2014Expected end date: 2021Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_19 Local sustainable transport initiatives Support the broader aims of OLEVby promoting alternative modes oftransport to single car occupancy ofICE vehicles, thereby improving airquality & facilitating behaviourchange

Public procurement: Other measure Preparation Start date: 2014Expected end date: 2020Spatial scale: Whole agglomerationSource affected: TransportIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Wolverhampton City Council_20 Encouragement of City Centre living Wolverhampton City Council willcontinue its strategy to encouragecity centre living

Other measure: Other measure Preparation Start date: 2013Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: None setTarget emissions reduction: N/A

123

This in

formati

on is

out o

f date

.

Page 125: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wolverhampton City Council_21 Energy efficiency WCC will pursue the uptake ofalternative energy sources in councilbuildings. WCC will work withWolverhampton Homes to continueits energy efficiency strategy forresidential properties.

Other measure: Other measure Implementation Start date: 2004Expected end date: 2030Spatial scale: Whole town or citySource affected: Commercial andresidential sourcesIndicator: None setTarget emissions reduction: WestMidlands Local Transport Plan 3performance aim: ” A net reduction ofNitrogen Dioxide (NO2) in those areas,as confirmed by each local authoritywithin the West Midlands, where theannual average NO2 values arepredicted to exceed 40µg/m3 between2008 (baseline) and 2015”.

Worcester City Council_1 Improvement of signage for traffic toavoid AQMA

Encourage strategic traffic to avoidtravelling through the AQMA anddirecting traffic via other routes

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Decrease in traffic flowsthrough AQMA. Decrease in number ofstrategic journeys through AQMATarget emissions reduction: 5-10%

Worcester City Council_2 Freight Quality Partnership (workwith sat nav providers)

Encourage freight vehicles to avoidAQMA and find alternative routesthrough work with sat nav dataproviders to ensure freight isroutinely routed around AQMA

Traffic planning and management:Other measure

Evaluation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Significant reduction ofstrategic freight diverted away fromAQMA.Target emissions reduction: 5-25%

Worcester City Council_3 Alteration to Traffic Light Phasing inand around Dolday

Explore whether alteration to trafficlight phasing around the DoldayAQMA could improve flow within theAQMA, specifically in area wheremeasured NO2 is particularly high

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2014Spatial scale: LocalSource affected: TransportIndicator: Improved flow of trafficaround Dolday. Reduction in queuingtimes.Target emissions reduction: 1-2%

124

This in

formati

on is

out o

f date

.

Page 126: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_4 Bus Quality Partnership (as part of awider Worcester City CentreAccessibility Masterplan Strategy andcombined Low Emission Strategy)

Reduce bus related emissions inAQMA through use of Bus QualityPartnerships (BQP) with localoperators. Worcester City bus stationis located on perimeter of DoldayAQMA and as such bus contributionto emissions is high

Retrofitting: Retrofitting emissioncontrol equipment to vehicles

Evaluation Start date: 2018Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Elimination of lower Eurostandard buses (which Euro Standardsto be agreed should political support forsuch an action be secured) by as yetunknown date.Target emissions reduction: 5-25%

Worcester City Council_5 Encourage uptake of employer andresidential travel plans for majoremployers and new developments toarea

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: <1%

Worcester City Council_6 Encourage car sharing Promote development and use of carsharing through potentialCounty-wide personal travel planningservice

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number of peoplecar sharingTarget emissions reduction: <1%

Worcester City Council_7 Install secure cycle parking shelters Encourage cycling as a mode oftransport into the city centre

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number of securecycle parking shelters in City, increasein use of secure cycle parking sheltersTarget emissions reduction: <1%

Worcester City Council_8 Greening Council and BusinessFleets

Secure use of “cleaner” fuels/higherEuro standard vehicles for Counciland Business fleets. Support bid forinstallation of CNG facility inWorcestershire

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Increase in number ofCouncil and business fleet vehicles ofhigher Euro Standard and/or utilisingalternative fuelsTarget emissions reduction: <1%

125

This in

formati

on is

out o

f date

.

Page 127: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_9 Development of a Low EmissionStrategy for Worcestershire

Development and implementation oflow emission strategy to contain avariety of strategies aimed atreducing emissions.

