comprehensive curricullum vitae - · pdf filefacilitates / lead pre - inspection meeting ......

36
Page 1 of 36 COMPREHENSIVE CURRICULLUM VITAE NAME : ROS HISHAM HASSAN NRIC : 7 0 0 8 0 6 0 8 5 4 3 5 (New) A 1 6 1 5 1 0 2 (Old) NATIONALITY : MALAYSIAN DATE OF BIRTH/AGE : 06 AUGUST 1970 @ 45 YEARS MARITAL STATUS : Married INCOME TAX NO : S G 3 4 5 4 9 7 0 0 6 EPF NO : 1 1 2 6 3 7 9 8 FORMAL EDUCATION : (a) Higher School Certificate Science Stream (STPM) (HNC) (b) Diplomë in Mechanical Engineering and Metallurgy / Metallurgical Technology; Dipl.Ing | Eur.Ing (non gradable) /Diplomë in der Maschinenbau und Metallurgie / Metallurgischen Technik ( nicht - klasse) (coorganized by DeutschMalaysische Industrie und Handelskammer / MalaysianGerman Chamber Of Commerce and Industry & Preussag Stahl AG) (Zusammenarbeit organisiert von Deutsch Malaysische Industrie und Handelskammer Industrie - und Preussag Stahl AG COURSES/TRAINING : 1988 thru 1992 CERTIFICATES : Mechanical, Metallurgy, Corrosion & QA/QC Training Courses at Preussag Stahl AG, Salzgitter, Hanover, Germany on RT, UT, MP, PT, Eddy Current Inspection (as per DIN, API, BS, AWS & ASME Codes), Corrosion, Steel & Welding Metallurgy & Inspection. (coorganized by DeutschMalaysische Industrie und Handelskammer / MalaysianGerman Chamber Of Commerce and Industry & Preussag Stahl AG) COMPUTER LITERACY : Microsoft Office INTERNATIONAL STANDARDS & CODES : IS0 9000, ISO 9001, ISO 9002, ISO 2547, ISO 2587 ASME SECTION I, II, V, VIII, IX

Upload: vanmien

Post on 06-Mar-2018

254 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 1 of 36

COMPREHENSIVE CURRICULLUM VITAE NAME : ROS HISHAM HASSAN

NRIC : 7 0 0 8 0 6 – 0 8 – 5 4 3 5 (New)

A 1 6 1 5 1 0 2 (Old) NATIONALITY : MALAYSIAN DATE OF BIRTH/AGE : 06 AUGUST 1970 @ 45 YEARS MARITAL STATUS : Married INCOME TAX NO : S G 3 4 5 4 9 7 0 0 6 EPF NO : 1 1 2 6 3 7 9 8 FORMAL EDUCATION : (a) Higher School Certificate – Science Stream

(STPM) (HNC) (b) Diplomë in Mechanical Engineering and Metallurgy /

Metallurgical Technology; Dipl.Ing | Eur.Ing (non – gradable) /Diplomë in der Maschinenbau und

Metallurgie / Metallurgischen Technik (nicht - klasse) (co–organized by Deutsch–Malaysische Industrie und

Handelskammer / Malaysian–German Chamber Of Commerce and Industry & Preussag Stahl AG)

(Zusammenarbeit organisiert von Deutsch –Malaysische Industrie und Handelskammer Industrie -und Preussag Stahl AG

COURSES/TRAINING : 1988 thru 1992 CERTIFICATES : Mechanical, Metallurgy, Corrosion & QA/QC Training

Courses at Preussag Stahl AG, Salzgitter, Hanover, Germany on RT, UT, MP, PT, Eddy Current Inspection (as per DIN, API, BS, AWS & ASME Codes), Corrosion, Steel & Welding Metallurgy & Inspection.

(co–organized by Deutsch–Malaysische Industrie und Handelskammer / Malaysian–German Chamber Of Commerce and Industry & Preussag Stahl AG)

COMPUTER LITERACY : Microsoft Office INTERNATIONAL STANDARDS & CODES : IS0 9000, ISO 9001, ISO 9002, ISO 2547, ISO 2587 ASME SECTION I, II, V, VIII, IX

Page 2: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 2 of 36

API 1104, 5L, 650, 661, 2C, RP, 2H, 510, 570, 581, API 571, 579

AWS D1.1, D15.1 AISC ANSI B31.1, B31.3, B31.4, B31.5, B31.6, B31.8

ANSI B31.8S (Managing System Integrity and Fitness–For Purpose Assessments of Pipelines) / (Geschäftsführer Systemintegrität und Fitness for

Purpose-Die Beurteilung von Rohrleitungen)

ANSI B31G (Manual for determining the remaining strength of corroded pipelines) / (Handbuch für die Bestimmung der restlichen Stärke korrodierte Rohrleitungen)

NACE RP 0502, TM 0194, RP 0296, TM 0177, RP

0387, MR 0175, RP 0394, RP 0287, RP 0490, RP 0472, RP 0176, RP 0492, RP 0388, RP 0387, RP 0285, RP 0196, RP 0193, RP 0198, RP 0287, RP 0274, TM 0284, RP 0675

AUSTRALIAN STANDARD(s) – AS

NATIONAL BOARD INSPECTION CODE (NBIC) RTD – Roetgen Technissien, Holland

BRITISH STANDARD(s) – BS

DEUTCH INDUSTRIALE NORM – DIN

UNDERWRITERS LABAROTORY – UL CLASSIFICATION STANDARD(S):– LLOYDS, DNV – OS – FS & ABS

ASME PVHO – 10;

PRESSURE VESSEL FOR HUMAN OCCUPANCY (DSV – Diving Bell / Chamber)

END – USER & CLIENT SPECIFICATIONS : EXXON MOBIL EPMI :- GS, IP, BP PETRONAS :- PTS, PPGUA, SES,

MESC ROYAL DUTCH SHELL :- SIEP, DEP, SES,

Page 3: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 3 of 36

TOTAL FINA ELF :- GS UNOCAL / WORLEYPARSONS:- PGS / PTS / PIP ALSTOM POWER & :- GAS TURBINE &

GENERAL ELECTRIC (GEC) POWER PLANT QUALIFICATION a) Diplomë in Mechanical Engineering and Metallurgy /

Metallurgical Technology; Dipl.Ing | Eur.Ing (non – gradable) / Diplomë in der Maschinenbau und Metallurgie / Metallurgischen Technik (nicht - klasse)

awarded by Preussag Stahl AG, Salzgitter, Germany in collaboration with FH Technische Fachhochschule Osnabrück & TU Berlin, Technische Universität Berlin

(non–gradable) (nicht - k lasse)

(Co–organized by Malaysian–German Chamber Of Commerce and Industry and Preussag Stahl AG) (Zusammenarbeit organisiert von Deutsch – Malaysische Industrie und Handelskammer Industrie und Preussag Stahl AG

b) American Society For Non Destructive Testing (ASNT) RT - ASNT Level II as per SNT-TC-1A UT - ASNT Level II as per SNT-TC-1A MP-ASNT Level II as per SNT-TC-1A PT - ASNT Level II as per SNT-TC-1A TOTAL SOLID EXPERIENCE IN OIL & GAS, PETROCHEMICAL

INDUSTRY : 23 Years PREAMBLES Every successful project starts as an idea. Collect all best ideas and transform into

business plan opportunity. Maximize team efficiency with innovative, collaborative features that keep all team members informed and accountable and connected.

Perform critical tasks of transforming top-down strategy into bottom line results. Executing projects through tasks and issue management, forecasting and dynamic

applications. Stay vigilant and agile in order to identify and leverage new business opportunities. SUMMARY OF EXPERIENCE I have over 23 years site and procurement source experience and exposure in O&G -

offshore & onshore, petrochemical and power plant. The scope of responsibilities ranging from entire aspect of front end engineering design (FEED – inclusive conceptual/feasibility studies, basic engineering design {BED}, detail engineering design {DED}, installation design, rejuvenation & revamp & decommissioning engineering, cause and effect matrix system design, engineering control & construction design, plant integrity management, Asset Life Study, constructability design review, condition assessment,

Page 4: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 4 of 36

engineering verification assessment, noise and vibration & gas flaring emission controls and major construction activities e.g. worldwide source inspection, field engineering, corrosion engineering, risk base inspection, engineering criticality assessment, asset integrity assessment, qualitative risk assessment (QRA) field supervision & man power arrangement, QA/QC matters, mechanical static equipment inspection, planning & scheduling, MTO & QS matters, source inspection & progress reporting, project control, construction & fabrication design, contract administrations, technical clarification ( NCR, DCR, STQ, CO, VO, MCCR etc ), mechanical & electrical commissioning, non – destructive examinations (NDE) and meeting with Consultants, Government Department Officers and Owners, liaison with local authorities i.e. Municipal Council and other daily construction operation and management activities. TECHNICAL QUALIFICATIONS : Diplomë in Mechanical Engineering and Metallurgy /

Metallurgical Technology; Dipl.Ing (non – gradable) / Diplomë in der Maschinenbau und Metallurgie / Metallurgischen Technik (nicht - klasse) awarded by Preussag Stahl AG, Salzgitter, Germany

in collaboration with FH Technische Fachhochschule Osnabrück & TU Berlin, Technische Universität Berlin (non–gradable)(nicht - k lasse)

(Co–organized by Malaysian–German Chamber Of Commerce and Industry and Preussag Stahl AG) (Zusammenarbeit organisiert von Deutsch –Malaysische Industrie und Handelskammer Industrie und Preussag Stahl

AG)

: Non-Destructive Examinations Level II in Radiography

Testing, Ultrasonic Testing, Magnetic Particle Inspection and Penetrant Testing in accordance to ASNT-TC-1A Edition.

