compliance report of environmental … report of environmental clearance [compliance period: october...
TRANSCRIPT
COMPLIANCE REPORT OF
ENVIRONMENTAL CLEARANCE
[Compliance Period: October 2015 to September 2016]
Submitted By:
M/s. Friends Oil & Chemical Terminals Pvt. Ltd.
Khari Rohar Road, Near Booster Pump Station, Old Kandla-370 210, Dist: Kutch, Gujarat.
November 2016
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | i Period: Oct’15 to Sept’16
CONTENTS
Sr. No. Title Page
no.
1. Introduction 1
2. Compliance status of Environment Clearance (EC) 2
LIST OF ANNEXURE
Annexure
no. Title
Page
no.
1. Copy of EC letter no. SEIAA/GUJ/EC/6(b)/142/2011 and its
amendment SEIAA/GUJ/EC/6(b)/188/2011 A-1
2. Copy of CTE vide no. PC/CCA·KUTCH135/GPCBID17835/
102299 A-7
3. Copy of CCA order no. AWH – 63316 and its amendment vide
no. PC/CCA-KUTCH-135(2)/GPCBID17835/229628 A-11
4.
Record of Performance data (Storage Utilization of Tanks, Water
consumption and waste water generation with water balance
diagram, Fuel consumption, Hazardous waste generation and
Disposal)
A-17
5. Copy of Saurashtra Enviro Project Pvt. Ltd. TSDF Membership A-20
6. Copy of various training record A-21
7. Copy of Record of recent mock drill A-22
8. Copy of Work Area monitoring report A-25
9. Copy of Ambient Air Quality monitoring report A-31
10. Copy of Stack monitoring report A-34
11. Copy of Noise monitoring report A-39
12. Copy of effluent analysis report A-40
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 1 Period: Oct’15 to Sept’16
INTRODUCTON
M/s Friends Oil & Chemical Terminals Pvt. Ltd. (FOCT) is located at Khari Rohar
Road, Old Kandla in District Kutch of Gujarat. The Kandla Port Trust has allotted the land
of 6.17 acres (25,000 m2) for establishing Liquid Storage Tank terminal in year 1995.
These 6.17 acres of land has been already developed for the storage of petroleum
products, chemicals, edible oils etc. Loading and unloading of import/export cargo are
main activity at major port of Kandla.
The unit has provided total 21 liquid storage tanks (Tank No. 101 to 121) to store
various Petroleum Product, Chemicals, Edible Oil, etc. with storage capacity of 50,904
KL. Storage capacity of 21 liquid storage tanks can be summarized as follows:
Details of Storage Tank and Storage Capacity after Expansion:
Tank No. Storage Tank
Size Dia. X Height
Capacity of each Tank,
KL
No. of Tank
Total Capacity,
KL
Type/ Class of Cargo to be
stored
101 to 113 18.0 m X 13.0 m 3,308 13 43,004 Class A,B & C Petroleum Products,
Chemicals and Edible Oils
114 to 117 13.0 m X 13.0 m 1,725 4 6,900
118 to 121 6.0 m X 9.0 m 250 4 1,000
Total 21 50,904
We have already obtained Environment Clearance vide no.
SEIAA/GUJ/EC/6(b)/142/2011 dated 03/09/2011 and its amendment vide no.
SEIAA/GUJ/EC/6(b)/188/2011 dated 03/09/2011(Copy of both enclosed as Annexure –
1). We have also obtained CTE vide no. PC/CCA·KUTCH-135/GPCBID17835/102299
dated: 17/01/2012 (Copy enclosed as Annexure – 2). We have also obtained valid CCA
order no. AWH - 63316 dated: 04/07/2014 and its Amendment vide no. PC/CCA-
KUTCH-135(2)/GPCBID17835/229628 dated: 29/10/2014 (Copy of both enclosed as
Annexure – 3).
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 2 EC compliance Report
Period: Oct’15 to Sept’16
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE
Project : Environment Clearance to M/s. Friends Oil & Chemical Terminals
Pvt. Ltd. for the expansion of isolated storage & handling of
hazardous chemicals by increasing the height of existing
storage tanks in existing Liquid Storage Terminal at Khari Rohar
Road, Old Kandla, Taluka: Gandhidham, District: Kutch. in
Category 6(b) of Schedule annexed with EIA Notification dated
14/9/2006.
Reference : EC vide no. SEIAA/GUJ/EC/6(b)/142/2011 dated 09/08/2011
Amendment in EC vide letter No. SEIAA/GUJ/EC/6(b)/188/2011
dated 03/09/2011
Period : October 2015 September 2016
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 3 Period: Oct’15 to Sept’16
As per EC vide no. SEIAA/GUJ/EC/6(b)/142/2011 dated 09/08/2011
Sr.
No. A. SPECIFIC CONDITIONS COMPLIANCE STATUS
A.1: WATER
1. There shall be no additional fresh water
consumption in the project due to the
proposed expansion.
Complying,
Monthly water consumption is enclosed
as Annexure – 4.
Average water consumption during
above mentioned compliance period
was 1.58 KLD out of which 0.43 KLD
was used for domestic purpose, 1.13
KLD for gardening purpose and 0.03
KLD was used for industrial purpose.
2. There shall not be any wastewater
generation from the project due to the
proposed expansion.
Noted
Details of monthly w/w generation with
water balance diagram are enclosed as
Annexure – 4.
Average wastewater generation during
above mentioned compliance period
was 0.45 KLD.
Domestic wastewater 0.43 KLD is
discharged through soak pit and
industrial waste water @ 0.02 KLD after
adequate treatment is reused for
gardening.
3. Rain water runoff from the project site at
its outlet shall be monitored by the
project proponent regularly in the
monsoon and its report shall be
submitted to the GPCB.
Complying
We are taking adequate measures for
proper disposal of storm water.
A.2: AIR
4. There shall be no additional fuel
consumption in the project due to the
proposed expansion.
Complying
We are using HSD as a fuel and monthly
fuel consumption during above
mentioned compliance period is
enclosed as Annexure – 4.
5. Fugitive emission at workplaces shall be
controlled and kept below the limits
prescribed by the concerned authorities
from time to time. At no time, the
Complying
We are regularly carrying out monitoring
of work area through NABL accredited
laboratory and the results are well within
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 4 EC compliance Report
Period: Oct’15 to Sept’16
emission levels shall go beyond the
stipulated standards.
the prescribed limits.
Copy of Work Area monitoring report is
enclosed the reports as Annexure – 8.
6. For control of fugitive emission following
steps shall be followed:
Closed handling system shall be
provided
Pumps shall be provided with
mechanical seals to prevent
leakages
System of leak detection and repair
of pump/pipeline based on
preventive maintenance
The petroleum products shall be
taken to or from storage tanks
through closed pipeline.
Complying
Following are the measures taken for
the control of fugitive emissions:
We have ensured that there is not
any leakage during the handling and
transportation of material.
The storage tanks are well
connected with various sizes of
transfer pipelines to and from to the
five vessel jetties enabling direct
discharging so there is no chance of
fugitive emission.
The length of pipeline from terminal
to vessel is provided very short to
avoid the chances of spillage and
leakages.
The storage tanks are hydraulically
tested in order to ensure that there
are no leak joints and welded joints
are also tested radio graphically.
All the pumps have been made with
the provision of magnetic seals to
prevent any leakages and thus to
reduce the fugitive emission.
In case of spillage, the immediate
actions are taken to control &
contain any spillage of chemicals so
by that way minimize the fugitive air
pollution.
The provisions of immediate
isolation of equipment have been
made in case of leakage.
In case of heavy leakage from the
storage tank, efforts are made to
quickly transfer product from the
leaking tank to other storage tanks,
so that the quantity of spillage is
minimized.
The Green belts have been
developed to control fugitive
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 5 Period: Oct’15 to Sept’16
emission in to surrounding
environment.
7. The project proponent shall measure
ambient air quality for the parameter like
hydrocarbon and VOCs in and around
the project site and shall maintain its
records. The locations of the ambient air
monitoring stations should be done in
consultation with GPCB.
Complying,
We carry out work area monitoring for
VOC (Methanol, xylene & Acetone) and
ambient air quality monitoring for PM,
SO2 and NOX within project site near
main gate, D.G. Pump and near fire
pump house through NABL accredited
laboratory and all the analysis results are
well within prescribed limits.
Work area monitoring, Ambient Air
Quality monitoring and Stack monitoring
reports are enclosed as Annexure-8, 9
& 10 respectively.
A3: SOLID WASTE
8. The company shall strictly comply with
the rules and regulations with regards to
handling and disposal of Hazardous
waste in accordance with the Hazardous
Waste (Management, Handing and
Transboundary Movement) Rules 2008,
as may be amended from time to time.
Authorization from the GPCB must be
obtained for collection / treatment /
storage / disposal of hazardous wastes.
Complying,
Authorization is taken for Used Oil (0.06
MT/year), Pigging waste (0.8 MT/year)
and Oily sludge (45.0 MT/year).
We have obtained membership of TSDF
site of Saurashtra Enviro Project Pvt.
Ltd., Bhachau for proper disposal of
Pigging waste (Copy enclosed as
Annexure – 5)
All the hazardous waste are handled and
managed as per Hazardous Waste
(Management, Handling &
Transboundary Movement) Rules-2008.
We also regularly submit the annual
return.
9. The hazardous waste shall be packed
and stored in separate designated
hazardous waste storage facility with
impervious bottom and leachate
collection facility, before its disposal.
Complying
We have provided isolated storage area
of 150 sqm for hazardous waste storage
within premises having proper roof cover
and impervious flooring with leachate
collection system. Photograph showing
separate hazardous waste storage area
was submitted along with previous EC
Compliance report (Period: Oct’13 to
Sept’15) on 04/02/2016.
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 6 EC compliance Report
Period: Oct’15 to Sept’16
10. ETP waste shall be disposed at the
common TSDF.
Noted,
There is an oil water interceptor provided
in which water after washing the tanks is
received. Here, oil is removed & stored
in Barrels which is taken away by parties
utilizing the storage tanks.
This waste is generated only during
decommissioning of storage tanks which
is done sparingly.
11. Oily sludge and pigging waste shall be
sent to the common hazardous waste
incineration facility for its disposal by
incineration.
Noted,
There is no oily sludge generated during
the above mentioned compliance period
and pigging waste generated is stored,
treated and disposed to SEPPL through
incineration.
12. Used oil shall be sold only to the
registered recyclers.
Complying,
There is no used oil generated during
the above mentioned compliance period.
A4: SAFETY
13. Necessary permissions from various
statutory authorities like Chief Controller
of Explosive, Factory Inspectorate and
others shall be obtained prior
commissioning of the project.
Complied,
We have obtained permission from
Petroleum & Explosive Safety
Organization (PESO), Nagpur.
