CORPORATE RESPONSIBILITY REPORT 2013
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
OUR MISSION, VISION & VALUES OUR MISSION IS THE RESPONSIBLE AND PROFITABLE PRODUCTION OF GOLD.
OUR VISION IS TO BUILD A BRAND NAME MINING COMPANY THAT:
• Delivers superior returns to investors
• Values and develops our people
• Is committed to international practices
and conduct
• Is a partner of choice for host communities
and governments
OUR VALUES ARE:
• Respect, honesty and open communications
in all relationships
• Commitment to safety, employee well-being
and protection of the environment
• Teamwork and accountability throughout
the organization
• Responsible corporate citizenship
PHOTOGRAPHIC CREDITS: NATALIE RAFFIELD,
PHILIP MOSTERT, AND THE GSR TEAM
THE FORWARD-LOOKING STATEMENTS
MADE IN THIS REPORT ARE BASED ON
ASSUMPTIONS AND JUDGMENTS OF
MANAGEMENT REGARDING FUTURE EVENTS
AND RESULTS. SUCH FORWARD-LOOKING
STATEMENTS, INCLUDING BUT NOT LIMITED
TO THOSE WITH RESPECT TO RESERVE AND
RESOURCE ESTIMATES, COST AND TIMING
OF THE DEVELOPMENT OF NEW DEPOSITS,
TIMING AND AMOUNT OF ESTIMATED FUTURE
PRODUCTION, ESTIMATED COSTS OF FUTURE
PRODUCTION, OPERATIONAL CAPABILITIES,
AND GOLD PRICE, INVOLVE KNOWN AND
UNKNOWN RISKS, UNCERTAINTIES, AND
OTHER FACTORS WHICH MAY CAUSE THE
ACTUAL RESULTS, PERFORMANCE OR
ACHIEVEMENTS OF THE COMPANY TO BE
MATERIALLY DIFFERENT FROM FORECAST
FUTURE RESULTS, PERFORMANCE OR
ACHIEVEMENTS EXPRESSED OR IMPLIED BY
SUCH FORWARD-LOOKING STATEMENTS.
SUCH FACTORS INCLUDE, AMONG OTHERS,
THE ACTUAL PRICE OF GOLD, THE ACTUAL
RESULTS OF CURRENT EXPLORATION,
DEVELOPMENT AND MINING ACTIVITIES
AND CHANGES IN PROJECT PARAMETERS
AS PLANS CONTINUE TO BE EVALUATED, AS
WELL AS THOSE FACTORS DISCLOSED IN THE
COMPANY’S FILED DOCUMENTS.
This report is Golden Star’s 8th annual report
on corporate responsibility, which summarizes
our performance and is our communication
on progress for the UN Global Compact.
The year 2013 saw dramatic highs and lows
in our business. Despite our focus on ‘If it is
not safe, do not do it’, to my great sadness,
John Asare was fatally injured in a mud rush
in our underground mine on the 23rd April.
Three other team members were rescued
from the mud rush, for which I am eternally
grateful. The strength of our team to ‘be each
other’s keepers’ brought a little light to this
tragic day.
Also in April, we celebrated the re-open-
ing of the Prestea Underground Mine with a
Grand Durbar attended by hundreds of peo-
ple including the Paramount Chief Osagyefo,
Dr. Kwamina Enimil VI, Divisional Chiefs, and
elected representatives. The Western Region-
al Minister officiated over the event on behalf
of the Ghanaian President, his Excellency Mr.
John Mahama, and the community rejoiced
that the event received showers of blessings.
By May, the dramatic dip in the gold price
placed Golden Star, and our industry more
generally, in very challenging times. I am
thrilled that, despite these challenges, we
continued through the remainder of 2013 with
a focus on meeting our production and cost
goals, and achieving our standards, whilst
making considerable improvements to the
sustainability of our business. We completed
the entire year without a reportable
environmental incident at any operational or
exploration site.
Whilst the gold price slowly recovers some
lost ground, we remain focused on the ‘re-
sponsible and profitable production of gold’.
As I recently discussed with my Ghanaian
leadership teams, now more than ever we
must remain patient. We have a bounty of
future projects, and when the economics
become right, we will look to our employ-
ees, contractors, regulators, and stakeholder
communities to fully support the more rapid
advancement of these developments for the
benefit of all.
