McCully Field Overview
Don LeBlancChief Reservoir/Production Engineer
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
4/52
McCully Production
6/30/2010 4
A total of 39 wells have
been drilled into theMcCully structure (plus 1in the Caledonia oilstructure)
Currently, there are 30producing wells inMcCully
To the end of May 2010,McCully has produced28.9 Bscf
Average rate for May2010 was 18.9 mmscf/d
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
5/52
2010 Well Activity
(to mid-June 2010)
6/30/2010 5
One horizontal well (L-37)was drilled into the structure
to target the shallow G sands
The purpose of the well wasto evaluate a non-fracture
stimulation completion option
The well was completed over75% of its length with anuncemented perforated casing
So far tests have yielded low-rate gas (200 mscf/d)
Evaluation is on-going
20
00m
1500m
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
6/52
2010 Field Activity
(to mid-June 2010)
6/30/2010 6
Stage 1 of a workoverprogram designed tostabilize and increase field
production, 3 wells weretargeted for remedial work
The wells had various
chemical/mechanicaltreatments applied and theproduction response wasmonitored for 30 days
On an aggregate basis,maximum uplift for all 3 wellswas 2.5 mmscf/d
The 30 day average upliftfor the 3 wells was 1.5mmscf/d
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
7/52
McCully
There has been a planned reduction in drilling activity
in the McCully Field during 2009 & 2010
As expected, the initial high rates of decline observedat the wells has become a more conventional decline
2010 field activities are being targeted to increaseand stabilize production
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
8/52
McCully Production Operations
Doug BaileyProduction Operations Manager
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
9/52
McCully Facilities
30 gas producing wellsdirectionally drilled from11 drilling pads
A field gathering systemconsisting ofapproximately 20 km ofburied 6, 8 and 10
pipe54 km of buried 8 gastransmission line toMaritimes and NortheastPipeline (M&NP)
A gas processing plantdesigned for 30 mmscfd
2400 HP salescompressor
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
10/52
McCully Operations Performance
2009 operating costs 20% less than 2008
2009 injuries none for staff, 1 minor for contractors 2009 spills none in 2009
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
11/52
Inlet Compressor Design
2 Stage Unit Suction Pressure 200psig
2100 HP Electric Driver with VFDInlet separator sized to accommodate piggingevents
Minimum capacity 35mmcfd (45 to 50 mmcfdunder normal conditions)
Designed and project managed by in-house staffEstimated Cost = $5.9 million
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
12/52
Project Schedule
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
13/52
McCully Operations
Inlet Compressor
Inlet Separator
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
14/52
Assumes compressoravailable on October 1, 2010
Two forecasts: One based on field IPR
(original analysis) One based on calibrated
GAP/MBal/Prosper model
Assuming a 200 psi inletpressure, the calibrated GAPmodel delivers 3500mmscfmore incremental gas over 5years
The two forecasts are similarfor the first 12 months ofproduction
Peak uplift for the first monthshould be around 5 mmscf/d
Planned Inlet Compressor Uplift Analysis
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
15/52
Frederick Brook Shale Overview
A Significant New Shale Gas Play?
Tom MartelChief Geologist
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
16/52166/30/2010
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
17/52
Basin-Wide Cross-Section
6/30/2010 17
McCully Field Elgin AreaG-41 N-11W E
Hiram Brook E-G Sands
Hiram Brook A-D Sands
Upper Fredrick Brook
Sussex Group
0
1
2
3
4
Ap
proximateDepth
(km)
5 km
Lower Fredrick Brook
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
18/52
186/30/2010
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
19/52
Upper Frederick Brook
- 500 m thick
- Composed of clay, quartz anddolomite
- Tested gas in G-41- GLJ estimates 43.2 TCF GIP
Lower Frederick Brook
- 600+ m thick
- Composed of albite, dolomiteand quartz- Producing gas in F-58- GLJ estimates 24.1 TCF GIP
625 BCF/Mi2
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
20/52
CONCLUSIONS
Testing and production indicates that both the
Lower and Upper Frederick Brook shale areproductive
This productivity extends widely across the basinfrom the McCully Field to the Elgin area.
Although basin area is small, the shale thicknessmeans that the amount of resource is large
6/30/2010 21
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
21/52
Green Road G-41 Test Results
Frederick Brook Shale
Don LeBlancChief Reservoir/Production Engineer
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
22/52
Elgin FB Testing: G-41
Two zones in the vertical
Green Road G-41 wellwere tested within theFrederick Brook duringNovember/December
2009
Each zone was fracd with
LPG prior to testing
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
23/52
G-41 FB Zone 1 Test
6/30/2010 24
Zone 1: 2047.5m -2052.5m
Frac: 46 tonnes, 307.6 m3 LPG
Test Duration: 83.5 hours (3.5 days)
Peak Gas Rate: 0.98 mmscf/d @ 1130 psiFinal Gas Rate: 0.43 mmscf/d @ 145 psi
Overall Average Rate: 0.64 mmscf/d
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
24/52
G-41 FB
Zone 2 Test
6/30/2010 25
Zone 2: 1852.5m -1893.5m (3 intervals)
Frac: 68 tonnes, 393.6 m3 LPG
Test Duration: 185 hours (7.5 days)
Gas Rate #1: 3.6 mmscf/d @ 2106 psiGas Rate #2: 7.1 mmscf/d @ 1526 psiPeak Rate: 11.7 mmscf/d @ 1076 psiFinal Rate: 3.0 mmscf/d @ 699 psi
Overall Average Rate: 5.5 mmscf/d
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
25/52
Elgin FB Shale Test
G-41 FB Zone #1 tested the shaly section of the FB
G-41 FB Zone #2 tested silty stringers within the FB
Based on the success of this test program, GLJ has
assigned the following contingent resources to Elgin:
Low Estimate 395 Bscf
Best Estimate 494 BscfHigh Estimate 708 Bscf
Ref: Corridor Resources Inc., Gross Lease, Contingent Resources, Effective December31,2009 by GLJ Petroleum Consultants. These estimates do not take into account the 50% working interest that may be earnedby Apache in approximately 116,000 acres of lands covering the Frederick Brook shale. See Corridors 2009 Annual Information for more information, a copy ofwhich is available at www.sedar.com.
