145
Click to edit Master text styles Second level Third level Fourth level » Fifth level | ©2012, Cognizant 1 Confidential 1 Transforming Transforming Belagavi Belagavi into a Smart City into a Smart City

Upload: vuanh

Post on 01-Jan-2017

256 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 1 Confidential 1

Transforming Transforming BelagaviBelagavi into a Smart Cityinto a Smart City

Page 2: cost in rs. crore

� CITY LEVEL CRITERIA

� AREA BASED DEVELOPMENT PROPOSALS

� PAN CITY PROPOSAL

AGENDAAGENDA

Page 3: cost in rs. crore

BASE MAPBASE MAP

Population4,90,045+17523=

507568

Area 94.08 Sq. Km

Number of Properties 1,00,169

Number of Wards 58 Wards

Length of Roads 804.20 Kms

Total Water Supply 90 MLD

Per Capita Water Supply 110-130 LPCD

Total Amount of SWG per

day220 tonnes

% of Household Covered

by Door-to-Door Collection95%

Page 4: cost in rs. crore

VISION FOR BELAGAVI

“A livable, inclusive and vibrant Belagavi city, in which every citizen has

adequate access to good quality of affordable and sustainable physical

& social infrastructure, employment opportunities, in which cultural

heritage and environment are protected and preserved through good

governance and city management”

VISION & SUB GOALS VISION & SUB GOALS

Page 5: cost in rs. crore

THE FOLLOWING ARE THE SUB-GOALS OF BELAGAVI WITH VIEW TO ACHIEVE THE VISION:

• 24 x 7 water supply: To achieve uninterrupted water supply for the entire city as per international

standards.

• Uninterrupted & sustainable Power supply: Augmenting existing power with efficient renewable solar

and wind energy with a view to providing uninterrupted and sustainable power supply.

• Sewerage network & system: To achieve complete underground sewerage network and system with

complete treatment and reusage for the entire city.

• City Mobility: Improvement of overall Mobility for Belagavi city that includes dedicated bus lanes,

Roads with integrated infrastructure , Pedestrian friendly footpaths, dedicated cycle tracks,

decongestion of Inner City, dedicated Parking areas, Junction improvements and using Integrated &

effective Traffic Management systems.

• Improving civic facilities and amenities in the city through development of specific area level multi

utilities civic service centers, aiming at significantly improving the standard of living.

VISION & SUB GOALS VISION & SUB GOALS

Page 6: cost in rs. crore

• Increasing the green cover of the City through development of large scale plantations/urban

forestry in available open spaces, institutional campuses, Cantonment areas, foreshores of water

bodies and avenue plantations.

• E-Governance- Information & Communication Technology enabled & Integrated portal/platform

with a Central Command Station for facilitating citizen services , ensuring safety and security, hassle

free mobility and for providing transparent, Citizen friendly, effective & responsive governance.

• Affordable housing: In view of priority requirements of this sector, facilitation of affordable housing

for EWS and LIG in the city.

• Enhancement of Employment opportunities: City has a potential engineering industries base as well

as aerospace units, and is home to large number of textile power looms. It has a large number of

educational Institutions & potential ITES growth. Imparting appropriate skill sets for youth through

skill development centres there by emphasis would be to given to establish engineering ancillary

units, encouragement of power loom sector along with Information Technology & Engineering Service

industries to strengthen the city’s economy & bringing in more employment and livelihood

opportunities.

VISION & SUB GOALS VISION & SUB GOALS

Page 7: cost in rs. crore

• Knowledge City : By ensuring adequate and quality infrastructure which acts as catalyst to

promote city of Belagavi as Knowledge hub for imparting education in the field of Medicine,

Technical, Management, Life sciences , City being already the seat of three Universities, Six

medical institutions, many technical, management and other institutions.

• Tourism development: Considering spatial location of Goa, by improving overall ambience,

Cultural and Heritage sites, promoting health tourism making Belagavi as a supplementary and

preferred tourist destination.

VISION & SUB GOALS VISION & SUB GOALS

Page 8: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 8 Confidential 8

CITIZEN CITIZEN ENGAGEMENTENGAGEMENT

Page 9: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

� Numerous awareness programs and

Events conducted for general

public, students, professionals

etc.

� Extensive coverage in Media

� Hoardings across the city, in

important junctions

� Mobile App developed

exclusively, for citizens’

convenience in participation

SOURCESUGGESTIONS

RECEIVED

mygov.in 1,549

Drop box & Face to

Face47,593

Facebook, Twitter,

SMS & Email878

Smart Belagavi App 52,814

Essays 56

TOTAL 1,02,890

Page 10: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

Page 11: cost in rs. crore

revised guidelines: Scoring ParametersCITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

12%

6%

6%

6%

6%

6%

8%4%6%

9%

8%

6%

4%4%

9%

Overall priorities as listed by CitizensDecongestion of city core area by development of new city centers

and improvement of mobilityDevelopment of existing commercial places like old markets,

dilapilated complex etc.Housing for urban poor

Development of new areas for housing and infrastructure needs of

the city for the future e-Government initiatives

Education & skills improvement

Energy efficiency & improvement

Environment

Health care

Water

Sanitation

Safety & Security

Disability services

Senior citizen amenities

Others

Page 12: cost in rs. crore

SECTOR OR FOCUS AREAO PRIORITY % AGE

DECONGESTION OF CITY CORE AREA BY DEVELOPMENT OF NEW CITY CENTERS AND

IMPROVEMENT OF MOBILITY 12

WATER 9

SANITATION 8

RENEWABLE ENERGY & ENERGY EFFICIENCY & IMPROVEMENT 8

E-governance initiatives 6

EDUCATION & SKILLS IMPROVEMENT 6

HOUSING FOR URBAN POOR 6

DEVELOPMENT OF NEW AREAS FOR HOUSING AND INFRASTRUCTURE NEEDS OF THE CITY

FOR THE FUTURE 6

DEVELOPMENT OF EXISTING COMMERCIAL PLACES LIKE OLD MARKETS, DILAPIDATED

COMPLEX ETC.6

HEALTH CARE 6

SAFETY & SECURITY 6

ENVIRONMENT 4

SENIOR CITIZEN AMENITIES 4

FACILITIES FOR PHYSICALLY CHALLENGED 4

OTHERS 9

revised guidelines: Scoring ParametersCITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

Page 13: cost in rs. crore

| ©2012, Cognizant Technology Solutions Confidential13

• Inputs received from all sections of the city

• Youth

• Professors, teachers and faculty

• Workers & Labour

• Government & Private service

• House wife & home makers

• Agriculturists

• Business people

• Skilled professionals

• Others

• Generally responses have been linear across different sections. There is

no observation of any inconsistencies in priorities from different

sections

• Participation from all wards of the city

• Covered all classes

• Covered residential, commercial areas

• Covered inner city and outskirts in the limits of corporation and

BUDA

• More active participation from the youth of the city indicating interest

in developing the city for future

• Priorities have been also similar for Male and Female citizens

• Not much variation has been observed in the overall priorities across

different age groups

• The priorities have been linear with most citizens opting for

development in all sectors

• 12% for have responded with the need to improve mobility

• 9% citizens have responded with the priority of water

• 8% prioritized Energy supply & efficiency and Sanitation

• 6% each for sectors of Healthcare, E-Governance, Education,

Safety & security, old commercial area development,

development of commercial spaces, Housing for poor,

housing infrastructure

• 4% each for Environment, senior citizen amenities and

Disability assistance

• The priorities chosen indicate that the responses have been

spread linearly across the different sections of the society

and across wards where there is general consensus to

develop the city in all the sectors

• 67% of the respondents who have suggested for

improvements in roads, transport, traffic and parking, have

suggested for decongestion in City center area and promote

encourage development in north & south part of the city

OBSERVATION PRIORITIES

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

Page 14: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

Occupation wise - Distribution of responses

Page 15: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

0

5

10

15

20

25

30

Priorities - Male & Female respondents

Percentage - Male Percentage - Female

Page 16: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

05

101520253035404550

Priorities - Age group wise

Age group < 20 Age group 20-40 Age group 40- 60 Age group > 60

Page 17: cost in rs. crore

CITIZEN CITIZEN ENGAGEMENT ENGAGEMENT –– Ward wise prioritiesWard wise priorities

Page 18: cost in rs. crore

CITIZEN CITIZEN ENGAGEMENT ENGAGEMENT –– Occupation wise prioritiesOccupation wise priorities

0100020003000400050006000

Teaching community Agriculturists Labour

Govt / Private service Business Skilled professionals

Housewife Others Youth

Page 19: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

0

20

40

60

80

Overall citizen inputs - Unsatisfactory services

Page 20: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

0

10

20

30

40

50

60

70

80

Water Electricity Sewerage Transport

facilities

Pedestrian

access

Roads &

Parking

Traffic

signals

Street

lights

Heritage Emergency

services

Percentage of citizens responding - Unsatisfactory services

Issues reported by Male citizens Issues reported by Female citizens

Page 21: cost in rs. crore

CITIZEN ENGAGEMENTCITIZEN ENGAGEMENT

0

10

20

30

40

50

60

70

Water Electricity Sewerage Transport

facilities

Pedestrian

access

Roads &

Parking

Traffic

signals

Street

lights

Heritage Emergency

services

Percentage of citizens responding - Unsatisfactory services

Age group < 20 Age group 20-40 Age group 40- 60 Age group > 60

Page 22: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

1CITIZEN

PARTICIPATION

A smart city constantly shapes and

changes course of its strategies

incorporating views of its citizen to bring

maximum benefit for all. (Guideline

3.1.6)

SCENARIO-3:

City undertakes citizen participation with

some select stakeholders. The findings are

compiled and incorporated in some projects or

programs. Very few major decisions are shared

with citizens until final projects are unveiled.

Scenario-4:

City constantly conducts citizen engagement with people

at each Ward level to incorporate their views, and these

shape priorities and development projects in the city.

Multiple means of communication and getting feedback

such, both face-to-face and online are utilized. The

effectiveness of city governance and service delivery is

constantly enhanced on the basis of feedback from

citizens.

2IDENTITY AND

CULTURE

A Smart City has a unique identity, which

distinguishes it from all other cities,

based on some key aspect: its location or

climate; its leading industry, its cultural

heritage, its local culture or cuisine, or

other factors. This identity allows an

easy answer to the question "why in this

city and not somewhere else?" A Smart

City celebrates and promotes its unique

identity and culture. (Guideline 3.1.7)

Scenario-2:

Historic and cultural resources are preserved

and utilized to some extent but limited

resources exist to manage and maintain the

immediate surroundings of the heritage

monuments. New buildings and areas are

created without much thought to how they

reflect the identity and culture of the city.

Scenario-4:

Built, natural and intangible heritage are preserved and

utilized as anchors of the city. Historical and cultural

resources are enhanced through various mediums of

expression. Public spaces, open spaces, amenities and

public buildings reflect local identity and are widely used

by the public through festivals, events and activities.

3ECONOMY AND

EMPLOYMENT

A smart city has a robust and resilient

economic base and growth strategy that

creates large-scale employment and

increases opportunities for the majority

of its citizens. (Guideline 2.6 & 3.1.7 &

6.2)

Scenario-2

There is a range of job opportunities in the

city for many sections of the population. The

city attemps to integrate informal economic

activities with formal parts of the city and its

economy.

Scenario-4:

There are adequate opportunities for jobs for all sections

of income groups and skill levels. Job-oriented skill

training supported by the city and by industry. Economic

activities are suited to and build on locational and other

advantages of the city.

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 23: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

4 EDUCATION

A Smart City offers schooling and

educational opportunities for all

children in the city (Guideline

2.5.10)

Scenario-3:

City provides adequate primary and

secondary education facilities within

easily reachable distance for most

residential areas of the city. Education

facilities are regularly assessed through -

databases of schools including number

of students, attendance, and teacher -

student ratio, facilities available and

other factors.

Scenario-4:

City provides adequate and high-quality education

facilities within easily reachable distance of 10

minutes walking for all the residential areas of the

city and provides multiple options of connecting

with specialized teaching and multimedia enabled

education. Education facilities are regularly

assessed through database of schools including

number of students, attendance, teacher-student

ratio, facilities available and other factors.

5 HEALTH

A Smart City provides access to

healthcare for all its citizens.

(Guideline 2.5.10)

Scenario-3:

City provides adequate health facilities

within easily reachable distance for all

the residential areas and job centers of

the city. It has an emergency response

system that connects with ambulance

services.

Scenario-4:

City provides adequate health facilities at easily

accessible distance and individual health

monitoring systems for elderly and vulnerable

citizens which are directly connected to hospitals

to prevent emergency health risks and to acquire

specialized health advice with maximum

convenience. The city is able to foresee likely

potential diseases and develop response systems

and preventive care.

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 24: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

6 MIXED USE

A Smart City has different kinds of land

uses in the same places; such as offices,

housing, and shops, clustered together.

(Guidelines 3.1.2 and 3.1.2)

SCENARIO-2:

In some parts of the city, there is a mixture of

land uses that would allow someone to live,

work, and shop in close proximity. However, in

most areas, there are only small retail stores

with basic supplies near housing. Most

residents must drive or use public

transportation to access a shop for food and

basic daily needs. Land use rules support

segregating3.2555 housing, retail, and office

uses, but exceptions are made when

requested.

