Page 1: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 1/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 1 

GENUS SAP USER MANUAL 

Billing Process

SD-PS Module 

Page 2: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 2/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 2 

We have created the BOQ for each town as per the BOQ given to us by customer .Next step is to doing

the customer billing whenever we supply material to customer against the Standard BOQ .We have two

type billing VAT sale and E-1 sale .

Billing process for VAT Sale: Following are step in VAT billing

1. Create the sale order first we create the sale order with reference to BOQ sale order

Enter the T-code VA01 in command field as shown in below screen

Put the value YOR1 in order type field, 1100 in sale organization, 10 in distribution field, and 30 in division

field as shown in below screen

Now click on create with Reference as shown in below screen

Page 3: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 3/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 3 

After clicking on create with reference following screen will appear

Now click on order tap as show in above screen

Enter the appropriate BOQ number in order field and enter on item selection button as shown below

Click here

Click here

Page 4: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 4/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 4 

Select the material which we are going bill to customer and enter the material quantity in relevant field

and click on copy button as shown below

Check the quantity, price, tax amount and total value

Check the incompletion Log

Edit Incompletion log as shown below

Enter BOQ NO

Click here

Click here

Enter quantity

Page 5: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 5/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 5 

Check the following message and then save the sale order

After saving the sale order system give a sale order no note down that number

2. Delivery of material Next step is doing the delivery of material

Enter the T-code VL01n in command field as shown in below screen

Page 6: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 6/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 6 

Put the shipping point 9000 and enter the sale order that we have generated in step 1 and press the enter

button

Change date in date field on every tab (item overview, picking, loading, transport) and enter the storage

location 0001 and pick the quantity whatever you are billing to customer.

After that click on Post Goods Issue button as shown below

Enter storage

location

Pick the quantity

Click here

Page 7: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 7/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 7 

Then system generate the delivery number

3. Billing to customer Final step is doing the billing corresponded to delivery number that generated inprevious step

Enter the T-code VF01 in command field as shown in below screen

Enter the delivery number in document field as shown below

Press enter button, and then following screen will come

Enter delivery

no

Page 8: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 8/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 8 

Check price, tax value and total value for each material

Click on display document header details button as shown below

Click here

Page 9: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 9/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 9 

Then select the blank entry in Account assignment group as shown below

Then click head text tab as shown in above screen and choose other details field

Here enter your reference text or number

Select blank

Click here

Page 10: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 10/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 10 

Then click on save button as shown below

System generate the billing number as shown below

Enter the T-code VF02 in command field as shown in below screen

Click here

Page 11: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 11/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 11 

Enter the billing document that system generate in previous step

Press enter button

Click on display document header details button as shown below

Click here

Page 12: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 12/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 12 

Then select the ECC project in Account assignment group as shown below

Then click on save button as shown below

System generate the billing number as shown below

Select ECC Project

Click here

Page 13: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 13/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 13 

Billing process for E-1 Sale : Following are step in E-1 billing

1. Create the sale order first we create the sale order with reference to BOQ sale order

Enter the T-code VA01 in command field as shown in below screen

Put the value ZOR1 in order type field, 1100 in sale organization, 10 in distribution field, and 30 in division

field as shown in below screen

Now click on create with Reference as shown in below screen

Click here

Page 14: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 14/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 14 

After clicking on create with reference following screen will appear

Now click on order tap as show in above screen

Enter the appropriate BOQ number in order field and enter on item selection button as shown below

Click here

Enter BO NO

Click here

Page 15: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 15/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 15 

Select the material which we are going bill to customer and enter the material quantity in relevant field

and click on copy button as shown below

Check the quantity, price, tax amount and total value

Check the incompletion Log

Edit Incompletion log as shown below

Click here

Enter quantity

Page 16: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 16/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 16 

Check the following message and then save the sale order

System generates the sale order no.

2. Billing to customer Final step is doing the billing corresponded to Sale order number that generated in

previous step. Enter the T-code VF01 in command field as shown in below screen

Enter the sale order number in document field as shown below

Enter sale

order no

Page 17: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 17/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 17 

Press enter button, and then following screen will come

Check price, tax value and total value for each material

Click on display document header details button as shown below

Click here

Page 18: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 18/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 18 

Then select the blank entry in Account assignment group as shown below

Then click head text tab as shown in above screen and choose other details field

Here enter your reference text or number

Select blank

Click here

Page 19: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 19/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 19 

Then click on save button as shown below

System generate the billing number as shown below

Enter the T-code VF02 in command field as shown in below screen

Click here

Page 20: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 20/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 20 

Enter the billing document that system generate in previous step

Press enter button

Click on display document header details button as shown below

Then select the ECC project in Account assignment group as shown below

Click here

Select ECC Project

Page 21: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 21/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 21 

Then click on save button as shown below

System generate the billing number as shown below

Click here

Page 22: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 22/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 22 

Erection Billing to Customer

Create Sale order First we create the sale order as per given BOQ quantity and price

Enter the T-code VA01 in command field as shown in below screen

Put the value ZOR3 in order type field, 1100 in sale organization, 10 in distribution field, and 30 in division

field as shown in below screen

Enter customer code

Enter Po date

Enter Payment

term

Enter Material code

Enter Incoterms

nter Po No

Change the

Description

Enter WBS Element

Page 23: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 23/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 23 

SELECT THE APPROPRIATE WBS ELEMENT IN WBS FIELD AND PLANT IN PLANT FIELD and enter the

quantity in order quantity filed.

GO TO ITEM OVERVIEW CONDITIONS  PUT ZPR1  NET PRICE AS SHOWN BELLOW

Check the quantity, price, tax amount and total value

Check the incompletion Log

Edit Incompletion log as shown below

Page 24: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 24/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 24 

Check the following message and then save the sale order

System generates the sale order no.

2. Billing to customer Final step is doing the billing corresponded to Sale order number that generated in

previous step. Enter the T-code VF01 in command field as shown in below screen

Click on selection list button as shown in above screen

Then select the item and enter the quantity which you want to billed to customer and click on copy

button as shown below

Then the following screen will come and press F8 key or click on

Click here

Click here

Click here

Page 25: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 25/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 25 

Check the quantity, price, tax amount and total value

Click here

Enter date

Select blank

Click here

Page 26: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 26/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 26 

Then click head text tab as shown in above screen and choose other details field

Here enter your reference text or number

Then click on save button as shown below

System generate the billing number as shown below

Page 27: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 27/28

  Billing Process 

PREPARED BY: VIPIN SHARMA - SAP CONSULTANT DATE: 28.02.2013 P a g e  | 27 

Enter the T-code VF02 in command field as shown in below screen

Enter the billing document that system generate in previous step

Press enter button

Click on display document header details button as shown below

Click here

Page 28: Customer Billing Process

7/23/2019 Customer Billing Process

http://slidepdf.com/reader/full/customer-billing-process 28/28

  Billing Process 

Then select the ECC project in Account assignment group as shown below

Then click on save button as shown below

System generate the billing number as shown below

Select ECC Project

Click here