Other measure: Other measure Evaluation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Formal adoption andimplementation of Low EmissionStrategyTarget emissions reduction: Currentlyunknown - dependant on whatmeasures are included in any LowEmission Strategy and if politicalsupport for a Low Emission Strategycan be secured.

Worcester City Council_10 Installing electric vehicle chargingpoints

Encourage and facilitate use ofelectric vehicles through increasedprovision of charging points

Other measure: Other measure Preparation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Increase in availability of EVcharging points and correspondingincrease in use of electric vehiclesTarget emissions reduction: 0.015

Worcester City Council_11 Encourage developers to providesustainable transport facilities andlinks serving new developments

Encourage and facilitate uptake ofsustainable modes of transportwhere new developments areproposed

Other measure: Other measure Preparation Start date: 2013Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Greater provision ofsustainable transport facilities and linksservicing new developmentsTarget emissions reduction: <1%

Worcester City Council_12 Railway Enhancements Improvements to trains, stations,services etc. to encourage andfacilitate increased use of rail travel

Traffic planning and management:Encouragement of shift of transportmodes

Implementation Start date: 2013Expected end date: 2018Spatial scale: Whole town or citySource affected: TransportIndicator: Completion of new WorcesterParkway rail station. Increased use ofWorcester Foregate Street stationfollowing refurbishment.Target emissions reduction: <1%

126

This in

formati

on is

out o

f date

.

Page 128: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_13 Travel Planning Promotion of alternative modes oftransport through business andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: <1%

Worcester City Council_14 Raise the profile and increaseawareness of air quality within theregion

Raise the profile and increaseawareness of air quality within theregion

Public information and Education:Other mechanisms

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased awareness atDistrict, County and general publiclevels of air quality issues across theCountyTarget emissions reduction: <1%

Worcester City Council_15 Smarter Choices - Choose How YouMove marketing initiatives

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour towardsmore sustainable modes of transport.Target emissions reduction: <1%

Worcester City Council_16 Make air quality information moreavailable and accessible

Proactive publication of informationon WRS website

Public information and Education:Internet

Implementation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved availability of airquality information. More informationproactively published on website.Target emissions reduction: <1%

Worcester City Council_17 Produce Air Quality SupplementaryPlanning Document

Provide consistent approach toplanning application and mitigationthrough production and adoption ofSupplementary Planning Documentfor Air Quality

Other measure: Other measure Preparation Start date: 2015Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Formally adopted and utilisedAQ SPD at all six LPAs acrossWorcestershireTarget emissions reduction: <1%

127

This in

formati

on is

out o

f date

.

Page 129: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_18 Air Quality Networks Collaboration between networks ofneighbouring Local Authorities totackle air quality in their area

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved cross boundaryworking between local authorities inWorcestershireTarget emissions reduction: <1%

Worcester City Council_19 Forge closer links with local healthagencies

Improve relationships with healthagencies to ensure public healthaspect of air quality continues to berelevant

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Participation of relevanthealth agencies in the WorcestershireAir Quality Steering GroupTarget emissions reduction: <1%

Worcester City Council_20 Introduction of a Journey TimeManagement System (JTMS) aroundA4440.

Real time journey time information,based on GPS/Bluetooth data,displayed on VMS boards aroundWorcester City on A4440 as part ofwider improvement works.

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number ofvehicles staying on A4440 to reachdestination rather than divertingthrough the City in search of a “quicker”route. Reduction in number of strategictrips through the city centreTarget emissions reduction: 1%-5%

Worcester City Council_21 Develop and implement WorcesterCity Centre Masterplan andcombined Low Emission Strategy

Worcester City Council in conjunctionwith Worcestershire County Councilto develop a City Centre Masterplan,WRS to facilitate development andimplementation of a Low EmissionStrategy to be combined with the CityCentre Masterplan

Other measure: Other measure Evaluation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Formal adoption andimplementation of City CentreMasterplan and Low Emission StrategyTarget emissions reduction: Currentlyunknown - will depend on the measuresput in place as part of the Low EmissionStrategy and wider Masterplan.Estimate emission reduction could beas high as 40%

128

This in

formati

on is

out o

f date

.

