CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center PROJECT: Crawford County Courthouse Judicial Center WMF 2014.023.00 DATE: September 24, 2015 SUBJECT: ADDENDUM NO. 2 This Addendum will amend, modify or clarify the Construction Documents and Project Manual. Receipt of this Addendum must be acknowledged on the Bid Form. Division numbers are listed for convenience only, all bidders are responsible to determine if Addendum items affect their scope of work. GENERAL: 1. Geotechnical Report: a. A geotechnical report is available for review. Contact Debbi Felix at WMF to obtain a copy at 814-920-1976 or [email protected] There are no know hazardous materials under the parking lot. 2. Final Bid RFI’s: a. All bid RFI’s must be received no later than 3:00pm on Tuesday, September 29 th to be reviewed, answered and included in the final Addendum to be issued on Wednesday, September 30 th . CLARIFICATIONS TO SPECIFICATIONS AND DRAWINGS: SPECIFICATIONS: 1. Section 012300: a. Revise paragraph 3.1, subparagraph B: Alternate 2 – Aluminum Storefront Window: Provide deduct to install fixed aluminum storefront window in lieu of aluminum-clad wood window. Refer to WINDOW SCHEDULE on sheet AE603. b. Revise paragraph 3.1, subparagraph U: Alternate 21 –Mechanical Control System Installers – Conexus or CS&E: Provide deduct alternate to change 3.1.A.1 to read as follows: “Conexus or CS&E“. 2. Section 042000: a. Revise paragraph 3.6, subparagraph B: Install cavity mortar control panels as indicated on drawings throughout masonry cavities during construction of exterior wythe, complying with manufacturer's installation instructions. Verify that airspace width is no more than 3/8 inch greater than panel thickness. Install horizontally between joint reinforcement. Stagger end joints in adjacent rows. Fit to perimeter construction and penetrations without voids. 3. Section 042613: a. Revise paragraph 2.7, subparagraph C.1 to eliminate configuration options c and d. b. Include Bowerstone Shale (Ohio) and Watsontown Brick as an approved substitution for the basis-of-design product, subject to full compliance with the contract documents. Color must be approved by architect as comparable to basis of design product.

Upload: others

Post on 09-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

PROJECT: Crawford County Courthouse Judicial Center WMF 2014.023.00 DATE: September 24, 2015 SUBJECT: ADDENDUM NO. 2 This Addendum will amend, modify or clarify the Construction Documents and Project Manual. Receipt of this Addendum must be acknowledged on the Bid Form. Division numbers are listed for convenience only, all bidders are responsible to determine if Addendum items affect their scope of work. GENERAL:

1. Geotechnical Report: a. A geotechnical report is available for review. Contact Debbi Felix at WMF to

obtain a copy at 814-920-1976 or [email protected] There are no know hazardous materials under the parking lot.

2. Final Bid RFI’s: a. All bid RFI’s must be received no later than 3:00pm on Tuesday, September 29th

to be reviewed, answered and included in the final Addendum to be issued on Wednesday, September 30th.

CLARIFICATIONS TO SPECIFICATIONS AND DRAWINGS: SPECIFICATIONS:

1. Section 012300: a. Revise paragraph 3.1, subparagraph B:

Alternate 2 – Aluminum Storefront Window: Provide deduct to install fixed aluminum storefront window in lieu of aluminum-clad wood window. Refer to WINDOW SCHEDULE on sheet AE603.

b. Revise paragraph 3.1, subparagraph U: Alternate 21 –Mechanical Control System Installers – Conexus or CS&E: Provide deduct alternate to change 3.1.A.1 to read as follows: “Conexus or CS&E“.

2. Section 042000: a. Revise paragraph 3.6, subparagraph B:

Install cavity mortar control panels as indicated on drawings throughout masonry cavities during construction of exterior wythe, complying with manufacturer's installation instructions. Verify that airspace width is no more than 3/8 inch greater than panel thickness. Install horizontally between joint reinforcement. Stagger end joints in adjacent rows. Fit to perimeter construction and penetrations without voids.

3. Section 042613: a. Revise paragraph 2.7, subparagraph C.1 to eliminate configuration options c and

d. b. Include Bowerstone Shale (Ohio) and Watsontown Brick as an approved

substitution for the basis-of-design product, subject to full compliance with the contract documents. Color must be approved by architect as comparable to basis of design product.

Page 2: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

4. Section 047200: Include Continental Cast Stone as an approved substitution for cast stone manufacturer, subject to full compliance with the contract documents. Color must be approved by architect as comparable to Architect’s Sample.

5. Section 087100: Include Stanley Magic Force automatic door operator as an approved substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents.

6. Section 102641: Add specification section 10 26 41 BULLET RESISTANT PANELS, attached herein as part of this addendum.

7. Section 102800: Include Thin Air by Excel Dryer as an approved substitution for the basis-of-design product Bobrick Trimline hand dryer.

DRAWINGS:

Architectural

1. All Sheets: Revise keynote 06 46 00.C00 BALLISTIC PANEL to be 10 26 41.A00 BULLET RESISTANT PANEL. Keynote refers to specification section 102641.

Fire Protection 1. F-001:

a. Detail A8, Change annotation note from “DRY PIPE” TO “PREACTION”. 2 Locations on detail. No Sketch Issued.

Plumbing

1. PL601: a. PLUMBING FIXTURES SCHEDULE, item CF-1 changes CW connection

size to 1 ½”. Item CF-2 changes CW connection size to 1 ½”. No sketch issued.

2. PL702: a. Sizes revised. Sheet issued as replacement sheet.

Mechanical

1. MH101: a. Note added to piping mains. “MAINS INDICATED TO SERVE LEVEL 1

AND LEVEL 2. EXTEND PIPING UP WITHIN WALLS TO ITEMS ON LEVEL 2”

2. MH102: a. Annotation added for ductwork, grilles registers and diffusers. Existing

annotation moved for clarity was not clouded. Only added items were clouded. Sheet issued as replacement sheet.

