16/11/2016
1
MSAMASTER SERVICE AGREEMENT
DATE : 24TH NOVEMBER 2016TIME : 8.30AM - 9.30AM
PRESENTER : MR. HAZMAN AHMAD
BENGKEL PENENTUAN KAEDAH PEMBAIKAN CERUN UNTUK PIHAK BERKUASA TEMPATAN (PBT) I-KPKT 2016
16/11/2016
PRESENTATION OUTLINE
1.CHRONOLOGY
2.MASTER SERVICE AGREEMENT
3.SCHEDULE II : SERVICE FEES OR SCHEDULE OF RATES
1.0 CHRONOLOGY
16/11/2016
2
16/11/2016
NO. DATE DESCRIPTION
1 24 FEBRUARY 2015 Appointment of technical committee member and workshop invitation
2 2 - 4 MARCH 2015 Master Service Agreement (MSA) workshop
3 5 MARCH 2015IKRAM first submission of Schedule of Rates and additional item to
JKR(CKUB)
4 6 MARCH 2015 Meeting with JKR (CKUB)
5 9 – 11 MARCH 2015 Meeting preparation of Schedule of Rates (SOR)
6 12 MARCH 2015 IKRAM final submission of Schedule of Rates (SOR) to JKR(CKUB)
7 13 MARCH 2015 Meeting preparation MSA
8 16 MARCH 2015 Meeting preparation of Master Service Agreement (MSA)
9 17 MARCH 2015 IKRAM first submission of Schedule of Rates and additional item to JKR Cerun
10 10 APRIL 2015 IKRAM final submission and result of Schedule of Rates to JKR Cerun
1.0 CHRONOLOGY
16/11/2016
NO. DATE DESCRIPTION
11 30 JUNE 20151st Meeting with MOF on Master Service Agreement (MSA) with KKR and JKR
Cerun and Kumpulan IKRAM
12 8 July 2015 Discussion Meeting With PUU KKR
13 10 JULY 2015 1st Meeting with JKR Cerun on MSA with JKR CKUB, PUU KKR
14 13 July 2015 Discussion with MOF
15 13 July 2015 Preparation of Master Service Agreement (MSA)
16 27 JULY 2015 2nd meeting with JKR Cerun on MSA with JKR CKUB, PUU KKR
17 29 July 2015 Meeting with Public Works Department (JKR)
18 30 JULY 2015 IKRAM application letter for minimum contract price to KKR
19 30 JULY 2015 IKRAM proposal letter for including state roads in MSA
20 30 JULY 2015 2nd meeting with MOF on MSA with JKR Cerun
21 29 DEC 2015 Contract Sign Between KISB And Government Malaysia
1.0 CHRONOLOGY
16/11/2016
9/5/2011
10/1/2013
14/2/2013
10/1/2014
2014
16/6/2014
Memo of end of IKRAM
concession
Order letter from KPKR
Applicationletter from
IKRAM to MOF
First memo IKRAM to MOF
based on 14/2/2013
letter
Invitation letter from
MOF to IKRAMLetter from IKRAM to
Minister of Finance Malaysia
1.0 PROJECT CORRESPONDENCE
16/11/2016
3
16/11/2016
24 FEBRUARY 2015Appointment of technical
committee member and
workshop invitation
10 APRIL 2015Meeting result on Schedule of
Rates with JKR(CKUB)17 MARCH 2015Second submission of
Schedule of Rates and
additional item to
JKR(CKUB)
5 MARCH 2015First submission of Schedule
of Rates and additional item
to JKR(CKUB)
1.0 PROJECT CORRESPONDENCE
16/11/2016
26 JUNE 2015Invitation letter for
meeting with MOF on
30 Jun 2015
1 JULY 2015Invitation letter for
meeting with
JKR(CKUB) on 10 July
2015
10 JULY 2015Second Invitation
letter for meeting
with JKR(CKUB) on 27
July 2015
15 JULY 2015Invitation letter for
meting with MOF on
30 July 2015
1.0 PROJECT CORRESPONDENCE
16/11/2016
29 DEC 2015CONTRACT SIGNED BETWEEN KISB AND
GOVERNMENT OF MALAYSIA
16/11/2016
4
16/11/2016
COOPERATION OF IKRAM WITH OTHER AGENCIES
1. LONG TERM SERVICE AGREEMENT WITH DEWAN BANDARAYA KUALA LUMPUR (30 MARCH 2012 – 29 MARCH 2017)
2. LONG TERM SERVICE AGREEMENT WITH TENAGA NASIONAL BERHAD (24 MAY 2012 – 23 MAY 2017)
3. PERKHIDMATAN KUMPULAN IKRAM WITH PEJABAT PERBENDAHARAAN NEGERI TERENGGANU
4. MASTER SERVICE AGREEMENT (MSA) FOR EMERGENCY RESPONSE FORENSIC SLOPE FAILURE WITH MINISTRY OF FINANCE, GOVERNMENT OF MALAYSIA
(1ST JAN 2016- 31ST DEC 2018)
16/11/2016
ROADSHOWROADSHOW
DATE LOCATION REGION
19.1.2016 PUTRAJAYA (LAUNCHING CENTRAL REGION
26.1.2016 KUALA TERENGGANU EASTERN REGION
2.2.2016 KUCHING SARAWAK
4.2.2016 KOTA KINABALU SABAH
16.2.2016 MELAKA SOUTHERN REGION
23.2.2016 PULAU PINANG NORTHERN REGION
KISB REGISTRATION
NO. ITEM
COMPANY
KISB IPCSB
1 REGISTRATION NO SSM 360785-A 966129-U
2 REGISTRATION NO. MOF 357-02179864 465-02033960
3 REGISTRATION NO. BEM - 1512-1000-MD-33
4 ALAMATUNIPARK SURIA, JALAN IKRAM-UNITEN 43000, KAJANG, SELANGOR DARUL EHSAN
NOTE :KISB : KUMPULAN IKRAM SDN BHDIPCSB : IKRAM PREMIER CONSULTING SDN. BHD
16/11/2016
5
CENTRAL REGION/HQ
(Selangor, WP KL/Putrajaya,
N.Sembilan, Melaka)[Kajang] (HQ )
SOUTHERN REGION(Johor)
[Skudai] (1)
EASTERN REGION(Kelantan, Terengganu, Pahang)
[K. Terengganu, Kota Bharu](2)
NORTHERN REGION(Perlis, Kedah, Pinang, Perak)
[Perai, Alor Setar, Ipoh](3)
SABAH REGION(Sabah, Labuan)[Kota Kinabalu] (1)
SARAWAK REGION(Sarawak) [Kuching] (1)
KISB’S REGIONAL OFFICES
IKRAM ENGINEERING FACILITIES & MANPOWER
46 Site/Soil Investigation Teams
- ISO 9001:2008
11 Engineering Labs
• Geotechnical
• Material/Structural & Pavement
- ISO 17025
KISB
484 (1.1.2016) EMPLOYEES
PROFESSIONAL 107 (22%)
• PE (Ir.) – 20
• ENGINEERS – 55
• GEOLOGIST – 32
16/11/2016
GENERAL INFORMATION OF MSA
NO. ITEM DESCRIPTION
1 DURATION 3 YEARS + 2 YEARS (OPTIONAL)
2 CONCESSION DATE 01.01. 2016 – 31.12.2018
3 CONTRACT VALUE RM 25 M PER YEAR
4 BON RM 1.25 M
5 GRANT ALLOCATION FEDERAL GOVERNMENT *
6 AGENCY
1. KEMENTERIAN
2. JABATAN
3. INSTITUSI
4. SURUHANJAYA
5. KERAJAAN NEGERI
6. PIHAK BERKUASA TEMPATAN
7. BADAN BERKANUN (AGENSI)
Dibawah Peruntukan/Pembiayaan Kerajaan PersekutuanSemua Agensi Pelaksana Tertakluk Menggunakan Perkhidmatan KISB
16/11/2016
PERTINENT COMPONENTS OF MSA(KKR/BPP/04/2016)
• MSA AGREEMENT
• SCHEDULES– Schedule I
• Scope of Services
• Terms of Reference
• KISB Services
• Letter of Appointment
– Schedule II• Board of Engineers (BEM)
• Scale of Fees (Revised 1998)
• Manual PerolehanPerkhidmatan PerundingEdisi 2011
• Schedule of Rates
- Schedule III• Indent
- Schedule IV• Borang Penilaian
Prestasi PerkhidmatanSyarikat
* Note: Elaborated in 1PP/PK 2.2 to facilitate the Implementation
16/11/2016
6
2.0 MSAMASTER SERVICE AGREEMENT
A. SCOPE OF SERVICESB. RIGHT OF FIRST REFUSAL (ROFR)
C. EMERGENCY RESPONSED. NON-EMERGENCY RESPONSE
16/11/2016
A. SCOPE OF SERVICES
PERKHIDMATAN KEJURUTERAAN FORENSIK (CERUN & STRUKTUR BERKAITAN CERUN)
1. Cerun2. Struktur Berkaitan Cerun (Slope
Associated Structures)
3. Struktur Berdekatan Yang Terlibat (Slope
Affected Structures)
4. Perkhidmatan Lain-lain Termasuk Ujian Di Lapangan Dan Makmal Yang Diperlukan
5. Penyeliaan Tapak Bagi Projek Fizikal
6. National Repository Center
16/11/2016
A. TECHNICAL DEFINITIONS
1. ‘Slope Associated Structures’ means any
or all structural components which
form(s) an integral part of the Slope and
contribute(s) towards(s) its stability
including but without limitation to soil
nail, retaining wall, reinforced earth wall,
rubble wall, etc; and
2. ‘Slope Affected Structures’ means any or
all structures located in the vicinity of the
Slope and is/ are affected by the Failure.
