Cost Norms for various crops (Unit – one Acre)
APPLE (Amount in Rs.)
Sl.No.
Component ProposedExpenditure
1. Cultivation Expenses
(i) Cost of planting material 2500 (ii) Manures & fertilizers 7700
(iii) Insecticides & pesticides 3000 (iv) Land Preparation 4200 (v) Others, if any, (Power) 3600 Sub Total 21000
2. Irrigation
(i) Borewell 25000 (ii) SIP & Electrical Installation 25000
(iii) Others, if any - Sub Total 50000
3. Cost of Drip/Sprinkler 200004. Infrastructure
(i) Store & Pump House 20000 (ii) Labour room 5000 (iii) Agriculture Equipments 10000 (iii) Others, if any, please specify
Sub Total 35000
5. Land Development
(i) Soil leveling 4000 (ii) Digging - (iii) Fencing 20000
(iv) Others, if any, please specify - Sub Total 24000
6. Land, if newly purchased (Please indicate the year)*
Grand Total 1,50,000.00
*Cost of newly purchased land will be limited to one-tenth of the total project cost
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 2/72
BANANA
(Amount in Rs.)Sl.No.
Component ProposedExpenditure
1. Plantation Expenses(i) Cost of planting material 11,000
(ii) Manures & fertilizers 5,000 (iii) Insecticides & pesticides 2,000 (iv) Cost of Labour 5,000 (v) Others, if any, (Power) 2,000
25,0002. Irrigation
(i) Tube-well/submersible pump 40,000 (ii) Cost of Pipeline - (iii) Others, if any, please specify - 40,0003. Cost of Drip/Sprinkler 25,0004. Infrastructure
(i) Store - (ii) Labour shed & Pump house 10,000 (iii) Farm Equipment 1,000 11,0005. Land Development
(i) Soil Leveling 4,000 (ii) Digging - (iii) Fencing 20,000
(iv) Others, if any, please specify - 24,0006. Land, if newly purchased (Please indicate the year) @
Grand Total 1,25,000 @Cost of newly purchased land will be limited to 10% of the total project cost .
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 3/72
AONLA
(Rs. in thousand)
TotalSr.No. Particulars Scale Unit Cost Qty Cost
1 LAND & SITE DEVELOPMENTLAND Acre 1
Cost of DevelopmentLand DevelopmentLevelling & Dressing Per Acre 4000 1 4.00
Fencing & Gates LS 20000 1 20.00 Sub Total 24.002 BUILDING
Labour Shed cum Pump house LS 7600 100 7.60 Sub Total 7.603 PLANT & MACHINERY
Irrigation systemBorewell Nos. 25000 1 25.00
SIP sets & Electrical Installation LS 25000 1 25.00 Drip Irrigation inc. Fertigation system LS 20000 1 20.00 Farm Equipment Machinery LS 5000 1 5.00 Sub Total 75.004 COST OF CULTIVATION
Planting Material 3.20 Input Cost 8.80 Land Preparation 2.80 Other Cost Inc. Power Cost 3.60 Sub Total 18.40 TOTAL 125.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 4/72
MANGO
(Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost Qty Cost
1 LAND & SITE DEVELOPMENTLAND Acre 1
Cost of DevelopmentLand Development
Levelling & DressingAcre
4000 1 4.00 Fencing & Gates Per Rft. 35 846 29.60 Sub Total 33.602 BUILDING
Store / Pump House Sq Ft. 150 100 15.00 Labour Shed Sq Ft. 100 50 5.00 Sub Total 20.00
3 PLANT & MACHINERYIrrigation systemBorewell Nos. 25000 1 25.00
SIP sets & Electrical Installation LS 20000 1 20.00 Drip Irrigation inc. Fertigation system LS 25000 1 25.00 Farm Equipment Machinery LS 5400 1 5.40 Sub Total 75.404 COST OF CULTIVATION
Land Preparation / Planting 4.20 Planting Material 2.00 Input Cost 7.00 Power Cost 3.60 Other Farm Operations 7.20 Sub Total 21.00 TOTAL 150.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 5/72
GUAVA
(Amount in Rs.)
Sl.No.
Component ProposedExpenditure
1. Cultivation Expenses(i) Cost of planting material 2200
(ii) Manures & fertilizers 5000 (iii) Insecticides & pesticides 2000 (iv) Cost of Labour 7700 (v) Others, if any, (Power) 3600 20,5002. Irrigation
(i) Tube-well/submersible pump 40000 (ii) Cost of Pipeline - (iii) Others, if any, please specify - 40,0003. Cost of Drip/Sprinkler 20000
4. Infrastructure
(i) Pump house & Labour shed 10,000 (ii) Labour room & godown - (iii) Agriculture Equipments 1,000 (iv) Others, if any (Drying platform) - 11,0005. Land Development
(i) Soil Leveling 4000 (ii) Digging - (iii) Fencing 29500 (iv) Others, if any, please specify - 33,5006. Land, if newly purchased (Please indicate the year) @
Grand Total 1,25,000 @Cost of newly purchased land will be limited to 10% of the total project cost.
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 6/72
ORANGE
(Rs. in thousand)TotalSr.
No.Particulars Scale Unit Cost
Qty Cost1 LAND & SITE DEVELOPMENT
LAND ACRE 1.00
Cost of DevelopmentLand DevelopmentLevelling & Dressing Acre 4000 1.00 4.00
Fencing & Gates Per RFT. 35 843 29.50 Sub Total 33.502 BUILDING
Store/Pump House Sq Ft. 200 150 30.00 Labour Shed Sq Ft. 100 50 5.00 Sub Total 35.003 PLANT & MACHINERY
Irrigation systemBorewell Nos. 25000 1 25.00
SIP sets & Electrical Installation LS 20000 1 20.00 Drip Irrigation inc. Fertigation system LS 26500 1 26.50 Farm Equipment Machinery LS 5000 1 5.00 Sub Total 76.504 COST OF PLANTATION
Planting Material 3.00 Input Cost 10.90 Land Preparation / Cultural Operations 12.50 Power Cost 3.60 Sub Total 30.00 TOTAL 175.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 7/72
PAPAYA
(Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost (Rs.) Qty Cost
1 LAND & SITE DEVELOPMENTLAND Acre 1Cost of DevelopmentLand DevelopmentLevelling & Dressing Acre 4000 1 4.00
Fencing & Gates LS/Acre 20000 1 20.00 Sub Total 24.002 BUILDING
Labour Shed Sq Ft. 100 50 5.00 Sub Total 5.003 PLANT & MACHINERY
Irrigation systemBore Casting & Drilling LS 20000 1 20.00
Bore Pump & Electrical Installation LS 25000 1 25.00 Drip Irrigation inc. Fertigation system LS 25000 1 25.00 Farm Equipment Machinery LS 3500 1 3.50 Sub Total 73.504 COST OF CULTIVATION
Land Preparation 7.00 Input Cost 8.50 Power Cost Units 3.60 Planting Material (Seedlings) Nos. 3.40 Sub Total 22.50 TOTAL 125.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 8/72
SAPOTA
(Rs. in thousand)TotalSr.