Scenario-4:

Every part of the city has a mix of uses. Everyone lives

within a 15-minute trip of office buildings, markets and

shops, and even some industrial uses. Land use rules

require or encourage developers to incorporate a mixture

of uses in their projects.

7 COMPACT

A Smart City encourages development to

be compact and dense, where buildings

are located close to one another and are

ideally within a 10-minute walk of public

transportation, forming concentrated

neighborhoods. (Guidelines 2.3 and 5.2)

SCENARIO-3:

The city has multiple high density clusters that

are easy to walk around where buildings are

close together. However, the city actively

encourages development to occur on under-

utilized parcels of land into high-density,

walkable areas. When new formal large-scale

development projects happen at the periphery,

they are encouraged to be dense and compact,

with buildings that are close together and line

the streets. The city actively encourages or

incentivizes re-development of under-utilized

parcels in the inner-city, especially those

located close to public transportation.

SCENARIO-4:

The city is highly compact and dense, making the most of

land within the city. Buildings are clustered together,

forming walkable and inviting activity centers and

neighborhoods. Regulations encourage or incentivize re-

development of under-utilized land parcels in the city

center. Buildings are oriented to the street - - and parking

is kept to a minimum, located below ground or at the back

of buildings. Public transport and walking connects

residences to most jobs and amenities. Residential density

is at an optimal with affordable housing available in most

areas.

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 25: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

8PUBLIC OPEN

SPACES

A Smart City has sufficient and usable

public open spaces, many of which are

green, that promote exercise and

outdoor recreation for all age groups.

Public open spaces of a range of sizes

are dispersed throughout the City so all

citizens can have access. (Guidelines

3.1.4 & 6.2)

Scenario-3:

Most areas of the city have some sort of public

open space. There is some variety in the types of

public spaces in the city. However, public spaces

are sometimes not within easy reach or access of

more vulnerable populations and are more

restricted in poorer neighborhoods.

Scenario-4:

Public open spaces are well dispersed throughout the city.

Every residential area and work space has access to open

space within 10 minutes walking distance. Open spaces are

of various types - natural, green, plazas, parks, or recreation

areas - which serve various sections of people. Public spaces

tend to truly reflect the natural and cultural identity of the

city.

9HOUSING AND

INCLUSIVENESS

A Smart City has sufficient housing for

all income groups and promotes

integration among social groups.

(Guidelines 3.1.2)

Scenario-3:

Housing is available at all income levels, but is

segregated across income levels. The growth of

supply of housing almost meets the rate of

population growth. Increasingly, lower and

middle-income people can find housing in areas

that are conveniently located.

Scenario-4:

A wide range of a housing is available at all cost levels. The

supply of housing is growing at pace with population.

Affordable, moderate, and luxury housing are found

clustered together in many areas of the city

10 TRANSPORT

A Smart City does not require an

automobile to get around; distances

are short, buildings are accessible from

the sidewalk, and transit options are

plentiful and attractive to people of all

income levels. (Guidelines 3.1.5 & 6.2)

Scenario-3:

Network of streets are fairly complete. Public

transport covers most areas of the city. However

last mile connectivity remains incomplete and

affects transport options. Foot paths are

accessible in most areas, whereas concerns of

safe crossings and security throughout the day

remain. Parking zones are demarcated but

absence of pricing increases over utilization of

parking lots.

Scenario-4:

Street network is complete and follows a clear structure.

Public transportation network covers the entire city and

intensity of connection relates with the demand. Plenty of

options of public transport are available and affordable for

all sections of the society. There is multi-modal integration at

all mass transit stations and organized-priced on street and

off street parking. Walking and cycling is prevalent.

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 26: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

11 WALKABLE

A Smart City’s roads are designed

equally for pedestrians, cyclists and

vehicles; and road safety and

sidewalks are paramount to street

design. Traffic signals are sufficient

and traffic rules are enforced.

Shops, restaurants, building

entrances and trees line the

sidewalk to encourage walking and

there is ample lighting so the

pedestrian feels safe day and night.

(Guidelines 3.1.3 & 6.2)

Scenario-2:

Older areas of the city see a mix of

pedestrians, cyclists, and vehicles but

newer areas are focused mainly on the

automobile. In the new areas, there are

few pavements and main entrances to

new buildings are not accessible from

the front of the street. Large driveways

or parking lots often separating them

from the street, and sometimes are

enclosed by gates. In these areas,

traffic signals are disobeyed.

Scenario-4:

The city is highly walkable. Pavements exist on

every street and are maintained. Trees line many

sidewalks to provide shade for pedestrians.

Buildings in most areas of the city are easily

accessible from the sidewalk. Traffic signals

control the flow of automobiles and are enforced.

A network of bike lanes exists to promote cycling

as a means of transport. Traffic rules are followed

and enforced with great seriousness.

12IT

CONNECTIVITY

A Smart City has a robust internet

network allowing high-speed

connections to all offices and

dwellings as desired. (Guideline 6.2)

Scenario-1:

City has no major plans to bring

increased high speed internet

connectivity to the public.

Scenario-3:

The city offers free Wi-Fi services to provide

opportunity for all the citizens to connect with

high speed internet across the city.

13

ICT-ENABLED

GOVERNMENT

SERVICES

A Smart City enables easy

interaction (including through

online and telephone services) with

its citizens, eliminating delays and

frustrations in interactions with

government. (Guidelines 2.4.7 &

3.1.6 & 5.1.4 & 6.2)

Scenario-2:

Some of the public services are

provided online and infrastructure for

total digitalization is not in place.

Service delays occur regularly in some

sectors. Responses to citizen inquiries

or complaints are often delayed. No

Scenario-4:

All major services are provided through online and

offline platforms. Citizens and officials can access

information on accounting and monitor status of

projects and programs through data available on

online system. Robust data infrastructure system

shares information and enhances internal

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 27: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

14ENERGY

SUPPLY

A Smart City has reliable, 24/7 electricity

supply with no delays in requested

hookups. (Guideline 2.4)

Scenario-2:

Electricity supply and loads are managed as

per demand and priority for various functions

with clear scheduling, with electricity being

available in many areas for most hours of the

day.

Scenario-4:

Electricity is available 24 x 7 in all parts of the city with

smart metering linked to online platforms for monitoring

and transparency.

15ENERGY

SOURCE

A Smart City has at least 10% of its

electricity generated by renewables.

(Guideline 6.2)

Scenario-2:

The city is preparing plans for ensuring that it

gets more energy from renewable sources and

is in the process of making commitments in this

regard.

Scenario-4:

At least 10% of the energy used in the city is generated

through renewable sources. The city is undertaking long-

term strategic projects to tap renewable sources of energy

in its region/beyond to increase the percentage of

renewable energy sources.

16 WATER SUPPLY

A Smart City has a reliable, 24/7 supply of

water that meets national and global

health standards. (Guidelines 2.4 & 6.2)

Scenario 2-3:

The city has 24 x 7 water supply in some areas

and intermittent water supply in other areas.

But the quality of water needs national

standards. Unaccounted water loss is less than

20%.

Scenario 4:

The city has 24 x 7 treated water supply which follows

national and global standards and also available in

sufficient quantity and affordable across all sections of the

society. Unaccounted loss less than 15%.

17WATER

MANAGEMENT

A Smart City has advanced water

management programs, including smart

meters, rain water harvesting, and green

infrastructure to manage storm water

runoff. (Guideline 6.2)

Scenario 1:

The city does not measure all its supply. It

does not recycle waste water to meet its

requirements and rain water harvesting is not

prevalent. Flooding often occurs due to storm

water run-off.

Scenario 4:

The city has meters for all its water supply. It includes

smart mechanisms to monitor remotely. Rainwater

harvesting systems are installed and utilized through the

city and storm water is collected and stored in water

bodies and treated for usage. Recycled waste water is

supplied for secondary uses

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 28: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

18

WASTE

WATER

MANAGEMEN

T

A Smart City treats all of its sewage to

prevent the polluting of water bodies and

aquifers. (Guideline 2.4)

Scenario 1:

The city is unable to treat all its sewage. Many

local sewer lines open on to water bodies and

open ground and pollute the environment.

Scenario 3:

All the waste water is collected and treated before

disposal. It is also treated to a high standard and some is

recycled.

19 AIR QUALITY

A Smart City has air quality that always

meets international safety standards.

(Guideline 2.4.8)

Scenario-1:

City does not have plans, policies or programs

to improve the air quality. Systems to monitor

air quality are absent.

Scenario-3:

City has programs and projects to monitor air quality and

spatializing the data to ascertain reasons for degrees of

pollution in the air. Pollution levels are acceptable.

20ENERGY

EFFICIENCY

A Smart City government uses state-of-the-

art energy efficiency practices in buildings,

street lights, and transit systems. (Guideline

6.2)

Scenario-2:

The city promotes energy efficiency and some

new buildings install energy efficiency systems

that track and monitor energy use and savings.

Scenario-3:

Most new public buildings install energy efficiency systems

and some older buildings are also retrofitted to be more

energy efficient. Local government conducts counselling

and outreach with developer, businesses and residents to

adopt energy efficiency strategies

21

UNDERGROU

ND ELECTRIC

WIRING

A Smart City has an underground electric

wiring system to reduce blackouts due to

storms and eliminate unsightliness.

(Guideline 6.2)

Scenario-2:

More than 40% of the city has underground

electric wiring system.

Scenario-4:

More than 90% of the city has underground electric wiring

system.

STATUS ON KEY PERFORMANCE INDICATORSSTATUS ON KEY PERFORMANCE INDICATORS

Page 29: cost in rs. crore

KPI SMART CITY BENCHMARK SELF-ASSESSMENT CITY’S GOAL FOR ACHIEVEMENT

22 SANITATION

A Smart City has no open defecation, and a

full supply of toilets based on the

population. (Guidelines 2.4.3 & 6.2)

Scenario 2:

Sanitation facilities are available to 90% of the

city's population.

Scenario 4:

Sanitation facilities are available to 100% of the city's

population.

23WASTE

MANAGEMENT

A Smart City has a waste

management system that removes

household and commercial garbage,

and disposes of it in an

environmentally and economically

sound manner. (Guidelines 2.4.3 &

6.2)

Scenario 2:

Waste generated is usually collected but

not segregated. Recycling is attempted

by difficult to implement.

Scenario 4:

The city reduces land fill caused by waste so that it

is minimal. All the solid waste generated is

segregated at source and sent for recycling.

Organic waste is sent for composting to be used for

gardening in the city. Energy creation through

waste is considered.

24SAFETY AND

SECURITY

A Smart City has high levels of public

safety, especially focused on

women, children and the elderly;

men and women of all ages feel safe

on the streets at all hours. (Guideline

6.2)

Scenario-3:

The city has high levels of public safety -

all citizens including women, children

and the elderly feel secure in most parts

of the city during most time in the day.

Scenario-4:

The city has very high levels of public safety - all

residents feel safe in all parts of the city during all

hours of the day.

STATUS ON KEY PERFORMANCE INDICATORSTATUS ON KEY PERFORMANCE INDICATOR

Page 30: cost in rs. crore

STRENGTHS WEAKNESSES

� BELAGAVI IS MORE OF A PLANNED CITY THAN A CITY THAT HAS EVOLVED

� Corporation developed areas (811 acres)

� Cantonment (1,763 acres)

� Layouts developed by BUDA, BUDA approved layouts

� Industrial areas developed by KIADB

� HUB FOR HEALTHCARE AND EDUCATION

� Tertiary Healthcare � Quaternary Healthcare

� INDUSTRIALIZED

� HINDALCO, AEQUS, Foundry Cluster

� SECOND CAPITAL OF KARNATAKA

� SALUBRIOUS CLIMATE

� STRATEGIC LOCATION COUPLED WITH GOOD CONNECTIVITY

� Equidistant from Bangalore, Hyderabad &

Mumbai, Proximity to Goa, good connectivity

by Road, Rail and Air.

� AVAILABILITY OF LAND

� Congestion in the central old part of the city

� National Highway (NH4A) runs through the city

� 4,000 Heavy Vehicles move through the city, daily

� Only 48% of the city covered with sewerage system

� Sewage discharges to water body without treatment.