QA/QC : Training & practical courses at Presussag Stahl AG,

and Krupp Polysuis GmBH,Germany on the following subjects:-

Steel and iron foundry

Non - Destructive Examinations including interpretations:- (in collaboration with Krautkramer GmBh, Koln, Germany & Roentgen GmBh, Dortmund, Germany) Radiography Testing ( X & Gamma Rays, Ultrasonic Flaw Detector, Magnetic Particle Inspection, Penetrant Testing, Eddy Current Inspection.

Steel and Welding Metallurgy, Corrosion & Inspection & Inspection Management Systems

Construction Management & Supervisory

Asset Integrity Management

Page 5: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 5 of 36

(offshore and onshore facilities) WORKING EXPERIENCE

: VESSEL & TANKS

- Heat Exchangers (plate/shell/tube) - Pressure filters - Compressors - Tanks - Pressure Vessels and HRSG Boilers - Special alloys fabricated vessels and exchangers - Corrosion Resistant Alloy ( CRA ) & Clad Vessel - Kiln - Layered Pressure Vessel (ULW) - Scrubbers - Separator - Cryogenic – Cogen LNG Vessels & Sphere Tanks

- Twister - Glycol Contactor - Condensator - Emulsion Heaters - Tall Towers (Columns) - Slug Catchers - Reactors - Reboiler - Desalter - Process Skids - Gas Turbines - Long Residue Catalytic Converter ( LRCC )

: PIPELINES & PIPINGS

- DSAW spiral pipe fabrications - Carbon/Duplex/Incoloy/CRA Steels Sub sea pipelines - Seam pipe and seam less pipe fabrications - Internally lined piping - Pipes and fittings - Pipelines and pipings for cryogenic – cogen

systems

- Pipe flanges - Internal pipe pressure blower

Process and utility piping (sour, non–sour, hydrocarbon, H2S service etc)

: STEEL STRUCTURES

- Tower crane - Offshore Pedestal Crane - Pipe racks - Modules - Jacket fabrications ( oil rig ) i.e.

Tripod jacket

4, 8, 12 legged jackets Bridge support platform

Page 6: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 6 of 36

Jack – Up leg - Furnace - Chimney - Flare Stack - Rail steel

: WELLHEADS & CHRISTMAS TREES

: BOILERS

- Gas Boiler - Steam Boiler - Fired Boiler - Heat Recovery Steam Generator Boiler

: PUMPS

- Centrifugal Pump - Submersible Pump

: TURBINE

- Gas Turbine - Steam Turbine - HRSG Turbine - CCGT Turbine

: VALVE & REGULATOR

- All kind of valves and regulators COMMONLY ASSIGNED SCOPE OF WORKS

Responsible for the overall quality management system of the EPC project implementation to meet the project‟s quality objectives

Supervise, coordinate and administer Contractor‟s project quality management system also performing periodic audit to ensure that the system is implemented accordingly

Worldwide procurement source inspection Provisions of minimum source inspection requirements (MSIR) Evaluation of bidding and tendering submissions by Project, Design and Procurement Department, whilst providing:-

Cost budgeting, Vendor bid evaluation (techno commercial)

& vendor selection, Preparation of technical requisition i.e.

Invitation to bid & project specifications, technical specifications, fabrication / manufacturing specifications,

Page 7: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 7 of 36

minimum source inspection requirements specifications, vendor data / design / inspection & test plans / drawing / specification review, work order specifications, vendor document master lists review

Issuance of Letter of Intent / indemnity (LOI) & Letter of Acceptance (LOA) to an appointed vendor(s)

Liaising with Government Agency i.e. MITI, MOF,

Department Of Safety and Health (DOSH), Royal Customs, MIDA, Banking Institutions for LC, BG applications, Forwarding Agency and Port Authority

Supplier / vendor selection Provision of annual vendor / supplier performance

reports Mechanical static equipment inspection / survey Construction / Fabrication design appraisal Facilitates / Lead Pre - inspection Meeting Follow up on contractor‟s documentation and

inspection procedures submittal, review and approve and witness qualification testing and in process testing as necessary

Failure and fatigue analysis review on mechanical, piping & structural systems for ILS, COFD, COFH and seabed structural foundation

Administer and coordinate with the work Inspectors‟ to ensure that the inspection procedures and inspection requirements in all phases of the project are complied with through surveillance and witness inspection

Ensure job compliance with governing:- Project Execution Plans (PEP),

Project Quality Plans (PQP),

Contract Agreement (CA),

Invitation to Bid (ITB),

ISO Standard,

Quality Management Systems (QMS)

Contract Document Deliverable Lists (CDDR / VDRL), Inspection & Test Plan (ITP),

Owner Specifications,

International Codes,

Statutory Agencies and Town Council Regulations

Acts on such fields i.e. civil, structural, mechanical, welding, piping, electrical & instrument etc

Monitor and control issuance of piping materials for fabrication, to detect and resolve pipe clashes and prepare rerouting of spools

Proactive in Project Risk Management comprising of Constructability Design Review, Construction Risk Assessment (CRA), HAZOP & HAZID assessment, Facilities Integrity Assessment

Page 8: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 8 of 36

Monitor the acceptable uniform interpretation of defined technical and quality requirements by Inspector‟s and NDE Technicians

Perform vendor shop survey, audit source inspection and expediting

Perform risk base survey and analyze datas Perform asset integrity survey Perform corrosion monitoring survey Provision / Coordination of Detail Engineering Design

(DED) for SURF (Subsea Pipelines, Umbilical, Riser & Flow lines)

Perform progress expediting for any delays Constructability design review of all design phases Provision of Method of Statement (M.O.S.) i.e. General, Mechanical, Civil, Piping, Construction,

Electrical & Instrument, Rotary Equipment, Commissioning, Start – Up,etc

Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council etc

Liaising with International Inspection Bureau i.e. Lloyds Register, ABS, DNV, BV, GLM, SGS, HARDFORD & STEAM BOILER etc (as stated in Fourth Schedule, DOSH Act )

Managing construction personnel, machinery and safety record (LTI, JSA, etc)

Job Skills Analytical Techniques:-

Scanning Electron Microscopy (SEM) Atomic Absorption Spectrometry (AAS) X – Ray Diffraction (XRD) Metallography:-

Light Microscopy, Photomicrography and image analysis as well as sample preparation techniques on various alloys

Developing Invitation To Bid document,

Scope Of Work document, Project Execution Plan (PEP), Project Quality Plan (PQP), Inspection & Test Plan (ITP), Minimum Source Inspection Requirement (MSIR), Contract Document & Deliverables Register, Master Document Register, QA & QC Procedure(s), Welding Procedure Specifications (WPS), Welder Qualification Test, Corrosion Monitoring Plan CMP Procedure, Pre – Shipment Inspection & Logistic Procedures, Material Management Plan, Material Control Procedures and All sort of QA/QC, Engineering, Technical and Integrity Procedures

Metallurgical / Mechanical Destructive Testing:-

Tensile Test, Compression Test, Macro and Micro Hardness Test ( Brinnel, Vickers and Rockwell ),Bend Test ( face and side bend ), Impact Test (charpy and izod), Fracture Toughness Test, Nick Brake Test, Crack Tip Opening Displacement Test ( CTOD ), Drop

Page 9: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 9 of 36

Weight Tear Test ( DWTT ), Hydrogen Induced Cracking Test ( HIC ), Corrosion Tests etc.