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
26/52
Apache Drilling/Completion Plans
Larry HuskinsDrilling/Completions Team Lead
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
27/52
Location
Green Road B-41
located on existing Green Road
well pad. drilled to 2,100 metres depth
before turning horizontal foranother 1,000 metres.
adjacent to original CorridorGreen Road G-41 well
Wille DeMille G-59
north-west of Elgin drilled to a depth of 2,400
metres before turning horizontalfor another 1,000 metres.
adjacent to original CorridorWille DeMille J-59
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
28/52
Seismic Green Road Wells
Zone of Interest
Gas log
B 41 Surface
500 m
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
29/52
Fresh Water Storage
Engineered pits forfresh water
Lined with a geotextile
2 pits planned with25,000 m3 of waterstorage each
~120 m x 120 m
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
30/52
Fraccing
1000 m horizontal legs in both Green Road &
Wille DeMille~5 fracs in each well
4000 m3 of water per stage
300 tonnes of proppant (sand) per stage
planned rate of 16 m3/min
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
31/52
Shale Gas Fraccing
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
32/52
Other Corridor Activities
6/30/2010 37
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
33/52
ANTICOSTI EXPLORATIONOBJECTIVES
6/30/2010 38
Trenton/Black River HTD Play
Tom MartelChief Geologist
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
34/52
Drilling Program 2010
6/30/2010 39
1.5 Million Acres
(900k Corridor, 600k Petrolia)
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
35/52
Chaloupe TBR Prospect
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
36/52
ANTICOSTI MACASTY (UTICA) SHALE
Investigating its Shale Oil Potential
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
37/52
Macasty (Utica) Cross-Section
J upiter
SchmittChaloupe
Saumon
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
38/52
Summary
We will soon begin testing the relatively shallowTrenton/Black River oil play on Anticosti
We will also begin to evaluate the shale oilpotential the Macasty (Utica) shale
6/30/2010 44
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
39/52
2010 Anticosti
Drilling Program
45
Larry HuskinsDrilling/Completions Team Lead
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
40/52
Objectives
Technical Goals Flow oil from Black River carbonate
Core & wireline log from Macasty Shalein one well
Suspend wells if they flow oil (P&A
otherwise)(no completion or fraccing )
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
41/52
Anticosti & Prospects
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
42/52
Schedule
PlanningWork
MobilieEquipmenttoDock
SailEquipmenttoIsland
ReEnterJupiter
Drill
Surface
&
Intermediate
holesfor3easternwells
Drillmainhole&test3
easternwells
Suspend&MoveoffIsland
October
2010
SeptemberAugustJulyJuneMayApril
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
43/52
Vessel - Aivik
Length overall 109.90 M
Breadth 19.40 M
Depth 12.95 MDraft 5.92 M
G.R.T. 7,048 M.T.
N.R.T. 5,043 M.T.
Indicated horsepower 5,200 BHP
Speed 14 KTSBuilt 1980
Class BV 1 3/3 E
RO-RO ICE 111 UMS
Bale Cubic 13,388 M3
Deadweight 4,860 M.T.
Container capacity 280 TEUsLane meters (2.5 M
wide)
1,150
Heavy lift derricks 2 X 155 M.T.
(310 M.T. in tandem)
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
44/52
Well Design
4 Wells in Total PlannedJupiter Nearly horizontal -> target Mingan
Saumon / Chaloupe / Schmitt or Bell at highangle (65-75 inclination ) -> target BlackRiver
All wells drilled under-balance (using nitrogen)to encourage oil flow
No casing planned for main hole open holetest to flow oil
Suspend wells if oil is found for futureoperations (P&A if no oil found)
Drilled with a Hybrid Coiled Tubing Drilling Rig(drills conventionally with drill pipe or using a reel of coiled tubing)
Conductor444.5mm/339.7mm casing
Surface to ~180m311mm/245mm casing
Intermediate to ~1000m
- Set between the Trenton & the
Black River 216mm hole/178mm casing
- Drilled on 89 mm Coiled Tubing
- WBM at ~1050kg/m3
Main Hole
- 2200m for Jupiter
- ~1500m for others
- No casing (open hole flow test)
- UB with N2/Water
- WBM Density of ~800 kg/m3
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
45/52
Hybrid / Coiled Tubing Drilling Unit
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
46/52
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
47/52
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
48/52
Old Harry
A Giant Prospect
Tom MartelChief Geologist
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
49/52
Corridor Resources Inc.
250,000 Acres
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
50/52
Corridor Resources Inc.
Brion Island #1
Bradelle L-49OH
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
51/52
Corridor Resources Inc.
-
7/28/2019 Corridor Resources - 22-Jun-2010 Investor Day Presentation
52/52
Summary
Old Harry is a giant structure that could be theflagship for a new basin opportunity