current activity (0600 hrs)...daily mud logging report company man: don castles grahame bailey--...
TRANSCRIPT
-
Report For: 13/9/2013 Days From Spud: 1 Rig: Nitro Rig #7
00:00Hr Depth: 0 m Last Survey: - Geologist(s):
24:00Hr Depth: 14 m Deviation: - Spud Date: 13/09/2013
Progress: 14 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Run 9 5/8" conductor casing
LITHOLOGY SUMMARY:Interval Formation4.2-10 Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 1 - 12 1/4" Manufacturer: 24 Hr Rot Hrs: - Surface RPM: - Depth In: 4.2 m
Type PDC Total Rot Hrs: - Bit Krevs: - Depth Out: 14 m
S/N: HM20925 Tot Off Btm Hrs: - Total Meters: 14 m
IADC 24 Hr Prog (m): - Av ROP on Bit: m/h
Jets 5 x 26/32
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
SCD Drilling Operations:0700 - 0730 Hrs Toolbox Meeting Continue rig up
0730 - 0800 Hrs Center rig over cellar Monitor drilling
0800 - 1600 Hrs Spud Well. Drill 12 1/4" hole T/14m Monitor rig activities
1600 - 1630 Hrs POOH bit change
1630 - 1730 Hrs B/out PDC, M/up Bit No. 2 12 1/4" Hammer, Function test ok
1730 - 1800 Hrs Remove water swivel
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
BACKGROUND GAS (avg ppm)
Pectil Notes
-
Report For: 14/9/2013 Days From Spud: 2 Rig: Nitro Rig #7
00:00Hr Depth: 14 m Last Survey: - Geologist(s):
24:00Hr Depth: 17 m Deviation: - Spud Date: 13/09/2013
Progress: 3 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):RIH 8 1/2" PDC, drill out csg shoe
LITHOLOGY SUMMARY:Interval Formation4.2-10 Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 2 Manufacturer: 24 Hr Rot Hrs: - Surface RPM: - Depth In: 14 m
Type 12 1/4" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 17 m
S/N: Tot Off Btm Hrs: - Total Meters: 3 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 2.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
SCD Drilling Operations:0000 - 0200 Hrs Muck out cellar Continue rig up
0200 - 0300 Hrs POOH BHA Monitor drilling
0300 - 0600 Hrs Run 9 5/8" Conductor csg Monitor rig activities
0600 - 0700 Hrs Toolbox Meeting
0700 - 0900 Hrs Run 9 5/8" Conductor csg to 16m
0900 - 1000 Hrs Mix cement & pump, Bump off @ 500psi
1000 - 1800 Hrs WOC, Dig out cement from cellar to fit A section
1800 - 2400 Hrs Continue dig out cellar
BACKGROUND GAS (avg ppm)
Pectil Notes
9 5/8" Conductor @ 15.8m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 15/9/2013 Days From Spud: 3 Rig: Nitro Rig #7
00:00Hr Depth: 17 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 135 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):POOH BHA
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): 5-118 Surface RPM: Max Gas (TGU)ROP Av (m/hr): 29.0 WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H217-152 16
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
SCD Drilling Operations:0000 - 0100 Hrs Jack hammer concrete F/cellar Continue rig up
0100 - 0330 Hrs Slack off casing, m/up diverter riser Monitor drilling
0330 - 0430 Hrs B/out casing drive subs Monitor rig activities
0430 - 0500 Hrs RIH 8 1/2" Bit No.3, add diverter rubber
0500 - 0730 Hrs Drill plug & csg shoe
0730 - 0800 Hrs PJSM, POOH BHA
0830 - 1430 Hrs Repair rod loader
1430 - 1800 Hrs Drill 8 1/2" Bit No.4 T/79m
1800 - 2400 Hrs PJSM, Drill F/79m T/152m
BACKGROUND GAS (avg ppm)
Pectil Notes
9 5/8" Conductor @ 15.8m
-
Report For: 16/9/2013 Days From Spud: 4 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 0 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Set up for cement job