Copy of PESO permission, License to
import and store petroleum in installation
& license under the Factory Act were
submitted along with previous EC
Compliance report (Period: Oct’13 to
Sept’15) on 04/02/2016.
14. Oil Industry Safety Directorate (OISD)
standards and other standards issued by
the Government of India for the
construction and operation of the storage
tanks shall be followed strictly.
All the applicable OISD standards have
been complied with. We have done all
the installations as per the standards
and approved drawings.
List of OISD standards was submitted
along with previous EC Compliance
report (Period: Oct’13 to Sept’15) on
04/02/2016.
15. All necessary precautionary measures
shall be taken to avoid any kind of
spillage and accident especially during
handling of the crude oil to and from the
Complying,
The storage tanks are hydraulically
tested in order to ensure that there
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 7 Period: Oct’15 to Sept’16
tanks. are no leak joints. Welded joints are
also tested radio graphically. Each
storage tank has been provided with
pipeline for receiving the liquid cargo
from the main pipelines in the
Terminal, laid near the manifold of
the flame proof pump house.
The main receiving pipeline is
connected to storage tank with SS
flexible hoses. There is negligible
chance of spillage, leakage in the
pipeline as the length of the pipeline
is very short.
In the Terminal, centrifugal pumps
are installed in flame proof pump
house constructed opposite to
manifold of storage tank pipelines as
per the requirement of Petroleum
rules. Each pump is provided with
mechanical seal to eliminate
chances of leakages. Sufficient
numbers of pumps are provided to
unload cargo from various storage
tanks at a time. The pipelines of the
storage tanks from which the cargo
is to be unleaded is connected with
flexible SS hoses to the pump
coupled with flame proof motors.
The storage tanks in the Terminal
have been provided with elaborate
fire fighting system consisting of
main fire hydrant pipeline, with fire
hydrants, water monitor etc. water
sprinkler & foam sprinkler are
provided on periphery of storage
tank itself.
16. Necessary dyke walls, spill collection
sump etc. shall be provided as per the
necessary statutory requirements and
best practices adopted in the industries.
Complying,
The dyke wall is provided to the group
of storage tanks. Impervious flooring is
provided in the tank area. However, in
case of any leakage, provisions are
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 8 EC compliance Report
Period: Oct’15 to Sept’16
made to collect the spill and pumped
the same into the buffer tank, specially
provided for the storage of spill.
Photographs of dyke wall provided to
the storage tanks were submitted along
with previous EC Compliance report
(Period: Oct’13 to Sept’15) on
04/02/2016.
17. Strict supervision by plant personnel
shall be carried out during oil transfer or
receipt of petroleum products.
Complying.
18. Proper earthing shall be provided on the
pipelines and storage tanks. The tank
gauging operator shall not be earthed
with the tank (i.e he shall wear non
conducting shoes).
Complying.
19. Lightening protection devices shall be
provided for all the storage tanks
Complied.
20. Fire protection facilities and fighting
equipments shall be maintained in the
terminal as per OISD-117.
Complying,
Fire protection facilities and fighting
equipments are maintained in the
terminal as per OISD-117. Details of
Fire and safety were submitted along
with previous EC Compliance report
(Period: Oct’13 to Sept’15) on
04/02/2016.
21. Height of two existing above ground Fire
Water Storage Tanks (12 m dia x 10 m
height, 18 m dia. x 10 m height, MOC:
MS) of 1130 KL & 2544 KL capacities
shall be increased by 3 m thus
expanding their volume to 1470 KL &
3306 KL respectively.
Complied.
22. Personal Protective Equipment shall be
provided to workers and its usage shall
be ensured and supervised.
Complying
We provide personal protective
equipment like Helmet, Hand gloves,
Safety boots, Face Shield and safety
goggles to the workers and its usage is
ensured and supervised regularly. We
also give training to the worker for the
usage of personal protective
equipments and their benefits.
Details of PPE and photographs
showing training to the worker for the
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 9 Period: Oct’15 to Sept’16
usage of PPE were submitted along
with previous EC Compliance report
(Period: Oct’13 to Sept’15) on
04/02/2016.
23. First aid box, fire extinguishers, foams,
sand etc. shall be made readily available
in adequate quantity at all the times.
Necessary tie up with the nearby fire
stations and other emergency services
shall be made to ensure that the required
aids reach within the shortest possible
time in case of any adverse conditions.
Complying
We have provided all the necessary
requirements like first aid box, fire
extinguishers, forms, sand, fire hydrant
system and fire water reservoir in
adequate quantity. Details of the fire
extinguishers, foams, sand etc were
submitted along with previous EC
Compliance report (Period: Oct’13 to
Sept’15) on 04/02/2016.
We have also tied up with nearby
firefighting facility like IFFCO Fire
Station, Gandhidham Fire Station &
Kandla Fire Station for emergency
situation.
24. Training shall be imparted to all the
workers on safety aspects of which shall
include regular mock drill.
Complying
We provide training to all the workers
for safety. Also mock drill is conducted
at regular intervals. Records of various
trainings given to the workers are
enclosed as Annexure-6. Record of
recent mock drill is enclosed as
Annexure - 7.
25. Occupational health surveillance of the
workers shall be done and its records
shall be maintained. Pre-employment
and periodical medical examination for all
the workers shall be undertaken on
regular basis as per Factories Act &
Rules
Complying
Pre-employment and periodic medical
checkup is done at regular intervals.
Copies of form-33 are also maintained
for records.
26. The company shall carryout risk
assessment based on the Worst Case
Scenario and Maximum Credible
Accident scenario by competent agency.
The company shall implement all
preventive and mitigation measures
suggested in letter and spirit based on
Complied
We have carried out quantitative risk
assessment based on worst case
scenario and Maximum Credible
Accident scenario by HELPS, Vadodara
and implemented all the preventive and
mitigation measures as suggested in
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 10 EC compliance Report
Period: Oct’15 to Sept’16
study carried out by the agency. report.
Risk Assessment report was last
updated in August 2015.
We are carrying out safety audit at fix
interval of time and copy of the same
was submitted along with previous EC
Compliance report (Period: Oct’13 to
Sept’15) on 04/02/2016.
27. The company shall revise their Onsite
Emergency Management Plan in view of
the proposed expansion and take
additional safety measures as required.
Complying,
Onsite Emergency Management Plan
had been revised by HELPS, Vadodara
in June 2015 in view of the proposed
expansion and additional safety
measures as required have been taken.
28. The project management shall strictly
comply with the provisions made in
Manufacture Storage and Import of
Hazardous Chemicals Rules 1989 as
amended in 2000 for handling of
hazardous chemicals. Necessary
approvals from the Govt. Authorities
shall be obtained before commissioning
of the project, if applicable.
Complied.
Copy of License to import and store
petroleum in installation was submitted
along with previous EC Compliance
report (Period: Oct’13 to Sept’15) on
04/02/2016.
A.5: NOISE
29. The overall noise level in and around the
plant area shall be kept well within the
prescribed standards by providing noise
control measures including acoustic
insulation, hoods, silencers, enclosures
vibration dampers etc. on all sources of
noise generation. The ambient noise
levels shall confirm to the standards
prescribed under the Environment
(Protection) Act and Rules. Workplace
noise levels for workers shall be as per
the Factories Act and Rules.
Complying
We provide ear plug/muff to the workers
working in high noise area.
The noise area monitoring is regularly
carried out by NABL accredited
laboratory.
Copy of noise monitoring report for the
compliance period is enclosed as
Annexure – 11.
A.6: CLEANER PRODUCTION AND WASTE MINIMIZATION
30. The company shall undertake following
waste minimization measures:
a) Good housekeeping.
b) Use of automated and enclosed filling
Complying
We are maintaining good housekeeping
within the premises. We have provided
paved road and impervious flooring in
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 11 Period: Oct’15 to Sept’16
to minimize spillage.
c) Venting equipment through vapour
recovery system.
the premises and do regularly clean the
same as well as maintain cleanliness in
the whole premises.
We have also provided automatic
system for filling of liquid chemicals to
minimize the spillage. As we are not
engaged in manufacturing of any
products, provision of venting
equipment through vapor recovery
system is not applicable to us.
A.7: GREEN BELT AND OTHER PLANTATION:
31. The unit shall develop green belt within
premises as per the CPCB guidelines,
preferably with local species. However,
if the adequate land is not available
within the premises, the unit shall take
up adequate plantation on road sides
and suitable open areas at nearby
schools, gram panchayat areas and any
other open areas in consultation with
the local bodies / GPCB and submit an
action plan of plantation for next three
years to the GPCB.
Complied
We have developed green belt @ 1308
Sqm area within the plant premises. We
have planted trees of coconut and dates
within the premises. Photographs
showing greenbelt area were submitted
along with previous EC Compliance
report (Period: Oct’13 to Sept’15) on
04/02/2016.
B. GENERAL CONDITIONS
32. The project proponent shall strive to
adopt environment and occupational
health and safety management system
standards like ISO-14001and OHSAS-
18001.
We have already obtained ISO-14001,
ISO-18001 and ISO 9001. Copies of the
same were submitted along with
previous EC Compliance report (Period:
Oct’13 to Sept’15) on 04/02/2016.
33. All the transportation routes in the
project premises shall be well paved to
minimize the fugitive emission and to
prevent soil contamination.
Complied,
We have provided paved roads and
impervious flooring within the plant
premises.
34. Impervious layer in the work area,
petroleum products storage area and
petroleum products handling area shall
be provided to minimize soil
contamination.
Complied.
We have provided impervious flooring in
the work area, petroleum products
storage area and petroleum products
handling area within the plant premises.
35. Leakages from the pipes, pumps, shall Complying
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 12 EC compliance Report
Period: Oct’15 to Sept’16
be minimal and if occurs, shall be
arrested promptly.
The main receiving pipeline is connected
to storage tank with SS flexible hoses.
There is negligible chance of spillage,
leakage in the pipeline as the length of
the pipeline is very short.
In the Terminal, centrifugal pumps are
installed in flame proof pump house
constructed opposite to manifold of
storage tank pipelines as per the
requirement of Petroleum rules. Each
pump is provided with mechanical seal
to eliminate chances of leakages.
Sufficient numbers of pumps are
provided to unload cargo from various
storage tanks at a time. The pipelines of
the storage tanks from which the cargo
is to be unleaded is connected with
flexible SS hoses to the pump coupled
with flame proof motors. Standby pumps
are provided and regular checking of all
mechanical equipments and their
maintenance is also carried out.
36. In the event of failure of any pollution
control system adopted by the unit, the
unit shall be safely closed down and
shall not be restarted until the desired
efficiency of the control equipment has
been achieved.
Noted & Agreed.