16/11/2016
7
16/11/2016
A. EXCLUSION SCOPE OF SERVICES
1. SEMUA JALAN PERSEKUTUAN DI MALAYSIA*
* Nota: Sekiranya Jabatan Kerja Raya Tidak Mempunyai Kapasiti Untuk
Menjalankan Perkhidmatan Tersebut, Maka Jkr Bolehlah Melantik
KISB Tertakluk Kepada “ROFR”.
2. SEMUA KONTRAK KERAJAAN YANG MEMPUNYAI SKOP PERKHIDMATAN
KEJURUTERAAN FORENSIK YANG SEDANG BERKUAT KUASA*
* NOTA: Setelah Kontrak Tersebut Tamat, Agensi Bolehlah Melantik KISB
Bagi Menjalankan Perkhidmatan Tersebut Tertakluk Kepada Pekeliling
Pk 2.2.
3. SEMUA JALAN BERTOL DI BAWAH PERJANJIAN KONSESI PENSWASTAAN
4. PROJEK-PROJEK PEMBANGUNAN BAHARU YANG MASIH DALAM PERINGKAT PEMBINAAN YANG BELUM DISERAHKAN KEPADA AGENSI
16/11/2016
B. “RIGHT OF FIRST REFUSAL” (ROFR)
DEFINISI :
Agensi Hendaklah Terlebih Dahulu
Menawarkan Kepada KISB Untuk
Mendapatkan Perkhidmatan Kejuruteraan
Forensik Tersebut Sebelum Tawaran Boleh
Dibuat Kepada Pihak Ketiga
16/11/2016
B. TATACARA “ROFR”
1. Agensi Mengeluarkan Surat Pelawaan (Pk 2.2 Lampiran
D)* Yang Mengandungi Maklumat-maklumat Berikut
Kepada KISB :
a. Deskripsi Perkhidmatan;
b. Anggaran Kos Perkhidmatan;
c. Jangkaan Tarikh Mula Dan
d. Tarikh Siap Perkhidmatan
e. Lokasi Perkhidmatan
* NOTA: TEMPOH SAH SURAT TAWARAN ADALAH 14 HARI DARI TARIKH SURAT TAWARAN TERSEBUT
16/11/2016
8
16/11/2016
SURAT PELAWAAN
16/11/2016
SURAT AKUAN KISB
16/11/2016
B. TATACARA “ROFR”
2. CADANGAN TEKNIKAL & KEWANGAN (CTK) YANG MENGANDUNGI:
i) MAKLUMAT-MAKLUMAT YANG DINYATAKAN DI TATACARA (1) DI ATAS
ii) YURAN BAYARAN*
* NOTA: YURAN BAYARAN ADALAH BERDASARKAN KEPADA KADAR-KADAR
HARGA YANG TELAH DIMUKTAMADKAN OLEH LEMBAGA PEROLEHAN ‘A’
KKR SEPERTI BERIKUT:-
a) SKALA YURAN PIAWAI : BOARD OF ENGINEERS MALAYSIA (BEM)
SCALE OF FEES (REVISED 1998) [PU (B) 548] - PK 2.2 LAMPIRAN A
b) INPUT MASA DAN IMBUHAN BALIK : BAB 5 DALAM MANUAL PEROLEHAN
PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA) – PK 2.2
LAMPIRAN B
c) JADUAL KADAR HARGA – PK 2.2 LAMPIRAN C
16/11/2016
9
16/11/2016
B. TATACARA “ROFR”
3. INDEN KERJA:
INDEN KERJA AKAN DIKELUARKAN OLEH AGENSI PELAKSANA SETELAH CTK DIPERSETUJUI OLEH KEDUA-DUA BELAH PIHAK
INDEN KERJA TERSEBUT AKAN MENJADI SEBAHAGIAN DARIPADA MSA DAN MENGIKAT KEDUA-DUA BELAH PIHAK
NOTA :
UNTUK SITUASI KECEMASAN (KEGAGALAN CERUN), ARAHAN KERJA AKAN DIKELUARKAN SECARA LISAN DAN PERLU DISUSULI DENGAN INDEN KERJA DALAM TEMPOH 7 HARI DARI ARAHAN KERJA SECARALISAN DIKELUARKAN
16/11/2016
INDEN KERJA
16/11/2016
B. TATACARA “ROFR”
4. PELAKSANAAN PERKHIDMATAN:
i) PERKHIDMATAN KEJURUTERAAN FORENSIK TERSEBUT AKAN DILAKSANAKAN OLEH IKRAM PREMIER CONSULTING SDN BHD (IPCSB)
ii) IPCSB AKAN MENANDATANGANI KESEMUA “DELIVERABLES”* BERKAITAN DENGAN PERKHIDMATAN PERUNDINGAN KEJURUTERAAN
FORENSIK* NOTA: REKA BENTUK, PELAN, PENGIRAAN, LUKISAN, LAPORAN DLL
iii) PERLANTIKAN IPCSB SEBAGAI PELAKSANA PERKHIDMATANTERSEBUT TIDAK AKAN SAMA SEKALI MELEPASKAN KISB DARIPADA TANGGUNGJAWABNYA SEPERTI YANG TERKANDUNG DI DALAM MSA
16/11/2016
10
16/11/2016
PENILAIAN PRESTASI SYARIKAT
PELANTIKAN
PENGARAH PROJEK/
WAKIL PENGARAH PROJEK
TANGGUNGJAWABAGENSI
BANTUAN DARI SEGI AKSES KE TAPAK, MAKLUMAT, DATA DAN LAIN-LAIN
Tanggungjawab Pengarah Projek
1. Mentadbir Dan Mengawal Selia Setiap Inden Kerja
2. Mengambil Apa-apa TindakanAtau Mengeluarkan Apa-apaArahan
16/11/2016
C.EMERGENCY RESPONSE
IKRAM with its nine (9) branches shall respond to the reported
failure situation upon directive of authority in the following
manner:
ii. If the failure location is more than 50 km from its
nearest branch office - response time shall be
within 24 hours.
i. If the failure location is within 50 km from its
nearest branch office - response time shall be
within 3 hours.
ii. If the failure location is REMOTE AREA – response time shall be within 48 hours
NOTE : Subject to the “ACCESSIBILITY” of site location
16/11/2016
11
� Year of Failure : 2012
� Location : Bukit Setiawangsa, KL
� No. of casualties : none
� Evacuation : 88 residents
BUKIT SETIAWANGSA SLOPE FAILURE (2012)
BRIEFING TO PUBLIC & MEDIA ON EMERGENCY RESPONSE OF SLOPE FAILURE AT SETIAWANGSA
Briefing To Public Briefing To Media And Kuala Lumpur Mayor
Briefing To Media At SiteBriefing At Site
16/11/2016
1.KAJANG HEADQUARTERS
16/11/2016
12
16/11/2016
2. IKRAM UTARA (ALOR SETAR) 3. IKRAM UTARA (PERAI)
4. IKRAM UTARA (IPOH) 5. IKRAM SELATAN
16/11/2016
6. IKRAM TIMUR (KELANTAN)
8. IKRAM SABAH
9. IKRAM SARAWAK
6. IKRAM TIMUR (TERENGGANU)
16/11/2016
D. NON EMERGENCY CASES
A. PREVENTIVE
B. NORMAL CONSULTANCY
SERVICE
16/11/2016
13
16/11/2016
FLOW CHART OF FORENSIC
ENGINEERING INVESTIGATION
(SLOPES & SLOPERELATED
STRUCTURES)
AGENSIKEGAGALAN
CERUN
(KECEMASAN)
CENTRAL NORTHERN EASTERN SOUTHERN SABAH SARAWAK
Head Of Project : Ir. Hj. Abd Ghani
ShaabanTel : 012-3685659
Deputy Head
Project :Syuri Hidayah
Sangaji
Tel : 012-3685659
Project Officer 1 :Suffian Abd
RahmanTel : 013-9306658
Head Of Project : Ir.Hj.Azhari b.
