  • 8/6/2019 Copy of Enduser Document for PS

    1/183

    mySAPERP2004 End user document (PS Module)

    V1.0

    Sep 2007

    English

    End UserDocumentation - PS

    mySAPERP2004 (ECC 6.0)

    SSTL

    1,6th Floor, Crown Court#128, Cathedral Road

    Chennai 600 086

    Solution/ Release: ECC 6.0 Page 1 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    2/183

    mySAPERP2004 End user document (PS Module)

    Content

    1 Sequential operation of Project System (PS) module ................................................4

    2 Create Investment Program ......................................................................................21

    3 Create Investment Program Top Position .................................................................24

    4 Change Investment Program Structure ....................................................................27

    5 Edit Original Budget ................................................................................................31

    6 Create Appropriation Request .................................................................................36

    7 Change Appropriation Request ................................................................................51

    8 Activate Project Definition .......................................................................................60

    9 Budget Distribution ..................................................................................................66

    10 Release Appropriation Request ................................................................................73

    11 Change Project Definition ........................................................................................76

    12 Change Cost Planning .............................................................................................80

    13 Change Original Budget ..........................................................................................85

    14 Create Network ........................................................................................................91

    15 Change Project Definition .....................................................................................105

    16 Create Purchase Requisition ..................................................................................109

    17 Create Purchase Order ...........................................................................................117

    18 Create Vendor Advance .........................................................................................122

    19 Post Vendor down Payment ...................................................................................125

    20 Goods Receipts Purchase Order ............................................................................128

    21 Logistics Invoice Verification .................................................................................133

    Solution/ Release: ECC 6.0 Page 2 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    3/183

    mySAPERP2004 End user document (PS Module)

    22 Create Reservation ..................................................................................................151

    23 Goods Issue ............................................................................................................154

    24 Service Entry .........................................................................................................158

    25 Create Confirmations ............................................................................................162

    26 Payment with Printout ...........................................................................................166

    27 Project Settlement ..................................................................................................171

    28 Create Completed Asset ........................................................................................174

    29 Change Network Status Closed ..........................................................................180

    30 Change Project Status Closed .............................................................................182

    Solution/ Release: ECC 6.0 Page 3 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    4/183

    SAP ECC 6.0 End user document (PS Module)

    Sequential operation of Project System (PS) module

    I Creation of Investment Program

    a) Create Investment Program - Transaction Code: IM01

    As soon as the Financial Year Starts the Investment Program Creation needsto be done by the authorized person.

    The Following things are mentioned in the Investment Program1. Investment Program

    2. Approval Year

    3. Program Type4. Fiscal Year Variant

    5. Currency

    With this information the Investment Program is saved and the same isinformed to Projects Department over phone and SAP Mail. The authorizedperson in SAP does this step.

    b) Create Investment Program Top Position - Transaction Code: IM11

    After Creating the Investment Program the Top Company Level position is

    created for the Investment Program.The Following things are mentioned in the Investment Program Top Position

    1. Investment Program

    2. Position ID3. Approval Year

    The authorized person in SAP does this step.

    c) Create Investment Program Structure - Transaction Code: IM22

    After Creating the Investment Program the Top Company Level position is

    created for the Investment Program the Investment Program Structure iscreated.

    The Following things are mentioned in the Investment Program Top Position1. Investment Program

    2. Position ID (Optional)3. Approval Year

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 4 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    5/183

    SAP ECC 6.0 End user document (PS Module)

    II Maintaining Budget for Investment Program

    a)Edit Original Budget - Transaction Code: IM32

    After Creating the Investment Program Structure the Budget is maintained

    for the created Investment Structure. This can be maintained whenever theNew appropriation request is assigned to the Position Ids.

    The Following things are mentioned in the Edit Original Budget

    1. Investment Program2. Position ID (Optional)

    3. Approval YearThis step is done by the authorized person in SAP.

    III. Appropriation Request

    a) Create Appropriation Request Transaction Code : IMA11

    After getting the Feasibility Study for scaling up the Process in the Production

    Level. The authorized person in SAP creates the appropriation request.The Following things are mentioned in the Appropriation Request

    1. Appropriation Request Type

    2. Controlling Area after this in General Data

    3. Appropriation Request

    4. Description5. Approval Year

    6. Planned Approval Date7. Implementation Start

    8. Person Involved for Approval User ID needs to be selected Level wise.In Control Data

    9. Investment Program /Year

    10. Position ID.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 5 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    6/183

    SAP ECC 6.0 End user document (PS Module)

    In Organizational Units1. Requesting Company code

    2. Requesting Business Area

    3. Requesting Cost Center4. Requesting Profit Center5. Requesting Company

    6. Object Class

    7. Plant8. Responsible Cost Center

    9. Responsible Profit Center10.Currency

    In Variants TabGeneral Data

    1. Completion Date Approximate date of Project completion date.

    Select Plan Values Tab

    Click on Create Cost Estimate Button below the screen.

    A new screen is opened where you need to click the button Show/Hide Item

    View. It would show a table where we need to feed in the values. The values

    to be fed are

    Item Categoryo M for Material

    o V for other costs like manpower, QC etc. The cost element for V

    should be 7100150

    Resource is where we select the RM name. The master would be

    entered by the Purchase person. This is not required for RM. EnterQuantity & hit enter.

    For V change the description to suit us.

    After completion of the entry, click confirm to record those values by

    SAP which would appear on the left hand side of the screen.

    Rows can be added, inserted, deleted accordingly. Filled values are shownbelow.

    Go Back or press F3. The total budget for the year 2007 (as the

    investment planned is for 2007) would appear as shown below. Savethe Appropriation request.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 6 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    7/183

    SAP ECC 6.0 End user document (PS Module)

    Note: We would define the cost for 1 year and if the project spills over to thenext year the remaining budget would also spill over.

    After mentioning all the required entries when the user saves theappropriation request as per the configuration the Appropriation request will

    go for approval process as SAP Workflow (predefined Process). The

    documents are uploaded through Document Management system as well as itcan be uploaded in Change mode of Appropriation request by selecting the

    Service for Object Create Attachment.

    b) Approve Appropriation Request Transaction Code : IMA12/SBWP

    When the approving authority opens their SAP Mail Box through thetransaction code SBWP the system will show all the Workflow process to be

    executed by him. He has to select the required appropriation request and

    Click on Approve button, if he wants to see the attachment. He can see thesame in display mode of Appropriation request by selecting the Service for

    Object View Attachment or in the Document Tab.The authorized person inSAP does this step.

    c) Activate & Release Appropriation Request Transaction Code:IMA12

    After approval the Appropriation request needs to be activated and released.

    This will be done by the authorized person in the Measures/Assets Tab of theAppropriation request in change mode of Appropriation request transaction.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 7 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    8/183

    SAP ECC 6.0 End user document (PS Module)

    IV. Budget Distribution

    a) Distribute Budget for Project Definition Transaction Code: IM52

    After activating the Appropriation Request (Project Definition). The Followingthings are mentioned in the Distribute Budget1. Investment Program

    2. Position ID (Optional)

    3. Approval Year

    The Overall as well as Yearwise Budget has to be updated. This step is doneby the authorized person in SAP.