We regularly check and monitor
pollution control systems to achieve the
prescribed limits. We assure you that In
the event of failure of any pollution
control system adopted by the unit, the
unit will be safely closed down and
won’t be restarted until the desired
efficiency of the control equipment has
been achieved.
37. The company shall undertake eco-
developmental measures including
community welfare program most useful
in the project area for the overall
improvement of the environment.
Complying,
We are taking adequate measures for
undertaking eco-developmental
activities for the purpose of community
welfare program and a copy of receipt
for one such activity stating the
donation from M/s Friends Oil Pvt. Ltd
to Kutch Management Association was
submitted along with previous EC
Compliance report (Period: Oct’13 to
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 13 Period: Oct’15 to Sept’16
Sept’15) on 04/02/2016.
38. The management shall ensure that the
unit complies with all the environment
protection measures and risk mitigation
measures/ safeguards proposed by
them.
Complying.
39. The project proponent shall also comply
with any additional condition that may
be imposed by the SEAC or the SEIAA
or any other competent authority for the
purpose of the environmental protection
and management.
Agreed.
40. No further expansion or modifications in
the plant shall be carried out without
obtaining prior Environment Clearance
from the concerned authority.
Noted & Agreed.
We assure you that no further
expansion or modifications in the plant
will be carried out without obtaining
prior Environment Clearance from the
concerned authority.
41. The above conditions will be enforced,
inter – alia under the provisions of the
Water(Prevention & Control of Pollution)
Act.1974, Air (Prevention & Control of
Pollution) Act, 1981, the Environment
(Protection) Act, 1986, Hazardous
Wastes (Management and Handling)
Rules, 2003 and the Public Liability
Insurance Act, 1991 along with their
amendments and rules.
Noted,
Copy of PLI was submitted along with
previous EC Compliance report (Period:
Oct’13 to Sept’15) on 04/02/2016.
42. This Environmental Clearance is valid
for five years from the date of issue.
Noted
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Page | 14 EC compliance Report
Period: Oct’15 to Sept’16
CONDITIONS AS PER AMENDMENT DATED 03/09/2011
43. The project authorities shall earmark
adequate funds to implement the
conditions stipulated by SEIAA as well
as GPCB along with the implementation
schedule for all the conditions stipulated
herein. The funds so provided shall not
be diverted for any other purpose.
Complied,
We are allocating adequate funds in
order to implement the conditions
stipulated by SEIAA as well as GPCB
and we assure you that funds so
provided are not diverted for any other
purpose.
44. The applicant shall inform the public
that project has been accorded
environmental clearance by the SEIAA
and that copies of the clearance letter
are available with the GPCB and may
also be seen at the Website of SEIAA/
SEAC/ GPCB. This shall be advertised
within seven days from the date of the
clearance letter, in at least two local
newspapers that are widely circulated in
the region, one of which shall be in the
Gujarati language and the other in
English, A copy each of the same shall
be forwarded to the concerned Regional
Office of the Ministry.
Complied
We had given advertisement of EC
obtained in Gujarati in Newspaper of
Kutch Uday on 14/09/2011 and in
English in Newspaper of Sandesh on
16/09/2009. Copies of the same were
submitted along with previous EC
Compliance report (Period: Oct’13 to
Sept’15) on 04/02/2016.
45. It shall be mandatory for project
management to submit half-yearly
compliance report in respect of
stipulated prior environmental clearance
terms and conditions in hard and soft
copies to the regulatory authority
concerned, on 1st June and 1st
December of each calendar year.
Noted & Complying,
Last compliance report for the period
October’13 to September’15 was
submitted on 04/02/2016.
46. The project authorities shall also adhere
to the stipulations made by the Gujarat
Pollution Control Board.
We have obtained CTE vide no.
PC/CCA·KUTCH-135/GPCBID
17835/102299 dated: 17/01/2012. We
have also obtained valid CCA order no.
AWH - 63316 dated: 04/07/2014 and
subsequent CCA Amendment vide no.
PC/CCA-KUTCH-135(2)/ GPCB ID
17835/229628 dated: 29/10/2014.
47. The project authorities shall inform the
GPCB, Regional Office of MoEF and
SEIAA about the date of financial
closures and final approval of the
Financial Closure
Particulars Details
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
EC compliance Report
Page | 15 Period: Oct’15 to Sept’16
project by the concerned authorities and
the date of start of the project.
Planned Project
Cost 2159.99 Lacs
Actual Project
Cost
Working Capital
Provision
48. The SEIAA may revoke or suspend the
clearance, if implementation of any of
the above conditions is not found
satisfactory.
Agreed.
49. The company in a time bound manner
shall implement these conditions. The
SEIAA reserves the right to stipulate
additional conditions, if the same is
found necessary. The above conditions
will be enforced, inter-alia under the
provisions of the Water (Prevention &
Control of Pollution) Act, 1974, Air
(Prevention & Control of Pollution)
Act, 1981, the Environment
(Protection) Act 1986 and Hazardous
Wastes (Management Handling and
Transboundary) Rules: 2008 along with
their amendments and rules.
Noted & Agreed
ANNEXURE – 1
Copy of EC letter no.
SEIAA/GUJ/EC/6(b)/142/2011 and its
amendment
SEIAA/GUJ/EC/6(b)/188/2011
-J STATE LEVEL ENVIRICINMEKT -- R.G. SHAH IMPACT ASSESSMENT
MEMBER SECRETARY AUTHORITY SEIAA (GUJARAT) ~ Z ~ U A GU JARAT
Government of Gujarat
No. S E I A A I G U J I E C I ~ ( ~ ) ~ ~ L ) ~ ~ ~ O I 1
Sub: Environment Clearance to Mls. Friends Oil & Chemical Terminals Pvt. Ltd. for the expansion of
isolated storage & handling of hazardous chemicals by increasing the height of existing storage
tanks in existing Liquid Storage Terminal at Khari ~ o h a r Road, Old Kandla, Taluka: Gandhidham, District: Kutch. in Category 6(b) of Schedule annexed with EIA Notification dated 141912006.
- -
Dear Sir,
This has reference to your application in Application Form-l along with feasibility cum detailed project report, risk
analysis study report, safety audit report & on site emergency plan submitted to the SEAC, seeking Environmental Clearance under Environment Impact Assessment Notification, 2006.
The proposal is for Environmental Clearance to Mls. Friends Oil & Chemical Terminals Pvt. Ltd. for the
expansion of isolated storage & handling of hazardous chemicals by increasing the height of existing storage tanks in existing Liquid Storage Terminal at Khari Rohar Road, Old Kandla, Taluka: Gandhidham, District: Kutch. Details of tanks after the proposed expansion will be as under :
of No. of Storage Tank Size Each Tank, TypelClass of I Tank No. 1 Diameter x Height Capacity Of cargo to be 1 KL 1 Tank I KL 1 stored 1
TO1 to 113
114 to 117 I I I I
'The project activity is covered in 6(b) and is of 'B' Category. The Public Consultation is not required as per Para 7(i) 111.
Stage (3) (e) - Public Consultation of EIA Notification, 2006.
18.0 m x 13.0 m
13.0 m x 13.0 m
118 to 121
Total
The SEAC, Gujarat had recommended to the SEIAA, Gujarat, to grant the Environment Clearance. to this project for the above-mentioned products. The proposal was considered by SEIAA, Gujarat in its meeting held on 30.07.201 1 at Gandhinagar. SElAA hereby accords Environmental Clearance to above project under the provisions of EIA
Notification dated 1 4 ' ~ September, 2006 subject to the compliance of the following Specific and General conditions.:
1. There shall be no additional fresh water consumption in the project due to the proposed expansion.
2. There shall not be any wastewater generation from the project due to the proposed expansion.
3,308
1,725 Chemicals and
Edible Oils 6.0 m x 9.0 m
2 1
3. Rain water run off from the project site at its outlet shall be monitored by the project proponent regularly in the
monsoon and its report shall be submitted to the GPCB.
50,904
4. There shall be no additional fuel consumption in the project due to the proposed expansion.
5. Fugitive emission at workplaces shall be controlled and kept below the limits prescribed by the concerned
authorities from time to time. At no time, the emission levels shall go beyond the stipulated standards.
13
4
250
6. For control of fugitive emission following steps shall be followed :
J Closed handling system shall be provided.
J Pumps shall be provided with mechanical seals to prevent leakages.
Office : Gujarat Pollution Control Board, 'Payavaran Bhavan" Sector-1 0 A, Gandhinagar-382010 Page 1 of 4 Phone No.:- (079) 232-32 152,232-4 15 14 Fax No.:-(079) 232-22784 E-mail : seiaaeuif$yahoo.com, Website:- www.seiaa.gujarat.gov.in
43,004
6,900
4
Class A, B & C Petroleum Products.
1,000
A-1
- 4 System of leak detection and repair of pumplp~pel~ne based on preventwe maintenance.
--- / -3 petraleum products shall be taEn to or from storage tanks through closed pipeline. ,
7 The project proponent shall measure ambient arr quality for the parameters like hydrocarbon and VOCs in and around the project s~te and shall maintain ~ t s records. The locations of the ambient air monltor~ng stations shall be done in consultation with GPCB
8. The company shall strictly comply with the rules and regulations with regards to handling and disposal of Hazardous I
waste In accordance with the Hazardous Waste (Management, Handing and Transboundary Movement) Rules
2008, as may be amended from time to time. Authorization from the GPCB must be obtained for collection 1
treatment / storage I disposal of hazardous wastes.
9. The hazardous waste shall be packed and stored in separate designated hazardous waste storage facility with
impervious bottom and leachate collect~on facility, before its disposal.
10 ETP waste shall be disposed at the common TSDF.
11. Oily sludge and pigging waste shall be sent to the common hazardous waste incineration facility for its disposal by
incineration.
12. Used oil shall be sold only to the registered recyclers.
13. Necessary permissions from various statutory authorities like PESO, Factory Inspectorate and others shall be
obtained prior to commissioning of the project.
14. Oil Industry Safety Directorate (OISD) standards and other standards issued by the Govt. of India for the
construction and operation of the storage tanks shall be followed strictly.
15. All necessary precautionary measures shall be taken to avoid any kind of spillage and accident especially during
handling of the crude oil to and from the tanks.
16. Necessary dyke walls, spill collection sump etc. shall be provided as per the necessary statutory requirements and
best practices adopted in the industries.