No.Particulars Scale Unit Cost
Qty Cost1 LAND & SITE DEVELOPMENT
LAND Acre - 1.00 - Cost of Development
Land DevelopmentLevelling & Dressing Per Acre 4000 1 4.00
Fencing & Gates Rft. 35 846 29.60 Sub Total 33.602 BUILDING
Store Pump House Sq Ft. 200 150 30.00 Labour Shed Sq. Ft. 100 50 5.00 Sub Total 35.003 PLANT & MACHINERY
Irrigation systemTubewell Nos. 25000 1 25.00
SIP sets & Electrical Installation LS 20000 1 20.00 Drip Irrigation inc. Fertigation system Acre 25000 1 25.00 Farm Equipment Machinery LS 10000 1 10.00 Sub Total 80.004 COST OF CULTIVATION
Planting Material 4.00 Input Cost 14.25 Land Preparation / Planting 2.80 Power Cost 3.60 Other Farm Operation 1.75 Sub Total 26.40 TOTAL 175.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 9/72
PINEAPPLE
(Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost (Rs.) Qty Cost
1 LAND & SITE DEVELOPMENTLAND Acre - 1.00 NilCost of DevelopmentLand DevelopmentLeveling & Dressing Mandays 70 30 2.10Fencing & Gates Per Rft. 35 845 29.58
Sub Total 31.682 BUILDING
Store-cum-Pump House Sq Ft. 100 100 15.00Labour Shed Sq Ft. 50 100 5.00
Sub Total 20.003 PLANT & MACHINERY
Irrigation systemTubewell / SIP Nos. 20000.00 1 20.00Pump & Electrical Installation 5HP LS 20000.00 1 20.00Drip Irrigation inc. Fertigation LS 20000.00 1 20.00Farm Equipment Machinery LS 5000.00 1 5.00
Sub Total 65.004 COST OF CULTIVATIONPlanting Material (Suckers) Nos. 1 13000 13.00Input Cost 12.00Labour Cost Mandays 70 68 4.73Power Cost 3.60
Sub Total 33.33GRANT TOTAL 150.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 10/72
LITCHI
(Amount in Rs.)Sl.No.
Component ProposedExpenditure
1. Cultivation Expenses(i) Cost of planting material 2400
(ii) Manures & fertilizers 5000 (iii) Insecticides & pesticides 3000 (iv) Cost of Labour 5600 (v) Others, if any (Power) 3600 Total 19600
2. Irrigation(i) Tube-well/submersible pump 50000
(ii) Cost of Pipeline - (iii) Others, if any, please specify -
Total 50000
3. Cost of Drip/Sprinkler 20000
4. Infrastructure(i) Store & Pump House 10000
(ii) Labour room 6800 (iii) Agriculture Equipments 10000 (iii) Others, if any, (Drying platform) - Total 26800
5. Land Development(i) Soil leveling 4000
(ii) Digging - (iii) Fencing 29600 (iv) Others, if any, please specify - Total 33600
6. Land, if newly purchased (Please indicate the year)* - Grand Total 1,50,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 11/72
POMEGRANATE
(Rs. in thousand)
TotalSr.No. Particulars Scale Unit Cost
Qty Cost1 LAND & SITE DEVELOPMENT
LAND Acre 1
Cost of DevelopmentLand DevelopmentLevelling & Dressing Acre 4000 1 4.00
Fencing & Gates Per Rft. 35 846 29.60 Sub Total 33.602 BUILDING
Store / Pump House Sq Ft. 200 150 30.00 Labour Shed Sq Ft. 100 50 5.00 Sub Total 35.003 PLANT & MACHINERY
Irrigation systemTubewell Nos. 45000 1 45.00
Drip Irrigation inc. Fertigation system LS 20000 1 20.00 Farm Equipment Machinery LS 10000 1 10.00 Sub Total 75.004 COST OF CULTIVATION
Planting Material 4.00 Input Cost 15.00 Land Preparation / Planting 8.80 Power Cost 3.60 Sub Total 31.40 TOTAL 175.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 12/72
KIWI
(Rs. in thousand)TotalSr.
No.Particulars Scale Unit Cost
Qty Cost1 LAND & SITE DEVELOPMENT
LAND* ACRE 1.00*(Cost of land is not considered in the project cost as farmer is having own land)
Cost of DevelopmentLand Development
Levelling & Dressing Per Acre 4000 1.00 4.00 Fencing & Gates Per RFT. 35 846 29.60 Sub Total 33.602 BUILDING
Store/Pump House Sq Ft. 200 100 20.00
Labour Shed Sq Ft. 100 100 10.00 Training Structure LS 90000 1 90.00
Sub Total 120.003 PLANT & MACHINERY
Irrigation systemTubewell/Submersible pump Nos. 50000 1 50.00
Drip Irrigation inc. Fertigation system LS 20000 1 20.00 Farm Equipment Machinery LS 5000 1 5.00 Sub Total 75.004 COST OF PLANTATION
Planting Material 4.00 Input Cost 8.00 Cost of Labour 5.80 Power Cost 3.60 Sub Total 21.40 TOTAL 250.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 13/72
LEMON GRASS
(Amount in Rs.)Sl.No.
Component ProposedExpenditure
1. Cultivation Expenses(i) Cost of planting material 200
(ii) Input Cost 4500 (iii) Insecticides & pesticides 2000 (iv) Cost of Labour 7000 (v) Others, if any, please specify (Power) 3600 Total 17300 2. Irrigation
(i) Tube-well/submersible pump 32000 (ii) Pump & Electrical Installation 25000 (iii) Others, if any - Total 57000 3. Cost of Drip/Sprinkler -
4. Infrastructure(i) Store & Pump House 20000
(ii) Labour room - (iii) Agriculture Equipments 6100 (iii) Others, if any, (Drying platform) 16000 Total 42100 5. Land Development
(i) Soil leveling 4000
(ii) Digging - (iii) Fencing 29600 (iv) Others, if any, please specify - Total 33600 6. Land, if newly purchased (Please indicate the year)*
Grand Total 1,50,000*Cost of newly purchased land will be limited to one-tenth of the total project cost
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 14/72
MINT
(Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost(Rs.) Qty Cost
1 LAND & SITE DEVELOPMENTLAND Acre 0 1 0.00Cost of DevelopmentLand DevelopmentLevelling & Dressing Acre 4000 1 4.00Fencing & Gates RFT 35 846 29.60
Sub Total 33.602 BUILDING
Drying Platform Sq Ft. 80 50 4.00Store/Grading/Packing Room/Pump house Sq. Ft. 200 150 30.00
Sub Total 34.003 PLANT & MACHINERY
Machinery/Equipment/Farm Equipment LS 10000 1 10.00Distillation unit LS 5000 1 5.00Irrigation systemTube well Nos. 27000 1 27.00SIP sets & Electrical Installation LS 30000 1 30.00
Sub Total 72.004 COST OF CULTIVATION
Land Preparation / Sowing Mandays 70 60 4.20Input Cost LS 6500 1 6.50Power Cost Units 2 1800 3.60Planting Material Kg. 10 100 1.00Other farm Operation Mandays 70 73 5.10
Sub Total 20.40GRAND TOTAL 160.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 15/72
PACHAULI
(Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost(Rs.) Qty Cost
1 LAND & SITE DEVELOPMENTLANDCost of DevelopmentLand DevelopmentLevelling & Dressing Acre 4000 1 4.00Fencing & Gates Per RFT 35 846 29.60
Sub Total 33.602 BUILDING
Drying Platform Sq Ft. 80 100 8.00Processing / Distillation facility Sq. Ft. 150 150 22.50Pump house / Labour Shed Sq. Ft. 150 150 22.50
Sub Total 53.003 PLANT & MACHINERY
Tubewell Nos. 30,000 1 30.00SIP sets & Electrical Installation LS 30,000 1 30.00Drip system including Fertigation equip. LS 20,000 1 20.00Machinery/Equipment/Farm Equipment LS 20,000 1 20.00
Sub Total 100.004 COST OF CULTIVATION
Land Preparation / Planting Mandays 70 36 2.50Input Cost LS 11100 1 11.10Power Units 2 1800 3.60Planting Material – Seedlings Nos. 1 12000 12.00Other Farm Operation Mandays 70 60 4.20
Sub Total 33.40TOTAL 220.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 16/72
BUTTON MUSHROOMRs. in Lakhs)
Sr.