AbdullahTel : 019-
4574847
Deputy Head Project :
Mohamad Zaidi b.
SaadiTel : 019-
4726963
Project Officer 1:Hamizat bin
Othman
Tel : 012-4726944
Head Of Project : Ir. Mohamed Bin
DaudTel :012-9892959
Deputy Head
Project : MohdSaiful Bahri
Tel : 019-9678989
Project Officer 1 :
Mohd Azri B. JusohTel : 013-9863955
Head Of Project : Kamarudin Bin
ZakariaTel :019-8888016
Deputy Head
Project :Jeya Pirathaba
Tel : 016-7716471
Project Officer 1 :
Nur Basarah MohdShukri
Tel : 013-
Head Of Project : Ir. Hiew Vun Heng
Tel :012-8288804
Deputy Head Project :
Edward Voo Lok Zan
Tel : 016-8320535
Project Officer 1 :
Kenneth NigelTel : 019-8211169
Head Of Project : Zaba Mason
Tel : 014-6866863
Deputy Head Project :
Victor SungTel : 014-9941917
Project Officer 1 :Rachel Lynn
Tel : 016-8799236
Head Of Project : Ir. Mohamed Bin Daud Tel :012-9892959Deputy Head Project : Mohd Saiful Bahri Tel : 019-9678989
Project Officer 1 :Mohd Azri B. JusohTel : 013-9863955
TALIAN BEBAS TOL
1 800 18 0700
ALIRAN KOMUNIKASI ( A: Kegagalan Cerun –Emergency
Head Of Project : Ir. Hj. Abd Ghani Shaaban
Tel : [email protected]
Deputy Head Project : Syuri Hidayah Sangaji
Tel : [email protected]
Head Of Project : Ir.Hj.Azhari b. Abdullah
Tel : [email protected]
Deputy Head Project : Mohd Zaidi b. Saadi
Tel : [email protected]
Head Of Project : Ir. Mohamed Bin Daud
Tel :[email protected]
Deputy Head Project : Mohd Saiful Bahri
Tel : [email protected]
Head Of Project : Kamarudin Bin Zakaria
Tel :[email protected]
Deputy Head Project :Jeya Pirathaba
Tel : [email protected]
TEAM APROJECT DIRECTOR
Ir. Md Rozi Shaari
0192240755TEAM B
PROJECT DIRECTOR
Ir. Sobri b. Aziz
012-3295817
Head Of Project : Zaba Mason
Tel : 014-6866863
Deputy Head Project :Victor Sung
Tel : 014-9941917
Head Of Project : Ir. Hiew Vun Heng
Tel :012-8288804
Deputy Head Project :Edward Voo Lok Zan
Tel : [email protected]
EASTERNNORTHERN
SOUTHERN SARAWAK
TEAM CPROJECT DIRECTOR
Dato’ Ir. Dr. Ashaari Mohamad
012-4720444
CENTRAL SABAH
Head Of Project :
Ir. Mohamed Bin DaudTel :012-9892959
Deputy Head Project :
Mohd Saiful BahriTel : 019-9678989
EASTERNALIRAN KOMUNIKASI ( A: Kegagalan Cerun –Emergency
TALIAN BEBAS TOL
1 800 18 0700AGENSI
16/11/2016
14
Agensi MemberiArahan Lisan KepadaKISB Untuk Tinjauan
Tapak
KISB GerakkanKumpulan
Tindakan KeTapak
(3jam/24jam)
KISB MenyediakanLaporan Awal
Dalam Tempoh 3 Jam Selepas TibaDi Kawasan Tapak
3jam / 24 Jam
3 Jam
7 Hari
KISB Kemukakan CTK Dengan JadualPerlaksaanan Kerja
Agensi Keluarkan Inden Kerja SebagaiArahan Memulakan Perkhidmatan
PenyiasatanForensik Tapak
Analisa Data Dan Reka
Bentuk OlehKISB
Pemilihan RekaBentuk Oleh
Agensi
Penyediaan RekaBentuk Terperinci
Dan DokumenTender Kerja
LaporanAkhir Dan Tuntutan
Akhir
Agensi Membuat BayaranTuntutan Akhir Selepas
Semua Dokumen DiserahkanKepada JKR Termasuk
Borang Peniliaian PrestasiPerkhidmatan Syarikat
Agensi KeluarkanInden Kerja
Sekiranya Ada Penyeliaan Tapak
Tuntuan Kemajuaan 95%
Baki Bayaran5%
Arahan Lisan Disusuli DenganInden Kerja Daripada Agensi
TATACARA PELAKSANAAN PERKHIDMATAN KEJURUTERAAN FORENSIK
(CERUN DAN STRUKTUR BERKAITAN CERUN)
(KEGAGALAN CERUN)
Agensi mengeluarkan
Surat Pelawaankepada KISB
KISB
menjalankanTinjauan
Tapak
KISB menyediakan
Laporan Awal
14 hari
KISB Kemukakan CTK dengan
Jadual Perlaksaanan Kerja
Agensi keluarkan Iden Kerja
sebagai arahan memulakan
perkhidmatan
Penyiasatan
Forensik Tapak
Analisa data
dan rekabentuk oleh
KISB
Pemilihan reka
bentuk olehAgensi
Penyediaan
reka bentukterperinci dan
dokumen tender
kerja
Laporan
Akhirdan
tuntutan
akhir
Agensi keluarkan
Iden Kerjasekiranya ada
penyeliaan tapak
Tuntuan Kemajuaan 95%
Agensi membuat bayaran
tuntutan akhir selepas semuadokumen diserahkan kepada JKR
termasuk Borang Peniliaian
Prestasi Perkhidmatan Syarikat
TATACARA PELAKSANAAN PERKHIDMATAN KEJURUTERAAN FORENSIK
(CERUN DAN STRUKTUR BERKAITAN CERUN)
(MENGKAJI KESTABILAN CERUN)
Baki Bayaran5%
3.0 SCHEDULE II : SERVICE FEES OR SCHEDULE OF
RATESA. BOARD OF ENGINEERS MALAYSIA (BEM)
B. MANUAL PEROLEHAN PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA - DISEMBER 2014) (PK3.2/2013)
C. FIELD TESTING/ SITE INVESTIGATIOND. REIMBURSABLE
16/11/2016
15
16/11/2016
PROJECT CLAIM STRUCTURE FOR
CONSULTANCY OF SLOPE FORENSIC WORKS
2. FIELD TESTING
B. IKRAM
Privitazation1996
A. Jabatan
Kerja Raya Malaysia
(JKR), 2012
3.REIMBURSABLE
A. Ministry Of Finance
(MOF), 2014
4.OTHERS
1. PROFESSIONAL
FEES
A. Board Of
Engineers Malaysia
(BEM), 1998
B. Ministry Of
Finance (MOF), 2014
SLOPE FORENSIC WORKS
ADDITIONAL ITEMS:
1. Detailed Engineering Survey
2. Geophysical Survey3. Surface Mapping4. Instrumentation5. Terrestrial Laser Scanner (TLS)6. Unmanned Aerial Vehicle
(UAV)
16/11/2016
BAB 5.0 Kos Perkhidmatan Perunding
CONTENT OF SCHEDULE II
2. KEMENTERIAN KEWANGAN MALAYSIA MANUAL
PEROLEHAN PERKHIDMATAN PERUNDING EDISI
2011 (PINDAAN KEDUA) (PK3.2/2013)
3. SCHEDULE OF RATES
JKR RATE 20121. General Conditions & Preliminaries
2. Deep Boring With Boring Plants
3. Deep Sounding And Piezocone
4. Other Field Tests
5. Collection Of Soil And Water Samples In Bulk
6. Laboratory Tests
7. Material Testing
1. BOARD OF ENGINEERS
MALAYSIA (BEM): SCALE
OF FEES
BEM Scale of
Fees (1982)
{P.U. (B) 346}
BEM Scale of Fees
(Revised 1998)
{PU(B) 548}
SCHEDULE II
ADDITIONAL ITEMS:1. Detailed Engineering Survey
2. Geophysical Survey
3. Surface Mapping
4. Instrumentation
5. Terrestrial Laser Scanner (TLS)