Page 130: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_22 Promote and support walking andcycling initiatives in Worcestershire

Initiative to encourage the uptake ofwalking and cycling by promoting thebenefits using various packagessuch as The Chose How You MoveInitiative

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour to moresustainable modes of transporte.g. walking, cycling, public transportTarget emissions reduction: 0.01

Worcester City Council_23 Promote flexible workingarrangements

Promotion of flexible workingarrangements with local businessesto include working from homeopportunities, staggered start timesetc.

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in use of flexibleworking arrangements with localbusinesses.Target emissions reduction: <1%

Worcester City Council_24 Loading and unloading restrictionsduring peak traffic times

Creation and implementation of TROto restrict loading and unloadingduring peak times

Traffic planning and management:Other measure

Evaluation Start date: 2018Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Introduction andimplementation of TRO during peaktimes. Reduced incidence of loadingand unloading during peak times andtherefore improved flow/reducedcongestion.Target emissions reduction: 5-10%

Worcester City Council_25 Bus Quality Partnership (as part of awider Worcester City CentreAccessibility Masterplan Strategy andcombined Low Emission Strategy)

Reduce bus related emissions inAQMA through use of Bus QualityPartnerships (BQP) with localoperators. Lowesmoor is a primaryarterial bus route serving the citycentre therefore emissioncontributions from buses are high.

Public procurement: Cleaner vehicletransport services

Evaluation Start date: 2018Expected end date: 2020Spatial scale: LocalSource affected: TransportIndicator: Elimination of lower Eurostandard buses (which Euro Standardsto be agreed should political support forsuch an action be secured) by as yetunknown date.Target emissions reduction: 5-25%

Worcester City Council_26 Alteration to phasing of traffic lightsystems

Explore alteration of traffic lightphasing for signal systems within andaffecting AQMA

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Improved flow of trafficthrough Lowesmoor. Reducedcongestion. Reduced volume of traffic.Target emissions reduction: 5-10%

129

This in

formati

on is

out o

f date

.

Page 131: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Worcester City Council_27 Number of bus routes and non pull-instops in AQMA

Move bus stops out of AQMA orcreate pull-in stops (if feasible) toimprove flow.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Location of bus stopschanged to minimise congestion andtraffic flow problemsTarget emissions reduction: 1-5%

Worcester City Council_28 Traffic lights onto LowesmoorTerrace cause congestion

During consultation County Counciladvised that congestion caused bycontravention of existing TRO thatrestricts traffic eastbound throughLowesmoor during afternoon peaktimes - improve enforcement ofexisting TRO

Traffic planning and management:Other measure

Implementation Start date: 2013Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Decreased in non-permittedvehicles along Lowesmoor at restrictedtimes resulting in reduced volume oftraffic and reduced congestion.Target emissions reduction: 5-10%

Wychavon District Council_1 Wider highway improvement schemeto include three actions identified aspart of action planning process -removal of traffic light system at PortStreet/Waterside junction.

Removal of signals at Watersidejunction and replacement withmini-roundabout or t-junction toimprove flow and reduce congestionin Port Street.

Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Reduction in monitored NO2such that AQMA can be revoked.Target emissions reduction: 5-10%

Wychavon District Council_2 Introduction of signals atroundabouts.

Signalisation of Lidl roundabout. Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Control of vehicle cohorttravelling along Port Street, reduction ofqueuing in the Port Street street canyonTarget emissions reduction: 5-10%

Wychavon District Council_3 Improvement to pedestrian crossingmanagement.

Upgrade pedestrian crossings toprovide intelligent system.

Traffic planning and management:Other measure

Planning Start date: 2015Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Vehicles will not be held attwo separate crossings along the streetcanyon. The two crossings will belinked and have synchronised greenphases.Target emissions reduction: 0.02

130

This in

formati

on is

out o

f date

.

