coordination of es w.r.t. terrestrial stations and ... · terrestrial stations and notification 1...

42
Coordination of ES w.r.t. terrestrial stations and Notification 1 ITU Regional Radiocommunication Seminar for the ASIA&PACIFIC Apia, Samoa 19-23 September 2016

Upload: hoangdang

Post on 20-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Coordination of ES w.r.t.

terrestrial stations and

Notification

1

ITU Regional Radiocommunication Seminar for the ASIA&PACIFICApia, Samoa19-23 September 2016

Two steps to be followed

CoordinationSubmission of AP4

data to affected ADMsArticle 9

NotificationSubmission of AP4

data to BRArticle 11

2

Coordination of earth stations

• Nos.9.6 : Before notifying to the Bureau or brining into use a frequency assignment of the following cases, an administration shall effect coordination. – No.9.15 : a specific earth station or typical earth station of a non-

geostationary satellite network to which No.9.11A applies in respect of terrestrial station

– No.9.17 : a specific earth station or typical mobile earth station above 100MHz except those under No.9.15 in respect of terrestrial station

– No.9.17A : a specific earth station in respect of other earth stations operating in the opposite direction of transmission or typical mobile earth station in respect of specific earth stations operating in the opposite direction of transmission

– No.9.21 : any station of a service for which the requirement to seek agreement is included in a footnote of the Table of Frequency Allocation

• The coordination between an earth station and terrestrial stations under 9.15 and 9.17 or between earth stations operating in opposite direction of transmission under 9.17A applies only to assignments in bands allocated with equal right

3

Identification of coordination requirement (AP5)

• Identification of administrations with which coordination to be effected– Coordination area of the earth station created using AP7 covers

territories or the earth station located is located within the coordination area

• and concerned frequency assignments – Recorded in MIFR with favourable findings or under 11.41– Included in coordination procedure from the date of dispatch of

coordination data under No.9.29– Terrestrial stations or earth station operating in the opposite direction

of transmission operating or to be operated prior to the date of bringing the earth station assignment into service or within next three years from the date of dispatch of coordination data under No.9.29, whichever is the longer

4

Submission of coordination data

• 9.29 Requests for coordination under 9.15 to 9.19 shall be sent by the requesting administration to the identified administrations, together with the appropriate information listed in Appendix 4 to the Radio Regulations

• SpaceCap software can be used for the capture of information required for coordination requests with the affected Administrations, and the resulting file can be sent to these affected Administrations

• When coordination is completed, the same file can be converted to a notification notice to be submitted to the Bureau

5

Notification of earth stations

• Any frequency assignment to a transmitting station and to its associated receiving stations shall be notified to the Bureau if (No.11.2)– Assignment is capable of causing harmful interference; or– Assignment is used for international radiocommunication; or– Assignment is subject to a world or regional frequency allotment or

assignment plan which does not have its own notification procedure; or

– if that assignment is subject to the coordination procedure of Article 9; or

– It is desired to obtain international recognition; or– Non conforming assignment seeking to be recorded for information

purposes only

• Similar requirements for receiving earth station (No.11.9)

6

Notification of a specific earth station

• Except for mobile earth station, individual notices of frequency assignments are necessary in the following cases (No.11.17):– Earth station whose coordination area includes

the territory of another administration or where the earth station located within the coordination area of an earth station

– Earth station whose interference potential is greater than that of a coordinated typical earth station

7

Process for E/S Coordination

Frequency Study

• Article 5 : Frequency Allocation

• Article 9: Understanding Coordination Provisions

Sending Information

• Appendix 7: Copy of Coordination Diagram

• Appendix 4: Coordination data (AP4/III)

Coordination & Notification

• Coordination under 9.15 / 9.17 / 9.17A / 9.21

• Send Notification data (AP4 captured by SpaceCap)

8

Process for E/S Coordination

Frequency Study

• Article 5 : Frequency Allocation

• Article 9: Understanding Coordination Provisions

Sending Information

• Appendix 7: Copy of Coordination Diagram

• Appendix 4: Coordination data (AP4/III)

Coordination & Notification

• Coordination under 9.15 / 9.17 / 9.17A / 9.21

• Send Notification data (AP4 captured by SpaceCap)

