costacctg13_keyxl_ch10
TRANSCRIPT
-
8/12/2019 costacctg13_keyxl_ch10
1/36
Week
Cost Driver:
Machine-Hours
Indirect
Manufacturing
Labor Costs XX Y-Y (X-X)2 (y-y)2(X) (Y)
1 68.00 1190.00 -3.83 148.25 14.69 21978.06252 88.00 1211.00 16.17 169.25 261.36 28645.5625
3 62.00 1004.00 -9.83 -37.75 96.69 1425.06254 72.00 917.00 0.17 -124.75 0.03 15562.56255 60.00 770.00 -11.83 -271.75 140.03 73848.06256 96.00 1456.00 24.17 414.25 584.03 171603.06257 78.00 1180.00 6.17 138.25 38.03 19113.06258 46.00 710.00 -25.83 -331.75 667.36 110058.06259 82.00 1316.00 10.17 274.25 103.36 75213.062510 94.00 1032.00 22.17 -9.75 491.36 95.0625
11 68.00 752.00 -3.83 -289.75 14.69 83955.062512 48.00 963.00 -23.83 -78.75 568.03 6201.5625
Total 862.00 12501.00 0.00 0.00 2979.67 607698.25
71.83 1041.75 1810738219
Intercept 300.9762837 b=((x-x)(y-y))/(X-X)2Slope 10.31239512Rsquare 0.521433328 b 10.31239512
-
8/12/2019 costacctg13_keyxl_ch10
2/36
(X-X)(Y-Y)
-568.29166672736.208333
371.2083333-20.791666673215.70833310011.04167852.54166678570.2083332788.208333
-216.125
1110.7083331876.875
30727.50
1.69696E-05
-
8/12/2019 costacctg13_keyxl_ch10
3/36
Week
Original
Cost Driver:
Machine-Hours
Alternate Cost Driver:
Direct Manufacturing
Labor-Hours
(X)
Indirect
Manufacturing
Labor Costs
(Y)
1 68 30 $ 1,1902 88 35 1,211
3 62 36 1,0044 72 20 9175 60 47 7706 96 45 1,4567 78 44 1,1808 46 38 7109 82 70 1,31610 94 30 1,032
11 68 29 75212 48 38 963
Total 862 462 $12,501
-
8/12/2019 costacctg13_keyxl_ch10
4/36
Cumulative Average-Time Learning Model for Rayburn Corporation
80% Learning Curve
Cumulative Cumulative Cumulative Individual UnitsNumber Average Time Total Time: Time for Xth
of Units (X) per Unit (y )*: Labor Hours Labor-Hours Unit: Labor Hours
100.002 80.00 =(100 0.8) 160.00 60.003 70.21 210.63 50.634 64.00 =(80 0.8) 256.00 45.37
5 59.56 297.82 41.826 56.17 337.01 39.197 53.45 374.14 37.138 51.20 =(64 0.8) 409.60 35.46
9 49.29 443.65 34.0510 47.65 476.51 32.8611 46.21 508.32 31.8112 44.93 539.22 30.8913 43.79 569.29 30.0714 42.76 598.63 29.34
15 41.82 627.30 28.6716 40.96 =(51.2 0.8) 655.36 28.06
1 100.00 100.00
D = Col A x Col B
*The mathematical re
learning model is:
wherey= Cumulative
X= Cumulative
a= Time (labob= Factor used
produce u
The value of bis calc
For an 80% learning cwhenX= 3, a= 100,
Numbers in table may
ln (learning
y = 100 x 3-0.
-
8/12/2019 costacctg13_keyxl_ch10
5/36
E13 = D13 D12
= 210.63 160.00
lationship underlying the cumulative average-time
average time (labor-hours) per unit
number of units producedr-hours) required to produce the first unit
to calculate cumulative average time to its
lated as
urve, b= ln 0.8/ln 2 = -0.2231/0.6931 = -0.3219
= -0.3219,
not be exact because of rounding.