Non Destructive Examinations:-

Ultrasonic Testing (Flaws & Thickness measurement, PAUT, LRUT, TOFD, AUT), Magnetic Particle Inspection, Penetrant Testing, Eddy Current Testing and Radiography Testing ( X – Ray and Gamma Ray employing the use of Iridium - Ir 192 , Cesium – Cs 137, Selenium – Se 75 and Cobalt - Co 60 ), MFL-magnetic flux leakage

Welding and Hand surfacing:-

Supervision Of Welders and Welders qualification Test ( WPQT & WQT ), Welding Procedures (WPS ), welding Processes ( SMAW, SAW, GTAW, GMAW, ESW, FCAW, CO2, ERW, PAW, Orbirtal Welding OBW, Elecroslag Welding ESW, Electrogas Welding EGW, Thermit welding ) On Various Alloys Including Austenitic, Ferritic, Martensitic, Duplex, Inconel, Incoloy, Hastelloy, And Other Nickel Alloys, Monel ( Copper – Nickel Alloys ), Satellite, Chromium – Molybdenum Steel, HSLA, Abrasion AR Steel, High Yield HY Steel, Rimming Steel, Titanium, CRA Clad Steel And Various Grades Of Carbon Steel

Heat Treatment:- Inspection And Supervision Of Normalizing, Annealing, ( Stress Relieving And Spherodizing ) Of Carbon Steel Pipe Fittings, Pressure Vessels And Test Specimens, Transformation Hardening (Tempering and Quenching) Of Carbon Steel Specimens And Phase Transformation Of Duplex Stainless Steel. Conducting Jominy End Quench Test To Determine Hardenability Of Carbon – Manganese Steel Material, Sensitizing Molecular / Atomic Transformation.

Painting And blasting:-

Inspection And Supervision Of Painting And Grid ( Copper Slag And Garnet ) Blasting On Pressure Vessel, Tank, Pipeline, Piping And Steel & Jacket Structures.

Corrosion:-

Conduct Corrosion Monitoring Survey

Corrosion Monitoring Programs

Corrosion Penetration Rate And Potentiostatic Anodic / Cathodic Polarization Test (CP ) On Stainless Steel And Mild Steel.

Huey And Streicher Test For Stainless Steel To Determine Chloride Stress Corrosion, Galvanic, Pitting, Sulphide Stress Corrosion & Intergranular Corrosion (Weld Decay And Knifeline Attack) Susceptibility.

Page 10: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 10 of 36

Inspection And Installation Of Cathodic Protection For Storage Tanks & Sacrificial Anodes For Jacket Leg Platforms and Sub Sea Pipeline.

Being responsible for the followings corrosion activities and deliverables such as;

To guide and control the project execution and discipline‟s results

Allocating the design activities to the discipline engineer

Coordinating with project management team and other discipline leaders for information exchange

Reviewing weekly and monthly progress discipline reports

To attend HAZOP meeting as needed.

To assist Client to complete corrosion protection procedures and on job training for Client‟s engineers for these procedures

Perform/Check the detailed design and engineering.

Provision of the following tasks:-

Corrosion Control Philosophy

Corrosion Design Basis Memorandum – CDBM

Corrosion study report for the pipeline system (pipelines and stations)

Anti-corrosion and field joint coating & painting

Selection and Specification for offshore and onshore pipelines

Soil resistivity survey report

TBE report

Lining & inhibitor selection and specification

Test station specification Specification for cathodic protection fabrication &

installation for offshore and onshore pipelines

Cathodic protection installation procedure

Inspection and maintenance procedure

corrosion analysis and estimation for pipelines

Cathodic protection calculation for onshore and offshore pipeline drawings

CP system drawings

Test point drawings

Cathodic protection installation procedures Data Sheets

Cathodic protection system data sheet

Stray current corrosivity

External corrosion analysis & estimation for pipelines (external corrosion direct assessment – ECDA)

Sacrificial anodes data sheet

Electrical resistance probes data sheet

Asset Integrity Management / Asset Life Study (ALS) / Principle Engineer (Mechanical

Page 11: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 11 of 36

Engineering, Metallurgist & Corrosionist) For Upstream, Downstream, Foundation & Subsea / SURF Engineering

Lead a team consisting of engineers and designers in carrying out basic/detailed engineering work for projects. They will also assume responsibility for conceptual and detailed design and provide necessary technical information for costing/procurement in compliance with tender specifications/guidelines, quality requirements and work within budgeted man-hours and project schedules.

Lead field development, asset business economic analysis, asset enhancement feasibility and concept screening, pre-FEED studies

Wealth background in engineering, management and coordination and highly skilled in performing general engineering management functions and implementing management initiatives to enhance the technical and quality performance of the work - while utilizing in-depth knowledge and experience of best-in-class standards and processes.

Fully familiarity with the engineering processes of metallurgical, corrosion and cathodic protection.

Monitor the preparation of material selection diagrams, material selection report, corrosion management manual and specifications for compatibility between piping material specification and equipment lists using contract documents and international codes.

Low Cycle & High Cycle Fatigue Assessments & Finite Elements Analysis on surface and sub – surface materials (LCF / HCF)

Engineering Criticality Assessment (ECA) And Alternative NDT Flaw Acceptance Criteria For CRA Materials Automatic And Manual Repair Girth Welds:- Level 3 combined fracture and fatigue option in crackwise to establish the critical/tolerable flaw and defect sizes i.e root surface breaking flaw in girth weld, failure assessment diagram (FAD), Ramberg–Osgood stress strain curve parameters, fracture resistance (J–R curve), maximum static stress including possible concentration, fracture mechanics assessments with or without cathodic protection, flaw acceptance criteria for RT, MUT, PAUT, TOFD, LRUT & AUT

Monitor the review of interdepartmental documents like process data sheets, mechanical data sheet, piping material specification and provide input to the various upstream & downstream engineering disciplines for document preparation to vendors.

Page 12: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 12 of 36

Monitor and control man-hour requirements during project execution, identify variations between contract and proposal.

Create manpower charts for task assignments, establish target completion dates and ensure target dates are achieved.

Maintain project schedules and ensure allotted man-hours, deadlines and cost requirements are strictly adhered to.

Provide the necessary inputs/data to other disciplines as per the requirements and procedures.

Obtain the required inputs from other engineering disciplines e.g. process flow diagrams, process design basis, heat-and-mass balance, P&ID‟s, piping material specifications and other necessary data.

Provide guidance for performing corrosion calculations and interpretation of metallurgical codes and standards with its imprecision on detail design.

Organize the preparation and issue of engineering drawings and technical documents for Interdisciplinary Design Checks.

Supervise in technical bid evaluations. Review vendor drawings and documents.

Coordinate with Procurement department to ensure cost effective recommendations.

Provide necessary assistance to Quality Department.

Meet with vendor representatives, inspect at vendor works and workshops and provide assistance to Quality Department as required.

Interface with Client representatives as required for resolving any technical issues.

Conduct internal staff meetings, ensure the progress of project in accordance to schedule, allotted man-hours and budgeted costs. Coordinate with Projects and Planning Departments on schedule related issues.

Participate in safety and design review meetings e.g. HAZOP, HAZID, 3D Modelling, underground mapping and laser scanning, process assessment safety review, along with Client and representatives of other engineering disciplines.

Monitor the preparation of all necessary documents up to the final IFC (Issued for Construction) stage, e.g. material selection diagrams, material selection report, corrosion management manual, material specifications and other relevant drawings and specifications

Interface and provide clarifications, guidance and technical support to Construction and Commissioning teams as required.

Page 13: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 13 of 36

Administer the preparation of the final “As Built” documents.

Ensure compliance with Company‟s ISO Quality procedures. Coordinate internal and Client audit requests, facilitate audit procedures of engineering systems within the discipline.

Participate in employee performance evaluations, establish performance criteria, identify employee strengths and weaknesses, and recommend training and development requirements.

Identify training/development needs for team and participate in establishing career path.

Perform related duties as and when directed by the direct supervisor.

Provide O & G industry experience in the fields of Facilities integrity, inspection, integrity assurance including risk based integrity management;

Advise on appropriate root cause analysis techniques

Participate in implementing integrity targets and Key Performance Index (KPI);

Troubleshoot and analyze static equipment performance and identify equipment performing outside the operating envelope and advise on appropriate action to ensure plant integrity;

Advise in the field of failure analysis;

Identifies and classifies of various types of damage / degradations mechanisms and capable of discerning acceptable conditions;

Application of Fitness For Purpose and The Remain Life Assessment Techniques;

Fully conversant with international codes

Fully conversant with NDT/NDE methods

Carry out internal pressure equipment visual / corrosion inspection

With appreciation of turnaround planning; capable to direct, plan and manage asset daily integrity activities and to act as an Asset Focal Point in handling asset related integrity and inspection daily activities;

Applying risk based inspection methodologies to develop, plan, implement and execute detailed inspection work scopes

Participate in risk based/corrosion/failure analysis (RCFA), risk assessment (RA) and management of change (MOC) reviews related to his nominated asset.

Participate in conceptual / FEED design for module, topside and onshore integrated facilities; act as Technical Authority as and when required.

Responsible to prepare inspection work lists for plant turnarounds and ensure effective shutdown execution by developing strategies, identification of required

Page 14: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 14 of 36

manpower and equipment, proper management and leading the inspection team during the shutdown.

