concretoo imprimirr

112
Datos Peso Unitario Ln 3.25 m Aligerado 300 F'c 210 Tabiqueria 150 Fy 4200 Acabado 100 n pisos 4 Viga 2400 s/c 200 Columna 2400 1. Predimensionamiento de Losa 0.18 0.2 cm 2. Predimensionamiento de Viga Se asume el mayor Viga Eje 3-3 (Principal) 2.1. Primer Método 2.2. Segundo Método CM = CV = Ln 3.93 m α 13 Wu 1185 h= 33.7370692762 0.35 m h 33.7 0.35 m h 0.302307692 0.35 m igualdad de cuantias h 0.285416363 30.00 cm h 0.285416363 0.30 m Predimensionamiento de Columna kg/cm 2 kg/cm 2 hLosa Kg/m 2

Upload: jose-carlos-cayo

Post on 09-Nov-2015

2 views

Category:

Documents


0 download

DESCRIPTION

TRABAJO DE CONCRETO ARMADO

TRANSCRIPT

predDatosPeso UnitarioLn3.25mAligerado300F'c210kg/cm2Tabiqueria150Fy4200kg/cm2Acabado100n pisos4Viga2400s/c200Columna24001. Predimensionamiento de LosahLosa0.180.2cm2. Predimensionamiento de VigaSe asume el mayor Viga Eje 3-3 (Principal)Predimensionmiento de viga Secundaria2.1. Primer Mtodo2.2. Segundo MtodoBLn3.25CM =550CV =200b3.325Bb0.166250.2cmh0.23214285710.25mb0.1250.25mLn3.93m13Wu1185Kg/m2h=33.73706927620.35mh33.70.35mM1h0.30230769230.35mM2igualdad de cuantiasb00.25m25cmh0.285416362530.00cmh0.28541636250.30mPredimensionamiento de ColumnaTIPO C1TIPO C2 - C3TIPO C4AT14.06AT10.68AT5.34CMCMCMT d columnaP= PG*nAligerado4219.425Aligerado3204.225Aligerado1602.1125tipo C1 1piso1.10.3Tabiqueria2109.7125Tabiqueria1602.1125Tabiqueria801.05625tipo C1 1.10.25Acabado1406.475Acabado1068.075Acabado534.0375tipo C2 - C31.50.2Viga761.4Viga761.4Viga407.7tipo C41.50.2Columna648Columna648Columna6489145.01257283.81253992.90625Dist. Tributaria4.23Dist. Tributaria4.23Dist. Tributaria2.265h d columna3h d columna3h d columna3columna0.3columna0.3columna0.3CVCVCVs/c200carga Viva2812.95carga Viva2136.15carga Viva1068.075PG11957.9625PG9419.9625PG5060.98125P13153.75875P14129.94375P7591.471875n0.3n0.2n0.2b*t835.1592857143b*t1345.7089285714b*t722.997321428628.899122576936.683905579626.888609510930403040asumimos 40 x404.234.232.84.234.232.953.13.253.553.253.93Determinar Carga UltimaCMAligerado300Tabiqueria150Acabado100Sub Total550por Area Tributaria1691.25Viga315TOTAL2006.25CV665Wu4206.375nDETERMINACIN DE LOS MOMENTOS FLECTOREScv

Wu=1.5CM + 1.8CV

Viga y AligeradaDISEO DE VIGASDETERMINACION DE MOMENTOS FLECTORESDETERMINACION DE LA SECCINDETERMINAR EL AREA DE ACEROPara la Viga 1Asumir 3/4"1.905cm4.234.232.84.234.23 A B CEstribo mnimo 3/8"0.952cm2.95Recubrimiento 4cm dPara MAB(-)MCB(-)3.964d= 30 - 4 - 0.952 -((1.905))Primera Iteracin4.81914.8423.1Segunda Iteracin4.55121635354.8059835389B3.325d=24.0955cmVolado4003.875x0.62=720.69750.721cuantia Tercera Iteracin4.52327862484.80290876743.552se considera acero 2 5/8 y 1 1/2As Real5.29MAB(-)4003.875x3.982=3963.9363468753.96416B10.85fc < 280Para MAB(+)MBC(+)4.530B10.9fc < 280Primera Iteracin4.81915.5264770006MAB(+)4003.875x3.982=4530.21296785714.530Datos de Edificacin140.021250.02130.0159750.016Segunda Iteracin5.20139011825.5756218417Columnas4040vivienda200MBA(-)4003.875x3.982=7046.997957.047Tercera Iteracin5.24764408635.5816273024fc21090.32fy4200se considera acero 2 5/8 y 2 1/2As Real6.4Vigas0.250.30MBC(-)4003.875x3.982=7046.997957.047Losa (h)0.209 Para MBA(-)MBC(-)7.0470.9Primera Iteracin4.81918.596742001Determinar Carga UltimaMBC(+)4003.875x3.982=4530.21296785714.530147.1211743439TN-mSegunda Iteracin8.0910512959.2981923028CMAligerado300MCB(-)4003.875x3.982=3963.9363468753.964Tercera Iteracin8.75123981449.4538362464Tabiqueria15016Acabado100Cuarta Iteracin8.89772823199.4890808938Suma550DISTANCIASDist. Trib3.075VOLADO0.6se considera acero 2 5/8 y 2 3/4As Real9.68A-B3.98B-C3.98Para Volado0.721Viga180Primera Iteracin4.81910.8791900483TOTAL1871.251871.25Segunda Iteracin0.82747298670.8050950861CV665Tercera Iteracin0.75773655160.8039114344Cuarta Iteracin0.75662252650.8038925541Wu4003.875Kg/m4TN-mse considera acero 1 1/2As Real1.29DETERMINACION DE MOMENTOS FLECTORESVERIFICAR LOS MOMENTOS RESISTENTESDETERMINAR ACEROS EN SECCIONDISEO DE LOSA ALIGERADA DATOSHallamos la cuantia balanceadaB10.85fc < 280Tabiqueria150123B10.9fc < 280Viga25*30Columna40*40b=0.021250.0213s/c200Para MAB(-)MCB(-)469.272fc210Hallamos la cuantia balanceadaPrimera Iteracin0.791.8690739138fy4200Segunda Iteracin0.75558425671.77784531Espeso de losa0.2mmax=0.0159750.016Volado474x0.62=85.320.085TN-mTercera Iteracin0.7534924088Carga Ultima de Diseo Wu1185kg/m22Hallamos wse considera acero 1 1/21.2940MAB(-)474x3.982=469.271850.469TN-mw=0.32 16Para MAB(+)MBC(+)536.311Hallamos el Momento ResistentePrimera Iteracin0.912.1360844729MAB(+)474x3.982=536.31068571430.536TN-m0.914d17.365Segunda Iteracin0.87059889242.0484679822MR 147941.2554197761479.41TnMBA(-)474x3.982=834.26106666670.834TN-mTercera Iteracin0.868264888610940DETERMINAR LA CARACTERISTICA DE LA VIGAse considera acero 1 1/21.29MBC(-)474x3.982=834.26106666670.834TN-mWu474kg/m9As=1.4847224076Para5 Para MBA(-)MBC(-)834.261Primera Iteracin1.413.322798069MBC(+)474x3.982=536.31068571430.536TN-m14 =0.0085500858Segunda Iteracin1.405435523.3069071059Grafico de vista perfil de la losaMCB(-)474x3.982=469.271850.469TN-mTercera Iteracin1.40472477763.305234770916a=3.4934644885Cuarta Iteracin1.404650022220DISTANCIAS3.49VOLADO0.6se considera acero 2 3/81.4230A-B150Determinar la cuantiaB-C0Para Volado85.320Primera Iteracin0.14442479170.3398230393603.983.98min=0.0027602622min=0.0033333333Segunda Iteracin0.13126671950.3088628695 min=0.003Tercera Iteracin0.13114865140.3085850621Determinar AsCuarta Iteracin0.1311475929As=0.52095As=1 3/8"se considera acero 1 3/80.71