Sam Coetzer President and Chief Executive Officer
MESSAGE FROM THE CEO
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
UN GLOBAL COMPACT The United Nations (UN) Global Compact’s 10 principles on human rights, labour, the environment, and anti-corruption aim to ensure that business benefits economies and societies everywhere. The following tables present our goals and progress for 2013 as well as our goals for 2014. 2013 UN GLOBAL COMPACT GOALS AND PROGRESS
REVIEW THE GENERAL HUMAN RIGHTS STANDARDS /
PERFORMANCE OF OUR SUPPLIERS AND PROVIDE A
REPORT TO THE SUSTAINABILITY COMMITTEE WITH
RECOMMENDATIONS
EXTEND HARASSMENT AND DISCRIMINATION
AWARENESS AND PREVENTION TRAINING TO OUR
WIDER WORKFORCE
EXAMINE WAYS IN WHICH BANKING SERVICES CAN BE
PROVIDED TO EMPLOYEES WITHOUT SALARIES PAID
TO A BANK
IMPLEMENT LEAD-INDICATOR CONTROL MEASURES
TO FURTHER REDUCE OUR LOST TIME INJURY
FREQUENCY RATE (LTIFR)
EXPAND RECYCLING INITIATIVES WITH COMPANIES
OWNED BY TRADITIONAL LEADERS, IN LINE WITH
EXISTING PRACTICES AT WASSA
PROVIDE DETAILED PAYMENT INFORMATION ON A
QUARTERLY BASIS TO THE EITI IN GHANA, IN
SUPPORT OF THE ANTI-CORRUPTION PROGRAMME
HUMAN RIGHTS DESKTOP REVIEW CONDUCTED FOR
TOP 20 SUPPLIERS AND TOP 10 SERVICE PROVIDERS
NOT COMPLETED
IN 2013, 83% OF OUR WORKFORCE (EMPLOYEES
AND DIRECT CONTRACTORS) WERE PAID TO A BANK
ACCOUNT. ALL GSR EMPLOYEE SALARIES ARE
REQUIRED TO BE PAID INTO A BANK ACCOUNT
LEAD INDICATOR MEASURES IMPLEMENTED IN 2013.
LTIFR INCREASED TO 0.38.
REVIEW CONDUCTED. IT WAS DETERMINED
THAT CURRENT MARKET WAS NOT CONDUCIVE TO
THIS APPROACH
COMPLETED IN 2013. DATA ON PAYMENTS
MADE AVAILABLE TO THE EITI AND ARE MADE
AVAILABLE IN MONTHLY REPORTS
GOALS PROGRESS
HUMAN RIGHTS
LABOUR STANDARDS
ENVIRONMENT
ANTI-CORRUPTION
CONTINUE TO REVIEW THE GENERAL HUMAN RIGHTS STANDARDS FOR GSR
AND OUR SUPPLIERS. PROVIDE AN UPDATED REPORT TO THE SUSTAINABILITY
COMMITTEE WITH RECOMMENDATIONS.
IMPLEMENT A TRAINING PROGRAMME FOR HUMAN RIGHTS FOR THE GSR
SECURITY PERSONNEL
IMPLEMENT LEAD-INDICATOR CONTROL MEASURES AIMING TO FURTHER REDUCE
OUR LTIFR
PROVIDE AN UPDATED INCIDENT REPORTING STANDARD THAT COVERS THE
BUSINESS WITH A VIEW OF PROVIDING A BETTER UNDERSTANDING OF INCIDENTS
AND HOW TO FURTHER PROTECT EMPLOYEES AND COMMUNITIES
FINALIZE THE THIRD-PARTY EVALUATION OF OUR ASSET RETIREMENT
OBLIGATIONS (ARO). WORK WITH OPERATIONS TO FULLY UNDERSTAND THE
TIMING AND REQUIREMENTS FOR THE ARO
PROVIDE DETAILED QUARTERLY PAYMENT INFORMATION TO THE EITI IN GHANA,
IN SUPPORT OF THE ANTI-CORRUPTION PROGRAMME
PROVIDE QUARTERLY INFORMATION TO THE PARTIES THAT SHOULD RECEIVE
PAYMENTS AS A RESULT OF OUR ROYALTIES PAID TO THE GOVERNMENT OF GHANA
KEY AREA GOALS AND OBJECTIVES
2014 UN GLOBAL COMPACT GOALS
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
OUR PEOPLEAt Golden Star, we pride ourselves on the employment that our operations generate for local communities, as well as our contributions to regional and national economies. Despite the dramatic reduction in the price of gold, we value and recognize the efforts that have been made by our team to initiate continuous improvement projects, to maintain morale, and to strengthen our business in the face of adversity.