3. MH103: a. Annotation added for ductwork, grilles registers and diffusers. Existing

annotation moved for clarity was not clouded. Only added items were clouded. Enlarged plans added for annotation clarity. Annotation was added to the enlarged plans. Sheet issued as replacement sheet.

4. MH104: a. Annotation added for ductwork, grilles registers and diffusers. Existing

annotation moved for clarity was not clouded. Sheet issued as replacement sheet.

5. MH502: a. Detail A4 was added. Details D3, F1, H7 & H10 were modified. Sheet

issued as replacement sheet. 6. MP102:

a. Annotation added for Fan Coil Unit. Existing annotation moved for clarity was not clouded. Sheet issued as replacement sheet.

Page 3: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

7. MP103: a. Annotation added for Fan Coil Units. Existing annotation moved for

clarity was not clouded. Only added items were clouded. Sheet issued as replacement sheet.

Electrical

1. EP101: a. ADD receptacle in Assist. D.A. 1180 adjacent to the fan coil unit and

connect to L1-31. b. ADD homerun S1-7 to door control power junction box in Storage 1103. c. CHANGE homerun for door control power junction box in Employee

Break Room 1057 to S1-9. d. ADD homerun L1-50 for general receptacle circuit in Corridor 1202. e. CHANGE homerun for camera power junction box in Central Control

1220 to S1-8. f. CHANGE homerun for door control power junction box in Holding Cell

area to S1-15. g. Tag fan coil unit in Lobby 1001 as FCU-131. h. Tag fan coil unit in Public Vending 1050 as FCU-130.

2. EP102: a. ADD homerun L2-58 to general receptacles in Corridor 2002. b. ADD homerun L2-74 to general receptacles in Corridor 2003.

3. EP103: a. Tag fan coil in Court Reporter 3060 as FCU-332.

4. EP104: a. Tag fan coil in Corridor 4002 as FCU-437. b. CHANGE homerun for sensor transformers to S4-2 in Women’s 4041. c. CHANGE homerun for sensor transformers to S4-4 in Men’s 4042.

5. EP606: a. REPLACE sheet EP606 with revised sheet EP606-X1.

Technology

1. T-101: a. All security door numbers revised b. Add Coded Note 3: CARD READER AND ASSOCIATED DOOR

CONTROLLER TO BE TIED INTO ELEVATOR CONTROLS SO THAT CREDENTIALS MUST BE PRESENTED TO CALL ELEVATOR. COORDINATE WITH ELEVATOR MANUFACTURER.

2. T-102: a. All security door numbers revised b. Add Coded Note 1: CARD READER AND ASSOCIATED DOOR

CONTROLLER TO BE TIED INTO ELEVATOR CONTROLS SO THAT CREDENTIALS MUST BE PRESENTED TO CALL ELEVATOR. COORDINATE WITH ELEVATOR MANUFACTURER.

c. Card reader added to door 2003A. d. Card reader removed from door 2032A on Stair side.

3. T-103: a. All security door numbers revised b. Add Coded Note 1: CARD READER AND ASSOCIATED DOOR

CONTROLLER TO BE TIED INTO ELEVATOR CONTROLS SO THAT CREDENTIALS MUST BE PRESENTED TO CALL ELEVATOR. COORDINATE WITH ELEVATOR MANUFACTURER.

c. Card reader added to door 3101B on Courtroom side. d. Card reader added to door 3201B on Courtroom side. e. Data jack quantity increased from 2 to 4 at jack 3101A-B. f. Data jack quantity increased from 2 to 4 at jack 3201B-A.

Page 4: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

4. T-104: a. All security door numbers revised b. Add Coded Note 1: CARD READER AND ASSOCIATED DOOR

CONTROLLER TO BE TIED INTO ELEVATOR CONTROLS SO THAT CREDENTIALS MUST BE PRESENTED TO CALL ELEVATOR. COORDINATE WITH ELEVATOR MANUFACTURER.

c. Card reader added to door 4101B on Courtroom side. d. 12 strand OM4 fiber added between MDF 1052A and Data/Tele 4055A.

5. T-105: a. Fiber routing revised to match conduit routing shown on electrical plans.

6. T-504: a. All Door detail numbers changed. Details D4, D6, D8 & D10 revised.

7. T-505: a. Change Door devices for doors 2006A, 2006C, 2004AA, 2032A, 2003A,

3002A, & 4030A. b. Duress System Detail updated to include Replay Panel for integration

with VMS system. 8. T-506:

a. Add “DATA/TELE 4055A RACK DETAIL”. b. “TELECOMMUNICATIONS CLOSET DETAILS” revised making all fiber

armored. Fiber added between MDF 1052A and 4055A. c. Grounding system extended to Fiber entrance points in Mech/Electrical

1055 and Data/Tele 4055A. d. “VOICE DATA OUTLET” detail revised to indicate the T.C. shall provide

the faceplate with labels. 9. T-601:

a. “COMMUNICATIONS OUTLET SCHEDULE”, “CAMERA LOCATION SCHEDULE”, AND “CAMERA DATA SCHEDULE” revised.

CLARIFICATIONS TO THE SCOPE OF WORK:

1. Concrete and Site Work a. Excavation Excess Material: All excess excavation material from the site is

required to be removed as part of the Concrete and Site Work bid package. Crawford County is reviewing if they will want any excess clean fill and will confirm by the final addendum to be issued Wednesday, September 30th.

b. Shoring and Sheet Piling: All shoring, sheet piling and support as required for a safe excavation process of the foundations is the responsibility of the Concrete and Site Work bid package.

c. Building Demolition: No building demolition is to be included in any bid package. The County is pursuing this under a separate project.

d. Site Utilities: Site utilities are the responsibility of each bid package as noted in the scopes of work. The storm water system is the responsibility of the Concrete and Site Work bid package. Fire protection service is the responsibility of the Fire Protection bid package. Sanitary, water and gas is the responsibility of the Plumbing bid package. Electric is the responsibility of the Electrical bid package.

e. Site Fencing: Site fencing around the perimeter of the construction site will be provided by WMF and should not be included in this bid package.

2. General Trades

a. Building Demolition: No building demolition is to be included in any bid package. The County is pursuing this under a separate project.

b. Site Fencing: Site fencing around the perimeter of the construction site will be provided by WMF and should not be included in this bid package.