Wu=1.5CM + 1.8CV

viga T hbBDatosh0.30mfc (kg/m)210hf0.08mfy (kg/m)4200B0.4mMu (TN-m)4b0.1mlosaygbyfdL3.83mb?cv16hf+b1.38mL/40.9575mB0.4mAsumir que 8 1"2.54Rec424.73cm5.10468431360.0051604168Hallamos a3.0027554786

b

a=hf=

Losa Armada o MacizaDiseo de Losa MacizaM12(-)1434x2.552=388.520.389TN-mDISEO DE REFUERZO242.11144.234.232.84.234.23M12(+)1434x2.552=666.040.666TN-mAsumir acero de 3/8"0.71cm2142.9533.62697736130M21(-)1434x2.552=932.460.932TN-m103/8" @ 0.30m3.1M23(-)1434x2.72=1045.391.045TN-mReclacular AsRecalculandoB3.325102.373.55M23(+)1434x2.72=653.370.653TN-mReclacular As16M32(-)1434x2.72=1045.391.045TN-mDATOS10S/C200Viga2530.001024.4573294118P. Muerto120Columna4040M34(-)1434x3.152=1422.891.423TN-mReclacular As0.56P. Losa240010P. Tabiqueria1501234ESPESOR DE LOSAM34(+)1434x3.152=1016.351.016TN-mCon un extremo continuo0.1312514Mas de un Extremo continuo0.0964285714M43(-)1434x3.152=592.870.593TN-mh0.1524En Un Voladizo0.075Volado1434x0.752=403.310.403TN-mRECALCULAR EL AREA DE ACEROMETRADO DE CARGAS2CMP. Losa360CVs/c200P. Muerto120VERIFICACION DEL PERALTE EFECTIVOP. Tabiqueria150M12(-) M32(-)1045.39Total630Primera Iteracin2.4150150.57Wu =14340.0159750.0160.32Segunda Iteracin2.41621552650.5685213004DETERMINCION DE LOS MOMENTOS ACTUANTES1/2"2.54Tercera Iteracin2.41624533291234Rec2d=11.73cmM34(-)1422.89Primera Iteracin3.2871040.770.9b(metro lineal)100Segunda Iteracin3.31848405880.78081977856750.49700183041422.892.552.73.150.75Tercera Iteracin3.3195644316

Wu=1.5CM + 1.8CV

592.87

Ref. transv.REFUERZO TRANSVERSAL PARA LA VIGA 1PARA EL TRAMO A-BDeterminacin de cortantes nominalesPara la Zona no confinadaA3.98B3.98CDentro de la zona de confinamientoVu = Vn Mn1(-) Mn2(-)Mn3(-)Mn4(-)fs = 1.25*fy =5250flexion1.00mVn= Vs + Vc Mn1(+) Mn2(+)Mn3(+)Mn4(+)Vc0Vn1sup =4*3.98+5.829+6.833=11.141L = 2d48.223.98=4.627fc210kg/cm2c0.75fy4200kg/cm3rec4cmHallamos los momentos nominalesVn2sup = -4*3.98+-9.354+-6.833=-12.0273024.1Estribo mnimo 3/8"0.952cm23.983.51Wu4Tn-m11.1410.71Mn1(-)As2 5/8 y 1 1/2As Real5.290.47a=6.2235294118Vn1inf =4*3.98+-6.833+-9.354=3.8932523.98Mn1(-)5.8289576471Mn1(+)As2 5/8 y 2 1/2As Real6.4Vn2inf = -4*3.98+6.833+5.829=-4.77912.027a=7.529411764723.983.98Mn1(+)6.8326588235Grafico de cortantes nominales11.141 Por relacin de tringulosMn2(-)As2 5/8 y 2 3/4As Real9.6811.141+12.027=11.141+Vu-1a=11.38823529413.8933.983.51Mn2(-)9.35386941185.821=3.174..+ (Vu-1)/3.51Vu=17.258-4.779Mn2(+)As2 5/8 y 2 1/2As Real6.4 Se toma como cortante de diseo -12.027=17.25823.011Vn=23.011a=7.5294117647012.0270.75Vn= Vc + VsVn= Vu/Mn2(+)6.8326588235Vn=16.036Requisitos del ACIVn= Vs + VcGrafica de momentos nominalesa. 1.06 * fc * bw * d=9.254917759Tn23.011.. = Vs + 4.6275.8299.354b. 2.12 * fc * bw * d=18.5098355179TnVs=18.384(+)(-)Separacins= d/4=6.025cms 30SeparacinLa separacin sera 3/8 "1 @ 0.05 [email protected]=1.42Separacion segn el ACI Despejando S(-)(+)Av=1.42s=10Despejando "s"6.8336.833=1.1204mLa separacin sera 3/8 "1 @ 0.05 [email protected] separacin sera 3/8 " 1 @ 0.05 [email protected]; [email protected] separacin sera 3/8 " 1 @ 0.05 [email protected]
Long DesarrLONGITUD DE DESARROLLOCalculo para el primer tramoPara el acero negativoMuAs RequeridoBarraAs ProporcionConsiderando 2 1/2As2.581.270.2MAB(-)3.96014.8300853051 3/4" y 1 5/8"4.84MBA(-)7.04017777788.58681831992 3/4" y 2 5/8"9.680.63.983.98MAB(+)4.52582857145.52009749143 1/2" y 1 5/8"5.87Mn=2.115a=2.428DatosPara el acero positivoM(x)=-2x2+x8.24-3.9601fc210Debe extenderse (1/4)As1/4*5.871.4675fy4200Entonces se extiende 2 1/22.58Para M =2.115b253.9601x2.115..= -2x2 + x8.24-3.9601h30--0..= -2x2 + x8.24-6.0751rec4+x1 =0.96d30 - 4 - 0.952 -((1.905))X2 =3.162VPuntos de Inflexiond=24.1cmWu4TnV(x)= V - x4fs5250M(x)= Vx -4x(x/2)-3.9601Vx -2x2-3.9601DISEO PRELIMINAR POR FLEXION0.560.42Para V(x) = 00.960.82Volado4x0.62=0.72As0.878175152x=V/4D10.420D20.4Reemplazamos en M(x) = MAB(+)MAB(-)4x3.982=3.9601TN-mAs4.8300853054.53.=(V2/4)-(V2/8)-3.9601La condicin indica de D1 y D2 deben ser mayores que d 12db160.125d=24.1V2=8.4901/ 0.37512db15.24MAB(+)4x3.982=4.5258285714TN-mAs5.5200974914v=8.2414076468144.53si cumple las condicionesMBA(-)4x3.982=7.0401777778TN-mAs8.5868183199entoncesV(x)= -4x +8.249M(x)=-2x2+x8.24-3.9601MBC(-)4x3.982=7.0401777778TN-mAs8.5868183199Para M(x) =090=-2x2+x8.24-3.9601X10.56MBC(+)4x3.982=4.5258285714TN-mAs5.5200974914X13.5614MCB(-)4x3.982=3.9601TN-mAs4.830085305160.560.421.51.5

