CSC 426 (Software Engineering) Lecture Note
Part I Cont’d:SOFTWARE DEVELOPMENT PROCESS MODELS
AJAYI, Olusola OlajideDepartment of Computer Science,Faculty of Science,Adekunle Ajasin University, Akungba-Akoko, Ondo State, [email protected] / [email protected] 08113699553 / 07056433798 / 08137044500
Software Development Process (SDP)_
•Munassar et al (2010) defined it as an abstract representation of a process that presents a description of a process from some particular perspectives.
•In this class/study, SDP refers to activities involved in producing/developing software.
SDP Cont’d – The Activities/Processes
Software SpecificationSoftware DevelopmentSoftware ValidationSoftware Evolution
SDP Cont’d – The Activities/Processes
Software
Specification
Software
Development
Software
Validation
Software
EvolutionFigure 1: Software Development Activities/Processes
SDP Activities/Processes – The Breakdown
•Software Specification: This activity involves stating the functionalities (operations) as well as the constraints/limitations of the software. Major Activity Requirements.
•Software Development: This activity involves developing (producing) a software according to the specification outlined in the first stage of the development process. Major Activity Designs.
SDP Activities/Processes – The Breakdown Cont’d
•Software Validation: This activity checks the software developed to ensure it conforms to the specification earlier concluded upon. Major Activity Testing.
•Software Evolution: This activity ensures that the software produced is modifiable/adjustable.Major Activity Maintenance.
SDP Activities/Processes – The Breakdown Cont’d
•Paraphrasing Pressman, R. S. (2010), we can define SD Process as a roadmap to defining, building, testing, & deploying timely and high quality software applications.
Both User & Developers are
involved
Only Development
Team are involved
Only Development
Team are involved
Both User & Developers are
involved
Requirements Designs Testing Maintenance
SDLC Models
•This refers to the existing and established frameworks for developing software.
•For the purpose of this study, we shall be examining six (6) common ones.
SDLC Models Cont’d
i. Waterfall Modelii. Evolutionary Modeliii. V-Shape Modeliv. Spiral Modelv. Agile Development Modelvi. Rational Unified Process (RUP)
Model
SDLC Models Cont’d
i. Waterfall ModelUndoubtedly the oldest and famous of all the available models. It acts as baseline for other SDLC models. In other words, other models are derivatives of Waterfall Model.
It major strength lies in the fact that it dwells much on requirement gathering and ascertaining of same (by way of feedbacks) to prevent flaws in the development of the project. Most suitable where requirement is well understood.
SDLC Models Cont’di. Waterfall Model - VARIANTS
Requirement Analysis and Definition/Specification
Implementation and Unit Testing
Integration and System Testing
Operation and Maintenance
System and Software Design
Figure 2: Classical Waterfall Model
SDLC Models Cont’di. Waterfall Model – STRENGTHS/ADVANTAGES
With her ‘define-b4-design’ & ‘design-b4-coding’ approach, it reduces flaws/errors in development.
Applications developed with it, are easily understood, implementable and maintained.
Documentation is embraced and enhanced. With its deep flow, quality assurance is ensured.
SDLC Models Cont’di. Waterfall Model – WEAKNESSES/DISADVANTAGES
Costly Time-consuming, leading to late project delivery
Maintenance
SDLC Models Cont’di. Waterfall Model – SUMMARY
Summarily, Waterfall Model complies with the process flow shown below:
Requirements
Designs
Testing
Figure 4: SDLC Process showing Waterfall Compliance
Proc
esse
s
Compliance
SDLC Models Cont’d
ii. Evolutionary ModelThis model involves the culmination of major activities involved in developing software. The model emphasize ‘fast/quick’ design approach to solution development.
Unlike Waterfall, the strength of this model is time-saving, which is achieved by rapid way of developing software with adequate feedbacks.
SDLC Models Cont’dii. Evolutionary Model - VARIANTS
The available variants include:
Throw-Away Prototyping ModelRapid Application Development Model / Iterative Prototyping ModelIncremental Prototyping Model
SDLC Models Cont’da. Throwaway Prototyping Model –
Emphasizes fast design + minimal requirement analysis.In this prototyping type, a small portion of an ‘on-going’ system is given to the client/user for evaluation purpose. The feedbacks allow for some modifications to be carried out on the main system, after which the prototype is discarded/done with/thrown away. This is why it is also refer to as a working system – it is only developed for evaluation/testing purposes, it is never part of the final delivered system/software.
SDLC Models Cont’d
Figure 5: Throwaway Prototyping Model – Variant I
Requirement Analysis
Design/Build Demo Software
Testing (Customer Test Run Demo App)
SDLC Models Cont’db. Rapid Application Development (RAD)
This iterative model emphasizes component-based construction in rapid software development approach. It embraces, encourages and enables participation of development team in actualizing speedy/timely development.
Figure 7 shows the different phases of RAD / Iterative model as catered by different development teams.
SDLC Models Cont’d
Figure 9: RAD Model – Variant III
Specification
Validation
Development
Initial Version
Intermediate Version
Final Version
Specification
Development
Validation
1st Version
Intermediate Version
Final Version or Product
SDLC Models Cont’d
Figure 10: RAD Model – Variant IV
Requirement Analysis
Develop Prototype
DeploymentClient/User Evaluation
Feedback for Modification
Final Implementation
& Integration
Deployment & Operation Maintenance
SDLC Models Cont’dc. Incremental Model – Like the Prototyping, it
emphasizes fast design + minimal requirement analysis. However unlike prototyping where the demo app is delivered, the core product/app is delivered, used and reviewed by the user, and feedback for modifications.