17. Strict supervision by plant personnel shall be carried out during oil transfer or receipt of petroleum products.
18. Proper earthing shall be provided on the pipelines and storage tanks. The tank gauging operator shall not be
earthed with the tank (i.e he shall'wear non conducting shoes)
19. Lightening protection devices shall be provided for all the storage tanks.
20. Fire protection facilities and fighting equipments shall be maintained in the terminal as per OIDS-117.
21. Height of two existing above ground Fire Water Storage Tanks (12 m dia x 10 m height, 18 m dia. x 10 m height,
MOC: MS) of 11 30 KL & 2544 KL capacities shall be increased by 3 m thus expanding their volume to 1470 KL 8
3306 KL respectively.
22. Personal Protective Equipments shall be provided to workers and its usage shall be ensured and supervised.
23. First Aid Box, fire extinguishers, foams, sand etc. shall be made readily available in adequate quantity at all the
times. Necessary tie up with the nearby fire stations and other emergency services shall be made to ensure that
the required aids reach within the shortest possible time in case of any adverse conditions.
24. Training shall be imparted to all the workers on safety aspects of which shall include regular mock drill.
25. Occupational health surveillance of the workers shall be done and its records shal! be maintained. Pre-.
employment and periodical medical examination for all the workers shall be undertaken on regular basis as per
Factories Act 8 Rules.
26. The company shall carryout rlsk assessment based on the Worst Case Scenario and Maximum Credible Accident
scenario by competent agency. The company shall implement all preventive and mitigation measures suggested in
letter and spirit based on study carried out by the agency.
27. The company shall revise their Onsite Emergency Management Plan in view of the proposed expansion and take
additional safety measures as required.
28. The project management shall strictly comply with the provisions made in Manufacture Storage and Import of
Hazardous Chemicals Rules 1989 as amended in 2000 for handling of hazardous chemicals. Necessary approvals from the Govt. Authorities shall be obtained before commissioning of the project, if applicable. -
29. The overall noise level in and around the plant area shall be kept well within the standards by providing noise
control measures including engineering control like acoustic insulations, hoods, silencers, enclosures etc. on all
Office : Gujarat Pollution Control Board, "Paryavaran Bhavan" Sector-10 A, Gandhinagar-382010 Page 2 of 4 Phone No.:- (079) 232-321 52,232-4 151 4 Fax No.:-(079) 232-22784 E-mo; l . c o ; o o ~ r r . ; A ~ , n L n n o r ~ m l l l - L ~ ; + ~ . .,...,... rr: - - ---:---A - - - .
A-2
.- source of noise generation (D.G.Sets). The ambient noise level shall confirm to the standards prescribed under the
E.P. Act, 1986 & Rules. -
30. The company shall undertake following waste minimization measures:
a) Good housekeeping.
b) Use of automated and enclosed filling to minimize spillage.
c) Venting equipment through vapour recovery system.
31. The unit shall develop green belt within premises as per the CPCB guidelines, preferably with local species.
However, if the adequate land is not available within the premises, the unit shall take up adequate plantation on
road sides and suitable open areas at nearby schools, gram panchayat areas and any other open areas in
consultation with the local bodies I GPCB and submit an action plan of plantation for next three years to the GPCB.
32. The project proponent shall strive to adopt environment and occupational health and safety management system
standards like ISO-14001 and OHSAS-18001.
33. All the transportation routes in the project premises shall be well paved to minimize the fugitive emission and to
prevent soil contamination.
34. Impervious layer in the work area, petroleum products storage area and petroleum products handling area shall be
provided to minimize soil contamination.
35. Leakages from the pipes, pumps, shall be minimal and if occurs, shall be arrested promptly.
36. In the event of failure of any pollution control system adopted by the unit, the unit shall be safely closlod down and
shall not be restarted until the desired efficiency of the control equipment has been achieved.
37. The unlt shall undertake eco-developmental measures including community welfare program most useful in the
project area for the overall improvement of the environment.
38. The management shall ensure that the unit complies with all the environment protection measures and risk
mitigation measures/safeguards pro9osed by them.
39. The project proponent shall also comply with any additional condition that may be imposed by the SEAC or the
SElAA or any other competent authority for the purpose of the environmental protection and management.
40. No further expansion or modifications in the plant shall be carried out w~thout obtaining prior Environment
Clearance from the concerned authority.
41. The above conditions will be enforced, inter-alia under the provisions of the Water(Preventi0n & Control of
Pollution) Act.1974, Air (Prevention & Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986,
Hazardous Wastes (Management and Handling) Rules, 2003 and the Public Ltability Insurance Act, 1991 along
with their amendments and rules.
42. This Environmental Clearance is valid for five years from the date of issue.
With regards,
Yours sincerely, 3
Member Secretary
Issued to:
Vice President, Terminals Pvt. Ltd.
Maitri Bhavan - 18, Sector - 8, P.O. Box No. 106, Gandhidham District: Kutch - 370 201.
1
Office : Gujarat Pollution Control Board, "Paryavaran Bhavan" Sector-10 A, Gandhinagar-382010 Page 3 o f 4
Phone No.:- (079) 232-321 52,232-41 51 4 Fax No.:-(079) 232-22784 P-mai l . c~i:>ao1~iln7vahnn rnrn W p h ~ i t p . - www c p i ~ a (~ l l iarat pnv in
A-3
d *. .- .- Copy to;- 7 The,Secretary, Department of Environment and Fores_t_tsGo.vt. .of Gujarat, Secretariaf, Gat5dhinagar-
3820 10.
2. - The Chairman, Central Pollution Control Board , Parivesh Bhavan, CBD -cum-Office Complex,
East Arjun Nagar, New Delhi-I 10032
-2 . ,. $:The Chief Conservator of Forests (Central), Ministry of Environment & Forests, !' q, *::-:, , ,
a - * Regional Office (WZ), E-5, Arera Colony, Link Road-3, Bhopal-462016, MP 4. ' Monitoring Cell, Ministry of Environment and Forests, Paryavaran Bhavan, CGO Complex, New
Delhi-110003. 5. The Member Secretary, Gujarat Pollution Control Board, Paryavaran Bhavan, Sector-10 A,
Gandhinagar-382010. 6. Select File.
Member Secretary
- - - - - - - - - - - -
Office : Gujarat Pollution Control Board, 'Pavavaran Bhavan" Sector-10 A, Gandhinagar-382010 Page 4 of 4 Phone No.:- (079) 232-32 152,232-4 15 14 Fax No.:-(079) 232-22784 E-mail : seiaaeui(ir7vahoo.com, Website:- www.seiaa.gujarat.gov.in
A-4
A-5
A-6
ANNEXURE – 2
Copy of CTE vide no. PC/CCA
KUTCH135/GPCBID17835/102299
GUJARAT POLLUTION CONTROL BOARDParyavaran Bhavan
Sector-10-A, Gandhinagar-382 010,Phone: (079) 23226295
Fax: (079) 23232156Website: www.gpcb.gov.in
Consent to Establishment (NOCICTE·44925
NO, PC/CCA·KUTCH-135/GPC810 17835/ ~O 'L~q "ITo,M/S. FRIENDS OIL & CHEMICAL TERMINALS PVT LTDKHARI ROHAR ROAD, NEAR BOOSTER PUMP STATION,VILL: OLD KANDLA, TA: GANDHIDHAM,DIST: KUTCH.
Sub: - Amendment in Consent to Establish/ NOC of this Board.Ref: - Your application for eTE amendment Inward 10 No: 51312 dated 12·10·2011.
Sir,Without prejudice to the powers of this Board under the Water (Prevention and Control of
Pollution) Act-1974, the Air Act-1981 and the Environment (Protection) Act-1986 and without reducing yourresponsibilities under the said Acts in any way, this is to inform you that this Board grants the amendment inConsent to Establish (NOe) for enhancement of storage capacity of the terminal without installing additionaltanks at existing unit located at KHARI ROHAR ROAD, NEAR BOOSTER PUMP STATION, VILL: OLDKANDLA, TA: GANDHIDHAM, DIST: KUTCH
1. The ere order shall be valid up to 13-09-2016.2. The CTE order is granted for storage tanks as mentioned below.
Tank No Storage Tank Size Capacity of Each Nos of Capacity of Type/Class of the
(Diameter X Height) Tank in KL Tank Tank in KL Cargo to be stored
10110 113 18.00 m X 13.00 m 3,308.00 13 43,004.00 CLASS A,B & C
114to 117 13.00 m X 13.00 m 1,725.00 4 6,900.00 PETROLEUM
118 to 121 6.00 m X 9.00 m 250,00 4 1,000.00 PRODUCTS,
CHEMICALS ANDTOTAL 21 50,904.00
EDIBLE OILS
WITli SUBJECT TO FOLLOWING SPECIFIC CONDITIONS1. You shall have to comply with all the conditions mentioned in the Environmental Clearance accorded to
you vide order no SEIAAlGUJ/EC/6(b)/142/2011 dated 09'" August 2011 and amended vide order noSEiAAlGUJ/EC/6(b)/1 88/2011 dated 03" September 2011,
2. You shall have to comply with the provisions of manufacturing, Storage and Import of HazardousChemicals Rules-1989 framed under the Environment (Protection) Act·1989 and amended in 2000 lorhandling of Hazardous chemicals
3. The ground ~r shall nO!Jlse ~thout obtai!)iQg permissioj).,from.,lhe comgetent authority.{'lean bU.Jarat &reen bU.JaraT A-7
3. CONDITIONS UNDER WATER ACT 1974:3.1 The generation and discharge of industrial effluent from the manufacturing process and other ancillary
industrial operations after expansion shall remain unchanged and shall not exceed 200 Liter/Day.3.2 The quantity of the domestic waste water (Sewage) shall remain unchanged and shall not exceed 3200
Liter/Day after proposed expansion.3.3 The domestic wasle water shall be disposed through off soak pit/septic tank.3.4 The quality of the treated effluent after adequate treatment shall conform to the following.
PARAMETERS INLET PERMISSIBLE LIMITpH 6.5 to 8.5Temperature 40'CColour (pt.co.scale) in units 100 UnitsSuspended Solids 100 mg~Oil and Grease 20mgllPhenolic Compounds 1 mg/IFluorides 1.50mg/1Ammonical Nitrogen 50 mg~BOD (3 days at 270 C) 30 mgllCOD 100 mgllChlorides 600mgllSulphates 1000 mgilTotal dissolved solids 2100 mgilSodium absorption ratio 26Percent Sodium 60%All efforts shall be made to remove colour & unpleasant odour as far as practicable.
3.5 The effluent after adequate treatment shall conform to the above standards shall be utilized in thegardening and plantation within plant premises.
3.6 The unit shall install meters for measuring category wise (Category as given in Water -Cess Act·1977schedule II) consumption of water.
4. CONDITIONS UNDER AIR ACT 1981:4.1 There shall be no change in the quantity of fuel after proposed expansion4.2 There shall be no change in flue gas stacks after proposed expansion4.3There shall be no process gas emission from the manufacturing activities and other ancillary operation.4.4 The concentration of the following parameters in the ambient air within the premises of the industry shall
not exceed the limits specified hereunder as per national Ambient Air Quality Emission Standardsissued by Ministry of Environment and Forest dated 16th November-2009.