6. Unmanned Aerial Vehicle (UAV)
A. BOARD OF ENGINEERS MALAYSIA (BEM)
16/11/2016
16
16/11/2016
INTRODUCTION TO BEM
1. The job market for engineering consultants(especially the C&S and
geotechnical) can be divided into:
– Public (government & GLC) sector
– Private sector
2. The public sector implementing agencies will adopt professional fees
3. based on :
– Scale of Fees (Based on BEM scale of fees)
– Man Month (Based on the latest “Manual Perolehan Perunding MOF”)
4. The functions of BEM is to establish the scale of fees as a reference
for any consultant professional engineer to provide their services
5. The objectives of “THE BEM SCALE OF FEES” it to prevent undercutting among engineering consultants
16/11/2016
CONTENT OF SCALE OF FEES, BEM 1998
PART A :
WORK
1. Construction &
Supervision
2. Tender
3. Analysis And Design
4. Site Investigation And
Laboratory
5. Other Additional
Services
PART B:
PROFESSIONAL FEES
1. BEM Scale Of Fees
2. Salary Cost Times
Multiplier
3. Stages Of
Payment
PART C: OTHERS PAYMENT
1.Equipment
2. Reimbursable
3. Supervision
ENGINEERING WORKS
16/11/2016
TYPE A
• Namely civil and structural engineering works (other than structural engineering works in building), mechanical engineering works and electrical engineering works (other than the engineering systems in buildings);
TYPE B
• Namely, structural engineering works in buildings of more than four storeyshigh
TYPE C
• Engineering systems in buildings of more than four storeys high
CLASSIFICATION OF WORKS(Based on BEM 1998)
16/11/2016
17
16/11/2016
• Scale of fees for
Basic
Professional
Service (Type A)
• *Type A = Civil
and Structural
Work
Total Cost of Components of the Works in The
Respective Type in RMP (max) P(min)
100,000 & below 10.00% 8.25%
250,000 8.65% 7.45%
500,000 7.60% 6.85%
1,000,000 6.80% 6.30%
2,500,000 6.00% 5.65%
5,000,000 5.50% 5.20%
10,000,00 5.00% 4.75%
20,000,000 4.65% 4.25%
25,000,000 4.50% 4.10%
50,000,000 4.25% 3.80%
75,000,000 4.10% 3.70%
100,000,000 3.95% 3.60%
200,000,000 3.55% 3.40%
250,000,000 3.40% 3.25%
300,000,000 3.30% 3.10%
350,000,000 3.20% 3.00%
400,000,000 3.10% 2.90%
500,000,000 2.95% 2.80%
600,000,000 2.85% 2.70%
700,000,000 2.75% 2.60%
800,000,000 2.67% 2.50%
900,000,000 2.60% 2.40%
1,000,000,000 & above 2.54% 2.28%
SCALE OF FEES, BEM 1998
16/11/2016
FORMULA SCALE OF FEES, BEM 1998
FORMULA :
1)P max & P min =(y2-y1)/(x2-x1) = (y2-y3)/x2-x3)
2)P average = (P max + P min)/2
3)Professional fees = P average x Estimate contract amount
EXAMPLE CALCULATION SCALE OF FEES, BEM 1998
No. ItemsContract
amountP max P min
1. Lower bound 2.5 million 6.0 5.65
2. Lower bound 4 million x y
3. Upper bound 5.0 million 5.5 5.2
Estimate Cost = RM4,000,000
P max= (y2-y1)/(x2-x1) = (y2-y3)/x2-x3)
= (4-2.5)/(x-6) = (4-5)/(x-5.5)
= 1.5/(x-6)= (-1)/(x-5.5)
= 1.5(x-5.5)=(-1) (x-6)
= 1.5x – 8.25 = -x + 6
= 1.5x + x = 6+8.25
= 2.5 x = 14.25
x = 14.25/2.5
x = 5.7
P min = (y2-y1)/(x2-x1) = (y2-y3)/x2-x3)
= (4-2.5)/(y-5.65) = (4-5)/(y-5.2)
= 1.5/(y-5.65)= (-1)/(y-5.2)
= 1.5(y-5.2)=(-1) (y-5.65)
= 1.5y – 7.8 = -y + 5.65
= 1.5y + y = 5.65+7.8
= 2.5 y = 13.45
y = 13.45/2.5
y = 5.38
16/11/2016
18
• Estimate Contract Amount = RM4,000,000
No. ItemsContract
amountP max P min
1. Lower bound 2.5 million 6.0 5.65
2. Lower bound 4 million x y
3. Upper bound 5.0 million 5.5 5.2
P average = (P max + P min)/2
= (5.7+5.38)/2
= 5.54%
Professional fees = P average x Estimate Contract Amount
= 5.54/100 x RM 4,000,000
= RM 221,600.00
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
10.50
Pvalue
COMPARISON OF PVALUE FOR SOF 1998 vs 1982
P (max) 1998
P (min)1998
P 1982
SCALE OF FEES, BEM 1998Estimate Contract Amount = RM4,000,000
P value = 5.54%
RM4,000,000
P value: 4.45
SCALE OF FEES, BEM 1982Estimate Contract Amount = RM4,000,000
P. value : 4.45%
P value: 5.54
16/11/2016
PAYMENT PROPORTION STAGES FOR SCALE OF FEES
16/11/2016
19
16/11/2016
FEE FOR SITE SUPERVISION
B. MANUAL PEROLEHAN PERKHIDMATAN PERUNDING EDISI 2011 (PINDAAN KEDUA -
DISEMBER 2014) (PK3.2/2013)
16/11/2016
INTRODUCTION
1. The consultancy service fee comprises of
a. consultancy fees
b. reimbursable cost
2. There are two methods for determining the
consultancy services fee namely:
a. Scale of Fees (BEM)
b. Man Month
3. The method of determining consultancy fees
for man-month is based on Time Basis.
Source: MOF – 2014 (5.1-5.2)
16/11/2016
20
16/11/2016
METHOD OF CALCULATION FOR MAN MONTH
YP= GP x FP x IMYP= YURAN PERUNDING
(i)GP= GAJI POKOK
(ii) FP=FAKTOR PENGGANDA
(iii) IM= INPUT MASA
16/11/2016
1.BASIC SALARY
1. Basic Salary is the basic monthly salary which is not included any allowance and other
payments to consultant staff.
2. Basic Salary for permanent staff is based on current salary slip of the staff.
3. Basic Salary for temporary staff shall not exceed the maximum salary scale establised by
the Ministry of Financial shown in Appendix 5B to 5C.
4. Basic salary for temporary who works for supervision under government project shall
based on maximum salary scale which needed application approval by MOF.
5. Basic Salary for temporary staff taken among university lecturers is based on the actual
salary slip while government servants who have retired is based on verification /
statements / last salary slip.
6. Remuneration for the Board of Directors / Share Partners is based on the maximum
salary scale approved by the Ministry of Finance in Appendix 5A.