Page 5: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

c. Detention Hardware: All detention enclosures, detention hardware and detention door hardware is the responsibility of this bid package.

d. Bullet Resistant Panels: It will be the responsibility of the General Trades bid package to furnish and install all Bullet Resistant Panels as noted on the drawings and defined in specification section 10 26 41.

3. Fire Protection

a. Site Utilities: It will be the responsibility of the Fire Protection bid package to furnish and install all site utilities related to fire protection including the fire protection service and required utility connections and meter installations for a complete and operation system. Any tap in fees will be paid for by the Owner.

4. Plumbing

a. Site Utilities: Site utilities are the responsibility of each bid package as noted in the scopes of work. The storm water system is the responsibility of the Concrete and Site Work bid package. Fire protection service is the responsibility of the Fire Protection bid package. Sanitary, water and gas is the responsibility of the Plumbing bid package. Electric is the responsibility of the Electrical bid package.

5. Electrical

a. Site Utilities: Site utilities are the responsibility of each bid package as noted in the scopes of work. The storm water system is the responsibility of the Concrete and Site Work bid package. Fire protection service is the responsibility of the Fire Protection bid package. Sanitary, water and gas is the responsibility of the Plumbing bid package. Electric is the responsibility of the Electrical bid package.

END ADDENDUM NO. 2 Attachments:

Pre-Bid Conference Report Pre-Bid Attendance Sheet Bid RFI Log 102641 BULLET RESISTANT PANELS

Attached as separate file: PL702-X2 MH101-X2 MH102-X2 MH103-X2 MH104-X2 MH502-X2 MP102-X2 MP103-X2

EP606-X1 T-101-X1

T-102-X1 T-103-X1 T-104-X1 T-105-X1 T-504-X1 T-505-X1 T-506-X1 T-601-X1

Page 6: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial Center

c: Owner, Architect, Consultants and all known bidders

Page 7: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 1 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

PROJECT: CRAWFORD COUNTY COURTHOUSE JUDICIAL CENTER WMF # 2014.023.00 DATE: September 23, 2015 SUBJECT: Pre-Bid Conference Report MEETING CALLED TO ORDER AT 11:00 AM WELCOME: Charlie Yazembiak INTRODUCTIONS: Owner Crawford County Jack Lynch Steve Scott Mark Phelan Bob Hopkins Mark Peaster Zack Norwood Architect Weber Murphy Fox (WMF) – Rich Speicher Civil Engineer Stiffler McGraw Landscape Architect Weber Murphy Fox (WMF) Structural Engineer Buchart Horn / Basco Associates – Rob Cramer MPET Engineers Buchart Horn / Basco Associates – Rob Cramer Technology/Security Engineer Tower Engineering Construction Manager WMF – Charlie Yazembiak Project Manager WMF – Tony Grace Field Superintendent WMF – Steve Burdick Trade Contractors The Attendance sheet is attached to this Pre Bid Conference Report. DESCRIPTION OF PROJECT: This project consists of new construction of a 3 story plus basement facility to house the judicial functions of Crawford County. Building will be steel framed with concrete foundations and footings, light gauge wall and roof framing and masonry exterior. Site, fire protection, plumbing, mechanical, electrical and technology work is included.

Page 8: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 2 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

Weber Murphy Fox (WMF) is the Construction Manager. Separate bids will be accepted for the following scopes of work: Concrete and Site Work Masonry and Stone Structural Steel General Trades Roofing Aluminum Entrances and Storefront Flooring Painting Manufactured Casework Elevators and Conveying Equipment Fire Protection Plumbing HVAC Electrical Technology Landscaping and Site Improvements 1. ADMINISTRATIVE REQUIREMENTS:

1.1 Contracts: WMF is the Construction Manager. Construction Contracts will be executed between the owner and the successful bidders.

1.2 Insurance: Insurance certificates from all trade contractors as specified must be

submitted to WMF before their work is begun. 1.3 Bonds: Bid Bonds, Performance, Labor and Material Payment Bonds are required as

specified.

1.4 Liquidated Damages: Liquidated Damages are noted in the Project Manual at $500.00 per day.

1.5 Builders Risk Insurance: The Owner will provide the Builders Risk Insurance. 1.6 Government Wage Requirements: Pennsylvania Prevailing wages apply. The wage

determination is included in the project manual. 1.8 Bidding: The project has been publicly advertised. Bids will be publicly opened. The

Owner reserves the right to reject any or all bids and the right to waive any irregularities in the bidding process.

1.9 Bids Due: Bids are due Wednesday October 7, 3:30 PM at Crawford County

Commissioners office. See instructions to bidders in the Project Manual. 2. STATUS OF PROJECT:

2.1 Schedule: Bids due October 7, 2015 Notification to proceed as soon as possible following a Commissioner’s meeting on October 15

Start Construction by end of October 2015

Page 9: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 3 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

Substantial Completion by March 2017 Construction sequencing schedule is included in the Project Manual. Successful bidders will be required to submit a detailed construction schedule for their work and participate in a weekly 2 week look ahead for upcoming construction activities.

3. SAFETY: 3.1 Safety Meeting: Meetings will be held every week as part of the weekly Coordination

meetings. All trade contractors are to have a responsible person from their company attend all meetings. Each contractor is responsible for maintaining their safety program in full compliance with all applicable OSHA procedures. Each trade contractor shall monitor the entire project for any unsafe conditions and report any concern to the Construction Manager.

4. JOB CONFERENCES: 4.1 Job Conferences: Job Conferences will be held every other week at the site.

It is important that the Owner, Architect, Construction Manager and all Trade Contractors who have work in progress or scheduled to begin within two weeks have a representative in attendance at all meetings with the authority to speak for their representative company. WMF will complete Job Conference Minutes and distribute to all parties.

Coordination Meetings: Coordination Meetings will be every week at a time convenient to the majority of the Project Foremen on the site.