    V. Creation of Project Structure

    a) Change Project Transaction Code: CJ02After updating the Budget for the Appropriation Request (Project Definition).

    The Following things are mentioned in the Change Project transactions. The

    authorized person in SAP does this step.In the Project Definition Header the Following things are mentioned

    1. Person Responsible

    2. Start Date and End date of Project will be defaulted from the

    Appropriation Request.

    3. Company code4. Business Area

    5. Plant6. Profit Center

    In the WBS element Overviewthe Basic Data tab the following things are mentioned.

    1. Level Number

    2. Description3. Upto Level 3 WBS elements are Created with Planning Element (if the

    level is below 4).In Responsibilties Tab

    4. Requesting Cost Center needs to be filled.

    5. Which will automatically copy the Controlling Area (CA) and Requesting

    Company Code.6. if required Responsible Cost Center field will be filled.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 8 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    9/183

    SAP ECC 6.0 End user document (PS Module)

    V. Cost Planning for Project Definition

    a) Manual Cost Planning for Project Transaction Code: CJ40

    After updating the budget for the Top-level Project Definition the Lower Level(Level 3) the Overall as well as Year-wise planned cost has to be updated.

    The authorized person does this step.

    VI. Budget Updation for Project Definition (Level 3)

    a) Manual Budget Updation for Project Transaction Code: CJ30

    After manual Cost Planning for the Lower Level (level 3) WBS Elements thebudget for the Lower Level (Level 3) the Overall as well as Year-wise planned

    cost has to be updated. The authorized person does this step.

    V. Creation of Network

    a) Create Network for Project Transaction Code: CN21

    In the initial Screen the Following things are mentioned

    Network Profile

    Network TypePlant

    MRP Controller

    In the Network Header the following things are mentioned.Network Description

    In Assignment Tab

    Select the Project Definition,which will copy the Start Date and End Date of the Project if its maintained in

    the Project Definition. These dates are considered for individual activities inthe Network. The Network activities are linked with relationship and these

    network activities will be scheduled. The Milestones or Milestone Groups are

    also used with the activities. A network can represent the sequence of

    activities in a project or the sequence of a single activity within a project. Youcan graphically display various structural elements of a project and theirinterdependencies in the Project System. During the life of a project,

    networks are used as a basis for planning, analyzing, controlling and

    monitoring schedules, dates, and resources.(such as personnel, machines,PRTs, materials, documents, and drawings)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 9 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    10/183

    SAP ECC 6.0 End user document (PS Module)

    These activities are three types 1. Internal Activities, 2. External Activities, 3.Primary Cost Activities.

    Internal Activities:Using internally processed activities you determine the amount of Workproduced by machines or persons, and use this information in resource

    planning to plan the capacity requirement.

    External Activities:

    Using external processing you determine which services are required fromother companies to carry out the project. The development of external

    processing occurs through purchasing.

    Primary Cost Activities:

    Using general costs activity you plan primary costs, for example, travel costs.

    V. Creation of Lower Level (Level 4) WBS & Release of Project

    a) Create Lower Level WBS (Level 4) & Release Project Transaction

    Code: CJ02

    In the initial Screen the Following things are mentioned

    Project DefinitionIn the WBS element Overview

    the Basic Data tab the following things are mentioned.1.Level Number (level 4)

    2. Description3 Planning Element (Tick)

    4. Account Assignment Element (Tick).

    In Responsibilties Tab5. Requesting Cost Center needs to be filled.

    Which will automatically copy the Controlling Area (CA) and RequestingCompany Code.

    if required Responsible Cost Center field will be filled.

    Select EditStatus Release.

    The authorized person does this step.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 10 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    11/183

    SAP ECC 6.0 End user document (PS Module)

    V. Creation of Purchase Requisition for Materials

    a) Create Purchase Requisition Transaction Code: ME51/ME51N.In the initial Screen the Following things are mentionedAccount Assignment Category Q

    Delivery Date

    PlantPurchasing Group

    Req. Tracking NumberRequisitioner

    In the Purchase requisition Item overview screen

    Material NumberQty. Required

    Val.TypeWBS Element

    The Purchase requisition will be saved and will be released by the approving

    authorities. The authorized person does this step.

    VI. Creation of Purchase Order for Materials

    a) Create Purchase Order Transaction Code: ME21/ME21N.

    In the initial Screen the Following things are mentioned - HeaderVendor

    Purchasing OrganizationPayment Term

    GR Message (Tick)Net Price

    In Item

    Tax code wil be selected (if any)Select the PR and Adopt the PR.

    The Purchase order will be saved and will be released by the approvingauthorities. The authorized person does this step.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 11 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    12/183

    SAP ECC 6.0 End user document (PS Module)

    VII. Create & Post Vendor Down Payment Request

    a) Create Down Payment Request Transaction Code: F-47.

    After creating the Purchase order the Down Payment (Advance) to the vendoris raised. The authorized person does this step.In the initial Screen the Following things are mentioned - Header

    Document Date

    Company CodeCurrency

    Reference & Doc. Header TextVendor Account No.

    Spl.GL indicator

    In DetailAmount, Business Area, Due On, Purchase Order No./ Item.

    The down payment request will be saved.

    b) Post out Going Payment Transaction Code: F-48/F-53.

    After creating the Down Payment request, the Down Payment request(Advance) will be called and payment will be posted. The authorized person

    does this step.

    VIII. Goods receipts for Purchase Order

    a) Create Goods Receipts Transaction Code: MIGO.

    After the Purchase order is approved the material will be received by storesat Site. The authorized person does this step.

    In the initial Screen the Following things are mentioned HeaderPurchase Order Number

    Movement Type

    Delivery Note, Header TextQuantity, Storage Location, No.of Container, etc.,

    The goods receipts document will be posted.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 12 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    13/183

    SAP ECC 6.0 End user document (PS Module)

    IX. Enter Invoice

    a) Enter Invoice Transaction Code: MIRO.

    After the material will be received by stores at Site. The authorized persondoes this step.In the initial Screen the Following things are mentioned Header

    Invoice Date

    ReferenceAmount

    If tax is there (tick) on check box (calculate Tax)Purchase Order number. After simulation the invoice Verfication document will

    be posted.

    X. External Processing Activites : for Services

    a) Change Network Transaction Code: CN22.

    In the initial Screen the Following things are mentioned Header

    Network NumberIn activities overview

    In Ext. ProcessingTick on Service

    Description, Purch.Org., Material Group,Vendor,Pur.Grp,Outline

    Agreement,Line No.Requisitioner, Req.tracking No,WBS element.Service Number, Quantity.

    Prerequisite : The Project Definition System Status should be in RELReleased mode.

    Select the Activity and Press Edit Status Release. Which will create aPurchase requisition for services with reference to the outline agreement

    entered.

    Purchase Order (Service PO ) will be created for the purchase requisition.

