cv f. romero

10
PRESENTATION Metallurgical Engineer with specialization in welding and non-destructive testing NDT and with nine years of experience in the metal engineering industry , in the production area (upervision plant in the area !oilerma"ing and welding# and $uality control (%nspection and Testing# for the manufacture of e$uipment for mining, fishery, sugar, oil, gas, energy and industry in general, inspection of gas and oil pipelines& ervice tation upervisor for 'etail u)lic Natural *as +ehicles (N*+#, %ndustrial upervisor %nternal facilities for natural gas consumers, Evaluator % ./ used and new according to the re$uirements of ME 0ode E00 tan"s& +%%%, % tandard 12/, 1/, 13, ./ and 42, ssessor in the manufacture of fuel storage tan"s ecurity "nowledgea)le in the implementa tion and maintenance of integrated management systems %5 .6//.7 2//6, 58 .9//.7 2//4, %5 ://.7 2//9, %5 .4/2/7 2/.2 and %5 .4/17 2/.2& ;ith high analytical capacity , used to wor" under pressure and teamwor", effective communication, with a high sense of ethics and committed to achieving esta)lished goals& nd management M%0'55<T 5<<%0E (Excel, ;ord, and ower oint# and =T50D& EDUCATION  Career Engineering Metallurgy NATIONAL UNIVERSITY OF HUACHO METALLURGICAL ENGINEERING FACULTY  Proe!!ional Degree in Metallurgi"al Engineering # METALLURGICAL ENGINEER FORMATION TECHNICAL CAREER AutoCAD I - II -2007 – UNI Ofice advanced – UNI OD- RH – 12 - V 01 Página 1 FERNANDO ALEX ROMERO GOMEZ  METALLURGICAL ENGINEER BIRTHDATE: /. de 5cto)er de .:96 CIVIL STA TUS7 %N*>E IDENTITY CARD: 63996.:9 MAIL$  romerogome2!"gmai#$com

Upload: lucas-romani

Post on 01-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 1/10

PRESENTATION

Metallurgical Engineer with specialization in welding and non-destructive testing NDT and with nine years of experience in the metalengineering industry, in the production area (upervision plant in the area !oilerma"ing and welding# and $uality control (%nspection andTesting# for the manufacture of e$uipment for mining, fishery, sugar, oil, gas, energy and industry in general, inspection of gas and oilpipelines&

ervice tation upervisor for 'etail u)lic Natural *as +ehicles (N*+#, %ndustrial upervisor %nternal facilities for natural gasconsumers, Evaluator % ./ used and new according to the re$uirements of ME 0ode E00 tan"s& +%%%, % tandard 12/, 1/,13, ./ and 42, ssessor in the manufacture of fuel storage tan"s

ecurity "nowledgea)le in the implementation and maintenance of integrated management systems %5 .6//.7 2//6, 58 .9//.72//4, %5 ://.7 2//9, %5 .4/2/7 2/.2 and %5 .4/17 2/.2&;ith high analytical capacity, used to wor" under pressure and teamwor", effective communication, with a high sense of ethics andcommitted to achieving esta)lished goals& nd management M%0'55<T 5<<%0E (Excel, ;ord, and ower oint# and =T50D&

EDUCATION

  Career Engineering Metallurgy

NATIONAL UNIVERSITY OF HUACHO  – METALLURGICAL

ENGINEERING FACULTY 

  Proe!!ional Degree in Metallurgi"al Engineering #

METALLURGICAL ENGINEER

FORMATION

TECHNICAL CAREER

• AutoCAD I - II -2007 – UNI• Ofice advanced – UNI

OD- RH – 12 - V 01  Página 1

FERNANDO ALEX ROMERO GOMEZ

  METALLURGICAL ENGINEER

BIRTHDATE: /. de 5cto)er de .:96

CIVIL STATUS7 %N*>E

IDENTITY CARD: 63996.:9

MAIL$ romerogome2!"gmai#$com

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 2/10

CERTIFICATIONS$

•0END?7 0ertification +isual %nspection >evel %%

@ A=>%T%E7 0ertification li$uid penetrating >evel %%

@ 0END?7 0ertification %ndustrial 'adiography >evel %%

@ 0END?7 0ertification Magnetic articles >evel %%

 TRAINING$

• =N% 7 %nterpretation of ME !3.&3 and stress analysis of pipes and connections 2/.

• 05>E*%5 DE %N*EN%E'5 %nterpretation of the NT %5 .4/1-2/.