Source: MOF – 2011 & 2014 (5.2.3)
16/11/2016
APPENDIX 5A: MAXIMUM SALARY SCALE OF DIRECTORS (THE FIRM OWNER) / PARTNERS (SHAREHOLDERS)
YEARS OF
EXPERIENCE
SALARY RATE (RM) %
DIFFERENCE YEAR 2014 YEAR 2014 (P.2)
5 6000.00 6000.00 0
6 6300.00 6300.00 0
7 6600.00 6600.00 0
8 6900.00 6900.00 0
9 7200.00 7200.00 0
10 7500.00 7500.00 0
11 7800.00 7800.00 0
12 8100.00 8100.00 0
13 8400.00 8400.00 0
14 8700.00 8700.00 0
15 9000.00 9000.00 0
16 9300.00 9300.00 0
17 9600.00 9600.00 0
Source: MOF 2014 (5.2.3)
16/11/2016
21
16/11/2016
YEARS OF
EXPERIENCE
SALARY RATE (RM) %
DIFFERENTYEAR 2014 YEAR 2014 (P.2)
18 9900.00 9900.00 0
19 10200.00 10200.00 0
20 10500.00 10500.00 0
21 10800.00 10800.00 0
22 11100.00 11100.00 0
23 11400.00 11400.00 0
24 11700.00 11700.00 0
25 12000.00 12000.00 0
26 12300.00 12300.00 0
27 12600.00 12600.00 0
28 12900.00 12900.00 0
29 13200.00 13200.00 0
30 13500.00 13500.00 0
31 & above 13800.00 13800.00 0
Source: MOF 2014 (5.2.3) Continue from previous
APPENDIX 5A: MAXIMUM SALARY SCALE OF DIRECTORS (THE FIRM OWNER) / PARTNERS (SHAREHOLDERS)
16/11/2016
APPENDIX 5B: MAXIMUM SALARY SCALE FOR PROFESSIONAL STAFFTEMPORARY STAFF – BACHELOR & ABOVE
YEARS OF
EXPERIENCE
SALARY RATE (RM) (BACHELOR DEGREE AND ABOVE)%
DIFFERENTYEAR 2014 YEAR 2014 (P.2)
<1 2900.00 3335 15%
1 3000.00 3450 15%
2 3150.00 3623 15%
3 3300.00 3795 15%
4 3450.00 3968 15%
5 4000.00 4600 15%
6 4200.00 4830 15%
7 4400.00 5060 15%
8 4600.00 5290 15%
9 4800.00 5520 15%
10 5800.00 6670 15%
11 6100.00 7015 15%
12 6400.00 7360 15%
13 6700.00 7705 15%
14 7000.00 8050 15%
15 7300.00 8395 15%
16 7600.00 8740 15%
Source: MOF 2014 (5.2.3)
16/11/2016
APPENDIX 5B: MAXIMUM SALARY SCALE OF PROFESSIONAL STAFF
YEARS OF
EXPERIENCE
SALARY RATE (RM) (BACHELOR DEGREE AND ABOVE) %
DIFFERENTYEAR 2014 YEAR 2014 (P.2)
17 7900.00 9085 15%
18 8200.00 9430 15%
19 8500.00 9775 15%
20 9000.00 10350 15%
21 9300.00 10695 15%
22 9600.00 11040 15%
23 9900.00 11385 15%
24 10200.00 11730 15%
25 11200.00 12880 15%
26 11700.00 13455 15%
27 12200.00 14030 15%
28 12700.00 14605 15%
29 13200.00 15180 15%
30 & above 14200.00 16330 15%
Source: MOF 2014 (5.2.3) Continue from previous
16/11/2016
22
16/11/2016
APPENDIX 5C: MAXIMUM SALARY SCALE OF SEMI PROFESSIONAL STAFF / TECHNICAL SUPPORT (TEMPORARY STAFF)
YEARS OF EXPERIENCE
SALARY RATE (RM) %DIFFERENTYEAR 2014 YEAR 2014 (P.2)
SALARY RATE 1 (WITHOUT
DIPLOMA)
SALARY RATE 2(WITH DIPLOMA)
SALARY RATE 1 (WITHOUT
DIPLOMA)
SALARY RATE 2(WITH DIPLOMA)
SALARY RATE 1 (WITHOUT
DIPLOMA)
SALARY RATE 2(WITH DIPLOMA
<1 1,800.00 2,100.00 2,250.00 2,625.00 17% 17%
1 1,890.00 2,190.00 2,363.00 2,738.00 16% 16%
2 1,980.00 2,280.00 2,475.00 2,850.00 15% 15%
3 2,070.00 2,370.00 2,588.00 2,963.00 14% 14%
4 2,160.00 2,460.00 2,700.00 3,075.00 14% 14%
5 2,250.00 2,550.00 2,813.00 3,188.00 13% 13%
6 2,340.00 2,640.00 2,925.00 3,300.00 13% 13%
7 2,430.00 2,730.00 3,038.00 3,413.00 12% 12%
8 2,520.00 2,820.00 3,150.00 3,525.00 12% 12%
9 2,610.00 2,910.00 3,263.00 3,638.00 11% 11%
10 2,700.00 3,000.00 3,375.00 3,750.00 11% 11%
11 2,830.00 3,300.00 3,538.00 4,12500 17% 17%
12 2,930.00 3,400.00 3,663.00 4,250.00 16% 16%
13 3,030.00 3,500.00 3,788.00 4,375.00 16% 15%
14 3,130.00 3,600.00 3,913.00 4,500.00 17% 17%
15 3,230.00 3,700.00 4,038.00 4,625.00 16% 16%
16 3,330.00 3,800.00 4,163.00 4,750.00 15% 15%
16/11/2016
APPENDIX 5C: MAXIMUM SALARY SCALE OF SEMI PROFESSIONAL STAFF / TECHNICAL
SUPPORT (TEMPORARY STAFF)
YEARS OF EXPERIENCE
SALARY RATE (RM) %DIFFERENTYEAR 2014 YEAR 2014 (P.2)
SALARY RATE 1
(WITHOUT
DIPLOMA)
SALARY RATE 2
(WITH
DIPLOMA)
SALARY RATE 1
(WITHOUT
DIPLOMA)
SALARY RATE 2
(WITH
DIPLOMA)
SALARY RATE 1
(WITHOUT
DIPLOMA)
SALARY RATE 2
(WITH DIPLOMA
17 3,430.00 3,900.00 4,288.00 4,875.00 14% 14%
18 3,530.00 4,000.00 4,413.00 5,000.00 13% 13%
19 3,630.00 4,100.00 4,538.00 5,125.00 13% 13%
20 3,730.00 4,200.00 4,663.00 5,250.00 13% 13%
21 3,880.00 4,600.00 4,850.00 5,750.00 19% 19%
22 4,000.00 4,720.00 5,000.00 5,900.00 18% 18%
23 4,120.00 4,840.00 5,150.00 6,050.00 17% 17%
24 4,240.00 4,960.00 5,300.00 6,200.00 17% 17%
25 4,360.00 5,080.00 5,450.00 6,350.00 17% 17%
26 4,480.00 5,200.00 5,600.00 7,080.00 16% 26%
27 4,600.00 5,320.00 5,750.00 7,280.00 16% 27%
28 4,720.00 5,440.00 5,900.00 7,470.00 15% 27%
29 4,840.00 5,560.00 6,050.00 7,670.00 15% 27%
30 & above 4,960.00 5,680.00 6,200.00 7,860.00 15% 27%
16/11/2016
2. TIME BASIS
1. Time Basis: the period of time required
for the completion of a project / study.
2. Lump sum basis are not allowed for
consultancy service fee.
Time Basis Completion Period of Study/Project
Man-month More than 1 month
Man-day Not exceeding 1 month
Man-hour Not exceeding 1 week
16/11/2016
23
16/11/2016
3.MULTIPLYING FACTOR
• Agencies should ensure FP
adopted by consultants shall not
exceed the prescribed
coefficients by the Ministry of
Finance as in tables F & G.
Source: MOF -2011 & 2014 (5.2.1 (b))
16/11/2016
COMPARISON OF MULTIPLIER FACTOR FOR MAN MONTH (APPENDIX 5D)
CATEGORIES MULTIPLIER FACTOR%
PERSONNEL/CONSULTANTS 1996 2014 MSA 2015
A Local Consultant
1 Professionals 2.2 2.7 2.5 -7.4
2Semi Professionals and Technical
Support Staff1.8 2.1 2.0 -4.8
3All Categories of Lecturers from Private
and Local Universities1.1 2.2 2.1 -4.5
B Foreign Consultant
4 Foreign Consultant 1.0
1.0
-(based on
charge rate)-
C Individual Consultant
5Local Individual Consultant Appointed
directly to Goverment Agencies1.1 1.6 - -
6Foreign Individual Consultant Appointed
directly to Goverment Agencies1.0
1.0
-(based on
charge rate)-
16/11/2016
MULTIPLYING FACTOR FOR PROFESSIONAL STAFF
COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE
DIFFERENCES (%)
A. Benefit of Named employee MOF 2014 MSA 2015
Salary 1.0 1.0 0%
Bonus, allowance, perks and leave 0.37 0.37 0%
EPF/SPF 0.11 0.11 0%
SOCSO 0.01 0.01 0%
Training 0.02 0.02 0%
Subscription to professional bodies, permits and licenses 0.05 0.05 0%
Health and medical benefits 0.03 0.03 0%
Retirement/ superannuation funds 0.03 0.015 -50%
B. Firm's Overhead
Rental 0.10 0.10 0%
Groupp Insurances 0.05 0.05 0%
Utilities and office supplies 0.05 0.05 0%
IT hardware/ network 0.03 0.03 0%
Software 0.04 0.04 0%
System (e.g ISO, library) 0.02 0.02 0%
Professional services including secretarial, audit and legal 0.04 0.04 0%
Salaries of non-bilable staff including administrative/ directors 0.20 0.20 0%
Research and development 0.02 0.02 0%
Depreciation amortization 0.07 0.07 0%
Cost of Capital 0.10 0.10 0%
Profit before tax 0.20 0.20 0%
Others 0.15 0 -100%
TOTAL 2.702.525
Proposed 2.50-7.4%
16/11/2016
24
16/11/2016
MULTIPLYING FACTOR FOR SEMI PROFESSIONALS AND TECHNICAL SUPPORT STAFF
COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE
DIFFERENCES (%)
A. Benefit of Named employee MOF 2014 MSA 2015
Salary 1.0 1.0 0%
Bonus, allowance, perks and leave 0.15 0.37 0%
EPF/SPF 0.11 0.11 0%
SOCSO 0.02 0.01 0%
Training 0.01 0.02 0%
Health and medical benefits 0.02 0.05 150%
B. Firm's Overhead
Rental 0.04 0.04 0%
Group Insurances 0.03 0.03 0%