Act as „Authorized Inspector‟ for undertaking examinations and to inspect fired / unfired pressure equipment, heaters, columns, vessels, heat exchangers, piping systems and storage tanks.

Management and coordination of Independent Verification Body (IVB) by direct liaison with the Independent Competent Person (ICP) as per API Code requirements;

Work closely with facilities, production and well intervention personnel to ensure inspection programs and schedules are carried out and achieved in a cost effective and timely manner. In particular, with the entire disciplines engineer within the Company;

Identify asset integrity anomalies and manage engineering assessment;

Coordinates factory acceptance tests, QA/QC, operation audits & reviews;

Serve as communication link between Asset Integrity, PMTs and Operations on ICP, AI, MWS and Government Statutory and Legislation Agencies;

Ensure annual inspection schemes comply with existing legislation and that non–conformances are properly documented, addressed and closed out;

Project Risk Management comprising of HAZOP & HAZID, Construction Risk Assessment (CRA), Cause & Effect Matrix, Project Risk Assessment and Facilities Integrity Assessment

Managing System Integrity and Fitness–For–Purpose Assessments Of Pipelines

Act as Technical Authority as and when required during conceptual, interface (mock – up) engineering, in-process fabrication/construction, provisions of vendor document register / vendor document requirement lists / contract documents deliverables lists,, pre and post vendor selection / approval,, design, fabrication, construction, material and corrosion assessment multistage

Develop, prepare and issue annual budget forecast for offshore and onshore inspection, topsides technical integrity and verification work;

Attend daily conference call meeting chaired by Project or Production Manager;

Advise Company in the areas of inspection, code compliance, welding, corrosion, risk base assessment and material requirements and selections.

Plant Integrity Management comprising of:-

(upstream, downstream & subsea)

Plant Integrity Management System Audits i.e.

Compliance with national legislation and local requirements

Page 15: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 15 of 36

Integrity threats and mitigation in place i.e.

– Onshore – mechanical damage, corrosion, ground seismic movement, etc

– Offshore – mechanical damage, stress / fatigue type material failures, internal & external corrosion, etc

Quantitative risk assessments undertaken

Engineering documentation

Plant records and fault data QHSE issues

Plant operations and maintenance i.e.

– Work scheduling

– Record keeping

– Routine and non routine activities

Plant inspection

Modification and repair process Emergency management

Defect assessment and repair methods

Training and competency of staff

Safe control of operations

Continuous improvement processes in place

Corrosion Management i.e. Congregate process data e.g. temperatures, pressures and fluid compositions during both normal operation and upset conditions

Consider the safety risk assessment in order to:-

– Identify pressurized systems

– Identify major hazards

– Identify HAZOP actions related to corrosion and materials

Conduct corrosion risk assessment e.g.

– Calculation of internal corrosion rates

– Assessment of stress corrosion cracking threat

– Assessment of erosion threat

– Assessment of external corrosion including under insulation e.g. ECDA & ICDA

Produce corrosion management scheme e.g.

– Select materials (CRA or carbon steel with corrosion allowance – CA)

– Select corrosion control methods e.g. inhibition, coatings, cathodic protection

– Select corrosion monitoring methods and locations

– Devise suitable key performance indicator KPI for corrosion management

– Document change procedure for revising sheme if process parameters are altered e.g. after debottlenecking

– Produce plant/field corrosion management guide/manual

Page 16: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 16 of 36

Feed back the corrosion management activities into the field safety case and risk assessment as mitigating factors

Material defect and component failure investigation:-

Incorrect materials selection,

Materials quality issues,

Fabrication issues,

Operating conditions outside original design parameters,

Environmental factors,

Maintenance and protection issues,

Human and procedural factors,

Third party damage.

Typical metallographic examination assessment e.g.

– Visual examination by eye and using a stereo optical microscope

– Detailed fractography using a scanning electron microsope (SEM)

– Surface compositional analysis by semi quantitative X-ray energy dispersive micro-analysis (EDX) in the SEM

– Preparation of weld sections for macro-examination and hardness surveys

– Preparation of mounted and polished sections for microstructural analysis and to confirm crack path

– Chemical analysis on material analysis

– Full mechanical testing i.e. tensile, hardness, charpy impact, fracture mechanics such as CTOD and J – integral

– Fracture Mechanics assessments based on failure assessment diagram approaches BS7910 & Ductile tearing resistance analysis

Fitness for service assessment e.g.

Remaining life analysis

Fitness for purpose assessments

Detailed fracture mechanics analysis to determine safe operating parameters

Review and update of standard operating procedures – SOP

Undertakes assessments per recognized industrial/international codes such as RSTRENG, DNV RP F101, API 579 etc

Stress analysis assessments Defect assessment due to:-

– Manufacturing damage

– Construction damage

– 3rd party damage

– Operational damage

Finite element analysis – FEA

Page 17: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 17 of 36

Ferrite measurement

Written schemes of examination covers:- Reviewing existing documentation pertaining to design, manufacture construction, testing, modifications and repairs, past inspection reports, etc. and plant operation records.

Establishing safe operating limits and their protective devices.

Identifying individual pressure systems. Developing examination specifications from each component group.

Identifying examination frequencies on fixed time intervals for major items of equipment based upon industry practices, experience and information as supplied from the Client.

Failure Assessment Diagram (Continuum damage modelling and failure modes & effect analysis – FMEA)

Failure Analysis & Prevention -

Liaising with the system User.

Coating

Welding

Risk Based Inspection – RBI Equipments & Facilities vibration study i.e. piping,

pressure vessel, tankage, pumps, compressor, boiler, lifting equipment, turbine, gas flaring, etc

PROFESSIONAL WORKING EXPERIENCES, POSITION & EMPLOYER PROFESSIONELLE ERFAHRUNGEN AM ARBEITSPLATZ, POSITION UND ARBEITGEBER

January 2011 : PETRONAS CARIGALI SDN. BHD. (PCSB) C/O PENINSULAR MALAYSIA OPERATION – PMO, KERTEH, TERENGGANU, MALAYSIA (A) SENIOR QA/QC/INSPECTION ENGINEER

(Sr.QA/QC/MCWIE) (PMO/PCSB) (Contract basis) SENIOR QA / QC und MATERIAL / KORROSION / SCHWEIßEN / PRüFINGENIEUR (Auf vertraglicher grundlage)

And (promoted as) November 2011 (B) SENIOR RESIDENT / FACILITIES ENGINEER C/O

REJUVENATION TEAM LEADER FACILITIES REJUVENATION & REHABILITATION ENGINEERING SECTION PENINSULAR INTEGRITY & ENGINEERING DEPT (PIE2 / PMO / PCSB) (Contract basis) (Auf vertraglicher grundlage)

Page 18: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 18 of 36

Feb 2012 – Nov 2015 (C) PRINCIPAL ENGINEERING MANAGER | FREHAB

BROWNFIELD FACILITIES FACILITIES REJUVENATION & REHABILITATION PENINSULAR INTEGRITY & ENGINEERING DEPT (PIE2.FREHAB | PMO | PCSB) (Contract basis) (Auf vertraglicher grundlage)

Proficient Skills Used:

Principle Engineering Manager; Subject Matter Expert; Technical Authority; Operations Crisis Management & Safety Coordinator; and Inspectorate for facilities / plant integrity and rejuvenation engineering Supervisor:-

Mr. Wan M Shafrizal Wan Yusof (PIE/PMO/PCSB)

Mr. Wan Zamani Wan Deraman (PIE/PMO/PCSB)

Mr Ir.Mohammad Ghazali Ariffin (DD/PCSB) BEST PRACTICE CONSULTANT E&P PROJECT MANAGEMENT INSTITUTE (EP-PMI) (Ex-EPMI)

[email protected] [email protected]

Tuan Haji Adros M Appandi (PIE/PMO/PCSB)

Tuan Haji Mohammad Hassan (PIE/PMO/PCSB)

Tuan Haji Zaki B Hashim (MLNG) (PIE/PMO/PCSB)

Tuan Haji Amir B Din (PMO/PCSB)

Tuan Haji Ali Gohar Rahman (DD/PCSB) Mr.Chris Poheng (PMO/PCSB)

Mrs. Hasroha Bte Arifin (PMU/PETH)

Mr.Mohd Jukris B Abdul Wahab (PMO/PCSB)

Mr.Hashim B Zainal Abiddin (GTS/PETH)

Mr.Ahmad Rizal B A Rahman (GTS/PETH)

Mr.Ir.V R Harindran – Custodian (GTS/PETH)

Mr.M Farhan B Azzmin (PMO/PCSB) Mr.Suhaimi B A Farouk (PMO/PCSB)

Mr. Helmi Ibrahim (PIE/PMO/PCSB)

Mr. Ikmal Hakim B A Rahman (PIE/PMO/PCSB)

