Page 1: Dalradian presentation may12 final2

Patrick F. N. AndersonChief Executive Officer

High-Grade Gold │ Post-PEA │ Low-Risk Jurisdiction │ Low Capex│ May 2014

Page 2: Dalradian presentation may12 final2

2

FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON

2

This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance ofthe Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineralresource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of thedevelopment of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks,reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always,forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,“intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”,“would”, “might” or “will” be taken, occur or be achieved.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such asthe continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed onschedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that theprice of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operationsand realize on mineral resource estimates and current mine plans and that the assumptions contained in the Company’s PEA (as defined herein) are accurate and complete.

Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian tobe materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others,general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamationactivities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possiblevariations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents,labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development orconstruction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2013dated March 25, 2014 (the “AIF”) .

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward lookingstatements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements containedherein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of newinformation, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to beaccurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forwardlooking statements.

Certain technical data in this presentation was taken from the technical report entitled “A Preliminary Economic Assessment of the Curraghinalt Gold Deposit, Tyrone Project,Northern Ireland” dated September 6, 2012 and prepared by B. Terrence Hennessey, P.Geo., Mr. Barnard Foo, P.ENG., Mr. Bogdan Damjanovic, P.ENG, Mr. Andre Villeneuve,P.ENG., and Mr. Christopher Jacobs, CEng MIMMM of Micon International Limited (the “PEA”), and is subject to all of the assumptions, qualifications and procedures describedtherein. Dalradian published an updated resource estimate on April 16, 2014 (see press release of that date for more information). The updated resource estimate does notinvalidate the conclusions of the PEA, which is based on the November 2011 resource.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral resources that areconsidered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is nocertainty that the results of the PEA will be realized.

Michele L. Cote, MSc., P. Geo., VP Exploration, Dalradian Resources Inc., is the Qualified Person who supervised the preparation of the exploration technical data in thispresentation. The exploration data was based on the procedures described in the Company’s AIF and is subject to all of the assumptions, qualifications and proceduresdescribed therein.

Page 3: Dalradian presentation may12 final2

3

BUILDING A PROFITABLE IRISH GOLD PRODUCER

Grow high-grade Curraghinalt deposit to 5M+ ounces

Move high-margin, low capex project quickly towards production

Broaden demand for DNA shares

PREMIUM ASSET IN A SCARCITY MARKET

Page 4: Dalradian presentation may12 final2

GROWTH TO 5M+ OUNCES

Page 5: Dalradian presentation may12 final2

5

METAL PROJECTS IN IRELAND & THE UK

Our flagship asset: Curraghinalt high-grade lode gold deposit

Excellent regional infrastructure

Over 84,000 hectares under license

Gortin

Omagh

Curraghinalt

BELFAST

N O R T H E R NI R E L A N D

GalantasGold

ConroyDiamonds& Gold

Lonmin

Irish SaltMining

UndergroundSalt Mine

Clontibret

Croagh PatrickParys Mountain

Gwynfynydd

Galmoy Avoca

Pallas GreenSilvermines

South Crofty

Curraghinalt GoldDeposit

GoldBase MetalsSalt Mine

Allihies Copper Mines

Galantas GoldPrevious open pit producer; permitting underground

ScotgoldPermitted

Vedanta ResourcesIn production

BolidenIn production

IMC ExplorationGold exploration

LundinPrevious producer

ConroyGold exploration

Lisheen

Cononish

Tara

Cavanacaw

XstrataFeasibility

Gold Mines of WalesExploration

Clogau

Page 6: Dalradian presentation may12 final2

6

CURRAGHINALT RESOURCE

Resource covers a fraction of 12 km trend

High-grade gold resource1

Measured: 0.02 MT grading 20.15 g/t Au for 15,100 contained ounces

Indicated: 2.98 MT grading 10.34 g/t Au for 989,000 contained ounces

Inferred: 8.01 MT grading 9.67 g/t Au for 2.49 million contained ounces

Positive PEA shows a high margin and low capex producer2

1 Refer to April 16, 2014 press release. 2 Refer to PEA. Please see cautionary statements in Forward Looking Information (slide 2)

Page 7: Dalradian presentation may12 final2

7

RESOURCE EXPANSION

Since 2010, we have proven our understanding of Curraghinalt by growing the resource 5-fold over 3 updates

Additional ounces could be brought into the resource through further well-placed drill holes

Deposit is open in all directions

Veins are predictable and continuous so drilling along strike has good potential to expand resource

Roadmap in place to get us to $5M+ ounces

Drilling to begin later this year

Page 8: Dalradian presentation may12 final2

8

A 12KM GOLD TREND

GLACIATED TERRAIN WITH MINIMAL OUTCROP

Curraghinalt

Deposit

Curraghinalt

Trend

Curraghinalt Trend

Veins in Current Resource

Intersected Veins

Historical Findings

Geochem Anomaly

Curraghinalt DepositResource effective as of Jan 2014

1–

Measured: 0.02 Moz Au (0.02MT @ 20.15 g/t)