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
SCD Drilling Operations:0000 - 0300 Hrs Circulate, PJSM, Wiper Trip Monitor gas
0300 - 0330 Hrs POOH BHA 8 1/2" Monitor drilling
0330 - 0800 Hrs B/out BHA Monitor rig activities
0800 - 0830 Hrs Confined space permits, organise truck to collect BOP
0830 - 1000 Hrs Chip out cellar to accommodate A-section
1000 - 1200 Hrs Lower & secure A-section
1200 - 1330 Hrs Set up to run 7" surface csg
1330 - 1800 Hrs RIH csg T/24m
1800 - 2000 Hrs Toolbox, refuel site
2000 - 2100 Hrs Position Trican cementing unit
2100 - 2400 Hrs RIH csg T/24m
BACKGROUND GAS (avg ppm)
Pectil Notes
7" surface csg @ 150m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 17/9/2013 Days From Spud: 5 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 0 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Raise mast, m/up BHA to drill out csg shoe
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
SCD Drilling Operations:0000 - 0400 Hrs Run 5 joints csg with main winch Monitor gas
0400 - 0600 Hrs Setup ready for cementing csg Monitor drilling
0600 - 0830 Hrs M/up csg hanger and landing joints Monitor rig activities
0830 - 1000 Hrs R/up cementing head, pump 22bbls/displace 18bbls, returns ok, 15ppg
1000 - 2400 Hrs WOC
BACKGROUND GAS (avg ppm)
Pectil Notes
7" surface csg @ 150m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 18/9/2013 Days From Spud: 6 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 0 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Wait on 11" BOP. Expected to arrive mid morning.
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 0600 Hrs Position choke. Monitor gas
0600 - 1800 Hrs Wait on 11" BOP Monitor drilling
1800 - 2400 Hrs Pressure test choke manifold, rig repairs. Monitor rig activities
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 19/9/2013 Days From Spud: 7 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 0 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Position and fix HCR valves.
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 1200 Hrs Wait on BOP Monitor gas
1200 - 1400 Hrs Unpack truck and fitters vehicle Monitor drilling
1400 - 1530 Hrs M/up BOP stack - HCR valves to close to cellar wall Monitor rig activities
1530 - 1630 Hrs Mud cross too long for cellar
1630 - 1800 Hrs Roll rams onto side - ckean and insert studs
1800 - 2030 Hrs Refuelling, permits, set up lighting over cellar
2030 - 2230 Hrs Cut section out of cellar wall to fit valves
2230 - 2400 Hrs N/up mud cross and rams
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 20/9/2013 Days From Spud: 8 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 152 m Deviation: - Spud Date: 13/09/2013
Progress: 0 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Drilling csg shoe/cement, run choke line to flare pit
LITHOLOGY SUMMARY:Interval Formation17-152m Carabirini Fm
DRILLING DATA:
ROP range (m/hr): Surface RPM: Max Gas (TGU)
ROP Av (m/hr): WOB (kLBS): Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2
BIT DATA: Bit No. 4Manufacturer: Sandvik 24 Hr Rot Hrs: - Surface RPM: - Depth In: 17 m
Type 8 1/2" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 152 m
S/N: Tot Off Btm Hrs: - Total Meters: 135 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 29.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 0600 Hrs Place Kill Line, Assemble valve onto block Monitor gas