Mr. Wan Abdullah B Wan Hamat (DD/PCSB) Principal – MCI Responsibilities:-

Fully responsible for all upstream downstream rejuvenations, revamps, decommissioning, recommissioning, demolitions, installations, process optimization, asset integrity and brownfield engineering undertakes by Facilities Rejuvenation and Rehabilitation Unit (FREHAB), Peninsular Integrity and Engineering Department (PIE2), Peninsular Malaysia Operation (PMO), Petronas Carigali Sdn Bhd (PCSB)

Page 19: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 19 of 36

Accomplishments:-

Asset integrity and rejuvenation studies, Conceptual Engineering, FEED, DED, EPCC and EPCIC engineering for PMO Assets of the following projects:- - TCOT Zero Flaring TZFP - Overall Fire Systems Studies for TCOT and OSC (Rim Seal to Full Surface Fire) (Fire and Safety Design Philosophy FSDP), - TCOT Gas Stabilizing Systems, - OGT Solid Liquid and Liquid Liquid Separation Project, - ANGSI WIM Water Injection Module - Tiong A GDU Decommissioning and Demolition - TCOT Heat Optimization of Burners, - Duyong LQ Rejuvenation - TCOT BS&W Separator Optimization - TCOT Chemical Injection Skid - TCOT Crude Oil Export Pump Upgrading - Tiong A GDU and ACHEX Upgrading - Demolition and Preservation of Duyong GDU - TCOT H2S Studies, - Upgrading Waste Water Pump - Upgrading Air System - Instrument & Service Air System - Installation of TCOT New Lighting Systems - Onshore Offshore BS&W Separation Improvement - Installation of New MCC/Switchgear For TCOT/OSC - Installation of New UPS & Charger - 3D Laser Scanning Underground Mapping Topography Surveys - Pump Performance Assessment for Critical Pumps - FGS, HIPPS and field detector replacement and upgrading - IPF Field Upgrading - Tiong A NAG (Flow Line) Tiong A Demolition & Structural Strengthening - Tiong A Cooler Upgrade Tiong A GDU Installation - Asset Life Studies for Duyong Gas Complex and LQ - OGT HARP Slug Catcher Concept & FEED Studies (aligned with existing HPL Hair Pin Loop) - ANGSI B LQ Extension - PM9 Control Rooms CCR Upgrading - Pipeline ECDA & ICDA Corrosion Assessment - Conceptual Study for Subsea Separation Systems - Field QRA Study for PMO Assets - TCOT OSC KRO Business Continuity Plan Assessment (e.g. in case of full surface fire; total plant shut down; etc)

Page 20: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 20 of 36

August 2009 – Jan 2011 : SIGUR ROS SDN. BHD. (SGRSB), ASHGABAT, TURKMENISTAN (A) SENIOR QA/QC & S.U.R.F ENGINEER

(Project basis) (Senior QA / QC / Integrität Ingenieur) (Projekt-Basis)

Project Contract No:- (i) 5495 – 9999 – 3500 – 001

(Subsea Pipelines & Onshore Gas Terminal, OGT) (ii) 5495 – 0399 – 3500 – 9160 – 002

(Hook Ups & Commissioning) CLIENT:- PETRONAS CARIGALI (TURKMENISTAN)

SDN. BHD. (PCTSB) / MMHE.TECHNIP JV; TURKMENISTAN BLOCK 1 GAS DEVELOPMENT PROJECT, KIYANLI, TURKMENBASHY

(Caspian Sea Development Project) (Kaspischen Meer Entwicklungsprojekt)

EPCCIC For:-

(i) Installation & Pre – Commissioning of

Offshore And Onshore Pipelines & Associated Onshore Construction Works

(Offshore & Onshore Installation Contractor, OIC And Onshore Gas Terminal, OGT) AND

(ii) Hook Ups & Commissioning For:- (Magtymguly Drilling Platform – MDPA Topside) (Magtymguly Collector Riser Platform–MCRA.Topside) (Gravity Base Structure – GBS) (Oil & Gas Terminal – OGT)

Barge:- Armada Installer & Arwana Satu

Email Address: [email protected]

[email protected] Project Supervisor:-

Mr. Omar Ah Chong - PCTCB Mr. Zahrin Zain - PCTSB Mr. Rizalman - PCTSB Mr. Haji Ghazali - PCSB (MCI – DD) Mr. Wan Abdullah Wan Hamat-PCSB (MCI – DD)

Mr. Zaaron - PCSB Mrs. Nurul Atyqah Anis - PCSB Mr. Amirul Hafiz - PCSB

Mr. Neil Yann (VP.Eng) - TECHNIP Oceania Pty Ltd

Page 21: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 21 of 36

(Vice President–Engineering, West Perth, Australia) Mr. Zaaba - MMHE/TECHNIP JV (General Manager – Turkmenbashy Turkmenistan) Mr. Jim Clifford - MMHE/TECHNIP JV Mr. Brendon Boyle - MMHE/TECHNIP JV Mr. Jim Smith - MMHE/TECHNIP JV Mr. KM Chew - MMHE/TECHNIP JV Mr. Eddy Law - MMHE/TECHNIP JV Mr. Kathiravan S - MMHE/TECHNIP JV Mr. Mohd Khir Abd Samad - MMHE/TECHNIP JV Mr. Azhar Solehho - MMHE/TECHNIP JV Mr. Abdul Malek - MMHE/TECHNIP JV Mr. Jacque Trounche - MMHE/TECHNIP JV Mr. Amir Helmi - MMHE/TECHNIP JV Mr. Amran Austria - MMHE/TECHNIP JV Mr. Benjamin Philip Darck - MMHE/TECHNIP JV

(Ben Darck) Mr. Khairul Che‟ Imran - SGRSB Mr. Mohd Azmadi Fadzil - SGRSB Mr. Omar Isa - SGRSB (ex-PCSB & Kencana Petroleum / KHL) Mr. Zon Zulkifli - SGRSB Mr. Amir Zohri Abdul Rahim - SGRSB (ex-EPMI & TL Offshore) Mr. Amir Zakee Adnal - SGRSB Mr. Mohd Nizam Amin - SGRSB (ex-PCSB) Mr. Mohd Hanafi Ismail - SGRSB (ex-EPMI & TL Offshore) Mr. Hj Jamil Hj Ahmad - SGRSB Capt. Zamani Abdullah - SGRSB

(B) PROJECT:-

DRAGON OIL (TURKMENISTAN) LIMITED / PETRO GAS FZE JV. (Caspian Sea Development Project) (Kaspischen Meer Entwicklungsprojekt)

SENIOR PROJECT ENGINEER SENIOR PROJEKTINGENIEUR

Project Management Consultant (PMC) For New 30 inch / 20 inch / 18 inch Block 2 –

NPF Trunk Line & Two Submersible Pipelines Offshore & Onshore Installation Contractor:-

MOMENTUM ENGINEERING – BAKU, AZERBAIJAN (Azerbaycan)

Jan 2009 – June 2009 : KENCANA PETROLEUM SDN.BHD., KUALA LUMPUR, MALAYSIA PROJECT QA/QC MANAGER (contract basis)

Page 22: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 22 of 36

Project Contract No : MURPHY / P7203 MURPHY OIL SARAWAK MGP – 1

Provision of Mechanical, Onshore Pipelines (GORA / BORF / MLNG 3) and Piping Installation Works of Bintulu Onshore Receiving Facilities (BORF) For Phase 1 SK – 309/SK – 311 Gas Development Project

Employee ID : C932

Email address : [email protected] Project Supervisor:-

Mr.Ian Duncan - MOC / MURPHY – PM Mr.Stephen Bradburry - MOC Mr.Ali Reza Karamzeh - MOC Mr.Robert Burns - MOC Mr.Warwick Ray - MOC Mr.Anthony Hodder - MOC Mr.Siow Chee Leong - MOC – CSR Mr.Abd Rahim Ngah –MOC–SNR CONTRACT ENGR Mr.Ong Bee Kian - KNPE – GM Mr.Norazman Abd Latif - KNPE – PM Mr.Mohd Nizam Zulkifli - KNPE – CM Mr.Shahroni Md.Safari - KNPE – SNR PIPING ENGR

Jan 2007 – November 2008 : J. RAY McDERMOTT ASIA PACIFIC PTE. LTD. THE JTC SUMMIT, JURONG, SINGAPORE

PROJECT QUALITY & TECHNICAL MANAGER PROJEKT QUALITÄT & TECHNISCHE INTEGRITÄT MANAGER

R2782 – SARAWAK SHELL BERHAD (SSB) / SABAH SHELL PETROLEUM CO (SSPC)

2007 – 2010 Transmission, Transportation & Installation of Offshore Facilities

(CRA Subsea Pipelines API – X65 cladded with SS316L, Inconel 625, Incoloy 25–6Mo, Incoloy 825), Jacket & Topside Installation

