mySAPERP2004 End user document (PS Module)
V1.0
Sep 2007
English
End UserDocumentation - PS
mySAPERP2004 (ECC 6.0)
SSTL
1,6th Floor, Crown Court#128, Cathedral Road
Chennai 600 086
Solution/ Release: ECC 6.0 Page 1 of 183
-
8/6/2019 Copy of Enduser Document for PS
2/183
mySAPERP2004 End user document (PS Module)
Content
1 Sequential operation of Project System (PS) module ................................................4
2 Create Investment Program ......................................................................................21
3 Create Investment Program Top Position .................................................................24
4 Change Investment Program Structure ....................................................................27
5 Edit Original Budget ................................................................................................31
6 Create Appropriation Request .................................................................................36
7 Change Appropriation Request ................................................................................51
8 Activate Project Definition .......................................................................................60
9 Budget Distribution ..................................................................................................66
10 Release Appropriation Request ................................................................................73
11 Change Project Definition ........................................................................................76
12 Change Cost Planning .............................................................................................80
13 Change Original Budget ..........................................................................................85
14 Create Network ........................................................................................................91
15 Change Project Definition .....................................................................................105
16 Create Purchase Requisition ..................................................................................109
17 Create Purchase Order ...........................................................................................117
18 Create Vendor Advance .........................................................................................122
19 Post Vendor down Payment ...................................................................................125
20 Goods Receipts Purchase Order ............................................................................128
21 Logistics Invoice Verification .................................................................................133
Solution/ Release: ECC 6.0 Page 2 of 183
-
8/6/2019 Copy of Enduser Document for PS
3/183
mySAPERP2004 End user document (PS Module)
22 Create Reservation ..................................................................................................151
23 Goods Issue ............................................................................................................154
24 Service Entry .........................................................................................................158
25 Create Confirmations ............................................................................................162
26 Payment with Printout ...........................................................................................166
27 Project Settlement ..................................................................................................171
28 Create Completed Asset ........................................................................................174
29 Change Network Status Closed ..........................................................................180
30 Change Project Status Closed .............................................................................182
Solution/ Release: ECC 6.0 Page 3 of 183
-
8/6/2019 Copy of Enduser Document for PS
4/183
SAP ECC 6.0 End user document (PS Module)
Sequential operation of Project System (PS) module
I Creation of Investment Program
a) Create Investment Program - Transaction Code: IM01
As soon as the Financial Year Starts the Investment Program Creation needsto be done by the authorized person.
The Following things are mentioned in the Investment Program1. Investment Program
2. Approval Year
3. Program Type4. Fiscal Year Variant
5. Currency
With this information the Investment Program is saved and the same isinformed to Projects Department over phone and SAP Mail. The authorizedperson in SAP does this step.
b) Create Investment Program Top Position - Transaction Code: IM11
After Creating the Investment Program the Top Company Level position is
created for the Investment Program.The Following things are mentioned in the Investment Program Top Position
1. Investment Program
2. Position ID3. Approval Year
The authorized person in SAP does this step.
c) Create Investment Program Structure - Transaction Code: IM22
After Creating the Investment Program the Top Company Level position is
created for the Investment Program the Investment Program Structure iscreated.
The Following things are mentioned in the Investment Program Top Position1. Investment Program
2. Position ID (Optional)3. Approval Year
Solution/ Release: MySAPERP2004 (ECC6.0) Page 4 of 183
-
8/6/2019 Copy of Enduser Document for PS
5/183
SAP ECC 6.0 End user document (PS Module)
II Maintaining Budget for Investment Program
a)Edit Original Budget - Transaction Code: IM32
After Creating the Investment Program Structure the Budget is maintained
for the created Investment Structure. This can be maintained whenever theNew appropriation request is assigned to the Position Ids.
The Following things are mentioned in the Edit Original Budget
1. Investment Program2. Position ID (Optional)
3. Approval YearThis step is done by the authorized person in SAP.
III. Appropriation Request
a) Create Appropriation Request Transaction Code : IMA11
After getting the Feasibility Study for scaling up the Process in the Production
Level. The authorized person in SAP creates the appropriation request.The Following things are mentioned in the Appropriation Request
1. Appropriation Request Type
2. Controlling Area after this in General Data
3. Appropriation Request
4. Description5. Approval Year
6. Planned Approval Date7. Implementation Start
8. Person Involved for Approval User ID needs to be selected Level wise.In Control Data
9. Investment Program /Year
10. Position ID.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 5 of 183
-
8/6/2019 Copy of Enduser Document for PS
6/183
SAP ECC 6.0 End user document (PS Module)
In Organizational Units1. Requesting Company code
2. Requesting Business Area
3. Requesting Cost Center4. Requesting Profit Center5. Requesting Company
6. Object Class
7. Plant8. Responsible Cost Center
9. Responsible Profit Center10.Currency
In Variants TabGeneral Data
1. Completion Date Approximate date of Project completion date.
Select Plan Values Tab
Click on Create Cost Estimate Button below the screen.
A new screen is opened where you need to click the button Show/Hide Item
View. It would show a table where we need to feed in the values. The values
to be fed are
Item Categoryo M for Material
o V for other costs like manpower, QC etc. The cost element for V
should be 7100150
Resource is where we select the RM name. The master would be
entered by the Purchase person. This is not required for RM. EnterQuantity & hit enter.
For V change the description to suit us.
After completion of the entry, click confirm to record those values by
SAP which would appear on the left hand side of the screen.
Rows can be added, inserted, deleted accordingly. Filled values are shownbelow.
Go Back or press F3. The total budget for the year 2007 (as the
investment planned is for 2007) would appear as shown below. Savethe Appropriation request.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 6 of 183
-
8/6/2019 Copy of Enduser Document for PS
7/183
SAP ECC 6.0 End user document (PS Module)
Note: We would define the cost for 1 year and if the project spills over to thenext year the remaining budget would also spill over.
After mentioning all the required entries when the user saves theappropriation request as per the configuration the Appropriation request will
go for approval process as SAP Workflow (predefined Process). The
documents are uploaded through Document Management system as well as itcan be uploaded in Change mode of Appropriation request by selecting the
Service for Object Create Attachment.
b) Approve Appropriation Request Transaction Code : IMA12/SBWP
When the approving authority opens their SAP Mail Box through thetransaction code SBWP the system will show all the Workflow process to be
executed by him. He has to select the required appropriation request and
Click on Approve button, if he wants to see the attachment. He can see thesame in display mode of Appropriation request by selecting the Service for
Object View Attachment or in the Document Tab.The authorized person inSAP does this step.
c) Activate & Release Appropriation Request Transaction Code:IMA12
After approval the Appropriation request needs to be activated and released.
This will be done by the authorized person in the Measures/Assets Tab of theAppropriation request in change mode of Appropriation request transaction.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 7 of 183
-
8/6/2019 Copy of Enduser Document for PS
8/183
SAP ECC 6.0 End user document (PS Module)
IV. Budget Distribution
a) Distribute Budget for Project Definition Transaction Code: IM52
After activating the Appropriation Request (Project Definition). The Followingthings are mentioned in the Distribute Budget1. Investment Program
2. Position ID (Optional)
3. Approval Year
The Overall as well as Yearwise Budget has to be updated. This step is doneby the authorized person in SAP.
V. Creation of Project Structure
a) Change Project Transaction Code: CJ02After updating the Budget for the Appropriation Request (Project Definition).
The Following things are mentioned in the Change Project transactions. The
authorized person in SAP does this step.In the Project Definition Header the Following things are mentioned
1. Person Responsible
2. Start Date and End date of Project will be defaulted from the
Appropriation Request.
