contact day – flemish rural network 22 april 2008, brussels the added value of cooperation under...
TRANSCRIPT
Contact Day – Flemish Rural Network22 April 2008, Brussels
The added value of Cooperation under Leader+
Martin Law, Team Leader, Leader+ Observatory Contact Point
European Commission
The European Leader+ Website http://ec.europa.eu/leaderplus
Main menu: Contact details of all Leader+ actors (in ‘Who’s who’) Documents of the European Leader+ events Leader+ country data sheets Publications in pdf-format (Magazine and Flash News) Publication materials/communication package Library / Archives / FAQ etc.
Interactive Tools:
Monitoring Indicators database Leader+ Infobank LAG Database Database of transnational cooperation projects Partner Search Tool: Instrument for encouraging transnational cooperation European database of Leader+ good practices Leader Competence Pool Events calendar Subscription form for publications
Number of LAGs under Leader+
Number of Leader+ LAGs per Member State (Total of 1 153)
149148 145140133
7057 56 52
4028 25 22 20 17 12 12 10 10 4 3 0 0 0 0 0 0
0
20
40
60
80
100
120
140
160
Member State
Nu
mb
er
of
L+
LA
Gs
Selected theme under Leader+
Natural and cultural resources most popular – 34%
New know-how and new technologies least popular – 13%
Themes chosen by all LAGs
13%
30%23%
34%
Use of new know-howand new technologies
Improving the quality oflife in rural areas
Adding value to localproducts
Best use of natural andcultural resources
Transnational cooperation under Leader+(based on data from January 2008)
Total of 383 registered projects
Origin of projects ?
The highest numbers of projects are coming from:
UK (15%) France (15 %) Finland (12 %) Germany (12 %) Italy (11 %)
*concerns projects where a national LAG is a lead partner
Number of all registered TCP per MS*
56
55
48
45
41
37
29
27
11
10
9
7
4
3
1
0 10 20 30 40 50 60
UK
FR
FI
DE
IT
ES
IE
PT
AT
SW
DK
BE
NL
GR
LU
Me
mb
er
Sta
te
Number of projects
Transnational cooperation under Leader+(based on data as at 1 January 2008)
LAGs’ involvement in the leadership:
The most active LAGs:Ireland, Sweden, Finland and UK
Why?
Share of national LAGs* involved in TNP as Lead partner
60%58%
40%
33%30% 29%
26% 25%23%
19%17%
13% 12% 11%
5%
0%
10%
20%
30%
40%
50%
60%
70%
IE SW FI UK BE PT FR LU IT ES DK AT DE NL GR
M ember State
Sh
are
of
nat
ion
al L
AG
s (%
)
Transnational cooperation under Leader+
Who are the partners?:
At least 464 LAGs are involved in cooperation, with an average 4 per project
Approximately 15% of them are not Leader+ LAGs: LAGs financed under previous Leader programmes Partnerships financed under national programmes (PRODER, POMO)
Other bodies involved in the cooperation: Tourism and development agencies, associations (environmental,
educational, heritage), local and regional authorities, universities and research institutes.
Transnational cooperation under Leader+
Where do the partners come from?
All EU-15 MS
New Member states: Czech Republic, Estonia, Hungary, Latvia, Slovenia, Malta, Cyprus and Romania
Azerbajdjan, Brazil, Canada, Georgia, Lebanon, Former Yugoslav Republic of Macedonia, Morocco, Mozambique, Norway, Switzerland, Russia, Syria, Tunisia, Turkey etc…
Transnational cooperation under Leader+
On which themes do they cooperate?
Predominant theme: best use of natural and cultural resources
Two next most popular themes chosen: quality of life, use of new know-how and new technologies
Least popular: adding value to local products
Themes chosen for all TCP
21%
26%17%
36%
Use of new know-how andnew technologies
Improving the quality of life inrural areas
Adding value to local products
Best use of natural andcultural resources
Transnational cooperation under Leader+:comparison between LAG theme and TCP theme
Natural and cultural resources is most popular in both cases
Use of new know-how and new technologies is more popular when part of a TCP – Why?