-curve % in decimal form
y=aXb
.3219= 70.21 labor hours
-
8/12/2019 costacctg13_keyxl_ch10
6/36
Learning curve 80% For an 80% learning curve, y = 100 X^-0.3219
-
8/12/2019 costacctg13_keyxl_ch10
7/36
Incremental Unit-Time Learning Model for Rayburn Corporation
80% Learning Curve
Cumulative Individual Unit Time Cumulative CumulativeNumber for Xth Unit (y )* Total Time: Average Time
of Units (X) Labor Hours Labor-Hours per Unit:Labor-Hours
100.002 80.00 =(100 0.8) 180.00 90.003 70.21 250.21 83.40
4 64.00 =(80 0.8) 314.21 78.555 59.56 373.77 74.756 56.17 429.94 71.667 53.45 483.39 69.06
8 51.20 =(64 0.8) 534.59 66.829 49.29 583.89 64.8810 47.65 631.54 63.1511 46.21 677.75 61.6112 44.93 722.68 60.2213 43.79 766.47 58.96
14 42.76 809.23 57.8015 41.82 851.05 56.7416 40.96 =(51.2 0.8) 892.01 55.75
E = Col D Col A
1 100.00 100.00
*The mathematicallearning model is:
wherey= Time (lab
X= Cumulati
a= Time (lab b= Factor us
=For an 80% learningWhereX= 3, a= 10
The cumulative tota
Numbers in table m
ln (lear
y = 100 x 3-0.
-
8/12/2019 costacctg13_keyxl_ch10
8/36
D14 = D13 + B14= 180.00 + 70.21
elationship underlying the incremental unit-time
or-hours) taken to produce the last single unit e number of units produced
or-hours) required to produce the first unit ed to calculate incremental unit time to produce units
curve, b= ln 0.8 ln 2 = -0.2231 0.6931 = -0.32190, b= -0.3219,
l time whenX= 3 is 100+80+70.21=250.21 labor-hours.
y not be exact because of rounding.
ning-curve % in decimal form
y=aXb
.3219= 70.21 labor hours
-
8/12/2019 costacctg13_keyxl_ch10
9/36
Learning curve 80% For an 80% learning curve, y = 100 X^-0.3219
-
8/12/2019 costacctg13_keyxl_ch10
10/36
0
20
40
60
80
100
120
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CumulativeAverageTimepe
rUnit
(Labor-Hours)(Y)
Cumulative Number of Units(X)
Panel A: Cumulative Average Time per Unit (80%Learning Curve; First Unit Takes 100 Labor-Hours)
Incremental Unit-TimeLearning Model
Cumulative Average-TimeLearning Model
0100200300400500600700800
9001,000
1 2
CumulativeTotalLabor-Hours(Y)
Panel B:Lea
IncLe
-
8/12/2019 costacctg13_keyxl_ch10
11/36
3 4 5 6 7 8 9 10 11 12 13 14 15 16
Cumulative Number of Units(X)
Cumulative Total Labor-Hours (80%rning Curve; First Unit Takes 100 Labor-Hours)
remental Unit-Timerning Model
Cumulative Average-TimeLearning Model
-
8/12/2019 costacctg13_keyxl_ch10
12/36
Cumulative Average-Time Learning Model for Rayburn Corporation
80% Learning Curve
Cumulative Cumulative Cumulative Individual UnitsNumber Average Time Total Time: Time for Xth
of Units (X) per Unit (y )*: Labor Hours Labor-Hours Unit: Labor Hours
1 100.00 100.00 100.002 80.00 =(100 0.8) 160.00 60.003 70.21 210.63 50.634 64.00 =(80 0.8) 256.00 45.375 59.56 297.82 41.82
6 56.17 337.01 39.197 53.45 374.14 37.138 51.20 =(64 0.8) 409.60 35.469 49.29 443.65 34.05
10 47.65 476.51 32.8611 46.21 508.32 31.8112 44.93 539.22 30.8913 43.79 569.29 30.0714 42.76 598.63 29.3415 41.82 627.30 28.67
16 40.96 =(51.2 0.8) 655.36 28.06
D = Col A x Col B
The mathematical rela
learning model is:
wherey= CumulativeX= Cumulative numb
a= Time (labor-hours
b= Factor used to calcproduce units
The value of bis calcu
For an 80% learning cwhenX= 3, a= 100,,
Numbers in table ma.
ln (learning
y = 100 x 3-0.