Figure 11 shows the Incremental Model.
SDLC Models Cont’dDifferences between Waterfall & Evolutionary
Waterfall Evolutionary
Time consuming Time-saving
Costly Cheap
Inflexible Flexible
Process is easily understood, implementable, and maintainable
Clumsy process due to excessive iterations and prototypes
Sufficient requirement analysis carried out
Insufficient requirement analysis performed
Table 1: Differences between Waterfall and Evolutionary Models
SDLC Models Cont’diii. V-Shaped Model
This is an extension of the Waterfall Model, whose development is bent upward after the implementation/coding phase to form a V-Shape.
Figure 12 shows this.
SDLC Models Cont’di. V-Shaped Model – STRENGTHS/ADVANTAGES
Like the Waterfall, it is easy to understood, implement and maintain.
Most suitable for use where requirements are clearly spelt out.
Each development phase and the technologies/tools involved, are known.
SDLC Models Cont’di. V-Shaped Model – WEAKNESSES/DISADVANTAGES
Again, like the Waterfall Model, it is inflexible Costly Time-consuming (even more than the Waterfall Model). Why?
SDLC Models Cont’dDifferences between Waterfall & V-Shaped
Waterfall V-Shaped
No planning at early stage – jump start to requirement.
Planning is done as early test approach.
Table 2: Differences between Waterfall and V-Shaped Models
SDLC Models Cont’div. Spiral Model
This combines the features/characteristics and strengths of prototyping and waterfall models in tandem with adequate risk analysis. It is most suitable for large, complex and security-driven/risk-involving software projects. It was described and presented by Barry Boehm in 1986 in his paper, titled: ‘A Spiral Model of Software Development and Enhancement’. It was widely accepted not because it discusses iterative processes of developing software like other models but because it presented the necessity for risk pattern and cost to be examined from the requirement to the development/deployment stage.
SDLC Models Cont’div. Spiral Model – Phases & Activities(1) OBJECTIVE/PLANNING Phase
i. Decide on the visibility/possibility of the project.ii. Determine the cost of implementation.iii. Specify project timeline.iv. Suggest alternative approach to implementation.
SDLC Models Cont’div. Spiral Model – Phases & Activities(2) RISK ASSESSMENT/ANALYSIS Phase
What do we look out for? What do we analyze?i. Developer’s level of experience.ii. Requirement information.iii. Delivery schedules.v. Key system operations.
SDLC Models Cont’div. Spiral Model – TAXONOMY(1) Risk: Implies an uncertain outcome that has potentials
for loss.It refers to measurable parameter that determines loss.
(2) Verification: Implies checks to ensure the team is building the software product rightly.
(3) Validation: Implies checks to ensure the team is building the right software product.
(4) Testing: Implies executing the program/application with set of data (valid & invalid) to study the software behavior.
(5) Debugging: Implies examining code(s) that cause(s) failing in software performance.
SDLC Models Cont’div. Spiral Model – STRENGTHS/ADVANTAGES
Risk avoidance. Precise knowledge of requirements. Accommodates frequent changes in requirements. Like Waterfall, it is more realistic than other iterative
models in that it allows software product to evolve as the development process progresses.
SDLC Models Cont’div. Spiral Model – WEAKNESSES/DISADVANTAGES
Time consuming. Not generic in application – Different application
with different risk factors; so, it has to be developed and applied differently.
Complex process. Involve excessive and rigorous documentation
process. Unsuitable for small software projects.
SDLC Models Cont’dDifferences between Waterfall & Spiral
Waterfall Spiral
Risk is not considered Analyzes and manages risk
No adequate estimation of budget
Adequate estimation of budget achieved through planning and progressive phases
Costly Costlier
Table 3: Differences between Waterfall and Spiral Models
SDLC Models Cont’dSpiral Model – Boehm’s Philosophy
Figure 18: Boehm’s Philosophy that prompted Spiral Model
“Stop the life cycle—I want to get off!” “Life-cycle Concept Considered Harmful.” “The waterfall model is dead.” “No, it isn’t, but it should be.”
SDLC ModelsUnder Topic Exercise (UTE) 1i. Following the demonstrated discussion pattern of
this course and particularly under this topic, write on:a. Agile Modelb. RUP Model
ii. Enumerate the strengths and weaknesses of the various Evolutionary Models.
iii. Come up with a modified Spiral Model and discuss the activities of each phase of the model.
iv. In few paragraphs and in convincing ways, discuss the necessities and benefits of modeling as a pointer and preceding step to software development.
SDLC ModelsUnder Topic Exercise (UTE) 2i. Iterative vs Incremental Models – Comment on the
‘fight’.ii. Discuss the differences between:
i. Evolutionary and V-Shaped Modelsii. Evolutionary and Spiral Modelsiii. Evolutionary and Agile Modelsiv. Evolutionary and RUP Models
iii. Between V-Shaped and Agile Models, which will you prefer and why?
iv. V-Shaped and Agile: Which is more agile? Discuss.v. Considering Spiral and Agile Models, which springs
up software faster and more reliably? Lecture a fellow.