3. Company code4. Business Area
5. Plant6. Profit Center
In the WBS element Overviewthe Basic Data tab the following things are mentioned.
1. Level Number
2. Description3. Upto Level 3 WBS elements are Created with Planning Element (if the
level is below 4).In Responsibilties Tab
4. Requesting Cost Center needs to be filled.
5. Which will automatically copy the Controlling Area (CA) and Requesting
Company Code.6. if required Responsible Cost Center field will be filled.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 8 of 183
-
8/6/2019 Copy of Enduser Document for PS
9/183
SAP ECC 6.0 End user document (PS Module)
V. Cost Planning for Project Definition
a) Manual Cost Planning for Project Transaction Code: CJ40
After updating the budget for the Top-level Project Definition the Lower Level(Level 3) the Overall as well as Year-wise planned cost has to be updated.
The authorized person does this step.
VI. Budget Updation for Project Definition (Level 3)
a) Manual Budget Updation for Project Transaction Code: CJ30
After manual Cost Planning for the Lower Level (level 3) WBS Elements thebudget for the Lower Level (Level 3) the Overall as well as Year-wise planned
cost has to be updated. The authorized person does this step.
V. Creation of Network
a) Create Network for Project Transaction Code: CN21
In the initial Screen the Following things are mentioned
Network Profile
Network TypePlant
MRP Controller
In the Network Header the following things are mentioned.Network Description
In Assignment Tab
Select the Project Definition,which will copy the Start Date and End Date of the Project if its maintained in
the Project Definition. These dates are considered for individual activities inthe Network. The Network activities are linked with relationship and these
network activities will be scheduled. The Milestones or Milestone Groups are
also used with the activities. A network can represent the sequence of
activities in a project or the sequence of a single activity within a project. Youcan graphically display various structural elements of a project and theirinterdependencies in the Project System. During the life of a project,
networks are used as a basis for planning, analyzing, controlling and
monitoring schedules, dates, and resources.(such as personnel, machines,PRTs, materials, documents, and drawings)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 9 of 183
-
8/6/2019 Copy of Enduser Document for PS
10/183
SAP ECC 6.0 End user document (PS Module)
These activities are three types 1. Internal Activities, 2. External Activities, 3.Primary Cost Activities.
Internal Activities:Using internally processed activities you determine the amount of Workproduced by machines or persons, and use this information in resource
planning to plan the capacity requirement.
External Activities:
Using external processing you determine which services are required fromother companies to carry out the project. The development of external
processing occurs through purchasing.
Primary Cost Activities:
Using general costs activity you plan primary costs, for example, travel costs.
V. Creation of Lower Level (Level 4) WBS & Release of Project
a) Create Lower Level WBS (Level 4) & Release Project Transaction
Code: CJ02
In the initial Screen the Following things are mentioned
Project DefinitionIn the WBS element Overview
the Basic Data tab the following things are mentioned.1.Level Number (level 4)
2. Description3 Planning Element (Tick)
4. Account Assignment Element (Tick).
In Responsibilties Tab5. Requesting Cost Center needs to be filled.
Which will automatically copy the Controlling Area (CA) and RequestingCompany Code.
if required Responsible Cost Center field will be filled.
Select EditStatus Release.
The authorized person does this step.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 10 of 183
-
8/6/2019 Copy of Enduser Document for PS
11/183
SAP ECC 6.0 End user document (PS Module)
V. Creation of Purchase Requisition for Materials
a) Create Purchase Requisition Transaction Code: ME51/ME51N.In the initial Screen the Following things are mentionedAccount Assignment Category Q
Delivery Date
PlantPurchasing Group
Req. Tracking NumberRequisitioner
In the Purchase requisition Item overview screen
Material NumberQty. Required
Val.TypeWBS Element
The Purchase requisition will be saved and will be released by the approving
authorities. The authorized person does this step.
VI. Creation of Purchase Order for Materials
a) Create Purchase Order Transaction Code: ME21/ME21N.
In the initial Screen the Following things are mentioned - HeaderVendor
Purchasing OrganizationPayment Term
GR Message (Tick)Net Price
In Item
Tax code wil be selected (if any)Select the PR and Adopt the PR.
The Purchase order will be saved and will be released by the approvingauthorities. The authorized person does this step.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 11 of 183
-
8/6/2019 Copy of Enduser Document for PS
12/183
SAP ECC 6.0 End user document (PS Module)
VII. Create & Post Vendor Down Payment Request
a) Create Down Payment Request Transaction Code: F-47.
After creating the Purchase order the Down Payment (Advance) to the vendoris raised. The authorized person does this step.In the initial Screen the Following things are mentioned - Header
Document Date
Company CodeCurrency
Reference & Doc. Header TextVendor Account No.
Spl.GL indicator
In DetailAmount, Business Area, Due On, Purchase Order No./ Item.
The down payment request will be saved.
b) Post out Going Payment Transaction Code: F-48/F-53.
After creating the Down Payment request, the Down Payment request(Advance) will be called and payment will be posted. The authorized person
does this step.
VIII. Goods receipts for Purchase Order
a) Create Goods Receipts Transaction Code: MIGO.
After the Purchase order is approved the material will be received by storesat Site. The authorized person does this step.
In the initial Screen the Following things are mentioned HeaderPurchase Order Number
Movement Type
Delivery Note, Header TextQuantity, Storage Location, No.of Container, etc.,
The goods receipts document will be posted.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 12 of 183
-
8/6/2019 Copy of Enduser Document for PS
13/183
SAP ECC 6.0 End user document (PS Module)
IX. Enter Invoice
a) Enter Invoice Transaction Code: MIRO.
After the material will be received by stores at Site. The authorized persondoes this step.In the initial Screen the Following things are mentioned Header
Invoice Date
ReferenceAmount
If tax is there (tick) on check box (calculate Tax)Purchase Order number. After simulation the invoice Verfication document will
be posted.
X. External Processing Activites : for Services
a) Change Network Transaction Code: CN22.
In the initial Screen the Following things are mentioned Header
Network NumberIn activities overview
In Ext. ProcessingTick on Service
Description, Purch.Org., Material Group,Vendor,Pur.Grp,Outline
Agreement,Line No.Requisitioner, Req.tracking No,WBS element.Service Number, Quantity.
Prerequisite : The Project Definition System Status should be in RELReleased mode.
Select the Activity and Press Edit Status Release. Which will create aPurchase requisition for services with reference to the outline agreement
entered.
Purchase Order (Service PO ) will be created for the purchase requisition.
When the order released for work, one PR for the services are generated. ThePO will be released by the Purchase Department. The PO Copy is given to the
Contractor by the Projects department. On completion of the work, contractor
brings the Joint Measurement Sheet / Bill along with the PO reference.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 13 of 183
-
8/6/2019 Copy of Enduser Document for PS
14/183
SAP ECC 6.0 End user document (PS Module)
b) Create Service Entry Transaction Code: ML81N.
In the initial Screen the Following things are mentioned Header
Purchase Order Number
When the Contractor brings the Joint Measurement Sheet / Bill for the
certification, the quantity entered in the JMC/Bill is verified by the Shift
Engineer and the same quantity is certified in the Service Entry Sheet. This issubject to Release Procedure (Certification by Higher Official). On
Certification the Project gets the Cost of the Services performed.
c) Enter Invoice Transaction Code: MIRO.
After the service confirmation is released. The authorized person does thisstep.
In the initial Screen the Following things are mentioned HeaderInvoice Date
Reference
AmountIf tax is there (tick) on check box (calculate Tax)
Purchase Order number. After simulation the invoice Verfication document willbe posted.
XI. Create Reservation
a) Create Reservation Transaction Code: MB21.The stocks are maintained as Special Stocks against the WBS elements. The
reservations are created against WBS elements. This reservation can be donein Automatically while running MRP for Projects.
