Complying with Ohio EPA Asset Management Regulations
Kevin CampanellaUtility Planning Leader
Burgess & Niple
![Page 2: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/2.jpg)
Agenda
• Asset Management Plan Frameworks• Foundational Elements of an AMP• Benefits of AMP Implementation
![Page 3: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/3.jpg)
![Page 4: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/4.jpg)
![Page 5: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/5.jpg)
The AM Story ‐Backwards
![Page 6: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/6.jpg)
Results from AM Programs
• Missing asset entry in register WWTP bypass• CIP 5‐15% reduction from CIP evaluation• Operations 5% reduction• Maintenance
• $250k / year in savings at two WWTPs• Safety improvements• Benefits in more reliable service
![Page 7: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/7.jpg)
The Last Pages in the Asset Register
![Page 8: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/8.jpg)
The Last Pages in the CIP
![Page 9: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/9.jpg)
The Last Pages on Operation
![Page 10: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/10.jpg)
The Last Pages in Maintenance
![Page 11: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/11.jpg)
$110k saved…and maybe a life
![Page 12: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/12.jpg)
Elements of an Asset Management Program
![Page 13: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/13.jpg)
Chapters in a Typical AMP
3. RISK EXPOSURE
1. LEVELS OF SERVICE
2. CURRENT STATE OF ASSETS
5. LONG‐TERM FUNDING STRATEGY
4. MINIMIZE LIFE‐CYCLE COSTS
![Page 14: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/14.jpg)
Levels of Service
3. RISK EXPOSURE
2. CURRENT STATE OF ASSETS
4. MIYCLE COSTS
1. LEVELS OF SERVICE
![Page 15: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/15.jpg)
Why Start with Levels of Service?
![Page 16: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/16.jpg)
![Page 17: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/17.jpg)
Level of Service
![Page 18: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/18.jpg)
Key Performance Indicators
FIRST DOWNS
RUSHING YARDS
PASSING YARDS
TOTAL YARDS
PENALTIES
TIME OF POSSESSION
26
5654
10316
246143
3/15 5/708:28
HALFTIME STATS
21:32
![Page 19: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/19.jpg)
What Levels of Service to Track
•Drinking Water Utility• Finished Water Quality (# of permit violations)• Availability (number and duration of outages)• Pressure (number of pressure complaints)• Complaints (taste, color, odor, etc.)
![Page 20: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/20.jpg)
![Page 21: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/21.jpg)
Metrics Need Definition
• Owner / Sponsor• Purpose• Description• Mathematical Expression / Measurement• Definition• Data Requirements • Reporting Period / Format• Historical Performance• Available Benchmark Data• Target
![Page 22: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/22.jpg)
Benefits of Establishing Service Levels
• Common goals across the organization• Consistency in the utility’s activities• Focus on the things that matter• Utility can communicate LOS goals to customers (incl. OEPA), and customers will know what to expect
![Page 23: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/23.jpg)
Current State of Assets
2. CURRENT STATE OF ASSETS
![Page 24: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/24.jpg)
Know What you Own
• Asset Register (GIS, CMMS, Excel)
• Asset Characteristics
• Asset Hierarchy
• List of Spares
Location Age Replacement $Size Material DepthFaceplate # Failure History
![Page 25: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/25.jpg)
If you’re not sure…
• Asset Walk Downs for Existing Assets• Two‐way check between asset on the floor and in the system of record (asset register)
• Enhance Specifications for New Asset Data Collection• Get assets and PM’s into the maintenance cycle before assets go live
![Page 26: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/26.jpg)
Condition of Assets
• Assess condition based on understanding of failure modes (1‐5 scoring system)
• Physical condition (i.e. PACP for pipes)• Performance (cost to maintain)• Capacity (can it perform its intended function?)• Obsolescence (Can I get replacement parts?)