� Water supplied intermittently in majority of the city area

� Shortage of middle and low income housing stock

� Potential of Transport linkages not fully exploited

OPPORTUNITIES THREAT

� Continuing upwards on the value curve – in academics and in eco-friendly, high

technology industries

� Capacity to emerge as the best destination for investments as Bangalore moves towards

saturation

� Capacity for planned unlocking of land in the city and its periphery

� Utilizing the citizens/NGOs willingness and ability in participative governance of the city

� Building upon experience gained in formulating infrastructure projects on a PPP format

� Competition from other cities (both metropolises and tier 2 cities),

especially from those in Southern India

65%

31%

4%

Planned

Unplanned

Public Utilities

SWOT ANALYSISSWOT ANALYSIS

Page 31: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 31 Confidential 31

PROPOSALS FOR AREA BASED DEVELOPMENTPROPOSALS FOR AREA BASED DEVELOPMENT

Page 32: cost in rs. crore

CONSISTS OF THE FOLLOWING COMPONENTS IN THE ABD AREA :

• IMPROVEMENT OF ALL ROADS, NETWORK, AND JUNCTIONS

• IMPROVEMENT OF UTILITIES AND AMENITIES LIKE WATER SUPPLY, SEWERAGE, SANITATION AND SOLID WASTE

MANAGEMENT

• IMPROVEMENT OF TRANSPORTATION FACILITIES AND MOBILITY – DEVELOPMENT OF FOOTPATHS, CYCLE WAYS,

REGULATING TRAFFIC AND PARA- TRANSIT FACILITIES

• PROVIDING THE SMART SOLUTIONS WITH ICT COMPONENTS, IT CONNECTIVITY, SAFETY AND SECURITY.

• IMPROVEMENT OF THE BASIC SUPPORT SERVICES LIKE HAWKERS VENDING AREAS, PARKING, BUS TERMINALS,

CYCLE STATIONS, BUS STANDS, SUPPORT SHOPPING FACILITIES

• IMPROVING OTHER SUPPORT SERVICES LIKE LOCAL OFFICES, CITIZEN INFORMATION CENTERS

• ENCOURAGE NON-MOTORIZED TRANSPORT AND PROVISION FOR WALKWAYS

• DEVELOPMENT OF NEIGHBORHOOD PARKS AND OPEN SPACES

• DEVELOPMENT OF MAJOR HERITAGE PARK AND ENHANCING GREENERY

• IMPROVEMENT OF EMPLOYMENT FACILITIES THROUGH FLATTED FACTORIES DEVELOPMENT, SKILL

DEVELOPMENT CENTERS AND IT INCUBATION CENTERS & INFORMAL SECTOR

• CONSERVATION & PRESERVATION OF CENTRAL AREA AS CIVIC CENTER

• DEVELOPMENT OF AFFORDABLE HOUSING FOR EWS & LIG SEGMENTS

• FACILITATION OF GOOD HEALTH AND EDUCATION FACILITIES FOR RESIDENTS OF THE AREA.

AREA BASED DEVELOPMENT PROPOSALSAREA BASED DEVELOPMENT PROPOSALS

Page 33: cost in rs. crore

MAIN RAILWAY

STATION

NORTH

� RAMTEERTH NAGAR

� MAL-MARUTI EXTENSION

� SHIV BASAVA NAGAR

CENTRAL

� KOTEKERE

� ASHOK NAGAR PART

� FORT PRECINT

� CENTRAL BUS TERMINAL

SOUTH

� TILAKWADI

� VACCINE DEPOT

RANI CHENNAMMA NAGAR PART

� SHANTI NAGAR/ MARATHA COLONY/

NANAWADI

TOTAL AREA:

9.46 Sq.Km - 2,337.6 acres)

AREA BASED DEVELOPMENT PROPOSALSAREA BASED DEVELOPMENT PROPOSALS

Page 34: cost in rs. crore

• Decongesting & decentralizing the Inner City Area

• Backbone of the city & Axis of future development.

Aids development of extension areas adjoining this

central spine as new activities/economic growth

centers

• Enables comprehensive development, through

retrofitting strategies of smart city including central

transportation hub, location of offices, employment

centers, civic centers and enhances connectivity

between north and south Belagavi

• Promotes equitable distribution of utilities service

centers. Promotes effective service delivery

mechanism

• Create maximum impact with the Smart City

initiative to the citizens of Belagavi with a view to

achieve a balanced development

BELAGAVI

CANTONMENT

AREA

CRITERIA SELECTION FOR AREA CRITERIA SELECTION FOR AREA

Page 35: cost in rs. crore

� Selection based on overall city profile; inputs

from Citizens, stakeholders, planning experts,

civic officials; and SWOT Analysis

� Retains the nature of lung space (18 sq.km of

Cantonment area) in the central part of city

which complements it

� Augments the future directional growth

- Towards east in view of NH, Airport

connectivity, Suvarna Soudha and industrial

hubs

- Towards west in view residential and

educational developments

CRITERIA SELECTION FOR AREA CRITERIA SELECTION FOR AREA

BELAGAVI

CANTONMENT

AREA

Page 36: cost in rs. crore

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

ROAD WIDTH ROAD LENGTH

Mtr. Feet Km

9.0 30 121

12.0 40 25

13.0 45 1

15.0 50 1

18.0 60 8

24.0 80 12

30.0 100 10

36.0 120 4

Total (Km) 182

� Carriageway improvement

� Footpaths

� Street Light

� Street Furniture

� Avenue Plantation

� Lanes & Other Traffic Markings

� Surface dressing/Pavement

� Underground Utilities –

Water, telecom, Drainage, Power ,

OFC

� Non Motorized Transport : Cycle track

� Facilities for physically challenged

12m ROW ROAD CROSS SECTION

15m ROW ROAD CROSS SECTION

9 m ROW ROAD CROSS SECTION

Page 37: cost in rs. crore

30m ROW ROAD CROSS SECTION

24m ROW ROAD CROSS SECTION18 m ROW ROAD CROSS SECTION

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 38: cost in rs. crore

ROAD FOOTPATH CYCLE TRACK (2M WIDE)

WIDTH (M) LENGTH (KM) WIDTH (M) LENGTH (KM) COST (RS. CR.) LENGTH (KM) COST (RS. CR.)

9.0 120.56 1.5 241.13 3.13 - -

12.0 25.52 2.0 51.05 8.84 - -

13.5 1.00 2.0 2.00 0.35 - -

15.0 0.87 2.0 1.74 0.30 1.74 0.30

18.0 8.09 2.0 16.18 2.80 16.18 2.80

24.0 12.52 2.0 25.05 4.34 25.05 4.34

30.0 9.56 2.5 19.13 4.14 19.13 3.31

36.0 4.27 3.0 8.53 2.22 8.53 1.48

Total 182.40 364.81 26.11 70.63 12.23

ROADUG DUCTING

COST (RS.CR.)

CARRIAGEWAY

IMPROVEMENT

(RS.CR.)

STREET LIGHT

WIDTH (M) LENGTH (KM) NO.S COST (RS.CR.)

9.0 120.56 36.17 120.56 4,823 7.60

12.0 25.52 7.66 25.52 1,021 1.61

13.5 1.00 0.30 1.00 40 0.06

15.0 0.87 0.26 0.87 35 0.06

18.0 8.09 2.43 4.05 324 0.51

24.0 12.52 3.76 6.26 501 0.79

30.0 9.56 2.87 4.78 383 0.60

36.0 4.27 1.28 2.13 171 0.27

Total 182.40 54.72 165.18 7,298.00 11.49

� Total Pedestrian Walkways: 364.81 Km

� Provision for Non – Motorized Transport (Cycle Tracks): 70.63 Km

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 39: cost in rs. crore

Road Total cost

(rs.Cr.)width (m) length (km)

9.0 120.56 168.20

12.0 25.52 43.78

13.5 1.00 1.71

15.0 0.87 1.80

18.0 8.09 12.64

24.0 12.52 19.56

30.0 9.56 15.77

36.0 4.27 7.40

TOTAL 182.40 270.87

ROAD STREET FURNITURE AVENUE PLANTATION

Width (m) Length (Km) No.s Cost (Rs.Cr.) No. of Trees Cost (Rs.Cr.)

9.0 120.56 482 0.51 1,808.00 0.23

12.0 25.52 102 0.11 383.00 0.05

13.5 1.00 4 0.00 15.00 0.00

15.0 0.87 3 0.00 13.00 0.00

18.0 8.09 32 0.03 162.00 0.02

24.0 12.52 50 0.05 250.00 0.03

30.0 9.56 38 0.04 191.00 0.02

36.0 4.27 17 0.02 85.00 0.01

Total 182.40 728 0.76 2,907.00 0.37

26.11 12.23

54.72

165.18

11.49

0.76

0.37 Footpath

Cycle track

UG Ducting

Carriageway

Improvement

Streetlighting

Street Furniture

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 40: cost in rs. crore

# MAJOR JUNCTIONS

1 VANTAMURI CROSS

2 DHARAMNATH CIRCLE

3 ASHOKA CIRCLE

4 CBT CIRCLE

5 GOGTE CIRCLE

6 GOAVES CIRCLE

7 RPD CROSS

8 KHANAPUR JUNCTION (3rd GATE)

9 VANTMURI CROSS

� GEOMETRIC IMPROVEMENTS

� ROUNDABOUT

� MANNED / SIGNALIZED

� HIGH MAST LIGHTS

� LANDSCAPING

� SURVEILLANCE EQUIPMENT

� TRAFFIC SIGNAGE

JUNCTION IMPROVEMENTJUNCTION IMPROVEMENT

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

ASHOKA CIRCLEASHOKA CIRCLE

Page 41: cost in rs. crore

# Minor Junctions

1 GANESH CIRCLE, RAMTIRTH NAGAR

2 RAMDEV CROSS

3 DCC BANK

4 CIRCUIT HOUSE

5 DESHPANDE PETROL BUNK

6 TILAKWADI GATE 1

7 TILAKWADI GATE 2

8 TILAKWADI GATE 3

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 42: cost in rs. crore

0.30

0.61 0.36

0.39

MAJOR JUNCTIONS

Geometric

Improvement

Signalized High Mast Light

0.43

-

0.36

0.46

MINOR JUNCTIONS

Geometric

Improvement

Signalized High Mast Light

AREA BASED COSTING IN RS CRORES

JUNCTION

TYPE

GEOMETRIC

IMPROVEMENT

ROUND

ABOUTSIGNALIZED

HIGH MAST

LIGHTTOTAL

Major 0.30 0.61 0.36 0.39 1.67

Minor 0.43 - 0.36 0.46 1.25

Total 0.73 0.61 0.72 0.85 2.92

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 43: cost in rs. crore

OLD PB ROAD

# PROPOSED LOCATIONS

1 B/W RAILWAY GATE I & II

2RAILWAY GATE III –

(NH 4A & KHANAPUR ROAD)

3 OLD PB ROAD

4 KAPILESHWAR ROAD

KAPILESHWAR ROAD

B/W Gate 1&2

TILAKWADI GATE 3

RAIL OVER BRIDGES RAIL OVER BRIDGES

# PROPOSED LOCATION

1RANI CHANNAMMA CIRCLE

(for pedestrian, Raichur Bachi Road)

UNDERPASSUNDERPASS

# PROPOSED LOCATION

1

Ashoka Circle

(NH4 Junction to CBT via Raichur Bachi

Road)

FLYOVERFLYOVER

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 44: cost in rs. crore

# LOCATION DEVELOPMENTCOST

(RS.CR.)

1Rani Channamma Circle,

on Raichur-Bachi RoadUNDERPASS 56.00

2

Flyover over Ashoka Circle,

NH4 Junction to CBT, via

Raichur-Bachi Road

FLYOVER 129.00

3

Between Railway Gate I &

II, at Railway Gate III,

Old PB Road & Kapileshwar

Road

ROBS 144.00

TOTAL 365.00

ABDABD--Improving Roads, Circulation Network & JunctionsImproving Roads, Circulation Network & Junctions

Page 45: cost in rs. crore

ROAD WIDTHROAD

LENGTH

CYCLE TRACK FOOTPATH (WIDTH)

2m wide1.5m

(5ft)

2m

(7ft)

2.5m

(8ft)

3m

(10ft)

Mtr Feet Km Km Km

9.0 30 120.56 - 241.13

12.0 40 25.52 - 51.05

13.0 45 1.00 - 2.00

15.0 50 0.87 1.74 1.74

18.0 60 8.09 16.18 16.18

24.0 80 12.52 25.05 25.05

30.0 100 9.56 19.13 19.13

36.0 120 4.27 8.53 8.53

Total (Km) 182.54 70.90 241.13 71.24 25.05 27.66

� TOTAL WALKABILITY : 365 km

� TOTAL Non Motorised (cycle track) :71 km

ABDABD--Improving Improving Non Motorized Transportation Non Motorized Transportation WalkabilityWalkability & Cycle Track& Cycle Track

Page 46: cost in rs. crore

BASEMENT :

� One Level Basement for parking (upto 50cars – 75 cars & up to 100 - 150 Two Wheelers )

GROUND LEVEL (OPEN AND BUILT UP SPACES )

� Transport Facilities

• Bus terminal (5-8 Transit Buses platforms)

• Auto rickshaw stand /Taxi Stand (10 Veh.)

• Modern Cycle Stations (25-30 Bicycles)

� Informal sector/ public hawkers’ spaces/zones

� Public conveniences facilities: Community toilets & Fresh drinking water kiosks)

� Open plazas with sit-out benches, Fountains, Landscaping/ Greenery & Wi-fi Zones

� IT Gateway/OFC/Broadband Connectivity

� Convenient shopping and Local shops including ATMs etc

UPPER FLOORS :

� Commercial cum Office complex, Restaurants, Banquet Halls, Small lodges etc.