-

Dis CoumnDISEO DE COLUMNASPara las columnas tipo C-1Debido a que las columnas del prmer piso son circulares. Se considera un dimetro de :55cmDatosMu=8Tn-m (Momento ultimo asumido)fc210Kg/cm2fy4200Alt. D Colm.2.6mH losa0.2mprincipal3/4"a. Determinar la carga ultimaFactores de mayoramientCM1.5Pu=90.586CV1.8b. Excentricidade=8.831c. Factor de dimensing=0.79d1=5.9045d. Factor de relacinm=23.529e. Factor de CargaFac Carga0.18f. Factor de MomentoFac de Mto.0.03Interpolando en los ABACOS se tiene que esta por debajo de cero,entonces asumiremos la cuantia minima.0.01As=23.76se tendra 3 1" y 3 3/4As Real =23.82Dist.sssZona Conf.43.324.095515.2422.84815.00Zona no con.173.330.4845.6963030Se tendra 3/8" 3@15y R 6
pre.ddDatosPeso UnitarioLn3.25mAligerado300F'c210kg/cm2Tabiqueria150Fy4200kg/cm2Acabado100n pisos4Viga2400s/c200Columna24001. Predimensionamiento de LosahLosa0.180.2cm2. Predimensionamiento de VigaSe asume el mayor Viga Eje 3-3 (Principal)Predimensionmiento de viga Secundaria2.1. Primer Mtodo2.2. Segundo MtodoBLn3.25CM =550CV =200b3.325Bb0.166250.2cmh0.23214285710.25mb0.1250.25mLn3.93m13Wu1185Kg/m2h=33.73706927620.35mh33.70.35mM1h0.30230769230.35mM2igualdad de cuantiasb00.25m25cmh0.285416362530.00cmh0.28541636250.30mPredimensionamiento de ColumnaTIPO C1TIPO C2TIPO C3TIPO C4AT11.69AT11.34AT7.65AT7.66CMCMCMCMAligerado3506.4Aligerado3400.8Aligerado2026.5Aligerado2299.44T d columnaP= PG*nTabiqueria1753.2Tabiqueria1700.4Tabiqueria1147.5Tabiqueria1149.72tipo C1 1piso1.10.3Acabado1168.8Acabado1133.6Acabado765Acabado766.48tipo C1 1.10.25Viga761.4Viga761.4Viga761.4Viga761.4tipo C2 - C31.50.2Columna648Columna648Columna648Columna648tipo C41.50.27837.87644.25348.45625.04Dist. Eje-eje4.23Dist. Eje-eje4.23Dist. Eje-eje4.23Dist. Eje-eje4.23h d columna3h d columna3h d columna3h d columna3asumir0.3asumir0.3asumir0.3asumir0.3CVCVCVCVs/c200carga Viva2337.6carga Viva2267.2carga Viva1530carga Viva1532.96PG10175.4PG9911.4PG6878.4PG7158P15263.1P14867.1P10317.6P10737n0.2n0.2n0.2n0.2b*t1453.6285714286b*t1415.9142857143b*t982.6285714286b*t1022.571428571438.126481235937.628636511531.346906887731.9776707809b*t40*40b*t40*40b*t35*35b*t35*3540403535para columna circular4.234.232.84.234.233.252.953.13.253.553.93Determinar Carga UltimaCMAligerado300Tabiqueria150Acabado100Sub Total550por Area Tributaria1691.25Viga315TOTAL2006.25CV665Wu4206.375n

