    Investor Day Presentations

    June 22, 2010

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    2/52

    http://www.sedar.com/
  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    3/52

    McCully Field Overview

    Don LeBlancChief Reservoir/Production Engineer

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    4/52

    McCully Production

    6/30/2010 4

    A total of 39 wells have

    been drilled into theMcCully structure (plus 1in the Caledonia oilstructure)

    Currently, there are 30producing wells inMcCully

    To the end of May 2010,McCully has produced28.9 Bscf

    Average rate for May2010 was 18.9 mmscf/d

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    5/52

    2010 Well Activity

    (to mid-June 2010)

    6/30/2010 5

    One horizontal well (L-37)was drilled into the structure

    to target the shallow G sands

    The purpose of the well wasto evaluate a non-fracture

    stimulation completion option

    The well was completed over75% of its length with anuncemented perforated casing

    So far tests have yielded low-rate gas (200 mscf/d)

    Evaluation is on-going

    20

    00m

    1500m

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    6/52

    2010 Field Activity

    (to mid-June 2010)

    6/30/2010 6

    Stage 1 of a workoverprogram designed tostabilize and increase field

    production, 3 wells weretargeted for remedial work

    The wells had various

    chemical/mechanicaltreatments applied and theproduction response wasmonitored for 30 days

    On an aggregate basis,maximum uplift for all 3 wellswas 2.5 mmscf/d

    The 30 day average upliftfor the 3 wells was 1.5mmscf/d

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    7/52

    McCully

    There has been a planned reduction in drilling activity

    in the McCully Field during 2009 & 2010

    As expected, the initial high rates of decline observedat the wells has become a more conventional decline

    2010 field activities are being targeted to increaseand stabilize production

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    8/52

    McCully Production Operations

    Doug BaileyProduction Operations Manager

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    9/52

    McCully Facilities

    30 gas producing wellsdirectionally drilled from11 drilling pads

    A field gathering systemconsisting ofapproximately 20 km ofburied 6, 8 and 10

    pipe54 km of buried 8 gastransmission line toMaritimes and NortheastPipeline (M&NP)

    A gas processing plantdesigned for 30 mmscfd

    2400 HP salescompressor

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    10/52

    McCully Operations Performance

    2009 operating costs 20% less than 2008

    2009 injuries none for staff, 1 minor for contractors 2009 spills none in 2009

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    11/52

    Inlet Compressor Design

    2 Stage Unit Suction Pressure 200psig

    2100 HP Electric Driver with VFDInlet separator sized to accommodate piggingevents

    Minimum capacity 35mmcfd (45 to 50 mmcfdunder normal conditions)

    Designed and project managed by in-house staffEstimated Cost = $5.9 million

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    12/52

    Project Schedule

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    13/52

    McCully Operations

    Inlet Compressor

    Inlet Separator

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    14/52

    Assumes compressoravailable on October 1, 2010

    Two forecasts: One based on field IPR

    (original analysis) One based on calibrated

    GAP/MBal/Prosper model

    Assuming a 200 psi inletpressure, the calibrated GAPmodel delivers 3500mmscfmore incremental gas over 5years

    The two forecasts are similarfor the first 12 months ofproduction

    Peak uplift for the first monthshould be around 5 mmscf/d

    Planned Inlet Compressor Uplift Analysis

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    15/52

    Frederick Brook Shale Overview

    A Significant New Shale Gas Play?