Indicated: 0.99 Moz Au (2.98MT @ 10.34 g/t)

Inferred: 2.49 Moz Au (8.01 MT @ 9.67 g/t)

Golan Burn

Outcropping veins including

60cm @ 61.43 g/t Au (12-CT-167)4

Alwories Discovery Holes2

4.72m @ 14.82 g/t Au (12-CT-173)

2.22m @ 14.10 g/t Au (12-CT-162)2a

1.47m @ 23.6 2g/t Au (12-CT-162)2b

400 m Step-out

3.2m @ 5.34 g/t Au (11-CT-99)3

Attagh Burn

2.47m @ 18.99 g/t Au

1 43-101 Compliant Resource completed by T. Maunula & Associates Consulting Inc., using a 5 g/t Au cutoff (see press release of April 16, 2014)2 12-CT-162 drilled at 180/-55. 12-CT-173 drilled at 150/-60; 2a from 186.00 m- 188.22m, 2b from 229m - 230.55 m ; true width undetermined3 11-CT-99 drilled at 200/-60, from 471.14-474.34 m4 12-CT-167 drilled at 180/-45 True width between 95-92% of core length

Page 9: Dalradian presentation may12 final2

9

OROGENIC VEIN SYSTEM

Page 10: Dalradian presentation may12 final2

CLEAR PATH TO PRODUCTION

Page 11: Dalradian presentation may12 final2

11

PATH TO PRODUCTION

1Prove economics of Curraghinalt deposit

2Permit a mine

3Finance construction

Page 12: Dalradian presentation may12 final2

12

PEA SHOWS STRONG ECONOMICS

KEY PEA DATA*3 YEAR TRAILING AVERAGE

GOLD PRICE:$1378/ounce

5 YEAR TRAILING AVERAGE GOLD PRICE:$1,166/ounce

NPV with 8% discount rate (After-tax) $467 million $331 million

IRR (After-tax) 41.9% 33.4%

Average Annual Production 145,000 ounces/year

Processing Rate 1,700 tonnes/day

Life of Mine 15 years

Initial Capex ($38M contingency) $192 million

Cash Costs $532/ounce or $125/tonne

Diluted Grade 8.1 g/t Au

Gold Recovery 92%

Payback 2 years**

At $814 gold price (10-year trailing average), after-tax IRR of 20.2%

* Prepared by Micon International Limited. PEA results released on July 25, 2012. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. The updated 2014 resource estimate does not invalidate the conclusions of the PEA, which is based on the November 2011 mineral resource estimate. It includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the results of the PEA will be realized. All dollars quoted in $ USD unless stated otherwise. ** Based on 3 year trailing average gold price of $1,378/ounce

Page 13: Dalradian presentation may12 final2

13

UG BULK SAMPLE TO FURTHER PROVE ECONOMICS

DALRADIAN HAS RECEIVED PLANNING PERMISSION TO COMPLETE UP TO 2,000 M OF UNDERGROUND EXPLORATION AND BULK SAMPLING IN ORDER TO:

Extend the existing aditto intersect further veining

Drift along exposed veins

Install a ramp and work on multiple levels

Remove a large bulk sample

Proposed Access Ramp to Sub-Level

Proposed Tunnel Extensions at Sub-Level

Proposed Tunnel Extensions at 170

M Level

Existing Exploration

Tunnel

Proposed Stopes

T17 Vein

No. 1 Vein

106-16 Vein

Page 14: Dalradian presentation may12 final2

14

UNDERGROUND BULK SAMPLE PROGRAM GOALS

Demonstrate continuity of thickness and grade of mineralized veins

Convert indicated mineral resources to measured

Test mining techniques and backfill methods

Investigate geotechnical and hydrogeological conditions

Produce a bulk sample for metallurgical test work

Advance the permitting process

RO

AD

SHEE

PD

IP

MU

LLA

N

T17

No

. 1

10

6_1

6

BEN

D

CR

OW

EXISTING DEVELOPMENT

PLANNED DEVELOPMENT

PLANNED DEVELOPMENT

PLANNED STOPING

Cross-section through proposed development,looking west

Page 15: Dalradian presentation may12 final2

PERMITTING

Page 16: Dalradian presentation may12 final2

16

DG3

Gortin

COUNTY TYRONE IS RESOURCE FRIENDLY

Curraghinalt

kilometres

0 1 2

Curraghinalt

Cavanacaw Open Pit Approx 30 km SW

Clear Cut Logging at Gortin Glen Forest Park

Alwories Quarry

125 Metres

Greencastle Quarry

Page 17: Dalradian presentation may12 final2

17

PERMITTING PROGRESS TO DATE

Permitting process in Northern Ireland is thorough, but we have shown that permitting can be done in a timely manner

Less than a year to permit underground bulk sample

Transparent process: all stakeholder communications published on government website