-
8/12/2019 costacctg13_keyxl_ch10
13/36
E13 = D13 D12
= 256.00 210.63
* tionship underlying the cumulative average-time
average time (labor-hours) per unit
er of units produced
) required to produce the first unitulate cumulative average time to
lated as
urve, b= ln 0.8/ln 2 = -0.2231/0.6931 = -0.3219b= -0.3219
not be exact because of rounding
-curve % in decimal form
y=aXb
.3219= 70.21 labor hours
-
8/12/2019 costacctg13_keyxl_ch10
14/36
Incremental Unit-Time Learning Model for Rayburn Corporation
80% Learning Curve
Cumulative Individual Unit Time Cumulative CumulativeNumber for Xth Unit (y )* Total Time: Average Time
of Units (X) Labor Hours Labor-Hours per Unit:Labor-Hours
1 100.00 100.00 100.002 80.00 =(100 0.8) 180.00 90.003 70.21 250.21 83.404 64.00 =(80 0.8) 314.21 78.55
5 59.56 373.77 74.756 56.17 429.94 71.667 53.45 483.39 69.068 51.20 =(64 0.8) 534.59 66.82
9 49.29 583.89 64.8810 47.65 631.54 63.1511 46.21 677.75 61.6112 44.93 722.68 60.2213 43.79 766.47 58.9614 42.76 809.23 57.80
15 41.82 851.05 56.7416 40.96 =(51.2 0.8) 892.01 55.75
E = Col D Col A
The mathematical relearning model is:
wherey= Time (lab
X= Cumulative nua= Time (labor-hou
b= Factor used to c=
For an 80% learningWhereX= 3, a= 1,
The cumulative tot.
Numbers in table m.
ln (lear
y = 100 x 3-0.
-
8/12/2019 costacctg13_keyxl_ch10
15/36
D14 = D13 + B14= 180.00 + 70.21
* lationship underlying the incremental unit-time
or-hours) taken to produce the last single unit
ber of units produced
rs) required to produce the first unit
lculate incremental unit time to produce units
curve, b= ln 0.8 ln 2 = -0.2231 0.6931 = -0.3219
0, b= -0.3219
l time whenX= 3 is 100+80+70.21=250.21 labor-hours
ay not be exact because of rounding
ning-curve % in decimal form
y=aXb
.3219= 70.21 labor hours
-
8/12/2019 costacctg13_keyxl_ch10
16/36
CumulativeCumulative Average Time Cumulative Cumulative Costs Additions toNumber of per Unit: Total Time: at $50 per Cumulative
Units Labor-Hoursa Labor-Hoursa Labor-Hour Costs
1 100.00 100.00 5,000$ (100.00 $50) $ 5,0002 80.00 160.00 8,000 (160.00 $50) 3,000
4 64.00 256.00 12,800 (256.00 $50) 4,8008 51.20 409.60 20,480 (409.60 $50) 7,680
16 40.96 655.36 32,768 (655.36 $50) 12,288
aBased on the cumulative average-time learning model. See Exhibit 10-10 for the computations
of these amounts.
-
8/12/2019 costacctg13_keyxl_ch10
17/36
Cumulative costs (per labor hour) 50$
-
8/12/2019 costacctg13_keyxl_ch10
18/36
Labor-Intensive Assembl MethodDirect material cost per helicopter $40,000Direct-assembly labor time for first helicopter 2,000 labor-hoursLearning curve for assembly labor time per helicopter 85% cumulative average time*Direct-assembly labor cost $ 30 per hourEquipment-related indirect manufacturing cost $ 12 per direct-assembly labor-hourMaterial-handling-related indirect manufacturing cost 50% of direct material cost
*Using the formula (p. 356), for an 85% learning curve, b =
**Using the formula (p. 357), for a 90% learning curve, b =
ln 0.85ln 2
-0.1625190.693147
= = -0.234465
ln 0.90ln 2
-0.1053610.693147
= = -0.152004
-
8/12/2019 costacctg13_keyxl_ch10
19/36
-
8/12/2019 costacctg13_keyxl_ch10
20/36
Cumulative Cumulative IndividualNumber Total Time: time for of Units Labor-Hours Xth unit:
Labor-HoursCol J = Col G Col H
1 2,000 2,000 2,000
2 1,700 (2,000 0.85) 3,400 1,4003 1,546 4,637 1,2374 1,445 (1,700 0.85) 5,780 1,1435 1,371 6,857 1,0776 1,314 7,884 1,0277 1,267 8,871 9878 1,228.25 (1,445 0.85) 9,826 955
CumulativeAverage Timeper Unit (y):Labor Hours
-
8/12/2019 costacctg13_keyxl_ch10
21/36