    Tom MartelChief Geologist

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    16/52166/30/2010

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    17/52

    Basin-Wide Cross-Section

    6/30/2010 17

    McCully Field Elgin AreaG-41 N-11W E

    Hiram Brook E-G Sands

    Hiram Brook A-D Sands

    Upper Fredrick Brook

    Sussex Group

    0

    1

    2

    3

    4

    Ap

    proximateDepth

    (km)

    5 km

    Lower Fredrick Brook

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    18/52

    186/30/2010

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    19/52

    Upper Frederick Brook

    - 500 m thick

    - Composed of clay, quartz anddolomite

    - Tested gas in G-41- GLJ estimates 43.2 TCF GIP

    Lower Frederick Brook

    - 600+ m thick

    - Composed of albite, dolomiteand quartz- Producing gas in F-58- GLJ estimates 24.1 TCF GIP

    625 BCF/Mi2

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    20/52

    CONCLUSIONS

    Testing and production indicates that both the

    Lower and Upper Frederick Brook shale areproductive

    This productivity extends widely across the basinfrom the McCully Field to the Elgin area.

    Although basin area is small, the shale thicknessmeans that the amount of resource is large

    6/30/2010 21

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    21/52

    Green Road G-41 Test Results

    Frederick Brook Shale

    Don LeBlancChief Reservoir/Production Engineer

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    22/52

    Elgin FB Testing: G-41

    Two zones in the vertical

    Green Road G-41 wellwere tested within theFrederick Brook duringNovember/December

    2009

    Each zone was fracd with

    LPG prior to testing

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    23/52

    G-41 FB Zone 1 Test

    6/30/2010 24

    Zone 1: 2047.5m -2052.5m

    Frac: 46 tonnes, 307.6 m3 LPG

    Test Duration: 83.5 hours (3.5 days)

    Peak Gas Rate: 0.98 mmscf/d @ 1130 psiFinal Gas Rate: 0.43 mmscf/d @ 145 psi

    Overall Average Rate: 0.64 mmscf/d

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    24/52

    G-41 FB

    Zone 2 Test

    6/30/2010 25

    Zone 2: 1852.5m -1893.5m (3 intervals)

    Frac: 68 tonnes, 393.6 m3 LPG

    Test Duration: 185 hours (7.5 days)

    Gas Rate #1: 3.6 mmscf/d @ 2106 psiGas Rate #2: 7.1 mmscf/d @ 1526 psiPeak Rate: 11.7 mmscf/d @ 1076 psiFinal Rate: 3.0 mmscf/d @ 699 psi

    Overall Average Rate: 5.5 mmscf/d

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    25/52

    Elgin FB Shale Test

    G-41 FB Zone #1 tested the shaly section of the FB

    G-41 FB Zone #2 tested silty stringers within the FB

    Based on the success of this test program, GLJ has

    assigned the following contingent resources to Elgin:

    Low Estimate 395 Bscf

    Best Estimate 494 BscfHigh Estimate 708 Bscf

    Ref: Corridor Resources Inc., Gross Lease, Contingent Resources, Effective December31,2009 by GLJ Petroleum Consultants. These estimates do not take into account the 50% working interest that may be earnedby Apache in approximately 116,000 acres of lands covering the Frederick Brook shale. See Corridors 2009 Annual Information for more information, a copy ofwhich is available at www.sedar.com.

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    26/52

    Apache Drilling/Completion Plans

    Larry HuskinsDrilling/Completions Team Lead

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    27/52

    Location

    Green Road B-41

    located on existing Green Road

    well pad. drilled to 2,100 metres depth

    before turning horizontal foranother 1,000 metres.

    adjacent to original CorridorGreen Road G-41 well

    Wille DeMille G-59

    north-west of Elgin drilled to a depth of 2,400

    metres before turning horizontalfor another 1,000 metres.

    adjacent to original CorridorWille DeMille J-59

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    28/52

    Seismic Green Road Wells

    Zone of Interest

    Gas log

    B 41 Surface

    500 m

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    29/52

    Fresh Water Storage

    Engineered pits forfresh water

    Lined with a geotextile

    2 pits planned with25,000 m3 of waterstorage each

    ~120 m x 120 m

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    30/52

    Fraccing

    1000 m horizontal legs in both Green Road &

    Wille DeMille~5 fracs in each well

    4000 m3 of water per stage

    300 tonnes of proppant (sand) per stage

    planned rate of 16 m3/min

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    31/52

    Shale Gas Fraccing

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    32/52

    Other Corridor Activities

    6/30/2010 37

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    33/52

    ANTICOSTI EXPLORATIONOBJECTIVES

    6/30/2010 38

    Trenton/Black River HTD Play

    Tom MartelChief Geologist

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    34/52

    Drilling Program 2010

    6/30/2010 39

    1.5 Million Acres

    (900k Corridor, 600k Petrolia)