DID YOU KNOW?
• Of our 2,317 employees, 98% are Ghanaian.
• Nearly half our Ghanaian employees hail from communities that are close to our operations.
• Bogoso has comprehensive local hiring conditions forming part of the corporate social responsibility (CSR) agreements signed with communities in 2012.
EMPOWERING WOMEN
Inaugurated in 2010, the Golden Star Ladies’
Clubs were formed by motivated women
in our workforce. The club aims to enhance
performance and empower our female
employees to be advocates for issues
concerning women both at work and in
the broader community.
Breast cancer is the leading cancer in
Ghana. Therefore, in October 2013, the
Golden Star Ladies’ Clubs recognized Breast
Cancer Awareness month by conducting
women’s health presentations and breast
screenings in conjunction with our partners
at the Ghana Health Service (GHS) and
Deutsche Gesellschaft für Internationale
Zusammenarbeit (German Society for
International Cooperation - GIZ). The
programme was a resounding success
with over 580 women from our workforce,
their families and communities attending
the screenings. Through the month of
programmes, our ladies’ clubs also raised
donations of cash, goods and services
of over GH¢ 27,000 in value, including
GH¢ 15,000 donated to women’s charities.
These achievements would not have been
possible without the generous support of
our partners, including three of our major
suppliers – DHL Global Forwarding, Primus
Catering Services and International SOS.
GSSTEP / CYAP AT WASSA
Employment, particularly for the youth
(in Ghana this is people from age 18 to 40),
continues to be of the foremost concerns of
our catchment communities. Established
in 2009, the Golden Star Skills Training and
Employability Programme (GSSTEP) focuses
on building practical skills in a variety of areas,
such as masonry, carpentry, and electrical
works. The GSSTEP programme enhances
the skills available in the local economy by
imparting capacities to community members
that will last well beyond the life of the mine.
To date, there have been 6 programmes
with 271 graduates, most whom have been
employed on resettlement projects.
Within the broader GSSTEP programme,
in 2013, we initiated a Community Youth
Apprenticeship Programme (CYAP) at
Wassa, which offers selected local residents
a one-year attachment within the company.
The pilot project enrolled 44 young people
(34 male and 10 female) from 15 catchment
communities in disciplines ranging from
welding and drill rig maintenance, to fixed
plant, heavy equipment, and pump operations.
As a result of CYAP, local graduates will be
better positioned to fill skilled employment
vacancies within the company to further boost
local hiring.
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
HEALTH AND SAFETYAt Golden Star, we are committed to safety and employee well-being. A comprehensive two year health and wellbeing plan adopted in 2013 harnessed the expertise of a variety of partners to assist us in realizing our health and wellbeing objectives. The health outcomes have been remarkable, with considerable improvements in fitness for work management, and medical diagnosis and treatment, resulting in improvements in employee productivity and wellbeing.
ENHANCED MALARIA DIAGNOSIS
Malaria is the leading cause of mortality in
Ghana, particularly among pregnant women
and children under five years. It is also one
of the most common illnesses affecting our
employees, accounting for some 20% of time
away from work for illness. As the illness is
potentially life-threatening, we have made
persistent efforts at malaria prevention
and treatment.
In late 2012, with the support of our medical
services provider, International SOS, we
improved our health management of malaria
illness cases by being able to conduct rapid
testing at any time, and making available full
blood screening for strain diagnosis coupled
with strain-targeted treatment. The results
of the programme have been exceptionally
promising. In 2013, our clinics reported a 62%
reduction in malaria cases, from 2,579 in 2012
to 960 in 2013, with a 6% reduction in total
time away from work for malaria. Golden Star
and International SOS will work to sustain the
momentum of the programme in 2014 with a
view of continual improvement.
GIZ
Golden Star and GIZ started working together
for the benefit of our employees, their fami-
lies and our stakeholder communities in 2011.
We collaborated on a variety of programmes
addressing community and work health and
wellbeing. The initial employee/community
wellbeing programme was launched for our
DID YOU KNOW?
• Our Wassa team achieved 11 million hours LTI free.
• The Bogoso employees achieved 1 year LTI free – almost 5 million hours.
• As at the end of 2013, the 12 month rolling LTIFR for GSR was 0.37, for our contractors was 0.40, and combined was 0.38.
Wassa catchment communities with
prevention-focused health screenings, and
training sessions on a variety of health topics
as well as pension planning. GIZ has worked
to develop a broader strategic alliance
between GIZ, the Ghana Health Service (GHS)
and large private sector companies in
Ghana, including Golden Star.