0600 - 0900 Hrs Remove HCR from cellar and knock up all fittings Monitor drilling
0900 - 1000 Hrs Land out Annular Monitor rig activities
1000 - 1200 Hrs Hose up lines to BOP
1200 - 1300 Hrs F/test Koomey
1300 - 1400 Hrs Rig repairs
1400 - 2200 Hrs P/test BOP, Tighten leaks, CIT Test
2200 - 2400 Hrs Land out wear bush, set up to RIH BHA
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
- Tota gas units recorded on Petron Total Gas Analyser. Parts per million readings taking from Varian CP-4900 Micro GC
PECTIL ENGINEERING Armour Energy: Myrtle Basin 1
Daily Mud Logging Report Company Man: Don Castles
Grahame Bailey
-
Report For: 21/9/2013 Days From Spud: 9 Rig: Nitro Rig #7
00:00Hr Depth: 152 m Last Survey: - Geologist(s):
24:00Hr Depth: 242 m Deviation: - Spud Date: 13/09/2013
Progress: 90 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Drill ahead. Current depth 319m
LITHOLOGY SUMMARY:Interval Formation160m-290m Reward - Barney Creek
DRILLING DATA:
ROP range (m/hr): 11 - 52m Surface RPM: - Max Gas (TGU)ROP Av (m/hr): 24.0 WOB (kLBS): - Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2152 - 242m 16 - -
BIT DATA: Bit No. 6Manufacturer: SANDVIK 24 Hr Rot Hrs: - Surface RPM: - Depth In: 152 m
Type 6 1/4" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: m
S/N: Tot Off Btm Hrs: - Total Meters: m
IADC 24 Hr Prog (m): - Av ROP on Bit: m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 0230 Hrs M/up BHA, RIH Bit No.5 Monitor gas
0230 - 0600 Hrs Tag cement @ 126n. Drill out shoe and cement. Monitor drilling
0600 - 0700 Hrs Crew change & prestart checks Monitor rig activities
0700 - 1000 Hrs POOH, B/out BHA, M/up Bit No.6
1000 - 1200 Hrs N/up Blooie line to flare pit
1200 - 1500 Hrs F/test hammer, RIH
1500 - 1600 Hrs Ream through float, collar, shoe
1600 - 1630 Hrs Drill F/152 T/155m
1630 - 1700 Hrs FIT - 200psi for 5 min
1700 - 1830 Hrs Drill T/175m
1830 - 1930 Hrs Repair split hoses in pipe handler
1930 - 2400 Hrs Drill F/175m T/242m
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
-
Report For: 22/9/2013 Days From Spud: 10 Rig: Nitro Rig #7
00:00Hr Depth: 242 m Last Survey: - Geologist(s):
24:00Hr Depth: 403 m Deviation: - Spud Date: 13/09/2013
Progress: 161 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Circulate bottoms up. Current depth 446m. ROP Ave. @ 12m/hr
LITHOLOGY SUMMARY:Interval Formation242m - 403m Reward Fm
DRILLING DATA:
ROP range (m/hr): 8 - 52 Surface RPM: - Max Gas (TGU)ROP Av (m/hr): 24.0 WOB (kLBS): - Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2242 - 403m 16 - -
BIT DATA: Bit No. 6Manufacturer: SANDVIK 24 Hr Rot Hrs: - Surface RPM: - Depth In: 152 m
Type 6 1/4" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 403 m
S/N: Tot Off Btm Hrs: - Total Meters: 251 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 26.0 m/h
Jets 3
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 0530 Hrs Drill F/240m T/319m Monitor gas
0530 - 0700 Hrs Circulate, crew change, gas detection down Monitor drilling
0700 - 1200 Hrs Drill F/319m T/373m Monitor rig activities
1200 - 1500 Hrs Drill F/373m T/403m
1500 - 1530 Hrs Carbide Test - Circulate
1530 - 1800 Hrs POOH, B/out BHA
1800 - 2100 Hrs M/up Bit No.7, change diverter rubber
2100 - 2400 Hrs RIH
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
-
Report For: 23/9/2013 Days From Spud: 11 Rig: Nitro Rig #7