No.Particulars Unit Basis Unit cost
(Rs.)Qty. Cost
1. LAND & SITE DEVELOPMENTLand Acres 300000 1.50 4.50Cost of DevelopmentLand DevelopmentLeveling & Fencing Acres 10000 1.50 0.15Entry Points & Guard rooms Nos. 50000 1.00 0.50Sub Total 5.15
2 BUILDING
Growing Room 8 Sqft. 60x18x13 300 8640 25.92Pasteurization Tunnel 1 Sqft. 40x9x12 300 360 1.08Composting Yard 1 Sqft. 60x40x14 100 2400 2.40Pre-wetting Area 1 Sqft. 40x20 50 800 0.40Casing Soil Chambers 1 Sqft. 12x10x10 250 120 0.30A/C Compressor Room / DG Setroom 1 Sqft. 30x18x13 200 540 1.08
Boiler Room 1 Sqft. 15x12x13 200 180 0.36Canning Facility 1 Sqft. 60x18x13 250 1080 2.70
Can Store Room 1 Sqft. 30x18x13 250 540 1.35Store / Tool Room / Canteen 1 Sqft. 15x12x13 250 180 0.45Spawning Area 1 Sqft. 18x12x13 200 216 0.43Packing Room 1 Sqft. 12x12x13 200 144 0.29Service Room (Under ground) 1 Sqft. 12x9x8 200 108 0.22Corridor 1 Sqft. 108x15x13 50 1620 0.81Spawn Lab 3 Sqft. 18x15x12 450 810 3.65Office Block 1 Sqft. 30x18x13 450 540 2.43Architect Fee % 2.5% 1.10
Sub Total 44.963 PLANT & MACHINERY
Compost and Casing Unit 7.00Production Unit 30.00Canning, Spawn Lab & OtherEquipment 10.00
Sub Total 47.004 MISCELLANEOUS FIXED ASSETS
Canteen Furniture 0.50
Communication system 0.25Sub Total 0.755 PRE-OPERATIVE EXPENSES
Administrative Exp. 0.25Professional Charges 0.50Interest During ConstructionPeriod 3.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 17/72
OYSTER MUSHROOM
Rs. in thousand)TotalSr.
No. Particulars Scale Unit Cost (Rs.) Qty Cost
1 LAND & SITE DEVELOPMENTLAND ACRE 20000 1.00 20.00Cost of DevelopmentLand Development Levelling & Dressing Mandays 70 21 .0 1.47
Sub Total 21.472 BUILDING
High Density Polythene Sheet Growing Room Sq Ft. 50 300 15.00Sub Total 15.003 PLANT & MACHINERY
Sprayer Room Nos. 1500 1 1.50Galvanised Tubs Nos. 250 4 1.00Iron Racks Nos. 1000 9 9.00Thermometers LS 400 1 0.40
Sub Total 11.90TOTAL 48.37
CONTINGENCIES
Particulars Total % Firm Non Firm Total Total Cost
Land 20.00 0 20.00 0.00 0.00 20.00
Development / Building 16.47 5 16.47 0.82 17.29
Plant & Machinery 11.90 5 11.90 0.60 12.50Horticulture 0.00 5 0.00 0.00 0.00
Sub Total 1.42 49.79
Total 49.79
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 18/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 19/72
GRAPES
(Amount in Rs.)Sl.No.
Component ProposedExpenditure
1. Cultivation Expenses(i) Cost of planting material 10,000
(ii) Manures & fertilizers 9,000 (iii) Insecticides & pesticides 4,000 (iv) Cost of Labour 8,800 (v) Others, if any, (Power) 3600 35,4002. Irrigation
(i) Tube-well/submersible pump 56,000 (ii) Cost of Pipeline - (iii) Others, if any, please specify - 56,0003. Cost of Drip/Sprinkler 35,0004. Infrastructure
(i) Store & pump house 30,000 (ii) Labour room - (iii) Agriculture Equipments 10,000 (iv) Others, if any. Please specify (Bower system) 1,20,000 1,60,0005. Land Development
(i) Soil Leveling 4000 (ii) Digging - (iii) Fencing & gates 29600 (iv) Others, if any, please specify - 33,6006. Land, if newly purchased (Please indicate the year) @
Grand Total 3,20,000 @Cost of newly purchased land will be limited to 10% of the total project cost .