Utilities and office supplies 0.04 0.04 0%
IT hardware/ network 0.01 0.01 0%
Software 0.03 0.03 0%
System (e.g ISO, library) 0.01 0.01 0%
Professional services including secfretarial, audit and
legal0.02 0.02 0%
Salaries of non-billable staff including administrative/
directors0.17 0.17 0%
Depreciation amortization 0.07 0.07 0%
Cost of Capital 0.10 0.10 0%
Profit before tax 0.20 0.20 0%
Others 0.07 0 -100%
TOTAL 2.102.03
Proposed 2-4.7%
16/11/2016
MULTIPLYING FACTOR FOR ALL CATEGORIES OF LECTURERS FROM PRIVATE AND LOCAL UNIVERSITIES
COMPONENT FOR MUTLIPIER COMPONENT RATIOPERCENTAGE
DIFFERENCES (%)
A. Benefit of Named employee MOF 2014 MSA 2015
Salary 1.00 1.00 0%
Incentive and leave 0.50 0.50 0%
Research and Development 0.05 0.05 0%
B. University Consultancy Bureau's Fee 0.30 0.30 0%
B. Firm's Overhead
Utilities and office supplies 0.05 0.05 0%
IT hardware 0.03 0.03 0%
Profit before tax 0.20 0.20 0%
Others 0.07 0 -100%
TOTAL 2.20
2.13
Proposed 2.10
-4.5%
16/11/2016
EXAMPLE CALCULATION OF CONSULTANCY FEE BETWEEN MOF 2014 AND MSA 2015
GEOTECHNICAL INVESTIGATION STUDY FOR SLOPE FAILURE AT DEWAN FLAT TAMAN MULIA, BANDAR TUN RAZAK, KUALA LUMPUR
NO DESIGNATION YEARS OF
EXPERIENCEMAN
MONTHSALARY(RM)
MULTIPLIER FACTOR (MF)
TOTAL (RM) PERCENT DIFFEREN
CE(%)2014 MSA 2014 MSA
1 Project Director 18 0.25 8,200.00 2.7 2.5 5,535 5,125 -7%
2 Project Manager 14 1 7,000.00 2.7 2.5 18,900 17,500 -7%
3Professional Geotechnical
Engineer
24 1 10,200.00 2.7 2.5 27,540 25,500 -7%
4
Senior Geotechnical
Engineer
9 1.5 4,800.00 2.7 2.5 19,440 18,000 -7%
5Geotechnical
Engineer1 2.5 3,000.00 2.7 2.5 20,250 18,750 -7%
6 Technical Assistant 3 1.5 2,370.00 2.1 2.0 7,465.5 7,110 -5%
7 Site Supervisor 3 2.5 2,370.00 2.1 2.0 12,442.5 11,850 -5%
8 Draughtsman 2 1.5 1,980.00 2.1 2.0 6,237 5,940 -5%
TOTAL OF PROFESSIONAL FEES 117,810 109,775 -7%
16/11/2016
25
C. FIELD TESTING/ SITE a. GENERAL CONDITION AND PRELIMINARIES
b. DEEP BORING WITH BORING PLANTSc. DEEP SOUNDING AND PIEZOCONE
d. OTHER FIELD TESTSe. COLLECTION OF SOIL AND WATER SAMPLES IN BULK
f. LABORATORY TESTg. MATERIAL TESTING
16/11/2016
SCOPE OF WORK FOR SITE INVESTIGATION
• BILL No. 1 : GENERAL CONDITION AND PRELIMINARIES
BILL No. 2 : DEEP BORING WITH BORING PLANTS
BILL No. 3 : DEEP SOUNDING AND PIEZOCONE
BILL No. 4 : OTHER FIELD TESTS
BILL No. 5 : COLLECTION OF SOIL AND WATER SAMPLES IN BULK
BILL No. 6 : LABORATORY TEST
BILL No. 7 : MATERIAL TESTING
D. REIMBURSABLE
16/11/2016
26
16/11/2016
• 41 total of item for reimbursable were established in MOF 1996.
• In 2014, MOF has 54 reimbursable items.
REIMBURSABLE ITEMS ACCORDING TO MOF 1996 & 2014
DETAILS REIMBURSABLE ITEMMOF 1996
(Item)
MOF 2014(Item)
A Cost Of Transportation / Travel 15 19
B Accommodation And Subsistence 11 11
C Communication Cost 3 3
D Documentation And Report Preparation Cost 4 8
E Project Assets 3 5
F Technical Testing And Other Test 2 2
G Cost Of Rental Office And Utilities 1 2
H Costs For Conducting Research Survey 2 4
TOTAL ITEM 41 54
16/11/2016
NO DESCRIPTION
TOTAL AMOUNT (RM)
DIFFERENCE(%)IKRAM ,1996
MOF 2014 AND
JKR 2012
a Professional Fees 101,136.75 122,457.98 21.08%
b Field Testing 61,500.20 70,015.00 13.85%
c Reimbursable 6,230.00 9,650.00 54.90%
GRAND TOTAL 138,170.20 197,475.00 42.92%
OVERALL SUMMARY DISTRIBUTION OF CLAIM FOR SLOPE FORENSIC WORKS
GEOTECHNICAL INVESTIGATION STUDY FOR SLOPE FAILURE AT DEWAN FLAT TAMAN
MULIA, BANDAR TU RAZAK
4. ADDITIONAL ITEMi. DETAILED ENGINEERING SURVEY
ii. GEOPHYSICAL SURVEYiii. SURFACE MAPPINGiv. INSTRUMETATION
v. TERRSTRIAL LASER SCANNING (TLS)vi. UNMANNED AERIAL VEHICLE (UAV)
16/11/2016
28
16/11/2016
SCOPE OF WORKS ENGINEERING SURVEY
1. Mobilisation and Demobilisation
2. Preparatory Work
3. Planimetric Control
4. Demarcation or Along the propose route / within site area
5. Height Control
6. Monumenting
7. Contour and Detail
8. Grid Heighting
9. Cross-Section
10. Demarcation of BH/MP
11. Processing, Conversion and Translation of Digital Data
16/11/2016
RATES OF DETAILED ENGINEERING SURVEY
ITEM DESCRIPTION OF WORK UNIT RATE
8.0 Mobilisation of personnel and all equipment's necessary for execution of the site
operations to site and demobilisation on completion:-
8.1 Work rates for mobilization and demobilization per party are as follow (Peninsular):
8.1.1 i)50 kilometres or less perday Nil
8.1.2 ii)More than 50 kilometres but not exceeding 150 kilometres (1 party/day) perday 743.00
8.1.3 iii)More than 150 kilometres but not exceeding 300 kilometres (2 party/day) perday 1,486.00
8.1.4 iv)More than 300 kilometres (3 party/day) perday 2,229.00
8.2 Work rates for mobilization and demobilization per party are as follow (Sabah/Sarawak):
8.2.1 i)50 kilometres or less perday Nil
8.2.2 ii)More than 50 kilometres but not exceeding 150 kilometres (1 party/day) perday 966.00
8.2.3 iii)More than 150 kilometres but not exceeding 300 kilometres (2 party/day) perday 1,932.00
8.2.4 iv)More than 300 kilometres (3 party/day) perday 2,898.00
8.2 Preparatory Work
Work rate for preparatory work is 1 party-day perday 743.00
8.3 Planimetric Control
The accuracy for planimetric control and connection shall not be less than 1 in 4000. The planimetric
control and connection includes:
8.3.1 Connection to GPS Datum
8.3.1.1 i)Peninsular
Flat and undulating area km 2,000.00
Hilly area km 2,500.00
Swampy area km 2,500.00
Built up area km 2,500.00
8.3.1.2 ii)Sabah/Sarawak
Flat and undulating area km 2,600.00
Hilly area km 3,250.00
Swampy area km 3,250.00
Built up area km 3,250.00
8.3.2 Along the proposed or existing routes or alignment
8.3.2.1 i)Peninsular
Flat and undulating area km 2,000.00
Hilly area km 2,500.00
Swampy area km 2,500.00
Built up area km 2,500.00
8.3.2.2 ii)Sabah/Sarawak
Flat and undulating area km 2,600.00
Hilly area km 3,250.00
Swampy area km 3,250.00
Built up area km 3,250.00
8.4 Height Control and Connection
The height control and connection includes:
8.4.1 Connection to JUPEM Bench Marks Flat and Undulating km 743.00
8.4.2 Along the proposed or existing routes or alignment Flat and Undulating km 743.00
8.5 Reimbursable
8.5.1 Expenses for purchase of Property Model sht 170.00
8.5.2 Expenses for Communication pday 743.00
8.5.3 Hiring charge of special equipment/software as agreed with client pday
8.5.4 Expenses for Travel & Accomodation pday 743.00
8.5.5 Expenses incurred in the use of special transportation e.g. helicopter, boat, etc as agreed with the client pday
16/11/2016
RATES OF DETAILED ENGINEERING SURVEY
ITEM DESCRIPTION OF WORK UNIT RATE
8.6 Site Survey with Contour and Detail - 1m Contour
8.6.1 Built-up ha 1486.00
8.7 Detail Site Survey - Grid Heighting
8.7.1 Built-up ha 4903.80
8.8 Cross-Section (cost per section @ +/- 150-200m length)
8.8.1 Built-up section 495.33
8.9 Demarcation of BH/MP unit 100.00
SUB-TOTAL i
8.10 Processing, Conversion and Translation of Digital Data (20% from SUB TOTAL i)
8.10.1Where the survey result is required to be submitted in a designated format, a charge of 20%
of the total
survey fees is applicable.