In late 2013, Golden Star, GIZ, and the GHS
launched a health stewardship initiative for
the Bogoso stakeholder communities. Central
to the project is the strengthening of part-
nerships and coordination between public,
private, and civil society organizations at the
community, district, regional, and national
levels. As part of Golden Star’s contribution to
the project, a rural health clinic has been built
in the Bogoso area.
Key components of the programme include
the provision of basic health services
including prevention, testing, and counseling,
as well as providing treatment facilitates
for infectious and non-communicable
diseases. A knowledge-building and
education campaign on disease-prevention,
social protection measures, and debt
counseling aims to further improve overall
community health and well-being.
DID YOU KNOW?
• Ghana has a 79% immunization coverage, up from 69% in 2003. In the last 3 years, Golden Star has continued to support the national immunization programmes in our catchment communities.
• Under-five mortality rates (per 1,000 live births) in Ghana reduced from 111 in 2003 to 80 in 2008. Our work building community health facilities, providing medical equipment in partnership with Project C.U.R.E., provision of National Health Insur-ance Scheme (NHIS) registration for over 7,000 people each year and pre-vention-focussed health screenings (with GIZ) for over 5,500 people to date, contribute to this improvement.
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
Our mines have a finite life. Therefore, to provide the opportunity for longer-term benefits from our operations, we established the Golden Star Development Foundation (GSDF), which is funded with US$1 for every ounce of gold produced plus 0.1% of pre-tax profit. The GSDF funds a variety of community projects, including health, education, and community infrastructure initiatives that are selected by local Community Mine Consultative Committees (CMCC) that represent our 80,000+ local stakeholders. The CMCCs are made up of local community leaders and they serve as the focal point for our community partnerships allowing communities to select the types of projects they see as important for the development of their communities.
COMMUNITY DEVELOPMENT
GSDF COMMUNITY CENTRES
In 2013, many of our local communities
– through the GSDF and their respective
CMCCs – prioritized the development of
community infrastructure. Community
centres were built at Bondaye, Chujah, and
Kwame Niampah in the Bogoso area and
Nsadweso and Awunakrom in the Wassa
area. Each is equipped with an office, store
room, electrical access, and seating.
A 300-seat community centre was also
built at Pretiat as part of the Awunakrom
resettlement project (see Resettlement).
The community centres serve as an
important social amenity for local residents
as the venue for events such as weddings,
engagements, and graduations as well
as the location for stakeholder consultation
sessions. In 2013, the construction costs
for the community centres totaled
US$0.33M.
DID YOU KNOW?
• In Ghana, 86.3% of children complete primary school - up from 80% in 2007. Since 2007, Golden Star has built 6 schools (via the GSDF), provided bussing to school for 7 communities, paid scholarships to over 580 students and subsidised educational expenses for some 3,000 other students each year.
• Community electrification rates increased from 54% in 2007 to 59% in 2009. Through the GSDF, we have provided access to electricity or supported its distribution to residents in Prestea, Mbease Nsuta, and Akyempim (communities with some 40,000 residents), as well as 3 school blocks, a community clinic and our resettlement communities.
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
PROJECT C.U.R.E.
Through an ongoing partnership with
Project C.U.R.E., Golden Star and the GHS
continued to distribute medical supplies
(valued at approximately US$0.4M to local
communities in 2013). This was all made
possible by contributions from the GSDF /
CMCCs. Aiming to ensure a focused delivery
of medical equipment and supplies, needs
assessments were completed by
Project C.U.R.E. before the items were
shipped. In 2013, some of Golden Star’s
corporate team in Denver helped to pack
the container with the supplies from the
Project C.U.R.E. warehouse.
GIZ AND GSOPP COLLABORATION
Golden Star is in the second year of a
partnership with GIZ and the Golden Star Oil
Palm Plantation (GSOPP), with collaboration
from the Ghana Ministry of Health (MoH) and
Ministry of Employment and Social Welfare.
With an expected outreach to some 13,500
people in selected stakeholder communities,
the combined economic empowerment and
wellbeing programme will include a poverty
impact assessment, the development of
an integrated farming system for oil palm
production, and the establishment of farmer-
based organizations to act as channels
and multipliers. The programme aims to
strengthen community self-governing
capacity and, ultimately, overall economic
sustainability.
HUMAN RIGHTS As a responsible corporate citizen GSR annually requires its leaders to affirm their commitment to the human rights standards adopted by our business.