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 20/72
BEE KEEPING
STANDARD NORMS OF EQUIPMENT COST OF ESTABLISHING AN APIARY
S.No. Items Tentative cost perunit (Rs.) asapproved by MC
1. Nucleus Bee Colonies(minimum 6 frame strength)
1500.00
2. a) a) Bee hive with super for melifera bees made ofseasoned non-wraping Tun/Kail/Teak wood
b) b) Bee hive with super for melifera bes made ofseasoned non-warping other local woods
1200.00
700.00
3. a) a) Bee hive with super for cerana bees made ofseasoned non-warping Tun/Kail/Teak wood
b) b) Bee hive with super for cerana bees made ofseasoned non-warping Tun/Kail/Teak wood
800.00
500.00
4. a) a) Extra super (honey chamber)For melifera bees (Tun/Kail/Teak wood)
b) b) Extra super (honey chamber)For melifera bees (other local wood)
500.00
300.00
5. a) a) Extra super (honey chamber)For cerana bees (Tun/Kail/Teak wood)
b) b) Extra super (honey chamber)For cerana bees (other local wood)
300.00
200.00
6. a) a)
Carrying cage(6 frame size without frames) (formelifera bees)Made from seasoned non warping Tun/Kail/ Teak wood
b) b) Carrying cage(6 frame size without frames) (formelifera bees)
M d f d i th l l d
400.00
300.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 21/72
7. a) a) Carrying cage(6 frame size without frames) (for
cerana bees)Made from seasoned non warping Tun/Kail/ Teak wood
b) b) Carrying cage(6 frame size without frames) (forcerana bees)
Made from seasoned non warping other local wood
200.00
150.00
8. a) a) Nucleus bee box (6 frame size)(For melifera bees)
With dummy made from non warping Tun/Kail/Teak wood
b) b) Nucleus bee box (6 frame size)(For melifera bees)With dummy made from non warping other local wood
500.00
350.00
9. a) a) Nucleus bee box (6 frame size)(For melifera bees)With dummy made from non warping Tun/Kail/Teak wood
b) b) Nucleus bee box (6 frame size)(For melifera bees)With dummy made from non warping other local wood
250.00
200.00
10. Managing kits (Hive stand; queen cage; queen excluder;queen protecter; feeding bottle; queen gates-one with eachbox)
200.00
11. Wasp Trap made of seasoned non-warpingTun/Teak wood-(3-4 per apiary of 100 boxes)
400.00
12. Handling kits (bee viel, gloves; hive tool; over-alls; hammer;nail puller; swarm bag; smoker; frame gripper one perbeekeeper)
500.00
13. a) a) Honey extractor(4 frame size) galvanized ironsheetb) b) Honey extractor(6 frame size) galvanized ironsheetc) c) Honey extractor(6 frame size) galvanized ironsheet
2000.002400.0012500.00
14. Honey extracting kits (comb scrapping knife; tray and honeystrainers)
1500.00
15. Honey containers(standard food grade plastic as per IIP
norms) 30/50 kgs capacity
200.00 each
16. Comb foundation sheets1 kg(15 sheets)per colony
300/-per keg
In all cases taxes, if any, will be extra as applicable
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 22/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 23/72
Mortality 5% 1,360 100.00 136,000 136,000
Pots 27,200 20.00 544,000 544,000Planting Media 27,200 10.00 272,000 272,000Soil Preparation & Planting 27,200 5.00 136,000 136,000
Sub Total 3,808,000 - 3,808,0002 Cost of Fertlizer and Manure kg/pot
Nitrogen 0.030 820 7.00 5,740 5,740Phosphorus 0.020 545 5.00 2,725 2,725Potassium 0.025 680 6.00 4,080 4,080FYM & Vermi Compost 0.600 16,320 4.00 65,280 65,280
Sub Total 77,825 - 77,8253 Others
Interculture 3.00 81,600 81,600Chemicals (Weedicides & Insecticides) 1 5,000.00 5,000 5,000
Sub Total 86,600 - 86,6004 Expenditure during Cultivation Period
Labour Mandays 300 90 27,000 27,000Electricity 1 7,200 7,200
Sub Total 34,200 - 34,200
Grand Total 4,006,625 - 4,006,625
GRAND TOTAL 6,100,125 6,100,125Say 6,100,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 24/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 25/72
Cost of planting Material 119,000 7.00 833,000 833,000
Mortality 5% 5,950 7.00 41,650 41,650Soil Sterlisation LS 1 30,000 30,000
Bed Preparation & Planting 0.10 11,900 11,900
Sub Total 916,550 - 916,5502 Cost of Fertlizer and Manure
Nitrogen 0.015 1,785 7.00 12,495 12,495Phosphorus 0.007 835 5.00 4,175 4,175Potassium 0.008 955 6.00 5,730 5,730
FYM 0.100 11,900 2.50 29,750 29,750Sub Total 52,150 - 52,150
3 Expenses during Cultivation periodLabour Mandays 250 90 22,500 22,500Power 1 4,800 4,800
Sub Total 27,300 27,3004 Others
Plant Protection 1 15,000.00 15,000 15,000
Chemicals (Weedicides & Insecticides) 1 5,000.00 5,000 5,000Sub Total 20,000 - 20,000
Grand Total 1,016,000 - 1,016,000
GRAND TOTAL 5,000,000 5,000,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 26/72
GerberaPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Land Leveling LS 1 2,500 2,500
-
Sub Total 2,5002 Infrastructure
Storage & Packing Shed Sq Mtr 24 2,500 60,000Cold Storage Sq Mtr 30 5,000 150,000
Sub Total 210,0003 Irrigation system (Aportioned )
Tube Well Quotation 1 75,000 75,000Drip Irigation Quotation 1 30,000 30,000
Sub Total 105,0004 Plant & Machinery
Green Houses Sq Mtr 3400 600 2,040,000Grading, Packing & Cold-Store (Aportioned) Ls 1 650,000 650,000Insulated Panels Ls 1 300,000 300,000Erection 5.00% 1 149,500 149,500Electrification Ls 1 50,000 50,000
Sub Total 3,189,5005 Equipment & Tools
Reefer Van (To be hired) -
Farming Equipments, Tools 1 20,000 20,000Furniture 1 20,000 20,000Storage Bins 1 20,000 20,000
Sub Total 60,000
TOTAL 3,567,000
S.NO. PARTICULARS UNIT QTYUNITCOST Year 0 Year 1 Total Cost
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 27/72
1 Planting Material
Cost of planting Material 38,000 25.00 950,000 950,000Mortality 5% 1,900 25.00 47,500 47,500Soil preparation & planting 38,000 1.00 43,000 43,000
Sub Total 1,040,500 - 1,040,5002 Cost of Fertlizer and Manure
Nitrogen 0.030 1,140 7.00 7,980 7,980Phosphorus 0.010 380 5.00 1,900 1,900Potassium 0.015 570 6.00 3,420 3,420FYM 0.200 7,600 4.00 30,400 30,400
Sub Total 43,700 - 43,7003 Expenses during Cultivation period
Labour Mandays 210 90 18,900 18,900Power 1 6,000 6,000 6,000
Sub Total 24,900 - 24,9004 Others
Interculture 0.50 19,000.00 19,000Chemicals (Weedicides & Insecticides) 1 5,000.00 5,000 5,000
Sub Total 24,000 - 24,000GrandTotal 1,133,100 - 1,133,100
GRAND TOTAL 4,700,100 4,700,100Say 4,700,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 28/72
GLADIOLUSPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTYUNITCOST Total Cost
1 Land Development