SUB-TOTAL ii ( Sub-total i + item 1.10.1)
8.11 IKRAM Fees (10% from SUB-TOTAL ii)
GRAND TOTAL (SUB-TOTAL ii + IKRAM Fees)
16/11/2016
29
16/11/2016
PHOTOS OF SEISMIC WORKS
16/11/2016
BH
6
BH
7
BH
10
BH
9
ZONE 2
Seismic Refraction Survey Kundasang Project
16/11/2016
30
16/11/2016
PHOTOS OF RESISTIVITY WORKS
16/11/2016
RESISTIVITY SURVEY PENANG HILL PROJECT
16/11/2016
SCOPE OF WORKS FOR GEOPHYSICAL SURVEY
1. General Condition and Preliminaries
2. Mobilisation and Demobilisation
3. Setting Out Equipment
4. Seismic Refraction Survey
5. Resistivity Survey
6. Multi-Channel Analysis of Surface Wave
(MASW)
7. Report
16/11/2016
31
16/11/2016
RATES OF GEOPHYSICAL SURVEY
ITEM DESCRIPTION OF WORK UNIT RATE
ITEM DESCRIPTION OF WORK UNIT AGREED RATE
9.1 Mobilisation
9.1.1Mobilisation of personnel and all equipment's necessary for execution of the site operations to site and demobilization on completion:-
9.1.1.1 Up to 25 Km from Kuala Lumpur LS 1200
9.1.1.2 Over 25Km and up to 225 Km from Kuala Lumpur LS 1700
9.1.1.3 Over 225Km and up to 425 Km from Kuala Lumpur LS 2100
9.1.1.4 Over 425 Km from Kuala Lumpur LS 2400
9.2 Setting Out
9.2.1 Setting out of geophysical survey lines at fixed sensor interval and taking the reduce level at LS 1250
9.3 Geophysical Survey
9.3.1 Seismic Refraction Survey
9.3.1.1
Carry out seismic survey within a 24 channel seismograph with geophone at maximum 5m interval measured along
the slope and 7 sheets per spread, sledge hammer as energy source, and analysis of data with seismic tomographic software and incorporating borehole data where available. (minimum length per line is 72m) Line 3000
9.3.2 Multi-Channel Analysis of Surface Wave (MASW)
9.3.2.1Carry out surface wave investigation with 3m interval with 24 geophone for investigation depth up to 20m depth,using Sledge Hammer As Seismic Source to obtain the S-Wave tomogram. (minimum length per line is 72m) Line 2500
9.3.3 2-D Resistivity Profilling
9.3.3.1
Carry out 2D resistivity profiling using schlumberger - wenner configuration and roll-along technique within 40
electrodes at roll-along technique within 40 electrodes at5m Intervals, each Interval measured as the slope distance between adjacent electrodes, determine levels of each electrode, and process data to produce resistivity profiles.(minimum length per line is 120m) Line 1800
9.4 Report
9.4.1Prepare and submit report which shall include the compilation of all data including result from ground investigation and 3D model of the study area and surrounding area nos 300
16/11/2016
SCOPE OF WORKS FOR SURFACE MAPPING
1. Mobilization
2. Geomorphological Mapping
3. Engineering Geological Mapping
4. Report
16/11/2016
32
16/11/2016
RATES OF SURFACE MAPPING
ITEM DESCRIPTION OF WORK UNIT RATE
10.1 Mobilization
Mobilization of personnel and all equipment necessary for execution of the site operations to site
and demobilization on completion:-
10.1.1 Up to 25 km from Kuala Lumpur. LS 1200
10.1.2 Over 25 km and up to 225 km from Kuala Lumpur. LS 1700
10.1.3 Over 225 km and up to 425 km from Kuala Lumpur. LS 2100
10.1.4 Over 425 km from Kuala Lumpur. LS 2400
10.2 Geomorphological Mapping
The works carried out inclusive filling up primary area based proforma, structural proforma (if
exist), collection of structural proforma (if exist), collection of any visible evidences, data
logging and expert judgement based on the site condition together with supporting illustration
ha 18000
10.3 Engineering Geological Mapping
The works carried out inclusive collection of data structural discontinuities for rock, distresses
using Rock Proforma and/or kinematic analyses, determination of critical area, potential mode
of failure and illustration of geological features on the slope
ha 18000
10.4 Report
Prepare and submit report which shall include the compilation of all data and analyses of the
study area. nos 600
iv. INSTRUMENTATION
16/11/2016
TYPES OF INSTRUMENTATION
NO TYPES OF INSTRUMENTATION
1 Building Settlement Marker
2 Ground Settlement Marker
3 Avongard Standard Tell-tale
4 Damage Gauge
5 Plate Tiltplate
6 Brass Tiltplate
16/11/2016
33
16/11/2016
TYPE OF INSTRUMENTATION
Building Settlement Marker Ground Settlement Marker
DeMeg Gauge Avongard standard tell-tale
16/11/2016
TYPE OF INSTRUMENTATION
Installation of Brass Tiltplate
Installation of Ceramic Tiltplate
16/11/2016
SCOPE OF WORKS FOR INSTRUMENTATION
1. Mobilisation
2. Type of Instrumentation/Monitoring System Used
3. Installation Works
4. Establishment of TBM
5. Monitoring/Supervision (Periodical Monitoring)
6. Report
16/11/2016
34
16/11/2016
RATES OF INSTRUMENTATION & MONITORING
ITEM DESCRIPTION UNIT RATE
11.1 Mobilisation
11.1.1Mobilisation of personnel and all equipment's necessary for execution of the site operations to site
and demobilisation on completion:-
11.1.1.1 Up to 25 Km from Kuala Lumpur LS 1,200.00
11.1.1.2 Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.00
11.1.1.3 Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.00
11.1.1.4 Over 425 Km from Kuala Lumpur LS 2,400.00
11.2 Instrument Installation (Supply & Install)
11.1 Building / column settlemet marker no. 130.00
11.2 Demec Gauge Station no. 100.00
11.3 Ceramic Tilt Plate no. 450.00
11.4 Brass Tilt Plate no. 500.00
11.5 Avongard Standard Tell-Tale no. 120.00
11.6 Setting up TBM no. 1,250.00
11.3 Monitoring of the Above Instrument
11.3.1 Up to 25 Km from Kuala Lumpur LS 1,200.00
11.3.2 Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.00
11.3.3 Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.00
11.3.4 Over 425 Km from Kuala Lumpur LS 2,400.00
11.4 Report
11.4.1Prepare and submit the report which shall include the compilation of all monitoring data of the
study area and surrounding areanos 300.00
v. TERRESTRIAL LASER SCANNING (TLS)
SAMPLE VIDEO OF POINT CLOUD DATA
16/11/2016
35
16/11/2016
RATES OF TERRESTRIAL LASER SCANNINGITEM DESCRIPTION OF WORK UNIT RATE
12.1 Mobilisation of personnel and all equipment's necessary for execution of the site operations to site and demobilisation on completion:-
12.1.1Up to 25 Km from Kuala Lumpur LS 1,200.0012.1.2Over 25 Km and up to 225 Km from Kuala Lumpur LS 1,700.0012.1.3Over 225 Km and up to 425 Km from Kuala Lumpur LS 2,100.0012.1.4Over 425 Km from Kuala Lumpur LS 2,400.00
12.2 Terrestrial Laser Scanning Works
Carry out Terrestrial Laser Scaning works using Laser Scanner Rental for Inclusive of : days 9,000.00
Laser Scanner , GPS Receiver, Data Acquisition Software Site staff for data acquisition using scanner System
12.2.1Carry out data processing works by using Point Cloud Processing software including of Point Cloud Registration, Course registration, Multistation Adjustment, & Filteration of features for producing deliverable
Point Cloud (LAS format)Layout plan in autocadMeshing (Hold failure area and adjacent)Cross Section (10m interval)3D Fly Through ( In Avi format)2m Contour
12.2.2Carry out features extraction works that can be seen from TLS procesed data
Building - foor printLamp post - point locationRoads/RailwaySignages
16/11/2016
12.4 Terrestrial Laser Scanning Works
Carry out Terrestrial Laser Scaning works using Laser Scanner Rental for Inclusive of : Days 13,900.00
Laser Scanner ,
Data Acquisition Software
Site staff for data acquisition using scanner System
Scanning frequency every 2 hour (24 hours)
12.4.1Carry out data processing works by using Point Cloud Processing software including of Point Cloud Registration, Course registration, Multistation Adjustment, & Filteration of features for producing deliverable
Point Cloud (LAS format) comparing every scan
Meshing (Hold failure area and adjacent)
Cross Section (5m interval)