Wu=1.5CM + 1.8CV

metradMETRADO DE CARGASMETRADO DE CARGASMETRADO DE CARGASCUADRO DE RESUMEN DE CARGASCOLUMNA A - 1TIPO C-4Area Tributaria4.6618COLUMNA B - 1TIPO C-2Area Tributaria6.89COLUMNA C - 1TIPO C-3Area Tributaria5.7213Tipo de ColumnaCargas MuertaCarga VivaCM + CVNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALC-1Columna B-237641.611535.2149176.810 CARGAS MUERTASMMMKG13230 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG1323Columna B-341306.0412677.3153983.35Columna (35*35cm2)kg/m324000.350.354.501323Columna (40*40cm2)kg/m324000.400.404.501728Columna (35*35cm2)kg/m324000.350.354.501323Columna C-231397.349571.7740969.11CARGAS VIVAS932.36CARGAS VIVAS1378.98CARGAS VIVAS1144.26Columna C-346807.20611319.4758126.676SobrecargaKg/m22002.861.63932.36SobrecargaKg/m22004.231.631378.98SobrecargaKg/m22003.511.631144.26C-2Columna A-227764.587799.2235563.8Columna A-330811.988571.4239383.4NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS4981.54NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS7644.72NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS6042.84Columna B-128393.475860.66534254.135Aligeradokg/m23002.861.381184.04Aligeradokg/m23004.231.381751.22Aligeradokg/m23003.511.381453.14Columna B-432222.6110202.7642425.37Acabadokg/m21002.861.63466.18Acabadokg/m21004.231.63689.49Acabadokg/m21003.511.63572.13C-3Columna C-123118.395149.1728267.56Viga Principal (25*30)kg/m324002.860.250.30514.8Viga Principal (25*30)kg/m324004.230.250.30761.4Viga Principal (25*30)kg/m324003.510.250.30631.8Columna C-423545.6266886.6230432.246Columna (35*35cm2)kg/m324000.350.352.30676.2Columna (40*40cm2)kg/m324000.400.402.30883.2Columna (35*35cm2)kg/m324000.350.352.30676.2C-4Columna A-119388.443962.5323350.97Muro 1Kg/m318000.60.152.3372.6Muro 1Kg/m3180021.930.152.32397.06Muro 1Kg/m318001.960.152.31217.16Columna A-424001.4956898.3230899.815Muro 2Kg/m318001.960.152.301217.16Muro 2Kg/m318001.650.152.401069.2Muro 2Kg/m318001.250.152.30776.25Muro 3Kg/m318001.480.151.20479.52Muro 3Kg/m318000.150.152.3093.15Muro 3Kg/m318000.60.152.40388.8Asumimos las cargas mayores segn el tipo de ColumnaVentana 1Kg/m2401.481.2071.04CARGAS VIVAS1378.98Muro 4Kg/m318000.880.151.20285.12CARGAS VIVAS932.36SobrecargaKg/m22004.231.631378.98Ventana 1Kg/m2400.881.2042.24SobrecargaKg/m22002.861.63932.36CARGAS VIVAS1144.264 CARGAS MUERTAS3731.31SobrecargaKg/m22003.511.631144.264 CARGAS MUERTAS3120.82Aligeradokg/m23004.231.381751.22Aligeradokg/m23002.861.381184.04Acabadokg/m21004.231.63689.494 CARGAS MUERTAS3666.87Acabadokg/m21002.861.63466.18Viga Principal (25*30)kg/m324004.230.250.30761.4Aligeradokg/m23003.511.381453.14Viga Principal (25*30)kg/m324002.860.250.30514.8Muro 1kg/m318001.960.151.00529.2Acabadokg/m21003.511.63572.13Muro 1kg/m318002.060.151.00556.2CARGAS VIVAS344.745Viga Principal (25*30)kg/m324003.510.250.30631.8Muro 2kg/m318001.480.151.00399.6SobrecargaKg/m21004.231.63344.745Muro 1kg/m318002.260.151.00610.2CARGAS VIVAS233.09Muro 2kg/m318001.480.151.00399.6SobrecargaKg/m21002.861.63233.09CARGAS VIVAS572.13SobrecargaKg/m22003.511.63572.13TOTALCarga Muerta28393.47TOTALCarga Viva5860.665Carga Muerta19388.44TOTALCarga Viva3962.53Carga Muerta23118.39Carga Viva5149.17METRADO DE CARGASMETRADO DE CARGASMETRADO DE CARGASCOLUMNA A - 2TIPO C-2Area Tributaria8.6658COLUMNA B - 2TIPO C-1Area Tributaria12.82COLUMNA C - 2TIPO C-1Area Tributaria10.6353NIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTAL0 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG1728Columna (40*40cm2)kg/m324000.40.44.501728Columna (40*40cm2)kg/m324000.40.404.501728Columna (40*40cm2)kg/m324000.40.44.501728CARGAS VIVAS1733.16CARGAS VIVAS2563.38CARGAS VIVAS2127.06SobrecargaKg/m22002.863.031733.16SobrecargaKg/m22004.233.032563.38SobrecargaKg/m22003.513.032127.06NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS7150.62NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS10114.23NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS8348.89Aligeradokg/m23002.862.782385.24Aligeradokg/m23004.232.783527.82Aligeradokg/m23003.512.782927.34Acabadokg/m21002.863.03866.58Acabadokg/m21004.233.031281.69Acabadokg/m21003.513.031063.53Viga Principal (25*30)kg/m324002.860.250.30514.8Viga Principal (25*30)kg/m324004.230.250.30761.4Viga Principal (25*30)kg/m324003.510.250.30631.8Columna (40*40cm2)kg/m324000.400.402.30883.2Columna (40*40cm2)kg/m324000.400.402.30883.2Columna (40*40cm2)kg/m324000.400.402.30883.2Muro 1Kg/m318000.60.152.30372.6Muro 1Kg/m318000.960.152.30596.16Muro 1Kg/m318000.710.152.30440.91Muro 2Kg/m318001.960.152.301217.16Muro 2Kg/m318001.350.152.40874.8Muro 2Kg/m318000.450.151.3157.95Muro 3Kg/m318001.000.152.40648Muro 3Kg/m318001.960.152.301217.16Muro 3Kg/m318001.40.152.40907.2Muro 4Kg/m318000.320.151.20103.68Muro 4Kg/m318000.10.152.4064.8Muro 4Kg/m318000.930.151.20301.32Ventana 1Kg/m2400.321.2015.36Muro 5Kg/m318001.40.152.40907.2Muro 5Kg/m318000.70.152.40453.6MamparaKg/m2401.52.40144CARGAS VIVAS2563.38Muro 6Kg/m318000.350.152.40226.8CARGAS VIVAS1733.16SobrecargaKg/m22004.233.032563.38Muro 7Kg/m318000.70.151.40264.6SobrecargaKg/m22002.863.031733.16Ventana 1Kg/m2400.451.00184 CARGAS MUERTAS5570.91Ventana 2Kg/m2400.931.2044.644 CARGAS MUERTAS4584.72Aligeradokg/m23004.232.783527.82Ventana 3Kg/m2400.71.0028Aligeradokg/m23002.862.782385.24Acabadokg/m21004.233.031281.69CARGAS VIVAS2127.06Acabadokg/m21002.863.03866.58Viga Principal (25*30)kg/m324004.230.250.30761.4SobrecargaKg/m22003.513.032127.06Viga Principal (25*30)kg/m324002.860.250.30514.8CARGAS VIVAS1281.69Muro 1kg/m318003.030.151.00818.1SobrecargaKg/m22004.233.031281.694 CARGAS