5. LIST OF SUBCONTRACTORS, DETAILED COST BREAKDOWNS, SCHEDULE OF

WORK: 5.1 Subcontractors, Suppliers: Each Trade Contractor should submit to the CM within 10

days after signing Contracts, a complete list of names/addresses/phone numbers of each Subcontractor and major supplier. Contractor shall submit one (1) copy for approval and distribution as an administrative submittal.

The CM will review each source and forward copies to appropriate parties. This list may be amended as work progresses; however, submission of initial list or amendments must be made in advance of ordering materials or authorizing Subcontractors to proceed.

5.2 Detailed Cost Breakdown: Each Trade Contractor shall submit to the CM, prior to

submitting any invoices, a detailed contract cost breakdown (schedule of values) for approval.

5.3 Coordination: All Trade Contractors are equally bound by the Specifications to

coordinate their work with one another. If at any time the work of another Contractor is not acceptable to the second Contractor, the CM should be notified and work should not be continued on that item.

Page 10: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 4 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

6. PAYMENTS/CHANGE ORDERS: 6.1 General: All items discussed in Sections #1 and #5 above must be submitted and

approved prior to request for first payment. Application for Payment forms are to be copies of Cost Breakdown, G702 and G703CMa or equal.

Applications for Payment will be accepted up to the fifth of the month for work completed by the end of the past month. Contractor shall submit one copy to the CM for approval. Electronic copies are permitted if signed and notarized properly. Payment will be made per the agreement (45 days). Late Applications for Payment will be held until the next month.

6.2 Retainage: Retainage will be withheld at the rate of 10% of the total work completed

and stored, to the date of Application for Payment.

Reduction of retainage to 5% of the total contract cost may be permitted at 50% completion of Contract and upon written request to the Owner via the Construction Manager.

At date of Substantial Completion of the work of each trade, retainage may be released with an amount equal to 1.5 times the value of punch list items and major uncompleted work held in escrow, until final completion.

6.3 Stored Materials: Stored materials may be included in the Contractors’ Applications

for Payment. Materials may be stored at the site or in Contractor’s Warehouse. Evidence of existence and insurance for materials stored off site must be provided to the CM before payment can be approved for same. The Owner and CM encourage early purchase of materials to ensure schedule performance.

6.4 Change Orders: No changes from the Contract Documents will be allowed

without a written Change Order, prepared and executed in advance, including cost breakdowns or materials justification as may be requested by the CM. CM will prepare Change Orders. Contractor shall not include Change Order on payment request until same has been approved.

6.5 Field Orders: Due to the nature of this project, it is anticipated that there will be Minor

cost-affecting changes required due to on-site conditions. All of these changes will be authorized as Construction Change Directives. All CCD’s will be turned into change orders before work can be billed. No payment will be made for any work not agreed to in advance (don’t even bother invoicing for “extras” unless it is covered by a change).

7. CORRESPONDENCE/SUBMITTALS/PROJECT RECORDS:

7.1 Correspondence: All correspondence from the Contractor regarding the project shall be directed to Debbi Felix at the Erie office of Weber Murphy Fox. 814-920-1976, [email protected]. All correspondence should be submitted thru the Newforma Info Exchange system (instructions will be provided). A letter of transmittal must accompany items for approval, such as Shop Drawings, etc. Transmittal must show clearly the Contractor name, project title, CM project number, date item and action requested.

7.2 Shop Drawings, Submittals: Shop Drawings, Spec. Sheets, Catalogue Cuts,

Page 11: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 5 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

Schedules, Test Reports and Certifications should be submitted with Contractor approval stamp. A PDF file must be sent thru the Newforma Info Exchange site. Each specification section should be submitted separately as one PDF with a transmittal included.

Samples of items indicated on the Schedule (two sets) should be tagged, showing project name, contractor name, CM project number and specification section and sent to WMF offices for approval. Samples will be stored at the project site so referral may be made if needed, for duration of construction.

Each Trade Contractor is responsible for providing a minimum of three (3) copies of installation instructions, parts lists or maintenance instructions, which come packaged with equipment. These items should be given to the Project Superintendent at time of material installation for inclusion in Maintenance Manuals. A CD of the maintenance manuals also is required to be sent to the Construction Manager with the final closeouts. Final payment will not be made until this information is complete.

7.3 As-Built Drawings: All Trade Contractors are responsible for maintaining accurate

records of changes or alterations to the work. Throughout the project, the Construction Manager will maintain one clean set of drawings. Prior to each Trade Contractor leaving the project, all changes must be compiled and transposed to this set.

8. TEMPORARY FACILITIES: 8.1 Water: Available from existing service. Provide temporary water as required for the

construction activities. The equipment for temporary water will be the responsibility of the Plumbing Contractor but the water utility cost will be by the Owner.

8.2 Electrical: Available from existing service. Provide temporary electric service as

required for construction activities. The equipment for the temporary electric will be the responsibility of the Electrical Contractor but the electric utility cost will be by the Owner.

8.3 Temporary Heat: Temporary heat will be the responsibility of each trade contractor

until the building is enclosed. Once the building is enclosed, the temporary heating equipment will be the responsibility of the HVAC contractor but the costs of the fuel for the temporary heat will be by the Owner.

8.4 Toilets: Job site toilets will be provided by the Construction Manager.

8.5 Dumpsters: The Construction Manager will provide dumpsters for general construction

materials. Note that the Trade Contractors with debris from the demolition, selective demolition, masonry and concrete will be responsible for providing dumpsters for those materials and proper disposal of such. Any hazardous materials will not be permitted in the dumpsters.

8.6 Field Office: The Construction Manager will have a field office. Each Trade Contractor

will be responsible for their own field office. Storage containers will be the responsibility of the Trade Contractor.

Page 12: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 6 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

8.7 FTP Site: Plans and specifications are located on the Newforma Info Exchange project site. An invitation was sent to you with a user name and password to download these documents. If you have bid a project with us before, you can use the same user name and password for it is good for every project you do with us.

8.8 Plans and Specifications: Electronic documents have been sent to all bidders. Plans

and Specifications may also be obtained for the cost of printing ($859.40), at the office of Weber Murphy Fox, 3230 West Lake Road, Erie PA 16501, or a CD at the cost of $25. Contact Debbi Felix at: (814) 920-1976 or [email protected]. to purchase bid documents.