Sr. No. Pollutant Time Weighted Concentration inAveraqe Ambient air in u a/M3
1. Sulphur DioXide (SO,) Annual 5024 Hours 80
2. Nitrogen Dioxide (N02) Annual 4024 Hours 80
3. Particulate Matter Annual 60I (Size less than IOu m) OR PM" 24 Hours 100
4. Particulate Matter Annual 40I (Size less than 2.5 mml OR PM 2., 24 Hours 60
A-8
GUJARAT POLLUTION CONTROL BOARDParyavaran Bhavan
Sector-1 O-A, Gandhinagar-382 010.Phone: (079) 23226295
Fax: (079) 23232156Website: www.gpcb.gov.in
4.5 The industry shall take adequate measures for control of noise levels from its own sources within thepremises so as to maintain ambient air quality standards in respect of noise to less than 75dB(a) during daytime and70 dB (A) during night time. Daytime is reckoned in between 6a.m. and10 p.m. and nighttime isreckoned between 10 p.m. and 6 a.m.
5. CONDITIONS UNDER HAZARDOUS WASTE:
5.1 The applicant shall provide temporary storage facilities and maintain the record for each type of HazardousWaste as per Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008 asamended from time to time
5.2The applicant shall be obtain membership of common TSDF site for disposal Hazardous Waste ascategorized in Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008 asamended thereof.
6. GENERAL CONDITION:
6.1 Unit shall develop green belt within premises as per the CPCB guidelines, However, if the adequate land isnot available within premises, the unit shall tie up with local agencies like gram panchayat, school, socialforestry office etc. lor the plantation at suitable open land in nearby locality and submit an action plan ofplantation for next three years to GPCB.
6.2Adequate plantation shall be carried out ail along the periphery of the industrial premises in such a way thatthe density of plantation isat least 1000 trees per acre of land and a green belt of 10 meters width isdeveloped.
6.3The applicant shall have to submit the returns in prescribed form regarding water consumption and shall haveto make payment of water cess to the 'Board under the Water Cess Act- 1977.
6.4ln case of change of ownership/management the name and address of the newownerslpartnersldirectors/proprietor should immediately be intimated to the Board.
6.5 The applicant shall however, not without the prior consent of the Board bring into use any new oraltered outlet for the discharge of effluent or gaseous emission or sewage waste from the proposedindustrial plant. The applicant is required to make applications to this Board for this purpose in theprescribed forms under the provisions of the Water Act·1974, the Air Act-1981 and the Environment(Protection) Act-1986.
6.6The applicant also comply with the General conditions as per Annexure· I attached herewith (NO.1 to 38)(whichever ap~icable).
6.7The over all noise level in and around the plant area shall be kept well within the standards by providing noisecontrol measures including engineering control like acoustic insulation hoods, silencers, enclosures etc on allsources of noise generation. The ambient noise level shall conform to the standards prescribed under theEnvironment (Protection) Act, 1986 & Rules.
6.8Applicant is required to comply with the manufacturing, Storage and Import of Hazardous Chemicals Rules-1989 framed under the Environment (Protection) Act-1986.
6.91f it is established by any competent authority that the damage is caused due to their industrial activities toany person or his property ,in that case they are obliged to pay the compensation as determined by thecompetent authority.
Clean GujaratGreen GujaratA-9
6.10 Applicant shall have to comply with all the guidelines/Directive issued/ being issued by MoEF/CPCB/DoEFfrom time to time.
6.11 Applicant shall not use/withdraw ground water either during construction and lor operation phase.6.12 Environmental cell shall be setup and shall be responsible for the total Environmental management.6.13 Monitoring in respect to Air, Water, Noise level shall be carried out and results shall be submitted to this
Board on quarterly basis.
For and on behalf ofGUJARAT POLLUTION CONTROL SOARO
(F~ 'r(1 (IL---
(V.R.~AbdE)
SENIOR ENVIRONMENTAL ENGINEER
A-10
ANNEXURE – 3
Copy of CCA order no. AWH – 63316
and its amendment vide no. PC/CCA-
KUTCH-135(2)/GPCBID17835/229628
BY R.P.AD
In exercise of the power conferred under section-25 of the Water (Prevention and Control of Pollution) Act-
1974, under seclion-21 of the Air (Prevention and Control of Pollution)-1981 and Authorization under rule 5(4) of the
Hazardous Waste (Management Handling & TM) -Rules-2008 & as amended framed under the Environment(Protection) Acl·1986
And whereas Board has received consolidated consent application Inward /.D. NO. 79182 dated
02104/2014 for the Amendment in Consolidated Consent and Authorization (Ce & A) of this Board under the
provisions/rJles of the aforesaid acts Consents & Authorization are hereby granted as under
CONSENTS AND AUTHORISA nON:
(Under the provisions Irules of the aforesaid environmental acts)
To,
~ MIS. FRIENDS OIL & CHEMICAL TERMINALS PVT LTO
KHARI ROHAR ROAD, NEAR BOOSTER PUMP ST A nON,
VILL: OLD KANDLA, TA: GANDHIDHAM
DlST: KUTCH - 370 210.
SUBJECT TO THE FOLLOWING SPECIFIC CONDITIONS:r-Y~uShail have to comply w:,iil--allthe corlditiOns mentioned in the Environmental Clearance accorded to you vide
order no SEIAA/GUJ/EC/6(b)i142/2011 dated 09:" August 2011 and amended vide order SEIAA i GUJ / EC
6(b)/188,'2011 dated 03rc September 2011
You shall have to comply with the provisions 01 manufacturing, Storage and Import of Hazardous Chemicals
Rules-1989 framed under the Environment (Protection) Act-1989 and amended in 2000 for handling of
Hazardous chemicals
The ground water shall not use without obtaining permission from the competent authority
3 CONDITIONS UNDER WATER ACT 197431 The generation and disposal of the industrial effluent from the industrial operations shall be 200 literlDay.
32 The quantity of the domestic waste water (Sewage) shall remain unchanged and shall not exceed 3200liter/Day.
3.3 TRADE EFFLUENT:
., ~lean Gujarat Green Gujaratt'(,J:5' 'lfs"o - 900' - 2008 & ISO - 14001 - 2004 Certified Organisation
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector 10-A, Gandhinagar 382010Phone : (079) 23226295Fax . (079) 23232156website: www.gpcb.gov.in
i Capa~ity of EaChl Nos of Ii Capacity Of-I: TypeiClass of the' Cargo !.
Tank In Kl Tank Tank in Kl to be stored
3.3'0800- 13 43:'00400 I CLASS A-;-S&- CI,
1,725.00 6.900.00 .- PETROLEUM
250.00 1,000.'00 I PRODUCTS, CHEMICALS I
21 50.904.00 AND EDIBLE OILSTOTAL
1. Consent Order No.: AWH - 63316 Date of Issue: 04/07/20142. The consent order shall be valid up to 07/03/2019 lor use of outlet for the discharge of treated effluent and
emission due to store the various chemicals for manufactur'lng of the following products at KHARI ROHAR
ROAD, NEAR BOOSTER PUMP STATION, VILL: OLD KANDLA, TA: GANDHIDHAM, DlST: KUTCH ·370210
Tank No . Storage Tank Size
I, (Diameter X Height)
! T0110113 i 18.00-mXT3.00m-
! 11410117: 13.00mX13.00m
-118To1211" ,:COO m ">C9.00--m
GPCB
A-11
331 The applicant shall provide operate modified effluent treatment for effluent generated from the boiler blow
down. cooling water and RO reject after addition of above mentioned product in order to achieve the
quality of the treated effluent as per GPCB norms mentioned bellow
33 The effluent after adequate treatment shall conform to the above standards shall be utilized in the gardening
and plantation within plant premises
3.4 The domestic waste water shall be disposed through off soak pit/septic tank
35 The unit shall install meters for measuring category wise (Category as given in Water-Cess Act-1977
schedule II) consumption of water
4. CONDITIONS ~NDER AIR ACT 1911t
4,1 There shall be no change in the quantity of fuel after proposed expanSion
4.2 There shall be no change in flue gas stacks after proposed expansion
4.3 There shall be no process gas emission from the manufacturing activities and other ancillary operation
4,4 The concentration of the following parameters in the ambient air within the premises of the industry shall not
exceed the limits specified hereunder as per national Ambient Air Quality Emission Standards issued by
rviinistry of Environment and Forest dated 1611. November-2009
Sr No Pollutant TimeWeighted Concentration in
24 Hours5080
A-12
GPCB
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector 10-A, Gandhinagar 382010Phone (079) 23226295Fax: (079) 23232156website: www.gpcb.gov.in
Nitrogen Dioxide (NO,,)
Particulate Matter10
Matterless than 2.5 mm) OR
4.5 The take adequate its own sources within the premises
so as to maintain ambient air quality standards in respect of noise to less than 75dB(a) during day time and70
dB (A) during night time, Daytime is reckoned in between 6a.m. and10 p,m, and nighttime is reckoned between10 pm and6a.m
5. Authorization For the [Management. Handling & Transboundary Movement] Of Hazardous Wastes Form·
2 (See rule 5 (4) Form for grant of authorization for occupier or operator handling hazardous waste rule.
2008.
5,1 Authorization Number: AWH - 63316 and shall valid up to 07/03f2019.5.2 MIs. FRIENDS OIL & CHEMICAL TERMINALS PVT LTD is hereby granted an authorization to operate facility
for following hazardous wastes on the premises situated KHARI ROHAR ROAD, NEAR BOOSTER PUMP
STATION, VILL: OLD KANDLA, TA: GANDHIDHAM, DIST: KUTCH - 370 201
Waste I~~~~~~tity Schedule Facility
Used Oil 0,5 KL/Year I· 51I
MTiYear5,2 The autllori2:aiion iSsl conditions stated
rules from lime to time under the Environment (Prolection) Acl-1986
5.4 TERMS AND CONDITIONS OF AUTHORISATION
a) The applicant shall comply with the provisions of the Environment (Protection) Act 1986 and the rules made
there under
b) The authorisation shall be produced for inspection at the request of an officer authorized by the GUjarat
Pollution Control Board
c) The persons authorized shall not rent, lend, sell, and transfer of otherwise transport the hazardous wastes
without obtaining prior permission of the Gujarat Pollution Control Board
d) Any unauthorized change in personnel. equipment or working conditions as mentioned in the authorisation
order by the persons authorized shall constitute a breach of this authorisation
e) It is the duty of the authorised person to take prior permission of the Gujarat Pollution Control Board to close
down the facility,An application for the renewal of an authorisation shall be made as laid down in rule 7
n Industry shall submit annual report within 15 days and sub sequent by 31,1 January every year
g) Hazardous waste shall be disposed off in accordance with the Haz Waste (Management. Handling &
Transboundary Movement) rules, 2008 and unit shall have to obtain Authorization of this Board for all applicable
Cl;s~;;teGujarat Green Gujarat~~spo.t -2008 & ISO - '4001 - 2004 Certified Organisation
A-13
,!
