create etl
TRANSCRIPT
![Page 1: Create ETL](https://reader035.vdocuments.mx/reader035/viewer/2022081804/5695cff71a28ab9b029056e8/html5/thumbnails/1.jpg)
7/23/2019 Create ETL
http://slidepdf.com/reader/full/create-etl 1/2
Search
Home • Q ui z • Ti ps • Tut or i al s • Funct i onal • Cert Q's • Interview Q's • Jobs • Testimonials • Advertise • Contact Us
Join the Mailing List
Enter name and email address below:
Name:
Email:
Subscribe Unsubscribe
GO
What's New:
Control Recipe/PI sheet deletionprocedure
Shift Note in SAP
SAP Jobs
Off line Workflow Approval in ECC R/3without SAP Logon from E-Mail(Outlook)
Introduction to SAP eCATT run bySECATT
ABAP Quiz (String Operations)
Optimization process of reading & writingof SAP HR master data through buffers
ABAP Quiz (Reports)
ABAP Quiz (LDB)
ABAP Quiz (Events based)
Quiz on Lock Ob jects
Quiz II on Workflow
Quiz on ABAP-HR
Quiz on Workflow
Quiz on Adobe Forms
Contribute?
Hall of Fame
Sample Specs
Creating Equipment Task List
Description: Need for an LSMW to create equipment task list.
Method suggested in creating an LSMW would be in the following order :
Use a standard BAPI if available
Standard input batch program if available
RecordingStandard direct input program
In other words if a standard BAPI is not available check to see if there is a standard batch input programthat could be used to produce the desired results. If there isn’t a standard batch input program then opt
for the method of recording. The LAST method to use in developing a new LSMW is the standard direct
input program.
Please note that no field should have a hard-coded value. All values have to be accepted from the input
file.
Steps to create equipment task list:
1. Go to transaction IA01 (Create equipment task list)
2. Enter the equipment and key date (F4 functionality could be used here).
3. Click on “Task list”.
4.
Click on “New Entries”.
5. Enter the following values:
Short Text
Work Center
Plant
Usage
Planner Group
Status
Inspection Points
![Page 2: Create ETL](https://reader035.vdocuments.mx/reader035/viewer/2022081804/5695cff71a28ab9b029056e8/html5/thumbnails/2.jpg)
7/23/2019 Create ETL
http://slidepdf.com/reader/full/create-etl 2/2
6. Click on “Operation”.
7. Enter the following input fields on this screen:
Operation
Work Center
Plant
Control Key
Short Text
Labor hours
Unit of work
Normal Duration
Unit of Normal Duration
Activity Type
8. Press SAVE.
You might also be interested in:
Adding Delivery Address to a scheduling Agreement (more details)
Sending an email to the basis team if the user hasn't.....(more details)
Please send us your feedback/suggestions at [email protected]
Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPTechnical.COM | Post Job • Contact Us
© SAPTechnical.COM. All rights reserved. All pro duct names are trademarks of their respective companie s. S APTechn ical.COM is in no way a ffiliated with SA P A G.
SAP, SAP R/3, R/3 software, mySAP, ABAP, BAPI, xApps, SAP NetWeaver, and and any other SAP trademarks are registered trademarks of SAP AG in Germany and in several other countries.Every effort is made to ensure content integrity. Use information on this site at your own risk.
Graphic Design by Round the Bend Wizards