• =N%+E'%DD N0%5N> *''% > M5>%N7 %nternal auditors training %5B%E0 .4/2/ of the %5 .4/1

-2/.

• NDTec Nondestructive Testing 7 %nspection certification Nivel %% C 2/..• 5>DE7 0riteria for welders homologated& 2//9• 5>DE 7 %nterpretation the ME % 2//9• 5>DE 7 %nterpretacin the ; D&.&. 2//9• %NE0T5'TE7 li$uid penetrating >evel %% 2//:• %NE0T5'TE7 Magnetic articles Nivel %% 2//:• %EN7 ;elding supervisor C 2//9• %EN7 ;elding supervisor 0ourse C 2//: Module %%• %EN7 ;elding supervisor 0ourse C 2//: C Module %%%

• %EN 7 0urso de 'adiografFa %ndustrial Nivel %C 2//9• %EN7 %ndustrial 'adiography >evel %% - 2/./

COURSES AND SEMINARS

• pecialization 0ourse7 G;E>D%N* <5' M%NT%N%N* E>E0T'%0 '0G (.3 to. 5cto)er from 2//6# National =niversity Hose <austino anchez 0arrion&

@ NT%5N> %NT%T=TE 5< M%N%N* MN*EMENT T'%N%N*& GM%NE <ETIND 8E>T8G (&1 and 4 5cto)er 2//6# - 0% 2//6&

@ G3rd %NTE'NT%5N> 05N<E'EN0E 5N EN+%'5NMENTG and G3rdNT%5N> IM5%=M 5N M%NE <ETIG (Huly .9, 2//3# - 0%

@ T'%N%N* 0ENTE' premier magisterial course GNET;5'J%N* TE08N5>5*IND notenoo"G 2//6 -% (<e)ruary 2.# %&&T& !05

@ % Technology eminar7 GE>E0T%5N 5< TEE> ND 8ET T'ETMENTG (ugust .2, 2//6# - =niversity Hose<austino anchez 0arrion de 8uacho - Gceros del eru & & 0&G

OD- RH – 12 - V 01  Página 2

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 3/10

%OR& E'PERIENCE

  COMPANY $ %A&CON'U() ( reelan"e)

PERIOD $ * %arc* - +re,ent

POSITION $ 'u+ervi,or

FEATURES $

• Inspection and evaluation of new and used tanks and according to the requirements of ASME

Code SECC. VIII AI !"#$ AI Standard %&#$ %!#$ %!'$ !"# and !(&• )ualification procedure *S$ )+ and *S welders

COMPANY $ '&P).O( P&/ 'AC  PRO+ECT$ (OOP CO')A II

CLIENT $  )&AN'PO&)ADO&A D A' D( P&U- TGP

 PERIOD $ Novemer 3 2014 to %arc* 123 201  POSITION $ 5e#ding In,+ector

FEATURES$

Curving$ parade down pipes and &, - / '& km 0ipeline1.

Inspector welding phases of special works$ repairs$ regular line and 2ie/In the end of work

  COMPANY $ %A&CON'U()

AREA$ * 3ivisi4n t5cnica 6 7reelance

PERIOD $ 6anuar 201 to 8eruar 2019

POSITION $ 8efe Certification

FEATURES$

• Implementation of procedures$ instructions$ certification scheme.• Evaluation of new tanks and used according to the requirements of ASME Code SECC. VIII

 AI !"#$ AI Standard %&#$ %!#$ %!'$ !"# and !(&

OD- RH – 12 - V 01  Página :

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 4/10

• )ualification procedure *S$ )+ and welders *) Characteri9ation of Materials 0Iron ipe1

  COMPANY $ )P'I ANDINA '$A$C

PRO+ECT $ PID , Pi+e#ine Integrit

CLIENT $ PLUSPETROL NORTE, LOTE -

PERIOD $ 6u# 243 2014 to Augu,t 2;3 201

POSITION $ %ec*anica# 'u+ervi,or (eader

FEATURES $

• +esponsi:le for the development of qualit; management indicators.

• 2he Control of pro<ect progress indicators.

• 3evelopment lan ipeline repairs.

• +esponsi:le to organi9e technical staff$ field supervisors$ in dail; activities 0right of wa; surve;

and evaluation of 33V defects1 of different locations.• Evaluation of simple geometric geometrical defects with loss of concentration or metal$ flat and

Volumetric anomalies :ased on ASME ='"., regulations$ ='".> ASME$ AI + !(?$ AI

S2A@3A+3 ""%#$ +CI$ ipeline +esearch Council International$ and documents transportregulations h;drocar:on :; pipeline. Supreme 3ecree @o. #"/&##(EM.