6.0 GENERAL CONDITIONS: •
6,1 Any change in personnel, equipment or working conditions as mentioned in the consents form/order should
immediately be intimated to this Board. Applicant shall also comply with the general conditions given in annexure6.2 The waste generator shall be totally responsible for (IE. Collection, storage, transportation and ultimate
disposal) of the wastes generated
63 Records of waste generation, its management and annual return shall be submitted to GUJarat Pollution Control
Board in Form - 4 by 31,1 January of every year, In case of any accident details of the same shall be submittedin Form - 5 to GUJ8ratPollution Control Board
6.4 As per "Public liability Insurance Act - 91" company shall get Insurance policy, if applicable
6.5 Empty drums and containers of toxic and hazards material shall b~ treated as per guideline published for
"management & handling of discarded containers" Records of the same shall be maintained and forwarded to
Gujarat Pollution Control Board regularly. In no case any kind of hazardous waste shall be imported without prior
approval of appropriate authority
6,6 In case of transport of hazardous waste to a facility for (IE Treatment Storage and disposal) existing in a state
other than the state where hazardous waste are generated, the occupier shall obtain "No Objection certificate'
from the state pollution Control Board, the Committee of the concerned state or Union territory Administration
where the facility exists
67 Unit shall take all concrete measures to show tangible results in waste generation reduction, voidance, reuse
and recycle, Action taken in this regards shall be submitted within 03 months and also along with Form 4
6,8 Industry shall have to display the relevant information with regard to hazardous waste as indicated in the Hon
Supreme Court's order in VV,P NO.65? of 1995 dated 14th October 2003
6.9 Industry shall have to display on-line data outside the main factory gate with regard to quantity and nature of
hazardous chemicals being handled in the plant, including wastewater and air emissions and solid hazardous
waste generated within the factory premises
NO: PCICCA·KUTCH-135IGPCB 10-17835121",1-2-ISSUE TO:
MIS. FRIENDS OIL & CHEMICAL TERMINALS PVT LTD
KHARI ROHAR ROAD, NEAR BOOSTER PUMP STATION.
VILL: OLD KANDLA, TA: GANDHIDHAM,
DIST: KUTCH - 370 210.
For and on behalf of
GUJARAT POLLUTION CONTROL BOARD
~~~\ (Tushar Shah) i
ENVIRONMENTAL ENGINEER
Dale. I' 1 r \'Lo\ 't
4
A-14
~~~GPCB
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A, Gandhinagar-382 021.Website: www.gpcb.gov.in
BY RPAD
Amendment in Consolidated Consent & Authorization order no AWH • 63316 dated 04/07/2014(Under theprovisionsfrules of the aforesaid Environmental acts)
NO: PC/CCA-KUTCH-135(2V GPCB ID 178351 2. f.1~ f. i(,T?~\Y"'. FRIENDS OIL & CHEMICAL TERMINALS PVT LTD.
KHARI ROHAR ROAD, NEAR BOOSTER PUMP STATION,VILL: OLD KANDLA, TA: GANDHIDHAM,DIST: KUTCH.
SUB: Consent to Establishment (NOC) under Seclion 25 of Water Act- 1974 and Section 21 of Air Ac11981.REF: 1. eTE - 60681(Amendmenl) vide leiter number PCICCA-KUTCH-135(2)/GPCB 10 17835/218772 Dated
16/07/20142. Your leller no-NIL, dtd:-01/08/2014
Without prejudice to the powers of this Board under the Water (Prevention and Control of Pollution) Act-1974, the Air Act-1981 and the Environment (Protection) Act-1986 and without reducing your responsibilitiesunder the said Acts in any way. this is to inform you that this Board grants the amendment in Consent toEstablish (NOC) for setting up Ihe plant at KHARI ROHAR ROAD, NEAR BOOSTER PUMP STATION, VILL:OLD KANDLA, TA: GANDHIDHAM, DIST: KUTCH.
1. The validity of the order shall be up to 07/03f2019.2. The condition number 4.2 under AIR ACT 1981 of AWH·63316 issued vide letter number PC/CCA-
KUTCH-135(2)/GPCB 10 17835/218772 Dated 16107/2014 shall be amended and read as under
Slack Stack attached Stack height FUEL Permissible limitNo. to in ~eter Consum tion1 D,G,Sets - 2 06 HSD-50 liUhr 150mgfNm3
Nos(250 KVA) ( each) S02 ; 100 ppmNO, 50 ppm
06 HSD-30 liter/Hr PM 150mg/Nm3S02 100 ppmNO, 50 ppm
3. 06 HSD-30 literfHr PM.--h"NO,
4. 06 HSD-30 literlHr P'MS02
: NOx
06 HSD-30 liter/Hr PMS02NO,
6. 06 HSD-30 liter/Hr PMS02NO,
i"QV' ~ Clean Gujarat Green GujaratISO - 9001 - 2008 & ISO - 14001 - 2004 Certified Organisation A-15
3. The followingitems shall be inserted in table of condition No, 5,2 under Authorization under Hazardouswaste rule-2ODBof AWH·63316 is amended as following
per Schedule FacilityQuantityAnnum
45.0MT
O.80MT
006MT
1-33
Class-E2II
I-51
Collection, storage, treatment and disposalb atTSDFCollection, storage, treatment and disposalb atTSDFCollection, storage Transportation&Dis osal b sellin.9....!Q...@gl§j~_e~recyler
4 The validity and aU other terms and condition mentioned in the consent order vide letter numberPC/CCA·KUTCH·135(2VGPCB ID 178351218772 Dated 16/07{2014 shall remain unchanged.
For and on behalf ofGUJARAT POLLUTION CONTROL BOARD
---J~~(T.B.SHAH)
ENVIRONMENTAL ENGINEER
COPYTO:1. Regional Officer - BHUJ, for information and carry out monitoring periodically2. Respective unitfile
A-16
ANNEXURE – 4
Record of Performance data (Storage
Utilization of Tanks, Water consumption
and waste water generation with water
balance diagram, Fuel consumption,
Hazardous waste generation and
Disposal)
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Annexure – 4
PERFORMANCE DATA
a. Storage Capacity Utilization During Compliance Period:
Month & Year Chemicals
Received (MT) Chemicals
dispatched (MT) Diesel, Ltr.
October-15 12,880.385 16,250.490 260
November-15 14,784.712 9,605.730 350
December-15 6,015.510 16,006.480 100
January-16 3,762.273 13,624.050 400
February-16 14,169.773 10,288.720 100
March-16 18,400.586 13,420.560 100
April-16 16,656.993 23,892.620 400
May-16 40,080.641 18,625.150 300
June-16 23,748.727 20,836.970 739
July-16 12,746.975 19,260.960 550
August-16 9,497.981 19,539.950 100
September-16 17,133.927 22,032.420 460
Total 189,878.48 203,384.10 3,859.00
Per Month 15,823.21 16,948.68 321.58
b. Hazardous Waste Generation:
Month & Year Oily Waste, MT Pigging Waste, Kg Waste/Used Oil, KL
October-15 -- 100 --
November-15 -- 100 --
December-15 -- 90 --
January-16 -- 100 --
February-16 -- 90 --
March-16 -- 110 --
April-16 -- 60 --
May-16 -- 90 --
June-16 -- 60 --
July-16 -- 40 --
August-16 -- 50 --
September-16 -- 50 --
Total -- 940 --
Quantity Per Month -- 78.33 --
A-17
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
c. Hazardous Waste Disposal:
Month & Year Oily Waste, MT Pigging Waste Waste/Used Oil, KL
October-15 -- 150 --
November-15 -- 100 --
December-15 -- 100 --
January-16 -- 150 --
February-16 -- -- --
March-16 -- 150 --
April-16 -- -- --
May-16 -- 100 --
June-16 -- -- --
July-16 -- 150 --
August-16 -- -- --
September-16 -- -- --
Total -- 900 --
Quantity Per
Month -- 75.0 --
d. Details of Monthly Water Consumption and waste water generation:
Month & Year Working Days Water
Consumption (KL) Waste water
generation (KL)
October-15 31 80 40
November-15 30 60 30
December-15 31 60 20
January-16 31 40 20
February-16 29 40 10
March-16 31 40 10
April-16 30 40 20
May-16 31 60 40
June-16 30 40 30
July-16 31 40 20
August-16 31 40 10
September-16 30 40 10
Total 366 580 260
Per Month -- 48.33 21.67
Per Day -- 1.58 0.45
A-18
FRIENDS OIL AND CHEMICAL TERMINALS PVT. LTD.
Category wise Water consumption and waste water generation during above
mentioned compliance period:
Source of Water: Gujarat Water Supply & Sewerage Board (GWSSB)
Sr. No. Category Water Consumption
KL/day Wastewater
Generation, KL/day
1 Domestic 0.43 0.43
2 Gardening 1.13 Nil
3 Industrial
a. Washing 0.02 0.02
Total (Industrial + Domestic) Consumption/ Discharge
1.58 0.45
Water Balance Diagram for water consumption and waste water generation
during above mentioned compliance period:
All quantities are expressed in KL/day
Discharged on Premises Land for
Gardening / Plantation Purpose
Domestic
(0.02)
(0.02)
(0.43)
Washing
(0.02)
Oil / Water Interceptor
Total Fresh
Water (1.58)
(1.58)
(0.43)
GWSSB
Discharged into Soak Pit through Septic Tank
Gardening
(1.13)
Nil
Loss
(1.13)
A-19
ANNEXURE – 5
Copy of Saurashtra Enviro Project Pvt.
Ltd. TSDF Membership
A-20
ANNEXURE – 6
Copy of various training record
A-21
ANNEXURE – 7
Copy of Record of recent mock drill
A-22
A-23
A-24
ANNEXURE – 8
Copy of Work Area monitoring report
REGO.OFF.: 3rd Floor, Akash Ganga Complex, 8/5. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paid!, Ahmedabad-3BO 007. Gujarat, INDIA. Tele/Fax: +91 792665 OB78, 2665 0473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/WRK/16-17/240401 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil 8c. Chemical Terminal KhariroharRoad,Near Booster Pump Station, Old Kandla Taluka-Kandla Dist. Kutchh
Date & Time Of Sampling Date of Receipt of Sample
16/04/2016; 05:30pm 17/04/2016
Sample collected By Description Of Sample
EEC Team Work Area Monitoring
MONITORING DATA: 1. Department
2. Visiting persons 3. Location of Sampling
4. Identified Contaminants
5. Sampling Instrument 6. Number of Workers Exposed
7. Exposure Time & Frequency of Exposure
8. Activity at Time of Sampling
9. Name of the Person Contacted
RESULT TABLE:
Collection
Mr. Rohit Marvadi Near pump house
Methanol, Xylene, Hexane, Toluene
VOC Detector 15 Workers
8 Hour Activity
Collection
Mr. Rao
Contaminants Reference Unit TWA Permissible Reference Method TWA Cone. Standard
Factories Act-Cone.