MUERTAS4622.67CARGAS VIVAS866.58Aligeradokg/m23003.512.782927.34SobrecargaKg/m22002.863.03866.58Acabadokg/m21003.513.031063.53Viga Principal (25*30)kg/m324003.510.250.30631.8TOTALCARGAS VIVAS1063.53Carga Muerta37641.6SobrecargaKg/m22003.513.031063.53TOTALCarga Viva11535.21Carga Muerta27764.58Carga Viva7799.22TOTALCarga Muerta31397.34Carga Viva9571.77METRADO DE CARGASMETRADO DE CARGASMETRADO DE CARGASCOLUMNA A - 3TIPO C-2Area Tributaria9.5238COLUMNA B - 3TIPO C-1Area Tributaria14.09COLUMNA C - 3TIPO C-1Area Tributaria11.6883NIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTAL0 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG3213Columna (40*40cm2)kg/m324000.40.44.501728Columna (40*40cm2)kg/m324000.40.404.501728Columna (40*40cm2)kg/m324000.40.44.501728CARGAS VIVAS1904.76CARGAS VIVAS2817.18Escalera (t=18cm)kg/m324001.252.750.181485SobrecargaKg/m22002.863.331904.76SobrecargaKg/m22004.233.332817.18CARGAS VIVAS2337.66SobrecargaKg/m22003.513.332337.66NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS8025.02NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS10909.11Aligeradokg/m23002.863.082642.64Aligeradokg/m23004.233.083908.52NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS11769.37Acabadokg/m21002.863.33952.38Acabadokg/m21004.233.331408.59Aligeradokg/m23003.513.083243.24Viga Principal (25*30)kg/m324002.860.250.30514.8Viga Principal (25*30)kg/m324004.230.250.30761.4Acabadokg/m21003.513.331168.83Columna (40*40cm2)kg/m324000.400.402.30883.2Columna (40*40cm2)kg/m324000.400.402.30883.2Viga Principal (25*30)kg/m324003.510.250.30631.8Muro 1Kg/m318000.60.152.30372.6Muro 1Kg/m318000.340.152.30211.14Columna (40*40cm2)kg/m324000.400.402.30883.2Muro 2Kg/m318001.960.152.301217.16Muro 2Kg/m318001.930.152.401250.64Muro 1Kg/m318000.710.152.30440.91Muro 3Kg/m3180020.250.152.40324Muro 3Kg/m318000.340.152.30211.14Muro 2Kg/m318000.450.152.30279.45Muro 4Kg/m318000.50.151.40189Muro 4Kg/m318000.930.152.40602.64Muro 3Kg/m318001.400.152.40907.2Muro 5Kg/m3180010.152.40648Muro 5Kg/m318001.40.152.40907.2Muro 4Kg/m318000.550.151.40207.9Muro 6Kg/m318000.630.151.20204.12Muro 6Kg/m318000.30.152.40194.4Muro 5Kg/m318000.70.152.40453.6Ventana 1Kg/m24020.50.5020Muro 7Kg/m318000.880.152.40570.24Muro 6Kg/m318001.630.152.401056.24Ventana 2Kg/m2400.631.2030.24CARGAS VIVAS2817.18Ventana 1Kg/m2400.551.0022MamparaKg/m2400.282.4026.88SobrecargaKg/m22004.233.332817.18Escalera (t=18cm)Kg/m37201.252.752475CARGAS VIVAS1904.76CARGAS VIVAS2337.66SobrecargaKg/m22002.863.331904.764 CARGAS MUERTAS6850.71SobrecargaKg/m22003.513.332337.66Aligeradokg/m23004.233.083908.524 CARGAS MUERTAS5008.92Acabadokg/m21004.233.331408.594 CARGAS MUERTAS8286.096Aligeradokg/m23002.863.082642.64Viga Principal (25*30)kg/m324004.230.250.30761.4Aligeradokg/m23003.513.083243.24Acabadokg/m21002.863.33952.38Muro 1kg/m318000.680.101.20146.88Acabadokg/m21003.513.331168.83Viga Principal (25*30)kg/m324002.860.250.30514.8Muro 2kg/m318000.680.151.20220.32Viga Principal (25*30)kg/m324003.510.250.30631.8Muro 1kg/m318003.330.151.00899.1Muro 3kg/m318000.750.101.20162Muro 1kg/m318001.40.152.06778.68CARGAS VIVAS952.38Muro 4kg/m318000.750.151.20243Muro 2kg/m318000.70.152.06389.34SobrecargaKg/m22002.863.33952.38CARGAS VIVAS1408.59Muro 3kg/m318001.630.152.06906.606SobrecargaKg/m22004.233.331408.59losa para tanque elevadokg/m23001.42.781167.6CARGAS VIVAS1968.83SobrecargaKg/m22003.513.331168.83TOTALTanque elevadokg/m28001800Carga Muerta30811.98TOTALCarga Viva8571.42Carga Muerta41306.04Carga Viva12677.31TOTALCarga Muerta46807.206Carga Viva11319.47METRADO DE CARGASMETRADO DE CARGASMETRADO DE CARGASCOLUMNA A - 4TIPO C-4Area Tributaria7.6648COLUMNA B - 4TIPO C-2Area Tributaria11.34COLUMNA C - 4TIPO C-3Area Tributaria7.6518NIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTALNIVELDESCRIPCIONUNIDP.UNITN DE VECESLARGOANCHOALTURAPESOTOTAL0 CARGAS MUERTASMMMKG165.3750 CARGAS MUERTASMMMKG17280 CARGAS MUERTASMMMKG992.25Columna (35*35cm2)kg/m33000.350.354.50165.375Columna (40*40cm2)kg/m324000.400.404.501728Columna (35*35cm2)kg/m318000.350.354.50992.25CARGAS VIVAS1532.96CARGAS VIVAS2267.28CARGAS VIVAS1530.36SobrecargaKg/m22002.862.681532.96SobrecargaKg/m22004.232.682267.28SobrecargaKg/m22003.512.181530.36NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS6432.7NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS8501.43NIVEL TIPICO 1 - 2 - 3 CARGAS MUERTAS5596.58Aligeradokg/m23002.862.432084.94Aligeradokg/m23004.232.433083.67Aligeradokg/m23003.511.932032.29Acabadokg/m21002.862.68766.48Acabadokg/m21004.232.681133.64Acabadokg/m21003.512.18765.18Viga Principal (25*30)kg/m324002.860.250.30514.8Viga Principal (25*30)kg/m324004.230.250.30761.4Viga Principal (25*30)kg/m324003.510.250.30631.8Columna (35*35cm2)kg/m324000.350.352.30676.2Columna (40*40cm2)kg/m324000.400.402.30883.2Columna (35*35cm2)kg/m324000.350.352.30676.2Muro 1Kg/m318000.750.152.40486Muro 1Kg/m318000.10.152.4064.8Muro 1Kg/m318000.620.152.40401.76Muro 2Kg/m318000.360.152.40233.28Muro 2Kg/m318001.80.151.20583.2Muro 2Kg/m318001.360.151.10403.92Muro 3Kg/m318001.800.151.20583.2Muro 3Kg/m318000.360.152.40233.28Muro 3Kg/m318000.350.152.30217.35Muro 4Kg/m318000.10.152.4064.8Muro 4Kg/m318000.60.152.40388.8Muro 4Kg/m318000.630.152.40408.24Muro 5Kg/m318000.950.151.20307.8Muro 5Kg/m318001.980.152.401283.04Ventana 1Kg/m2401.361.1059.84Muro 6Kg/m318000.30.152.40194.4Ventana 1Kg/m2401.81.2086.4CARGAS VIVAS1530.36Muro 7Kg/m318000.60.152.40388.8CARGAS VIVAS2267.28SobrecargaKg/m22003.512.181530.36Ventana 1Kg/m2400.951.2045.6SobrecargaKg/m22004.232.682267.28Ventana 2Kg/m2401.801.2086.44 CARGAS MUERTAS5763.636CARGAS