9. OTHER ITEMS OF DISCUSSION:

9.1 Damages: Each Trade Contractor is responsible for damages done to his work or work of others by their employees or agents.

9.2 Clean Up: Each Trade Contractor should pick up his own mess daily and dispose of it.

If Trade Contractors habitually fail to clean up after themselves, WMF will arrange for cleaning, prorating the cost among those Contractors contributing to the mess.

9.3 Parking: Limited contractor parking will be provided at the east end of the site. 9.4 Questions During Bidding: All questions during bidding should be directed to Debbi

Felix at 814-920-1976 [email protected] or Charlie Yazembiak 814-920-1972 [email protected]. ALL QUESTIONS MUST BE IN WRITING via Newforma Info Exchange as a Bid RFI.

9.5 Addendum: All questions during bidding will be recorded and will be included in an

Addendum. The first Addendum was issued on Friday September 18, 2015. Addendum #2 will be issued Thursday, September 24th and will include the pre-bid meeting minutes and attendance sheet.

9.6 Site Visits: All site visits must be coordinated with CCCH and WMF.

9.7 Work Hours: All work shall be performed between 7:00 am and 5:00 pm, or as

coordinated in advance with the Owner and WMF. 9.8 Hazardous Material Removal: The Owner is responsible for the removal and disposal

of any hazardous materials. 9.9 Building Permit. The Owner will secure the building permit. 10. SPECIAL REQUESTS:

10.1 Tobacco: Tobacco is not permitted on the site.

10.2 Alcohol: Alcohol or illegal drugs are not permitted on the site. 10.3 Fire Arms: Firearms are not allowed on the site.

10.4 Security: Any special requirements will be confirmed by the Owner.

Page 13: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 7 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

10.5 Delivery Protocol: All Deliveries must be scheduled with WMF Field Superintendent

Steve Burdick. 11. CLARIFICATIONS / QUESTIONS: 11.1 Bid Qualification Meetings: The apparent Low Bidders will be required to attend a Contractor Bid Qualification Meeting, at which there will be a complete review of the

Contract documents and addenda. 11.2 Design Intent Standard of Quality: The drawings and specifications show the intent of

design for a standard of quality and do not limit manufacturers of various building components. Substitution requests and determinations of approved equals must be submitted in writing and approved before bids are opened.

11.3 Alternates: Note that there are bid alternates on this project and refer to specification

section 012300 – ALTERNATES for further information. Note that if nothing is listed, the assumption will be that it is no change in cost.

11.4 Combined Bids: Note that the County will be accepting combined bids on the project.

Refer to specification section 002213 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS for further information.

11.5 Geotechnical Report: A geotechnical report is available for review. Contact Debbi

Felix at WMF to obtain a copy at 814-920-1976 or [email protected] There are no know hazardous materials under the parking lot.

11.6 Excavation Excess Material: All excess excavation material from the site is required

to be removed as part of the Concrete and Site Work bid package. Crawford County is reviewing if they will want any excess clean fill and will confirm by the final addendum to be issued Wednesday, September 30th.

11.7 Shoring and Sheet Piling: All shoring, sheet piling and support as required for a safe

excavation process of the foundations is the responsibility of the Concrete and Site Work bid package.

11.8 Building Demolition: No building demolition is to be included in any bid package. The

County is pursuing this under a separate project.

11.9 Site Fencing: Site fencing around the perimeter of the construction site will be provided by WMF and should not be included in any bid package.

11.10 Site Utilities: Site utilities are the responsibility of each bid package as noted in the

scopes of work. The storm water system is the responsibility of the Concrete and Site Work bid package. Fire protection service is the responsibility of the Fire Protection bid package. Sanitary, water and gas is the responsibility of the Plumbing bid package. Electric is the responsibility of the Electrical bid package.

11.11 Detention Hardware: All detention enclosures, detention hardware and detention door

hardware is the responsibility of the General Trades bid package.

Page 14: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

WMF

- 8 - S:\Cloud Projects\2014.023.00 - Crawford County Courthouse New Judicial\001 General\10 Buyout\Pre-Bid Meeting\Pre Bid Conference Report.docx

11.12 Plumbing and HVAC Pipe Sizing: The piping sizes for the plumbing and HVAC drawings is under review and will be clarified in the next Addendum.

11.13 HVAC Controls Manufacturers: Other manufacturers were asked to be considered for

the project. WMF noted for those manufacturers need to be submitted as a substitution request as a Bid RFI through Newforma for review and consideration.

11.14 Final Bid RFI’s: All bid RFI’s must be received no later than 3:00pm on Tuesday,

September 29th to be reviewed, answered and included in the final Addendum to be issued on Wednesday, September 30th.

12. ADJOURNMENT:

12.1 The Pre Bid Conference adjourned at 11:41 AM. c: Owner

Architects Consulting Engineers Construction Manager Project Superintendent All Bidders

Page 15: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents
Page 16: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents
Page 17: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents
Page 18: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

1 of 4

RFI Report - All

PROJECT: Crawford County Courthouse New JudicialMANAGER: Rich SpeicherPREPARED BY: Deborah FelixDATE: 9/24/2015 - 2:18 PM

ID Subject Status From Question Answer

00001 Pipe Sizing Closed Mark Klimow (Scobell Company Inc.) The plumbing drawings are missing pipe sizing. When will these drawings be available with the sizing on them? RESPONSE (BH) : Risers will be available and released in the next addendum.

00002 Substitution Request - Grating Closed Mike Scott (Kadee Industries) Substitution Request : Add Kadee Industries as an approved manufacturer for Model KD58 Stainless Steel Grating

RESPONSE : Substitution acceptable as per the specification. Confirm compliance with requirements on drawings.

00003 Substitution Request - Polyurethane Foam Closed Scott Bruce (National Shelter Products Inc) Substitution Request : BASF Walltite ABAA Closed Cell Polyurethane Foam RESPONSE : Product information provided complies with specification and product will be

accepted as a substitution.