Shell Contract No: 591447 BMD Contract No: R2782

E–mail address: [email protected] Employee ID: 42919 Project Supervisor/Coordinator (EPA–ECS1–CAT1):- Shaharudin Saleh – Project Director (JRMAP) Andy Taylor – Project Director (JRMAP) Muhadzir Musa – Project Manager (JRMAP) K.P.Lok – Project Manager (JRMAP) Murray Wilson – QA/QC Manager AP (JRMAP)

Page 23: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 23 of 36

John Macdonald – Snr Welding Engineer(JRMAP) David Foo – Head Of Malaysian Project (JRMAP)

Ahmad Nazhar Abdullah–Sr Pipeline Engineer (JRMAP) Andreas Otter – Technical Authority 1 (SSB) Pieter Jan Graaf – Technical Authority 1 (SSB) Niel Kristensen – Technical Authority 1 (SSB) Dr.Edwin Jong – Technical Authority 1 (SSB) Niel Kristientiansen – Technical Authority 1 (SSB) Gerd Bayer – Snr Project Engineer (SSB) Con Brouwers – Snr Project Engineer (SSB) George Anung – Welding Engineer (SSB) Ian Shenston – Welding Engineer (SSB) Andrew Murdey – Snr Operation Eng (SSB) Deedar Singh – Snr Operation Eng (SSB) Ray Valdez – Snr Corrosion Eng (SSB) Freddie Ting – Corporate QA/QC Eng (SSB) David Lee – QA/QC Engineer (SSB) Meor Rosazman – QA/QC Engineer (SSB) Ahmad Husni – QA/QC Engineer (SSB) Dominic Tang – ECS1 Team Leader (SSB) Othman Hasan – CSR (SSB) Shamshul Kamal – CSR (SSB) James Young Blood – CSR (SSB) Ben Arino – CSR (SSB) Paul Linang – CSR (SSB)

Dec 2004 – Dec 2006 : GLOBAL PROCESS SYSTEMS SDN. BHD (GPS), KUALA LUMPUR, MALAYSIA

PROJECT QA/QC MANAGER Employee ID : RHH – 01 Email address : [email protected]

[email protected] Project : Unocal / WorleyParsons Gas Separator Packages,

Bibiyana Field Development, Bangladesh, Project Supervisor / Coordinator:-

Mr. Arnaud Desoles, Mr. Almond Diaz, Mr. Terry Reynolds, Mr. Bradford I Stone, Mr. Blum Humprey, Mr. Mack Thompson, Mr. Feng Lee, Mr. Ken Wagner, Mohd Nazim Rosli – GPS Sarawak Shell Berhad, E11KA / E8 Field Development, Glycol Contactor and Glycol Regeneration Skids, Project Supervisor / Coordinator:- Mr. Munawar Ishak, Mr. Ian Durrant

Page 24: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 24 of 36

Talisman Malaysia Limited Sea Water Injection Packages Petronas Carigali / Kawasaki Heavy Industries, Japan, Baram South Compression Moodules Baram South Fuel Gas Skid Packages Petrofac Pte. Ltd., United Kingdom / Petrofac Malaysia Limited Mobile Offshore Production Unit (MOPU) :– Cendor Field Development, Malaysia – PM 304 :- Topsides, Jack–up Rig (Jacket), Hull and Marine Section Fabrications Project Supervisor / Coordinator:- Mr. Mike Cummings

Mr. Peter Ries Mr. Roslan Daut, Mr.Rodhi Bakar,

September 2004 – Dec 2004: Mitsubishi Heavy Industries Inc., Japan Kerteh, Terengganu, Malaysia Field QA/QC & Inspection Manager (FQIM) Project: Petronas Gas Berhad,

Gas Procesing Plant GPP1 & Export Terminal ET 1/2, Rejuvenation & Revamp Project (PRR), Kerteh

April 2003 – Aug 2004 : Total Fina Elf / Sime Sembcorp Engineering (SSE), Singapore

Senior QA / QC / Material / Corrosion / Integrity Engineer

Project:

(Jacket & Topside) PTT Exploration And Production, Thailand (PTTEP)

Bongkot Field Development Project – Phase 3C, Sour Process Platform (SPP), Bridge Support Platform (BSP), Associated Sealine & Facilities

May 2002 – March 2003 : SGS Petrotechnical Inspection Sdn. Bhd., Kuala Lumpur, Malaysia Senior Project Coordinator @ Project Inspection Coordinator ( Contract Basis ) (Seconded to Kawasak i Heavy Industries /

Tractor Malaysia Berhad ) Feb. 2001 – March. 2002 : ALSTOM Power Asia Pacific Sdn. Bhd., Kuala Lumpur, Malaysia

Page 25: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 25 of 36

Head Of QA/QC Section @ Senior QA/QC Inspector & Project Sourcing Coordinator

Full Time Employee With ALSTOM Power Asia Pacific Responsible On Procurement & Supply Tasks, Inspection, Expediting, QA/QC, Vendor And Supplier Assessment Including Supplier Monitoring / Rating Services On Various Power Plant Projects ( 600 Mega Watts To 2300 Mega Watts ) On The Following Projects:- Lumut Power Plant, Manjung Power Plant, Perlis Power Plant, Senoko Power Plant ( Singapore ), Pelican Power Plant ( Australia ), Bowin Power Plant ( Australia ), Bang Boo Power Plant ( Thailand )

- Daily live video conference discussion with ALSTOM

Principal located in Baden, Switzerland And Belfourt, Cedex, France regarding supply chain management, project progress updates, logistic, QA/QC, HSE, fabrication and construction, project and corporate key performance index (KPI).

Aug. 1996 – Jan. 2001 : VELOSI (Malaysia) SDN. BHD., Subang Jaya, Selangor, Malaysia Engineering Surveyor

: Full Time Employee With Velosi (M) Sdn. Bhd.

Performing Inspection, Expediting And Auditing Services On Various Clients / Projects

: Coordinators:-

Mr. Ahmad Nizar, Mr. Nik Sazila, Ms. Wan Azilah, En. Mohd Ashaari Abas, Dr. Nabil 1996 : SNC-LAVALLIN / BOUMBARDIER CONSORTIUM

(CANADA) PUTRA LIGHT RAIL TRANSIT LRT PROJECT,

KUALA LUMPUR, MALAYSIA QA/QC Superintendent 1995 : HICOM PETRO PIPES SDN. BHD., SUNGAI PETANI, KEDAH, MALAYSIA Assistant QA/QC Engineer

1994 : INCHAPE TESTING SERVICES-CALEB BRETT., PORT KLANG, MALAYSIA

General Inspector

Page 26: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 26 of 36

1992 – 1994 : NUSANTARA TECHNOLOGIES ( Nusatek ) / OILFIELD PIPELINE INSPECTION., SHAH ALAM, SELANGOR, MALAYSIA NDT Inspector and Coordinator

PAST PROJECTS PARTICIPANTS SINCE 21 YEARS INVOLVEMENT IN OIL & GAS AND POWER INDUSTRIES VERGANGENHEIT PROJEKTTEILNEHMER SEIT 19 JAHREN ENGAGEMENT IM ÖL-UND GAS-UND ENERGIE INDUSTRIE

A) Brunei Shell Petroleum Co.

- Position:

Authorized Representative / Inspection Coordinator - Project:

Emulsion Heaters (5 units) – PERMINT ENGINEERING Wellheads & Christmas Trees – FMC PETROLEUM, PASIR GUDANG

- Supervisor: Haji Rosli

B) OGP Technical Services (OGPTS)

- Position: Vendor Quality Surveyor / Project Inspection Coordinator

Mechanical Static Equipment Surveyor - Project

Gas Processing Plant (GPP) 5 & 6 - Waste Heat Boiler – TEPAT TEKNIK (KEMAMAN / S.ALAM) Fired Boiler DO Steam Boiler Tank – GPP 5&6 (IN PROGRESS INSPECTION) Exchanger – KPSAP (PORT KLANG) Pressure Vessel – AMC / SMW / MEHCMAR / KAI PENG / KNM. Tall Tower (Column) – AMC / SUN METAWL WORKS (SMW).

Slug Catcher (48mm & 55mm) – KAI PENG TEG Glycol Regeneration Packages (65mm) – KPSAF PORT KLANG. Overhead Crane & Hoists – MHE DEMAG S. ALAM

Sand & Sludge filter ( CRA Vessel ) – ENERSAVE ENG / CHIP NGAI Pipeline – GPP 5 & 6 PLANT ON LINE INSPECTION - Supervisor: Mr. George Steven & Mr. Alex Stefanovic

C) Overseas Merchandise Inspection Co. Ltd, Japan, OMIC /

GENERAL ELECTRIC, USA (GE).

- Position:

Authorized Representative Regional Inspection Coordinator

Page 27: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 27 of 36

Mechanical Static Equipment Surveyor - Project:

Ratchaburi Power Plant, Ratchaburi, Thailand. Location : Spheretech, Pasir Gudang & in plant inspection located in Thailand, and GE, Connecticut, USA.