VIVAS1532.964 CARGAS MUERTAS4990.32Aligeradokg/m23003.511.932032.29SobrecargaKg/m22002.862.681532.96Aligeradokg/m22004.232.432055.78Acabadokg/m21003.512.18765.18Acabadokg/m21004.232.681133.64Viga Principal (25*30)kg/m324003.510.250.30631.84 CARGAS MUERTAS4538.02Viga Principal (25*30)kg/m324004.230.250.30761.4Muro 1kg/m318001.40.152.06778.68Aligeradokg/m23002.862.432084.94Muro 1kg/m318002.110.151.00569.7Muro 2kg/m318000.530.152.06294.786Acabadokg/m21002.862.68766.48Muro 2kg/m318000.420.151.00113.4Muro 3kg/m318000.470.151.00126.9Viga Principal (25*30)kg/m324002.860.250.30514.8Muro 3kg/m318001.980.101.00356.4Muro 4kg/m318001.80.151.00486Muro 1kg/m318002.110.151.00569.7CARGAS VIVAS1133.64Muro 5kg/m318001.250.151.00337.5Muro 2kg/m318001.630.151.00440.1SobrecargaKg/m22004.232.681133.64Muro 6kg/m318000.550.151.00148.5Muro 3kg/m318000.60.151.00162Muro 7kg/m318000.60.151.00162CARGAS VIVAS766.48CARGAS VIVAS765.18SobrecargaKg/m22002.862.68766.48SobrecargaKg/m22003.512.18765.18TOTALCarga Muerta32222.61Carga Viva10202.76TOTALTOTALCarga Muerta24001.495Carga Muerta23545.626Carga Viva6898.32Carga Viva6886.62
ZapatsDISEO DE ZAPATA C-1DISEO DE ZAPATA C-2DISEO DE ZAPATA C-3DISEO DE ZAPATA C-31.51.51.51.5HHHHPara el diseo de zapatas consideramos los siguientes datos:Para el diseo de zapatas consideramos los siguientes datos:Para el diseo de zapatas consideramos los siguientes datos:Para el diseo de zapatas consideramos los siguientes datos:Datos de ZapataColmna tipo C-140x40Datos de ZapataColmna tipo C-240x40Datos de ZapataColmna tipo C-335x35Datos de ZapataColmna tipo C-335x35Recubrimiento ACI 7.7.17.5cmRecubrimiento ACI 7.7.17.5cmRecubrimiento ACI 7.7.17.5cmRecubrimiento ACI 7.7.17.5cm de Acero3/4"1.905 de Acero3/4"1.905 de Acero3/4"1.905 de Acero3/4"1.905fc210kg/cm2fc210kg/cm2fc210kg/cm2fc210kg/cm2fy4200kg/cm2fy4200fy4200fy42001. PREDIMENSIONAMIENTO DE PERALTEPREDIMENSIONAMIENTO DE PERALTEPREDIMENSIONAMIENTO DE PERALTEPREDIMENSIONAMIENTO DE PERALTElbd=44.1697163224H=51.669716322455cmlbd=44.1697163224H=51.669716322455cmlbd=44.1697163224H=51.669716322455cmlbd=44.1697163224H=51.669716322455cmSe asume 55cm de peralteSe asume 55cm de peralteSe asume 55cm de peralteSe asume 55cm de peralte2. DIMENSION DEL AREA DE ZAPATA2. DIMENSION DEL AREA DE ZAPATA2. DIMENSION DEL AREA DE ZAPATA2. DIMENSION DEL AREA DE ZAPATA2.1. Predimencionamiento del Area de zapata por qsn2.1. Area de zapata por qsn2.1. Area de zapata por qsn2.1. Area de zapata por qsnDatos del sueloCarga admisible (qs)10300kg/m2Datos del sueloCarga admisible (qs)10300kg/m2Datos del sueloCarga admisible (qs)10300kg/m2Datos del sueloCarga admisible (qs)10300kg/m2 del suelo (t)1564kg/m3 del suelo (t)1564kg/m3 del suelo (t)1564kg/m3 del suelo (t)1564kg/m3Altura del suelo sobre la zapata (ht)0.95mAltura del suelo sobre la zapata (ht)0.95mAltura del suelo sobre la zapata (ht)0.95mAltura del suelo sobre la zapata (ht)0.95mAltura de cimentacin (hc)0.55mAltura de cimentacin (hc)0.55mAltura de cimentacin (hc)0.55mAltura de cimentacin (hc)0.55mProfundidad de desplante (Df)1.5mProfundidad de desplante (Df)1.5mProfundidad de desplante (Df)1.5mProfundidad de desplante (Df)1.5mDatos Adicionales del concreto (c)2400kg/m3Datos Adicionales del concreto2400kg/cm3Datos Adicionales del concreto2400kg/cm3Datos Adicionales del concreto2400kg/cm3Carga muerta46807.206kgCarga muerta32222.61kgCarga muerta23545.626kgCarga muerta24001.495kgCarga viva11319.47kgCarga viva10202.76kgCarga viva6886.62kgCarga viva6898.32kgS/C200kg/m2S/C200kg/m2S/C200kg/m2S/C200Kg/m22.1.1 Capacidad portante neta del terreno2.1. Capacidad portante neta del terreno2.1. Capacidad portante neta del terreno2.1. Capacidad portante neta del terrenoqsn=7294.2kg/m2qsn=7294.2kg/m2qsn=7294.2kg/m2qsn=7294.2kg/m22.1.2 Area de zapata 2.1.2 Area de zapata 2.1.2 Area de zapata 2.1.2 Area de zapata Az=7.9688898029m2Az=5.8163157029m2Az=4.1721156535m2Az=4.2362171314m2Seccion de la zapata cuadrada calculada2.8229222098m de ladoSeccion de la zapata cuadrada calculada2.4117039003m de ladoSeccion de la zapata cuadrada calculada2.04257574m de ladoSeccion de la zapata cuadrada calculada2.0582072615m de lado el area de la Zapata sera :2.8mel area de la Zapata sera :el area de la Zapata sera :2.5m el area de la Zapata sera :2mel area de la Zapata sera :2.1m2.2. Area de zapata por la Ecuacion de la Capacidad de Carga2.2. Area de zapata por la Ecuacion de la Capacidad de Carga2.2. Area de zapata por la Ecuacion de la Capacidad de Carga2.2. Area de zapata por la Ecuacion de la Capacidad de CargaFactores de Forma, Profundidad e InclinacinFactores de Forma, Profundidad e InclinacinFactores de Forma, Profundidad e InclinacinFactores de Forma, Profundidad e InclinacinRelacinFuente:RelacinFuente:RelacinFuente:RelacinFuente:Factor FormaFcs1+BNq/LNcBeer (1970) Hansen(1970)Factor FormaFcs1+BNq/LNcBeer (1970) Hansen(1970)Factor FormaFcs1+BNq/LNcBeer (1970) Hansen(1970)Factor FormaFcs1+BNq/LNcBeer (1970) Hansen(1970)Fqs1+Btan/LFqs1+Btan/LFqs1+Btan/LFqs1+Btan/LFs1-0.4B/LFs1-0.4B/LFs1-0.4B/LFs1-0.4B/LDonde: L>B lonitudes de la cimentacinDonde: L>B lonitudes de la cimentacinDonde: L>B lonitudes de la cimentacinDonde: L>B lonitudes de la cimentacinFactor ProfundidadCondicin a) Df/B 1Hansen(1970)Factor ProfundidadCondicin a) Df/B 1Hansen(1970)Factor ProfundidadCondicin a) Df/B 1Hansen(1970)Factor ProfundidadCondicin a) Df/B 1Hansen(1970)Fcd1+0.4Df/BFcd1+0.4Df/BFcd1+0.4Df/BFcd1+0.4Df/BFqd1+2tan(1-SEN)2(Df/B)Fqd1+2tan(1-SEN)2(Df/B)Fqd1+2tan(1-SEN)2(Df/B)Fqd1+2tan(1-SEN)2(Df/B)Fd1Fd1Fd1Fd1Condicin b) Df/B > 1Condicin b) Df/B > 1Condicin