HUMAN RIGHTS REVIEW
Achieving business success would not be
possible without the contributions of our sup-
pliers and service providers; thus, achieving
our sustainability goals is integral to our value
chain and our areas of influence.
In 2011 and 2012, we set a UN Global Com-
pact goal to conduct a desktop human rights
review of our top suppliers and service pro-
viders. The review uncovered few material
instances requiring further action by Golden
Star. Where instances were uncovered, our
Supply Departments have initiated dialogue
to gain further information and understand-
ing. No further action was required following
this dialogue.
As a result of the review, Golden Star has ad-
opted a variety of management practices to
proactively address human rights concerns.
Chief among these are:
• Provision of training for operational sites
so that suppliers with annual contracts of
over US$1M are subject to human rights
screening;
• Developed a “supplier code of conduct”;
• Reviewed existing GSR grievance
mechanisms to ensure that they include
human rights concerns;
• Incorporated human rights concerns into
CMCC meetings; and,
• Developed and implemented a commu-
nications plan for all GSR business units
to communicate the results of the human
rights review.
These steps are in addition to our ongoing
commitments to protecting and promoting
human rights as well as our human rights
goals for 2014.
DID YOU KNOW?
• In 2013, 85% of the money paid by our Ghanaian operations was paid to Ghanaians or to registered Ghanaian companies.
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
REHABILITATION AND NEXT LAND USE PLANNING
In August 2013, the Executive Director of
the Forestry Commission and officials of the
Forestry Services Division (FSD) participated
in a tour of our operations and our proposed
Mampon-Abronye project, which is partially
located within the Opon Mansi Forest
Reserve – a timber production forest. The
visit allowed us to highlight our commitment
to sustainable land use and to showcase our
extensive expertise in mine-site rehabilitation.
By working with government sectors, we
continue to ensure that closure planning
remains an integral part of all the phases
of project development and execution.
The field inspection included tours of rehabil-
itated pits and waste dumps, and focused on
backfilled pits, as the proposed Mampon pit
would be completely backfilled to facilitate
the return of the forest area to future forest /
timber production. At the Mampon-Abronye
project area, the visitors met with the elders
and people of the communities, and visited
the exploration drilling sites in the area.
The Executive Director and his team
were impressed and remarked that some
of Golden Star’s backfilled pits exhibited
forest tree growth as good as that of the
forest reserves.
To further this collaboration, the FSD, with
the support of the Ghana Wildlife Service,
conducted an inventory analysis of the
proposed project area, to independently
validate the Bogoso environmental impact
assessment studies.
ENVIRONMENT SUSTAINABILITY OF LAND USES
In November, Bogoso was privileged to
host a visit by the Honourable Minister for
Environment, Science and Technology, as he
toured mines in the Western Region. During
the visit, the Minister took a helicopter flight
over the Bogoso and Prestea concessions
to observe Bogoso’s operations and reha-
bilitation areas, and to observe first-hand
the extensive impact of galamsey (artisanal
small-scale) miners.
In a widely-broadcasted media address
following the inspection, the Minster noted
that illegal mining was “an organized crime
that must be eliminated in order to protect
the environment.” He noted that galamsey
could have a long-term, adverse effect on
the country’s economy if nothing was done
about it. He also called for support from tra-
ditional leaders to stamp out galamsey.
During his presentation, the Minister
commended Golden Star for introducing
an alternative livelihood project for the
miners and urged them to take advantage of
the project. DID YOU KNOW?
• The percentage of the Ghanaian rural population with access to water supply increased to 80% in 2011, from 73% in 2007. Golden Star has provided water supplies and water services that now supply more than 30,000 households.
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
including a market centre, early childhood
education centre, community centre, and
police station. The 215 houses were equipped
with electricity and toilets. A mechanized
water system was also installed to serve
the community.
The completed project, with construction
costs of approximately US$23M, further en-
hances our development model of successful
collaboration with our local partners as it con-
tinues to demonstrate what can be achieved
when we work together with our stakeholder
communities towards a common goal.
AWUNAKROM
The community of Awunakrom is located
close to our Dabokrom / Father Brown open-
pit operations. Following the successful
negotiation of a partial resettlement project
in May 2012, some 19 households were
resettled to a new location at Pretiat. The
project, with total costs of some US$3.8M,
included construction of community
infrastructure, a market, early childhood
development centre, 300-seat community
centre, and a water closet toilet facility with
a centralized biogas digester. Relocation and
resettlement packages, and a skills training
and sustainable livelihoods programme
completed the resettlement project.