    When the order released for work, one PR for the services are generated. ThePO will be released by the Purchase Department. The PO Copy is given to the

    Contractor by the Projects department. On completion of the work, contractor

    brings the Joint Measurement Sheet / Bill along with the PO reference.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 13 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    14/183

    SAP ECC 6.0 End user document (PS Module)

    b) Create Service Entry Transaction Code: ML81N.

    In the initial Screen the Following things are mentioned Header

    Purchase Order Number

    When the Contractor brings the Joint Measurement Sheet / Bill for the

    certification, the quantity entered in the JMC/Bill is verified by the Shift

    Engineer and the same quantity is certified in the Service Entry Sheet. This issubject to Release Procedure (Certification by Higher Official). On

    Certification the Project gets the Cost of the Services performed.

    c) Enter Invoice Transaction Code: MIRO.

    After the service confirmation is released. The authorized person does thisstep.

    In the initial Screen the Following things are mentioned HeaderInvoice Date

    Reference

    AmountIf tax is there (tick) on check box (calculate Tax)

    Purchase Order number. After simulation the invoice Verfication document willbe posted.

    XI. Create Reservation

    a) Create Reservation Transaction Code: MB21.The stocks are maintained as Special Stocks against the WBS elements. The

    reservations are created against WBS elements. This reservation can be donein Automatically while running MRP for Projects.

    In the initial Screen the Following things are mentioned Header

    Base date (When the material is required)Movement type

    PlantIn Create Reservation Screen

    WBS elements, Material Code, Quantity, Batch Number, Goods recipient.

    The reservation is created.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 14 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    15/183

    SAP ECC 6.0 End user document (PS Module)

    XI. Goods Issue

    a) Create Goods Issue Transaction Code: MIGO/MB1A.When the Stores person saw the reservations pending for issues on that dayhe has to post the goods issue against the reservations. Creation needs to be

    done by the authorized person.

    The Following things are mentioned in the goods issue.Reservation number

    QuantityMaterial Slip.

    Document header text.

    No.of Container.The Goods Issue document will be posted.

    XII. Create Confirmations

    a) Create Confirmations Transaction Code: CN25/CN27.

    When the activities are completed, that needs to be confirmed by the users.The authorized person will do the confirmation.

    The Following things are mentioned in the goods issue.Network number

    Activity number

    Work Center, Description, Actual finish Date.If the work is fully completed then Final Comp. Otherwise completion

    indicator (tick).

    XIII. Vendor Payment

    a) Post Outgoing Payments Transaction Code: F-58.

    After Invoice is verified the payment to the vendor needs to be posted. Theauthorized person will do the outgoing payment.

    The Following things are mentioned in the outgoing payment.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 15 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    16/183

    SAP ECC 6.0 End user document (PS Module)

    XIV. Project Settlement

    a) Actual Settlement Transaction Code: CJ88/CJ8G.This settlement will be run on periodic basis (every end of month). Theauthorized person will do the actual settlement.

    The Following things are mentioned in the actual settlement.

    Project DefinitionWith Hierarchy (tick)

    With Order (tick)Settlement Period

    Fiscal Year

    Test runDetail List

    Check. Trans.dataThe actual consumption against the Project/ Network will be settled to the

    WBS elements.(AUC) asset Under Construction.

    b) Create Complete Asset Transaction Code: CJ02.

    After getting the confirmation from the Project Department that the Project iscommissioned and handed over to the Production department for use. The

    authorized person will do the completed Asset creation.

    The Following things are mentioned in the Create Complete AssetProject Definition

    Select the WBS elements and Extras

    Create Completed Asset.In Asset Create Screen

    Asset Class (sub Asset if required)Description

    Vendor & Manufacturer

    Asset Pur. New (tick)Purchase Used (tick)

    Group Asset / Sub NumberNeg. value Allowed (tick)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 16 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    17/183

    SAP ECC 6.0 End user document (PS Module)

    c) Actual Settlement Transaction Code: CJ88/CJ8G.This settlement will be run after getting the confirmation from the Project

    Department that the Project is commissioned and handed over to the

    Production department for use. The authorized person will do the completedAsset creation.The Following things are mentioned in the actual settlement.

    Project Definition

    With Hierarchy (tick)With Order (tick)

    Settlement Period, Posting PeriodFiscal Year, Asset Value date

    Test run

    Detail ListCheck. Trans.data

    XIV. Project Closure

    a) Change Network Transaction Code: CN22.Select all the Activities in the Network and select Edit Status Close.

    b) Change Project Transaction Code: CJ02.

    Select all the WBS elements in the Project Definition and select Edit Status Close.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 17 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    18/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 18 of 183

    Create Investment Program

    /Position ID

    (By Finance)

    Approve Appropriation Request(By Approving Authorities)

    SBWP/ IMA12

    Activate Project & Allocate Budget(By Finance)

    IMA12/IM52

    Create WBS up to 3 Level

    (By Projects)

    CJ02

    Allocate Budget for Level 3

    (By Finance/Projects)CJ40 / CJ30

    Create Lower Level WBS elements(By Projects)

    CJ02

    Create Appropriation Request

    (By Projects)

  • 8/6/2019 Copy of Enduser Document for PS

    19/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 19 of 183

    Create PR/Release PR

    (By Projects/Approving

    Authorities)(ME51/ME55)

    Goods Receipts

    (By Stores )MIGO

    Create Reservation

    & Goods Issue(By Projects / Stores)

    MB21 MIGO

    Create Service PR /Release PR

    (By Projects/App.Autho.)

    Create Service PO/Release PO

    (By Purchase/App.Autho.)

    ME21N/ME28

    Create Service Entry/Approve

    (By Projects/App.Autho)ML81N/ML85

    Create PO/Release PO(By Purchase/Approving

    Authorities)ME21N/ME28

  • 8/6/2019 Copy of Enduser Document for PS

    20/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 20 of 183

    Create Confirmation

    (By Projects)CN25/CN27

    Create Completed Asset

    (By Finance)CJ02

    Network System Status as

    CLSD(Closed)

    (By Projects / Finance)CN22

    Actual Settlement (Automatic)

    (By Finance) CJ88/CJ8G

    Projects Definition System Status as

    CLSD(Closed)

    (By Projects / Finance)CJ02

  • 8/6/2019 Copy of Enduser Document for PS

    21/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Create Investment ProgramTransaction CodeIM01

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    Receipt of Intimation from Management or the Financial Year Change.

    Business Process Procedure Overview Creation of Capital Investment Program

    Via Menus Accounting Investment Management Program Master Data

    Investment Program Definition Create.

    Via Transaction Code IM01

    Input - Required Fields* Field Value / Comments

    Investment Program Type the Description of the Investment Program e.g. Shasun Investment

    Approval YearType the financial year e.g. 2007

    Program Type Select the option from the list e.g. ZSCD Capital Investment Program

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system.

    Output Results CommentsCreation of Investment Program

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 21 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    22/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Create Investment Program transaction by:

    Via Menus Accounting Investment Management Program Master Data Investment Program Definition Create.