• Supervision Inspection condition of pipeline and secondar; lines in the right of wa;.

• +eport findings critical level 0vandalism$ stroke etc.1$ for activating the contingenc; plan.

 

3etermining the degree of criticalit; of anomalies$ method and criteria repair defects.

COMPANY $ SE+E2=B E+D/ S=

PRO+ECT $  CONSTANCIA/ TAILING AND WATER RECOVERY SYSTEM-PIPING & PIPELINES

INSTALLATION

  CLIENT $ CIA MINERA HUD.AY

PERIOD $ %ao <2014 – 6u#io <2014

POSITION $ In!/e"tor 0e %el0ing

FEATURES $

• Inspecting assem:lies of metal structures Dnder the requirements of A*S 3"." and AISC/'%#/"#.

OD- RH – 12 - V 01  Página 4

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 5/10

• Inspecting assem:lies static equipment and rotar;• Inspection pipe welding tailings transport$ according to AI Standard ""#,• roduction of steel storage tank of deminerali9ed water according to AI %!#$ qualification of

welders for steel pipe$ 3 according to ASME sect IF/&#"'.•  Assem:l; iping 3

 

COMPANY$ TECHINT INGENIERIA Y CONSTRUCTION.

  PRO+ECT $ PC= :0 P&U 5((>AD CO%P&''ION P&O6C) ?P5CP@ –(O) 9< %A(INA'

  CLIENT $ P(U'P)&O( P&U

PERIOD $ %a < 2014 - 6u# < 2014

POSITION $ In!/e"tor 1A21C

FEATURES$

3edicated to qualit; assurance 0)A1 and )ualit; Control 0)C1$ Evaluator and Interpreter

nondestructive testing 0@321$ welding inspection$ preparation of *S prequalified$ )ualification of *elders under different codes and 6 or standards 0A*S $ ASME$ AI1.

 

Inspection manufacture$ assem:l;$ testing h;draulic pressure pipes$ venting and download

according to ASME = '".' standard. 

Inspection of 3E pipesG welding process and assem:l; heat fusion.

 

Inspecting assem:lies of steel structures$ static and rotar; mechanical equipment. 

Inspection of :uried pipelines coatings 0EpoH; henolic$ tapes =ituminous1. 

coatings inspection process air pipes 0inc$ EpoH; pol;urethane pol;amide$ aluminum high

temperature1. 

Inspection of thermal insulation in piping and equipment 0in<ected ol;urethane$ calcium silicate$

mineral wool1.

  COMPANY$ .UREAU VERITAS DEL PERU

  PRO+ECT $ PC = 2 Production 8aci#itie, and Proce,, Unit, 100 :00Binteroni – (ote 7

CLIENT $ &P'O( P(O&ACIN P&/ '$A

OD- RH – 12 - V 01  Página

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 6/10

PERIOD $ 2011-2012

POSITION $ Su/er3i!or 1C

FEATURES$

• Monitor )C activities of the pro<ect$ organi9ed :; the staff of inspectors for the pro<ect in the

iping$ Mechanical$ Civil disciplines.• 3evelopment of plans of inspection points and tests$ welding processes$ procedures and

formats iping manufacturing.• Supervision in the steps ofJ +eceiving materials$ manufacturing process$ welding tanks and

piping in workshops allocated to the pro<ect.• lanning internal audits$ monitoring of non/conformities$ corrective and preventive actions.

  COMPANY$ INSPECTORATE SERVICES PERU SAC

PRO+ECT $ #% Manufacture 7uel storage tanks of %$### M=$ reservoir$ pump house$

Installation of pipes for the fire s;stem.

  CLIENT $ &P'O( P(O&ACIN P&/ '$A

PERIOD $ 2010-2011

POSITION $ Coordinator )A 6 )C

FEATURES$

+eview and verification of )ualit; Manual and )ualit; lan Contractor applied to the pro<ect$3evelopment of )ualit; Indicators$ Emission and 2reatment of @on/conformities and acts ofnotification. Inspection work of manufacturing <o:s :; welding according to drawings and

OD- RH – 12 - V 01  Página 9

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 7/10

standard AI %!# and AI ""#,.