- Project for Electricity Generating Authority of Thailand (EGAT) -

Lube Oil Tank Cooler ( 55 mm thk ) Accessory Module ( Compressor Packages )

Waste Heat / Power / Fired Boiler – MHI / Mitsui, Japan. Exhaust Diffuser Duct – Sun Metal Works. CCGT Turbines – GE Connecticut, USA

- Supervisor: Mr. T. Ishida & Dr. Khromsak

D) Sarawak Shell Bhd c/o Sabah Shell Petroleum Co.Ltd

- Position:

Authorized Representative Source Inspection Coordinator Mechanical Static Equipment Surveyor

- Projects

Central Gas Luconia Compressor Project/ St Joseph Oil Field Dry Air Receiver THERMO BOILER, RAWANG Wet Air Receiver Pedestal Crane – FAVELL FAVCO, KLANG Compressor after cooler ( Duplex Steel ) (65mm) – EBARA / TEPAT TEKNIK. Wellheads & Christmas Trees – FMC PETROLEUM, PASIR GUDANG Sub sea pipelines – PREUSSAG STAHL, SALZGITTER, GERMANY

- Supervisor: Mr. Kidney a/l Enau & Mr. Freedie Ting Tiong Eng

E) Mitsubishi Heavy Ind, Japan - Position:

Senior QA/QC Supervisor - Projects

Storage Tank : SSAS POWER PLANT, KAPAR. - Supervisor: Mr. Nakazano

F) Velosi Europe Ltd c/o British Petroleum Co. Ltd. (BP)

LOCATION : SNAMPROGETTI / MACCI, Spa, ITALY , NKK STEEL & JAPAN STEEL WORKS (JSW), JAPAN.

- Position:

Page 28: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 28 of 36

Authorized Representative - Projects

Horizontal Bullet tank / Pressure Vessel (125 mm thk) – KNM, AT SITE (5 meter dia x 125 meter long – 3 curvature units)

- Supervisor: Mr. Martin Coles & Mr. Joe Vincent

G) Crown Agents Ltd, United Kingdom (CA QAIS)

- Position:

Authorized Representative - Projects

Mineral Loma De Niquel, Caracas, Venuezuela LOCATION : TORSC0, LUMUT. Lomared Kiln Cylinder (3 units) (50mm, 75mm & 95mm – thk) Lomared Ladle Hoods (3 units) (95mm, 125mm & 65mm – thk)

- Supervisor: Mr. Raj Para & Mr. Sariffuddin

H) Brown & Roots Engineering, Australia

- Position:

Authorized Representative Source Inspection Coordinator Mechanical Static Equipment Surveyor

- Projects

Pogo Benchamas Oil field development Phase-1 & 2. Diesel Fuel Filter (6 units) – TEPAT TEKNIK Heat Exchanger (4 units) – SUN METAL WORKS Compressor Package – KPSAP Wellheads & Christmas Trees – FMC PETROLEUM Blow down K.O Drum – TEPAT TEKNIK

Glycol Regeneration Units – VARIOUS (Pressure Vessels, Pipe and Fittings & Pumps)

I) Niigata Engineering Co. Ltd C/o Japan Inspection Co. Ltd

- Position:

Authorized Representative / Technical Authority - Projects:- D.I.C. Epoxy Petrochemical Plant – PASIR GUDANG, JOHORE

Pressure Vessel (36 units) – CIDAR ENGINEERING Heat Exchanger (11 units) – INTECO, AUSTRIA Atmospheric Tank (17 units) – CIDAR ENGINEERING, SUBANG

Tall tower (3 units) (45mm, 55mm & 65mm Wall Thickness)–MHI, JAPAN

Combustion chamber (3 units) – VESTECH, IPOH and FURNACE TECHNO, JAPAN.

Page 29: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 29 of 36

- Supervisor: Mr. Sakaguchi & Mr. Masafumi Ebine

J) Greater Nile Petroleum Operating Co. SUDAN (GNPOC)

- Position:

Authorized Representative - Projects

Glycol Regeneration and Degasser Skid – KPSAP, PORT KLANG Wellheads & Christmas Trees

- Supervisor:- Mr.Mohd Shaffie (General Inspection Engineer)(ex-ABS,KUL) Mr.Abdul Pakar Sukor (Source Inspection Coordinator)

K) KNM DP Fabricators

- Position:

QA/NDT Coordinator

- Projects Non-Destructive Test

(RT/MPI) on pipe rack weldments for HYUNDAI, PSR – 1.

L) Empire Machinery/MBF Marketing

- Position:

NDT Inspector

- Projects

MPI and Hardness Test on tower Crane

M) Malaysia Shipyard Engineering - Position:

Interpreter/Welding Inspector LOCATION : MSE, PASIR GUDANG.

- Projects

Non-Destructive Test and film interpretation on MIDR-A Drilling Structure for Sarawak Shell Bhd.

N) Polyethylene Company (S) Pte. Ltd.

- Position:

QC/NDT/Welding Inspector

- Projects

Non-Destructive Test, and Quality Control and Welding Inspection on petrochemical complex.

Page 30: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 30 of 36

O) Brown & Roots Engineering, Australia - Position:

Authorized Representative & Mechanical Static Equipment Surveyor

- Projects:

Pogo Benchamas Oil field development Phase-1 & 2. Wellheads & Christmas Trees – FMC PETROLEUM

Diesel Fuel Filter (6 units) Heat Exchanger (4 units) Compressor Package Blow down K.O Drum

- Supervisor: Mr. David Benson & Mr. Ralph Polinneo

P) Esso Production Malaysia Inc. ( EPMI )

- Position:

Authorized Representative Mechanical Static Equipment Inspector General Inspector (Source, Mechanical, Piping)

- Projects

Angsi Host Tie - Ins, Guntong D, Larut & Tabu Field Development - Glycol Dehydrogenation Skid / Contactor ( Clad Vessel, 316L + SA 516 GR 70N (HIC) – 107 mm Thick ) - Slug Separator ( Clad Vessel, 316L + SA 516 GR 70N ( HIC ) – 97 mm Thick ) - Gas Compressors

- Crude / Riser Compressors - IGF Flash & Surge Vessels

- Pumps - Wellheads & Christmas Trees ( FMC PETROLEUM )

- Fire Pump Diesel Engine - Condensate K.O. Drum - Turbine Generator

- Desalter - Exchangers

- Project Inspection Coordinator(s) / Supervisor(s):-

Mr. Tuan Haji Zainal Abidin Tompang Mr. Mohd Azlan Mr. Munawar

Mr. Johnson Yap Mr. K.K. Pang

Page 31: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 31 of 36

Mr. David Lim Mr. Chong Chee Fai Mr. James Wong, Mr. Koo Swee Sen

Q) PETRONAS CARIGALI SDN. BHD. ( PCSB )

- Position:

Senior Inspector (Source & Mechanical Static Equipment) Senior Mechanical & Piping Inspector - Projects

Resak Oil & Gas Terminal ( ROGT – Project Management Team ) Bekok A, B, C Revisit Project ( Edward & Sons Sdn Bhd ) - Resident Engineer / Superintendent:-

Mr. Mohd Rashid Sainal Mr. Mohd Ali Gohar Rahman Mr. Saad

Mr. Ilyas Rashid Mr. Anis Mr. Rosman Khamis Mr. Mohd Pahmi Yusof Mr. Haji Musa Bidin ( OGT Terminal Superintendent ) Mr. Ramon Dayab Mr. Alex

R) SARAWAK SHELL BERHAD (SSB )

- Position:

Facilities Inspection Coordinator (Topsides, Source and Mechanical Static Equipment) - Projects

Central Luconia Gas Compressor Project / St. Joseph Oil Field (F6KA & F23KA) - Supervisor(s)

Mr. Kidney Enau Mr. Freedie Ting Tiong Eng Mr. Cosmos Hiew

S) ESSO PRODUCTION MALAYSIA INC. (EPMI)

- Position:

Mechanical and Piping Inspector / General & Source Inspector

- Project

Larut A CPP Central Processing Platform ( Topsides ) - Area of Concern

Page 32: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 32 of 36

Production & Process Module, Module Support Frame ( MSF ), Living Quarters

- Resident Engineer / Superintendent

Mr. Zaaba Abd Rahim ( ESSR ) Mr. Ghazali Mr. Chong Chee Fai Mr. Gary Lee Mr. Roslan Mr. Nasruddin Hj Bakar Mr. Koo Swee Sen Mr. Vikay Rajah Mr. Tuan Haji Zainal Abidin Tompang Mr. Loganathan Mrs.Faridah Che‟ Ibrahim

T) ALSTOM Power Asia Pacific Sdn. Bhd. - Position:

Head Of QA/QC Section @ Senior QA/QC Inspector Project Sourcing Coordinator - Project ( 600 Mega Watts to 2300 Mega Watts ) Lumut Power Plant, Manjung Power Plant, Perlis Power Plant

( Malaysia ), Senoko Power Plant ( Singapore ), Bang Boo Power Plant ( Thailand ) Bowin Power Plant (Australia), Pelican Point Power Plant (Australia ),

- Supervisor:-

Mr. Beat Sigrit (Director of Engineering – MYAP) Mr. Peter Warner (General Manager - Supply Department MYAP) Mr. Gerard Boreaniz (Manager - Boiler, Turbine & Steam Business) (ALSTOM FRANCE) Mr. Len Gerragh (Director of Engineering–Mechanical & Combustion) (ALSTOM FRANCE) Mr. K. Larsen (Balance Of Plant, BOP Manager MYAP) Mr. Franco Ferrari (Engineering Manager-ALSTOM SWITZERLAND) Mr. William Fok (Senior Procurement Manager – MYAP)

U) SGS Petrotechnical Inspection (M) Sdn. Bhd.