    Via Transaction Code IM01

    1.2. On screen Create Inv. Program Definition: Header Screen, enter information in the fields in the tablebelow:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 22 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    23/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    InvestmentProgram

    Investment Program R Type the Description of the InvestmentProgram e.g. Shasun Investment 07-08

    Approval Year Approval Year R Type the financial year e.g. 2007

    Program Type Program Type R Select from the list ZSCD or ZSRD.Based on the Project for Capital

    Expenditure or Research & Development

    Program

    Description

    Investment Program Description R Type Investment Program Description

    FI Variant Fiscal Year Variant R Select the option from the list e.g. V3 April March.

    Currency Currency R Company code Currency INR.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Press Ctrl + S or Save Button from the Screen

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 23 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    24/183

    SAP ECC 6.0 End user document (PS Module)

    Title:Create Investment Program Top

    Position

    Transaction Code

    IM11

    Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate

    SAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After Creating the Capital Investment Program.

    Business Process Procedure Overview

    Creation of Capital Investment Program Top Position.

    Via Menus Accounting Investment Management Program Master Data Investment Program Position Create Top Position.

    Via Transaction Code IM11

    Input - Required Fields* Field Value / Comments

    Investment Program Type the Description of the Investment Program e.g. SHA0708

    Position ID Type the Top level Position ID. e.g. SHASUN Investment 2007-08

    Approval Year Type the financial year e.g. 2007

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsCreation of Investment Program TopPosition.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 24 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    25/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Create Investment Program transaction by:

    Via Menus Accounting Investment Management Program Master Data

    Investment Program Position Create Top Position.Via Transaction Code IM11

    1.2. On screen Create Inv. Program Position : Header Screen, enter information in the fields in the tablebelow:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 25 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    26/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    InvestmentProgram

    Investment Program R Type the Description of the InvestmentProgram e.g. Shasun Investment 07-08

    Position ID Top Position ID R Type the Top level Position ID. e.g.Shasun Investment 07-08

    Approval Year Approval Year R Type the financial year e.g. 2007

    Position IDDescription

    Top Position ID Description R Type the Description of the Top Position

    ID.

    CO Area Controlling Area R Select the option from the list e.g.1000

    Company Code Company Code O Select the option from the list e.g.9000

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Press Ctrl + S or Save Button from the Screen

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 26 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    27/183

    SAP ECC 6.0 End user document (PS Module)

    Title:Change Investment Program

    Structure

    Transaction Code

    IM22

    Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate

    SAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After Creating the Capital Investment Program Top Position.

    Business Process Procedure Overview

    Creation of Capital Investment Program Top Position.

    Via Menus Accounting Investment Management Program Master Data Investment Program Structure Change.

    Via Transaction Code IM22

    Input - Required Fields* Field Value / Comments

    Investment Program Type the Description of the Investment Program e.g.SHA0708.

    Position ID Type the Top level Position ID. e.g. SHASUN INVESTMENT 2007-08

    Approval Year Type the financial year e.g. 2007

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsCreation of Investment ProgramStructure.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 27 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    28/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Change Inv. Program Structure transaction by:

    Via Menus Accounting Investment Management Program Master Data

    Investment Program Structure Change.Via Transaction Code IM22

    31 3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in thetable below:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 28 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    29/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 29 of 183

    Click on Create

  • 8/6/2019 Copy of Enduser Document for PS

    30/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    InvestmentProgram

    Investment Program R Type the Description of the InvestmentProgram e.g. SHA0708

    Position ID Top Position ID O Type the Top level Position ID. e.g.Shasun Investment 07-08.

    Approval Year Approval Year R Type the financial year e.g. 2007

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Press Ctrl + S or Save Button from the Screen

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 30 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    31/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Edit Original BudgetTransaction CodeIM32

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After creating the Investment Program Structure the company Level Budget needs to beupdated.

    Business Process Procedure Overview Edit Original Budget for the Company.

    Via Menus Accounting Investment Management Program Budgeting EditOriginal.

    Via Transaction Code IM32

    Input - Required Fields* Field Value / Comments

    Investment Program Type the Description of the Investment Program e.g. Shasun Investment 07-

    Position ID Select the Position ID from the List.

    Approval Year Type the financial year e.g. 2007

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsCompany level Budget is updated.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 31 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    32/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Change Inv. Program Structure transaction by:

    Via Menus Accounting Investment Management Program Budgeting Edit

    Original.

    Via Transaction Code IM32

    31 3.1. On screen Change Inv. Program Structure: , enter information in the fields as specified in thetable below:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 32 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    33/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 33 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    34/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 34 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    35/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    InvestmentProgram

    Investment Program R Type the Description of the InvestmentProgram e.g. SHAN0708.

    Position ID Top Position ID O Type the Top level Position ID. e.g.Shasun Investment 07-08

    Approval Year Approval Year R Type the financial year e.g. 2007

    Enter the Amount to be Invested foreach Position ID Overall and

    Yearwise Values. And

    Click on Edit Select Select All.

    Click on Edit Total up.Select Annual Values & Total Value.

    Click on Continue or Enter.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Overall and the year wise budget needs to be updated, system will generate a Budget update document.

    Press Ctrl + S or Save Button from the Screen

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 35 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    36/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Create Appropriation RequestTransaction CodeIMA11

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    Receipt of Intimation from Management or the Basic User Specifications from User Department and QASpecifications from QA Department.

    Business Process Description Overview Creation of Project Appropriation Requests.

    The Proposed Project Appropriation Request Numbering system is same as Project Numbering, will be based on

    External Alphanumeric numbering and as follows :

    First Character will represent CAP to represent the categories of Projects, and remaining 4 characters are

    numerals.e.g. CAP-07-P02-EXPANS represents Capital Expenditure related Project with Code No. EXPANS.

    Via Menus Accounting Investment Management Appropriation Requests EditAppropriation Requests Individual Processing.

    Via Transaction Code IMA11

    Input - Required Fields* Field Value / Comments

    Press Create button from the Screen

    Appropriation Request Type Select S1 from the given list by drill down search method.

    Controlling Area Type 1000 and then Press Create button from the Screen or SelectCreate from the

    Appropriation Request Select from the Open Number. Find the next Open Number by giving theStarting Number.If the Project is related to Capex then you have to give the ProjectCoding Logic As defined CAP-00-XXX-XXXXXX-00-000.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system.

    Output Results Comments

    Creation of Appropriation Request forthe requested Project.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 36 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    37/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Create Appropriation Request transaction by:

    Via Menus Accounting Investment Management Appropriation Requests Edit Appropriation Requests Individual Processing.

    Via Transaction Code IMA11

    31 3.1. On screen Create Appropriation Request: , enter information in the fields as specified in the tablebelow:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 37 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    38/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 38 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    39/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    Controlling Area Controlling Area R Type 1000 and then Press Create buttonfrom the Screen or Select Create from theMenu.

    Appropriation RequestType

    R Select S1

    Project Profile Project Profile R Select ZP00001 for Capital InvestmentProjects.