In the initial Screen the Following things are mentioned Header
Base date (When the material is required)Movement type
PlantIn Create Reservation Screen
WBS elements, Material Code, Quantity, Batch Number, Goods recipient.
The reservation is created.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 14 of 183
-
8/6/2019 Copy of Enduser Document for PS
15/183
SAP ECC 6.0 End user document (PS Module)
XI. Goods Issue
a) Create Goods Issue Transaction Code: MIGO/MB1A.When the Stores person saw the reservations pending for issues on that dayhe has to post the goods issue against the reservations. Creation needs to be
done by the authorized person.
The Following things are mentioned in the goods issue.Reservation number
QuantityMaterial Slip.
Document header text.
No.of Container.The Goods Issue document will be posted.
XII. Create Confirmations
a) Create Confirmations Transaction Code: CN25/CN27.
When the activities are completed, that needs to be confirmed by the users.The authorized person will do the confirmation.
The Following things are mentioned in the goods issue.Network number
Activity number
Work Center, Description, Actual finish Date.If the work is fully completed then Final Comp. Otherwise completion
indicator (tick).
XIII. Vendor Payment
a) Post Outgoing Payments Transaction Code: F-58.
After Invoice is verified the payment to the vendor needs to be posted. Theauthorized person will do the outgoing payment.
The Following things are mentioned in the outgoing payment.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 15 of 183
-
8/6/2019 Copy of Enduser Document for PS
16/183
SAP ECC 6.0 End user document (PS Module)
XIV. Project Settlement
a) Actual Settlement Transaction Code: CJ88/CJ8G.This settlement will be run on periodic basis (every end of month). Theauthorized person will do the actual settlement.
The Following things are mentioned in the actual settlement.
Project DefinitionWith Hierarchy (tick)
With Order (tick)Settlement Period
Fiscal Year
Test runDetail List
Check. Trans.dataThe actual consumption against the Project/ Network will be settled to the
WBS elements.(AUC) asset Under Construction.
b) Create Complete Asset Transaction Code: CJ02.
After getting the confirmation from the Project Department that the Project iscommissioned and handed over to the Production department for use. The
authorized person will do the completed Asset creation.
The Following things are mentioned in the Create Complete AssetProject Definition
Select the WBS elements and Extras
Create Completed Asset.In Asset Create Screen
Asset Class (sub Asset if required)Description
Vendor & Manufacturer
Asset Pur. New (tick)Purchase Used (tick)
Group Asset / Sub NumberNeg. value Allowed (tick)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 16 of 183
-
8/6/2019 Copy of Enduser Document for PS
17/183
SAP ECC 6.0 End user document (PS Module)
c) Actual Settlement Transaction Code: CJ88/CJ8G.This settlement will be run after getting the confirmation from the Project
Department that the Project is commissioned and handed over to the
Production department for use. The authorized person will do the completedAsset creation.The Following things are mentioned in the actual settlement.
Project Definition
With Hierarchy (tick)With Order (tick)
Settlement Period, Posting PeriodFiscal Year, Asset Value date
Test run
Detail ListCheck. Trans.data
XIV. Project Closure
a) Change Network Transaction Code: CN22.Select all the Activities in the Network and select Edit Status Close.
b) Change Project Transaction Code: CJ02.
Select all the WBS elements in the Project Definition and select Edit Status Close.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 17 of 183
-
8/6/2019 Copy of Enduser Document for PS
18/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 18 of 183
Create Investment Program
/Position ID
(By Finance)
Approve Appropriation Request(By Approving Authorities)
SBWP/ IMA12
Activate Project & Allocate Budget(By Finance)
IMA12/IM52
Create WBS up to 3 Level
(By Projects)
CJ02
Allocate Budget for Level 3
(By Finance/Projects)CJ40 / CJ30
Create Lower Level WBS elements(By Projects)
CJ02
Create Appropriation Request
(By Projects)
-
8/6/2019 Copy of Enduser Document for PS
19/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 19 of 183
Create PR/Release PR
(By Projects/Approving
Authorities)(ME51/ME55)
Goods Receipts
(By Stores )MIGO
Create Reservation
& Goods Issue(By Projects / Stores)
MB21 MIGO
Create Service PR /Release PR
(By Projects/App.Autho.)
Create Service PO/Release PO
(By Purchase/App.Autho.)
ME21N/ME28
Create Service Entry/Approve
(By Projects/App.Autho)ML81N/ML85
Create PO/Release PO(By Purchase/Approving
Authorities)ME21N/ME28
-
8/6/2019 Copy of Enduser Document for PS
20/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 20 of 183
Create Confirmation
(By Projects)CN25/CN27
Create Completed Asset
(By Finance)CJ02
Network System Status as
CLSD(Closed)
(By Projects / Finance)CN22
Actual Settlement (Automatic)
(By Finance) CJ88/CJ8G
Projects Definition System Status as
CLSD(Closed)
(By Projects / Finance)CJ02
-
8/6/2019 Copy of Enduser Document for PS
21/183
SAP ECC 6.0 End user document (PS Module)
Title: Create Investment ProgramTransaction CodeIM01
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
Receipt of Intimation from Management or the Financial Year Change.
Business Process Procedure Overview Creation of Capital Investment Program
Via Menus Accounting Investment Management Program Master Data
Investment Program Definition Create.
Via Transaction Code IM01
Input - Required Fields* Field Value / Comments
Investment Program Type the Description of the Investment Program e.g. Shasun Investment
Approval YearType the financial year e.g. 2007
Program Type Select the option from the list e.g. ZSCD Capital Investment Program
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system.
Output Results CommentsCreation of Investment Program
Solution/ Release: MySAPERP2004 (ECC6.0) Page 21 of 183
-
8/6/2019 Copy of Enduser Document for PS
22/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Create Investment Program transaction by:
Via Menus Accounting Investment Management Program Master Data Investment Program Definition Create.
Via Transaction Code IM01
1.2. On screen Create Inv. Program Definition: Header Screen, enter information in the fields in the tablebelow:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 22 of 183
-
8/6/2019 Copy of Enduser Document for PS
23/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
InvestmentProgram
Investment Program R Type the Description of the InvestmentProgram e.g. Shasun Investment 07-08
Approval Year Approval Year R Type the financial year e.g. 2007
Program Type Program Type R Select from the list ZSCD or ZSRD.Based on the Project for Capital
Expenditure or Research & Development
Program
Description
Investment Program Description R Type Investment Program Description
FI Variant Fiscal Year Variant R Select the option from the list e.g. V3 April March.
Currency Currency R Company code Currency INR.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Press Ctrl + S or Save Button from the Screen
Solution/ Release: MySAPERP2004 (ECC6.0) Page 23 of 183
-
8/6/2019 Copy of Enduser Document for PS
24/183
SAP ECC 6.0 End user document (PS Module)
Title:Create Investment Program Top
Position
Transaction Code
IM11
Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate
SAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After Creating the Capital Investment Program.
Business Process Procedure Overview
Creation of Capital Investment Program Top Position.
Via Menus Accounting Investment Management Program Master Data Investment Program Position Create Top Position.