- Position: Senior Project Coordinator @ Project Inspection Coordinator (Contract Basis) - Project

Gas District Cooling GDC (Putrajaya) Sdn. Bhd. - Client

Seconded to Kawasaki Heavy Industries Limited Japan (KHI) / Tractors Malaysia Berhad as Senior Project Coordinator @

Page 33: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 33 of 36

Project Inspection Coordinator ( Sourcing / Supply Division ) - Supervisor

Mr. Haji Mazlan Mahiddin ( TMB - KHI, QA/QC Manager, Ex EPMI )

Mr. Cheok Hong Guan ( TMB - KHI, Project Manager ) Mr. Kamal Jaafar (TMB - KHI, Procurement Manager, Ex EPMI)

Mr. Johari Ariffin ( TMB - KHI, Procurement Manager ) Mr. Mustaffa Abd.Rahman ( TMB - KHI, Deputy Project Manager @) ( TMB - KHI, Project Control Manager ) Mr. Kumagai (Kawasaki Heavy Industries KHI, Construction Advisor) Mr. Yazit (PETRONAS - GDC, Package Engineer) Mr. Ir. Yarman (PETRONAS - GDC, Project Manager) Mr. Ir. Nawawi (PETRONAS / PMC / OGPTS, Project Manager) Mr. Nur Hisham (PETRONAS / PMC / OGPTS, Procurement Mgr) Mr. Jeffrey (PETRONAS / PMC / OGPTS, Project Engineer) Mr. Raffidi (PETRONAS / PMC / OGPTS, Mechanical Engineer)

V) Total Fina Elf / Sime Sembcorp Engineering (SSE)

- Position: QA/QC Engineer - Project

(Jacket Fabrication) PTT Exploration And Production, Thailand (PTTEP)

Bongkot Field Development Project – Phase 3C, Sour Process Platform (SPP), Bridge Support Platform (BSP), Associated Sealine & Facilities

- Supervisor

Mr. Narongpol ( PTTEP – Project Manager ) Mr. Gan ( PTTEP – QA/QC Manager ) Mr. Lim Fok You ( PTTEP – Company Site Representative‟s ) Mr. Venugopala ( SOME – Project Manager ) Mr. Annuar Hanafiah ( SSE – Project Manager ) Mr. Mohd Ali Ibrahim ( SSE – Head Of QA/QC Department ) Mr. Norman Buang ( SSE – Operations Manager )

(W) Mitsubishi Heavy Industries Inc., Japan ( MHI ) - Position: Field QA/QC & Inspection Manager ( FQAM )

- Project: Petronas Gas Berhad,

Gas Procesing Plant GPP1 & Export Terminal ET ½ Rejuvenation & Revamp Project (PRR), Kerteh, Terengganu - Supervisor / Report To:

Mr. Nakagawa ( MHI–Project Manager; Yokohama HQ ) Mr. Sugimoto (MHI–Procurement Manager;Yokohama HQ)

Page 34: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 34 of 36

Mr. Y.Uemura ( MHI – Site Manager ) Mr. Chung Ken Kee ( PGB – Senior Project Manager ) Mr. Saharuddin Saad ( OGPTS – Project Manager; PMC ) Mr. Abidin Amir Hussain (OGPTS – QA/QC Manager; PMC) Mrs. Kamariah (OGPTS – QA/QC Manager; PMC )

(X) Global Process Systems (Malaysia) Sdn. Bhd.

- Position: PROJECT QA/QC MANAGER

Supervisors: Mr. Clint Edgar (GPS – KL)

Mr. Lee Hong Tein (GPS – KL) Mr. Wan Azhar Wan Mohd (GPS – KL) Mr. Svein Riebe (GPS – KL) Mr. Mohd Nazim Rosli (GPS – KL) Mr. Ramon Dayab (GPS – Dubai)

Mr. Paul Boynton (GPS – Dubai)

- Project: Unocal / Worley Parsons Separator Packages,

Bibiyana Field Development, Bangladesh / Technic Offshore Engineering (TOE), Singapore. Project Supervisor / Coordinator:-

Mr. Arnaud Desoles (Unocal) Mr. Almond Diaz (Unocal) Mr. Terry Reynolds (Unocal) Mr. Bradford I Stone (Unocal) Mr. Blum Humprey, (Worley Parsons)

Mr. Mack Thompson (Worley Parsons) Mr. Feng Lee, (Worley Parsons) Mr. Ken Wagner (Worley Parsons)

Sarawak Shell Berhad, E11KA / E8 Field Development, Glycol Contactor and Glycol Regeneration Skids, Project Supervisor / Coordinator:- Mr. Munawar Ishak, Mr. Ian Durrant Talisman Malaysia Limited Sea Water Injection Packages Project Supervisor / Coordinator:-

Mr. Abdul Pakar Shukor Petronas Carigali / Kawasaki Heavy Industries, Japan, Baram South Compression Modules Baram South Fuel Gas Skid Packages

Page 35: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 35 of 36

Project Supervisor / Coordinator:- Mr. Basher Sulaiman (PCSB) Mr. Mirza Baig, (PCSB) Mr. Tan Chee Fei, (PCSB) Mr. Sazali, (PCSB) Mr. Farsi (PCSB) Mr. Syed Mohammad (PCSB)

Petrofac Pte. Ltd., United Kingdom Mobile Offshore Production Unit (MOPU) Cendor Field Development, Malaysia:- Topsides, Jack–up Rig (Jacket), Hull and Marine Section Fabrications., Project Supervisor / Coordinator:-

Mr. Mike Cummings, Mr. Roslan Daut, Mr. Rodhi Bakar, Mr. Peter Ries

(Y) J. RAY McDERMOTT ASIA PACIFIC PTE. LTD. (JRMAP)

- Position: Project Quality & Technical Integrity Manager Project: R2782 – Sarawak Shell Berhad (SSB)

2007 – 2010 Transportation & Installation Of Offshore Facilities Shell Contract No: 591447 BMD Contract No: R2782 E–mail address: [email protected] [email protected]

(Z) SIGUR ROS SDN. BHD.

(Z)(i) Position: Senior QA/QC/Integrity Engineer (Project basis)

Project Contract No:- 5495 – 9999 – 3500 – 001 (Subsea Pipelines & Onshore Gas Terminal) 5495 – 0399 – 3500 – 9160 – 002 (Hook Ups & Commissioning)

PETRONAS CARIGALI (TURKMENISTAN) SDN. BHD. (PCTSB) / MMHE.TECHNIP JV

TURKMENISTAN BLOCK 1 GAS DEVELOPMENT PROJECT, KIYANLI, TURKMENBASHY

(Caspian Sea Development Project)

EPCCIC For:-

Installation & Pre – Commissioning of Offshore And Onshore Pipelines And Associated Onshore Construction Works (Offshore & Onshore Installation Contractor, OIC, And Oil & Gas Terminal, OGT) And

Page 36: COMPREHENSIVE CURRICULLUM VITAE - · PDF fileFacilitates / Lead Pre - inspection Meeting ... Liaising with local statutory bodies i.e. DOSH, NIOSH, FIRE DEPT, DOE, TNB, and Town Council

Page 36 of 36

Hook Ups & Commissioning (Topsides and OGT) Barge Name: Armada Installer & Arwana Satu Email Address: [email protected] [email protected]

(Z)(ii) DRAGON OIL (TURKMENISTAN) LIMITED /

PETRO GAS FZE JV. (Caspian Sea Development Project)

Position: Senior Project Engineer (project basis)

Project Management Consultant (PMC) For New 30 inch / 20 inch / 18 inch Block 2 – NPF Trunk Line & Two Submersible Pipelines Offshore & Onshore Installation Contractor:- MOMENTUM ENGINEERING – BAKU, AZERBAIJAN (Azerbaycan)

*****************************End of Resume*****************************