RESETTLEMENTOver the last several years, Golden Star has carried out multiple resettlement projects in conjunction with our partners. At the local level, this includes negotiation teams and committees, traditional authorities, District Assemblies and, crucially, local residents themselves. At the national level, this includes the Land Valuation Board, the Inspectorate Division of the Minerals Commission, and the Environmental Protection Agency. These partnerships help to promote an inclusive and transparent process for all parties.
All of our resettlement projects are aligned with applicable Ghanaian laws as well as the International Finance Corporation (IFC) Performance Standard 5 on involuntary resettlement. This means that we seek to avoid, or at least minimise, adverse social and economic impacts, and seek to enhance the positive impacts of our intervention, which very often leads to large improvements in the lives of local residents.
TOGBEKROM
To allow for the development of a new tailings
storage facility for our Wassa operation, reset-
tlement activities for the Togbekrom group of
hamlets were initiated in 2010 for the over 750
inhabitants. The resettlement site, adjacent
to Ateiku, was constructed as a modern-style
community with over 260 structures, a local
road network, and community infrastructure,
and small scale mining business, we ceded
a portion of the highly prospective Prestea
surface concession back to the Government
of Ghana. The Minerals Commission has
now established the area for legal small
scale mining.
The preferred site for the construction of
the proposed raise bore / hoisting shaft for
the Prestea Underground Mine falls at the
current location of the Prestea Goldfields
International School. Therefore, a nine
member school relocation negotiation
committee, comprising representatives from
the Prestea Huni-Valley District Assembly,
Ghana Education Service, Prestea Goldfields
International School Board, the Himan –
Prestea community, and GSPL, was formed
and inaugurated on 22nd January 2013 by
the District Chief Executive of Prestea
Huni-Valley District. The mandate of the
committee is to reach a signed negotiated
relocation agreement for the school that is
acceptable to all represented parties.
DUMASI
The Dumasi community is located
approximately 4 km north of our Bogoso
processing facilities and atop the largest
undeveloped ore body on Bogoso’s
concession. Negotiations to resettle the
community commenced in 2007, and in
2013, under the guidance of the Dumasi
Resettlement Negotiation Team, we were
pleased to reach a negotiated resettlement
agreement acceptable to all stakeholders.
To accommodate the 2,500 residents, over
800 houses equipped with toilets, electricity,
and kitchens will be required. The details of
the new houses were substantially agreed with
individual compound owners in the latter half
of 2013. Preliminary earthworks and construc-
tion activities have started at the new site.
PRESTEA PROJECTS
The Prestea Projects Resettlement Action
Plan (RAP), which was submitted to the
Prestea Huni-Valley District Assembly
in November 2012, was developed to
minimise potential negative effects
on the people affected by the Bogoso
Prestea Underground Mine and Prestea
South projects. In accordance with the
IFC Performance Standard 5, Golden Star
works to avoid the need for resettlement.
For the Prestea Projects, we designed
project areas to avoid structures for which
Bogoso is not the legal tenant, and located
infrastructure in disturbed areas. As part of
our collaboration to formalize the artisanal
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
ANTI-CORRUPTION Golden Star strives to maintain the highest standards of transparency and professional integrity. We believe that all aspects of our business should be conducted in an honest, ethical, and transparent manner in accordance with all applicable laws and regulations.
Our participation in the Ghana Extractive Industries Transparency Initiative (EITI) exemplifies our commitments to anti-corruption efforts. In 2011 and 2012, we set a goal of providing records of our quarterly payments to government, and we are pleased to have achieved this goal for both years.
At the end of 2013, the Traditional authorities, stools, and District Assemblies were informed by letter of the estimated royalties that would be payable to them based on gold production and the location of that production. The allocations according to the legislation are provided in the following tables, in addition to our payments to the government.
DID YOU KNOW?
• Ghana has sustained an economic growth rate of 5-7% over two decades, and continued poverty reduction from 39.5% in 1999 to 28.5% in 2006. Golden Star, to date, has made payments to the Government of Ghana amounting to over US$298M.
• In 2013, over US$437M was paid to Ghanaians or Ghanaian registered companies by our Ghanaian operations.