Via Transaction Code IM11
Input - Required Fields* Field Value / Comments
Investment Program Type the Description of the Investment Program e.g. SHA0708
Position ID Type the Top level Position ID. e.g. SHASUN Investment 2007-08
Approval Year Type the financial year e.g. 2007
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsCreation of Investment Program TopPosition.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 24 of 183
-
8/6/2019 Copy of Enduser Document for PS
25/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Create Investment Program transaction by:
Via Menus Accounting Investment Management Program Master Data
Investment Program Position Create Top Position.Via Transaction Code IM11
1.2. On screen Create Inv. Program Position : Header Screen, enter information in the fields in the tablebelow:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 25 of 183
-
8/6/2019 Copy of Enduser Document for PS
26/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
InvestmentProgram
Investment Program R Type the Description of the InvestmentProgram e.g. Shasun Investment 07-08
Position ID Top Position ID R Type the Top level Position ID. e.g.Shasun Investment 07-08
Approval Year Approval Year R Type the financial year e.g. 2007
Position IDDescription
Top Position ID Description R Type the Description of the Top Position
ID.
CO Area Controlling Area R Select the option from the list e.g.1000
Company Code Company Code O Select the option from the list e.g.9000
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Press Ctrl + S or Save Button from the Screen
Solution/ Release: MySAPERP2004 (ECC6.0) Page 26 of 183
-
8/6/2019 Copy of Enduser Document for PS
27/183
SAP ECC 6.0 End user document (PS Module)
Title:Change Investment Program
Structure
Transaction Code
IM22
Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate
SAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After Creating the Capital Investment Program Top Position.
Business Process Procedure Overview
Creation of Capital Investment Program Top Position.
Via Menus Accounting Investment Management Program Master Data Investment Program Structure Change.
Via Transaction Code IM22
Input - Required Fields* Field Value / Comments
Investment Program Type the Description of the Investment Program e.g.SHA0708.
Position ID Type the Top level Position ID. e.g. SHASUN INVESTMENT 2007-08
Approval Year Type the financial year e.g. 2007
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsCreation of Investment ProgramStructure.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 27 of 183
-
8/6/2019 Copy of Enduser Document for PS
28/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Change Inv. Program Structure transaction by:
Via Menus Accounting Investment Management Program Master Data
Investment Program Structure Change.Via Transaction Code IM22
31 3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in thetable below:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 28 of 183
-
8/6/2019 Copy of Enduser Document for PS
29/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 29 of 183
Click on Create
-
8/6/2019 Copy of Enduser Document for PS
30/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
InvestmentProgram
Investment Program R Type the Description of the InvestmentProgram e.g. SHA0708
Position ID Top Position ID O Type the Top level Position ID. e.g.Shasun Investment 07-08.
Approval Year Approval Year R Type the financial year e.g. 2007
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Press Ctrl + S or Save Button from the Screen
Solution/ Release: MySAPERP2004 (ECC6.0) Page 30 of 183
-
8/6/2019 Copy of Enduser Document for PS
31/183
SAP ECC 6.0 End user document (PS Module)
Title: Edit Original BudgetTransaction CodeIM32
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After creating the Investment Program Structure the company Level Budget needs to beupdated.
Business Process Procedure Overview Edit Original Budget for the Company.
Via Menus Accounting Investment Management Program Budgeting EditOriginal.
Via Transaction Code IM32
Input - Required Fields* Field Value / Comments
Investment Program Type the Description of the Investment Program e.g. Shasun Investment 07-
Position ID Select the Position ID from the List.
Approval Year Type the financial year e.g. 2007
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsCompany level Budget is updated.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 31 of 183
-
8/6/2019 Copy of Enduser Document for PS
32/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Change Inv. Program Structure transaction by:
Via Menus Accounting Investment Management Program Budgeting Edit
Original.
Via Transaction Code IM32
31 3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in thetable below:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 32 of 183
-
8/6/2019 Copy of Enduser Document for PS
33/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 33 of 183
-
8/6/2019 Copy of Enduser Document for PS
34/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 34 of 183
-
8/6/2019 Copy of Enduser Document for PS
35/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
InvestmentProgram
Investment Program R Type the Description of the InvestmentProgram e.g. SHAN0708.
Position ID Top Position ID O Type the Top level Position ID. e.g.Shasun Investment 07-08
Approval Year Approval Year R Type the financial year e.g. 2007
Enter the Amount to be Invested foreach Position ID Overall and
Yearwise Values. And
Click on Edit Select Select All.
Click on Edit Total up.Select Annual Values & Total Value.
Click on Continue or Enter.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Overall and the year wise budget needs to be updated, system will generate a Budget update document.
Press Ctrl + S or Save Button from the Screen
Solution/ Release: MySAPERP2004 (ECC6.0) Page 35 of 183
-
8/6/2019 Copy of Enduser Document for PS
36/183
SAP ECC 6.0 End user document (PS Module)
Title: Create Appropriation RequestTransaction CodeIMA11
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
Receipt of Intimation from Management or the Basic User Specifications from User Department and QASpecifications from QA Department.
Business Process Description Overview Creation of Project Appropriation Requests.
The Proposed Project Appropriation Request Numbering system is same as Project Numbering, will be based on
External Alphanumeric numbering and as follows :
First Character will represent CAP to represent the categories of Projects, and remaining 4 characters are
numerals.e.g. CAP-07-P02-EXPANS represents Capital Expenditure related Project with Code No. EXPANS.
Via Menus Accounting Investment Management Appropriation Requests EditAppropriation Requests Individual Processing.
Via Transaction Code IMA11
Input - Required Fields* Field Value / Comments
Press Create button from the Screen
Appropriation Request Type Select S1 from the given list by drill down search method.
Controlling Area Type 1000 and then Press Create button from the Screen or SelectCreate from the
Appropriation Request Select from the Open Number. Find the next Open Number by giving theStarting Number.If the Project is related to Capex then you have to give the ProjectCoding Logic As defined CAP-00-XXX-XXXXXX-00-000.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system.
Output Results Comments
Creation of Appropriation Request forthe requested Project.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 36 of 183
-
8/6/2019 Copy of Enduser Document for PS
37/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Create Appropriation Request transaction by:
Via Menus Accounting Investment Management Appropriation Requests Edit Appropriation Requests Individual Processing.
Via Transaction Code IMA11
31 3.1. On screen Create Appropriation Request: , enter information in the fields as specified in the tablebelow:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 37 of 183
-
8/6/2019 Copy of Enduser Document for PS
38/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 38 of 183
-
8/6/2019 Copy of Enduser Document for PS
39/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
Controlling Area Controlling Area R Type 1000 and then Press Create buttonfrom the Screen or Select Create from theMenu.
Appropriation RequestType
R Select S1
Project Profile Project Profile R Select ZP00001 for Capital InvestmentProjects.
Appropriation Request Enter the Appropriation Request Number asper the Project Coding Logic
CAP-00-XXX-XXXXXX-00-000.Then type the Description of Project.``
General DataReason for Investment
EnvironmentInvestment
Scale
R
C
O
Select the reason for investment from thegiven list. If the selected reason is forEnvironmental Protection thenSelect the Environment Investment from thegiven list.Select the Scale from the given list
Solution/ Release: MySAPERP2004 (ECC6.0) Page 39 of 183
-
8/6/2019 Copy of Enduser Document for PS
40/183
SAP ECC 6.0 End user document (PS Module)
PriorityApproval YearPlanned Approval Date
Person InvolvedIM : Proposed By :
(Partner field)IM : Supported By :(Partner field)IM : Supported By :IM : Approved UnitHead :IM : ApprovedFinance
RO
O
R
R
Select the Priority from the given list.Type the Approval year of the Project.
Select the date of approval.
Select the Name of the Applicant (ProjectManager) from the Given List.Select the Name of the Authorization Level(Finance ) from the given List.PRESS ENTER.
As per tApprovAuthoriWe haveselect tapproviAuthori
Solution/ Release: MySAPERP2004 (ECC6.0) Page 40 of 183
-
8/6/2019 Copy of Enduser Document for PS
41/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 41 of 183
-
8/6/2019 Copy of Enduser Document for PS
42/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
Control Data :Investment Program
Position ID
R
R
Select SHA0708 from the given List. Year
defaulted from the Program.