Electronic InstrumentMethanol ppm 200 1948 : as in 89with PID Sensor
second Schedule Factories Act-Electronic Instrument
Xylene ppm 25 1948 : as in 100with PID Sensor second Schedule
Electronic Instrument ACGIH ppmHexane 18 500with PID Sensor Factories Act-Electronic Instrument
Toluene ppm 1948 : as in 15 100with PID Sensor second Schedule
ACGIH=American Conference of Government Industrial Hygienists For Envisafe Environm t Consultants,
\f.. L-~P Authorize ~:"'I=g=n'-::a:;;:t-::o::ry::-::-----------------------------------------End of Test Report------------------------------------------
This Report is issued under the following terms &. conditions: 1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure,
retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose without the
written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Seven (15) days after completion of the analysis. Longer retention periods can be
arranged, on request of the customer. S. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by customer
and not reveal to third party unless required by the statutory or legal requirement.
A-25
------
FORM NO. 37 (Prescribed under Rule 12-B of Factory Act)
Particulars of Monitoring Of Work Environment Required Under Section 7-A (a)(e)
A. Name of the Department/Plant M/s. Friends Oil & Chemical Terminal Kandla.
Date & Time of sampling 16/04/2016; 05: 30pm
B. Chemicals involved in the process
1. Raw Materials Methanol, Xylene, Hexane, Toluene
2. By-products
3. Finished products
C. Particulars of sampling;
Location! SamplingSr. Identified No
Operation Contaminant
Instrument Mentioned Used
-_.
1 2 3 4 f--- - ------
1 Methanol
i~ _.
2 Xylene VOC
r------ Near Pump ------ DetectorHouse
3 Hexane
I---
4 Toluene
. Airborne Contamination TWA Conca ~.. C-.-
No. of Range ._.
sample of Average
Conca Conca
5 6 7
1 --- 89
1 --- 25
.-
1 --- 18
1 --- 15
(as in second
Schedule)
8
200
100
_.
50*
100
I
I
- --- -
Number Reference Of
Method RemarksWorkers Exposed
10 119 ._.
Electronic Instrument w ith 15 None
PID Senso -
Electronic Instrument wlith None
PID Senso r Electronic
nstrument wlith
15
None PID Senso r
15 ._.
Electronic nstrument wlith None15
~PID Senso A.
*As mentioned in ACGIH (American Conference of Government Industrial Hygienists) \r~~~\ Name of the person taking Sample: MR.ROHIT MARVADI Signature:
A-26
--
REGD. OFF.: 3rd Floor, Akash Ganga Complex. 8/5. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. GUjarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/WRK/16-17/240402 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal KhariroharRoad,Near Booster Pump Station, Old Kandla, Taluka-Kandla Dist. Kutchh
Date & Time Of Sampling Date of Receipt of Sample
16/04/2016; 05:40pm 17/04/2016
Sample collected By Descri ption Of Sample
EEC Team Work Area Monitorinq
MONITORING DATA: 1. Department
2. Visiting persons 3. Location of Sampling
4. Identified Contaminants
5. Sampling Instrument 6. Number of Workers Exposed
7. Exposure Time & Frequency of Exposure
8. Activity at Time of Sampling
9. Name of the Person Contacted
RESULT TABLE:
Tanker Filling Area
Mr. Rohit Marvadi Near Tanker Filling Area
Methanol, Xylene, Hexane, Toluene
VOC Detector 10 Workers
8 Hour Activity
Tanker Filling
Mr. Rao
ReferenceContaminants Unit TWA I Permissible Reference I Method Cone. TWA Cone. Standard
Factories Act-i Electronic InstrumentMethanol ppm i 25 200 1948 : as in
with PID Sensor second Schedule
Factories Act-Electronic Instrument
ppmXylene 15 100 1948 : as in with PID Sensor
i second Schedule Electronic Instrument ACGIH ppmHexane 05 50 i II I with PID Sensor
Factories Act-I Electronic Instrument ppm i 07Toluene 1948 : as in 100
i with PID Sensor second Schedule I I i
ACGIH=American Conference of Government Industrial Hygienists For Envisafe Environm nt Consultants,
v.' \..-, U\: Authorized Ignatory -----------------------------------------End of Test Report------------------------------------------ This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure,
retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose without the
written consent of laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Seven (15) days after completion of the analysis. longer retention periods can be
arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us / supplied by customer
and not reveal to third party unless required by the statutory or legal requirement.
A-27
----
--- ---
---- ----
---
---
---
------
---
-------
FORM NO. 37 (Prescribed under Rule 12-B of Factory Act)
Particulars of Monitoring Of Work Environment Required Under Section 7-A (a)(e)
A. Name of the Department/Plant M/s. Friends Oil & Chemical Terminal Kandla.
Date & Time of sampling 16/04/2016; 05:40pm
B. Chemicals involved in the process
1. Raw. Materials Methanol, Xylene Hexane, Toluene
2. By-products
3. Finished products
C. Particulars of sampling:
Location!Sr. Operation ConNo Mentioned
1 2
1
2 Tanker Filling Area
3
4
NumberAirborne Contamination TWAConc.Sampling ReferenceI Ide Ofntified (as inRangeNo. ofInstrument Method RemarksAverage Workersaminant secondsample ofUsed Conca ExposedSchedule)Conca
3 4 5 7 106 118 9
Electronic InstrumentMethanol 1 25 200 10 None
with PID Sensor -
Electronic Instrument15 100VOCXCylene 1 10 Nonevo.'ith PID SensorDetector i------- -
Electronic InstrumentOS 50*H:xane 10 None1 with PID Sensor
- ~-
Electronic Instrument07 100T Iluene 10 None1 \"lith PID Sensor.
*As mentioned in ACGIH (American Conference of Government Industrial Hygienists) v~I-.~Name of the person taking Sample: MR.ROHIT MARVADI Signature:
A-28
REGD. OFF.: 3rd Floor, Akash Ganga Complex, 8/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. GUjarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/WRK/16-17/240403 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client
Date & Time Of Sampling Date of Receipt of Sample
MIs. Friends Oil &. Chemical Terminal KhariroharRoad,Near Booster Pump Station, Old Kandla Taluka-Kandla Dist. Kutchh 16/04/2016; 05:55pm Sample collected By 17/04/2016 Description Of
Sample
EEC Team Work Area Monitoring
MONITORING DATA: 1. Department
2. Visiting persons 3. Location of Sampling
4. Identified Contaminants
5. Sampling Instrument 6. Number of Workers Exposed
7. Exposure Time & Frequency of Exposure
8. Activity at Time of Sampling
9. Name of the Person Contacted
RESULT TABLE:
Tank Storage Area
Mr. Rohit Marvadi Near Tank Storage Area
Methanol, Xylene, Hexane, Toluene
VOC Detector 07 Workers
8 Hour Activity
Storage
Mr. Rao
Unit PermissibleContaminants Reference TWA Reference Method TWA Cone. Standard 1
Factories Act-Cone.
IElectronic InstrumentMethanol ppm BDL(DL= 0.001) 200 1948 : as in with PID Sensor
second Schedule I Factories Act-Electronic Instrument ppm BDL(DL= 0.001) 100 1948 : as in Xylene with PID Sensor I second Schedule
Electronic Instrument ACGIHHexane ppm BDL(DL= 0.001) 50 II with PID Sensor I
I Factories Act-Electronic InstrumentToluene ppm BDL(DL= 0.001) 100 1948 : as in I
with PID Sensor I second Schedule !
•
ACGIH=American Conference of Government Industrial Hygienists For Envisafe Envir ent Consultants,
V·'v-Authoriz Ignatory-----------------------------------------End of Test Report-------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure,
retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose without the
written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Seven (15) days after completion of the analysis. Longer retention periods can be
arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s} collected by us I supplied by customer
and not reveal to third party unless required by the statutory or legal requirement.
A-29
-------
-----
FORM NO. 37 (Prescribed under Rule 12-B of Factory Act)
Particulars of Monitoring Of Work Environment Required Under Section 7-A (a)(e)
A. Name of the Department/Plant
Date & Time of sampling
B. Chemicals involved in the process
1. Raw Materials
2. By-products
3. Finished products
C- Particulars of- samDling·~-..-.
.
Samll ing Instrument
USE d
4
VC Detector
I,
Location! IdentifiedSr. Operation
No ContaminantMentioned
1 32 1---.1 I
1 MethanolI
I 2 Xylene
TankI f-- ._.Storage
Area Hexane3
,.-
4
,--
Toluene
M/s. Friends Oil & Chemical Terminal Kandla.
16/04/2016; 05:55pm
Methanol, Xylene, Hexane, Toluene
AirborneContamination
No. Of/ Range of
Average
Conc. Conc.
6 7
BDL(DL= 0.001)
~--=-1
TWA Conc. (as in
secondsample Schedule)
.._8~-
200
1001
~. 50*
1001 --
*As mentioned in ACGIH (American Conference of Government Industrial Hygienists)
Name of the person taking Sample: MR.ROHIT MARVADI
Number Reference I OfMethod Workers I Remarks
Exposed
9 10 I 11 Electronic
Instrument with 07 None PID Sensor Electronic
Instrument with 07 None PID Sensor Electronic
Instrument with 07 None PID Sensor Electronic
Instrument with 07 None PID Sensor
V~ l.-.Signature:
A-30
ANNEXURE – 9
Copy of Ambient Air Quality monitoring
report
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/ AIVIB/16-17 /240401 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal KhariroharRoad,Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016;01:45 pm
17/04/2016
Ambient Air Nr. Main gate
Sample collected By
Analysis Starting Date
Analysis Completion Date
EEC Team
18/04/2016
18/04/2016
MONITORING DATA:
Wind Direction
Duration of Sampling
Ambient Temperature
SW to NE
24 Hrs
36°C
RESULT TABLE:
Parameter Reference Method Lab ID Code Unit Result GPCB Limit
I PM 10 15:5182 (Part - XXIII) 2006 27/LB/AM/PM 10 J.1g/m3 140 100
i PM2.5 Gravimetric IVlethod 27/LB/AM/PM2.5 J.1g/m3 38 60
SOx IS: 5182 (Part- II) 2001 27/LB/AIVl/SOx J.1g/m3 32 80
NOx IS: 5182 (Part- VI) 2006 27/LB/AM/NOx J.1g/m3 41 80
For Envisafe Environment Consultants,
Authorized Signatory-----------------------------------------End of Test Report----------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity
purpose without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention
periods can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us / supplied
by customer and not reveal to third party unless required by the statutory or legal requirement.