![Page 27: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/27.jpg)
Physical ConditionPump
![Page 28: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/28.jpg)
Condition Assessment –Performance Based
Water Main
![Page 29: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/29.jpg)
Risk Exposure
3. RISK EXPOSURE
![Page 30: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/30.jpg)
Likelihood of Failure
Consequence of FailureXRisk =
![Page 31: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/31.jpg)
Consequence = Criticality
• Consequences can include:• Financial – direct cost to the utility• Social – property damage, traffic, noise, service interruption• Environmental – overflows, spills
• Can be assessed on a 1‐5 scale• Consequences can be assessed in $$
![Page 32: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/32.jpg)
![Page 33: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/33.jpg)
![Page 34: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/34.jpg)
![Page 35: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/35.jpg)
Example Consequence of Failure Matrix
![Page 36: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/36.jpg)
1 2 3 4 5
LIK
ELIH
OO
DConcentrate your efforts
on highest risk assets
CONSEQUENCE
Illustrating Risk
![Page 37: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/37.jpg)
Minimize Life‐Cycle Costs1. LEVELS OF SERVICE
4. MINIMIZE LIFE‐CYCLE COSTS
![Page 38: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/38.jpg)
Minimizing Life‐Cycle Costs
An Asset Management Plan should include strategies for minimizing costs and risks while maintaining service levels:
• Capital Costs• Operating Costs• Maintenance and Reliability
Only one strategy above may be necessary – depends on the context of the utilities anticipated needs.
![Page 39: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/39.jpg)
Optimize Capital Spending
• Justify projects using more data and with more rigor in the preliminary design stage
• The Asset Management Plan may state something like this:• Business Case Evaluations will be conducted on
all projects with a capital budget over $50,000
![Page 40: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/40.jpg)
• Summary Info.• Problem Statement• Alternatives Evaluation• Benefit/Cost Analysis
![Page 41: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/41.jpg)
BCE Savings: Case StudyProposed Project Alternate Water Supply Pump Station and
Intake (Supply Pipeline Existing)
BCE Conclusion Purpose was to provide alternate water supply in time of drought, but reservoirs were currently under construction to allow uninterrupted water supply in 100‐year drought, reducing risk
Savings Realized $15 Million
Lessons Learned Pipeline was constructed over a decade ago, but sunk costs are not a reason to proceed. Quantified risks illustrated undesirable BCR.
![Page 42: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/42.jpg)
Opportunity to Save vs.Availability of Data over Time
![Page 43: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/43.jpg)
The Business Case for BCE’s
BCEsConsultant cost $ 730,000Estimated staff cost (training and administration) $ 290,000Estimated staff cost (BCE performance) $ 300,000
TOTAL COST $ 1,320,000TOTAL BENEFITS $ 50,000,000+Benefit/cost ratio 38
![Page 44: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/44.jpg)
Risk‐Based CIP Prioritization
![Page 45: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/45.jpg)
Operations Optimization
![Page 46: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/46.jpg)
Case Study ‐ Operations Optimization Savings
Proposed Project
Shift Production to Low Cost Water Plant
Optimization Conclusion
4 MGD could be shifted to low cost plant for 200 days per year ($187/MG less in treatment/pumping)
Savings Realized
$150,000 per year
Lessons Learned
Seemingly small cost reductions add up over time
![Page 47: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/47.jpg)
Case Study ‐ Operations Optimization SavingsFilter Backwash Optimization
• Backwash process was conservative• Backwash water reduced
• Time between backwashes increased by 12 hrs• Duration of backwash reduced from 10‐15 minutes to 8‐10 minutes
• Backwash savings: $50,000/year
• Annual savings may be increased in the future as staff gains comfort
![Page 48: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/48.jpg)
The Operations Optimization BCE
Operations Optimization at 5 Treatment PlantsConsultant and staff cost $ 500,000Approximate annual savings identified $ 750,000TOTAL LIFE‐CYCLE BENEFITS $ 12,260,000Benefit/cost ratio 25
![Page 49: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/49.jpg)
Optimize Maintenance Strategies
• Increased capacity = More assets to maintain• Advanced equipment technology = Maintenance is complex• More stringent standards = Less downtime• Existing assets are aging; reactionary maintenance and replacements alone are too costly
• Proactive maintenance is safer!• Maintenance tools are more sophisticated
![Page 50: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/50.jpg)
Thermography