� Public utility offices- like

• Air & Noise Monitoring system

• Belagavi One / Citizen Service Centre

• Local municipal ward offices

• Post office, Various Bill payment & Receipt counters etc

• Skill Development Centre and Incubation Centre (NSIC)

KEY FEATURES

� Located on vacant sites of Mpl.

Corp./BUDA/Cantt.

� 6 Sites identified -abutting to

Major roads / Junctions

� Management & Maintenance

under Professional agencies

with smart O&M techniques

� SMART SOLUTIONS

� Intelligent Parking Mngt.

system

� Smart card

� PIS

� Bicycles sharing system

� Rain Water Harvesting

syatem

� Air & Noise Monitoring

system

ABDABD--Improving Improving Facilities and Services Through Multi Utilities Complexes Facilities and Services Through Multi Utilities Complexes (MUCS)(MUCS)

Page 47: cost in rs. crore

# LOCATIONEXTENT

(ACRES)

1 DHARMANATH CIRCLE Corporation 13

2 RAM TEERTH NAGAR BUDA 2.7

3 MAHANTESH NAGAR Corporation 1.36

4 1st Gate Opp Kalamandir Corporation 1.15

5 Fort Road Cantonment 3.44

6 GOAVES COMPLEX Corporation 1.17

ABDABD--Improving Improving Facilities and Services Through Multi Utilities Complexes Facilities and Services Through Multi Utilities Complexes (MUCS)(MUCS)

Page 48: cost in rs. crore

# LOCATION OWNERSHIPEXTENT

acres

PROJECT COST

Rs.Crores

1 DHARMANATH CIRCLE Corporation 13

2 RAM TEERTH NAGAR BUDA 2.7 34.71

3 MAHANTESH NAGAR Corporation 1.36 34.71

4 1st GATE OPP KALAMANDIR Corporation 1.15 34.71

5 FORT ROAD Cantonment 3.44 11.40

6 GOAVES COMPLEX Corporation 1.17 34.71

TOTAL 150.25

ABDABD--Improving Improving Facilities and Services Through Multi Utilities Complexes Facilities and Services Through Multi Utilities Complexes (MUCS)(MUCS)

Page 49: cost in rs. crore

PUBLIC TOILETS

ABDABD--Improvement of Public Improvement of Public Convenience Convenience & Amenities& Amenities

• Providing Public Convenience and utilities in the ABD

(2 in each ward)

• Easily accessible for physically challenged people

• High emphasis on cleanliness of the toilet units.

• Roof top Solar Panels (Optional)

• To ensure sustainability of operation and

maintenance, operators are given the rights of

advertisement which can be displayed around the

units of public amenity.

DRINKING WATER

KIOSKS

Page 50: cost in rs. crore

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

# LOCATIONEXTENT

(ACRES)

1 KALA MANDIR Corporation 2.1

2 DHARMANATH CIRCLE Corporation 13

3 OLD PB ROAD Cantonment 3.44

Page 51: cost in rs. crore

KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility KALAMANDIR : Sector level Community Facility

TOTAL EXTENT OF LAND – 7,800 sq.m (2.1Acres)

PROPOSALS : G + 3

ACTIVITIES IN THE PREMISES

• Multi Level Car Parking Lot (G-2)

• Multimodal Parking stand (Auto & Cycle)

• Shopping mall including Multiplex

• Atrium

• Branded Shops

• Local shops

• Family entertainment and Restaurants, Food court etc

• Mini Auditorium cum Culture center

• Other Community Facilities

ESTIMATED PROJECT COST RS.53.41 Cr

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

Page 52: cost in rs. crore

BENEFITS INCLUDE

� Convenience to citizens (most citizen services available at one place)

� Enhanced Community facilities will increase the livability of citizens

� The New Civic center will enhance the revenues of the corporation.

� Ease of Parking problems in & around Shukrawarpet and Tilakwadi Railway

Gate – I and adjoining inner city area

� Optimal use of land value (the site is located in the heart of the city)

� Upfront / Recurring cash inflow, to the Corporation during the concession

period (In PPP Mode)

� Transfer of asset to the corporation at the end of the concession period

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

Page 53: cost in rs. crore

� Proposed vacant Municipal Corporation site at Dharmanath Circle

� Total extent: 13 acres (52,611 sq.m.)

Activity ExtentNo. of

FloorsComponents

OFFICES/IT COMPLEX;

SKILL DEV. AND

INCUBATION CENTRE

4 acres G+4

SHOPPING MALL 3 acres G+3

MULTIPLEX BLOCK 2 acres G+1

SWIMMING POOL AND

INDOOR SPORTS

CENTER

1 acres G+2 Restaurant

Sports goods shops

MULTI UTILITIES

BLOCK1.8 acres G+2

Cycle station, Auto

Stand, City Route Mini

Bus Terminal, Space for

Informal Sector

PARKING 2 acres 2 Basement

DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility DHARMANATH CIRCLE : Central level Community Facility

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

ESTIMATED PROJECT COST: RS.268 CR

Page 54: cost in rs. crore

ACTIVITIES PROPOSED

• Offices/IT Complex; Skill Development Centre and Incubation centre

• Convention Centre

• Shopping for Informal sector, Local shops

• Shopping Mall cum Multiplex Block

• Multi Utilities Centre

• Family entertainment and Restaurants, Food court

• Mini Auditorium cum Culture center

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

Page 55: cost in rs. crore

Bus Terminal

Ground floorBasement- Parking

Parking: 100 cars, 200 2-wheelers

25-30 bicycles

Ground level:

3 wheeler parking- 25 vehicles

Ground level:

ABDABD-- NEW CITY CENTERSNEW CITY CENTERS

Page 56: cost in rs. crore

HAWKER ZONE

� Formalization of street vending leading to better upkeep of the

spaces, brings in vitality and vibrancy in the inner city and

civic center area

� 20-25 hawkers space in each of the proposed nine Multi-

utilities complexes

� Total spaces created ~200

A platform doubling as

lockable storage

SPECIFIC HAWKER VENDING SPACESSPECIFIC HAWKER VENDING SPACES

EAT STREET IN CENTRAL AREA

� Stretch of 200 m on OLD PB road along Footpath towards Fort side

� Stretch of 100 m along Kanbargi Road footpath towards Kotekere lake

� Creating ~200 fast food outlets

� Estimated Cost: Rs.3 Crores

Page 57: cost in rs. crore

• MODERN BUS STATION :

• Terminal building (G+1)

• Dormitory

• Local Convenience shop

• Waiting cum seating lobby space

• Rest room

• Public Toilets

• Accessible to differently challenged

people

• COMMERCIAL cum OFFICE COMPLEX

• MULTI LEVEL CAR PARKING (G+2)

• ROOF TOP SOLAR PANELLING

KEY FEATURES

• Site Area 26 Acres

• Self sustainable Terminal

facilities along with SMART

solutions

• Intelligent Parking Mngt.

system

• Smart card

• PIS

• Smart Ticketing

• LED Boards

• LCD Displays / Video Walls

• Vehicle Location (Real time)

• Control Station

• Enterprise Management

System / MIS

• Rain water harvesting

system

ABDABD-- IMPROVEMENT OF CENTRAL BUS TERMINUS (CBT)IMPROVEMENT OF CENTRAL BUS TERMINUS (CBT)

Page 58: cost in rs. crore

Smart Bus Station – in line with KSRTC, Mysore

� LED Boards

� LCD Displays / Video Walls

� Vehicle Location (Real time)

� Control Station

� Enterprise Management System / MIS

Smart Buses

� Passenger Information Systems (Real Time)

� Vehicle Mounted System – GIS/GPS

� In Vehicle Display

� Automated Voice Announcement System

� Smart ticketing (RFID)

� ESTIMATED PROJECT COST: RS.106.81 CR

� FUNDING UNDER SMART CITY: RS.76.81 Cr,

(Balance 30 Cr from KSRTC Funds)

ABDABD-- IMPROVEMENT OF CENTRAL BUS TERMINUS (CBT)IMPROVEMENT OF CENTRAL BUS TERMINUS (CBT)

Page 59: cost in rs. crore

#. LOCATIONEXTENT

(ACRES)

1 MAHANTESH NAGAR 1 Corporation 0.68

2 MAHANTESH NAGAR 2 Corporation 0.68

3 SHREE NAGAR GARDEN Corporation 1.98

4RANICHENNAMMA GARDEN M.M

EXTENSIONCorporation 0.89

5 KARANJIMATH UDYAN Corporation 1.76

6SHIVALAYA UDYAN. SHIVABASAV

NAGARCorporation 1.01

7GARDEN AT MM NAGAR EXTENSION

SECTOR-12Corporation 3.47

8 PRAGATHI GARDEN Corporation 0.88

9MALA MARUTI OPP. POLICE

STATIONCorporation 1.24

10 BHAGAVAN MAHAVEER UDYAN Corporation 0.87

11 BASAVESWAR UDYAN Corporation 2.96

12 NURSURY UDYAN, GOAVES Corporation 0.76

13MAHATMA PULE UDYAN,

TILAKWADICorporation 0.13

14VACCINE DEPOT UDYAN,

TILAKAWADICorporation 1.03

15 BR. NATH PAI UDYAN Corporation 1.32

16 MARATHA COLONY UDYAN Corporation 0.15

17 CONGRESS WELL PARK Corporation 0.97

18 KARIAPPA COLONY GARDEN Corporation 0.61

ABDABD--IMPROVEMENT OF NEIGHBORHOOD PARKS & RECREATIONAL SPACESIMPROVEMENT OF NEIGHBORHOOD PARKS & RECREATIONAL SPACES

TOTAL PARKS AND GARDENS AREA : ~21.50 Acres

ESTIMATED PROJECT COST: RS.18.50 Cr

Page 60: cost in rs. crore

� PUBLIC CONVENIENCES FACILITIES :

Community toilets

Fresh drinking water kiosks

� CHILDREN PLAY AREA : Swing , Slides , hanging bar etc & Jogging

Tracks

� Special areas for senior citizens like study circle

� OPEN PLAZAS with sit-outs benches for senior citizens , Fountains,

Landscaping/ Greenery & Wi-fi Zones

� ESTABLISHMENT OF NURSERY

� WATER BODY, PONDS , AQUATIC PLANTS, WALKING TRACKS

ALONG WATER BODY (OPTIONAL)

� PARKING PLAZAS & CYCLE STATIONS

� CONSERVATION AND

IMPROVEMENT OF

FORESHORES

� IRRIGATION AND RAIN WATER HARVESTING

ABDABD--IMPROVEMENT OF NEIGHBORHOOD PARKS & RECREATIONAL SPACESIMPROVEMENT OF NEIGHBORHOOD PARKS & RECREATIONAL SPACES

Page 61: cost in rs. crore

8

# PROPOSALS

1 GRAMIN BHARAT

2 EXISTING WATER BODIES DEVELOPMENT, BOATING

3 GLASS HOUSE

4 TREE HOUSES

5 SOCIAL – CLUB

6 WATER PONDS

7 OLD BUILDINGS HERITAGE

8 AMUSEMENT PARK

9 PICNIC HUTS

10 JOGGING TRACKS

11 CHILDREN PARK

12 AMPHITHEATRE

13 HERBAL GARDEN

14 BOTANICAL GARDEN

15 OPEN YOGA CENTER

16 THICK BLOCKS AFFORESTATION

VACCINE DEPOT

2

2

3

4

5

1

1

1

72

3

2

6

7 8

9

1

5

1

3

1

4

2

2

1

9

2

01

0

1

6

1

6

2

1

8

1

2

ABDABD-- IMPROVEMENT OF VACCINE DEPOT AS HERITAGE PARKIMPROVEMENT OF VACCINE DEPOT AS HERITAGE PARK

EXISTING PROPOSED

TOTAL EXTENT : ~156 Acres

ESTIMATED PROJECT COST: RS.38.50 Cr

Page 62: cost in rs. crore

Nandini Dairy

Extn Land

EXHIBITION GROUND AT MAHANTESHNAGAREXHIBITION GROUND AT MAHANTESHNAGAR

Area for temporary

Exhibitions/Circus/Meeting ground/City

Maidan

� Extent: 9.15 acres

� Public Conveniences: Community toilets,

� Drinking water kiosks

� Peripheral thick block plantation with 3

rows of trees

� Rain water Harvesting

Page 63: cost in rs. crore

Mahantesh

Nagar Ground

ABDABD-- IMPROVEMENT OF EMPLOYMENT POTENTIAL IMPROVEMENT OF EMPLOYMENT POTENTIAL

ESTIMATED PROJECT COST: RS.

LAND –

LOCATIONINDUSTRY TYPE EXTENT

EXPECTED

EMPLOYMENT

NANDINI

EXTN.