Select the required Structure where theProject is going to Come.
e.g. Shasun Investment R&D
Solution/ Release: MySAPERP2004 (ECC6.0) Page 42 of 183
-
8/6/2019 Copy of Enduser Document for PS
43/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 43 of 183
-
8/6/2019 Copy of Enduser Document for PS
44/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comments
Org. Units :Req. Cost Center
Plant
Location
Resp.Company
R
RO
O
Select the Requesting Costs centerfrom the Existing Cost centers if thecost centers are available in thatparticular plant. If the cost centers arenot there then It has to be created forthat particular plant.
Press ENTERAll other fields are automatically copiedfrom the standard profile Setting.Select the required plant from the Given
List.Select the required Location from theGiven List.Select 1000 From the given List
User Defined Fields
Nature of Exp Nature of Expenditure
R Select the required entry from the givenlist. DISPOSAL-,DisposalLEASE , -LeasePURCHASE - PurchaseTRANSFER - Transfer
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 44 of 183
-
8/6/2019 Copy of Enduser Document for PS
45/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values CommeVariants
General Data:Completion Date Project Completion Date.
REnter Approximate Date of ProjectCompletion
Solution/ Release: MySAPERP2004 (ECC6.0) Page 45 of 183
-
8/6/2019 Copy of Enduser Document for PS
46/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 46 of 183
Click on Create CostEstimate
Click on Show/Hide Item View
-
8/6/2019 Copy of Enduser Document for PS
47/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 47 of 183
-
8/6/2019 Copy of Enduser Document for PS
48/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comme
VariantsPlan Values:
Item Cat M Material R Select the Item Category from the List Mor N or V as per the Requirement.
Only Mor Vshould used.
Item Cat N Service R
Item Category
o M for Material
o V for other costs like manpower, QC etc. The cost element for V
should be 7100150
Resource is where we select the RM name. The master would be
entered by the Purchase person. This is not required for RM. Enter
Quantity & hit enter. For V change the description to suit us.
Go Back or press F3. The total budget for the year 2007 (as the
investment planned is for 2007) would appear as shown below. Savethe Appropriation request.
Note: We would define the cost for 1 year and if the project spills over to the
next year the remaining budget would also spill over.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 48 of 183
-
8/6/2019 Copy of Enduser Document for PS
49/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 49 of 183
-
8/6/2019 Copy of Enduser Document for PS
50/183
SAP ECC 6.0 End user document (PS Module)
Select the project in the left side of the screen and go to Approp.
Request Menu and select the change option.
Go to Control data Tab and click Form approval. The Appropriation
Request needs to be sent for approval. Save the Appropriation Request.
Press Ctrl + S or Save Button from the Screen
Solution/ Release: MySAPERP2004 (ECC6.0) Page 50 of 183
-
8/6/2019 Copy of Enduser Document for PS
51/183
SAP ECC 6.0 End user document (PS Module)
Title: Change Appropriation RequestTransaction CodeIMA12/SBWP
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Creating of Project Appropriation Request and its sent for Approval.
Business Process Description Overview
Releasing the of Project Appropriation Requests.
The Authorized person whose name is mentioned in the Appropriation Request (IM : Authorization Partner field) wi
have the authorization to Release the Appropriation Request.
Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.
Via Transaction Code IMA11/ IMA12 / SBWP
Input - Required Fields* Field Value / Comments
Appropriation req. No. Select the Appropriation Request Number to be Released from the list.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results CommentsRelease Appropriation Request of the requestedProject.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 51 of 183
-
8/6/2019 Copy of Enduser Document for PS
52/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.
Via Transaction Code IMA11/ IMA12
1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 52 of 183
-
8/6/2019 Copy of Enduser Document for PS
53/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 53 of 183
-
8/6/2019 Copy of Enduser Document for PS
54/183
SAP ECC 6.0 End user document (PS Module)
System Will show the Display Mode of the Appropriation Request sent for Approval.In case of any further requirement on the same Appropriation Request press BACK.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 54 of 183
-
8/6/2019 Copy of Enduser Document for PS
55/183
SAP ECC 6.0 End user document (PS Module)
Click on Create Attachment.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 55 of 183
-
8/6/2019 Copy of Enduser Document for PS
56/183
SAP ECC 6.0 End user document (PS Module)
Click on SAVE and BACK Button.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 56 of 183
-
8/6/2019 Copy of Enduser Document for PS
57/183
SAP ECC 6.0 End user document (PS Module)
Click on APPROVE.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 57 of 183
-
8/6/2019 Copy of Enduser Document for PS
58/183
SAP ECC 6.0 End user document (PS Module)
Now Inbox Workflow will be blank.There will be a mail which goes to the Person Who has created the Appropriation Request. Which he
can check in his login through the Transaction code SBWP INBOX Documents.Transaction Code : SBWP
Field Name Description R/O/C User Action and Values Comments
Select In Box SAP Business
Work Bench
R Select the Inbox Workflow
Press Execute Button.
Transaction Code : IMA11
Field Name Description R/O/C User Action and Values Comments
WorklistOff / On
R Toggle the Work list Button ON if it is OFF.Select the Project Name from the Work-list whichwas created by you.
e.g. P-0001.Select the Change Button which is appearinglike Pencil in the screen.Or select the Appropriation Request from theMenu and select Change Option.
AssignmentProject R Select the Project Field.
General DataStatus R Select Approve.
System givesmessage thathe
Solution/ Release: MySAPERP2004 (ECC6.0) Page 58 of 183
-
8/6/2019 Copy of Enduser Document for PS
59/183
SAP ECC 6.0 End user document (PS Module)
AppropriationRequest isapproved.
AssignmentWBS Element R Select the WBS Element Field.
Systemautomatically
copies theProject Codee.g. : M-001
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 59 of 183
-
8/6/2019 Copy of Enduser Document for PS
60/183
SAP ECC 6.0 End user document (PS Module)
Title: Activate Project DefinitionTransaction CodeIMA11
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Approval of Project Appropriation Request & Activation of Project Definition.
Business Process Description Overview
Activating the Project Definition.
The Authorised Person who is responsible for Activating the Project Definition will do this Transaction.
Input - Required Fields* Field Value / Comments
Appropriation Request Select the Appropriation Request for which Project Definition needs to be activated..
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results CommentsThe Budget is Distributed for the Appropriation
Request of the requested Project.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 60 of 183
-
8/6/2019 Copy of Enduser Document for PS
61/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.
Via Transaction Code IMA11/ IMA12
1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:
Field Name Description R/O/C User Action and Values CommentsMeasure / Assets
Project Activate project R Click on Project .
WBS Element Work Break Down StructureElement
R Click on WBS Element
Solution/ Release: MySAPERP2004 (ECC6.0) Page 61 of 183
-
8/6/2019 Copy of Enduser Document for PS
62/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 62 of 183
-
8/6/2019 Copy of Enduser Document for PS
63/183
SAP ECC 6.0 End user document (PS Module)
Click on Continue or Tick Mark.System will propose that Copy the Planned Values
Click on Tick or Press Enter.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 63 of 183
-
8/6/2019 Copy of Enduser Document for PS
64/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 64 of 183
-
8/6/2019 Copy of Enduser Document for PS
65/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 65 of 183
-
8/6/2019 Copy of Enduser Document for PS
66/183
SAP ECC 6.0 End user document (PS Module)
Title: Budget DistributionTransaction CodeIM52
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Approval of Project Appropriation Request & Activation of Project Definition.
Business Process Description Overview
Budget Distribution for the Project.
The Person who is responsible for Budget Distribution will have the authorization to Distribute the Budget.