b) Df/B > 1Condicin b) Df/B > 1Fcd1+0.4tan-1(Df/B)Fcd1+0.4tan-1(Df/B)Fcd1+0.4tan-1(Df/B)Fcd1+0.4tan-1(Df/B)Fqd1+2tan(1-Sen)tan-1(Df/B)Fqd1+2tan(1-Sen)tan-1(Df/B)Fqd1+2tan(1-Sen)tan-1(Df/B)Fqd1+2tan(1-Sen)tan-1(Df/B)Fd1Fd1Fd1Fd1Factor de inclinacionFci(1-B/90)^2Meyerhof(1963) Hanna y Meyerhof(1981)Factor de inclinacionFci(1-B/90)^2Meyerhof(1963) Hanna y Meyerhof(1981)Factor de inclinacionFci(1-B/90)^2Meyerhof(1963) Hanna y Meyerhof(1981)Factor de inclinacionFci(1-B/90)^2Meyerhof(1963) Hanna y Meyerhof(1981)Fqi(1-B/90)^2Fqi(1-B/90)^2Fqi(1-B/90)^2Fqi(1-B/90)^2Fi(1-B/)^2Fi(1-B/)^2Fi(1-B/)^2Fi(1-B/)^2Donde:Donde:Donde:Donde:B:Angulo de la inclinacin de la cargasobre la cimentacion con respecto a la verticalB:Angulo de la inclinacin de la cargasobre la cimentacion con respecto a la verticalB:Angulo de la inclinacin de la cargasobre la cimentacion con respecto a la verticalB:Angulo de la inclinacin de la cargasobre la cimentacion con respecto a la vertical* El factor tan-1(Df/B) en radianes* El factor tan-1(Df/B) en radianes* El factor tan-1(Df/B) en radianes* El factor tan-1(Df/B) en radianesFactores de CargaFactores de CargaFactores de CargaFactores de CargaNqTan2(45+/2)e^tanNqTan2(45+/2)e^tanNqTan2(45+/2)e^tanNqTan2(45+/2)e^tanN2(Nq+1)tanN2(Nq+1)tanN2(Nq+1)tanN2(Nq+1)tanNcCot(Nq-1)NcCot(Nq-1)NcCot(Nq-1)NcCot(Nq-1)2.2.1 Ecuacin general de la capacidad de carga2.2.1 Ecuacin general de la capacidad de carga2.2.1 Ecuacin general de la capacidad de carga2.2.1 Ecuacin general de la capacidad de cargaDatosDatosDatosDatosC1.75Tn/m2C1.75Tn/m2C1.75Tn/m2C1.75Tn/m212.49612.49612.49612.496 Especifico1.564Tn/m2 Especifico1.564Tn/m2 Especifico1.564Tn/m2 Especifico1.564Tn/m2Df1.5mDf1.5mDf1.5mDf1.5mHallamos los Factores de CargaHallamos los Factores de CargaHallamos los Factores de CargaHallamos los Factores de CargaNq3.1140881677Nq3.1140881677Nq3.1140881677Nq3.1140881677N1.8235401185N1.8235401185N1.8235401185N1.8235401185Nc9.5391870223Nc9.5391870223Nc9.5391870223Nc9.5391870223Hallamos los Factores de FormaHallamos los Factores de FormaHallamos los Factores de FormaHallamos los Factores de FormaFcs1.3264521558Fcs1.3264521558Fcs1.3264521558Fcs1.3264521558Fqs1.2216214194Fqs1.2216214194Fqs1.2216214194Fqs1.2216214194Fs0.6Fs0.6Fs0.6Fs0.6Hallamos los Factores de ProfundidadPara Df/B 1Hallamos los Factores de ProfundidadPara Df/B 1Hallamos los Factores de ProfundidadPara Df/B 1Hallamos los Factores de ProfundidadPara Df/B 1Fcd1.2142857143Fcd1.24Fcd1.3Fcd1.2857142857Fqd0.4082756526 1+ 0.41/BFqd0.4082756526 1+ 0.41/BFqd0.4082756526 1+ 0.41/BFqd0.4082756526 1+ 0.41/BFd1Fd1Fd1Fd1Hallamos los Factores de InclinacinHallamos los Factores de InclinacinHallamos los Factores de InclinacinHallamos los Factores de InclinacinFci1Fci1Fci1Fci1Fqi1Fqi1Fqi1Fqi1Fi1Fi1Fi1Fi1Esfuerzo efectivo en el punto de la zapataEsfuerzo efectivo en el punto de la zapataEsfuerzo efectivo en el punto de la zapataEsfuerzo efectivo en el punto de la zapataDf2.346Df2.346Df2.346Df2.346HALLAMOS EL quHALLAMOS EL quHALLAMOS EL quHALLAMOS EL ququ=26.8882097787 +(1+ 0.41/B )*8.9247395505 +B*0.8556050236qu=27.4576071623 +(1+ 0.41/B )*8.9247395505 +B*0.8556050236qu=28.7862010572 +(1+ 0.41/B )*8.9247395505 +B*0.8556050236qu=28.4698691775 +(1+ 0.41/B )*8.9247395505 +B*0.8556050236qadm=qu/3qadm=Qadm/B2qadm=qu/3qadm=Qadm/B2qadm=qu/3qadm=Qadm/B2qadm=qu/3qadm=Qadm/B2qadm=8.9627365929 +(1+ 0.41/B )*2.9749131835 +B*0.2852016745 .1qadm=9.1525357208 +(1+ 0.41/B )*2.9749131835 +B*0.2852016745 .1qadm=9.5954003524 +(1+ 0.41/B )*2.9749131835 +B*0.2852016745 .1qadm=9.4899563925 +(1+ 0.41/B )*2.9749131835 +B*0.2852016745 .110.4110.4110.4110.41qadm=58.126676/B2.2qadm=42.42537/B2.2qadm=30.432246/B2.2qadm=30.899815/B2.2Igualando las Ecuaciones (1) y (2)Igualando las Ecuaciones (1) y (2)Igualando las Ecuaciones (1) y (2)Igualando las Ecuaciones (1) y (2)0.2852016745B3 +11.9376497764B2 +1.2197144052B-58.126676 .= 00.2852016745B3 +12.1274489043B2 +1.2197144052B-42.42537 .= 00.2852016745B3 +12.5703135359B2 +1.2197144052B-30.432246 .= 00.2852016745B3 +12.464869576B2 +1.2197144052B-30.899815 .= 0Entonces los valores de x son:Entonces los valores de x son:Entonces los valores de x son:Entonces los valores de x son:X12.1X11.73X11.45X11.46X2-41.72X2-42.6X2-43.92X2-43.92X3-2.23el area de la Zapata sera:2.1* 2.1 m2X3-1.9el area de la Zapata sera:1.8* 1.8m2X3-1.59el area de la Zapata sera:1.5* 1.5 m2X3-1.6el area de la Zapata sera:1.5* 1.5 m23. REACCION DEL SUELO3. REACCION DEL SUELO3. REACCION DEL SUELO3. REACCION DEL SUELOqsn=1.3180652154Kg/cm2qsn=1.309425Kg/cm2qsn=1.3525442667Kg/cm2qsn=1.3733251111Kg/cm24. REACCION AMPLIFICADA DEL TERRENO4. REACCION AMPLIFICADA DEL TERRENO4. REACCION AMPLIFICADA DEL TERRENO4. REACCION AMPLIFICADA DEL TERRENOFactor de AmplificacinFactor de AmplificacinFactor de AmplificacinFactor de AmplificacinCM1.2CM1.2CM1.2CM1.2CV1.6CV1.6CV1.6CV1.6qsnu=1.6843491882Kg/cm2qsnu=1.69727Kg/cm2qsnu=1.74548192Kg/cm2qsnu=1.7706269333Kg/cm25. VERIFICACION POR CORTANTE5. VERIFICACION POR CORTANTE5. VERIFICACION POR CORTANTE5. VERIFICACION POR CORTANTE 5.1 CORTE POR FLEXIONSeccin Critica 5.1 CORTE POR FLEXIONSeccin Critica 5.1 CORTE POR FLEXIONSeccin Critica 5.1 CORTE POR FLEXIONSeccin Criticad= Peralte Efectivod= Peralte Efectivod= Peralte Efectivod= Peralte Efectivod=45.595cmd=45.595cmd=45.595cmd=45.595cmLd=46cmLd=46cmLd=46cmLd=46cmBFuerza cortante ultima (Vu)Fuerza cortante ultima (Vu)Fuerza cortante ultima (Vu)Fuerza cortante ultima (Vu)Vu=13794.8198514286kgVu=28717.8084kgVu=18065.737872kgVu=3054.33146kgLa resistencia del concreto al corte por flexin es:La