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    35/52

    Chaloupe TBR Prospect

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    36/52

    ANTICOSTI MACASTY (UTICA) SHALE

    Investigating its Shale Oil Potential

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    37/52

    Macasty (Utica) Cross-Section

    J upiter

    SchmittChaloupe

    Saumon

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    38/52

    Summary

    We will soon begin testing the relatively shallowTrenton/Black River oil play on Anticosti

    We will also begin to evaluate the shale oilpotential the Macasty (Utica) shale

    6/30/2010 44

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    39/52

    2010 Anticosti

    Drilling Program

    45

    Larry HuskinsDrilling/Completions Team Lead

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    40/52

    Objectives

    Technical Goals Flow oil from Black River carbonate

    Core & wireline log from Macasty Shalein one well

    Suspend wells if they flow oil (P&A

    otherwise)(no completion or fraccing )

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    41/52

    Anticosti & Prospects

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    42/52

    Schedule

    PlanningWork

    MobilieEquipmenttoDock

    SailEquipmenttoIsland

    ReEnterJupiter

    Drill

    Surface

    &

    Intermediate

    holesfor3easternwells

    Drillmainhole&test3

    easternwells

    Suspend&MoveoffIsland

    October

    2010

    SeptemberAugustJulyJuneMayApril

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    43/52

    Vessel - Aivik

    Length overall 109.90 M

    Breadth 19.40 M

    Depth 12.95 MDraft 5.92 M

    G.R.T. 7,048 M.T.

    N.R.T. 5,043 M.T.

    Indicated horsepower 5,200 BHP

    Speed 14 KTSBuilt 1980

    Class BV 1 3/3 E

    RO-RO ICE 111 UMS

    Bale Cubic 13,388 M3

    Deadweight 4,860 M.T.

    Container capacity 280 TEUsLane meters (2.5 M

    wide)

    1,150

    Heavy lift derricks 2 X 155 M.T.

    (310 M.T. in tandem)

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    44/52

    Well Design

    4 Wells in Total PlannedJupiter Nearly horizontal -> target Mingan

    Saumon / Chaloupe / Schmitt or Bell at highangle (65-75 inclination ) -> target BlackRiver

    All wells drilled under-balance (using nitrogen)to encourage oil flow

    No casing planned for main hole open holetest to flow oil

    Suspend wells if oil is found for futureoperations (P&A if no oil found)

    Drilled with a Hybrid Coiled Tubing Drilling Rig(drills conventionally with drill pipe or using a reel of coiled tubing)

    Conductor444.5mm/339.7mm casing

    Surface to ~180m311mm/245mm casing

    Intermediate to ~1000m

    - Set between the Trenton & the

    Black River 216mm hole/178mm casing

    - Drilled on 89 mm Coiled Tubing

    - WBM at ~1050kg/m3

    Main Hole

    - 2200m for Jupiter

    - ~1500m for others

    - No casing (open hole flow test)

    - UB with N2/Water

    - WBM Density of ~800 kg/m3

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    45/52

    Hybrid / Coiled Tubing Drilling Unit

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    46/52

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    47/52

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    48/52

    Old Harry

    A Giant Prospect

    Tom MartelChief Geologist

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    49/52

    Corridor Resources Inc.

    250,000 Acres

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    50/52

    Corridor Resources Inc.

    Brion Island #1

    Bradelle L-49OH

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    51/52

    Corridor Resources Inc.

  • 7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation

    52/52

    Summary

    Old Harry is a giant structure that could be theflagship for a new basin opportunity