 INSPECTORATE SERVICE PERU S#A#C#

PERIOD $ 4556, 4575

  POSITION$ Su/er3i!or

Evaluaci4n de tanques usados ; nuevos de acuerdo a los requerimientos del C4digo ASME

SECC. VIII$ Standar AI %&#$ %!#$ %!'$ !"# ; !(& su respectiva reparaci4n para los siguientesclientesJN E A $I$&$(F)A A' ANDINO '$A$

(I%A A' '$A$GINDU')&IA( )U.O' '$A$

CA%I'A A' CO&PO&ACIN%I'A

I)'A&P'O(

455- , 455- INSPECTORATE SERVICES PERU SACPro8e"t$ Moderni9ation copper smelting metallurgical compleH in a Bro;a / Customer Area '##.3BE +DM.

  POSITION $ Su/er3i!or

• +eview of operating procedures 0control of materials$ qualification of welding procedure qualification

of welders$ welding visual$ dimensional control$ non/destructive testing$ surface preparation andpainting1.

• Supervision during the manufacturing process$ non/destructive testing$ surface preparation and

coating structures.

 

OD- RH – 12 - V 01  Página 7

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 8/10

4559 * 455- INSPECTORATE SERVICES PERU S#A#C#

 

Project:  Supervision of @atural >as 7acilities

POSITION H Su/er3i!or

Monitoring Service Stations for pu:lic purchase of @atural >as Vehicles 0@>V1 according to therequirements of eruvian technical standard @2 """#"?/&##($ and the 2echnical Specification for packeti9ed equipment and encasetados for C@> compression and storage that do not require @2perimeter wall """.#&,/&##%.ara the following customersJ

- 8A&%IN 'AC$

- (%A8A' 'AC

- A' N& 'AC$- PI INDU')&IA( I&(

Certification includesJ

• +eviewJ Certificate of qualification of welders$ design of welded <oints$ welding

procedures and materials.• +eviewJ 2echnical Specifications meters$ regulators$ valves and securit; s;stem

equipment consumption.• +eviewJ Calculation logs design and dimensions of the piping s;stem$ cathodic

protection design.• Visual inspection of the facilities and equipment. Inspection of tightness and resistance

test.

  Internal Supervision of Industrial 7acilities consumers of natural gas in accordance with therequirements of eruvian technical standard @2 """.#"#/&##' aw 3. S/&%&&". #,&/?? EM$ and>@C/S2A+2/D SDKC/#" -+equirements for suppl;ing gas to industrial customers-procedure$ for the following clientsJ

/ >EFIM SAC

/ CBMALA MI@E+A A>+E>A3BS CACN+EBS

/ 2EF2I BS BIVBS./ AMBSA

/ AICB+./ @B+2EF2I

/ 2ASA @B+2E

OD- RH – 12 - V 01  Página ;

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 9/10

/ VDCB E+D

/ IS2 E+DSAC >I

/ E@E+>O >AS 3E E+D SAC.

 Certification includesJ

• +eviewJ Certificate of qualification of welders$ design of welded <oints$ welding procedures and

materials.• +eviewJ 2echnical Specifications meters$ regulators$ valves and :urner safet; s;stem

equipment consumption.• +eviewJ Calculation logs design and dimensions of the piping s;stem$ cathodic protection

design.• +eview Mechanical 3rawings$ a; But$ as/:uilt isometric *elding Map.

• Visual inspection of the facilities and equipment.

• Inspection of tightness and resistance test.• risk anal;sis facilities.

• Bperations rocedures on the use of natural gas Contingenc; lan.

reventive Maintenance rogram facilities.

INSPECTORATE SERVICES PERU S#A#C# 4559

POSITION H In!/e"tor NDT

 ActivitiesJ)ualit; control and evaluation of products Metal/ Mechanic Area 0structures$ tanks$ pipes$ plates$ pots$Machiner;$ rocesses and rocedures welding and assem:l;$ among others1.

• Visual Inspection• +adiographic Inspection

• Magnetic particle inspection• 3;e penetrant inspection.

  LHD S#A# (455: * 4559)

POSITION $ Su/er3i!or

OD- RH – 12 - V 01  Página !

7/25/2019 CV F. Romero

http://slidepdf.com/reader/full/cv-f-romero 10/10

  ActivitiesJ3rilling work structures of heav; machiner;$ :oiler work. 2I> welding$ MI> 6 MA>. +ecover; with specialwelding gears$ shafts$ pulle;s. +ectification of :earings. +epair of centrifugal pumps$ compressors andtur:ines manufacturing repair$ maintenance and upgrading of heav; construction machiner;$ miningJ

/ =oom <um:o/ 3ump truck/ oaders/ =ackhoe/ Vi:rator; +ollers/ Caterpillar / Motor >raders/ Compressors/ Scoops

OD- RH – 12 - V 01  Página 10