CONCRETE PRESERVATION ALLIANCE

The Concrete Preservation Alliance is a growing coalition of organizations committed to advancing best practices in the field of concrete preservation and infrastructure renewal.

Working together to promote education and awareness of concrete repair industry standards, new and innovative corrosion prevention technologies and sustainable construction practices.

WeSaveStructures.info

Page 3: Corrosion Assessments for Parking Structures

3

OUR MEMBERS

Page 4: Corrosion Assessments for Parking Structures

4

WESAVESTRUCTURES.INFO

Page 5: Corrosion Assessments for Parking Structures

5

Dr. Brian Pailes, Ph.D., P.E., NACE Specialist

Brian is the Principal Engineer with VCS, a professional engineer and certified NACE Cathodic Protection Specialist (CP4).

Brian has extensive experience in the field of nondestructive evaluation (NDE), material testing, structural evaluation and corrosion assessment of reinforced concrete structures.

He earned a Ph.D. in Civil Engineering from Rutgers University, an M.S. in Civil Engineering from the University of Virginia and a B.S. in Civil Engineering from Northeastern University. Brian has also obtained a Graduate Certificate in Engineering Geophysics.

Page 6: Corrosion Assessments for Parking Structures

6

Corrosion Assessments for Parking Structures

• Professional services to extend the service life of parking and building structures

• Understanding the cause and effect of reinforcing steel corrosion in concrete

• Quantifying the magnitude and extent of corrosion risk.

• Many destructive and non-destructive test methods for assessing corrosion risk.

Page 7: Corrosion Assessments for Parking Structures

What is really happening in the concrete?

• Large Near surface Delamination

• Extent of delamination beyond what sounding can pick up

• Corrosion is active but has not formed enough iron oxide to create significant cracking

Page 8: Corrosion Assessments for Parking Structures

8

Corrosion

• Electrochemical reaction requires:

• Moisture• Electrolyte – concrete• Metallic path – steel

• Anode• Where rust is formed

• Cathode• No section loss

Page 9: Corrosion Assessments for Parking Structures

• Chloride ions diffuse into concrete and destroy steel’s passive layer

• Source of chlorides• Marine environments• De-icing salts• Chemical/processing plants• Cast into concrete

• Chlorides are not consumed in corrosion reaction, therefore, once threshold concentration reached, corrosion can occur unabated

Chloride Induced

Page 10: Corrosion Assessments for Parking Structures

•Carbon dioxide permeates into concrete

•Reduces pH of concrete• CO2 reacts with free lime, Ca(OH) 2,

resulting in CaCO3 and H2O•Reduced pH de-passivates steel•Often seen when

• Concrete permeability is high• Industrial sites• Very old structures – carbonation is a

result of time and exposure

Carbonation

Page 11: Corrosion Assessments for Parking Structures

Corrosion Induced Damage

0 1 2 3 4 5 6 7Relative Size

Fe

FeO

Fe3O4

Fe(OH)2

Fe(OH)3*3H2O

Pilling-Bedworth Ratio

Page 12: Corrosion Assessments for Parking Structures

Corrosion Induced Damage

•Conventional mild reinforcing bar• Typically damage to concrete becomes significant

and observable prior to severe steel section loss •High Strength Tendons

• Minor section loss of steel can have significant effect on strength

• Steel can have significant section loss without significant concrete damage

Page 13: Corrosion Assessments for Parking Structures

How can we better understand these

deterioration conditions?

Page 14: Corrosion Assessments for Parking Structures

REBAR CORROSION DELAMINATION SPALLING

IMPACT ECHO

CHAIN DRAG

VISUAL INSPECTION

BRID

GE

DEC

K C

ON

DIT

ION

TIME

HALF-CELL POTENTIAL

ELECTRICAL RESISTIVITY

GROUND PENETRATING RADAR

CHLORIDE AND MOISTURE

PENETRATION

Stru

ctur

e C

ondi

tion

Concrete Deterioration

Page 15: Corrosion Assessments for Parking Structures

Parking Garage - Washington D.C.