Land Leveling & Soil Preparation LS 1 5,000 5,000
Fencing 280 125 35,000
Sub Total 40,000
2 InfrastructureShed Sq Mtr 9 2,500 22,500Open Yard (Apportioned) 3.33 1,500 5,000
Sub Total 27,5003 Irrigation system (Aportioned)
Tube Well Quotation 1 25,000 25,000Sprinkler Quotation 1 30,000 30,000
Sub Total 55,000
4 Equipment & ToolsFarming Equipments, Tools 1 10,000 10,000Crates for storing Bulbs 50 150 7,500Buckets 50 100 5,000
Sub Total 22,500
TOTAL 145,000
S.NO. PARTICULARS UNIT QTYUNITCOST Year 1 Total Cost
1 Planting Material and plantingCost of planting Material 61,200 2.50 153,000 153,000Mortality 5% 3,060 2.50 7,650 7,650
Soil Preparation & Planting LS 1 6,200 6,200
CormTreatment LS 1 2,500 2,500
Sub Total 169,350 - 169,3502 Cost of Fertlizer and Manure
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 29/72
Nitrogen 0.010 615 7.00 4,305 4,305
Phosphorus 0.006 370 5.00 1,850 1,850Potassium 0.010 615 6.00 3,690 3,690FYM 0.120 7,345 1.00 7,345 7,345
Sub Total 17,190 - 17,1903 Expenses during Cultivation period
Labour Mandays 145 90 13,050 13,050Power 1 2,400 2,400
Sub Total 15,450 15,4504 Others
-Chemicals (Weedicides & Insecticides) 1 3,000.00 3,000 3,000
Sub Total 3,000 - 3,000GrandTotal 204,990 - 204,990
GRAND TOTAL 349,990 349,990Say 350,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 30/72
OrchidsPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Land Leveling LS 1 1,000 1,000
-
Sub Total 1,0002 Infrastructure
Storage & Packing Shed Sq Mtr 14 2,500 35,000Cold Storage (Apportioned) Sq Mtr 9 5,000 45,000
Sub Total 80,0003 Irrigation system (Apportioned)
Tube Well Quotation 1 50,000 50,000Drip Irigation Quotation 1 30,000 30,000
Sub Total 80,0004 Plant & Machinery
Green Houses Sq Mtr 3400 600 2,040,000Grading, Packing & Cold-Store (Aportioned) Ls 1 650,000 650,000Insulated Panels Ls 1 300,000 300,000Erection 5.00% 1 149,500 149,500Electrification Ls 1 50,000 50,000
Sub Total 3,189,5005 Equipment & Tools (Aportioned)
Reefer Van (To be Hired) 1 -
Farming Equipments, Storage, Tools 1 20,000 20,000Furniture 1 20,000 20,000
-
Sub Total 40,000
TOTAL 3,390,500
S.NO. PARTICULARS UNIT QTYUNITCOST Year 0 Year 1 Total Cost
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 31/72
1 Planting MaterialCost of planting Material 40,000 70.00 2,800,000 2,800,000Mortality 5% 2,000 70.00 140,000 140,000Pots 40,000 10.00 400,000 400,000
Media & Planting 40,000 4.00 160,000 160,000
Sub Total 3,500,000 - 3,500,0002 Cost of Fertlizer and Manure
Nitrogen 0.015 600 7.00 4,200 4,200 8,400Phosphorus 0.010 400 5.00 2,000 2,000 4,000Potassium 0.012 480 6.00 2,880 2,880 5,760Organic Manure 0.200 8,000 4.00 32,000 32,000
Sub Total 41,080 9,080 50,1603 Expenses during Cultivation period
Labour Mandays 200 90 18,000 18,000 36,000Power 1 6,000 6,000 6,000 12,000
Sub Total 24,000 24,000 48,0004 Others
Interculture 1.00 40,000 40,000Chemicals (Weedicides & Insecticides) 1 4,500.00 4,500 4,500 9,000
Sub Total 44,500 4,500 49,000GrandTotal 3,609,580 37,580 3,647,160
GRAND TOTAL 7,000,080 7,037,660Say 7,000,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 32/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 33/72
Cost of planting Material 24,000 30.00 720,000 720,000Mortality 3% 720 30.00 21,600 21,600
Soil Preparation & Planting LS 1 5,420 5,420
Sub Total 747,020 - 747,0202 Cost of Fertlizer and Manure
Nitrogen 0.015 360 7.00 2,520 2,520Phosphorus 0.008 195 5.00 975 975Potassium 0.010 240 6.00 1,440 1,440FYM (Organic) 0.200 4,800 4.00 19,200 19,200
Sub Total 24,135 - 24,1353 Expenses during Cultivation periodLabour Mandays 156 90 14,040 14,040Power 1 2,400 2,400
Sub Total 16,440 16,4404 Others
Interculture 0.10 2,400.00 2,400Chemicals (Weedicides & Insecticides) 1 4,000.00 4,000 4,000
Sub Total 6,400 - 6,400
Grand Total 793,995 - 793,995
GRAND TOTAL 3,999,995 3,999,995Say 4,000,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 34/72
TuberosePROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTYUNITCOST Total Cost
1 Land Development
Land Leveling LS 1 2,500 2,500
Fencing -
Sub Total 2,500
2 InfrastructureShed Sq Mtr 9 2,500 22,500Open Yard Sq Mtr 3.33 1,500 5,000
Sub Total 27,5003 Irrigation system (Aportioned)
Tube Well Quotation 1 25,000 25,000Sprinkler Quotation 1 30,000 30,000
Sub Total 55,000
4 Equipment & ToolsFarming Equipments, Tools 1 10,000 10,000Crates for storing Bulbs 40 150 6,000Buckets 40 100 4,000
Sub Total 20,000
TOTAL 105,000
S.NO. PARTICULARS UNIT QTYUNITCOST Year 1 Total Cost
1 Planting MaterialCost of planting Material 54,400 1.00 54,400 54,400Mortality 10% 5,440 1.00 5,440 5,440
Soil Preparation & Planting LS 1 6,170 6,170
Bulb Treatment LS 1 2,000 2,000
Sub Total 68,010 - 68,0102 Cost of Fertlizer and Manure
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 35/72
Nitrogen 0.005 275 7.00 1,925 1,925Phosphorus 0.002 110 5.00 550 550Potassium 0.002 110 6.00 660 660FYM 0.100 5,440 1.00 5,440 5,440
Sub Total 8,575 - 8,5753 Expenses during Cultivation period
Labour Mandays 150 90 13,500 13,500Power 1 2,400 2,400
Sub Total 15,900 15,9004 Others
-Chemicals (Weedicides & Insecticides) 1 2,500.00 2,500 2,500
Sub Total 2,500 - 2,500GrandTotal 94,985 - 94,985
GRAND TOTAL 199,985 199,985Say 200,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 36/72
APRICOTPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 7,500 7,500.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 100 15 1,500.00
Sub Total 44,000.002 InfrastructureGodown Sq Mtr 9 2,500 22,500.00Shed (Aportioned on 3 Acres) Sq Mtr 6.67 1,500 10,000.00
Sub Total 32,500.003 Irrigation system
Water Pond 1 10,000 10,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 40,000.004 Equipment & Tools (Aportioned)
Farming Equipments & Tools 1 15,000 15,000.00Plastic Crates (7500Kg/20Kg/12Dx2), 60 150 9,000.00
Sub Total 24,000.00
TOTAL 140,500.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2-4 Total Cost
1 Planting MaterialCost of planting Material 100 30.00 3,000.00 3,000.00Mortality 10% 10 30.00 300.00 300.00
Sub Total 3,300.00 - 3,300.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.500 50 7.00 350.00 525.00 875.00Phosphorus 0.250 25 5.00 125.00 281.25 410.00Potassium 0.200 20 6.00 120.00 270.00 390.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 37/72
FYM with Neem
Cake 20.000 2,000 2.50 5,000.00 5,000.00
Sub Total 5,595.00 1,076.25 6,675.003 Others
