    Week

    Cost Driver:

    Machine-Hours

    Indirect

    Manufacturing

    Labor Costs XX Y-Y (X-X)2 (y-y)2(X) (Y)

    1 68.00 1190.00 -3.83 148.25 14.69 21978.06252 88.00 1211.00 16.17 169.25 261.36 28645.5625

    3 62.00 1004.00 -9.83 -37.75 96.69 1425.06254 72.00 917.00 0.17 -124.75 0.03 15562.56255 60.00 770.00 -11.83 -271.75 140.03 73848.06256 96.00 1456.00 24.17 414.25 584.03 171603.06257 78.00 1180.00 6.17 138.25 38.03 19113.06258 46.00 710.00 -25.83 -331.75 667.36 110058.06259 82.00 1316.00 10.17 274.25 103.36 75213.062510 94.00 1032.00 22.17 -9.75 491.36 95.0625

    11 68.00 752.00 -3.83 -289.75 14.69 83955.062512 48.00 963.00 -23.83 -78.75 568.03 6201.5625

    Total 862.00 12501.00 0.00 0.00 2979.67 607698.25

    71.83 1041.75 1810738219

    Intercept 300.9762837 b=((x-x)(y-y))/(X-X)2Slope 10.31239512Rsquare 0.521433328 b 10.31239512

  • 8/12/2019 costacctg13_keyxl_ch10

    2/36

    (X-X)(Y-Y)

    -568.29166672736.208333

    371.2083333-20.791666673215.70833310011.04167852.54166678570.2083332788.208333

    -216.125

    1110.7083331876.875

    30727.50

    1.69696E-05

  • 8/12/2019 costacctg13_keyxl_ch10

    3/36

    Week

    Original

    Cost Driver:

    Machine-Hours

    Alternate Cost Driver:

    Direct Manufacturing

    Labor-Hours

    (X)

    Indirect

    Manufacturing

    Labor Costs

    (Y)

    1 68 30 $ 1,1902 88 35 1,211

    3 62 36 1,0044 72 20 9175 60 47 7706 96 45 1,4567 78 44 1,1808 46 38 7109 82 70 1,31610 94 30 1,032

    11 68 29 75212 48 38 963

    Total 862 462 $12,501

  • 8/12/2019 costacctg13_keyxl_ch10

    4/36

    Cumulative Average-Time Learning Model for Rayburn Corporation

    80% Learning Curve

    Cumulative Cumulative Cumulative Individual UnitsNumber Average Time Total Time: Time for Xth

    of Units (X) per Unit (y )*: Labor Hours Labor-Hours Unit: Labor Hours

    100.002 80.00 =(100 0.8) 160.00 60.003 70.21 210.63 50.634 64.00 =(80 0.8) 256.00 45.37

    5 59.56 297.82 41.826 56.17 337.01 39.197 53.45 374.14 37.138 51.20 =(64 0.8) 409.60 35.46

    9 49.29 443.65 34.0510 47.65 476.51 32.8611 46.21 508.32 31.8112 44.93 539.22 30.8913 43.79 569.29 30.0714 42.76 598.63 29.34

    15 41.82 627.30 28.6716 40.96 =(51.2 0.8) 655.36 28.06

    1 100.00 100.00

    D = Col A x Col B

    *The mathematical re

    learning model is:

    wherey= Cumulative

    X= Cumulative

    a= Time (labob= Factor used

    produce u

    The value of bis calc

    For an 80% learning cwhenX= 3, a= 100,

    Numbers in table may

    ln (learning

    y = 100 x 3-0.

  • 8/12/2019 costacctg13_keyxl_ch10

    5/36

    E13 = D13 D12

    = 210.63 160.00

    lationship underlying the cumulative average-time

    average time (labor-hours) per unit

    number of units producedr-hours) required to produce the first unit

    to calculate cumulative average time to its

    lated as

    urve, b= ln 0.8/ln 2 = -0.2231/0.6931 = -0.3219

    = -0.3219,

    not be exact because of rounding.