Page 132: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wychavon District Council_4 Bus Quality Partnership Reduce bus related emissions inAQMA through use of Bus QualityPartnerships (BQP) with localoperators. Port Street is a primarybus route in and out of the city centreand as such bus contribution toemissions is high

Public procurement: Cleaner vehicletransport services

Evaluation Start date: 2018Expected end date: 2030Spatial scale: LocalSource affected: TransportIndicator: Elimination of lower Eurostandard buses (which Euro Standardsto be agreed should political support forsuch an action be secured) by as yetunknown date.Target emissions reduction: 0.01

Wychavon District Council_5 Loading and unloading restrictionsduring peak traffic times

Loading and unloading of vehicles isa frequent issue which results incongestion. Variable loading andunloading restrictions exist but areunder enforced.

Traffic planning and management:Other measure

Evaluation Start date: 2015Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Fewer incidents of loadingand unloading resulting in congestiondue to increased enforcement.Potential increase in number of fixedpenalty notices served.Target emissions reduction: 1-3%

Wychavon District Council_6 Freight Quality Partnership (workwith sat nav providers)

Encourage freight vehicles to avoidAQMA and find alternative routesthrough work with sat nav dataproviders to ensure freight isroutinely routed around AQMA

Traffic planning and management:Other measure

Evaluation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: Significant reduction ofstrategic freight diverted away fromAQMA.Target emissions reduction: 5-10%

Wychavon District Council_7 Encourage developers to providesustainable transport facilities andlinks serving new developments

Encourage and facilitate uptake ofsustainable modes of transportwhere new developments areproposed

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Greater provision ofsustainable transport facilities and linksservicing new developmentsTarget emissions reduction: <1%

Wychavon District Council_8 Smarter Choices - Choose How YouMove marketing initiatives

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour towardsmore sustainable modes of transport.Target emissions reduction: <1%

131

This in

formati

on is

out o

f date

.

Page 133: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wychavon District Council_9 Greening Council and BusinessFleets

Secure use of “cleaner” fuels/higherEuro standard vehicles for Counciland Business fleets. Support bid forinstallation of CNG facility inWorcestershire

Traffic planning and management:Other measure

Evaluation Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Increase in number ofCouncil and business fleet vehicles ofhigher Euro Standard and/or utilisingalternative fuelsTarget emissions reduction: <1%

Wychavon District Council_10 Encourage car sharing Promote development and use of carsharing through potentialCounty-wide personal travel planningservice

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number of peoplecar sharingTarget emissions reduction: <1%

Wychavon District Council_11 Installing electric vehicle chargingpoints

Encourage and facilitate use ofelectric vehicles through increasedprovision of charging points

Other measure: Other measure Planning Start date: 2014Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in availability of EVcharging points and correspondingincrease in use of electric vehiclesTarget emissions reduction: 0.015

Wychavon District Council_12 Raise the profile and increaseawareness of air quality within theregion

Raise the profile and increaseawareness of air quality within theregion

Public information and Education:Other mechanisms

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased awareness atDistrict, County and general publiclevels of air quality issues across theCountyTarget emissions reduction: <1%

Wychavon District Council_13 Encourage uptake of employer andresidential travel plans for majoremployers and new developments toarea

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: <1%

132

This in

formati

on is

out o

f date

.

Page 134: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wychavon District Council_14 Travel Planning Promotion of alternative modes oftransport through business andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: <1%

Wychavon District Council_15 Promote flexible workingarrangements

Promotion of flexible workingarrangements with local businessesto include working from homeopportunities, staggered start timesetc.

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in use of flexibleworking arrangements with localbusinesses.Target emissions reduction: <1%

Wychavon District Council_16 Make air quality information moreavailable and accessible

Proactive publication of informationon WRS website

Public information and Education:Internet

Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved availability of airquality information. More informationproactively published on website.Target emissions reduction: <1%

Wychavon District Council_17 Produce Air Quality SupplementaryPlanning Document

Provide consistent approach toplanning application and mitigationthrough production and adoption ofSupplementary Planning Documentfor Air Quality

Other measure: Other measure Preparation Start date: 2015Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Formally adopted and utilisedAQ SPD at all six LPAs acrossWorcestershireTarget emissions reduction: <1%

Wychavon District Council_18 Air Quality Networks Collaboration between networks ofneighbouring Local Authorities totackle air quality in their area

Other measure: Other measure Implementation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved cross boundaryworking between local authorities inWorcestershireTarget emissions reduction: <1%

133

This in

formati

on is

out o

f date

.