    Appropriation Request Enter the Appropriation Request Number asper the Project Coding Logic

    CAP-00-XXX-XXXXXX-00-000.Then type the Description of Project.``

    General DataReason for Investment

    EnvironmentInvestment

    Scale

    R

    C

    O

    Select the reason for investment from thegiven list. If the selected reason is forEnvironmental Protection thenSelect the Environment Investment from thegiven list.Select the Scale from the given list

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 39 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    40/183

    SAP ECC 6.0 End user document (PS Module)

    PriorityApproval YearPlanned Approval Date

    Person InvolvedIM : Proposed By :

    (Partner field)IM : Supported By :(Partner field)IM : Supported By :IM : Approved UnitHead :IM : ApprovedFinance

    RO

    O

    R

    R

    Select the Priority from the given list.Type the Approval year of the Project.

    Select the date of approval.

    Select the Name of the Applicant (ProjectManager) from the Given List.Select the Name of the Authorization Level(Finance ) from the given List.PRESS ENTER.

    As per tApprovAuthoriWe haveselect tapproviAuthori

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 40 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    41/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 41 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    42/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    Control Data :Investment Program

    Position ID

    R

    R

    Select SHA0708 from the given List. Year

    defaulted from the Program.

    Select the required Structure where theProject is going to Come.

    e.g. Shasun Investment R&D

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 42 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    43/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 43 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    44/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comments

    Org. Units :Req. Cost Center

    Plant

    Location

    Resp.Company

    R

    RO

    O

    Select the Requesting Costs centerfrom the Existing Cost centers if thecost centers are available in thatparticular plant. If the cost centers arenot there then It has to be created forthat particular plant.

    Press ENTERAll other fields are automatically copiedfrom the standard profile Setting.Select the required plant from the Given

    List.Select the required Location from theGiven List.Select 1000 From the given List

    User Defined Fields

    Nature of Exp Nature of Expenditure

    R Select the required entry from the givenlist. DISPOSAL-,DisposalLEASE , -LeasePURCHASE - PurchaseTRANSFER - Transfer

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 44 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    45/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values CommeVariants

    General Data:Completion Date Project Completion Date.

    REnter Approximate Date of ProjectCompletion

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 45 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    46/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 46 of 183

    Click on Create CostEstimate

    Click on Show/Hide Item View

  • 8/6/2019 Copy of Enduser Document for PS

    47/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 47 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    48/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comme

    VariantsPlan Values:

    Item Cat M Material R Select the Item Category from the List Mor N or V as per the Requirement.

    Only Mor Vshould used.

    Item Cat N Service R

    Item Category

    o M for Material

    o V for other costs like manpower, QC etc. The cost element for V

    should be 7100150

    Resource is where we select the RM name. The master would be

    entered by the Purchase person. This is not required for RM. Enter

    Quantity & hit enter. For V change the description to suit us.

    Go Back or press F3. The total budget for the year 2007 (as the

    investment planned is for 2007) would appear as shown below. Savethe Appropriation request.

    Note: We would define the cost for 1 year and if the project spills over to the

    next year the remaining budget would also spill over.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 48 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    49/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 49 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    50/183

    SAP ECC 6.0 End user document (PS Module)

    Select the project in the left side of the screen and go to Approp.

    Request Menu and select the change option.

    Go to Control data Tab and click Form approval. The Appropriation

    Request needs to be sent for approval. Save the Appropriation Request.

    Press Ctrl + S or Save Button from the Screen

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 50 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    51/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Change Appropriation RequestTransaction CodeIMA12/SBWP

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    After Creating of Project Appropriation Request and its sent for Approval.

    Business Process Description Overview

    Releasing the of Project Appropriation Requests.

    The Authorized person whose name is mentioned in the Appropriation Request (IM : Authorization Partner field) wi

    have the authorization to Release the Appropriation Request.

    Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.

    Via Transaction Code IMA11/ IMA12 / SBWP

    Input - Required Fields* Field Value / Comments

    Appropriation req. No. Select the Appropriation Request Number to be Released from the list.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..

    Output Results CommentsRelease Appropriation Request of the requestedProject.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 51 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    52/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Appropriation Request Individual Processing transaction by:

    Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.

    Via Transaction Code IMA11/ IMA12

    1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 52 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    53/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 53 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    54/183

    SAP ECC 6.0 End user document (PS Module)

    System Will show the Display Mode of the Appropriation Request sent for Approval.In case of any further requirement on the same Appropriation Request press BACK.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 54 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    55/183

    SAP ECC 6.0 End user document (PS Module)

    Click on Create Attachment.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 55 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    56/183

    SAP ECC 6.0 End user document (PS Module)

    Click on SAVE and BACK Button.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 56 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    57/183

    SAP ECC 6.0 End user document (PS Module)

    Click on APPROVE.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 57 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    58/183

    SAP ECC 6.0 End user document (PS Module)

    Now Inbox Workflow will be blank.There will be a mail which goes to the Person Who has created the Appropriation Request. Which he

    can check in his login through the Transaction code SBWP INBOX Documents.Transaction Code : SBWP

    Field Name Description R/O/C User Action and Values Comments

    Select In Box SAP Business

    Work Bench

    R Select the Inbox Workflow

    Press Execute Button.

    Transaction Code : IMA11

    Field Name Description R/O/C User Action and Values Comments

    WorklistOff / On

    R Toggle the Work list Button ON if it is OFF.Select the Project Name from the Work-list whichwas created by you.

    e.g. P-0001.Select the Change Button which is appearinglike Pencil in the screen.Or select the Appropriation Request from theMenu and select Change Option.

    AssignmentProject R Select the Project Field.

    General DataStatus R Select Approve.

    System givesmessage thathe

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 58 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    59/183

    SAP ECC 6.0 End user document (PS Module)

    AppropriationRequest isapproved.

    AssignmentWBS Element R Select the WBS Element Field.

    Systemautomatically

    copies theProject Codee.g. : M-001

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 59 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    60/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Activate Project DefinitionTransaction CodeIMA11

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    After Approval of Project Appropriation Request & Activation of Project Definition.

    Business Process Description Overview

    Activating the Project Definition.

    The Authorised Person who is responsible for Activating the Project Definition will do this Transaction.

    Input - Required Fields* Field Value / Comments

    Appropriation Request Select the Appropriation Request for which Project Definition needs to be activated..

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..

    Output Results CommentsThe Budget is Distributed for the Appropriation

    Request of the requested Project.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 60 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    61/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Appropriation Request Individual Processing transaction by:

    Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.

    Via Transaction Code IMA11/ IMA12

    1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:

    Field Name Description R/O/C User Action and Values CommentsMeasure / Assets

    Project Activate project R Click on Project .

    WBS Element Work Break Down StructureElement

    R Click on WBS Element

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 61 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    62/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 62 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    63/183

    SAP ECC 6.0 End user document (PS Module)

    Click on Continue or Tick Mark.System will propose that Copy the Planned Values

    Click on Tick or Press Enter.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 63 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    64/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 64 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    65/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 65 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    66/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Budget DistributionTransaction CodeIM52

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    After Approval of Project Appropriation Request & Activation of Project Definition.