Corrosion Assessment, Repair and Corrosion Mitigation

Page 16: Corrosion Assessments for Parking Structures

•6 level sub-grade parking facility

•2-bay split level design•Cast-in-place reinforced concrete

•Exposure to deicing chemicals causing concrete deterioration

Parking Garage

Page 17: Corrosion Assessments for Parking Structures

Elastomeric Coating performing poorly in areas of high traffic volume, i.e. ramps and areas near entrance

Current Condition

Page 18: Corrosion Assessments for Parking Structures

Soffit and Wall Damage

Page 19: Corrosion Assessments for Parking Structures

• Condition assessment• Corrosion potential

survey ASTM C876• Ground penetrating

radar ASTM D6432• Concrete material

samplingChloride concentration depth testing ASTM C1152

Scope of Work

Page 20: Corrosion Assessments for Parking Structures

Corrosion Potential Measurements

ASTM C876 - also known as half-cell potentialDetermines probability of active corrosion

Page 21: Corrosion Assessments for Parking Structures

Corrosion Potential Survey

Page 22: Corrosion Assessments for Parking Structures

• Electromagnetic evaluation of concrete• Reinforcement layout

• Location of embedded metals• Cover Depth• Qualitative condition of reinforced concrete

• Chlorides, moisture, and concrete deterioration attenuate GPR signal

Ground Penetrating Radar

Page 23: Corrosion Assessments for Parking Structures

GPR – Cover Depth Survey

Page 24: Corrosion Assessments for Parking Structures

Chloride Sampling

0

1000

2000

3000

4000

5000

6000

7000

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

Chlo

ride

Cont

ent (

ppm

)

Depth (in)

C1 C2 C3 D1 D2 Threshold Cover Depth - Average Cover Depth - +STDEV Cover Depth - -STDEV

Page 25: Corrosion Assessments for Parking Structures

•Severe corrosion damage on levels A, B and C• Delamination and spalling• Concrete with high chloride contact, active corrosion• Near entry way, exposed to most amount of traffic and deicing chemicals

•Little to no damage on level D, E and F• Deeper in the garage, less traffic and reduction in chloride exposure

•Corrosion activity on all ramps• Turning of vehicle wheels and more traffic lead to early deterioration of elastomeric coating, allowing greater chloride diffusion

Assessment

Page 26: Corrosion Assessments for Parking Structures

• Do nothing• Basic Repair

• Remove/replaced delaminated concrete

• Targeted Approach• CP to levels A,B, C and ramps• Imbedded galvanic anodes

• Global Approach• CP to all levels• ICCP – MMO titanium mesh

Rehabilitation Options

Page 27: Corrosion Assessments for Parking Structures

Anode Design Using Survey

Page 28: Corrosion Assessments for Parking Structures

Honolulu Club

Page 29: Corrosion Assessments for Parking Structures
Page 30: Corrosion Assessments for Parking Structures

GPR Survey

Page 31: Corrosion Assessments for Parking Structures
Page 32: Corrosion Assessments for Parking Structures

Impact Echo

Page 33: Corrosion Assessments for Parking Structures

Pulse Velocity

Page 34: Corrosion Assessments for Parking Structures
Page 35: Corrosion Assessments for Parking Structures

Assessment of Concrete

Page 36: Corrosion Assessments for Parking Structures
Page 37: Corrosion Assessments for Parking Structures
Page 38: Corrosion Assessments for Parking Structures