Direct-assembly labor time for first helicopter 2,000 labor-hoursLearning curve for assembly labor time per helicopter 85% cumulative average time
-
8/12/2019 costacctg13_keyxl_ch10
22/36
For an 85% learning curve, y = 2,000 X -0.2345
-
8/12/2019 costacctg13_keyxl_ch10
23/36
Cumulative Cumulative CumulativeNumber Total Time: Average Timeof Units Labor-Hours Per Unit:
Labor-HoursCol K = Col J Col G
1 800 800 800
2 720 (800 0.9) 1,520 7603 677 2,197 7324 648 (720 0.9) 2,845 7115 626 3,471 6946 609 4,081 6807 595 4,676 6688 583 (648 0.9) 5,259 657
IndividualUnit Time
for Xth Unit (y):Labor Hours
-
8/12/2019 costacctg13_keyxl_ch10
24/36
Direct-assembly labor time for first helicopter 800 labor-hours For an 9Learning curve for assembly labor time per helicopter 90% cumulative average time
-
8/12/2019 costacctg13_keyxl_ch10
25/36
0% learning curve, y = 800 X^ -0.1520
-
8/12/2019 costacctg13_keyxl_ch10
26/36
Labor-IntensiveAssembly Method
(using data from part 1a)Direct materials: 8 helicopters $40,000; $36,000 per helicopter $320,000Direct-assembly labor:
9,826 hrs.; 5,258 hrs. $30/hr. 294,780Indirect manufacturing costs Equipment related 9,826 hrs. $12/hr.; 5,258 hrs. $45/hr. 117,912
Materials-handling related 0.50 $320,000; $288,000 160,000Total assembly costs $892,692
-
8/12/2019 costacctg13_keyxl_ch10
27/36
Machine-IntensiveAssembly Method
(using data from part 1b)
$288,000
157,740
236,610
144,000$826,350
-
8/12/2019 costacctg13_keyxl_ch10
28/36
Labor-Intensive Assembly Method MachiDirect material cost per helicopter $40,000 $36,000Direct-assembly labor time for first helicopter 2,000 labor-hours 800
Learning curve for assembly labor time per helicopter 85% cumulative average time 90%Direct-assembly labor cost $ 30 per hour $ 30Equipment-related indirect manufacturing cost $ 12 per direct-assembly labor-hour $ 45
Material-handling-related indirect manufacturing cost 50% of direct material cost 50%Cumulative total time: labor-hours 9,826 hours 5,258Number of helicopters 8
-
8/12/2019 costacctg13_keyxl_ch10
29/36
e-Intensive Assembly Method
labor-hours
incremental unit timeper hourper direct-assembly labor-hour
of direct material costhours
-
8/12/2019 costacctg13_keyxl_ch10
30/36
Coefficients Standard Error t Stat
(1) (2) (3) = (1) (2)Intercept $300.98 $229.75 1.31Independent Variable:Machine-Hours (X) $ 10.31 $ 3.12 3.30
R Square 0.52Durbin-Watson Statistic 2.05
Regression Statistics
-
8/12/2019 costacctg13_keyxl_ch10
31/36
= Coefficient/Standard Error= B3/C3= 300.98/229.75
-
8/12/2019 costacctg13_keyxl_ch10
32/36
Coefficients Standard Error t Stat
(1) (2) (3) = (1) (2)Intercept $744.67 $217.61 3.42n epen ent ar a e:Direct ManufacturingLabor-Hours (X) $ 7.72 $ 5.40 1.43
R Square 0.17Durbin-Watson Statistic 2.26
Regression Statistics
= Coefficient= B4/C4= 7.72/5.40
-
8/12/2019 costacctg13_keyxl_ch10
33/36
Standard Error
-
8/12/2019 costacctg13_keyxl_ch10
34/36
Week
Machine-
Hours
(X1 )
um er o
Production
Batches
(X2 )
Direct
Manufacturing
Labor-Hours
n rec
Manufacturing
Labor Costs
(Y)
1 68 12 30 $ 1,1902 88 15 35 1,211
3 62 13 36 1,0044 72 11 20 917
5 60 10 47 7706 96 12 45 1,4567 78 17 44 1,1808 46 7 38 7109 82 14 70 1,316
10 94 12 30 1,03211 68 7 29 75212 48 14 38 963
Total 862 144 462 $12,501
-
8/12/2019 costacctg13_keyxl_ch10
35/36
Coefficients Standard Error t Stat(1) (2) (3) = (1) (2)
Intercept $42.58 $213.91 0.20Independent variable 1: Machine-Hours (X1 ) $ 7.60 $ 2.77 2.74Independent variable 2: Number of
production batches (X2 ) $37.77 $ 15.25 2.48
R Square 0.72Durbin-Watson Statistic 2.49
Regression Statistics
-
8/12/2019 costacctg13_keyxl_ch10
36/36
= Coefficient/Standard Error= B4/C4= 7.60/2.77