    Business Process Description Overview

    Budget Distribution for the Project.

    The Person who is responsible for Budget Distribution will have the authorization to Distribute the Budget.

    Input - Required Fields* Field Value / Comments

    Investment Program Select the Investment Program from the List.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..

    Output Results CommentsThe Budget is Distributed for the AppropriationRequest of the requested Project.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 66 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    67/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Budget Distribution transaction by:

    Via Menus Accounting Investment Management Programs Budgeting Budget Distribution Edit

    Via Transaction Code IM52

    1.1 On screen Budget Distribution : Header Screen, enter information in the fields in the table below:

    Field Name Description R/O/C User Action and Values CommentsInvestment Program The Investment Program R Select the Investment Program

    SHA0708 from the Given List.

    Press Enter.Select Execute option from the Menu orSelect the Clock Button in the Screen.

    Original Budget Original Budget to be distributedFor the Project.

    R Enter the amount to be distributed for theProject as Budget. e.g. CAP-2007-P02-EXPAN.

    Annual Overview R Select Annual Overview from theScreen and Enter the Original Budgetdistributed for that Project.

    Select Save Button from the Screen orSave from the Menu.

    System will display thmessage that

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 67 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    68/183

    SAP ECC 6.0 End user document (PS Module)

    Document xxxxxxxxxposted.

    Press Green Colour with Arrow Button/ Back and come out of the Screen.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Enter the Overall / year Wise Budget for the Appropriation Request / Project Definition

    Click on EDIT COPY VIEW Select the Planned total

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 68 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    69/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 69 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    70/183

    SAP ECC 6.0 End user document (PS Module)

    Select the Annual Year : 2007

    Click on EDIT COPY VIEW Select the Planned total

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 70 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    71/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 71 of 183

    Check onCHECK

  • 8/6/2019 Copy of Enduser Document for PS

    72/183

    SAP ECC 6.0 End user document (PS Module)

    Click on check button and Save the system will generate the Budget document.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 72 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    73/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Release Appropriation RequestTransaction CodeIMA11

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    After Activation of Project Definition and Budget Updating for the Appropriation Request.

    Business Process Description Overview

    Release Appropriation Request.

    The Person who is responsible for Release Appropriation Request will have the authorization to Release the

    Appropriation Request.

    Input - Required Fields* Field Value / Comments

    Appropriation Request Select The Appropriation Request to be released.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..

    Output Results Comments

    The Appropriation Request should be released..

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 73 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    74/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Appropriation Request Individual Processing transaction by:

    Via Menus Accounting Investment Management Appropriation Requests Edit AppropriationRequests Individual Processing.

    Via Transaction Code IMA11/ IMA12

    1.0 On screen Change Appropriation Requests : Header Screen, enter information in the fields in the tablebelow:

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 74 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    75/183

    SAP ECC 6.0 End user document (PS Module)

    Click on RELEASE. And click on SAVE.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 75 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    76/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Change Project DefinitionTransaction CodeCJ02/CJ20N

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Finance 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    Trigger:

    After the Approved Budget Appropriation Request form.

    Business Process Description Overview

    The project Lower Level WBS Elements has to be created. (Up to Level 3)

    Via Menus Logistics Project System Project Spl. Maintenance FunctionWork Break DowStructure (WBS) ChangeLogistics Project System Project Project Builder

    Via Transaction Code CJ02 /CJ20 N

    Input - Required Fields* Field Value / Comments

    Project Definition. Find the next Project number by pressing F4 button in this field and then Type theProject Definition Number.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration of your system..

    Output - Results Comments

    Upto Level 3 WBS elements will be created.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 76 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    77/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    1.0 On screen Change Project Definition : Header Screen, enter information in the fields in thetable below:

    Field Name Description R/O/C User Action and Values Comments

    Project Definition Select Project Definition from the

    ScreenResponsible Person The person (Project

    Manager ) who isResponsible for thatProject.

    R Select the Name of the ProjectManager who is responsible for thatProject from the given list.

    Applicant No. The User Department whorequested to do the Project.

    O Select the Name of the RequestedUser Department from the givenlist.

    Start Date Start date of the Project R Type the start date or Select the Startdate of Project from the Calender.

    This dateswill bedefaultedfromAppropriationRequest

    End Date End Date of the Project R Type the End date or Select the Enddate of Project from the Calender.

    This dateswill bedefaultedfromAppropriation

    Request

    Company Code Company Code R Select the company code from thelist

    Business Area Business Area R Select the Business Area from theList

    Plant Name of the Plant where theProject is going to take place

    R Select the Name of the Plant wherethe Project is going to take place.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 77 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    78/183

    SAP ECC 6.0 End user document (PS Module)

    Profit Center Profit Center R Select the Name of the Profit Center whereProject is going to take place.

    Location Name of the Location wherethe Project is going to takeplace

    O Select the Name of the Locationwhere the Project is going to take place.

    Mask ID O Type ++++++ after two spaces from theBeginning of the Field.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 78 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    79/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comments

    Level WBS Level Number R Enter 2

    WBS Element WBS Element R Enter @-01

    Description WBS Description R Enter the WBS Description CIVIL As requiredby the ProjectEngineers.The Project

    Structuringneeds to becreated.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 79 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    80/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Change Cost PlanningTransaction CodeCJ40

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After creating the Lower Level (3) WBS elements under the Project Definition.

    Business Process Procedure Overview Manual Cost Planning for the Lower Level WBS elements

    Via Menus Logistics Project System Financials Planning Cost in WBS

    Overall Values Change.

    Via Transaction Code CJ40

    Input - Required Fields* Field Value / Comments

    Project Definition Select the project definition from the list.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsManual Cost Planning for the ProjectDefinition will be done.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 80 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    81/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Change Cost Planning transaction by:

    Via Menus Logistics Project System Financials Planning Cost in WBS

    Overall Values Change.

    Via Transaction Code CJ40

    1.2 On screen Change Cost Planning : Initial Screen, enter information in the fields in the table below:

    Give the Project Definition and Click on Cost Planning

    Enter the Manual Cost planning for Overall and Annual.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 81 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    82/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 82 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    83/183

    SAP ECC 6.0 End user document (PS Module)

    Click on Edit Total Up.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 83 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    84/183

    SAP ECC 6.0 End user document (PS Module)

    Tick on Annual and Total Value.

    Field Name Description R/O/C User Action and Values Comments

    Project Definition Select Project Definition from the

    Screen

    Overall & Year

    wise budgetneeds to beupdated.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C =Conditional)

    Click on Save.After saving this the User needs to send an SAP Mail to Budgeting Department to

    Update the Cost Planned to Budget.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 84 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    85/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Change Original BudgetTransaction CodeCJ30

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After creating the Manual Cost planning for the Lower Level (3) WBS elements under the

    Project Definition.