Input - Required Fields* Field Value / Comments
Investment Program Select the Investment Program from the List.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results CommentsThe Budget is Distributed for the AppropriationRequest of the requested Project.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 66 of 183
-
8/6/2019 Copy of Enduser Document for PS
67/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Budget Distribution transaction by:
Via Menus Accounting Investment Management Programs Budgeting Budget Distribution Edit
Via Transaction Code IM52
1.1 On screen Budget Distribution : Header Screen, enter information in the fields in the table below:
Field Name Description R/O/C User Action and Values CommentsInvestment Program The Investment Program R Select the Investment Program
SHA0708 from the Given List.
Press Enter.Select Execute option from the Menu orSelect the Clock Button in the Screen.
Original Budget Original Budget to be distributedFor the Project.
R Enter the amount to be distributed for theProject as Budget. e.g. CAP-2007-P02-EXPAN.
Annual Overview R Select Annual Overview from theScreen and Enter the Original Budgetdistributed for that Project.
Select Save Button from the Screen orSave from the Menu.
System will display thmessage that
Solution/ Release: MySAPERP2004 (ECC6.0) Page 67 of 183
-
8/6/2019 Copy of Enduser Document for PS
68/183
SAP ECC 6.0 End user document (PS Module)
Document xxxxxxxxxposted.
Press Green Colour with Arrow Button/ Back and come out of the Screen.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Enter the Overall / year Wise Budget for the Appropriation Request / Project Definition
Click on EDIT COPY VIEW Select the Planned total
Solution/ Release: MySAPERP2004 (ECC6.0) Page 68 of 183
-
8/6/2019 Copy of Enduser Document for PS
69/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 69 of 183
-
8/6/2019 Copy of Enduser Document for PS
70/183
SAP ECC 6.0 End user document (PS Module)
Select the Annual Year : 2007
Click on EDIT COPY VIEW Select the Planned total
Solution/ Release: MySAPERP2004 (ECC6.0) Page 70 of 183
-
8/6/2019 Copy of Enduser Document for PS
71/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 71 of 183
Check onCHECK
-
8/6/2019 Copy of Enduser Document for PS
72/183
SAP ECC 6.0 End user document (PS Module)
Click on check button and Save the system will generate the Budget document.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 72 of 183
-
8/6/2019 Copy of Enduser Document for PS
73/183
SAP ECC 6.0 End user document (PS Module)
Title: Release Appropriation RequestTransaction CodeIMA11
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After Activation of Project Definition and Budget Updating for the Appropriation Request.
Business Process Description Overview
Release Appropriation Request.
The Person who is responsible for Release Appropriation Request will have the authorization to Release the
Appropriation Request.
Input - Required Fields* Field Value / Comments
Appropriation Request Select The Appropriation Request to be released.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output Results Comments
The Appropriation Request should be released..
Solution/ Release: MySAPERP2004 (ECC6.0) Page 73 of 183
-
8/6/2019 Copy of Enduser Document for PS
74/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Appropriation Request Individual Processing transaction by:
Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.
Via Transaction Code IMA11/ IMA12
1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:
Solution/ Release: MySAPERP2004 (ECC6.0) Page 74 of 183
-
8/6/2019 Copy of Enduser Document for PS
75/183
SAP ECC 6.0 End user document (PS Module)
Click on RELEASE. And click on SAVE.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 75 of 183
-
8/6/2019 Copy of Enduser Document for PS
76/183
SAP ECC 6.0 End user document (PS Module)
Title: Change Project DefinitionTransaction CodeCJ02/CJ20N
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Finance 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
Trigger:
After the Approved Budget Appropriation Request form.
Business Process Description Overview
The project Lower Level WBS Elements has to be created. (Up to Level 3)
Via Menus Logistics Project System Project Spl. Maintenance FunctionWork Break DowStructure (WBS) ChangeLogistics Project System Project Project Builder
Via Transaction Code CJ02 /CJ20 N
Input - Required Fields* Field Value / Comments
Project Definition. Find the next Project number by pressing F4 button in this field and then Type theProject Definition Number.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..
Output - Results Comments
Upto Level 3 WBS elements will be created.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 76 of 183
-
8/6/2019 Copy of Enduser Document for PS
77/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
1.0 On screen Change Project Definition : Header Screen, enter information in the fields in thetable below:
Field Name Description R/O/C User Action and Values Comments
Project Definition Select Project Definition from the
ScreenResponsible Person The person (Project
Manager ) who isResponsible for thatProject.
R Select the Name of the ProjectManager who is responsible for thatProject from the given list.
Applicant No. The User Department whorequested to do the Project.
O Select the Name of the RequestedUser Department from the givenlist.
Start Date Start date of the Project R Type the start date or Select the Startdate of Project from the Calender.
This dateswill bedefaultedfromAppropriationRequest
End Date End Date of the Project R Type the End date or Select the Enddate of Project from the Calender.
This dateswill bedefaultedfromAppropriation
Request
Company Code Company Code R Select the company code from thelist
Business Area Business Area R Select the Business Area from theList
Plant Name of the Plant where theProject is going to take place
R Select the Name of the Plant wherethe Project is going to take place.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 77 of 183
-
8/6/2019 Copy of Enduser Document for PS
78/183
SAP ECC 6.0 End user document (PS Module)
Profit Center Profit Center R Select the Name of the Profit Center whereProject is going to take place.
Location Name of the Location wherethe Project is going to takeplace
O Select the Name of the Locationwhere the Project is going to take place.
Mask ID O Type ++++++ after two spaces from theBeginning of the Field.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 78 of 183
-
8/6/2019 Copy of Enduser Document for PS
79/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comments
Level WBS Level Number R Enter 2
WBS Element WBS Element R Enter @-01
Description WBS Description R Enter the WBS Description CIVIL As requiredby the ProjectEngineers.The Project
Structuringneeds to becreated.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 79 of 183
-
8/6/2019 Copy of Enduser Document for PS
80/183
SAP ECC 6.0 End user document (PS Module)
Title: Change Cost PlanningTransaction CodeCJ40
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After creating the Lower Level (3) WBS elements under the Project Definition.
Business Process Procedure Overview Manual Cost Planning for the Lower Level WBS elements
Via Menus Logistics Project System Financials Planning Cost in WBS
Overall Values Change.
Via Transaction Code CJ40
Input - Required Fields* Field Value / Comments
Project Definition Select the project definition from the list.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsManual Cost Planning for the ProjectDefinition will be done.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 80 of 183
-
8/6/2019 Copy of Enduser Document for PS
81/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Change Cost Planning transaction by:
Via Menus Logistics Project System Financials Planning Cost in WBS
Overall Values Change.
Via Transaction Code CJ40
1.2 On screen Change Cost Planning : Initial Screen, enter information in the fields in the table below:
Give the Project Definition and Click on Cost Planning
Enter the Manual Cost planning for Overall and Annual.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 81 of 183
-
8/6/2019 Copy of Enduser Document for PS
82/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 82 of 183
-
8/6/2019 Copy of Enduser Document for PS
83/183
SAP ECC 6.0 End user document (PS Module)
Click on Edit Total Up.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 83 of 183
-
8/6/2019 Copy of Enduser Document for PS
84/183
SAP ECC 6.0 End user document (PS Module)
Tick on Annual and Total Value.
Field Name Description R/O/C User Action and Values Comments
Project Definition Select Project Definition from the
Screen
Overall & Year
wise budgetneeds to beupdated.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C =Conditional)
Click on Save.After saving this the User needs to send an SAP Mail to Budgeting Department to
Update the Cost Planned to Budget.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 84 of 183
-
8/6/2019 Copy of Enduser Document for PS
85/183
SAP ECC 6.0 End user document (PS Module)
Title: Change Original BudgetTransaction CodeCJ30
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After creating the Manual Cost planning for the Lower Level (3) WBS elements under the
Project Definition.