NO. ENTITY SUB-ENTITY AMOUNT IN US$
Bogo- OASL
TRADITIONAL
AUTHORITIES
STOOL LANDS
DISTRICT
OASL OVERHEAD
BOGOSO TRADITIONAL AUTHORITY
HIMAN TRADITIONAL AUTHORITY
BOGOSO / BEPPO TRADITIONAL
AUTHORITY (NOT YET DEFINED)
ADAAMANSO TRADITIONAL AUTHORITY
TOTAL
BOGOSO TRADITIONAL AUTHORITY
HIMAN TRADITIONAL AUTHORITY
BOGOSO / BEPPO TRADITIONAL
AUTHORITY (NOT YET DEFINED)
ADAAMANSO TRADITIONAL AUTHORITY
TOTAL
PRESTEA HUNI-VALLEY
DISTRICT ASSEMBLY
AMENFI EAST DISTRICT ASSEMBLY
TOTAL
TOTAL OF 10%
2013 TOTAL
119,221
131,109
4,190
57,780
35,117
228,197
176,222
6,698
74,930
47,354
305,205
512,542
115,001
627,543
1,280,167
2013 Q4
21,179
32,800
-
18,837
8,224
59,862
41,001
-
23,547
10,280
74,828
136,948
27,674
164,622
326,493
2013 Q3
23,215
33,742
380
14,469
10,756
59,348
42,177
475
18,086
13,445
74,185
121,195
42,011
163,207
319,956
2013 Q2
28,504
33,794
207
17,618
7,530
59,151
42,098
258
21,948
9,381
73,686
138,873
23,793
162,667
324,010
2013 Q1
40,322
30,771
3,602
6,854
8,605
49,834
50,944
5,964
11,348
14,246
82,504
115,524
21,250
137,045
309,706
ROYALTIES (BOGOSO)
TABLE CONTINUED ON NEXT PAGE...
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
NO. ENTITY SUB-ENTITY AMOUNT IN US$
WASSA
OASL
TRADITIONAL
AUTHORITIES
STOOL LANDS
DISTRICT
ASSEMBLIES
OASL OVERHEAD
WASSA FIASE
MPOHOR
AHANTA
TOTAL
MAMPONSO
MPOHOR
MANSO
PRETSEA
TOTAL
MPOHOR WASSA EAST
TARKWA NSUAEM
AHANTA WEST
TOTAL
TOTAL OF 10%
2013 TOTAL
266,443
145,575
167,011
167,011
479,599
181,969
208,764
-
208,764
599,498
400,332
459,282
459,282
1,318,897
2,664,439
2013 Q4
68,244
56,741
33,048
33,048
122,839
70,926
41,311
-
41,311
153,549
156,038
90,884
90,884
337,807
682,440
2013 Q3
58,141
27,441
38,606
38,606
104,654
34,302
48,257
-
48,257
130,817
75,464
106,167
106,167
287,798
581,411
2013 Q2
69,316
23,102
50,833
50,833
124,769
28,878
63,541
-
63,541
155,962
63,532
139,792
139,792
343,117
693,165
2013 Q1
70,742
38,289
44,523
44,523
127,336
47,862
55,653
-
55,653
159,170
105,297
122,438
122,438
350,174
707,422
ROYALTIES (WASSA)
BOGOSO
WASSA
2013 Q2
937,299
509,474
1,006,388
995,919
2,850,446
30,913
421,289
12,433
6,764,164
777,563
373,786
759,342
4,757,234
317,173
3,444,301
46,138
698,260
-
-
11,173,801
2013 Q1
1,170,169
528,080
1,012,759
262,765
4,032,201
94,709
424,541
-
7,525,227
1,020,359
457,948
854,101
8,286,389
518,985
3,690,257
72,835
387,237
0
0
15,288,113
PAYE
SSNIT
VAT
IMPORT DUTIES
ROYALTIES
FEES, PERMITS,
LICENSES
WITHOLDING TAX
STAMP DUTIES
TOTAL
PAYE
SSNIT
VAT
CORPORATE TAX
IMPORT DUTIES
ROYALTIES
FEES, PERMITS,
LICENSES
WITHOLDING TAX
STAMP DUTIES
NATIONAL
STABLIZATION LEVY
TOTAL
2013 Q4
842,420
471,598
1,013,812
253,277
2,717,923
172,122
247,495
7,654
5,726,305
944,063
388,960
599,761
10,365,000
297,412
2,829,630
26,021
991,672
-
-
16,442,522
2013 Q3
726,279
494,191
1,269,148
800,719
2,321,527
16,011
278,490
35,402
5,941,771
618,726