00004 Flagpole Height Closed Kim Teri (Pole-Tech Co Inc)We have received the flagpole specification regarding the above project. However, there is no height indicated in the spec. Please provide this information so we can price the job. Thank you.

RESPONSE : Height is approximately 12'-0". Detail information will be supplied as part of the next addendum.

00005 HVAC Questions Closed Tom Smith (Scobell Company Inc.)

1. Who is the basis of design for temperature controls?2. Can copper propress fittings and valves be used on the HWS/HWR & CWS/CWR systems 2" and less?3. Can coil piping kits be used for connections to the HWS/HWR & CWS/CWR coils on the fan coil units, unit heaters radiant ceiling panels and air handlers 2" and less?4. Drawing MP101, MP102, MP103 pipe sizes missing5. Drawing MP102 - Room 2054. No symbol for radiant ceiling panel.6. Drawing MP104 - Room 4011, 4104, 4121. Panel south of stairwell and panel above FCU-405 & 407. No symbol for radiant ceiling panel.7. Why is there no pipe run-out from the mains to the equipment?8. Drawings MP104-MP102 - No pipe mains shown.

1. Dynatech Installer2. Refer to piping and fitting schedule sheet MP601.3. Refer to piping details, if mail kit matches comjponents and specifications, yes.4. Be more specific. Sizes are indicated.5. Ceiling panel was indicated. Tag added for addendum.6. Ceiling panel was indicated. Tag added for addendum.7. Refer to general note "A" drawing MP101-104. Refer to schedules for runout size.8. Piping mains on Sheet 101 and 103 feed floor level indicated on and floor level above.NOTE : Piping and fittings assemblies are indicated on the schedule sheet MP601. Material specs are Section 201005. HVAC piping accessories are specified in Section 232114. HVAC valves are specified in Section 201007, refer to paragraph 3.2 for application. VFD are in Section 230920 for HVAC controlled systems. Vibration controls are specified with the individual components as well as 200548. Refer to detail A1 on Sheet MH502.

00006 Substitution Request - Aluminum Composite Panels

Closed Camille Knezevich (Alucoil North America LLC) Substitution Request : Aluminum Composite Panels

Product information provided complies with specifications. However, no reference is made showing compliance with ASTM E 330, ASTM E 283, or ASTM E 331. Please provide confirmation that product complies with these testing standards.

00007 2014.023.00 - Crawford County Courhouse New Judicial

Closed Lyn Noah (Renick Brothers Construction Co)

1. What are the payment terms?2. Will retainage be withheld? If so, what are the terms?3. Will liquidated damages apply? If so, what are the terms?

RESPONSE : 1. Monthly AIA billings based on percentage of work complete. Schedule of due dates for billings needs to be established by Owner. 2. Retainage will be held at 10%. Reduction in retainage at 50% completion will be at the discretion of the Owner. 3. Liquidated damages will be set at $500 per day. They will be added to the project in Addendum #1

00008 Crawford County Courthouse - Bid Package 031000 Concrete

Closed Marty Schenker (Gilcon & Associates)

1. Spec. Section 035300 – Concrete Topping; Part 2.6 Concrete Mixtures; Item D. Proportion lightweight concrete mixture; Item 6. Calculated Equilibrium Unit Weight: a. Lists 105 lb./cu.ft., plus or minus 3. Is this a misprint? Should this be 115 lb./cu.ft.? We recently did a project with a 115 lb./cu.ft. CEUW requirement and it was a struggle to even meet that factor. We ultimately achieved around 117 and 118 after very extended testing. Even after much tweaking of the LW mix design, the lowest we achieved was 113. The concrete supplier that we used on that project, will probably be the same one used on this project, by almost any bidder, and they do not feel this 105 factor is attainable. Please review. b. The supplier is also questioning the minimum cement content listed in Item 2., at 677 pounds/cubic yard for a 3,000 psi mix? Please confirm.2. I’m unclear on the desired locations for use of this lightweight concrete mix. Please clarify : a. The structural floor plans S-102, S-103, S-104 and S-105 all list in Note 4, that the floor slab is 4” total thickness, 4,000 psi concrete, with no mention of a LW mix. b. There are a few sections on S-201 that refer to a 2 ½” LW concrete on 1 ½” decking. c. There are sections on S-302 and S-303 that refer to the 4” total slab thickness, without mention of it being a LW mix.

RESPONSE (BH) : All concrete is normal weight - this will be clarified in the addendum.

RESPONSE (WMF) : See response from J Kaminski (BH). This was addressed as part of Addendum #1 (issued 9/18/15).

Page 19: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

2 of 4

ID Subject Status From Question Answer

00009 HVAC Questions - MP401/MP601 Closed Tom Smith (Scobell Company Inc.)

Drawing MP601 - Piping & Fitting Assembly Schedule : There are several Types of HWS/HWR & CWS/CWR shown in the schedule. Please indicate what thickness the insulation is to be for the above systems. The condensate drain pipe (CD) that is shown on the drawings. What type of pipe is this to be? Is this to be insulated? It is not listed on the Piping & Fitting Assembly Schedule.

Drawing MP401 - Mechanical Piping Enlarged Plans : Please provide pipe sizes for the pipe in the Mechanical Room. Also, where is the 4” HWS/HWR & CWS/CRW going to? It just ends at UH-105.

RESPONSE : From the Boiler Schedule, the Hot Water Temperature is 180 supply and 140 return. Therefore based on the system temperature range indicated on the pipe and fittings assembly schedule, the hot water system will be following the high Temperature Heating Water Supply and Return. Pipe insulation and cover type. Condensate drain piping would follow the drain piping less than 99 degrees. The 4" hws/hwr and cws/cwr piping ends at UH-105 with capped ends. Extend branch connection to unitary equipment.

00010 Substitution Request - Aluminum Composite Panels

Closed Beth Heil (Laminators Incorporated) Substitution Request : Aluminum Composite Panels RESPONSE : Subject to full compliance with the specifications, Omega-lite from Laminators Inc. will be an approved substitution for the metal composite wall panels.

