coumcc01

6
MISSION 2000 DATE : 11/03/22 CONTROLLING XYZ LIMITED Title: Organisation/ Area : BUSINESS PROCESS PROCEDURE Creation of a cost center. Cost center. File name: Coumcc01.doc Solution/Release : R/3 4. 6B Responsibilit y: Trigger : To Create a new Cost Center. Business Process Description Overview Creation of a Cost Center : Cost Center is a cost collecting object. If you want to collect a particular type of costs which will cover many Cost Elements, and identifiable and want to analyse the expense at that level, you can create a Cost Center in that name. Input-Required Fields Field Value /Comments Cost center : Valid From : Valid To : Copy from : Controlling area : Name : Description : Cost center manager : Hierarchy Area : Business Area : Currency : Unique code to identify the Cost center. Date from which you want to create this cost center. Date to which you want to keep this cost center valid. Sample cost center . Name of Controlling area to which the sample cost center belongs. Name of the Cost center. Description of the Cost center. Name of Cost center manager. Last level of Standard Hierarchy to which you want to attach this cost center. Name of Business area to which this cost center belongs. Cost center currency. Output – Results Comments You will get the message- Cost center with “Code” created. Please read the name of the message. If your entry is incomplete, that will be shown as “message.”

Upload: amitsap7

Post on 25-Jun-2015

59 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coumcc01

MISSION 2000 DATE : 04/13/23

CONTROLLING

XYZ LIMITED Title: Organisation/Area :

BUSINESS PROCESS PROCEDURECreation of a cost center.Cost center.

File name: Coumcc01.doc Solution/Release : R/3 4. 6BResponsibility:

Trigger : To Create a new Cost Center.

Business Process Description OverviewCreation of a Cost Center : Cost Center is a cost collecting object. If you want to collect a particular type of costs which will cover many Cost Elements, and identifiable and want to analyse the expense at that level, you can create a Cost Center in that name.

Input-Required Fields Field Value /CommentsCost center :Valid From : Valid To :Copy from :Controlling area :Name :Description : Cost center manager : Hierarchy Area :

Business Area :Currency :

Unique code to identify the Cost center.Date from which you want to create this cost center.Date to which you want to keep this cost center valid. Sample cost center .Name of Controlling area to which the sample cost center belongs.Name of the Cost center.Description of the Cost center.Name of Cost center manager.Last level of Standard Hierarchy to which you want to attach this cost center.Name of Business area to which this cost center belongs.Cost center currency.

Output – Results CommentsYou will get the message- Cost center with “Code” created.

Please read the name of the message. If your entry is incomplete, that will be shown as “message.”

Tips and Tricks:

Cost center code should be unique throughout the Controlling area.Business area should be attached to each Cost center.

Last change on:

02.07.01Last change by:

ViswanathVersion Page 1 of 2

Page 2: Coumcc01

MISSION 2000 DATE : 04/13/23

CONTROLLING

XYZ LIMITED Title: Organisation/Area :

BUSINESS PROCESS PROCEDURECreation of a cost center.Cost center.

File name: Coumcc01.doc Solution/Release : R/3 4.6BResponsibility:

PROCEDURAL STEPS

1.1 Access transaction by :

Via Menus Accounting Controlling Cost CentersMaster DataCost CenterIndividual processingCreate

Via Transaction Code KS01

1.2 On the “Create Cost center : Initial Screen “, enter information in the fields as specified in the below table :

Field Name Description R/O/C User Action and Values Comments Cost centerFrom date

To date

Copy from

Controlling area

Code Date

Date

Code

R R R

O

R

Enter the Cost center code. Enter the date from which you want to create Cost center.Enter the date upto which you want to Cost center to be valid.If this cost center is similar to one that already exists,then you can give the name of that cost center so that entries in all fields of that cost center will be copied. In the next screen, you can change any fields by overwriting . Enter the Controlling area of the sample Cost Center. Enter “PIL” if the sample cost center belongs to XYZ Limited or “GTN” if the sample cost center belongs to GTN Textiles Ltd.

1.3 Press Enter , F5 or Basic Screen to advance to the next screen.

1.4. On the “Create Cost center : Basic Screen “, enter information in the fields as specified in the below table :

Field Name Description R/O/C User Action and Values CommentsName :Description : Person respon.. :

Cctr Category:Hierarchy Area :

Business Area :

Currency :

R R

R R R

R

Enter the name of the cost center. (Short name)Enter the description (long name)Enter the name of the Person responsible for this Cost center.Select the category from the pull down menu.Enter the node of the Standard Hierarchy to which you want this cost center to be attached.Enter the name of the business area to which this cost center belongs.Enter the currency of the Cost Center - INR.

1.6 Save the document by pressing F11 or enter Save.

Last change on:02.07.01

Last change by:Viswanath

Version Page 2 of 2

Page 3: Coumcc01

MISSION 2000 DATE : 04/13/23

CONTROLLING

XYZ LIMITED Title: Organisation/Area :

BUSINESS PROCESS PROCEDUREChanging a cost center.Cost center.

File name: Coumcc01.doc Solution/Release : R/3 4.6 BResponsibility:

Trigger : To Change any fields in a Cost Center.

Business Process Description OverviewChanging a Cost Center : If you want to change a particular field in a cost center , it can be done by using this function. You can change only the following fields.

Input-Required Fields Field Value /Comments

Name :Description : Person responsible : Hierarchy Area :

Name of the Cost center.Description of the Cost center.Name of person in charge of the cost center.Last level of Standard Hierarchy to which you want to attach this cost center.

Output – Results CommentsYou will get the message- Cost center has been changed.

Please read the name of the message. If your entry is incomplete, that will be shown as “message.”

Tips and Tricks:

You cannot delete a cost center once data gets recorded even after reposting all costs and making it empty.This is because reposting will be appearing as a credit entry only.

Last change on:

02.07.01Last change by:

ViswanathVersion Page 1 of 2

Page 4: Coumcc01

MISSION 2000 DATE : 04/13/23

CONTROLLING

XYZ LIMITED Title: Organisation/Area :

BUSINESS PROCESS PROCEDUREChanging a cost center.Cost center.

File name: Coumcc01.doc Solution/Release : R/3 4.6 BResponsibility:

PROCEDURAL STEPS

1.1 Access transaction by :

Via Menus Accounting Controlling Cost CentersMaster DataCost CenterIndividual processing Change

Via Transaction Code KS02

1.2. On the “Change Cost center : Initial Screen “, enter information in the fields as specified in the below table :

Field Name Description R/O/C User Action and Values CommentsCost center Code R Enter the cost center you want to change

1.3. Press Enter , F5 or Basic Screen to advance to the next screen.

1.4 . On the “Change Cost center : Basic Screen “, enter information in the fields as specified in the below table.

Field Name Description R/O/C User Action and Values Comments NameDescription

Person respon..:

Cctr CategoryHierarchy Area :

R R R

R R

Change the name of the Cost center if requiredChange the description of the cost center

Enter the name of the Person responsible for this Cost center.Select the category from the pull down menu.Enter the Standard Hierarchy node under which you want this cost center to be attached.

1.5. Save the document by pressing F11 or enter Save.

Last change on:02.07.01

Last change by:Viswanath

Version Page 2 of 2