Strong social license: 6:1 ratio of supporters to objectors for UG bulk sample

Regular community and government agency meetings; site visits for local and government groups

Page 18: Dalradian presentation may12 final2

18

PERMITTING A MINE

January 2011: EIA baseline data collection commenced

Feasibility Study not required for EIA

Main components are project description of mine and infrastructure and environmental statement

Updated Economic Study in H2 2014 will provide project description

Dealing with same departments that permitted UG explorationand bulk sample program

Page 19: Dalradian presentation may12 final2

19

PERFECT TIMING

Page 20: Dalradian presentation may12 final2

FINANCING

Page 21: Dalradian presentation may12 final2

21

WE’VE GOT WHAT THE MARKET WANTS

The projects that are financeable in the current market are: High grade Low capex Low-risk jurisdiction

We anticipate raising construction funding on the back of proving economics and mine permitting progress

Page 22: Dalradian presentation may12 final2

22

THE BOARD: HAVE RAISED BILLIONS OF DOLLARS TO ADVANCE PROJECTS INTO MINES

PATRICK F. N. ANDERSONCHIEF EXECUTIVE OFFICER

Founder & Former CEO of Aurelian Resources ‘08 – PDAC International Mineral Discovery ‘08 – Northern Miner Man of the Year

RONALD GAGEL

CFO of TMAC Resources; Former CFO of FNX Mining and Aur Resources

Director of Adriana Resources and StonegateAgricom

Former board member of HudBay Minerals and Central Sun Mining

‘13 – PDAC Distinguished Service Award

THOMAS OBRADOVICHCHAIRMAN

Founder & Former CEO of Young-Davidson Mines

Former Director of Aurelian Resources

SEAN ROOSEN

Founder & CEO OF Osisko Mining Corporation Also Director of Astur Gold ‘06 – Prospector of the Year - Quebec ‘08 – Prospector of the Year - Canada ‘09 – Northern Miner Man of the Year

JONATHAN RUBENSTEIN

Director of Eldorado Gold Director of Detour Gold Chairman & Director of MAG Silver Former Director of Aurelian Resources,

Sutton Resources, Canico Resource andCumberland Resources

ARI SUSSMAN

Founder & CEO of Continental Gold Raised over $500M in funding during

15 years in the natural resources & investment sectors

GRENVILLE THOMAS

Founder & Chairman of StrongbowExploration

Founder & Former Chairman, President & Director of Aber Resources (Harry Winston Diamond) now Dominion Diamond

‘99 – PDAC Prospector of the Year ‘01 – Northern Miner Man of the Year ‘09 – Canadian Mining Hall of Fame

Page 23: Dalradian presentation may12 final2

BROADEN DEMAND FOR DNA

Page 24: Dalradian presentation may12 final2

24

ANALYST COVERAGE

Targets range from $1.00-$2.25 Average daily volume (April): 200,000

All dollars quoted in $ CAD

$0.00

$0.25

$0.50

$0.75

$1.00

$1.25

$1.50

$1.75

$2.00

$2.25

$2.50

M J J A S O N D J F M A M

2013 2014

$0.92May 9, 2014

Andrew Kaip

$1.00Laurie Curtis

$1.50Michael Curran$1.50

Joe Mazumdar

$1.25Mike

Kozak

$2.25Stuart

McDougall

$1.70Bart

Jaworski

$1.20Steve

Parsons

$1.75Jamie Spratt

Page 25: Dalradian presentation may12 final2

25

CORPORATE SUMMARY

TSX: DNA STOCK PRICE

Shares outstanding of 109.4 million and fully diluted of 127.6 million as of May 9, 2014

Cash position of $17.2 million as of March 31, 2014

SHARE CAPITALIZATION AND CASH POSITION

All dollars quoted in $ CAD

Tremendous opportunity to expand Irish, UK and European shareholder base

TOP TEN SHAREHOLDERS (REPRESENTING ~50%)

GEOGRAPHIC OWNERSHIP FOR IDENTIFIED SHAREHOLDERS

Canada

US

Europe

Rosseau Asset Mgmt

Sprott Asset Mgmt

Front Steet

Insiders (5.9%)

Aegis

Julius Baer

Sun Valley

US Global

RBC

Fidelity

Page 26: Dalradian presentation may12 final2

MILESTONES

Page 27: Dalradian presentation may12 final2

27

2014 MILESTONES

Start-up of underground program

Commencement of drilling

Metallurgical test results

Drill results (ongoing)

Hiring of mine planning and permitting team

Updated economic study

Blasting and initial stoping

Page 28: Dalradian presentation may12 final2

28

Patrick F. N. Anderson

Chief Executive Officer

[email protected]

416.583.5622

Trading Symbol:

DNA on TSX

Corporate Office:

Dalradian Resources Inc.

155 Wellington Street West

Suite 2920

Toronto, Ontario

Canada M5V 3H1

www.dalradian.com