Update the officer in charge
2m Contour
12.5Carry out Target Control Survey using Total Station for determination of Ground Control Point LS 6,000.00
Control monument site inspection
Coordinating Control
RTK-GNSS ground Control / Levelling
Planimetric Survey processing
ITEM DESCRIPTION OF WORK UNIT RATE
RATES OF TERRESTRIAL LASER SCANNING
vi. UNMANNED AERIAL VEHICLE (UAV)
16/11/2016
36
16/11/2016
SCOPE OF WORKS UNMANNED AERIAL VEHICLE (UAV)
1. Mobilisation2. Project Preparation3. Unmanned Aerial Vehicle Works4. Carry out Target Control Survey using Total Station
for determination of Ground Control Point
16/11/2016
UAV SPECIFICATION
1. UAV Remotely Piloted Aircraft System Equipped With Laser
Scanner Complete Miniaturized, Lightweight ALS System
2. The Scanner Is Lightweight Airborne Laser Scanner Fully
Integrated, Providing 230° FOV, An Effective Measurement
Rate Up To 350,000 Meas./Sec, And 10 Mm Accuracy
3. Fibre-optic Gyroscope And GPS/GLOSNASS Receiver
Integrated
4. Compact Control Unit With Various Interfacing Options
5. Mounting Options For Highly Flexible Aircraft Installation
6. Prepared For Remote Control Via Low-bandwidth Data Link
7. Operates Up To 2 Digital Cameras
16/11/2016
Main Features
1. Precision survey at hilly area
2. Topography in open-cast mining
3. Terrain mapping
4. Archaeology and cultural heritage building documentation
5. Surveying of urban environments
6. Construction-site monitoring
7. Corridor mapping: power line, railway track, and pipeline inspection
16/11/2016
37
16/11/2016
PHOTOS OF UAV
ROVERS UNIT MAIN SCANNER UNIT
GOUND CONTROL REMOTE CONTROL
LASER SCANNER
VIDEO OF UAV
16/11/2016
PHOTOS OF UAV
16/11/2016
38
16/11/2016
RATES OF UNMANNED AERIAL VEHICLE WORKSITEM DESCRIPTION UNIT RATE
13.2 Project Preparation sum
Flight Planning
a) DCA Approval & Permit As Per Bill
b) JUPEM Approval & Permit As Per Bill
c) Execution table (flight path, area of interest, 3,300.00
weather / environmental condition)
13.3 Unmanned Aerial Vehicle Works
Carry out UAV LiDAR works for inclusive of : Day 20,000.00
Online waveform LiDAR sensor
IMU/GNSS Receiver,
Data Acquisition Software
Camera
Site staff for data acquisition using scanner System
13.3.1
Carry out data processing works by using processing software including of Point Cloud Registration, trajectory adjustment,
georeferenced point cloud, combination and adjustment of laser scan data & Filteration of features for producing
deliverable
Point Cloud (LAS format)
DTM & DSM classification
Layout plan in autocad
Aerial Photo
Cross Section (5m interval)
3D Fly Through ( In Avi format)
2m Contour
13.3.2 Carry out features extraction works that can be seen from UAV procesed data
13.3.2.1 Building - foot print
13.3.2.2 Slope Structure - point location
13.3.2.3 Roads/Railway
13.3.2.4 Signages / Lamp Post
13.3.2.5 Other possible features
13.4 Carry out Target Control Survey using Total Station for determination of Ground Control Point LS 6,000.00
Control monument site inspection
Coordinating Control
RTK-GNSS ground Control / Levelling
Planimetric Survey processing
16/11/2016
SUMMARY OF AGREED ITEMSNO. BILL NO. OF ITEM
1. Bill 1: General Condition & Preliminaries 5
2. Bill 2: Deep Boring With Boring Plants 109
3. Bill 3: Deep Sound And Piezocone 35
4. Bill 4: Other Field Test 50
5. Bill 5: Collection Of Soil And Water Samples In Bulk 7
6. Bill 6: Laboratory Tests 84
7. Bill 7: Material Testing 138
8. Bill 8: Detailed Engineering Survey 38
9. Bill 9: Geophysical Survey 9
10. Bill 10: Surface Mapping 7
11. Bill 11: Instrumentation 15
12. Bill 12: Terrestrial Laser Scanning (TLS) 10
13. Bill 13: Unmanned Aerial Vehicle (UAV) 9
TOTAL ITEM 516
16/11/2016
EXAMPLE OF COST ESTIMATION FOR SLOPE FORENSIC WORK
(GEOTECHNICAL INVESTIGATION WORK AT LEBUHRAYA MAHAMERU)
NO DESCRIPTION TOTAL AMOUNT (RM)
a Professional Fees + 6% GST RM 81,734.60
Sub Total Item a. RM 81,734.60
6% Goverment Tax RM 4,904.08
b Reimbursable Fee : Soil Investigation RM 30,589.80
Reimbursable Fee : Instrumentation & Monitoring RM 13,998.00
Reimbursable Fee : Laboratory Testing RM 9,941.40
Reimbursable Fee : Detail Engineering Survey RM 36,839.11
Reimbursable Fee : Seismic Refraction Survey RM 18,630.00
Sub Total Item b. RM 109,998.31
6% Goverment Tax RM 6,599.90
c Others (Communication, Travelling & Report) RM 10,108.00
GRAND TOTAL RM 213,344.89
16/11/2016
39
vii. REPOSITORY CENTRE
16/11/2016
SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS
( FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)
1. Data Storage. (Example of data orthophoto, UAV raw data, spatial & non-spatial data etc )
i. Server (Application server and Database server) Powered by Nutanix Software
ii. Backup server (One to one)
iii. San Strorage
iv. GIS Server (extension 3D, Spatial & Image)
v. ABACO 3D
vi. Database Microsoft SQL Server
(Note: All tool and equipment inclusive of training and maintenance for 3 years)
2. Data Submissioni. Manual Submission, i.e External hardisk, DVD
3. Data Managementi. Global Mapper application (Latest Version)
ii. ArcGis application (Latest Version) – 5 Concurrent license
iii. Other necessary application to read supplied data
iv. Data Management System required to be link with ISIS
v. System development on slope data management system
(Note: All tool and equipment inclusive of training and maintenance for 3 years)
16/11/2016
SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS
(FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)
4. Tools & Equipmenti. High Performance Laptop (built in GPS) – 10 unit
ii. Handheld GPS – 10 unit Surface Pro
5. Gathering Datai. Incident Proforma
� To prepare the necessary form as per given samples. Need to be improvised and done in digital format.
� The filling of form is required to be done in hardcopy and in digital form when slope failure occur
� Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)
ii. Slope Primary Proforma� To prepare the necessary form as per given samples. Need to be improvised and done in digital format.
� The filling of form is required to be done in hardcopy and in digital form when slope failure has been remedied / treated
� Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)
iii. Structure Proforma� To prepare the necessary form as per given samples. Need to be improvised and done in digital format.
� The filling of form is required to be done in hardcopy and in digital form when slope failure has been remedied / treated and involving slope structural construction works
� Submission to JKR shall be in hardcopy, softcopy ( Scanned in PDF format) and digital format (as JKR Scheme)
16/11/2016
40
16/11/2016
SCHEDULE I (ITEM 1.8)TOOLS & EQUIPMENT REQUIREMENTS
( FOR CENTRAL DATABASE OR NATIONAL REPOSITORY CENTRE FOR SLOPES)
iv. Data submission to JKR requires the Letter of Acknowledgment
from the Consultant to ensure that the raw data, processed data
and other related document pertaining to the implementation of
a particular project have been completely submitted. The
Consultant also has to state the accuracy of the Consultant’s own
data.
v. In the event that if inaccuracy of data is discovered after a
particular project has been completed, the Consultant shall re-
execute the related works to fulfil the required quality data.
vi. The Consultant needs to upload the submitted data into the server
with the monitoring of JKR
16/11/2016FINAL REPORT to DBKL FINAL REPORT to JKR
EXAMPLE OF FINAL REPORT
16/11/2016
EXAMPLE OF TECHNICAL AND FINANCIAL PROPOSAL
COVER PAGE TABLE OF CONTENTS
16/11/2016
41
16/11/2016
EXAMPLE OF FINANCIAL PROPOSAL
SUMMARY OF FINANCIAL
16/11/2016
EXAMPLE OF PROPOSED WORK SCHEDULE
WORK SCHEDULE
WHAT IS THE POSSIBLE MODE OF FAILURE AT
THIS SLOPE??