Gethsemane Church

Page 39: Corrosion Assessments for Parking Structures

Corrosion Deterioration

Page 40: Corrosion Assessments for Parking Structures

Carbonation Corrosion

Page 41: Corrosion Assessments for Parking Structures

Corrosion Potential Survey

Page 42: Corrosion Assessments for Parking Structures

150 Bay Street

Page 43: Corrosion Assessments for Parking Structures

Reinforcement Layout

Page 44: Corrosion Assessments for Parking Structures

Chloride Sampling

Page 45: Corrosion Assessments for Parking Structures

Carbonation Depth

Page 46: Corrosion Assessments for Parking Structures

Venetian Isles

Page 47: Corrosion Assessments for Parking Structures

Pile Deterioration

Page 48: Corrosion Assessments for Parking Structures

Substructure Evaluation

Page 49: Corrosion Assessments for Parking Structures

Sacred Heart Hospital

Page 50: Corrosion Assessments for Parking Structures

•Strands don’t have the same level of protection

• Not encased in cement therefore the corrosion resistant film is not created

•Breaks in sheathing• Allow access for moisture and chlorides

•Poor greasing• Improperly caped anchors

• Access for moisture and chlorides

Unbonded PT

Page 51: Corrosion Assessments for Parking Structures

Exposed PT

Page 52: Corrosion Assessments for Parking Structures

PT Issues

Page 53: Corrosion Assessments for Parking Structures

Moisture Issues

Page 54: Corrosion Assessments for Parking Structures

Post-TechTM Corrosion Evaluation

Page 55: Corrosion Assessments for Parking Structures

0

10

20

30

40

50

60

70

80

90

100

10 12 14 16 18 20 22 24 26 28 30

Rel

ativ

e H

umid

ity (%

)

Temperature (oC)

Data CE M.C. 0.003K CE M.C. 0.007K

"Wet" Cables

"Wet/Dry" Cables

"Dry" Cable

Moisture Testing

Page 56: Corrosion Assessments for Parking Structures

Screwdriver Penetration Test

Page 57: Corrosion Assessments for Parking Structures

Grady CASS Parking Garage

Page 58: Corrosion Assessments for Parking Structures

Lateral Deflection Testing

Page 59: Corrosion Assessments for Parking Structures

Access the Tendons

Page 60: Corrosion Assessments for Parking Structures

Test No. Cycle Tendon Group Tendon

∆-2(final) ∆-1(initial) ∆2-∆1 Theoretical Corrected

(in) (in) (in) Tension (lb) Tension (lb)

11 197 B 0.510 0.275 0.235 22773 180102 197 B 0.503 0.287 0.216 24775 207843 197 B 0.408 0.193 0.215 24891 20943

AVG 0.474 0.252 0.222 24106 19856

21 191 A 0.460 0.222 0.238 22486 176122 191 A 0.468 0.248 0.220 24325 201603 191 A 0.470 0.246 0.224 23891 19558

AVG 0.466 0.239 0.227 23541 19073

31 190 A 0.377 0.175 0.202 26492 231622 190 A 0.370 0.174 0.196 27302 242853 190 A 0.367 0.175 0.192 27871 25073

AVG 0.371 0.175 0.197 27210 24157

41 185 C 0.604 0.304 0.300 17842 111772 185 C 0.591 0.328 0.263 20350 146523 185 C 0.61 0.346 0.264 20273 14545

AVG 0.602 0.326 0.276 19416 13357

Results

Page 61: Corrosion Assessments for Parking Structures

Kansas City Airport Hanger

Page 62: Corrosion Assessments for Parking Structures

• Tie-beam in floor of each hanger• 12 button head PT Tendons• 34 wires each tendon

Unbonded PT

Page 63: Corrosion Assessments for Parking Structures

• Observed wires sticking out of anchorage

Broken Wires

Page 64: Corrosion Assessments for Parking Structures

• Determine current stress tendons are under

Lift Off Testing

Page 65: Corrosion Assessments for Parking Structures

TendonMax Applied

Jack Pressure (psi)

Did Lift off Occur?

Tendon Load at Lift Off

(kips)

Effective Number of

Wires

Potential Number of

Broken Wires1 5050 Yes 243.0 34 12 5000 Yes 240.6 34 13 4850 Yes 233.4 33 24 4950 Yes 238.2 34 15 5150 Yes 247.8 35 06 5100 Yes 245.4 35 07 5000 Yes 240.6 34 18 5100 Yes 245.4 35 09 5000 Yes 240.6 34 1

10 4850 Yes 233.4 33 211 4050 Yes 194.9 28 712 5000 Yes 240.6 34 1

Lift Off Results

Page 66: Corrosion Assessments for Parking Structures

QUESTIONS?

Page 67: Corrosion Assessments for Parking Structures

67

Contact Brian

Dr. Brian Pailes

Principal Engineer

VCS Inc.

Tampa, FL

Office: 813-501-0050

[email protected]

Page 68: Corrosion Assessments for Parking Structures

68

WEBINAR RECORDING & FUTURE EVENTS

Page 69: Corrosion Assessments for Parking Structures

WESAVESTRUCTURES.INFO