resistencia del concreto al corte por flexin es:La resistencia del concreto al corte por flexin es:La resistencia del concreto al corte por flexin es:ACI 11.3ACI 11.3ACI 11.3ACI 11.30.53ACI 9.3Factor de reduccion de resistencia =0.570.53ACI 9.3Factor de reduccion de resistencia =0.570.53ACI 9.3Factor de reduccion de resistencia =0.570.53ACI 9.3Factor de reduccion de resistencia =0.570.570.570.570.57Vc =42289.9818791302kgbwVc =36248.5558963973kgbwVc =30207.1299136644kgbwVc =30207.1299136644kgbwLa relacion debe serLa relacion debe serLa relacion debe serLa relacion debe ser13794.8242289.98la relacin es correcta28717.8136248.56la relacin es correcta18065.7430207.13la relacin es correcta3054.3330207.13la relacin es correcta 5.2 CORTE POR PUNZONAMIENTO 5.2 CORTE POR PUNZONAMIENTO 5.2 CORTE POR PUNZONAMIENTO 5.2 CORTE POR PUNZONAMIENTO(ACI 11-35)(ACI 11-35)(ACI 11-35)(ACI 11-35)(ACI 11-36)(ACI 11-36)(ACI 11-36)(ACI 11-36)(ACI 11-37)(ACI 11-37)(ACI 11-37)(ACI 11-37)Donde:Donde:Donde:Donde:VcResistencia del concreto al corteVcResistencia del concreto al corteVcResistencia del concreto al corteVcResistencia del concreto al cortecCociente de la dimensin mayor de la columna entre la dimensin menorcCociente de la dimensin mayor de la columna entre la dimensin menorcCociente de la dimensin mayor de la columna entre la dimensin menorcCociente de la dimensin mayor de la columna entre la dimensin menorboPermetro de la seccin crticaboPermetro de la seccin crticaboPermetro de la seccin crticaboPermetro de la seccin crticasParmetro igual a 40 para columnas interiores40sParmetro igual a 30 para columnas laterales30sParmetro igual a 20 para columnas ubicada en la esquina20sParmetro igual a 20 para columnas ubicada en la esquina20Interior4 lados de seccin crtica .Laterales3 lados de seccin crtica .Esquineras2 lados de seccin crtica .Esquineras2 lados de seccin crtica .Seccion crticaSeccion crticaSeccion crticaSeccion crticaArea CrticaArea CrticaArea CrticaArea CrticaBL-(d+bc)(d+dc)BL-(d+bc)(d+dc)BL-(d+bc)(d+dc)BL-(d+bc)(d+dc)B210B180B150B150L210L180L150L150d46d46d46d46 Lbc40bc40 Lbc35bc35dc40dc40dc35dc35qsnu1.7qsnu1.7qsnu1.7qsnu1.80.750.750.750.75f'c210f'c210f'c210f'c210s40s40s40s40Fuerza cortante aplicada (Vu)Fuerza cortante aplicada (Vu)Vu=54930.44628kgVu=39062.13988768kgResistencia del C al corte por punzonamientoResistencia del C al corte por punzonamientoa)bo=344a)bo=324Vc=278613.527942518kgVc=262415.067015627kgb)b)Vc=814629.26585662kgVc=700205.470999722kgFuerza cortante aplicada (Vu)Fuerza cortante aplicada (Vu)c)c)Vu=74219.1626292245kgVc=189182.025146154kgVc=178183.070195796kgVu=39624.8601410667kgEn los tres casos Vc > VuEn los tres casos Vc > VuResistencia del C al corte por punzonamiento6. REFUERZO LONGITUDINAL POR FLEXION6. REFUERZO LONGITUDINAL POR FLEXIONResistencia del C al corte por punzonamientoa)bo=344a)bo=324Vc=278613.527942518kgVc=262415.067015627kgb)b)Vc=865487.290798508kgVc=700205.470999722kgc)c)Vc=189182.025146154kgVc=178183.070195796kgEn los tres casos Vc > VuEn los tres casos Vc > VuSeccin critica para el diseo pro flexionSeccin critica para el diseo pro flexion6. REFUERZO LONGITUDINAL POR FLEXION6. REFUERZO LONGITUDINAL POR FLEXIONMux=1027119.9132Kg-mMux=990866.448936Kg-mRux =2.6967021456Rux =3.12182246042.52=0.9x(4200)(1-(0.59x4200)/210)2.93=0.9x(4200)(1-(0.59x4200)/210)1 =0.08412=0.0006721 =0.0842=0.0007823Seccin critica para el diseo pro flexionSeccin critica para el diseo pro flexion6.1 Calculo de acero6.1 Calculo de aceroAs=5.56416cm2As=5.39787cm2Mux=793909.56811619Kg-mEl Area de acero calculado sera:5.56416cm2El Area de acero calculado sera:5.39787cm2Mux=1005140.64438Kg-m6.2 Calculo de acero Minimo6.2 Calculo de acero MinimoRux =1.7866359891Asmin=14.904cm2Asmin=12.42cm2Rux =3.1667947208Debido a que el area de acero calculado es menor que el area de acero minimo, entonces tomamos el rea de acero minimoDebido a que el area de acero calculado es menor que el area de acero minimo, entonces tomamos el rea de acero minimo1.70=0.9x(4200)(1-(0.59x4200)/210)2.97=0.9x(4200)(1-(0.59x4200)/210)6.3 Numero de varilla de acero 1/2"1.296.3 Numero de varilla de acero 1/2"1.291 =0.084292=0.000452141 =0.083952=0.00079314n11.553488372112n9.6279069767106.1 Calculo de acero6.1 Calculo de acero6.4 Espaciamiento de las varillas6.4 Espaciamiento de las varillasAs=4.3676724cm2As=5.472666cm2El Area de acero calculado sera:4.3676724cm2El Area de acero calculado sera:5.472666cm2S =14.8827272727cmS =14.8566666667cm6.2 Calculo de acero Minimo6.2 Calculo de acero Minimo 1/2" @ 14cm 1/2" @ 14cmAsmin=17.388cm2Asmin=12.42cm2Debido a que el area de acero calculado es menor que el area de acero minimo, entonces tomamos el rea de acero minimo7. Verificacion de la conexin columna zapata7. Verificacion de la conexin columna zapataDebido a que el area de acero calculado es menor que el area de acero minimo, entonces tomamos el rea de acero minimo aplastamiento del concreto0.65 aplastamiento del concreto0.65A11600A112256.3 Numero de varilla de acero 1/2"1.29Pn=371.28TnA212100Pn=284.26125TnA2121006.3 Numero de varilla de acero 1/2"1.29n13.479069767414Pn > Puok2.75Pn > Puok3.1428571429n9.627906976710Utilizaremos 2Utilizaremos 26.4 Espaciamiento de las varillas6.4 Espaciamiento de las varillasS =14.9007692308cmS =14.8566666667cm 1/2" @ 14cm 1/2" @ 14cm7. Verificacion de la conexin columna zapata7. Verificacion de la conexin columna zapata aplastamiento del concreto0.65 aplastamiento del concreto0.65A11600A11225Pn=371.28TnA212100Pn=284.26125TnA212100Pn > Puok2.75Pn > Puok3.1428571429Utilizaremos 2Utilizaremos 2