Page 135: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wychavon District Council_19 Forge closer links with local healthagencies

Improve relationships with healthagencies to ensure public healthaspect of air quality continues to berelevant

Other measure: Other measure Preparation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Participation of relevanthealth agencies in the WorcestershireAir Quality Steering GroupTarget emissions reduction: <1%

Wychavon District Council_20 HGV >7.5t currently unable to utilisealternative bridge

Improvements to bridge to allowremoval of weight restriction

Traffic planning and management:Other measure

Implementation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Removal of weight restrictionon Abbey road BridgeTarget emissions reduction: <1%

Wychavon District Council_21 Promote and support walking andcycling initiatives in Worcestershire

Initiative to encourage the uptake ofwalking and cycling by promoting thebenefits using various packagessuch as The Chose How You MoveInitiative

Traffic planning and management:Encouragement of shift of transportmodes

Preparation Start date: 2014Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour to moresustainable modes of transporte.g. walking, cycling, public transportTarget emissions reduction: 0.01

Wyre Forest District Council_1 Normal length buses block road innarrow bends

Buses cause blockage in roadleading to back up of traffic not beingable to pass. Encourage buscompanies through Bus Qualitypartnership to use shorter lengthbuses on route.

Traffic planning and management:Improvement of public transport

Preparation Start date: 2015Expected end date: 2017Spatial scale: LocalSource affected: TransportIndicator: More shorter length busesseen in AQMA areaTarget emissions reduction: 0.02

Wyre Forest District Council_2 Alteration to phasing of traffic lightsystems

Two sets of traffic lights (pedestriancrossings) seen to affect traffic buildup in AQMA.

Traffic planning and management:Other measure

Other Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Decrease in congestionwithin AQMA areaTarget emissions reduction: 0.03

Wyre Forest District Council_3 Loading and unloading restrictionsduring peak traffic times

Restrictions are already in place butfurther enforcement believed toimprove traffic flow with AQMA.

Traffic planning and management:Management of parking places

Preparation Start date: 2015Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Decrease in illegally parkedvehiclesTarget emissions reduction: 0.02

134

This in

formati

on is

out o

f date

.

Page 136: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wyre Forest District Council_4 HGV or weight restriction on affectedroads

Encourage HGVs to avoid AQMAand find alternative routes

Traffic planning and management:Other measure

Preparation Start date: 2015Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Less HGV’s travellingthrough AQMATarget emissions reduction: 0.02

Wyre Forest District Council_5 Encourage developers to providesustainable transport facilities andlinks serving new developments

Encourage and facilitate uptake ofsustainable modes of transportwhere new developments areproposed

Other measure: Other measure Preparation Start date: 2013Expected end date: 2016Spatial scale: LocalSource affected: TransportIndicator: Greater provision ofsustainable transport facilities and linksservicing new developmentsTarget emissions reduction: 0.01

Wyre Forest District Council_6 Encourage car sharing Promote car sharing services withinWyre Forest

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in number of peoplecar sharingTarget emissions reduction: 0.01

Wyre Forest District Council_7 Greening Council and BusinessFleets

Secure use of “cleaner” fuels/higherEuro standard vehicles for Counciland Business fleets. Support bid forinstallation of CNG facility inWorcestershire

Traffic planning and management:Other measure

Planning Start date: 2016Expected end date: 2018Spatial scale: LocalSource affected: TransportIndicator: Increase in number ofCouncil and business fleet vehicles ofhigher Euro Standard and/or utilisingalternative fuelsTarget emissions reduction: 0.01

Wyre Forest District Council_8 Installing electric vehicle chargingpoints

Encourage and facilitate use ofelectric vehicles through provision ofcharging points in city

Other measure: Other measure Preparation Start date: 2014Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Increase in availability of EVcharging points and correspondingincrease in use of electric vehiclesTarget emissions reduction: 0.01

135

This in

formati

on is

out o

f date

.