Staking & Interculture 10.00 1,000.00 1,000.00Chemicals (Weedicides & Insecticides) 1 1,800.00 1,800.00 5,400.00 7,200.00
Sub Total 2,800.00 5,400.00 8,200.004 Expenditure during Cultivation Period
Labour Mandays 60.00 90 5,400 16,200.00 21,600.00Electricity 1.00 2,400 2,400 7,200.00 9,600.00
Sub Total 7,800.00 23,400.00 31,200.00Grand Total 19,495.00 29,876.25 49,375.00
GRAND TOTAL 159,995.00 189,875.00Say 160,000.00
AERACANUTPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land DevelopmentSoil Leveling LS 1 5,000 5,000.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 500 15 7,500.00
Sub Total 47,500.002 Infrastructure
Godown Sq Mtr 9 2,500 22,500.00Shed (Apportioned on 6 Acres) Sq Mtr 3.50 1,500 5,250.00
Sub Total 27,750.003 Irrigation system
Tube Well (Aportioned) Quotation 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.004 Equipment & Tools
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 38/72
Farming Equipments & Tools 1 15,000 15,000.00
Sub Total 15,000.00TOTAL 145,250.00
S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2&3 Total Cost1 Planting Material
Cost of planting Material 500 4.00 2,000.00 2,000.00Mortality 10% 50 4.00 200.00 200.00
Sub Total 2,200.00 - 2,200.002 Cost of Fertilizer and Manure Kgs
Nitrogen 0.050 25 7.00 175.00 175.00 350.00Phosphorus 0.020 10 5.00 50.00 75.00 125.00Potassium 0.030 15 6.00 90.00 135.00 225.00FYM 10.000 5,000 2.50 12,500.00 12,500.00
Sub Total 12,815.00 385.00 13,200.003 Plant protection
Staking & Interculture 2.00 1,000.00 1,000.00Chemicals (Weedicides & Insecticides) 1 1,000.00 1,000.00 2,000.00 3,000.00
Sub Total 2,000.00 2,000.00 4,000.004 Expenditure during Cultivation Period
Labour Mandays 60.00 90 5,400.00 10800 16,200.00Electricity 1.00 2,400 2,400.00 4800 7,200.00
Sub Total 7,800.00 15,600.00 23,400.00
Grand Total 24,815.00 17,985.00 42,800.00
GRAND TOTAL 170,065.00 188,050.00Say 170,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 39/72
CASHEWNUTPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 7,500 7,500.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 74 30 2,220.00
Sub Total 44,720.002 InfrastructureGodown M2 9 2,500 22,500.00Drying Shed (Apportioned) M2 6.67 1,500 10,000.00
Sub Total 32,500.003 Irrigation system
Tube Well (Aportioned) Quotation 1 50,000 50,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 80,000.004 Equipment & Tools (Aportioned)
Farming Equipments & Tools 1 15,000 15,000.00Storage Bins 1 5,000 5,000.00
Sub Total 20,000.00
TOTAL 177,220.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2 Total Cost
1 Planting MaterialCost of planting Material 74 60.00 4,440.00 - 4,440.00Mortality 10% 8 60.00 480.00 - 480.00
Sub Total 4,920.00 - 4,920.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.450 35.00 7.00 245.00 245.00 490.00Phosphorus 0.150 15.00 5.00 75.00 75.00 150.00Potassium 0.250 20.00 6.00 120.00 120.00 240.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 40/72
FYM 20.000 1,480.00 2.50 3,700.00 3,700.00 7,400.00
Sub Total 4,140.00 4,140.00 8,280.003 Others
Staking 10 740.00 - 740.00Chemicals (Weedicides & Insecticides) 1 2,500.00 2,500.00 2,500.00 5,000.00
Sub Total 3,240.00 2,500.00 5,740.004 Expenditure during Gestation Period
Labour Mandays 90.00 90 8,100 8,100 16,200.00Electricity 1.00 2,400 2,400 4,800.00
Sub Total 10,500.00 10,500.00 21,000.00
Grand Total 22,800.00 17,140.00 39,940.00
GRAND TOTAL 200,020.00 217,160.00Say 200,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 41/72
COCONUTPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 5,000 5,000.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 86 20 1,720.00
Sub Total 41,720.002 Infrastructure
Godown Sq Mtr 9 2,500 22,500.00Shed for post harvest activities (Apportioned) Sq Mtr 3 1,500 5,000.00
Sub Total 27,500.003 Irrigation system
Tube Well (Aportioned) 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.00
4 Equipment & Tools (Aportioned)Farming Equipments & Tools 1 7,000 7,000.00
-
Sub Total 7,000.00
TOTAL 131,220.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2-4 Total Cost
1 Planting MaterialCost of planting Material 86 60.00 5,160.00 5,160.00
Mortality 10% 9 60.00 540.00 540.00Sub Total 5,700.00 - 5,700.00
2 Cost of Fertilizer and Manure Kgs/pitNitrogen 0.500 45 7.00 315.00 472.50 790.00Phosphorus 0.300 30 5.00 150.00 337.50 490.00Potassium 1.200 105 6.00 630.00 1,417.50 2,050.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 42/72
FYM 25.000 2,150 2.50 5,375.00 5,375.00
Sub Total 6,470.00 2,227.50 8,705.003 Others
Staking & Interculture 10.00 860.00 860.00Chemicals (Weedicides & Insecticides) 1 650.00 650.00 1,950.00 2,600.00
Sub Total 1,510.00 1,950.00 3,460.004 Expenditure during Cultivation Period
Labour Mandays 30 90 2,700 8,100 10,800.00Electricity 1 2,400 7,200 9,600.00
Sub Total 5,100.00 15,300.00 20,400.00
Grand Total 18,780.00 19,477.50 38,265.00
GRAND TOTAL 150,000.00 169,485.00
Say R/O 150,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 43/72
DatepalmPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 5,000 5,000.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 64 35 2,240.00
Sub Total 42,240.002 Infrastructure
Godown M2 9 2,500 22,500.00Shed (Apportioned) M2 3.33 1,500 5,000.00
Sub Total 27,500.003 Irrigation system
Tube Well (Aportioned) Quotation 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.00
4 Equipment & Tools (Aportioned) Farming Equipments & Tools 1 10,000 10,000.00
Sub Total 10,000.00
TOTAL 134,740.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2-5 Total Cost
1 Planting MaterialCost of planting Material 64 30.00 1,920.00 - 1,920.00Mortality 10% 7 30.00 210.00 - 210.00
Sub Total 2,130.00 - 2,130.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.400 30.00 7.00 210.00 790.00 1,000.00Phosphorus 0.150 10.00 5.00 50.00 130.00 180.00Potassium 0.250 20.00 6.00 120.00 300.00 420.00FYM with Neem Cake 24.000 1,540.00 2.50 3,850.00 - 3,850.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 44/72
Sub Total 4,230.00 1,220.00 5,450.003 Others
Staking 15 960.00 - 960.00Chemicals (Weedicides & Insecticides) 1 1,500.00 1,500.00 3,000.00 4,500.00
Sub Total 2,460.00 3,000.00 5,460.005 Expenditure during Gestation Period
Labour Mandays 45.00 90 4,050 8,100 12,150.00Electricity 1 2,400 9,600 12,000.00
Sub Total 6,450.00 17,700.00 24,150.00
Grand Total 15,270.00 21,920.00 37,190.00