9

Region 1

___________________

5850 - 5925 MHz

FIXED

FIXED-SATELLITE

(Earth-to-space) ↑

All Regions

___________________

6700 - 7075 MHz

FIXED-SATELLITE

(Earth-to-space) ↑(space-to-Earth) ↓

Volume No.1 Article 5

opposite direction

Uplink ↔ Downlink

equal rights

Space = Terrestrial

Frequency Study

Frequency Allocations for Earth Station

10

Frequency Study

11

9.6

9.15

9.17

9.17A

9.21

Volume No.1 Article 9

9.6Administrations shall effect coordination before notifying to the BR or brings into use any frequency assignment.

Frequency Study

12

9.15Coordination of a Specific or Typical Earth Station of non-GSO in respect of Terrestrial Stations (associated with Footnote - 9.11A)

Footnote9.11A

Adm A

Adm B

Volume No.1 Article 9

Frequency Study

13

9.17

Coordination of any Specific Earth Station or

Typical Mobile Earth Station in frequency bands

above 100 MHz, in respect of Terrestrial Stations,

with the exception of the coordination under 9.15

Adm A Adm B

Adm A Adm B

Volume No.1 Article 9

Frequency Study

14

9.17A

Coordination of any Specific Earth Station in respect of other Earth Stations operating in the opposite direction of transmission (ODT), or any Typical Mobile Earth Station in respect of Specific Earth Station (ODT) *Rx E/S – No methodology in AP7

Adm A

Adm B

Volume No.1 Article 9

Frequency Study

15

9.21Specific Earth Station of a service required to seek agreement of other administrations (under Footnotes)

Volume No.1 Article 9

Space Service under No. 9.21 agreement(ex: footnote 5.461 – MSS)

“rare case for Earth Station”

Frequency Study

16

Frequency Study

GSO Satellites

Terrestrial

Transmitting

Earth Station

Receiving

Earth Station

Non-GSO

SatellitesInterference

9.17A

9.15/9.17 9.15/9.17

Coordination of Earth Station is ADM’s duty and responsibility.

Process for E/S Coordination

Frequency Study

• Article 5 : Frequency Allocation

• Article 9: Understanding Coordination Provisions

Sending Information

• Appendix 4: Coordination data (AP4/III)

• Appendix 7: Copy of Coordination Diagram

Coordination & Notification

• Coordination under 9.15 / 9.17 / 9.17A / 9.21

• Send Notification data (AP4 captured by SpaceCap)

18

Preparation of Coordination Data

Collecting AP4 data

AP7 Capture (BR Software)

Capture data (.MDB)

GIBC/AP7(BR Software)

Coordination Area/ADM

Coordination Request

SpaceCap(BR Software)

• BR IFC (Space Services) -International Frequency

Information Circularor • http://www.itu.int/ITU-

R/go/space-software/en

Where is BR Software ?

Sending Information

19

Coordination data

Annex 2

GEOGRAPHICAL DATALongitude / Latitude

Altitude

SATELLITEOrbital Location,

Identification (Geo, Non-Geo)

ANTENNAMaximum gain

Radiation pattern

SIGNAL

CHARACTERISTICS

Power

Maximum Power Density

Frequencies

Noise temperature

Emission Type

Others Horizontal Elevation Angle

Volume No.2 Appendix 4

Sending Information

20

*

Option 1: AP4 data - AP7 Capture (Exercise Purpose)

*

* The associated Space Station should be notified and the beam should be matched.

Sending Information

21

22

Option 2: AP4 data - SpaceCap (for Coordination & Notification)

Sending Information

22

Attention: Check Associated Satellite:• satellite network: INTELSAT8 304.5E (not Commercial name)

• Check Service area as follows in GIMS• Check Beam name & direction correctly at the point of Earth Station

↑ Up link (↔ Downlink for ↓ ES) beam: HL ↓ Down link SS (↔ Uplink for ↑ ES)beam: HL

AP7 embedded in GIBC (from BR IFIC DVD)

Computer Program forDetermination of Coordination Area

Magic button for Coordination?