00:00Hr Depth: 403 m Last Survey: - Geologist(s):
24:00Hr Depth: 491 m Deviation: - Spud Date: 13/09/2013
Progress: 88 m Last Casing: 0.158987
CURRENT ACTIVITY (0600 Hrs):Drill ahead. Current depth 510m
LITHOLOGY SUMMARY:Interval Formation Interval Formation403-463m Reward Fm 463-491m Barney Creek Fm
DRILLING DATA:
ROP range (m/hr): 8-27 Surface RPM: - Max Gas (TGU)ROP Av (m/hr): 12.0 WOB (kLBS): - Gas B/ground (TGU)
GAS PEAKS (ppm)
Interval TGU C1 C2 C3 C4 C5 He H2
Interval TGU C1 C2 C3 C4 C5 He H2403-491m - 12 - -
BIT DATA: Bit No. 7Manufacturer: SANDVIK 24 Hr Rot Hrs: - Surface RPM: - Depth In: 403 m
Type 6 1/8" Hammer Total Rot Hrs: - Bit Krevs: - Depth Out: 491 m
S/N: 273367 Tot Off Btm Hrs: - Total Meters: 88 m
IADC 24 Hr Prog (m): - Av ROP on Bit: 12.0 m/h
Jets 2
COMPRESSOR DATA: Carbide Lag Check
Make: Sullair Depth:
Type: DC 1150XH/350 C21 Cal Strks:
Max Output: 350 psig 24 bar Act Strks:
Engine: CAT C15 Acert E.H.S:H.V.W:
NITRO OPERATIONS:0000 - 0100 Hrs Wash down 3 joints and circulate Monitor gas
0100 - 0600 Hrs Drill F/403m T/446m Stabiliser tight in hole Monitor drilling
0600 - 1200 Hrs Crew change, Drill F/446m T/487m Monitor rig activities
1200 - 1515 Hrs Drill F/487m T/494m
1515 - 1800 Hrs POOH Bit trip
1800 - 1900 Hrs Crew change, Pre-starts
1900 - 2000 Hrs M/up Bit No.7, RIH
2100 - 2400 Hrs Circulate 2 joints off bottom
2400 - 0600 Hrs: Unable to unload 1 well with only single compressor, P/back 102m and unload progressively while RIH.
BACKGROUND GAS (avg ppm)
PECTIL NOTES:
7" surface csg @ 150m
-
����������� ��������� ������������� �� ���� ������������������ ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
��� � ����!���� ������������������������������������������������������� ��!��"������������������������� ����������������# ��$���%#��
���������" �������������� ���� ���#�$��� % � %�&����&'()*�" �'��������� ���� (")����� � ���)*�������&'()*������� ��!""�#������� ���� �$ �% �& �' �( �� �%������� ��� �$ �% �& �' �( �� �%������ � � � +)������� )���,�-�.%���#�$������ +,�-./0 ������������ � ���#�$��� % � �����/� ��� #0��� ����12�##�� 0����������� � )���1��� � �����"�� ��� #�*, 0���"##�)����� � 0�����%���� �� #/'! ������ ����* � '���" ����)�� ���� #��2�� ����������������� ���*�+���,��-�./��/�� + ���� ��"�-��0"�� -�����32������� �������/1���2��3�"3�� ���"��
��4�� �.�����/1���,���� �,'���,��� �4�4���445�������������������������2�� )��4����5
$���6���7 ���55�8����
�#� ���� ��������9�� :�������,4����5
6�����8������#&�����#"������$��!��* :�������������������2�� ��"�����+���8 #"�55$���� #�������9���#��$��� :��������9�����������2�� �/2$����!������#"�����$�����4��!�4�
�#&��8������#*���������2�� -���,� ���""�;�#��
��#��
��������������2�� ���$������<7����������������2�� -����������#����5��#������$�������&=����#"������$��!��*���������2�� -����������#(�� ��$�����#���
����&=����#"������$��!��*���������2�� 2����9��7>+:7���������������2�� )��4�����9��������$������#"������<��� ����
�5����5��#���������� "4��?����6���������������������$"���"����8��
��5���������������
(����#�@���A�1� �5������6���# 3!0/��3,�/,33�/,� '������3������%������)����4�����%����������������� ������������������
)�� �����������!��,�""�#
�����������
-
����������� ��������� ������������� �� ���� ������������������ ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
� � ����!���� ������������������������������������������� ����������������������� �����������
���������" �������������� ���#�$��� % � %�&������� !�" �'��������� (")����� � ���)*���������� !������� ��!""�#������� ���� �$ �% �& �' �( �� �%������� ��� �$ �% �& �' �( �� �%�������� � � +)������� )���,�-�.%���#�$������ "#��$%& ������������ � ���#�$��� % � �����/� ��� '0��� ���()*�''�� 0����������� � )���1��� � �����"�� '�*, 0���"##�)����� � 0�����%���� '/'! ������ �����'! � '���" ����)�� '��2�� ����������������� ���*�+���,��-�./��/�� "+���� ��"�-��0"�� �,����-*����,�� �������/1���2��3�"3�� ���./�
�(0�� �.�����/1���,���� ,#�,��#1�� �4�4���445�������������������������*�/ ,��2���+
*�''���2�3%��%*�/������' 4�2����/���������*�/ "�2�056�2��27�20��/7��1�'.��//�� 4�2������2�,���2�+
1�����8/��91�6��1�/��9��9�/2��/5/�'8.��.(���),�/2� 4�2�����19�/���������*�/ "�2�056�2��27�20��/7��1�'.��//����.����/��2�����2����80���:�+
��''���2�/���.�20���������*�/ *�2��9��.��/��/;
-
����������� ��������� ������������� �� ���� �������������������� ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
�� � ����!���� �������������������������������������������������� ����������������������� ������������������ ������� ��!�"���
���������" �������������� ���� ���#�$��� % � %�&����#$%&'�" �'��������� ���� (")����� � ���)*�������#$%&'������� ��!""�#������� ���� �$ �% �& �' �( �� �%�������������� ��� �$ �% �& �' �( �� �%������� � � +)������� )���,�-�.%���#�$������ (�)*+ ������������ � ���#�$��� % � �����/� ��� �0��� �����,�-����� 0����������� � )���1��� � �����"�� ��*, 0���"##�)����� � 0�����%���� �/'! ������ ����#�' � '���" ����)�� ���2�� ����������������� ���*�+���,��-�./��/�� .���� ��"�-��0"�� �/�����0-�����/�� �������/1���2��3�"3�� ����1!��������2�� �.�����/1���,���� /($�/���(���� �4�4���445����������������������������-�! $�1!��"�".���*-����.���"���3��4���5"�! 6"�����!�����������-�! $�1!�����1������3����� 6"�������"������������-�! $�1!��7�!���7"���!����5"�!��.��"�!�"���� 6"���������3��!����������-�! /��.�������������"�7��!�����1���"��11���*"�.��
"����.��1��!"���!������������������-�! ����� �7��"�������8����
"!������8������������������-�! -�"�3���1��!����!�����������-�! �����!�7��"�������8����
"!�%�."��7�������"��"���������������-�! /"��"��"�����.���������1.���2��9���5"�!��"��8�.!���7"���2���/"�".��8�.!�"���7���"!��.��
"!�8���(��.�����������-�! �����!�7��"�������8����
"!�%�."��7�������"��"���������������-�! �����8������������������������������-�!� /"��
"��.���"�����.��������������-�! ��������.���8������������
%�������:���4�,�!.�8�����!��;����� 3!0/��3,�/,33�/,� '������3������%������)����4�����%����������������� ��������������
)�� �����������!��,�""�#
�����������
-
����������� ��������� ������������� �� ���� �������������������� ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
�� � ����!���� �������������������������������������������������� ����������������������� ������������������ ������� ��!�"���
���������" �������������� ��� ���#�$��� % � %�&����#$%&'�" �'��������� �� (")����� � ���)*�������#$%&'������� ��!""�#������� ���� �$ �% �& �' �( �� �%���������������� ��� �$ �% �& �' �( �� �%��������� � � +)������� )���,�-�.%���#�$������ (�)�* ������������ � ���#�$��� % � �����/� ��� �0��� ����+�������� 0����������� � )���1��� � �����"�� ��� ��*, 0���"##�)����� � 0�����%���� ��� �/'! ������ ����#�' ���� '���" ����)�� ���� ���2�� ����������������� ���*�+���,��-�./��/�� ,���� ��"�-��0"�� �-�����.������-�� �������/1���2��3�"3�� ����/!������+�0�� �.�����/1���,���� -($�-���(���� �4�4���445������������������������������! -��,�������� 1"�����!�������������! ��������,������������� 1"���2���"��������������! -��,�����3�����"��44!2���4�����������+�� 1"���������5��!������������! ��������,������������������������! ��"25���/��!����!�������������! ��/�����4�"�0����"���/��!!��-�+�0���627"������������! ����������+��!�7��"�����2�4����
"!�%�,"2�7�������"��"�����������������! ������+������!�7�2���"�����2�4����
"!�%�,"2�7�������"��"������������������! 8��!����!�89 1������������! �����4�������������������!�/�4�"���25�����/�":���"�"�!��������������! -��,�������������"������+�����!� -��,������������,��4�������;"�!�"����6���;"�!�"����
)�� �����������!��,�""�#
�����������
3!0/��3,�/,33�/,� '������3������%������)����4�����%����������������� �������������� %�������
-
����������� ��������� ������������� �� ���� �������������������� ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
�� � ����!���� ������������������������������������������������������� �!����"##������������������������ ������������������ ����$�%��&�!����'��(� )� !������$�%��&�!��"!*�(���!��
���������" �������������� ���� ���#�$��� % � %�&����+�(,-�" �'��������� ��
(")����� � ���)*�������+�(,-������� ��!""�#������� ���� �$ �% �& �' �( �� �%���������������� ��� �$ �% �& �' �( �� �%��������� � � +)������� )���,�-�.%���#�$������ %.�/01 ������������ � ���#�$��� % � �����/� ��� �0��� �����2�� ���� 0����������� � )���1��� � �����"�� ��*, 0���"##�)����� � 0�����%���� �/'! ������ ����+�- ���� '���" ����)�� ��'2�� ����������������� ���*�+���,��-�./��/�� %3�� � ��"�-��0"�� �4�����5������4�� �������/1���2��3�"3�� �����&��������6 � �.�����/1���,���� 4.��4���.$��� �4�4���445������������������������������& 4!�!3��"##��' �����+' �����&�7��- 8!���� &�������������& ���� $��' ����� !��6����&��9���!�&3�9 $������93������ !��$����&&�& 8!�������!��������������& �0�������2�' ���� 8!������ $�:��&������������& � !�:������&� ��&�������������& �0�������2�' �����; ������������9��; �����:��)���<!�&����� ��'����������������������& �0���9����3!��; ���� !���� ��9����������������������& � !�:������&� ��&�����=��&�')�� 3�$���!���������������& ���������������������������& 4�$3� ���'����������
)�� �����������!��,�""�#
�����������
3!0/��3,�/,33�/,� '������3������%������)����4�����%����������������� �������������� (� ' ���> ��)�2�&3�9 $��$&��������
-
����������� ��������� ������������� �� ���� ������������������ ��� � ���������� � ���������������������� ��� � �������� � ��������� ��������� �����
�� � ����!���� ��������������������������������������������� ����������������������� ������������������ ������ �!�����"
#�$%$�&������ �!���'�(#������
���������" �������������� ���� ���#�$��� % � %�&����)*#+,�" �'��������� ��� (")����� � ���)*�������)*#+,������� ��!""�#������� ���� �$ �% �& �' �( �� �%���������������� ��� �$ �% �& �' �( �� �%��������� � � +)������� )���,�-�.%���#�$������ -��./0 ������������ � ���#�$��� % � �����/� ��� �0��� ����12$���� 0����������� � )���1��� � �����"�� ��� ��*, 0���"##�)����� � 0�����%���� �� �/'! ������ ����)�, ��� '���" ����)�� ���� ��"2�� ����������������� ���*�+���,��-�./��/�� ���$� ��"�-��0"�� ������32������� �������/1���2��3�"3�� ���4!�
��5$� �.�����/1���,���� �-*���-��� �4�4���445�������������������������2�! ����6������������ 7�����$!���������2�! 2$�&�8���4��!$�! 7����&��������������2�! �����$�"��� 7������$�8�!���������2�! 9��"���:":$�����������2�! *�4��
��������6��"����8��%��;��!���������2�! *�4!��