GRAND TOTAL 150,010.00 171,930.00Say 150,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 45/72
OLIVEPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 7,500 7,500.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 100 30 3,000.00
Sub Total 45,500.002 Infrastructure
Godown Sq Mtr 9 2,500 22,500.00Shed (Apportioned) Sq Mtr 10 1,500 15,000.00
Sub Total 37,500.003 Irrigation system
Tube Well (Aportioned) Quotation 1 75,000 75,000.00Irigation 1 10,000 10,000.00
Sub Total 85,000.00
4 Equipment & Tools (Aportioned)-
Farming Equipments 1 10,000 10,000.00
Sub Total 10,000.00
TOTAL 178,000.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Year 2&3 Total Cost
1 Planting MaterialCost of planting Material 100 25.00 2,500.00 2,500.00
Mortality 5% 5 25.00 125.00 125.00Sub Total 2,625.00 - 2,625.00
2 Cost of Fertlizer and Manure Kgs/pitNitrogen 0.200 20 7.00 140.00 140.00 280.00Phosphorus 0.150 16 5.00 80.00 120.00 200.00Potassium 0.250 25 6.00 150.00 225.00 375.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 46/72
FYM 25.000 2,500 2.50 6,250.00 6,250.00
Sub Total 6,620.00 485.00 7,105.003 Others
Staking / Interculture 100.00 25.00 2,500.00 2,500.00Chemicals (Weedicides & Insecticides) 1 2,500.00 2,500.00 2,500.00 5,000.00
Sub Total 5,000.00 2,500.00 7,500.004 Expenditure during Cultivation Period
Labour Mandays 60.00 90 5,400 10,800 16,200.00Electricity 1.00 2,400 4,800 7,200.00
Sub Total 7,800.00 15,600.00 23,400.00
Grand Total 22,045.00 18,585.00 40,630.00
GRAND TOTAL 200,045.00 218,630.00Say 200,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 47/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 48/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 49/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 50/72
FYM 2.500 4,600 2.50 11,500.00 2,300.00 13,800.00
Sub Total 11,905.00 2,802.50 14,707.503 Plant Protection
Interculture 1,840.00 1.00 1,840.00 1,840.00Chemicals (Weedicides & Insecticides) 1 3,500.00 3,500.00 3,500.00 7,000.00
Sub Total 5,340.00 3,500.00 8,840.004 Expenditure during Cultivation Period
Labour Mandays 150.00 90 13,500 13,500 27,000.00Electricity 1.00 3,600 7,200 10,800.00
Sub Total 17,100.00 20,700.00 37,800.00
Grand Total 44,495.00 27,002.50 71,497.50
GRAND TOTAL 230,015.00 257,017.50Say 230,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 51/72
CitronellaPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 2,000 2,000.00
Fencing -
Sub Total 2,000.002 Infrastructure
Shed M2 12 2,500 30,000.00-
Sub Total 30,000.003 Irrigation system
Tube Well (Aportioned) Quotation 1 30,000 30,000.00Pipe Irrigation Quotation 1 10,000 10,000.00
Sub Total 40,000.004 Equipment & Tools (Aportioned)
Farming Equipments & Tools 1 10,000 10,000.00Storage Containers Ls 1 3,600 3,600.00
Sub Total 13,600.00
TOTAL 85,600.00
S.NO. PARTICULARS UNIT QTYUNITCOST Year 1 Total Cost
1 Planting MaterialCost of planting Material 10,000 0.25 2,500.00 2,500.00Mortality Gap filling 10% 1,000 0.25 250.00 250.00Planting Cost 10,000 0.15 1,500.00 1,500.00
Sub Total 4,250.00 - 4,250.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.005 50 7.00 350.00 350.00Phosphorus 0.010 100 5.00 500.00 500.00Potassium 0.010 100 6.00 600.00 600.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 52/72
FYM 0.750 7,500 1.00 7,500.00 7,500.00
Sub Total 8,950.00 - 8,950.003 Others
Interculture 0.15 1,500.00 1,500.00Chemicals (Weedicides & Insecticides) 1 1,500.00 1,500.00 1,500.00
Sub Total 3,000.00 - 3,000.005 Expenditure during Cultivation Period
Labour Mandays 120.00 90 10,800 10,800.00Electricity 1.00 2,400 2,400.00
Sub Total 13,200.00 13,200.00GrandTotal 29,400.00 - 29,400.00
GRAND TOTAL 115,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 53/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 54/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 55/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 56/72
FYM 0.750 7,500 1.00 7,500.00 7,500.00
Sub Total 8,950.00 - 8,950.003 Others
Interculture 0.15 1,500.00 1,500.00Chemicals (Weedicides & Insecticides) 1 1,500.00 1,500.00 1,500.00
Sub Total 3,000.00 - 3,000.005 Expenditure during Cultivation Period
Labour Mandays 120.00 90 10,800 10,800.00Electricity 1.00 2,400 2,400.00
Sub Total 13,200.00 13,200.00
GrandTotal 29,400.00 - 29,400.00
GRAND TOTAL 115,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 57/72
SteviaPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 5,000 5,000.00
Fencing -
Sub Total 5,000.002 Infrastructure
Godown M2 10 2,500 25,000.00Shed (Aportioned) 5 1,500 7,500.00
Sub Total 32,500.003 Irrigation system
Tube Well (Aportioned) Quotation 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.004 Equipment & Tools (Aportioned)
Farming Equipments & Tools 1 15,000 15,000.00Sub Total 15,000.00
TOTAL 107,500.00
S.NO. PARTICULARS UNIT QTYUNITCOST Year 1 Total Cost
1 Planting MaterialCost of planting Material 27,000 5.00 135,000.00 135,000.00Mortality Gap filling 5% 1,350 5.00 6,750.00 6,750.00Planting Cost 27,000 0.50 13,500.00 13,500.00
Sub Total 155,250.00 - 155,250.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.020 540 7.00 3,780.00 3,780.00Phosphorus 0.010 270 5.00 1,350.00 1,350.00Potassium 0.010 270 6.00 1,620.00 1,620.00FYM 0.250 6,750 1.00 6,750.00 6,750.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 58/72
Sub Total 13,500.00 - 13,500.003 Others
Interculture 0.25 6,750.00 6,750.00Chemicals (Weedicides & Insecticides) 1 2,000.00 2,000.00 2,000.00
Sub Total 8,750.00 - 8,750.005 Expenditure during Cultivation Period
Labour Mandays 120.00 90 10,800 10,800.00Electricity 1.00 4,200 4,200.00
Sub Total 15,000.00 - 15,000.00Grand
Total 192,500.00 - 192,500.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 59/72
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 60/72
FYM 7.000 5,600 2.50 14,000.00 14,000.00
Sub Total 16,750.00 3,670.00 20,420.00
3 Plant protectionStaking (Standards) 400.00 5.00 2,000.00 2,000.00Chemicals (Weedicides & Insecticides) 1 5,000.00 5,000.00 2,500.00 7,500.00
Sub Total 7,000.00 2,500.00 9,500.005 Expenditure during Cultivation Period
Labour Mandays 90.00 90 8,100 8,100 16,200.00Electricity 1.00 2,400 4,800 7,200.00
Sub Total 10,500.00 12,900.00 23,400.00
Grand Total 36,010.00 19,070.00 55,080.00GRAND TOTAL 150,010.00 169,080.00
Say 150,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 61/72
PASSION FRUITPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 7,500 7,500.00