00011 Substitution Request - Automatic Door Closed James Dunlay (Stanley Security) Substitution Request : Automatic Door The Stanley Magic Force is considered equal to the Norton 6000 series specified and will be accepted as an approved substitution.

00012 Duct Sizing Closed Tom Smith (Scobell Company Inc.) There is a lot of duct that is not sized. Please provide sizing ASAP .Duct sizes are indicated on the contract documents. The duct sizes for the fan coil units are indicated on the fan coil unit schedule. Duct sizes for the diffusers branch connections are to match diffuser connectin size, refer to diffuser, grilles and registers schedule.

00013 2014.023.00 - Crawford County Courthouse New Judicial

Closed Lyn Noah (Renick Brothers Construction Co)

1. Please clarify - drawing MH601 - has a duct and insulation schedule for transfer duct to be 1" liner but if you look at drawing MH502 details H7, H10, and F1 all show different requirements for the liner. Which is correct?

2. Please clarify on drawing MH102 at column lines D & 4 also at D & 5 1/2 shows 2 specific details F/MH502 - which indicates double wall transfer with fire damper. None are shown on plan view. Do we need fire dampers being that detail was specifically called out?

3. On drawing MH102 at column lines B & 2 also at B & 9 shows fan coils with return end supply ducts feeding level 3. There are no GRDs called out on drawing MH103. Ducts are just shown within walls - please clarify.

1. Duct liner to be clarified in Addendum #2.2. Fire damper requirements to be clarified in Addendum #2.3. Register tags to be added in Addendum #2.

(WMF) : Addendum #2 to be issued Thursday, September 24.

00014 2014.023.00 - Crawford County Courthouse New Judicial

Closed Lyn Noah (Renick Brothers Construction Co)

1. When are completed mechanical drwings going to be available?2. Who is the Rep. for NRG Controls and Conexus?

1. Complete mechanical drawings have been issued.2. NRG Controls and Conexus have regional Representatives. Basis of Design contact for NRG Controls is Jay Franklin at 717-939-2400, Conexus contact is Kurt Twiford 717-222-4150 Dynatech Greg Jordan 717-393-5930

00015 2014.023.00 - Crawford County Courthouse New Judicial

Closed Lyn Noah (Renick Brothers Construction Co) What is the basis of design for Direct Digital control System for HVAC as per the section 230923? Dynatech Controls - Answered in previous RFI.

00016 2014.023.00 - Crawford County Courthouse New Judicial

Closed Peter Wurst (J. J. Wurst Landscape Contractor)

The Hercules Retaining wall web site says the distributor is in Bridgeton MO. Is the another distributor or another product that would be closer? Suggestion : Use a local block company to save a little money on trucking.

Provide Hercules retaining wall or approved equal. See section 323223 Part 2.2 Segmental Retaining Wall Units for comparable products.

00017 Drainage Material Closed Adam Hines (CavClear / Archovations Inc) Substitution Request : Drainage Material Provide drainage material at flashing as indicated on drawings (not full height of cavity).

Specification will be revised as part of addendum #2.

00018 Vendor Approval Closed J Genova (Johnson Controls) Request for Vendor Approval : Johnson Controls - Vendor requests to be added as approved supplier for this project

RESPONSE (BH) : Submit which products, the manufacturer would like to be considered for approval. Itemize equipment with spec. section. Indicate any items within spec. which the manufacturer is unable to comply with for review.

Page 20: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

3 of 4

ID Subject Status From Question Answer

00019 Vendor Approval OPEN D Franklin (Thompson Lightning Inc) Request for Vendor Approval : Thompson Lightning Protection Inc

00020 Mechanical - MP102X1 / MP103X1 Closed Lyn Noah (Renick Brothers Construction Co)

1. Dwg MP102-X1 : Column line #9 There is a fan coil with no tag number : Column line #2 There is a fan coil with no tag number.2. Dwg MP103-X1 : Column line #3 and D FCU with no tag number : Rm 3052 There are 2 FCU with no tag numbers : Toilet rms between column 5/6 FCU with no tag numbers : Rm 3056 FCU with no tag numbers : Column 6/8 outside bldg Tag FCU 301 Where is it? : Column 6/8 and column D FCU no tag number.

RESPONSE (BH) : Fan Coil Unit tags to be added for addendum #2. Refer to MI, MP and MH series for tags.

RESPONSE (WMF) : See response from B Ondrasik (BH). Addendum #2 to be issued Thursday September 24

00021 6" Underground Fire Line Closed L Perretti (Simplex Grinnell) Who is responsible for the 6" tap in for the underground fire line and installation to the building? And will there be a tap in fee required as part of the fire protection scope/contract.

RESPONSE (BH) : To be answered in Addendum #2. Refer to section 00 24 13 changes.

RESPONSE (WMF) : See response from B Ondrasik (BH). Addendum #2 to be issued Thursday September 24

00022 General Requirements Closed Lyn Noah (Renick Brothers Construction Co) Is a list of potential bidders available? A bidders list will be estabilshed after the pre-bid conference Wednesday September 23

00023 Dry Pipe System at Sally Port Closed T Walsh (Preferred Fire Protection)Drawing F102 calls for the Sally Port to be protected with a pre action system. The detail on drawing F 001 shows a dry pipe system. Which is correct? If it is to be a pre action system who is responsible for detection and wiring to operate the system?

RESPONSE (BH) : Detail to be corrected in Addendum 2.

RESPONSE (WMF) : See response from B. Ondrasik (BH). Addendum #2 to be issued Thursday, September 24.

00024 Product Approval - Hand Dryer Closed M Savitt (Excel Dryer Inc) Product Approval : ThinAir Hand Dryer Thin Air by Excel Dryer will be accepted as an approved substitution for basis of design Bobrick Trimline hand dryer.

00025 Manufacturers for Approval Closed D Bope (Architectural Clay Products) Approval request for brick manufacturers

Following brick manufacturers will be accepted as an approved substitition for the Basis-of-design product: Bowerstone Shale (Ohio) and Watsontown Brick (PA). Endicott (Ironspots) is not an acceptable substitution due to limited variation in color blends. Continental Cast Stone is accepted as an approved manufacturer for cast stone. All substitutions are subject to full compliance with the specification. Color selections must be approved by architect and be comparable to the basis-of design product.