Themes chosen
18%
28%
15%
39%
13%
30%
23%
34%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
Use of newknow-howand new
technologies
Improving thequality of lifein rural areas
Adding valueto local
products
Best use ofnatural and
culturalresources
Themes chosenfor TCP
Themes chosenby all LAGs
Transnational cooperation with NMS under Leader: the challenges
LAG selection procedures have been terminated only recently in 3 NMS (PL, LV, EST), 4 other NMS (CY, SK, SL, MT) do not provide financial support for cooperation at all
Very short time for implementation of projects
Low budget assigned per LAG
Little previous experience
Structures which could assist are still under development
Transnational cooperation under Leader+EU-15: some examples
Magazine 2: Austria + Germany: Training for cultural guides and regional museum management. 3 LAGs
Important project aspects:- Strong basis for cooperation based on linking history and culture with
tourism and employment - Visit to Italy where similar project already implemented- Clarification of approval procedures at national level- Agreement of leading LAG and its financial role- Agreement between LAGs re. areas of competence and responsibility- Understanding of need to prepare for market entry: publicity materials,
web-site etc.
Provides a sustainable basis for future cooperation and a ‘best practise’ example
Transnational cooperation under Leader+EU-15: some examples
Magazine 3: France + Germany: EURO LAND ART: 2 LAGs
Important aspects:- Common project idea provides the regions with a modern and
creative image- Idea developed together: importance of setting up early
meetings project goals, and a clear steps and responsibilities- Need for site visits in both regions and adapt the project to
reflect the different cultural differences: common branding on marketing materials; publicity for each partner in each country
- Create awareness by showing both differences and similarities of each region by involving local actors: chefs; writers; and naturalists etc.
- Project served two regions with very similar: languages; culture; natural resources and economic needs.
- Evaluation and general analysis to decide to continue
Transnational cooperation under Leader+EU-15: some examples
Magazine 4: France + Spain: GRUS: ornithological tourism network: 15 LAGs (incl. non-Leader+)
Important aspects:- Based on a Leader II project: but a more focussed target group- Based on common zones of special interests: awareness of
nature conservation required for all participating LAGs- Language barriers and cultural differences had to be overcome- Development of: common tourist packages/management
systems to be later adapted for different sites- Exploitation of new technologies for common use
Cooperation and networking
Successful lessons from past project experiences
Putting people in touch with each other (communication, during events, through technology)
Many documents, publications, guidelines & presentations available which record best practices
Partner-search tools, seminars and transnational support programmes
Advisers and key experts who can provide help and advice.
Cooperation under Leader+EU-15: lessons learned
Some of the challenges and pitfalls experienced under Leader+ Be prepared: make sure you understand a common language and appreciate
cultural differences Take time to explore the project idea and understand what is involved: take
advantage of any funds for preparatory work; in some MS Leader funds are available for pre-development of projects
Don’t underestimate the time needed to do certain things Be aware of technical (programming) differences with regard to national
procedures and timing! Have a very clear structure and clear responsibilities between the different
partners – leading LAG very important if more than 2 partners Don’t set too ambitious targets – project can be done in several phases Don’t reinvent the wheel! Look to see what already is being done in similar
areas; on similar themes, and with similar tools to achieve similar aims – Leader+ Observatory: databases on web-site, Magazine, seminars – all provide ideas and help
Conclusions
Results of networking and cooperation under Leader: More professionalism
more experience (LAGs and local actors): involved in mature projects with tangible results at different stages of development
A longer term vision (phases, greater ambition, economic turnover)
Tangible outcomes in more sectors than before: from only (nearly) tourism only to tourism + culture + craft + economy
Greater proactivity among the local actors: not only as participants but in definition, implementation and development of the projects, and therefore real bottom-up
Stronger partnerships: local, specialized partnership (women entrepreneurs, typical quality craftsmen, specific
tourism provider...) between areas involved around 1 project, then another, then another --> the spiral of
cooperation
Provides a strong platform for the benefit of all involved
Cooperation under Leader+
Dank U wel voor uw aandacht !