382,901
613,885
84,280
244,959
2,755,506
47,751
902,916
-
-
5,650,927
2013 TOTAL
3,676,168
2,003,344
4,302,108
2,312,682
11,922,099
313,757
1,371,817
55,490
25,957,469
3,360,713
1,603,596
2,827,090
23,492,903
1,378,529
12,719,695
192,746
2,980,087
-
-
48,555,363
LIFE TO
DATE (AS AT
END 2013)
19,810,604
11,142,237
22,719,869
9,540,729
57,427,962
1,281,605
10,334,155
756,014
133,013,179
13,969,119
8,403,201
36,376,418
23,492,903
3,988,087
56,247,850
1,016,505
14,485,344
349,490
7,084,585
165,413,506
GOVERNMENT PAYMENTS
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
YEAR AT A GLANCE
2012
2,044
448
260
52
48
147
US$54M
102,440
US$0.76M
20
159
8
98
METRIC
# OF EMPLOYEES
# OF THIRD-PARTY CONTRACTOR EMPLOYEES
# OF GSOPP CONTRACTOR EMPLOYEES
% OF WORKFORCE FROM WESTERN REGION
% OF WORKFORCE FROM LOCAL COMMUNITIES
# OF HSEC SPECIALIST PERSONNEL
WAGES PAID
TOTAL HOURS OF TRAINING PROVIDED
EXPENDITURE ON TRAINING
# OF EMPLOYEE EDUCATION SCHEME PARTICIPANTS
# OF WOMEN EMPLOYED
% OF WORKFORCE THAT ARE WOMEN
% OF WORKFORCE BELONGING TO A UNION
2013
2,317
316
245
58.6
45.3
127
US$54M
155,492
US$0.78M
16
155
6.7
98
–
–
√
√
–
–
–
√
–
–
–
–
–
2012
3
26
0.24
396
METRIC
FATALITIES
# OF HSE AUDITS
LTIFR
# OF HAZARD INSPECTIONS
2013
1
43
0.38
414
X
√
X
√
OUR PEOPLE
HEALTH AND SAFETY
√ = IMPROVEMENT X = NEEDS IMPROVEMENT – = SAME
√ = IMPROVEMENT X = NEEDS IMPROVEMENT – = SAME
2012
532,489
867,794
3,689,510
98
320,397
124
US$4.8M
272,022
37.5ML
100
100
95
METRIC
ML OF WATER ABSTRACTED
ML OF WATER RELEASED
ML OF WATER RECYCLED
% OF WATER SAMPLES IN EPA COMPLIANCE
LITRES OF WASTE OIL RECYCLED
HA OF LAND BEING REHABILITATED
TOTAL ENVIRONMENTAL EXPENDITURE
MWH OF ELECTRICITY CONSUMED
DIESEL CONSUMPTION
% OF BLASTS IN COMPLIANCE WITH MONITORING PROGRAMME
% OF BLASTS IN COMPLIANCE WITH NOISE LIMITS
% OF BLASTS IN COMPLIANCE WITH VIBRATION LIMITS
2013
465,034
995,620
4,503,570
98
313,721
104
US$4.4M
254,632
38.8ML
100
100
96
ENVIRONMENT
√
√
√
–
–
X
–
–
X
√
√
X
*ML = MEGA-LITRES √ = IMPROVEMENT X = NEEDS IMPROVEMENT – = SAME
√ = IMPROVEMENT X = NEEDS IMPROVEMENT – = SAME
2012
263
4,464
169
106
US$0.38M
US$2.3M
METRIC
# OF FORMAL CONSULTATIONS
CONSULTATION PARTICIPANTS
# OF COMMUNITY MINE CONSULTATIVE COMMITTEE MEETINGS
# OF COMMUNITY COMPLAINTS
GSDF CONTRIBUTIONS
GSDF CONTRIBUTIONS TO DATE
2013
314
6,020
153
69
US$0.33M
US$2.36M
√
√
–
√
–
–
COMMUNITY RELATIONS
GSR CORPORATE RESPONSIBILITY REPORT 2013 | Partnerships for Development
2012
52
50
77
90
METRIC
# OF ENVIRONMENT INSPECTIONS
% OF JOBS LET TO TENDER
# OF SOLE SOURCED CONTRACTS
% OF STAFF ACKNOWLEDGING SUSTAINABILITY POLICIES
2013
115
38
58
100
√
X
√
√
CORPORATE GOVERNANCE
150 KING STREET WEST
SUN LIFE FINANCIAL TOWER, SUITE 1200
TORONTO, ON M5H 1J9, CANADA
TOLL-FREE: + 1 800 553 8436
WWW.GSR.COM
TORONTO STOCK EXCHANGE: GSC
NYSE MKT: GSS
GHANA STOCK EXCHANGE: GSR