Fencing 280 125 35,000.00
Pit Digging, Filling & Planting LS 1320 5 6,600.00
Sub Total 49,100.00
2 InfrastructureGodown M2 9 2,500 22,500.00Trellis Nos 1,320 15 19,800.00
Sub Total 42,300.003 Irrigation system
Tube Well Quotation 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.00
4 Equipment & Tools (Aportioned)Farming Equipments & Tools 1 10,000 10,000.00
Sub Total 10,000.00
TOTAL 156,400.00S.NO. PARTICULARS UNIT QTY UNIT COST Year 1 Total Cost
1 Planting MaterialCost of planting Material 1,320 25.00 33,000.00 33,000.00Mortality 5% 66 25.00 1,650.00 1,650.00
Sub Total 34,650.00 - 34,650.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.100 135 7.00 945.00 945.00Phosphorus 0.050 70 5.00 350.00 350.00Potassium 0.100 135 6.00 810.00 810.00FYM 10.000 13,200 2.50 33,000.00 33,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 62/72
Sub Total 35,105.00 - 35,105.003 Plant protection
Prunning & Training 1.00 1,745.00 1,745.00Chemicals (Weedicides & Insecticides) 1 2,000.00 2,000.00 2,000.00
Sub Total 3,745.00 - 3,745.004 Expenditure during Cultivation Period
Labour Mandays 170.00 90 15,300.00 15,300.00Electricity 1.00 4,800 4,800.00
Sub Total 20,100.00 20,100.00
Grand Total 93,600.00 - 93,600.00
GRAND TOTAL 250,000.00 250,000.00
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 63/72
VanillaPROJECT COST (Rupees)
S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Soil Leveling LS 1 1,000 1,000.00
Fencing -
Sub Total 1,000.002 Infrastructure
Godown Sq Mtr 9 2,500 22,500.00Curing Center (Aportioned) Sq Mtr 3.33 1,500 5,000.00Trellis 1800 15 27,000.00
Sub Total 54,500.003 Irrigation system
Tube Well (Aportioned) Quotation 1 25,000 25,000.00Drip Irrigation Quotation 1 30,000 30,000.00
Sub Total 55,000.004 Plant & Machinery
Shade Net Houses 75% Sq Mtr 3,000 190 570,000.00Electrification 1 25,000 25,000.00
Erection 5.0% 1 28,500 28,500.00
Sub Total 623,500.005 Equipment & Tools (Aportioned)
Farming Equipments & Tools 1 10,000 10,000.00
Furniture & Fixture 1 5,000 5,000.00
Sub Total 15,000.00
TOTAL 749,000.00
UNIT
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 64/72
S.NO. PARTICULARS UNIT QTYUNITCOST Year 1 Year 2 Total Cost
1 Planting MaterialCost of planting Material 1,800 20.00 36,000 36,000.00
Mortality 10% 180 20.00 3,600 3,600.00
Soil Preparation & Planting 1,800 4.00 7,200 7,200.00
Sub Total 46,800 - 46,800.002 Cost of Fertlizer and Manure Kgs/pit
Nitrogen 0.100 180 7.00 1,260 1,260 2,520.00
Phosphorus 0.050 90 5.00 450 450 900.00
Potassium 0.100 180 6.00 1,080 1,080 2,160.00FYM & Vermi
Compost 4.000 7,200 4.00 28,800 28,800 57,600.00
Sub Total 31,590 31,590 63,180.003 Plant Protection
Prunning & Training 1.10 1,980 1,980 3,960.00Chemicals (Weedicides &
Insecticides) 1 2,000.00 2,000 2,000 4,000.00
Sub Total 3,980 3,980 7,960.006 Expenditure during Cultivation Period
Labour Mandays 180 90 16,200 16,200 32,400.00
Electricity 1 2,400 2,400 4,800.00
Sub Total 18,600 18,600 37,200.00
Grand
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 65/72
GrandTotal 100,970 54,170 155,140.00
GRAND TOTAL 849,970 904,140.00
Say 850,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 66/72
NurseryPROJECT COST (Rupees)S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Land Leveling Sq Mtrs 4,000 50 200,000
Fencing 260 150 39,000
Sub Total 239,0002 InfrastructureUtilities Building Sq Mtr 20 2,500 50,000Administrative Building Sq Mtr 20 3,000 60,000Open Yard Sq Mtr 45 1,000 45,000
Sub Total 155,0003 Plant & Machinery
Green House with fogger & Sprinkler
Irrigation Sq Mtr 1400 600 840,000
Net House (Hardening Area) Ls 2000 200 400,000
Erection 5.00% 1 62,000 62,000
Media Sterlisation System with Boiler Ls 1 450,000 450,000
Electrification Ls 1 100,000 100,000
Sub Total 1,852,0004 Equipment & Tools
D G Set 60 KVA 1 250,000 250,000
Tractor 1 400,000 400,000
Furniture 1 4,000 4,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 67/72
Furniture 1 4,000 4,000Tools & Equipment
1 300,000 300,000• Trolleys – 6
• Wheel borrows – 10
• Grafting & budding knives – 10
• Pruning shears – 6
• Motorised sprayer-1
• Workshop tools – 1
•
Sterilisation equipment
-• Refrigerator – storage of bud wood & seeds
-
Sub Total 954,000
GRAND TOTAL 3,200,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 68/72
Pre-coolingPROJECT COST (Rupees)S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land DevelopmentLand Development Sq Mtrs 80 200 16,000
Sub Total 16,0002 Infrastructure
Pre-coolingShed Sq Mtr 50 3,000 150,000Utilities Building Sq Mtr 20 2,500 50,000
Sub Total 200,0003 Plant & Machinery
Refrigeration Equipment Ls 1 600,000 600,000Insulated
Panels Ls 1 400,000 400,000
Erection 5.00% 1 50,000 50,000
Electrification Ls 1 35,000 35,000
Sub Total 1,085,0004 Equipment & Tools
D G Set 40 KVA 1 250,000 250,000
Hydrolic Pallet Truck (Hand operated) 2 25,000 50,000
Furniture 1 20,000 20,000Plastic Crates 500 150 75,000Wooden Pallets 20 200 4,000
Sub Total
399,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 69/72
GRAND
TOTAL 1,700,000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 70/72
PROJECT REPORT
COST OF PROJECT(RS INLACS)
PARTICULARS AMOUNT
LAND & SITE DEVELOPMENT 6.33
MAIN BUILDING 3.75
PLANT & MACHINERY 23.30
MISC. FIXED ASSETS 7.42
TOTAL FIXED ASSETS 40.80
SECURITY DEPOSITS 0.70
PRE-OPERATIVE EXPENSES -
TOTAL 41.50
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 71/72
Ripening ChamberPROJECT COST (Rupees)S.NO. PARTICULARS UNIT QTY UNIT COST Total Cost
1 Land Development
Land Development Sq Mtrs 1,000 200 200,000-
Sub Total 200,0002 Infrastructure
Shed for Ripening Chamber Sq Mtr 500 3,000 1,500,000
Utilities Building Sq Mtr 20 2,500 50,000
Administrative Block Sq Mtr 20 4,000 80,000
Open Yard Sq Mtr 25 1,500 37,500
Sub Total 1,667,5003 Plant & Machinery
Refrigeration Equipment Ls 1 2,750,000 2,750,000
Insulated Panels Ls 1 1,000,000 1,000,000Ethylene generator
Ls 1 100,000 100,000
Erection 5.00% 1 187,500 187,500
Electrification Ls 1 100,000 100,000
Sub Total 4,137,5004 Equipment & Tools
D G Set 90 KVA 1 650 000 650 000
8/14/2019 Cost Norms NHB
http://slidepdf.com/reader/full/cost-norms-nhb 72/72
D G Set 90 KVA 1 650,000 650,000
Fork Lifts 1 900,000 900,000
Hydrolic Pallet Truck (Hand operated) 2 25,000 50,000
Furniture 1 20,000 20,000
Plastic Crates 2000 180 360,000
Wooden Pallets 75 200 15,000
Sub Total 1,995,000
GRAND TOTAL 8,000,000