AREA

Flatted Factories

(G+4)

9.15 Acres

(BUA

4.5 Lakh ft)

~4000

NEW CITY

CENTER

IT and Allied

Activities +

Incubation

Centre

BUA

1.5 Lakh Sft~2000

INFORMAL

SECTOR IN

MUCS ,

CENTRAL

AREA

Hawkers zones

& Food Streets, ~1000

Page 64: cost in rs. crore

1

3

4

21. BELAGAVI FORT

2. KOTEKARE LAKE

3. MOAT AND FORT AREA

4. VEGETABLE MARKET

5. PARKING PLAZA5

ABD BOUNDARY

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 65: cost in rs. crore

ACTIVITIES in FORT PREMISES :

1. MILITARY/DEFENCE THEME MUSEUM

2. JOGGING TRACK

3. HERITAGE CONSERVATION OF

• RAMAKRISHNA ASHRAM

• KAMAL BASTI

• MOSQUES: Safa Majid, Jamia Masjid

4. AFFORESTATION AND BLOCK PLANTATION

5. AMPHITHEATER (OAT)

6. ART AND CRAFT CENTER (in Existing Building)

7. BANNING OF VEHICULAR MOVEMENT INSIDE THE FORT

AREA

• ]

FORTFORT ANDAND MOATMOAT PRECINCTPRECINCT AREAAREA

13

2

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 66: cost in rs. crore

S/N PARTICULARS APPROX LAND AREA APPROX AMOUNT (in crore)

1

MILITARY THEME MUSEUM

• Museum Landscaping

• Outdoor display area Audio & Video room

• Parking lot Toilets

10 Acres 6 Cr

2

AMPHITHEATER & ART, CRAFT AN OTHER INDIGENOUS PRODUCT CENTER

Indoor and outdoor Display areas

• Open space and garden Interpretation center

• Multipurpose Hall Parking Lot

• Toilets

3 - 4 Acres 10 Cr

3

HERITAGE STRUCTURE AND PREMISES

• Renovation of Building (Swamiji Ashram and Mosques)

• Information Counter

• Audio Visual Room Multi Purpose Hall

• Landscape Development Restructuring and Premises,

• Entrance Gate at main Entry point

2 Cr

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 67: cost in rs. crore

ACTIVITIES in MOAT PREMISES :

1. REJUVENATION OF MOAT AREA AS A WATER

BODY AND LANDSCAPED AREA

• Removing the algae and weed

• Dredging the moat to have proper depth

• Aerators & Connecting with Kotekere

• Development of Natural aquarium

• Foot over bridges

• Recycling of Water (Aeration) in MOAT

• Canoeing & fountains in MOAT

2. THEME BASED PARKS AND GARDEN

• Walkway- Jogging Tracks

• Public recreational space

• Open sit out area , Furniture

• Sound & light show-Laser Show

• Open air theatre

3. Improving the Lake and MOAT Hydraulics

MOAT PREMISES INCLUDES1. Vegetable market Premises

2. Open Parking Lot

3. MOAT AREA

4. Open Land Under Income tax Dept

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 68: cost in rs. crore

BEFORE AFTER

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 69: cost in rs. crore

KEY FEATURES

• Cleaning of MOAT to make it pollution-free

• Retain and replenish the water

• Creating a safe habitat environment

• Development of Public and recreational spaces

• Strengthen the MOAT/ Canal edge

• Improve accessibility and connectivity in the area

• Generate resources to pay for all of the foregoing

• Integrate with city development

• Increase groundwater recharge

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 70: cost in rs. crore

FORTFORT ANDAND MOATMOAT AREAAREA

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 71: cost in rs. crore

FORTFORT ANDAND MOATMOAT AREAAREA

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 72: cost in rs. crore

VEGETABLEVEGETABLE MARKETMARKET AREAAREA

• Vegetable market will be shifted to the APMC

site at B K Kangroli, existing Onion Market site

utilized for open space for old city

• Existing vegetable market utilized as part of civic

central area preservation through landscaping,

etc

• Developed as an Heritage & Culture centre and

landscaped park for citizen’s of Belagavi

• A theme based park & Garden

• Walkway- Jogging Tracks

• Public recreational space

• Open sit out area , Furniture

• Sound & light show-Laser Show

• Open air theatre

� Development of 2 rows

of continuous avenue

plantations along all

roads of 9m & above

RoW

Road Side Tree PlantationRoad Side Tree Plantation

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL AREACONSERVATION & PRESERVATION OF CENTRAL AREA

Page 73: cost in rs. crore

� Eat street on lines of Chaupati, Mumbai

� Boating

� Chennamma / Gandhiji’s statue on the lines of

Buddha statue in Hussain Sagar

� Water front development activities

� Aeration sprinklers in the water body

KOTEKERE LAKE KOTEKERE LAKE

ABDABD--CONSERVATION & PRESERVATION OF CENTRAL CONSERVATION & PRESERVATION OF CENTRAL AREAcAREAc

Page 74: cost in rs. crore

Development of 2 rows of continuous

avenue plantations along all roads 9 m &

above in Area Based Development

ROAD SIDE TREE PLANTATION IN ABDROAD SIDE TREE PLANTATION IN ABD

ESTIMATED PROJECT COST: RS.0.50 Cr

Page 75: cost in rs. crore

The above will cover about 27%

of the Housing Demand for above

segments

1

2

3

4

# SITE NO AREA

(IN SQ.M )STRUCTURE NO OF UNITS

1 VANTMURI 3744 G+3 128

2SRI NAGAR ZOPAD

BASTI6477 G+3 272

3 GAGANWADI 22,986 Single Housing 78

4 ASHRAY COLONY 17806 G+3 750

TOTAL 1228

• TOTAL AREA DEVELOPMENT :

12.60 ACRES

• TOTAL ESTIMATED PROJECT

COST: RS.73.68 Cr

DEVELOPMENT OF AFFORDABLE HOUSING FOR EWSDEVELOPMENT OF AFFORDABLE HOUSING FOR EWS

Page 76: cost in rs. crore

� 24x7 Water Supply Project to cover entire areas of City Corporation of Belagavi : Rs.663 Crore (World Bank aided project).

� Already Pilot Project Completed in 10 wards out of 58 wards and running successfully since 8 years with performance

monitoring.

� Modular rejuvenation of Open Wells augmenting the surface Water Source.

� Quality monitoring & triggering – based on pH ratio & other quality parameters

� Billing and online payment

� Water Kiosks on roads for public – with capacity of

100 litres per hour & 2000 litres per day – 100 units

cost: Rs.1.5 crores

� SMART SOLUTIONS:

• Managing Pumping requirements with sensors

• Smart Metering

• Leakage detection

• Modular rejuvenation of open wells, augmentation of

surface supply

Funding: World Bank, State Govt. and ULB.

WATER SUPPLY WATER SUPPLY

Page 77: cost in rs. crore

• The Area Considered in ABD, 85% of the area is covered with Sewerage Scheme.

• It is proposed to rehabilitate the network wherever it is required.

• It is proposed to construct outfall sewers to the proposed Sewage Treatment Plant.

• Two Sewage Treatment Plants are proposed in the ABD area.

• It is proposed to reuse treated sewage water for watering existing and proposed gardens in the city

and also for watering median landscape of roads.

SL.NO DESCRIPTION COST IN RS. CRORE

1 Construction of Sewage Treatment Plant of 4.0 MLD capacity in North Zone

220.00

2 Construction of Sewage Treatment Plant of 5.0 MLD capacity in Soth Zone

3 Rehabilitation of Old Sewerage Network

4 Construction of Sewer Network in Uncovered Areas

5 Construction of Pump House and Outfall Sewer

6Construction of Piping Network for Reuse of Ttreated Sewage for maintenance

of Parks, Median Landscaping

Total Cost in Rs. :

SEWERAGE SYSTEM SEWERAGE SYSTEM

Page 78: cost in rs. crore

STORM WATER DRAINAGE SYSTEMSTORM WATER DRAINAGE SYSTEM

Sl.No. Drains Indicator (km) Cost in Rs. Crores

1 PRIMARY DRAIN 8 48

2 SECONDARY DRAIN 10 22

3 TERTIARY DRAIN

Covered in Road

Improvement

Component

TOTAL COST IN RS. CRORES 70

It is proposed to Cover the entire area of ABD with Storm Water Drainage

System.

Page 79: cost in rs. crore

� 100% door to door collection with

infrastructure for segregation at Source.

Separate bins for collection of wet and dry

waste.

� Infrastructure for collection of Segregated

Waste.

� Material Recovery Unit

� Compost Plant

� RDF Making Plant

� Bio-methanation Plant

� Final Disposal Facility.

Collection & Transportation

Primary Collection Secondary Collection

Household Bins Commercial BinsTricycle BinsCompactor Bins

Tricycle Hand CartsAuto Tippers

Transfer Station (Segregation)

RDF

plantLandfillCompost

Plant

SOLID WASTE MANAGEMENTSOLID WASTE MANAGEMENT

SL.NO. DESCRIPTION

AREA REQUIRED IN

ACRES

(2016-36)

COST IN RS. CRORE

(PHASE -I: 2016-26)

1Infrastructure for Primary and Secondary

Collection with segregation 0.0 23.7

2 Compost Plant 4.2 9.1

3 Biomethanation Plant 0.5 1.2

4 RDF 8.0 2.0

5 Landfill 10.8 6.7

TOTAL 23.6 42.7

Page 80: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 80 Confidential 80

PAN CITY PROPOSALSPAN CITY PROPOSALS

Page 81: cost in rs. crore

PAN CITY PROPOSALPAN CITY PROPOSAL� URBAN MOBILITY

• Priority Bus Lanes, Bus Terminals & Bus Shelters

• Para - Transit

– Battery operated autos

– Auto-hailing App

• Walkability & Non-Motorized Transport

– Cycle Tracks

• Rail Over Bridges

• Flyovers

• Junction Improvements

– Major & Minor Junctions

• Intelligent Transport Systems

� RENEWABLE ENERGY & ENERGY EFFICIENCY

• Current HT & LT Scenario

• Projections

• Rooftop Solar PV & Wind Energy Potential

• Energy Efficiency – Street Lighting

� EGOVERNANCE

� WATER SUPPLY, SANITATION & SOLID WASTE MANAGEMENT

Page 82: cost in rs. crore

36.5Km of dedicated bus lanes proposed

16.28

Km

4.6

Km

4.9

Km

1.25K

m3.1Km

6.4Km

Criteria for Selection

� North-south road covers major access path. Most segment has 100 feet width, where exclusive bus lane is marked

� Minimum 80 ft./24m RoW required for dedicated bus lanes.

URBAN MOBILITY & TRANSPORT URBAN MOBILITY & TRANSPORT –– PRIORITY BUS LANESPRIORITY BUS LANES

# ORIGINATION DESTINATION VIA

1KAKATI INDUSTRIAL

ESTATEBOGARVES CIRCLE

• KLE HOSPITAL

• CHENNAMMA

CIRCLE

2 BOGARVES CIRCLETILAKWADI GATE

NO.3• NH 4A

3TILAKWADI GATE

NO.3PEERANWADI • NH 4A

4 KOLHAPUR CIRCLE RTO CIRCLE • POLICE HQ

5 RAILWAY STATIONTILAKWADI GATE

NO.3• GOAVES CIRCLE

6TILAKWADI GATE

NO.2YELLUR/ANGOL

• DESHMUKH

ROAD

7CITY BUS TERMINAL

(CBT)KANBARGI

• MAHANTESH

NAGAR CROSS

8RANI CHENNAMMA

CIRCLE

AIRPORT ROAD

BRIDGE

• RTO

• ASHOK CIRCLE

• SAMBARA

BRIDGE

9VANITA VIDYALAYA

CIRCLEVIJAYANAGAR

• ST.XAVIER’S

SCHOOL

• GANAPATI

TEMPLE

Page 83: cost in rs. crore

INTELLIGENT TRANSPORT INTELLIGENT TRANSPORT –– (ITMS FRAMEWORK)(ITMS FRAMEWORK)

Page 84: cost in rs. crore

Monitoring touchpoints in ITS

Page 85: cost in rs. crore

Functionality provided through mobility plan

Page 86: cost in rs. crore

How ITMS works

• Ensuring connectivity using different channels and integrating with on-road

traffic, GPS monitoring and access points

Page 87: cost in rs. crore

Vehicle & Driver monitoring solution

• This ensures safety and also monitors the performance of the driver on a real-time basis thus enabling scorecards for improving the driving behaviour

Page 88: cost in rs. crore

Emergency response team

• This setup enables that any event can be easily monitored and managed

through a connected network.