    Business Process Procedure Overview Manual Cost Planning for the Lower Level WBS elements

    Via Menus Logistics Project System Financials Budgeting Original Budget Change.

    Via Transaction Code CJ30

    Input - Required Fields* Field Value / Comments

    Project Definition Select the project definition from the list.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsBudget for the Lower Level WBSelements (level 3 ) for the ProjectDefinition will be done.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 85 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    86/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Change Original Budget transaction by:

    Via Menus Logistics Project System Financials Budgeting Original Budget Change.

    Via Transaction Code CJ30

    Field Name Description R/O/C User Action and Values Comments

    Project Definition Select Project Definition from the

    Screen

    Overall &

    Yearwisebudget needsto be updated.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C =Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 86 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    87/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 87 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    88/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 88 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    89/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 89 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    90/183

    SAP ECC 6.0 End user document (PS Module)

    Save the Document System Generate the Budget document Posted.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 90 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    91/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Create NetworkTransaction CodeCN21

    Document No. Responsibility Version Supercedes Issue

    d on

    Effective

    Date

    Review

    DateSAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    After creating the Project definition for the activities this Network will be created.

    Business Process Procedure Overview For all the Project related activities (Internal /External) network will be created.

    Via Menus Logistics Project System Special Maintenance Function Network Create.

    Via Transaction Code CN21

    Input - Required Fields* Field Value / Comments

    Network Profile Select the network profile from the list. e.g. Network profile

    w/Acct.asst(SCDL)

    Network type Select the network Type

    Plant Select the plant

    MRP Controller Select the MRP Controller for Project

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsNetwork will be created.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 91 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    92/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Create Network transaction by:

    Via Menus Logistics Project System Special Maintenance Function Network

    Create.Via Transaction Code CN21

    Field Name Description R/O/C User Action and Values Comments

    Network Profile Network Profile R Select the Network Profile ZP00003 Network Profile W/a Assign(SCDL)

    The user has toselect only thisnetwork Profile

    Network Type Network Type R Select ZP02 Network with activityassignment(SCDL) from the list

    The user has toselect only thisnetwork type

    Plant Plant R Select the Plant Where the Projectis going to be implemented.

    MRP Controller MRP Controller R Select 006 PROJECT MRP The user has toselect 006 only.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 92 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    93/183

    SAP ECC 6.0 End user document (PS Module)

    After Giving Project Definition Click on SAVE Button.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 93 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    94/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 94 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    95/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comments

    Network Description of Network R Type the name of the Network, with

    reference to the Project definitionwhich will help you in future forreference and easy search.

    Scheduling

    Scheduling Type R

    Please ensure that the Scheduling

    Type must be in Backward type.

    For all our Projects end

    date is fixed. Becauseof this we are usingthe Backwardscheduling type.

    Assignment

    Project Def. Project Definition R

    Type the Required Project Definition

    for which this Network is to belinked..

    Give YES

    System will prompt

    you whether It has tocopy the WBS elementDates which you havementioned in theProject Definition.System will promptyou that the Dates

    copied from the ProjectDefinition.

    (Note: On above table

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 95 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    96/183

    SAP ECC 6.0 End user document (PS Module)

    , in column R/O/C: R = Required, O = Optional, C = Conditional)

    If you see the Scheduling Field, the Start date and the End date of the Project will be copied in that fields.

    Select the Activity Overview Button from the Screen or go to option from the Main Menu and select the Activity OverviewOption or Press F7.

    Field Name Description R/O/C User Action and Values Comments

    Network No. Network Number. R Type the Network No, for whichActivities and duration has to beentered.

    Select the Activity Overview Buttonfrom the Screen or Goto Option

    Activity overview option from theMain menu or F7.

    System will takes youto Change NetworkBasic Data Overview(basic Dates)

    Description Description of theActivities

    R Type the Description of theActivities required for the Projectsone by one. (row by row ).

    Normal Duration Normal RequiredDuration for the Activity

    R Type the Required Duration for allthe activities (time taken tocomplete the Activity. In days)

    WBS Element WBS elementCorresponding to the

    Activities

    R Assign the Corresponding WBS elementTo the Activities to Capture the Costs

    System will generatethe Settlement Rule for

    that Activities.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 96 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    97/183

    SAP ECC 6.0 End user document (PS Module)

    1.2 On screen Create Network Basic Data Overview (basic Dates ) Screen, enter information inthe fields in the table below:

    Select the Activities for which the Milestones are Attached.Select the Milestone Overview Button from the Screen or Activity option Milestone Overviewoption from the Main menu.

    Field Name Description R/O/C User Action and Values Comments

    Usage The Person who isresponsible forconfirming thisMilestone

    R Type the Person responsible orselect the responsible person fromthe given Usage list.

    Description Description of theMilestone

    R Type the Description of theMilestone to be confirmed

    System will automaticaset the Scheduled datetodays date.

    Group R Type CHEM, INST, PURC,ELEC, CIVL or MECH this fieldsdecides which person will confirmthis Milestone.

    Fixed Date R If the Milestone has to be confirmedin particular fixed date then typethat particular fixed date in thisfield.

    Fin. Off. Finish to Offset R Tick this field if you want to set theMilestone to the finish date of the activity.e.g. shown in the figure.

    If this field Indicator tickthere then the system wautomatically set thismilestone in the finish d

    activity.Offset Number of day of Offsetof

    Milestone.

    R If you want to set the milestone toThe required number of days.e.g. 2 day

    Offset Unit Unit of Offset of

    MilestoneDate

    R Type the unit of offset field.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 97 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    98/183

    SAP ECC 6.0 End user document (PS Module)

    1.3 On screen Create Network Milestone Overview Screen, enter information in the fields in thetable below:

    If you want to insert a Group of Milestones then select the Milestone Group from the given Listof Groups.

    If you want to insert a Standard Milestone select the Standard Milestone from the given List.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 98 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    99/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 99 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    100/183

    SAP ECC 6.0 End user document (PS Module)

    1.4 On screen Create Network Basic Data Overview (basic dates ) Screen, enter information inthe fields in the table below:

    Select the Activity Element Overview button from the Screen or Activity option ElementOverview option from the Main menu or Ctrl +Shift + F10 .

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 100 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    101/183

    SAP ECC 6.0 End user document (PS Module)

    Field Name Description R/O/C User Action and Values Comments

    InternalProcessingDescription

    Description of WorkCenter Work

    R Type the Work center name withword Work e.g. Managers Work.

    Work No. of hours to Work R Type the Number of hours of theWork center to work.

    Work Center Name of the Workcenter

    R Type the Work center related toProject or select the Work Centerfrom the given list. (drill downsearch option ) andPress Enter.

    Activity Type System will automaticalpicks up the Activity typfrom the setting.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    1.5 On screen Create Network Basic Data Overview (basic dates ) Screen, enter information inthe fields in the table below:Select the External processing button from the Screen.

    Field Name Description R/O/C User Action and Values Comments

    ExternalProcessing

    Service

    Indicator for ExternalService requirement

    R Tick this f ield i f you want to dosome external service activities e.g.