Electrical Panel Motor
![Page 51: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/51.jpg)
Vibration Analysis
![Page 52: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/52.jpg)
Ultrasound (Vibration and Lube)
![Page 53: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/53.jpg)
Findings
• Mechanical assets tend to be over‐maintained• Manufacturer’s recommendations designed to warranty period, and ignore operating
context
• Most failures are not traditional “wear and tear” time‐bound failures; they are random (e.g. electrical/SCADA)
• Preventive tasks were not effective at preventing failure• Predictive Maintenance would be more effective
![Page 54: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/54.jpg)
Findings (continued)
• Maintenance types are out of balance• The balance between PM and CM was incorrect
• Critical assets not properly identified• Inventory not reflective of critical spares
• Safety PM’s often overlooked• Testing of protective devices needed to be ramped up
![Page 55: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/55.jpg)
Examples of Maintenance Strategy
• Train staff in use of ultrasound for use in detecting when and how much to lube
• Measure ratio of (PdM+PM) / CM• Capture all failure data in a CMMS by 2020• Increase population of asset replacement data• Increase wrench time through better maintenance planning by 5% by 2019
![Page 56: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/56.jpg)
RCM – Benefits
• Optimized Proactive Maintenance Plans• 60‐percent reduction in PM tasks on 2 pilots• 41 new safety preventive maintenance tasks• $100,000 annual savings
• Increased Reliability and Availability• Increased Safety• Increased Staff Knowledge
![Page 57: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/57.jpg)
The Maintenance BCE
Maintenance Initiative at 5 Treatment PlantsConsultant cost and staff cost $ 1,000,000Approximate annual savings (RCM) $ 160,000TOTAL LIFE‐CYCLE BENEFITS $ 2,600,000Benefit/cost ratio 3
![Page 58: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/58.jpg)
Long‐Term Funding Strategy
5. LONG‐TERM FUNDING STRATEGY
![Page 59: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/59.jpg)
Expenses, Revenue, Reserves
0
100000
200000
300000
400000
500000
600000
700000
800000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
CASH FLOWSExpenses Revenue Reserve
![Page 60: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/60.jpg)
Scope of Work
• Data Gathering• Data Request• Interviews
• Prepare Draft AMP (existing conditions)• Workshop Potential Recommended Action Items for the Plan
• Prepare AMP• Public Use Document• Internal Use Document
![Page 61: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/61.jpg)
SAM‐GAP output
![Page 62: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/62.jpg)
SAM‐GAP Output
![Page 63: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/63.jpg)
Drivers Exercise
![Page 64: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/64.jpg)
Types of Follow‐Up Work• Asset management training
Current State of Assets• Asset walk downs to verify the existing asset register• Develop specifications for asset data requirements at commissioning• Assess asset data in GIS (structure, population)• Develop condition assessment processes (i.e. scoring systems)• Conduct condition assessment
![Page 65: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/65.jpg)
Types of Follow‐Up Work
Levels of Service and Performance Management• Develop Levels of Service (metrics, targets, reporting process)• Develop KPI’s for any line of business
Risk Management• Develop a risk‐register• Develop a list of critical assets (consequence of failure methodology)
![Page 66: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/66.jpg)
Types of Follow‐Up WorkO&M and CIP Strategies• Develop a CIP prioritization methodology• Develop a CIP evaluation process (i.e. BCE)• Prepare replacement plans• Conduct operations optimization studies
• Chemicals• Energy• Staffing (be cautious)
• Assess CMMS technology for purchase or rework
![Page 67: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/67.jpg)
Types of Follow‐Up Work
O&M and CIP Strategies• Develop a process for conducting more proactive maintenance
• Develop maintenance metrics• Introduce PdM technologies (ultrasound, vibration)• Optimize timing of PM
![Page 68: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/68.jpg)
Prologue
• Asset Management Plans (AMPs) can be simple• AMPs bring structure to improving AM practices• AMPs help you focus resources to minimize cost• AM is a journey – AMPs are living documents• AMPs assist with communication on many levels• AM is not a separate “thing”
![Page 69: Complying with Ohio EPA Asset Management Regulations · Complying with Ohio EPA Asset Management Regulations Kevin Campanella Utility Planning Leader Burgess & Niple. Agenda • Asset](https://reader033.vdocuments.mx/reader033/viewer/2022042309/5ed68ac5ff0e593c0b640a51/html5/thumbnails/69.jpg)
Questions and Comments
Kevin CampanellaBurgess & Niple, Inc.Utility Planning Leader
Phone: 614-459-2050
Thank you!