Page 89: cost in rs. crore

Multi modal passenger information solution

• Provides the features to track and book cabs/autos

• These are tracked from the command center to ensure safety and security 24 X 7

Page 90: cost in rs. crore

Traffic monitoring & control solution

• WVDs and surveillance cameras help in providing real-time updates on the flow of traffic

and also ensure free flow of traffic

• The command center has data on peak zones, peak hours and how traffic can be managed

with alternate paths

Page 91: cost in rs. crore

KAKATI

BOGARVES CIRCLE

TILALWADI GATE 3

PIRANWADI

KOLHAPUR CIRCLE

RTO CIRCLER.STATION

TILAKWADI GATE 3

TILAKWADI GATE 2

YELLUR\ ANGOL V

V

PRIORITY BUS LANESPRIORITY BUS LANES

Page 92: cost in rs. crore

C.B.T

Airport road

KANABARGI

VIJAY NAGAR

VANITA VIDHYALAYA CIRCLE

C.B.T

Rani Chennamma circle

C.B.T

PRIORITY BUS LANESPRIORITY BUS LANES

Page 93: cost in rs. crore

30m ROW ROAD CROSS SECTION WITH DEDICATED BUS LANE

24m ROW ROAD CROSS SECTION WITH DEDICATED BUS LANE

PRIORITY BUS LANESPRIORITY BUS LANES

Page 94: cost in rs. crore

Components1. Painting

2. Surface Redressing

3. Signage

4. Collapsible Lane Dividers

Cost Estimates� Rs.28.57 Lakhs per Km

� Project Cost for (36.5x2) 73 Km is Rs.20.86 Crore

PRIORITY BUS LANESPRIORITY BUS LANES

Page 95: cost in rs. crore

NWKRTC Terminals1. Kumaraswamy Layout

2. Piranwadi

3. Hindwadi

4. Railway Station

MULTI-UTILITIES FACILITATION COMPLEXES

� Basement Parking

� [Bus Terminus]

� Auto Rickshaw stand

� Cycle parking & cycle station

� Hawking space

� Belagavi One

� Landscaping (& open plazas with sit-outs/Fountains)

� Retail Spaces (Shops, Restaurants etc.

� Commercial Office Spaces (Departments/Private–

Incubation Centers/Skill Development Centers etc)

� Air pollution monitoring station

� Developed as Green Building

• Rain Water Harvesting,

• Energy Efficiency,

• Drinking Water

• Grey Water Recycling

� Wifi Zone

BUS TERMINALSBUS TERMINALS

� Funding Sought under Smart City: Rs.90.77

Crores

� Expected to contribute Rs.10.29 Crores to the

ULB, from lease rentals

Page 96: cost in rs. crore

MULTIMULTI--UTILITY FACILITATION CENTERSUTILITY FACILITATION CENTERS

Model – I (Kumaraswamy Layout & Piranwadi) Model – II (Hindalga)

FACILITIES NO.SPLINT AREA

(SQ.M.)

COST

(RS.CR.)

Basement (1 level only) Parking

(2 Wheelers)100

2,062.50 4.74 Basement (1 level only) Parking

(4 Wheelers)50

Bus Terminal 8 1,008.00

5.86

Auto Rickshaw Stand 10 125.00

Cycle Station & Parking 50 125.00

Shops 16 178.44

Public Conveniences 4 76.00

Belagavi One 4 22.30

ATM 1 11.15

Common Areas 516.60

Ground Floor 2,062.50

Commercial Spaces

(3 Floors)6,187.50 17.59

25% additional,

for Green Buildings5.86

Hawkers’ Spaces 20 59.48 0.40

Landscaping 0.25

Total Built-up 8,250.00 34.71

FACILITIES NO.SPLINT AREA

(SQ.M.)

COST

(RS.CR.)

Basement Parking(2 Wheelers) 75

1,054.22 2.42 Basement Parking

(4 Wheelers)40

Bus Terminal 4 420.00

3.00

Auto Rickshaw Stand 8 100.00

Cycle Station & Parking 30 75.00

Shops 9 100.37

Public Conveniences 4 76.00

Belagavi One 4 22.30

ATM 1 11.15

Common Areas - 249.39

Ground Floor 1,054.22

Commercial Spaces

(3 Floors)- 3,162.66 8.99

25% additional,

for Green Buildings- 3.00

Hawkers’ Spaces 20 59.48 0.40

Landscaping - 0.13

Total Built-up - 4,216.88 17.94

Page 97: cost in rs. crore

Smart Bus Shelters� Display boards / Passenger Information

Systems

� Maps with major tourist attractions,

information on how to get there

� Drinking water

� Solar panels

� Bio-toilets, Smart bins

� Charging points etc.

1. Ashok circle

2. Lingaraj College

3. Fish market

4. Gogte circle

5. Goaves

6. Nathpai circle

7. Yallur

8. RPD cross

9. Hari Mandir

10. Third (III) gate

11. Udyambagh

12. Peeranwadi

13. Union Gymkhana

14. Ganapati temple

15. Military hospital

16. Ganeshapur

17. Rani Chennamma

circle

18. Azamnagar

19. Market yard

20. Mahanteshnagar

Dairy

21. Kakati

22. Hotel

Surabhi

23. Ashoknagar

24. Gandhinagar

25. S C Motors

26. Kudachi

27. Fort

(Bharatesh

School)

28. Mankibagh

29. Patson

30. Naka

31. Suverna

Soudha

32. Vadagaon

33. Angol

34. Majagaon

35. Guruprasad

colony

36. Shaunagar

37. P&T quarters

38. Sidnan stops

39. Anjaneyanagar

40. Dattamandir

41. Harsha hotel

42. Uday school

43. Ganesh circle

44. Ramtirth nagar

45. Sangolli Rayanna

college

46. Srinagar

47. Corporation

complex

48. Vantamuri

49. Kapileshwar

temple

50. Shivaji garden

51. Sadashivanagar

52. Vishveshwar

Nagar

53. Kotekere circle

SMART BUS SHELTERSSMART BUS SHELTERS

Page 98: cost in rs. crore

FACILITY COST (RS.LAKHS)

Smart Bus Shelter 3.50

Drinking Water Facility 1.50

Solar Paneling (1KW) 0.70

E-Toilet 5.00

Cost per Smart Shelter 10.70

No. of Shelters 53.00

Total Cost 567.10

SMART BUS SHELTERSSMART BUS SHELTERS

Page 99: cost in rs. crore

Streamlining paratransit to ensure last mile

connectivity

� Battery operated shared auto-rickshaws plying

inside the inner city

� An auto-hailing app on the lines of “Ola” is

proposed.

Promotion of battery operated Auto-rickshaw

PARATRANSITPARATRANSIT

Battery operated Autorickshaw

Page 100: cost in rs. crore

FACILITY COST (RS.LAKHS)

Electric Vehicle Charging Station 3.50

Drinking Water Facility 1.50

Solar Paneling (1KW) 0.70

E-Toilet 5.00

Cost per Station 10.70

No. of Station 8

Total Cost 85.60

Area contained by Inner Ring Road = 7.95 sq.Km

PARATRANSITPARATRANSIT

Page 101: cost in rs. crore

� Every road of ROW 9m (30 ft.) & above should

have footpaths for pedestrians, on either sides

PedestrianPedestrian WalkwaysWalkways Cycle TracksCycle Tracks� Dedicated cycle lanes in all roads of width 15m

(50 ft.) and above

Road WidthRoad Length

Overall Area Based Pan City

9m 474.83 120.56 354.27

12m 220.63 25.52 195.10

13.5m 6.97 1.00 5.97

15m 41.71 0.87 40.84

18m 10.58 8.09 2.49

24m 70.81 12.52 58.29

30m 90.13 9.56 80.57

36m 18.43 4.27 14.17

60m 3.65 - 13.65

Total 947.75 182.40 765.35

Road WidthRoad Length

Overall Area Based Pan City

15m 41.71 0.87 40.84

18m 10.58 8.09 2.49

24m 70.81 12.52 58.29

30m 90.13 9.56 80.57

36m 18.43 4.27 14.17

60m 3.65 - 13.65

Total 245.32 35.32 210.01

Improving Non Motorized Transportation Improving Non Motorized Transportation WalkabilityWalkability & Cycle Track& Cycle Track

Page 102: cost in rs. crore

� Exclusive of Footpaths

covered under Area Based

Development

� Of the Footpath length of

1,530.70 Km, PWD has

undertaken improvement of

113.8 Km

PedestrianPedestrian WalkwaysWalkways

Cycle TracksCycle Tracks� Cycle tracks in Pan City (excluding tracks

covered under Area Based Development)

is estimated as 420 Km

� PWD has undertaken work on creating

cycle tracks on 6 Km of Atal Bihari

Vajapeyi Marg

Road Width

(m)

Road Length

(Km)

Cycling Track

Km (2m Width)

Cost

(Rs.Cr.)

15.0 40.84 81.67 14.14

18.0 2.49 4.99 0.86

24.0 58.29 116.58 20.19

30.0 80.57 161.13 27.90

36.0 14.17 28.34 4.91

60.0 13.65 27.31 4.73

Total 765.35 420.02 72.73

Work undertaken by PWD 12.00

Work under Smart City 408.02 70.65

Road Width

(m)

Road Length

(Km)

Foot Path

Width (m)

Foot Path

Length (Km)

Cost

(Rs.Cr.)

9.0 354.27 1.5 708.53 9.20

12.0 195.10 2.0 390.20 67.56

13.5 5.97 2.0 11.94 2.07

15.0 40.84 2.0 81.67 14.14

18.0 2.49 2.0 4.99 0.86

24.0 58.29 2.0 116.58 20.19

30.0 80.57 2.5 161.13 34.87

36.0 14.17 3.0 28.34 7.36

60.0 13.65 3.0 27.31 7.09

Total 765.35 1,530.70 163.35

Work undertaken by PWD 113.81

Work to be undertaken under Smart City 1,416.89 151.20

Page 103: cost in rs. crore

JUNCTION IMPROVEMENTJUNCTION IMPROVEMENT

# Name

1 OLD PB ROAD – BYPASS JUNCTION

2 VANITA VIDYALAYA JUNCTION

3 RANI CHENNAMMA CIRCLE

4 NATHPAI CIRCLE

5 DHARAMVEER SAMBAJI CIRCLE

6 APMC MARKET YARD JUNCTION

Major JunctionsMajor Junctions

Geometric

ImprovementSignalized

High Mast

Lighting

Total(in

Cr

0.30 0.61 0.39 1.31

0.30 -

0.61

0.39

Major Junctions

Geometric

Improvement

Signalized High Mast Lighting

Rs.Cr.

Page 104: cost in rs. crore

TABLE TOP

CROSSING

E

Office 6

Complex

3

4 5

9 8

7 3

11

4

210

1

E

Office

Compl

ex 3

3

1

NAshokaAshoka CircleCircle

PB Road JunctionPB Road Junction

JUNCTION IMPROVEMENTJUNCTION IMPROVEMENT

Page 105: cost in rs. crore

Minor JunctionsMinor Junctions # Name

1 Kolhapur cross

2 RTO Circle

3 Triveni Circle

4 Nityanand Cross

5 Gandhinagar

6 City Bus Stand Circle

7 Mujavar Kot (Bhavi Met)

8 Pimpal Katta

9 NB Chowk

10 Kambli Koot

11 DC Gate

12 VishVeshwara nagar cross

13 Kaktives Road

14 Ganesha Temple

15 Ganapati Gali

# Name

16 Sambra Underbridge

17 Club Road

18 Sanman Cross

19 Kirloskar Road

20 Maruthi Galli

21 Huns Talkies Road

22 Sambhadevi Galli

23 Ramdev Galli

24 Globe Cross

25 Fish Market

26 Shanivar Kot

27 Kadha Bazaar Road

28 Ravivar Pet

29 KLE Road

GEOMETRIC

IMPROVEMENT

ROUND

ABOUTSIGNALIZED

HIGH MAST

LIGHTINGTOTAL

1.64 3.04 0.12 1.90 6.71

1.64

3.04 0.12

1.90 MINOR JUNCTIONS

Geometric … Roundabout

Signalized High Mast Lighting

JUNCTION IMPROVEMENTJUNCTION IMPROVEMENT

Page 106: cost in rs. crore

� HESCOM is planning to go for underground cabling of all LT lines under urban area.

� Total Length of the line which needs to be converted into underground cabling is around 247 ckt. Km

� Estimated cost for the shifting of overhead LT lines to UG LT Lines would be around Rs.104 Crores.

POWER DISTRIBUTION POWER DISTRIBUTION –– HT & LT LINESHT & LT LINES

Line Length in Ckt. Km

HT Line OH 423.0

HT Line UG 7.9

LT Line OH 905.0

Existing Scenario Conversion of OH HT Line to UG HT Line

� HESCOM has undertaken conversion of 11KV OH HT

Line to 11KV HT UG cable in ENTIRE BELAGAVI city, at

a project cost of Rs.316.27 Crores

Adoption of IT

� HESCOM has implemented IT Solutions through

funding from PFC, at a cost of Rs.2.5 Crores.

Strengthening of Distribution Network� HESCOM plans to strengthen the distribution

network of Belagavi City

� Plans to introduce Digital Metering

� Estimated project cost of Rs.24.81 Crores, funded by

Power Finance Corporation (PFC)

Page 107: cost in rs. crore

YearConsumption

(Mil Units)

2012-13 348.20

2013-14 357.40

2014-15 367.38

Based on trend analysis of the total electricity consumption data for Belagavi

urban sub-division for the past three years, by 2019-20, the annual electricity

consumption of Belgaum urban sub-division would be around 402 MU in BAU

scenario.