    Civil Construction, MechanicalErection etc.,

    Description Description of theService

    R Type the description of the Servicewhich are to be done.

    Purchase org. Name of the PurchaseOrganization

    R Type the name of the PurchaseOrganization. e.g. for engineeringpurchase EB01.

    Cost Element Cost Element for whichthe cost has to bebooked

    R Enter the required cost element forwhich the cost for this service hasto be booked.

    WBS Element WBS element for which

    the external service.

    R Assign the corresponding WBS

    element for the External Service forwhich cost has to be captured forthe Project.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 101 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    102/183

    SAP ECC 6.0 End user document (PS Module)

    e.g. Contractors Costs.

    Outline-agreement Contract Number. O Select and Assign the requiredOutline agreement number from thegiven list.

    Agreement item Item number O System will automatical

    set this field from theoutline-agreement.

    Material Group R In case any material group is therethen select from the given list. (drilldown search)

    Planned Delivery

    time

    Time taken to complete

    the Activity.

    R Type the required time taken to

    complete the external processingactivities.

    Purchase Group Name of the PurchaseGroup

    R Enter the Name of the PurchaseGroup or select from the given list(drill down search method).

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Select the an activity or group of activity by clicking the above said green colour button from the screen. Thesystem will display the following Screen.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 102 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    103/183

    SAP ECC 6.0 End user document (PS Module)

    1.6 On screen service Specifications : External Specs. F.Task List Maintain Screen, enter information the fields in the table below:

    Field Name Description R/O/C User Action and Values Comments

    Service Number Service Number R Select the required service to bemade by the Vendor by drill down

    search from the Service master.

    System will automaticalpicks up the short text

    from the service masterQuantity No. of Quantity R Enter the number of quantity to be

    done by the external servicecontractor.e.g. Cable laying 1.5 sq mm - 5

    mtrs

    Cost Element Cost Element for whichthe cost has to bebooked

    R Enter the required cost element forwhich the cost for this service hasto be booked.

    Contract Number Contract Number withthe external Vendor.

    R If there is any contract existingthen u have to specify that contractnumber.

    Item Contract Number Item R Enter the Item Number of the

    Contract.

    System will automatical

    sets the short text fromthe contract.

    Overall Limit Overall Costs limit forthis contract R Enter the Overall limit for thecontract which includes unplanned

    service costs also.

    Expected Value Expected Value for theservices.

    R Enter the expected cost limit forthis contact at which all the plannedservice costs can be posted.

    No Limit Indicator for theContract without CostLimit

    R If this indicator is set then the valuefor the contract is unlimited.

    Other Limit R If this activity has unplanned

    services that unplanned costs limit

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 103 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    104/183

    SAP ECC 6.0 End user document (PS Module)

    has to be entered in this field.

    (Note: On above table, in column R/O/C: R = Required, O = Optional, C = Conditional)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 104 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    105/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Change Project DefinitionTransaction CodeCJ20/CJ20N

    Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate

    SAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    The Asset wise WBS elements has to be created and Project definition has to be released.

    Business Process Procedure Overview Asset wise WBS elements has to be created and Project definition needs to be released.

    Via Menus Logistics Project System Project Spl. Maintenance Function Work Break Down Structure (WBS) ChangeLogistics Project System Project Project Builder

    Via Transaction Code CJ02 /CJ20 N

    Input - Required Fields* Field Value / Comments

    Project Definition Select the Project Definition for which the Asset wise WBS elements needs tobe created.

    Some of the fields mentioned in the following may not be in your entry screen. This depends on the configuration ofyour system..

    Output Results CommentsThe Assetwise WBS elements will becreated & Project is released.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 105 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    106/183

    SAP ECC 6.0 End user document (PS Module)

    Procedural Steps

    Access Change Project definition transaction by:

    Via Menus Logistics Project System Project Spl. Maintenance Function

    Work Break Down Structure (WBS) ChangeLogistics Project System Project Project Builder

    Via Transaction Code CJ02 /CJ20 N

    Field Name Description R/O/C User Action and Values Comments

    Project Definition Select Project Definition from theScreen to Release.

    Select EDIT SELECT SELECT ALL from the Main Menu.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 106 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    107/183

    SAP ECC 6.0 End user document (PS Module)

    Select EDIT STATUS RELEASE from the Main Menu.

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 107 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    108/183

    SAP ECC 6.0 End user document (PS Module)

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 108 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    109/183

    SAP ECC 6.0 End user document (PS Module)

    Title: Create Purchase RequisitionTransaction CodeME51/ME51N

    Document No. Responsibility Version Supercedes Issued on EffectiveDate ReviewDate

    SAP/EUD/PS/01 Projects 001 NIL

    Prepared by Reviewed by Approved by

    V.Ananthapadmanaban

    10.03.2008

    2.1 Trigger

    1. Direct requirements from a project, cost center , sales order or work order

    Business Process Description Overview

    A requisition defines the need for a material or service. It is the primary instrument for identifying materials orservices that must be either procured outside the company or manufactured internally. It authorizes the Purchasingdepartment to purchase materials in specific quantities within a specified time frame. It is an internal document andis not used outside of the company.

    Requisitions can be created for materials with or with out a material master. When creating the requisition with amaterial master,The part number must be referenced, and a flag must be placed in the account assignment field. This will bring upa pop-upwindow to assign the material to an account.

    Requisitions do not need a material master. If processing a requisition for material that does not have a materialmaster, the

    account assignment must be flagged with the proper key to charge the item to a cost center, project, or an order.

    Input - Required Fields Field Value / Comments

    Document Type Type of requisition (NB)

    Delivery date date item is required

    Plant Plant requiring material

    Purchasing Group Buyer or group that will purchase material

    Account assignment A flag that determines the account where financial transactions arecharged.

    Output - Results Comments

    Approved requisitions Authorization to Purchasing department to proceed with purchase

    Solution/ Release: MySAPERP2004 (ECC6.0) Page 109 of 183

  • 8/6/2019 Copy of Enduser Document for PS

    110/183

    SAP ECC 6.0 End user document (PS Module)

    Tips and Tricks

    When you enter the item category, account assignment, delivery date, plant, storage location, Purchasing

    group, material group on the initial overview screen, this information defaults to each item number on the itemscreen eliminating duplication of typing effort. In the item screen any of these fields can be changed using a

    requisition tracking number or entering a requisitioner allows grouping for easy monitoring. If you specify anaccount assignment, do not reference a storage location, because the item is being charged off and will not gointo inventory.

    Set up the user defaults for each user to force the system to plug in default data, i.e. plant, purchasing

    organization.

    Procedure Steps

    31 1.1.Access transaction by:

    Via Menus LogisticsMaterials Management PurchasingPurchase RequisitionCreate

    Via Transaction Code ME51/ME51N

    1.2. On screen Create Purchase Requisition: Initial Screen: enter information specified in thetable below:

    Transaction Code : ME51

    Solution/ Release: MySAPERP2004 (ECC6.0) P