Business Process Procedure Overview Manual Cost Planning for the Lower Level WBS elements
Via Menus Logistics Project System Financials Budgeting Original Budget Change.
Via Transaction Code CJ30
Input - Required Fields* Field Value / Comments
Project Definition Select the project definition from the list.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsBudget for the Lower Level WBSelements (level 3 ) for the ProjectDefinition will be done.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 85 of 183
-
8/6/2019 Copy of Enduser Document for PS
86/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Change Original Budget transaction by:
Via Menus Logistics Project System Financials Budgeting Original Budget Change.
Via Transaction Code CJ30
Field Name Description R/O/C User Action and Values Comments
Project Definition Select Project Definition from the
Screen
Overall &
Yearwisebudget needsto be updated.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C =Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 86 of 183
-
8/6/2019 Copy of Enduser Document for PS
87/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 87 of 183
-
8/6/2019 Copy of Enduser Document for PS
88/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 88 of 183
-
8/6/2019 Copy of Enduser Document for PS
89/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 89 of 183
-
8/6/2019 Copy of Enduser Document for PS
90/183
SAP ECC 6.0 End user document (PS Module)
Save the Document System Generate the Budget document Posted.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 90 of 183
-
8/6/2019 Copy of Enduser Document for PS
91/183
SAP ECC 6.0 End user document (PS Module)
Title: Create NetworkTransaction CodeCN21
Document No. Responsibility Version Supercedes Issue
d on
Effective
Date
Review
DateSAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
After creating the Project definition for the activities this Network will be created.
Business Process Procedure Overview For all the Project related activities (Internal /External) network will be created.
Via Menus Logistics Project System Special Maintenance Function Network Create.
Via Transaction Code CN21
Input - Required Fields* Field Value / Comments
Network Profile Select the network profile from the list. e.g. Network profile
w/Acct.asst(SCDL)
Network type Select the network Type
Plant Select the plant
MRP Controller Select the MRP Controller for Project
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsNetwork will be created.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 91 of 183
-
8/6/2019 Copy of Enduser Document for PS
92/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Create Network transaction by:
Via Menus Logistics Project System Special Maintenance Function Network
Create.Via Transaction Code CN21
Field Name Description R/O/C User Action and Values Comments
Network Profile Network Profile R Select the Network Profile ZP00003 Network Profile W/a Assign(SCDL)
The user has toselect only thisnetwork Profile
Network Type Network Type R Select ZP02 Network with activityassignment(SCDL) from the list
The user has toselect only thisnetwork type
Plant Plant R Select the Plant Where the Projectis going to be implemented.
MRP Controller MRP Controller R Select 006 PROJECT MRP The user has toselect 006 only.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 92 of 183
-
8/6/2019 Copy of Enduser Document for PS
93/183
SAP ECC 6.0 End user document (PS Module)
After Giving Project Definition Click on SAVE Button.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 93 of 183
-
8/6/2019 Copy of Enduser Document for PS
94/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 94 of 183
-
8/6/2019 Copy of Enduser Document for PS
95/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comments
Network Description of Network R Type the name of the Network, with
reference to the Project definitionwhich will help you in future forreference and easy search.
Scheduling
Scheduling Type R
Please ensure that the Scheduling
Type must be in Backward type.
For all our Projects end
date is fixed. Becauseof this we are usingthe Backwardscheduling type.
Assignment
Project Def. Project Definition R
Type the Required Project Definition
for which this Network is to belinked..
Give YES
System will prompt
you whether It has tocopy the WBS elementDates which you havementioned in theProject Definition.System will promptyou that the Dates
copied from the ProjectDefinition.
(Note: On above table
Solution/ Release: MySAPERP2004 (ECC6.0) Page 95 of 183
-
8/6/2019 Copy of Enduser Document for PS
96/183
SAP ECC 6.0 End user document (PS Module)
, in column R/O/C: R = Required, O = Optional, C = Conditional)
If you see the Scheduling Field, the Start date and the End date of the Project will be copied in that fields.
Select the Activity Overview Button from the Screen or go to option from the Main Menu and select the Activity OverviewOption or Press F7.
Field Name Description R/O/C User Action and Values Comments
Network No. Network Number. R Type the Network No, for whichActivities and duration has to beentered.
Select the Activity Overview Buttonfrom the Screen or Goto Option
Activity overview option from theMain menu or F7.
System will takes youto Change NetworkBasic Data Overview(basic Dates)
Description Description of theActivities
R Type the Description of theActivities required for the Projectsone by one. (row by row ).
Normal Duration Normal RequiredDuration for the Activity
R Type the Required Duration for allthe activities (time taken tocomplete the Activity. In days)
WBS Element WBS elementCorresponding to the
Activities
R Assign the Corresponding WBS elementTo the Activities to Capture the Costs
System will generatethe Settlement Rule for
that Activities.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 96 of 183
-
8/6/2019 Copy of Enduser Document for PS
97/183
SAP ECC 6.0 End user document (PS Module)
1.2 On screen Create Network Basic Data Overview (basic Dates ) Screen, enter information inthe fields in the table below:
Select the Activities for which the Milestones are Attached.Select the Milestone Overview Button from the Screen or Activity option Milestone Overviewoption from the Main menu.
Field Name Description R/O/C User Action and Values Comments
Usage The Person who isresponsible forconfirming thisMilestone
R Type the Person responsible orselect the responsible person fromthe given Usage list.
Description Description of theMilestone
R Type the Description of theMilestone to be confirmed
System will automaticaset the Scheduled datetodays date.
Group R Type CHEM, INST, PURC,ELEC, CIVL or MECH this fieldsdecides which person will confirmthis Milestone.
Fixed Date R If the Milestone has to be confirmedin particular fixed date then typethat particular fixed date in thisfield.
Fin. Off. Finish to Offset R Tick this field if you want to set theMilestone to the finish date of the activity.e.g. shown in the figure.
If this field Indicator tickthere then the system wautomatically set thismilestone in the finish d
activity.Offset Number of day of Offsetof
Milestone.
R If you want to set the milestone toThe required number of days.e.g. 2 day
Offset Unit Unit of Offset of
MilestoneDate
R Type the unit of offset field.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 97 of 183
-
8/6/2019 Copy of Enduser Document for PS
98/183
SAP ECC 6.0 End user document (PS Module)
1.3 On screen Create Network Milestone Overview Screen, enter information in the fields in thetable below:
If you want to insert a Group of Milestones then select the Milestone Group from the given Listof Groups.
If you want to insert a Standard Milestone select the Standard Milestone from the given List.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 98 of 183
-
8/6/2019 Copy of Enduser Document for PS
99/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 99 of 183
-
8/6/2019 Copy of Enduser Document for PS
100/183
SAP ECC 6.0 End user document (PS Module)
1.4 On screen Create Network Basic Data Overview (basic dates ) Screen, enter information inthe fields in the table below:
Select the Activity Element Overview button from the Screen or Activity option ElementOverview option from the Main menu or Ctrl +Shift + F10 .
Solution/ Release: MySAPERP2004 (ECC6.0) Page 100 of 183
-
8/6/2019 Copy of Enduser Document for PS
101/183
SAP ECC 6.0 End user document (PS Module)
Field Name Description R/O/C User Action and Values Comments
InternalProcessingDescription
Description of WorkCenter Work
R Type the Work center name withword Work e.g. Managers Work.
Work No. of hours to Work R Type the Number of hours of theWork center to work.