RENEWABLE ENERGY & ENERGY EFFICIENCY RENEWABLE ENERGY & ENERGY EFFICIENCY –– PROJECTIONSPROJECTIONS

Adoption of IT

� Targeted Generation:

10% = 40.2 MU

� Targeted Capacity:

24.15 MW

Page 108: cost in rs. crore

SECTORIDENTIFIED

CAPACITY (MW)

ESTIMATED

GENERATION (MU)

INVESTMENT

(RS. CRORE)

EXISTING 0.5 0.8

KSWC (ON PPP) 6.0 8.4 36.3

kuws & db 1.6 2.2 9.5

RESIDENTIAL (200 GROUP HOUSING SCHEMES OF AVERAGE AREA

6,000 SQ.FT. ROOF TOP)1.2 2.0 7.3

MUNICIPAL/PUBLIC BUILDINGS 7.6 12.6 46.0

INSTITUTIONS 2.0 2.8 12.1

MULTI-UTILITIES FACILITATION COMPLEX & NEW CITY CENTER 1.7 2.5 10.3

TOTAL 18.9 31.9 121.5

� Note: Karnataka State Warehousing Corporation is working on PPP Business model for solar rooftops on their existing, under construction and

proposed construction warehouses in Karnataka

� Capital cost: Rs. 6.05 cr/MW as per CERC order dated 31.03.2015 on Bench marking costs

� 15% Capital subsidy is available for all

Renewable Energy Potential Renewable Energy Potential –– Solar Roof Top & WindSolar Roof Top & Wind

SOLAR ROOFTOP

Particular Units

Installed Capacity 59.0 MW

Terminating in Belagavi 10-15 MW

WIND ENERGY

Renewable Energy Potential

� Proposed 18.9 MW (Rs.121.5 Crore investment) may

be undertaken under PPP

Page 109: cost in rs. crore

PROPOSED ENERGY EFFICIENCY MEASURES FOR BELAGAVI – STREET LIGHTS

Energy Efficiency Strategy - Municipal Target No.sInvestment(

Rs.Crores)

Energy Saved

p.a. (MU)

Replacement of High Mast Tower lights of 40W Tube Light with LED lights of 18 W 10,620 1.22 1.44

Replacement of High Pressure Sodium Vapor Lamps of 250W with LED lights of

120 W16,002 17.28 8.35

Replacement of Metal Halide of 400 W with LED lights of 180 W 1,892 2.83 1.67

TOTAL 21.33 11.46

Corporation can work on PPP ESCO Business Model to implement this project

ENERGY EFFICIENCY ENERGY EFFICIENCY –– LED STREET LIGHTINGLED STREET LIGHTING

Page 110: cost in rs. crore

Project Developer (Build Own

Operate & maintain Solar Rood top

Project)

Obligated Entities for RPO

Government Bodies

(Project

Implementation Unit)

Private Roof top owners

Transaction Advisor

Bid Process

coordinator &

selection of

Bidder

Screening out

potential Roof

tops &

coordinator for

Govt. Bodies

Screening out

Potential Roof

top

PPA

Off taking

facility

PAN CITY ROOFTOP SOLAR PV PAN CITY ROOFTOP SOLAR PV –– PPP MODELPPP MODEL

Page 111: cost in rs. crore

� 24x7 Water Supply Project to cover entire areas of City Corporation of Belagavi through SPV: Rs.663 Crore

(World Bank aided project).

� Construction of Water Treatment Plant at Basavanakolla Hillock, 2 ELSRs of 1.5ML capacity each with allied

works taken up with the internal revenue generated by the City Corporation: Rs.35.94cr.

� Quality monitoring & triggering – based on pH ratio & other quality parameters

� Quantity – 24X7 coverage

� Billing and online payment

� Water filters on roads for public – with capacity of

100 litres per hour & 2000 litres per day – 100 units

cost: Rs.1.5 crores

� SMART SOLUTIONS:

• Managing Pumping requirements with sensors

• Leakage detection

• Modular rejuvenation of open wells, augmentation of surface supply

• Water Quality monitoring (pH metering)

• Digital metering

WATER SUPPLYWATER SUPPLY

Page 112: cost in rs. crore

PUBLIC TOILETS

• Providing Public Convenience and utilities (2 in each

ward)

• Easily accessible for physically challenged people

• High emphasis on cleanliness of the toilet units.

• Roof top Solar Panels (Optional)

• To ensure sustainability of operation and maintenance,

operators are given the rights of advertisement which

can be displayed around the units of public amenity.

No of Wards, excluding ABD 37

No. per Ward 2

Cost per Toilet Block 15.96

TOTAL COST (RS.CR) 11.81

SANITATION SANITATION –– PUBLIC CONVENIENCES PUBLIC CONVENIENCES

Page 113: cost in rs. crore

Collection & Transportation

Primary Collection Secondary

Collection

Household Bins Commercial BinsTricycle BinsCompactor Bins

Tricycle Hand CartsAuto Tippers

Transfer Station

(Segregation)

Transfer Station

(Segregation)

RDF

plantLandfillCompost

Plant

SOLID WASTE MANAGEMENTSOLID WASTE MANAGEMENT

# DESCRIPTION AREA REQ. (ACRES) COST (RS.LAKHS)

1Infrastructure for Primary and Secondary

Collection with segregation0 3048

2 Compost Plant 8.4 1164

3 Biomethanation Plant 0.5 115

4 RDF 3 165

5 Landfill 23.04 1052

Total 34.94 5544

� 100% door to door collection with

infrastructure for segregation at Source.

Separate bins for collection of wet and dry

waste.

� Infrastructure for collection of Segregated

Waste.

� Material Recovery Unit

� Compost Plant

� RDF Making Plant

� Bio-methanation Plant

� Final Disposal Facility.

Page 114: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 114 Confidential 114

ICT ELEMENTSICT ELEMENTS

Page 115: cost in rs. crore

ICT ENABLEMENT FRAMEWORKICT ENABLEMENT FRAMEWORK

Page 116: cost in rs. crore

ICT COMPONENTS IN SMART CITYICT COMPONENTS IN SMART CITY

Page 117: cost in rs. crore

LOGICAL VIEW OF ICT ARCHITECTURELOGICAL VIEW OF ICT ARCHITECTURE

Page 118: cost in rs. crore

• ADSL

• VoWLAN

• WIFI

• Network

• MAN

• CRM

• Digital Radio

• WAN

• Wide Band

• LAN

• Sensors

• DTT

• GPRS

• Radiolink

• Optical Fibre

118

IT TECHNOLOGIES USEDIT TECHNOLOGIES USED

Page 119: cost in rs. crore

• Water

• Electricity

• Waste management

• Sanitation

• E-Governance

• Citizen services

• Healthcare

• Education

• Tourism

• Roads

• Transport & Traffic

• Safety & SecurityInfrastructure Services

AmenitiesServices

Command center

Dashboards & reports for

departments and consolidated

Access & upload of data from

each sector

� ULB • State Govt. • Central.

ICT SOLUTIONS FOR CENTRALIZED MANAGEMENTICT SOLUTIONS FOR CENTRALIZED MANAGEMENT

Page 120: cost in rs. crore

• Healthcare

• Education

• Tourism

Centralized monitoring

Dashboards & reports for

departments and consolidated

Access & upload of data from each

sector

• ULB • State Govt. • Central Govt.

• Roads

• Transport & Traffic

• Safety & Security

• E-Governance

• Citizen services• Water

• Electricity

• Waste management

• Sanitation

CENTRALIZED MONITORING CENTRALIZED MONITORING –– ACCESS ALL SECTORS DATAACCESS ALL SECTORS DATA

Page 121: cost in rs. crore

Ensuring

connectivity

using different

networks

Ensuring

security across

connections

and

applications

COMMUNICATION NETWORK COMMUNICATION NETWORK –– FOUNDATION FOR ALL SOLUTIONSFOUNDATION FOR ALL SOLUTIONS

Page 122: cost in rs. crore

• Smart City framework

– Framework helps capture various cross-city governance processes that deliver benefits based on core guiding principles and

taking due account of critical success factors.

• Domain knowledge model

– The aggregation of multi-source and heterogeneous data and service needs a set of unified concepts and terminologies. In

addition, the development of applications needs the support of common knowledge of Smart Cities. In order to support cross-

domain and cross-city interoperation of knowledge, a core concept model specifies terms from different stakeholders, supports

semantic understanding and provides a standardized expression of knowledge. Such a model should be completed with a

taxonomy of (smart) device types (such as types of sensor, mobile devices, hardware, software, systems, etc.); Smart Cities

sectors (such as health, transport, governance, etc.); and ‘components’ within each sector (such as medical devices, analytics,

for health; buses, trams, for transport; etc.).

• Data and services model

– Using Open systems interconnection as a template, a data a services model would reflect the data, communications, service

and application layers that are used by citizens, businesses, and city authorities. Such a model would provide an adequate

technical view of and for a more general Smart City model.

• Data flows

– Data is created in social and physical systems, collected, transmitted, stored and possibly shared before the data can be

analyzed, displayed and finally used to make decisions. At each step, different stakeholders are involved and technical

challenges to be addressed (e.g. related to interfaces and interoperability) as well as social issues (e.g. privacy, security,

monetization). Such data flows need to be observed within as well as between different systems and help understand where

further standards may be needed.

There is no specific need for products or solutions such as ERP for Smart Cities if these guidelines are followed.

Rather the critical part is to enable integration between different systems to ensure proper data flow

WHAT IS REQUIRED FROM ICTWHAT IS REQUIRED FROM ICT

Page 123: cost in rs. crore

� Ubiquitous computing

� computing can occur using any device, in any location, and in any format

� Geospatial information

� Spatial referencing by coordinate and name; web mapping and related features; location based

service for tracking and navigation; linear referencing; ubiquitous public access and place identifier

linking; land administration modelling; sensor modelling; and core geospatial terminology

� Transparency of information

� Transparency towards the end users on how their information is being used, with clear opt-in options

and secured environments, has to be the starting point when providing services that leverage

personal data.

� Metadata and data standardization

� Enables comparability and comprehensibility, publishing of more fine granular data through

mechanisms for automatic anonymization or pseudonymization of data sets.

� Networking

� Broadband capacity with FTTH, 4G LTE and IP Multimedia Systems (IMS) as well as future networking

technologies to enable the democratization, in terms of reasonable cost for high quality service, of

Immersive Digital Environments

OVERALL PRINCIPLES FOR ICT INTERVENTIONOVERALL PRINCIPLES FOR ICT INTERVENTION

Page 124: cost in rs. crore

� Big Data

� A Smart City, as a “system of systems”, can potentially generate vast amounts of data, especially as

cities install more sensors, gain access to data from sources such as mobile devices, and government

and other agencies make more data accessible.

� Geographic information system (GIS)

� GIS is used to provide location based services. The implementation of a GIS in Smart City is often

driven by city jurisdictional, purpose, or application requirements. GIS and location intelligence

applications can be the foundation for many location-enabled services that rely on analysis,

visualization and dissemination of results for collaborative decision making.

� Cloud computing

� Cloud computing is increasingly helping the private sector to reduce cost, increase efficiency, and

work smarter.

� Service Oriented Architecture (SOA)

� Pre-built integration into back-office applications and multi-channel access to maximize citizen self-

service results in higher efficiencies and cost savings, and must be implemented with a SOA that

facilitates a fully shared environment.

� Embedded networks and Internet of Things (IoT)

� Enabling connectivity across devices and facilitating automation

ICT COMPONENTS IN SMART CITY (CONTD..)ICT COMPONENTS IN SMART CITY (CONTD..)

Page 125: cost in rs. crore

SYSTEM INTEGRATION MATRIXSYSTEM INTEGRATION MATRIX

Page 126: cost in rs. crore

FACILITATION THROUGH ICTFACILITATION THROUGH ICT

Page 127: cost in rs. crore

Guiding principles

Key processes

Critical success factors

Cost

Business objectives• Continuity of public

transport

• Generate revenue and

enable multi modal

commute

Citizen centricity• Ease of transport

• Availability of information

• schedule, outage,

locations etc.

• Smart ticketing

• Tracking

• Last mile connectivity

• Safety

Technology components• GPS, GIS

• CCTV camera

• Sensor

• Web app and Mobile app

• GPRS, Wi-Fi

communication

Intelligent transport system, Ensure connectivity, smooth traffic flow, track and monitor

Integration between providers, real-time information, police, surveillance, Sensors, incident

management and response

Network, Sensors, CCTV cameras, web & mobile apps, GIS & GPS communication

FundingTo be funded in Smart City

12 crores

URBAN MOBILITYURBAN MOBILITY

Page 128: cost in rs. crore

Feature

Stage I

• Bus lanes are marked

• Bus information is published through apps and on digital boards

• Auto or quadri-cycle information is enabled

Stage II

• Monitoring of bus movement and speed

• Ability to book last mile connectivity

• Integrated city information

• Alternate channel information

• Route guides

• Bicycle parking and renting facilities

• Automated alerts for important events and diversions

• Alerts for road work

Improvement

Marked zones for buses, Cycle tracks,Standardization of carriageway

Monitoring of vehicular movementthrough CCTVs

Traffic tickets (challans) andenforcement through electronicmeans

Residential, school and hospital zonesmarked

ICT initiative

GIS and GPS enablement (in stage I 54km of roads, zone control in stage II)

CCTV monitoring (currently only 19 cameras are enabled), need to augment to 12 + 38 + 88 in Stage I and another 54 + 17 + 70 in Stage II

Integrated monitoring through a central monitoring team

Parking is monitored through tickets and location CCTV

Integrating with city information

Integration with Smart phone apps for cabs, autos and other modes

IMPROVING URBAN MOBILITY THROUGH ICTIMPROVING URBAN MOBILITY THROUGH ICT

Page 129: cost in rs. crore

Guiding principles

Key processes

Critical success factors

Cost

Business objectives• Access to information

• Enable citizen services

• Information delivery

across departments

• Operation management

and coordination across

sectors

Citizen centricity• Information and public

service data

• Requests and services

provisioned

• Notifications

• Updates and alerts

Technology components• Command center

• Citizen service charters

• Integration

• M2M – IoT (meters)

• Web app and Mobile app

• GPRS, Wi-Fi communication

Citizen services, Department level coordination

Central monitoring and command center for the entire city

Integration between departments & providers, real-time information, police, surveillance,

Sensors, incident management and response

Network, Sensors, CCTV cameras, web & mobile apps, GIS & GPS communication, Command

center

FundingTo be funded in Smart City

12 crores

EE--GOVERNANCEGOVERNANCE

Page 130: cost in rs. crore

Feature

Stage I• Most of the services are provided

online and offline.

