MEMBERS PRESENT . MR. K. NOMURA MR. D. GHOSH MR. T .WA T ANABE MR. SUSANT A GHOSH  MR. VIKASH NIGAM MR. B.K.DAS  MR. SAMIR SAHA MR. D. BANERJEE  MR. SUBRA T A P AL. MR. S. DASMAL MR. P.K.GANGULY MR. S.K.MAITY THE FOLLOWING POINTS WERE DISCUSSED & DECIDED . 1. CIVIL EXPLAINED THE SOP FOR CONFINED SPACE P AINTING WORK. EXCEPT SPOTTER RESPONSIBILIT Y SOP IS ACCEPTED. 2.CIVIL BRIEFED THE DET AILS WORK PROCEDURE & SAFETY MEASURE FOR EACH DIFFERENT T ANKS .. 3. CIVIL REQUESTED FOR AIR LINE CONNECTION FOR EVERY TANK WHETHER AIR LINE OR ORGANIC MASK USED FOR MAINTAIN THE NATURAL AIR CIRCULATION. . MR. NIGAM ASKED FOR CONFIRMATION OF GAS MEASUREMENT FORMAT AS SH&E AND CIVIL MADE TWO TYPES OF FORMAT. !. MR. NOMURA CLARIFIED THE FOLLOWINGS " FOR GAS MEASUREMENT FORMA T# $ DESCRIPTION SAFETY ARRANGEMENT FORMA T REMARKS 1.TYPE%%A " ONE OR TWO AIR LINE MASK GENERAL O2 FLAMMABLE GAS  MANHOLE # "SH&E# AS PER ROUTINE CHECK 2. TYPE%B " MORE THAN TWO SPECIFIC FORMA T O2VOC FLAMMABLE MANHOLE # ORGANIC MASK "CIVIL# AS PER CIVIL FORMA T '. MR.S. P AL CONFIRMED THAT CSWI WILL BE RENAMED BY CSWI PAINTING & NECESSARY ACTION WI LL BE TAKEN BY HS&E. (. MR. SAHA SUGGESTED THAT SPOTTER WILL BE FROM CONTRACTOR SIDE WITH NECESSARY SAFETY TRAINING AND ALSO RESPONSIBLE FOR VOC MEASUREMENT . ). MR. WAT ANABE WANTTED THAT SPOTTER WIL L BE FROM F ACILITY OWNER SIDE AS THE REQUIREMENT FOR SPOTTER WILL BE MAXIMUM TWO AT SDM . *.MR. NOMURA INFORMED THE SPOTTER + VOC MEASUREMENT RESPONSIBILITY WILL BE CONFIRMED  AFTER DIS CUSSION WITH MR. KASAI . 1,. MR. D GHOSH ASKED FOR THE LOCA TION OF VOC MEASUREMENT AND CIVIL CONFIRMED 1ST MEASUREMENT  A T INSIDE OF MANHOLE " EX HAUST VENTILA TION AREA AS THE ORGANIC V APOR DENSIT Y OF P AINT IS HIGHER#. 11. MR.NOMURA SUGGESTED THA T HS&E SHOULD ARRANGE FOR PA TROLLING AT THE TIME OF WORKING. 12. CIVIL REQUESTED SH&E FOR PROVIDING OF ORGANIC MASK INCLUDING CARTAGE "CHANGE TYPE# & MINUTES OF THE MEETING FOR CONFINED SPA CE PAINTING SOP

Upload: vikas-nigam

Post on 01-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

7/26/2019 Con Ent Meeting

http://slidepdf.com/reader/full/con-ent-meeting 1/2

MEMBERS PRESENT.

MR. K. NOMURA MR. D. GHOSH

MR. T.WATANABE MR. SUSANTA GHOSH

 MR. VIKASH NIGAM MR. B.K.DAS

 MR. SAMIR SAHA MR. D. BANERJEE

 MR. SUBRATA PAL. MR. S. DASMAL

MR. P.K.GANGULY

MR. S.K.MAITY

THE FOLLOWING POINTS WERE DISCUSSED & DECIDED .

1. CIVIL EXPLAINED THE SOP FOR CONFINED SPACE PAINTING WORK. EXCEPT SPOTTER RESPONSIBILITY

SOP IS ACCEPTED.

2.CIVIL BRIEFED THE DETAILS WORK PROCEDURE & SAFETY MEASURE FOR EACH DIFFERENT TANKS ..

3. CIVIL REQUESTED FOR AIR LINE CONNECTION FOR EVERY TANK WHETHER AIR LINE OR ORGANIC MASK

USED FOR MAINTAIN THE NATURAL AIR CIRCULATION.

. MR. NIGAM ASKED FOR CONFIRMATION OF GAS MEASUREMENT FORMAT AS SH&E AND CIVIL MADE TWO

TYPES OF FORMAT.

!. MR. NOMURA CLARIFIED THE FOLLOWINGS " FOR GAS MEASUREMENT FORMAT# $

DESCRIPTION SAFETY ARRANGEMENT FORMAT REMARKS

1.TYPE%%A " ONE OR TWO AIR LINE MASK GENERAL O2 FLAMMABLE GAS

 MANHOLE # "SH&E# AS PER ROUTINE CHECK

2. TYPE%B " MORE THAN TWO SPECIFIC FORMAT O2VOC FLAMMABLE

MANHOLE # ORGANIC MASK "CIVIL# AS PER CIVIL FORMAT

'. MR.S. PAL CONFIRMED THAT CSWI WILL BE RENAMED BY CSWI PAINTING & NECESSARY ACTION WILL

BE TAKEN BY HS&E.

(. MR. SAHA SUGGESTED THAT SPOTTER WILL BE FROM CONTRACTOR SIDE WITH NECESSARY SAFETY

TRAINING AND ALSO RESPONSIBLE FOR VOC MEASUREMENT .

). MR. WATANABE WANTTED THAT SPOTTER WILL BE FROM FACILITY OWNER SIDE AS THE REQUIREMENT

FOR SPOTTER WILL BE MAXIMUM TWO AT SDM .

*.MR. NOMURA INFORMED THE SPOTTER + VOC MEASUREMENT RESPONSIBILITY WILL BE CONFIRMED

 AFTER DISCUSSION WITH MR. KASAI .

1,. MR. D GHOSH ASKED FOR THE LOCATION OF VOC MEASUREMENT AND CIVIL CONFIRMED 1ST MEASUREMENT

 AT INSIDE OF MANHOLE " EXHAUST VENTILATION AREA AS THE ORGANIC VAPOR DENSITY OF PAINT IS HIGHER#.

11. MR.NOMURA SUGGESTED THAT HS&E SHOULD ARRANGE FOR PATROLLING AT THE TIME OF WORKING.

12. CIVIL REQUESTED SH&E FOR PROVIDING OF ORGANIC MASK INCLUDING CARTAGE "CHANGE TYPE# &

MINUTES OF THE MEETING FOR CONFINED SPACE

PAINTING SOP

7/26/2019 Con Ent Meeting

http://slidepdf.com/reader/full/con-ent-meeting 2/2

  AIR LINE MASK WITH HOSE PIPE . " ACTUAL REQUIREMENT OF QUANTITY WILL BE INFORMED#.