C:\BR_SOFT\BATCH

Create your Input File

Sending Information

24

Diffraction(local)

Tropospheric scatter (>100km)

Ducting (>500km)

Elevated layerreflection/refraction(h < x 100m)

Great-circle propagation(Mode 1) – 4 Radio-Clim. zone

Hydrometeor scatter(Mode 2) – 15 Rain zone A-Q+

Anomalous (short-term) Interference Propagation mechanisms

Common Volumeat the intersection of the antenna main beams

Hydrometeor scatter

Volume No.2 Appendix 7 Sending Information

25

,Great-circle propagation

(Mode 1)

Hydrometeor scatter(Mode 2) )Max (

Maximum Calculation Distance (369/ Mode2 up to 1200 Km/ Mode1*Zone C)

(Mode2)

Pt*Ge

Hydrometeor scatter

(Mode1)L(%)=Pt+Ge+Gx

Gx, Pr(%) from Tables of AP7

(10 to 123 Km/f) Minimum Coordination Distance

L(%)=Pt+GxGx, Pr(%) from Tables of AP7

convert to

- Pr(%)

- Pr(%)

GX

26

Report (p1) of AP7 (GIBC) program – 9.17

Automatic indication

in AP7 report

ex: Rcv GSO ES (FSS) w.r.t.Terrestrial St (TS, FS, MS)

Freq: 3850-4200 GHzSat longitude : 18 W

Horizon Ele. Anagle : 0

Affected countries:Countries included

in Coordination Distance/Area

Sending Information

27

SUI

SMR

MCO

LUX

LIE

I

F

D

AND

10E 5E 0

10E 5E 0

50N

45N

50N

45N

Tracking Antenna reduce the probability of Mode2.

No Mode2 contours

Earth station (NGSO)

Main Mode 1

Aux. Mode 1

Sending Information

Coordination area of 9.17A (Opposite direction)ex: Tx NGSO ES (FSS) with respect to Rcv GSO ES (EESS)

KRE

KOR

130E125E

130E125E

40N40N

KRE

KOR

J

135E130E125E120E

130E125E120E

40N

35N

40N

35N

Specific, 100Km Specific, 580Km

KRE

KOR

J

130E125E

130E125E

40N

35N

40N

35N

KRE

KOR

J

135E130E125E120E

135E130E125E120E

40N

35N

30N

40N

35N

30N

KRE

KOR

J

CHN

140E135E130E125E120E115E

135E130E125E120E

40N

35N

30N

40N

35N

30N

MAC

KRE

KORJ

HKG

CHN

150E145E140E135E130E125E120E115E110E105E

140E135E130E125E120E115E

45N

40N

35N

30N

25N

45N

40N

35N

30N

25N

Typical, 100Km Typical, 400Km Typical, 500Km Typical, 580Km

MAC

KRE

KORJ

HKG

CHN

150E145E140E135E130E125E120E115E110E105E

140E135E130E125E120E115E

45N

40N

35N

30N

25N

20N

45N

40N

35N

30N

25N

20N

Typical, 1080KmTypical, 1000Km

KRE

KOR

J

CHN

140E135E130E125E120E115E

135E130E125E120E

45N

40N

35N

30N

45N

40N

35N

30N

Predetermined Coordination distance(Table 10 of Appendix 7)

Predetermined AP7 Table 10 (Example Adm: KOR)

Sending Information

29

Calculated parameters by 5° Azimuth

Coordination distance by 5° Azimuth

Tech. parameters of the planning E/S

Report (p2) of AP7 (GIBC) program

( 0 - 355º )

• To: Probably Affected ADMs (9.29/31)• Send AP4/III Coord. Data• Send Copy of Cood. Contour

Sending Information

30

Process for E/S Coordination

Frequency Study

• Article 5 : Frequency Allocation

• Article 9: Understanding Coordination Provisions

Sending Information

• Appendix 7: Copy of Coordination Diagram

• Appendix 4: Coordination data (AP4/III)

Coordination & Notification

• Coordination under 9.15 / 9.17 / 9.17A / 9.21

• Send Notification data (AP4 captured by SpaceCap)

31

0

45

90

135180

225

270

315

ALB

MKD

GRC

SUI

D

AUT

HNGF

E

ALG

TUN

LBY

EGY

ROU

BUL

TUR

I

YUG

SVN

HRV

BIH

SVK

MLT

APPENDIX 7

Definition of the Coordination Area

Mode(1)

Mode(2)

Coordination contours with the greatest coordination distance

It represents a regulatory conceptbased on Worst Cases &

Conservative Assumptions.