Stage II• All major services are provided

through online and offline platforms.

• Citizens and officials can access information on accounting and monitor status of projects and programs through data available on online system.

• Information is shared between departments and enhances internal governmental coordination.

Improvement

Municipal services and other identified 66 services are integrated through web and smart phones

Government services and other services have dashboards and information brochures

ICT initiative

All e-governance activities have workflow enabled with inter-departmental coordination

Grievance management systems and escalation mechanisms are provided with periodic updates

EE--GOVERNANCE THROUGH ICTGOVERNANCE THROUGH ICT

Page 131: cost in rs. crore

Guiding principles

Key processes

Critical success factors

Cost

Business objectives• Ensure optimum utilization

of energy

• Renewable energy sources

providing power for the

city requirements

• Enable smart metering

Citizen centricity• Uninterrupted supply

• Charged based on usage

• Enable optimization of

usage and reduction in

bills

Technology components• Smart meters

• Web and Mobile apps

Assured electricity supply with at least 10% of the Smart

City’s energy requirement coming from solar power

Integration between providers, real-time information, deployment of smart meters, provision of

grids

Network, Sensors, web & mobile apps, GIS communication

Cost of meters is shared among consumer, electricity dept and ULB

Funding60 crores to be supply by HESCOM (recovered from consumer on annuity basis)

60 crores

ELECTRICITYELECTRICITY

Page 132: cost in rs. crore

Feature

Stage I

• 24 X 7 supply

• Provision for renewable sources

Stage II

• 24 x 7 in all parts of the city with smart metering

• Renewable sources and alternate sources are increasingly used

Improvement

Supply and consumption monitored in Stage I

Smart meters and monitoring Electricity and renewable sources with differential pricing

ICT initiative

Smart meters integrated with e-governance services

Monitoring of peak usage, demand variation and alternate energy utilization through smart meters

ELECTRICITY MANAGEMENT THROUGH ICTELECTRICITY MANAGEMENT THROUGH ICT

Page 133: cost in rs. crore

Guiding principles

Key processes

Critical success factors

Cost

Business objectives• Ensure 24 X 7 supply

• Enable smart metering and

optimization

Citizen centricity• Uninterrupted supply

• Charged based on usage

• Enable optimization of

usage and reduction in

bills

Technology components• Smart meters

• Web and Mobile apps

• Sujal water filters for

public (on roads)

Assured 24 X 7 water supply

Integration between providers, real-time information, deployment of smart meters, provision of

redundant sources

Network, Sensors, web & mobile apps, GIS communication

Cost of meters is shared among consumer, Water supply and ULB

Funding60 crores to be funded by Water supply (recovered from consumer on annuity basis). 2 crores to

be funded from Smart City

62 crores

WATERWATER

Page 134: cost in rs. crore

Feature

Stage I

• 24 x 7 water supply in most areas with meters

• Rainwater harvesting and storm water planning is done

Stage II

• 24 x 7 treated water supply with smart meters

• Rainwater harvesting systems are installed and storm water is collected and stored in water bodies and treated for usage.

• Recycled waste water is supplied for secondary uses.

Improvement

Water supply monitored in Stage I

Quality and Quantity of water supply being assured

Smart meters and monitoring primary and secondary uses with differential pricing as future upgrade

ICT initiative

Water filters / kiosks on city roads

Monitoring of rain harvesting, storm water and recycling through command center

WATER MANAGEMENT THROUGH ICTWATER MANAGEMENT THROUGH ICT

Page 135: cost in rs. crore

Guiding principles

Key processes

Critical success factors

Cost

Business objectives• Ensure information is

available about all

locations, amenities, maps

and transport

Citizen centricity• Availability of information

on sites, locations,

features, accessibility,

reservations

• Notifications and alerts

Technology components• Web and Mobile apps

• Integrated facility

applications

Information access and availability in various modes

Integration between providers, real-time information

Cost covered under e-governance0

TOURISMTOURISM

Page 136: cost in rs. crore

CCostingosting

Sl.NoItem

no.Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from

other Grants

1

IMPROVING ROAD, CIRCULATION

NETWORK

1.1 FOOTPATH 26.50 SFC + 14th finance +

SC

1.2 CYCLE TRACK 12.50

1.3 UG DUCTING 55.00 SC

1.4 CARRIAGEWAY IMPROVEMENT 165.00 SFC + 14th finance +

SC

1.5 UG CABLE DUCTING (HT & LT LINE) 104.00 Hescom + SC

1.6 STREET LIGHTING 11.50 PPP by replacing LED

+ EE Programme

1.7 STREET FURNITURE 1.00 SC

1.8 AVENUE PLANTATION 0.50 SC

SUB TOTAL 376.00

Page 137: cost in rs. crore

Sl.No Item no. Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from

other Grants

2

SPECIFIC HAWKER VENDING SPACES

2.1 Hawker zone & Eat Street 3.00 SC

Sub Total 3.00

3

JUNCTION IMPROVEMENT

3.1 Major Junction 1.70 PPP

3.2 Minor Junction 1.30 SC

Sub Total 2.90

4

FLYOVERS, UNDERPASS & ROB

4.1 Flyover 129.00 PWD

4.2 Underpass 56.00 PWD

4.3 ROB 113.50 PWD

Sub Total 298.50

CCostingosting

Page 138: cost in rs. crore

Sl.No Item no. Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from

other Grants

5

MULTI UTILITIES CENTRES

5.1 Dharamnath Circle 18.00 SC+PPP

5.2 Ramteerth Nagar 35.00 SC+PPP

5.3 Mahantesh Nagar 35.00 SC+PPP

5.4 First Rly Gate Opp. Kalamandir 35.00 SC+PPP

5.5 Fort Road 11.40 SC

5.6 Goaves Complex 35.00 PPP

Sub Total 169

6

PUBLIC CONVENIENCE & AMENITIES

6.1 PUBLIC URINALS AND TOILETS 6.50 SFC+SBC+PPP

6.2 Road Side Drinking Water Kiosks 0.70 SC

6.3 Bus Shelters 2.50 SC

6.4 Road Signages 3.00 SC

6.4 Trauma Center 6.00 SC

SUB TOTAL 19

CCostingosting

Page 139: cost in rs. crore

CCostingosting

Sl.No Item no. Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from

other Grants

7

DEVELOPMENT OF MARKETS

7.1Development of modern markets at Tilakwadi

(Kalamandir) 53.50 PPP

7.2Development of modern markets near

DHARAMNATH CIRCLE at MM Extension250 PPP

SUB TOTAL 303.50

8

IMPROVEMENT OF PUBLIC TRANSPORT

8.1 Improvement of Central Bus Terminus 107.00 KSRTC+SC

SUB TOTAL 107.00

9

PARKS & RECREATIONAL SPACES

9.1Improvement of Neighborhood Parks &

Recreational Spaces18.50 AMRUT+SC+BUDA

9.2Development of Heritage Park at Vaccine Depot -

Tilakwadi38.50 SC

SUB TOTAL 57.00

10

EMPLOYMENT CENTER

10.1 Skill Development Center 12 SC

SUB TOTAL 12.00

Page 140: cost in rs. crore

Sl.No Item no. Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from

other Grants

11

CONSERVATION & PRESERVATION OF HERITAGE STRUCTURE

11.1 Development of Fort and Precinct 25.00 SC

11.2 Improvement of Lakes 10.00 SC

Sub Total 35.00

12

AFFORDABLE HOUSING

12.1 Development of Affordable Housing for EWS 74.00 SCHEME+SC

Sub Total 74.00

13

ROAD SIDE TREE PLANTATION

13.1 Road side tree plantation 0.50 Forest + CCB+BUDA

Total 0.50

14

SEWERAGE SYSTEM

14.1 Construction of STP and Improvement of sewerage lines 220.00 AMRUT+SC

Total 220.00

15

STORM WATER DRAINAGE SYSTEM

15.1 Storm Water Drainage System 70.00SC+SFC+13th

Finance+100 cr

Total 70.00

CCostingosting

Page 141: cost in rs. crore

Sl.No Item no. Description

Cost in Rs Crores

Area Based

DevelopmentPan City

Convergence from other

Grants

16

Solid Waste Management and Sanitation

17.1 Solid Waste Management 52.70 SBA+PPP+SC

Total 52.70

17

Urban Mobility & Transport

18.1 Priority Bus Lanes 20.86

18.2 Bus Terminals 90.77 KSRTC+CCB+SC

18.3 Smart Bus Shelters 3.50 PPP+CCB

18.4 Paratransit 0.85 SC

18.5 Pedestrian Walkways 110.6

18.6 Cycle Tracks 70.65

18.7 Junction Improvement - Major 1.3

18.8 Junction Improvement - Minor 6.7

Total 305.23

18

ICT

19.1Central Command Center and Traffic and Transportation

12

19.2 E-Governance 12

19.3Smart Metering for Electricity

60 Consumers+SC+Hescom

19.4Smart Metering Water Supply/ UGD

62 Consumers+sc+kuwssb

Total 146.00

Grand Total (in Rs Crores):1685.42 451.23

CCostingosting

Page 142: cost in rs. crore

Other Proposed/ Ongoing Projects

Sl.No. Description

Cost In Rs CroresFunding Source and

RemarksOngoing/

SanctionedProposed

1 24x7 water supply with world bank funding 680

World Bank+SG+CCB;

Already Sanctioned and

tendered

2

11 KV Under Ground Cable - Conversion of

existing 11 KV OH Line by 11 KV UG Cable in

complete Belagavi City

320

3Area Development Project at Kanbargi

Scheme no 61177 BUDA

4

Imrovement of Road, Drains, Garden

Development, Stadium, UGD, Street Lights,

Nallas, and Multilevel Parking etc.

100 3rd Phase Rs. 100 Cr works

5Karnataka Housing Board - Housing of 2170

DU - EWS & MIG and Commercial Complex70 502 Karnataka Housing Board

OTHER PROPOSED PROJECTSOTHER PROPOSED PROJECTS

Page 143: cost in rs. crore

Other Proposed/ Ongoing Projects

Sl.No. Description

Cost In Rs Crores

Funding Source and RemarksOngoing/

SanctionedProposed

6Strengthening and Improvement of

Distribution system in Belagavi30 IPDS-PFC

7Sewerage system for uncovered areas of

belagavi City200 284 AMRUT+SG+CCB+Spl Funding

8Storm Water Drainage Scheme for rest of

the City310 AMRUT+SG+CCB+Spl Funding

9Development of Urban Forestery and

Green Cover43 State Government

10Development of Outer Ring Road for

Belagavi1000

Rs. 100 crore from BUDA for I

phase. Given Cost is only

Infrastructure Cost which is

other than land assemblage thru

self generating scheme

OTHER PROPOSED PROJECTSOTHER PROPOSED PROJECTS

Page 144: cost in rs. crore

Other Proposed/ Ongoing Projects

Sl.No. Description

Cost In Rs Crores

Funding Source and RemarksOngoing/

SanctionedProposed

11 Tourism Improvement Projects 26 SG+DoT, GoK

12 Logistic Hubs- 2 no and Truck Terminal- 2 no. 200 PPP+SG

13 Development of Major Roads and new links 200 250BUDA+CCB+Rs 100 Cr Spl

Funding

14 Improvement of Airport 500 AAI

15Shifting of existing railway station to Desur

and laying of new rail tracks150 Railways+SG

16

Construction of additional 1 no 220 KV

station along with 4 nos. of interconnected

110KV Lines and Strengthening of existing

110 KV Lines

130 KPTCL/ SG

17 Development of new industrial areas 100 200 KIADB+SG+100 Cr Spl. funding

Total in Rs Crores: 1670 3802

OTHER PROPOSED PROJECTSOTHER PROPOSED PROJECTS

Page 145: cost in rs. crore

Click to edit Master text styles

– Second level

• Third level

– Fourth level

» Fifth level

| ©2012, Cognizant 145 Confidential 145

T H A N K Y O UT H A N K Y O U

Transforming Transforming BelagaviBelagavi into a Smart Cityinto a Smart City