Work Center Name of the Workcenter
R Type the Work center related toProject or select the Work Centerfrom the given list. (drill downsearch option ) andPress Enter.
Activity Type System will automaticalpicks up the Activity typfrom the setting.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
1.5 On screen Create Network Basic Data Overview (basic dates ) Screen, enter information inthe fields in the table below:Select the External processing button from the Screen.
Field Name Description R/O/C User Action and Values Comments
ExternalProcessing
Service
Indicator for ExternalService requirement
R Tick this f ield i f you want to dosome external service activities e.g.
Civil Construction, MechanicalErection etc.,
Description Description of theService
R Type the description of the Servicewhich are to be done.
Purchase org. Name of the PurchaseOrganization
R Type the name of the PurchaseOrganization. e.g. for engineeringpurchase EB01.
Cost Element Cost Element for whichthe cost has to bebooked
R Enter the required cost element forwhich the cost for this service hasto be booked.
WBS Element WBS element for which
the external service.
R Assign the corresponding WBS
element for the External Service forwhich cost has to be captured forthe Project.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 101 of 183
-
8/6/2019 Copy of Enduser Document for PS
102/183
SAP ECC 6.0 End user document (PS Module)
e.g. Contractors Costs.
Outline-agreement Contract Number. O Select and Assign the requiredOutline agreement number from thegiven list.
Agreement item Item number O System will automatical
set this field from theoutline-agreement.
Material Group R In case any material group is therethen select from the given list. (drilldown search)
Planned Delivery
time
Time taken to complete
the Activity.
R Type the required time taken to
complete the external processingactivities.
Purchase Group Name of the PurchaseGroup
R Enter the Name of the PurchaseGroup or select from the given list(drill down search method).
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Select the an activity or group of activity by clicking the above said green colour button from the screen. Thesystem will display the following Screen.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 102 of 183
-
8/6/2019 Copy of Enduser Document for PS
103/183
SAP ECC 6.0 End user document (PS Module)
1.6 On screen service Specifications : External Specs. F.Task List Maintain Screen, enter information the fields in the table below:
Field Name Description R/O/C User Action and Values Comments
Service Number Service Number R Select the required service to bemade by the Vendor by drill down
search from the Service master.
System will automaticalpicks up the short text
from the service masterQuantity No. of Quantity R Enter the number of quantity to be
done by the external servicecontractor.e.g. Cable laying 1.5 sq mm - 5
mtrs
Cost Element Cost Element for whichthe cost has to bebooked
R Enter the required cost element forwhich the cost for this service hasto be booked.
Contract Number Contract Number withthe external Vendor.
R If there is any contract existingthen u have to specify that contractnumber.
Item Contract Number Item R Enter the Item Number of the
Contract.
System will automatical
sets the short text fromthe contract.
Overall Limit Overall Costs limit forthis contract R Enter the Overall limit for thecontract which includes unplanned
service costs also.
Expected Value Expected Value for theservices.
R Enter the expected cost limit forthis contact at which all the plannedservice costs can be posted.
No Limit Indicator for theContract without CostLimit
R If this indicator is set then the valuefor the contract is unlimited.
Other Limit R If this activity has unplanned
services that unplanned costs limit
Solution/ Release: MySAPERP2004 (ECC6.0) Page 103 of 183
-
8/6/2019 Copy of Enduser Document for PS
104/183
SAP ECC 6.0 End user document (PS Module)
has to be entered in this field.
(Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 104 of 183
-
8/6/2019 Copy of Enduser Document for PS
105/183
SAP ECC 6.0 End user document (PS Module)
Title: Change Project DefinitionTransaction CodeCJ20/CJ20N
Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate
SAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
The Asset wise WBS elements has to be created and Project definition has to be released.
Business Process Procedure Overview Asset wise WBS elements has to be created and Project definition needs to be released.
Via Menus Logistics Project System Project Spl. Maintenance Function Work Break Down Structure (WBS) ChangeLogistics Project System Project Project Builder
Via Transaction Code CJ02 /CJ20 N
Input - Required Fields* Field Value / Comments
Project Definition Select the Project Definition for which the Asset wise WBS elements needs tobe created.
Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..
Output Results CommentsThe Assetwise WBS elements will becreated & Project is released.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 105 of 183
-
8/6/2019 Copy of Enduser Document for PS
106/183
SAP ECC 6.0 End user document (PS Module)
Procedural Steps
Access Change Project definition transaction by:
Via Menus Logistics Project System Project Spl. Maintenance Function
Work Break Down Structure (WBS) ChangeLogistics Project System Project Project Builder
Via Transaction Code CJ02 /CJ20 N
Field Name Description R/O/C User Action and Values Comments
Project Definition Select Project Definition from theScreen to Release.
Select EDIT SELECT SELECT ALL from the Main Menu.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 106 of 183
-
8/6/2019 Copy of Enduser Document for PS
107/183
SAP ECC 6.0 End user document (PS Module)
Select EDIT STATUS RELEASE from the Main Menu.
Solution/ Release: MySAPERP2004 (ECC6.0) Page 107 of 183
-
8/6/2019 Copy of Enduser Document for PS
108/183
SAP ECC 6.0 End user document (PS Module)
Solution/ Release: MySAPERP2004 (ECC6.0) Page 108 of 183
-
8/6/2019 Copy of Enduser Document for PS
109/183
SAP ECC 6.0 End user document (PS Module)
Title: Create Purchase RequisitionTransaction CodeME51/ME51N
Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate
SAP/EUD/PS/01 Projects 001 NIL
Prepared by Reviewed by Approved by
V.Ananthapadmanaban
10.03.2008
2.1 Trigger
1. Direct requirements from a project, cost center , sales order or work order
Business Process Description Overview
A requisition defines the need for a material or service. It is the primary instrument for identifying materials orservices that must be either procured outside the company or manufactured internally. It authorizes the Purchasingdepartment to purchase materials in specific quantities within a specified time frame. It is an internal document andis not used outside of the company.
Requisitions can be created for materials with or with out a material master. When creating the requisition with amaterial master,The part number must be referenced, and a flag must be placed in the account assignment field. This will bring upa pop-upwindow to assign the material to an account.
Requisitions do not need a material master. If processing a requisition for material that does not have a materialmaster, the
account assignment must be flagged with the proper key to charge the item to a cost center, project, or an order.
Input - Required Fields Field Value / Comments
Document Type Type of requisition (NB)
Delivery date date item is required
Plant Plant requiring material
Purchasing Group Buyer or group that will purchase material
Account assignment A flag that determines the account where financial transactions arecharged.
Output - Results Comments
Approved requisitions Authorization to Purchasing department to proceed with purchase
Solution/ Release: MySAPERP2004 (ECC6.0) Page 109 of 183
-
8/6/2019 Copy of Enduser Document for PS
110/183
SAP ECC 6.0 End user document (PS Module)
Tips and Tricks
When you enter the item category, account assignment, delivery date, plant, storage location, Purchasing
group, material group on the initial overview screen, this information defaults to each item number on the itemscreen eliminating duplication of typing effort. In the item screen any of these fields can be changed using a
requisition tracking number or entering a requisitioner allows grouping for easy monitoring. If you specify anaccount assignment, do not reference a storage location, because the item is being charged off and will not gointo inventory.
Set up the user defaults for each user to force the system to plug in default data, i.e. plant, purchasing
organization.
Procedure Steps
31 1.1.Access transaction by:
Via Menus LogisticsMaterials Management PurchasingPurchase RequisitionCreate
Via Transaction Code ME51/ME51N
1.2. On screen Create Purchase Requisition: Initial Screen: enter information specified in thetable below:
Transaction Code : ME51
Solution/ Release: MySAPERP2004 (ECC6.0) P