However

i.e.

It’s not an exclusion zone.

means

More detailed calculations anddiscussions need to be performed.

Coordination & Notification

32

Earth station

Horizon ElevationAngle

.Azimuth x o

.Azimuth x1 o

HE Angle 1

.Azimuth x2 o

HE Angle 2

Azimuth x 3o

.

HE Angle 3

.Azimuth x4 o

HE Angle 4

Azimuth x5 o

HE Angle 5

Horizontal Elevation Angles • All Azimuths around Earth Station Ant.• if no values between Average value• No values default 0 degree

Coordination & Notification

33

RECEIVING EARTH STATION COORDINATION AREASMAGHTAB MLT/MLT 014E2640 35N5556 4135.0 - 4135.0 MHZ

ALB

MKD

GRC

SUI

D

AUT

HNGF

E

ALG

TUN

LBY

EGY

ROU

BUL

TUR

I

YUG

SVN

HRV

BIH

SVK

MLT

ALG

LBY

TUN

E

F

I

ROU

TUR

EGY

D

SUI

AUTHNG

BUL

GRC

YUGBIH

ALB

MKD

SVN

HRV

MDASVK UKR

MLT

Effect of Horizon Elevation Angle

HORIZON ELEVATION ANGLE : 0 o HORIZON ELEVATION ANGLE: Actual Value

Reduced

Coordination Area

Coordination & Notification

34

AP7 embedded in GIBC

Auxiliary Contour

It’s all

Complementary information.

Extra coordination lines inside main contour

More practical consideration with Auxiliary Contour Coordination & Notification

35

Adm B

Coordination contour (Gx=50 dBi)

- 5 dB Auxiliary contour(Gx = 45 dBi)

- 10 dB Auxiliary contour(Gx = - 40 dBW)

Auxiliary Contour - Mode 1 (& 2)Appendix 7 - Annex 6

Extra coordination lines inside main contour

(decided between ADMs)

Adm A

Coordination & Notification

36

Ad

min

istratio

nB

Actions on Coordination Request (Article 9)

Ad

min

istratio

nA

A Coordination Req. (9.29/9.31)

Ack. of receipt (9.45)

4Months

Notify Adm B’s system (9.52, 11.2/11.9)

if Disagreement (9.51A/9.52)• Adm B’s assignment **

• Suggestion for resolution

Technical Exam (9.50)• Collect existing/planning system• Inside Coordination Contours

Req. additional Info (9.54)

Notify Adm B’s system (9.52B, 11.2/11.9)

if Agreement (9.51A)

Assistance Req. - No reply/decision from Adm B (9.33/9.46/9.60)

ITU

Send Notification (11.2)

Coordination & Notification

3 Things (Planning Adm A)on Coordination of Earth Station

1. Define Affected ADM (AP7)

38

2. Send Request (AP4 & AP7)

3. Coordinate (with mutual cooperation)

3 Things (Requested Adm B)on Coordination of Earth Station

39

1. Acknowledge the reception

2. Coordinate (with mutual cooperation)

3. Give an early decision

Submission of typical earth stations in the fixed-satellite service

• The issue of notification of Typical earth station in the FSS was raised in the Director report to WRC-15

• WRC-15 concluded that further ITU-R studies are needed

• For these studies WRC-15 agreed to instruct the Bureau to publish a Circular letter containing a common format according to which administrations may wish to submit to the Bureau, on a voluntary basis, characteristics and number of typical earth stations deployed in their countries for information purposes only (minutes of 8th plenary)

• The Bureau has provided administrations with a web-based platform for the submission and posting of these typical FSS earth stations (CR/404)

40

Characteristics of Typical Earth Stations in Fixed Satellite Service

https://www.itu.int/net4/ITU-R/space/TypicalESinFSS

Question?

Answer

WRS

42