Page 137: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wyre Forest District Council_9 Encourage uptake of employer andresidential travel plans for majoremployers and new developments toarea

Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: 0.01

Wyre Forest District Council_10 Travel Planning Promotion of alternative modes oftransport through organisation andpersonal travel planning

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in uptake ofpersonal travel planning services.Change in behaviour towards moresustainable modes of transport.Target emissions reduction: 0.01

Wyre Forest District Council_11 Raise the profile and increaseawareness of air quality within theregion

Publication campaign relating to airquality to publicise and raiseawareness of air quality and itsimplications

Public information and Education:Other mechanisms

Evaluation Start date: 2014Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Increased awareness atDistrict, County and general publiclevels of air quality issues across theCountyTarget emissions reduction: 0.01

Wyre Forest District Council_12 Smarter Choices - Choose How YouMove marketing initiatives

Use of marketing and informationmethods to encourage use ofsustainable travel modes andtypically include workplace, school,residential, community, travelplanning, car sharing and clubs, andawareness raising campaigns

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Change in behaviour towardsmore sustainable modes of transport.Target emissions reduction: 0.01

Wyre Forest District Council_13 Make air quality information moreavailable and accessible

WRS to make all air qualitydocuments available to the generalpublic for access from the website

Public information and Education:Internet

Evaluation Start date: 2013Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Improved availability of airquality information. More informationproactively published on website.Target emissions reduction: 0.01

136

This in

formati

on is

out o

f date

.

Page 138: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wyre Forest District Council_14 Produce Air Quality SupplementaryPlanning Document

Document providing transparent andconsistent advice to developmentcontrol departments and developersrelating to air quality

Other measure: Other measure Preparation Start date: 2015Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Formally adopted and utilisedAQ SPD at all six LPAs acrossWorcestershireTarget emissions reduction: 0.01

Wyre Forest District Council_15 Air Quality Networks Group of councils working inpartnership to address air qualityissues across those areas

Other measure: Other measure Implementation Start date: 2014Expected end date: 2016Spatial scale: Whole town or citySource affected: TransportIndicator: Improved cross boundaryworking between local authorities inWorcestershireTarget emissions reduction: 0.01

Wyre Forest District Council_16 Forge closer links with local healthagencies

Aiming to forge partnership with localhealth authorities such as PublicHealth England to improveknowledge and understanding oflocal air quality and associatedhealth risks

Other measure: Other measure Implementation Start date: 2015Expected end date: 2030Spatial scale: Whole town or citySource affected: TransportIndicator: Participation of relevanthealth agencies in the WorcestershireAir Quality Steering GroupTarget emissions reduction: 0.01

Wyre Forest District Council_17 Promote flexible workingarrangements

Promoting flexible workingarrangements with local businesses

Traffic planning and management:Encouragement of shift of transportmodes

Evaluation Start date: 2015Expected end date: 2015Spatial scale: Whole town or citySource affected: TransportIndicator: Increase in use of flexibleworking arrangements with localbusinesses.Target emissions reduction: 0.01

Wyre Forest District Council_18 Freight Quality Partnership Encourage freight vehicles to avoidAQMA and find alternative routes

Traffic planning and management:Freight transport measure

Planning Start date: 2015Expected end date: 2017Spatial scale: Whole town or citySource affected: TransportIndicator: Decreased in freightmovements through AQMATarget emissions reduction: 2-5%

137

This in

formati

on is

out o

f date

.

Page 139: date. out of information is This...Roadlengthexceeding(km) 112.3 47.3 163.2 115.8 90.4 84.6 90.2 76.3 64.1 92.5 47.5 50.7 43.3 Backgroundexceeding(km 2 ) 22 7 14 0 0 0 0 0 2 10 1 1

Measure code Description Focus Classification Status Other information

Wyre Forest District Council_19 Promote and support walking andcycling initiatives in Worcestershire

Initiative to encourage the uptake ofwalking and cycling by promoting thebenefits using various packagessuch as The Chose How You MoveInitiative

Traffic planning and management:Encouragement of shift of transportmodes

Planning Start date: 2015Expected end date: 2015Spatial scale: LocalSource affected: TransportIndicator: Change in behaviour to moresustainable modes of transporte.g. walking, cycling, public transportTarget emissions reduction: 0.01

138

This in

formati

on is

out o