    -curve % in decimal form

    y=aXb

    .3219= 70.21 labor hours

  • 8/12/2019 costacctg13_keyxl_ch10

    6/36

    Learning curve 80% For an 80% learning curve, y = 100 X^-0.3219

  • 8/12/2019 costacctg13_keyxl_ch10

    7/36

    Incremental Unit-Time Learning Model for Rayburn Corporation

    80% Learning Curve

    Cumulative Individual Unit Time Cumulative CumulativeNumber for Xth Unit (y )* Total Time: Average Time

    of Units (X) Labor Hours Labor-Hours per Unit:Labor-Hours

    100.002 80.00 =(100 0.8) 180.00 90.003 70.21 250.21 83.40

    4 64.00 =(80 0.8) 314.21 78.555 59.56 373.77 74.756 56.17 429.94 71.667 53.45 483.39 69.06

    8 51.20 =(64 0.8) 534.59 66.829 49.29 583.89 64.8810 47.65 631.54 63.1511 46.21 677.75 61.6112 44.93 722.68 60.2213 43.79 766.47 58.96

    14 42.76 809.23 57.8015 41.82 851.05 56.7416 40.96 =(51.2 0.8) 892.01 55.75

    E = Col D Col A

    1 100.00 100.00

    *The mathematicallearning model is:

    wherey= Time (lab

    X= Cumulati

    a= Time (lab b= Factor us

    =For an 80% learningWhereX= 3, a= 10

    The cumulative tota

    Numbers in table m

    ln (lear

    y = 100 x 3-0.

  • 8/12/2019 costacctg13_keyxl_ch10

    8/36

    D14 = D13 + B14= 180.00 + 70.21

    elationship underlying the incremental unit-time

    or-hours) taken to produce the last single unit e number of units produced

    or-hours) required to produce the first unit ed to calculate incremental unit time to produce units

    curve, b= ln 0.8 ln 2 = -0.2231 0.6931 = -0.32190, b= -0.3219,

    l time whenX= 3 is 100+80+70.21=250.21 labor-hours.

    y not be exact because of rounding.

    ning-curve % in decimal form

    y=aXb

    .3219= 70.21 labor hours

  • 8/12/2019 costacctg13_keyxl_ch10

    9/36

    Learning curve 80% For an 80% learning curve, y = 100 X^-0.3219

  • 8/12/2019 costacctg13_keyxl_ch10

    10/36

    0

    20

    40

    60

    80

    100

    120

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    CumulativeAverageTimepe

    rUnit

    (Labor-Hours)(Y)

    Cumulative Number of Units(X)

    Panel A: Cumulative Average Time per Unit (80%Learning Curve; First Unit Takes 100 Labor-Hours)

    Incremental Unit-TimeLearning Model

    Cumulative Average-TimeLearning Model

    0100200300400500600700800

    9001,000

    1 2

    CumulativeTotalLabor-Hours(Y)

    Panel B:Lea

    IncLe

  • 8/12/2019 costacctg13_keyxl_ch10

    11/36

    3 4 5 6 7 8 9 10 11 12 13 14 15 16

    Cumulative Number of Units(X)

    Cumulative Total Labor-Hours (80%rning Curve; First Unit Takes 100 Labor-Hours)

    remental Unit-Timerning Model

    Cumulative Average-TimeLearning Model

  • 8/12/2019 costacctg13_keyxl_ch10

    12/36

    Cumulative Average-Time Learning Model for Rayburn Corporation

    80% Learning Curve

    Cumulative Cumulative Cumulative Individual UnitsNumber Average Time Total Time: Time for Xth

    of Units (X) per Unit (y )*: Labor Hours Labor-Hours Unit: Labor Hours

    1 100.00 100.00 100.002 80.00 =(100 0.8) 160.00 60.003 70.21 210.63 50.634 64.00 =(80 0.8) 256.00 45.375 59.56 297.82 41.82

    6 56.17 337.01 39.197 53.45 374.14 37.138 51.20 =(64 0.8) 409.60 35.469 49.29 443.65 34.05

    10 47.65 476.51 32.8611 46.21 508.32 31.8112 44.93 539.22 30.8913 43.79 569.29 30.0714 42.76 598.63 29.3415 41.82 627.30 28.67

    16 40.96 =(51.2 0.8) 655.36 28.06

    D = Col A x Col B

    The mathematical rela

    learning model is:

    wherey= CumulativeX= Cumulative numb

    a= Time (labor-hours

    b= Factor used to calcproduce units

    The value of bis calcu

    For an 80% learning cwhenX= 3, a= 100,,

    Numbers in table ma.

    ln (learning

    y = 100 x 3-0.

  • 8/12/2019 costacctg13_keyxl_ch10

    13/36

    E13 = D13 D12

    = 256.00 210.63

    * tionship underlying the cumulative average-time

    average time (labor-hours) per unit

    er of units produced

    ) required to produce the first unitulate cumulative average time to

    lated as

    urve, b= ln 0.8/ln 2 = -0.2231/0.6931 = -0.3219b= -0.3219

    not be exact because of rounding

    -curve % in decimal form

    y=aXb

    .3219= 70.21 labor hours

  • 8/12/2019 costacctg13_keyxl_ch10

    14/36

    Incremental Unit-Time Learning Model for Rayburn Corporation

    80% Learning Curve

    Cumulative Individual Unit Time Cumulative CumulativeNumber for Xth Unit (y )* Total Time: Average Time

    of Units (X) Labor Hours Labor-Hours per Unit:Labor-Hours

    1 100.00 100.00 100.002 80.00 =(100 0.8) 180.00 90.003 70.21 250.21 83.404 64.00 =(80 0.8) 314.21 78.55