00026 Preaction System Closed L Perretti (Simplex Grinnell)

Specification 211300 refers to a preaction system , please identify the area to be protected .also a dry system is shown on the fp drawings, please identify areas to be protected with the dry system

(BH) The keynotes indicate on the drawings where the pre-action system is to protect. Dry pipe system to be answered via addendum #2.

(WMF) : See response from B Ondrasik (BH). Addendum #2 will be issued Thursday Sepember 24.

00027 Basis of Design - Cast Iron Closed J Schulties (Rabe Environmental)In Addenda #1, drawing PL-601-X1 piping schedule shows that PVC piping is allowed for sanitary, vent, storm, and condensate. Under Alternates 012300-1, number 12 it asked for a deduct alternate for Pvc IN LIEU of specified materials. Under base bid should we believe that cast iron is the basis of design, and the pvc will be a true alternate? Please confirm.

On sheet PL-601-x1, the piping and fitting schedule allows PVC to be used for sanitary piping below ground, or the bottom most floor slab. It is excluded from being used above ground, or the bottom most floor slab. Cast iron is allowed for the sanitary within the building and above the bottom most floor slab. The alternate allows the use of PVC within the building for the sanitary system for both above ground and below ground

Page 21: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

4 of 4

ID Subject Status From Question Answer

00028 Direct Digital Control System for HVAC OPEN R Gumpalli (Pittsburgh Automation)We represent American Auto-Matrix based DDC controllers and Tridium based front end system. Can we submit our proposal for HVAC contractors as another alternative? We don't see additional ine item on the bid form. Appreciate if you could approve Auto-Matrix based DDC controllers

Page 22: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

Crawford County Courthouse Judicial Center

WMF 2014.023.00 September 2015

BULLET RESISTANT PANELS 102641 - 1

SECTION 102641 - BULLET RESISTANT PANELS

PART 1 – GENERAL 1.1 SUMMARY A. Section includes bullet resistant fiberglass panels.

1.2 REFERENCES A. American Society for Testing and Materials:

1. ASTM E119-98 Standard Test for One-Hour Fire-Rating of Building Construction and Materials

2. ASTM F1233-98 Standard Test Method for Forced Entry Testing of Materials/Assemblies, Class IV

B. International Organization for Standardization: 1. ISO 9001:2008 Quality Management System C. National Institute of Justice Ballistic Standards:

1. NIJ Standard 0108.01 – Type III-A D. Small Business Administration: 1. SBA Small Business Size Standard E. Underwriters Laboratories:

1. UL 752 Specifications and Ammunition, 11th Edition, Standard for Bullet Resisting Equipment published September 9, 2005, revised December 21, 2006, Level 3

F. The United States Department of State: 1. The International Traffic in Arms Regulations (ITAR)

1.3 SUBMITTALS

A. Submittals for Review: Submit for approval prior to fabrication. 1. Product Data: Include specifications, brochures, and samples.

B. Certificates: Submit printed data to indicate compliance with following requirements. 1. UL LISTING Verification and UL752 Current Test Results as provided by Underwriters

Laboratories. 2. ASTM E119-98 One-Hour Fire Rating of Building Construction and Materials.

3. ASTM F1233-98 Standard Test Method for Forced Entry Testing of Materials/Assemblies. 4. Manufacturer’s third party certificate of registration with ISO 9001:2008. 5. Manufacturer’s U.S. Dept. of State ITAR Statement of Registration. 6. Manufacturer’s SBA Profile verifying small business status by the SBA.

1.4 DELIVERY, HANDLING, AND STORAGE A. Deliver materials to project with manufacturer’s UL LISTED Labels intact and legible. B. Handle material with care to prevent damage. Store materials inside under cover, stack flat and

off the floor.

1.5 WARRANTY A. Warrant all materials and workmanship against defects for a period of ten (10) years from the

date of Substantial Completion.

PART 2 – PRODUCTS

2.1 MANUFACTURER

Page 23: CRAWFORD COUNTY COURTHOUSE Addendum No. 2 Judicial … · substitution for the basis-of-design product Norton 6000 series, subject to full compliance with the contract documents

Crawford County Courthouse Judicial Center

WMF 2014.023.00 September 2015

BULLET RESISTANT PANELS 102641 - 2

A. Design Basis: ArmorCore by Waco Composites, (Waco, TX 76710, phone: 254-752-3622, toll free: 866-688-3088, email: [email protected], web: www.armorcore.com)

2.2 PERFORMANCE CRITERIA

A. Bullet Resistant Fiberglass Panels shall be “non ricochet type” to permit the encapture and retention of an attacking projectile lessening the potential of a random injury or lateral penetration.

B. Panel Rating: UL752 Level 3. C. Bullet resistance of joints: equal to that of the panel.

2.3 MATERIALS

A. Panels fabricated of multiple layers of woven roving ballistic grade fiberglass cloth impregnated with a thermoset polyester resin and compressed into flat rigid sheets.

B. Thickness: 7/16” nominal thickness C. Nominal Weight: 4.8 lbs. per sq. ft. E. Panels manufactured in the United States of America with raw materials sourced from the

U.S.A. for quality assurance purposes and to comply with any applicable “Buy American” provisions.

PART 3 - EXECUTION 3.1 EXAMINATION

A. Prior to starting installation, verify work of related trades required in contract documents and architectural drawings is complete to the point where work of this Section may properly commence.

3.2 JOINTS

A. Reinforce joints with a back-up layer of bullet resistive material. Minimum width of reinforcing layer at joint shall be 4-inches, centered on panel joints.

3.3 APPLICATION

A. Install armor in accordance with manufacturer’s printed recommendations and as required by contract documents.

B. Secure armor panels using screws, bolts, or an industrial adhesive. 1. Method of application shall install panels minimizing vulnerabilities by fitting tightly to

adjacent surfaces including concrete floor slab, concrete roof slab, bullet resistive door frames, bullet resistive window frames, and the like.

END OF SECTION 10 26 41