    5 59.56 373.77 74.756 56.17 429.94 71.667 53.45 483.39 69.068 51.20 =(64 0.8) 534.59 66.82

    9 49.29 583.89 64.8810 47.65 631.54 63.1511 46.21 677.75 61.6112 44.93 722.68 60.2213 43.79 766.47 58.9614 42.76 809.23 57.80

    15 41.82 851.05 56.7416 40.96 =(51.2 0.8) 892.01 55.75

    E = Col D Col A

    The mathematical relearning model is:

    wherey= Time (lab

    X= Cumulative nua= Time (labor-hou

    b= Factor used to c=

    For an 80% learningWhereX= 3, a= 1,

    The cumulative tot.

    Numbers in table m.

    ln (lear

    y = 100 x 3-0.

  • 8/12/2019 costacctg13_keyxl_ch10

    15/36

    D14 = D13 + B14= 180.00 + 70.21

    * lationship underlying the incremental unit-time

    or-hours) taken to produce the last single unit

    ber of units produced

    rs) required to produce the first unit

    lculate incremental unit time to produce units

    curve, b= ln 0.8 ln 2 = -0.2231 0.6931 = -0.3219

    0, b= -0.3219

    l time whenX= 3 is 100+80+70.21=250.21 labor-hours

    ay not be exact because of rounding

    ning-curve % in decimal form

    y=aXb

    .3219= 70.21 labor hours

  • 8/12/2019 costacctg13_keyxl_ch10

    16/36

    CumulativeCumulative Average Time Cumulative Cumulative Costs Additions toNumber of per Unit: Total Time: at $50 per Cumulative

    Units Labor-Hoursa Labor-Hoursa Labor-Hour Costs

    1 100.00 100.00 5,000$ (100.00 $50) $ 5,0002 80.00 160.00 8,000 (160.00 $50) 3,000

    4 64.00 256.00 12,800 (256.00 $50) 4,8008 51.20 409.60 20,480 (409.60 $50) 7,680

    16 40.96 655.36 32,768 (655.36 $50) 12,288

    aBased on the cumulative average-time learning model. See Exhibit 10-10 for the computations

    of these amounts.

  • 8/12/2019 costacctg13_keyxl_ch10

    17/36

    Cumulative costs (per labor hour) 50$

  • 8/12/2019 costacctg13_keyxl_ch10

    18/36

    Labor-Intensive Assembl MethodDirect material cost per helicopter $40,000Direct-assembly labor time for first helicopter 2,000 labor-hoursLearning curve for assembly labor time per helicopter 85% cumulative average time*Direct-assembly labor cost $ 30 per hourEquipment-related indirect manufacturing cost $ 12 per direct-assembly labor-hourMaterial-handling-related indirect manufacturing cost 50% of direct material cost

    *Using the formula (p. 356), for an 85% learning curve, b =

    **Using the formula (p. 357), for a 90% learning curve, b =

    ln 0.85ln 2

    -0.1625190.693147

    = = -0.234465

    ln 0.90ln 2

    -0.1053610.693147

    = = -0.152004

  • 8/12/2019 costacctg13_keyxl_ch10

    19/36

  • 8/12/2019 costacctg13_keyxl_ch10

    20/36

    Cumulative Cumulative IndividualNumber Total Time: time for of Units Labor-Hours Xth unit:

    Labor-HoursCol J = Col G Col H

    1 2,000 2,000 2,000

    2 1,700 (2,000 0.85) 3,400 1,4003 1,546 4,637 1,2374 1,445 (1,700 0.85) 5,780 1,1435 1,371 6,857 1,0776 1,314 7,884 1,0277 1,267 8,871 9878 1,228.25 (1,445 0.85) 9,826 955

    CumulativeAverage Timeper Unit (y):Labor Hours

  • 8/12/2019 costacctg13_keyxl_ch10

    21/36

    Direct-assembly labor time for first helicopter 2,000 labor-hoursLearning curve for assembly labor time per helicopter 85% cumulative average time

  • 8/12/2019 costacctg13_keyxl_ch10

    22/36

    For an 85% learning curve, y = 2,000 X -0.2345

  • 8/12/2019 costacctg13_keyxl_ch10

    23/36

    Cumulative Cumulative CumulativeNumber Total Time: Average Timeof Units Labor-Hours Per Unit:

    Labor-HoursCol K = Col J Col G

    1 800 800 800

    2 720 (800 0.9) 1,520 7603 677 2,197 7324 648 (720 0.9) 2,845 7115 626 3,471 6946 609 4,081 6807 595 4,676 6688 583 (648 0.9) 5,259 657

    IndividualUnit Time

    for Xth Unit (y):Labor Hours

  • 8/12/2019 costacctg13_keyxl_ch10

    24/36

    Direct-assembly labor time for first helicopter 800 labor-hours For an 9Learning curve for assembly labor time per helicopter 90% cumulative average time

  • 8/12/2019 costacctg13_keyxl_ch10

    25/36

    0% learning curve, y = 800 X^ -0.1520

  • 8/12/2019 costacctg13_keyxl_ch10

    26/36

    Labor-IntensiveAssembly Method

    (using data from part 1a)Direct materials: 8 helicopters $40,000; $36,000 per helicopter $320,000Direct-assembly labor:

    9,826 hrs.; 5,258 hrs. $30/hr. 294,780Indirect manufacturing costs Equipment related 9,826 hrs. $12/hr.; 5,258 hrs. $45/hr. 117,912

    Materials-handling related 0.50 $320,000; $288,000 160,000Total assembly costs $892,692

  • 8/12/2019 costacctg13_keyxl_ch10

    27/36

    Machine-IntensiveAssembly Method

    (using data from part 1b)

    $288,000

    157,740

    236,610

    144,000$826,350

  • 8/12/2019 costacctg13_keyxl_ch10

    28/36

    Labor-Intensive Assembly Method MachiDirect material cost per helicopter $40,000 $36,000Direct-assembly labor time for first helicopter 2,000 labor-hours 800

    Learning curve for assembly labor time per helicopter 85% cumulative average time 90%Direct-assembly labor cost $ 30 per hour $ 30Equipment-related indirect manufacturing cost $ 12 per direct-assembly labor-hour $ 45

    Material-handling-related indirect manufacturing cost 50% of direct material cost 50%Cumulative total time: labor-hours 9,826 hours 5,258Number of helicopters 8

  • 8/12/2019 costacctg13_keyxl_ch10

    29/36

    e-Intensive Assembly Method

    labor-hours

    incremental unit timeper hourper direct-assembly labor-hour

    of direct material costhours

  • 8/12/2019 costacctg13_keyxl_ch10

    30/36

    Coefficients Standard Error t Stat

    (1) (2) (3) = (1) (2)Intercept $300.98 $229.75 1.31Independent Variable:Machine-Hours (X) $ 10.31 $ 3.12 3.30

    R Square 0.52Durbin-Watson Statistic 2.05

    Regression Statistics

  • 8/12/2019 costacctg13_keyxl_ch10

    31/36

    = Coefficient/Standard Error= B3/C3= 300.98/229.75

  • 8/12/2019 costacctg13_keyxl_ch10

    32/36

    Coefficients Standard Error t Stat

    (1) (2) (3) = (1) (2)Intercept $744.67 $217.61 3.42n epen ent ar a e:Direct ManufacturingLabor-Hours (X) $ 7.72 $ 5.40 1.43

    R Square 0.17Durbin-Watson Statistic 2.26

    Regression Statistics

    = Coefficient= B4/C4= 7.72/5.40

  • 8/12/2019 costacctg13_keyxl_ch10

    33/36

    Standard Error

  • 8/12/2019 costacctg13_keyxl_ch10

    34/36

    Week

    Machine-

    Hours

    (X1 )

    um er o

    Production

    Batches

    (X2 )

    Direct

    Manufacturing

    Labor-Hours

    n rec

    Manufacturing

    Labor Costs

    (Y)

    1 68 12 30 $ 1,1902 88 15 35 1,211

    3 62 13 36 1,0044 72 11 20 917

    5 60 10 47 7706 96 12 45 1,4567 78 17 44 1,1808 46 7 38 7109 82 14 70 1,316

    10 94 12 30 1,03211 68 7 29 75212 48 14 38 963

    Total 862 144 462 $12,501

  • 8/12/2019 costacctg13_keyxl_ch10

    35/36

    Coefficients Standard Error t Stat(1) (2) (3) = (1) (2)

    Intercept $42.58 $213.91 0.20Independent variable 1: Machine-Hours (X1 ) $ 7.60 $ 2.77 2.74Independent variable 2: Number of

    production batches (X2 ) $37.77 $ 15.25 2.48

    R Square 0.72Durbin-Watson Statistic 2.49

    Regression Statistics

  • 8/12/2019 costacctg13_keyxl_ch10

    36/36

    = Coefficient/Standard Error= B4/C4= 7.60/2.77