A-31
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878, 2665 0473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/AMB/16-17/240402 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal Khari RoharRoad,Near Booster Pump Station, Old kandla,Taluka-Kandla Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016; 02:30pm
17/04/2016
Ambient Air Nr. Fire Pump
Sample collected By
Analysis Starting Date
Analysis Completion Date
EEC Team
18/04/2016
18/04/2016
MONITORING DATA:
Wind Direction
Duration of Sampling
Ambient Temperature
SW to NE
24 Hrs
36°C
RESULT TABLE:
Parameter Reference Method Lab ID Code Unit Result GPCB Limit
PM 10 IS:5182 (Part - XXIII) 2006 28/LB/AM/PM lO llg/m3 95 100
PM Z.5 Gravimetric Method 28/LB/AM/PMz.5 llg/m3 39 60
• SOx IS: 5182 (Part- II) 2001 . 28/LB/AM/SOx llg/m3 41 80
I NOx IS: 5182 (Part- VI) 2006 I 28/LB/AM/NOx llg/m3 43 80 I ,
For Envisafe Environment Consultants,
v.~ Authorized Signatory -----------------------------------------End of Test Report----------------------------------------- This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity
purpose without the written consent of laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention
periods can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied
by customer and not reveal to third party unless required by the statutory or legal requirement.
A-32
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/AMB/16-17/240403 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal KhariRoharRoad,Near Booster Pump Station, Old kandla Taluka-Kandla,Dist. Kutchh
Date &Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016; 03:50pm
17/04/2016
Ambient Air Nr.DG Pump
Sample collected By
Analysis Starting Date
Analysis Completion Date
EEC Team
18/04/2016
18/04/2016
MONITORING DATA:
Wind Direction
Duration of Sampling
Ambient Temperature
SW to NE
24 Hrs
36°C
RESULT TABLE:
Parameter Reference Method Lab ID Code Unit Result GPCB Limit
PM 10 IS:5182 (Part - XXIII) 2006 29/LB/AM/PM lO fJ.g/mj 120 100
PMZ.5 Gravimetric Method 29/LB/AM/PM 2•5 • fJ.g/m3 45 60
sax IS: 5182 (Part- II) 2001 29/LB/AM/Sax fJ.g/m3 35 80
NOx I
IS: 5182 (Part- VI) 2006 . 29/LB/AM/NOx I
fJ.g/m3 49 80
For Envisafe Environment Consultants,
V-~ Authorized Signatory -----------------------------------------End of Test Report----------------------------------------- This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity
purpose without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention
periods can be arranged, on request of the customer 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied
by customer and not reveal to third party unless required by the statutory or legal requirement
A-33
ANNEXURE – 10
Copy of Stack monitoring report
REGD.OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-3S0 007. Gl1jarat. INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/STK/16-17/240401 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil & Chemical Terminal PVT LTD Kharirohar Road, Near Booster Pump Station, Old kandla Taluka-Kandla Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016; 01:45pm
17/04/2016
Stack attached to D.G.Set (365KVA)
Sample collected By EEC Team
Analysis Starting Date 18/04/2015
Analysis Completion 19/04/2015 Date
MONITORING DATA:
Fuel Used
Stack Height (Meter)
Ambient Temperature (0C)
Temperature of Stack Gas (0C)
Manometer Reading (mm)
Average Velocity of Stack Gas (m/Sec)
Duration of Sampling (Minutes)
Volume of Gas Sampled (Nm3)
RESULT TABLE:
Diesel
6.0
35
110
1.5
4.68
20
0.289
• Parameters Reference Method Lab ID Code Unit Result GPCB
Limit
, PM IS: 11255 (Part-I) 1985 . 30/LB/ST /PM mg/Nm3 130 150
S02 ! IS: 11255 (Part-II) 1985 30/LB/ST/SOx ppm 41 100
NOx IS: 11255 (Part-VII) 2005 30/LB/ST/NOx I
ppm BDL(DL=5.0) 50
For Envisafe Environment Consultants,
V-~~ Authorized Signatory -----------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be·arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by
customer and not reveal to third party unless required by the statutory or legal requirement.
A-34
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Name & Address of Client MIs. Friends Oil & Chemical Terminal Pvt. Ltd. Kharirohar Road, Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016; 02: 15pm
17/04/2016
Stack attached to Fire Enqine-1
Sample collected By EEC Team
Analysis Starting Date 18/04/2016
Analysis Completion 19/04/2016 Date
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/STK/16-17/240402 24 April, 2016 Page 1 of 1
TEST REPORT
MONITORING DATA:
Fuel Used
Stack Height (Meter)
Ambient Temperature (0C)
Temperature of Stack Gas (0C)
Manometer Reading (mm)
Average Velocity of Stack Gas (m/Sec)
Duration of Sampling (Minutes)
Volume of Gas Sampled (Nm3)
RESULT TABLE:
Diesel
6.0
35
93
1.5
4.58
20
0.296
Parameters Reference Method Lab ID Code I Unit Result GPCB
Limit
PM
S02
NOx
IS: 11255 (Part-I) 1985
IS: 11255 (Part-II) 1985
IS: 11255 (Part-VII) 2005
31/LB/ST/PM
31/LB/ST/SOx
31/LB/ST/NOx
mg/Nm3
ppm
ppm
106
38
BDL(DL=5.0)
150
100
50
i
For Envisafe Enviro ment Consultants,
Auth~zl.· gnatory -----------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure,
retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by
customer and not reveal to third party unless required by the statutory or legal requirement.
I
A-35
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. TElle/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC{LAB{STK{16-17{240403 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal Pvt. Ltd. Kharirohar Road, Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16{04{2016; 02:40pm
17{04{2016
Stack attached to Fire Engine-3
Sample collected By
Analysis Starting Date
Analysis Completion Date
EEC Team
18{04{2016
19{04{2016
MONITORING DATA:
Fuel Used
Stack Height (Meter)
Ambient Temperature (0C)
Temperature of Stack Gas (0C)
Manometer Reading (mm)
Average Velocity of Stack Gas em{Sec)
Duration of Sampling (Minutes)
Volume of Gas Sampled (Nm3)
RESULT TABLE: Parameters Reference Method
IS: 11255 (Part-I) 1985PM
S02 ! IS: 11255 (Part-II) 1985
NOx IS: 11255 (PartNII) 2005
Diesel
6.0
35
92
1.3
4.25
20
0.275
Lab ID Code
32{LB{ST {PM
32{LB{ST{SOx
32{LB{ST{NOx
Unit Result
mg{Nm3 95
ppm 35 100
ppm BDL(DL=5.0) 50
For Envisafe Environment Consultants,
V· t. . YWV"'·~ Authorize~ -----------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms & conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by
customer and not reveal to third party unless required by the statutory or legal requirement.
A-36
REGD. OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/STK/ 16-17/240404 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client MIs. Friends Oil & Chemical Terminal Pvt. Ltd. Kharirohar Road, Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
16/04/2016; 03:15pm
17/04/2016
Stack attached to Fire Engine-4
Sample collected By
Analysis Starting Date
Analysis Completion Date
EEC Team
18/04/2016
19/04/2016
MONITORING DATA:
Fuel Used
Stack Height (Meter)
Ambient Temperature (DC)
Temperature of Stack Gas (DC)
Manometer Reading (mm)
Average Velocity of Stack Gas (m/Sec)
Duration of Sampling (Minutes)
Volume of Gas Sampled (Nm3)
RESULT TABLE:
Diesel
6.0
35
110
1.5
4.68
20
0.289
Parameters
PM
Reference Method
IS: 11255 (Part-I) 1985
Lab ID Code
33/LB/ST/PIVl
Unit
mg/Nm3
Result
110
GPCB Limit 150
S02 IS: 11255 (Part-II) 1985 33/LB/ST/SOx ppm 45 100
NOx IS: 11255 (Part-VII) 2005 33/LB/ST/NOx ppm BDL(DL=5.0) 50
For Envisafe Environment Consultants,
V~ ~,(lVl? AuthoriZ~ -----------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors induding, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be arranged, on request of the customer. 5.We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by customer and not reveal to third party unless required by the statutory or legal requirement.
A-37
REGO.OFF.: 3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. TelelFax: +917926650878,26650473 E-mail: [email protected] Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EECjLAB/STK/16-17/240405 24 April, 2016 Page 1 of 1
TEST REPORT
Name & Address of Client Mis. Friends Oil & Chemical Terminal Pvt. Ltd. Kharirohar Road, Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling 16/04/2016; 04:50pm
Date of Receipt of Sample 17/04/2016
Description Of Sample Stack attached to Fire Engine-5
MONITORING DATA:
Fuel Used Diesel
Stack Height (Meter) 6.0
Ambient Temperature (0C) 35
Temperature of Stack Gas (0C) 65
Manometer Reading (mm) 1.5
Average Velocity of Stack Gas (m/Sec) 4.55
Duration of Sampling (Minutes) 20
Volume of Gas Sampled (Nm3 ) 0.297
RESULT TABLE:
Sample collected By EEC Team
Analysis Starting Date 18/04/2016
Analysis Completion : 19/04/2016 Date
Parameters I Reference Method I
Lab ID Code I Unit Result GPCB Limit
PM IS: 11255 (Part-I) 1985
S02 IS: 11255 (Part-II) 1985
NOx IS: 11255 (Part-VII) 2005 -
34/LB/ST/PM mg/Nm3
34/LB/ST/SOx ppm
34/LB/ST/NOx ppm '
90
31
BDL(DL=5.0)
150
100
50
For Envisafe Environment Consultants,
V~~·~~AuthoriZe~ry-----------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us I supplied by
customer and not reveal to third party unless required by the statutory or legal requirement.
--~----~-------,..------------- ---~-~---~--~~--------
A-38
ANNEXURE – 11
Copy of Noise monitoring report
· -,'.
REGD. OFF.:' . '. .•. . ....• ".." .'. ".. ' '.' .. '. .'
3rd Floor, Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tete/Fax: +91 7926650878,26650473 E-mail: envisafe@gmaiLcom Environment Consultants
Environmental Consultancy & Laboratory
Ref.: EEC/LAB/NSL/16-17/240401 24 April, 2016 Page 1 of 1
TEST REPORT
I~---'-'-'--'-'I Name & Address of Client MIs. Friends Oil &. Chemical Terminal
Kharirohar Road, Near Booster Pump Station,I Old kandla, Taluka-Kandla, Dist. Kutchh ___ ~~ ___~._
Date & Time Of Monitoring 17/04/2016~ 10:00am to 02:10pm
Mode of Sampling Grab
Monitoring done by EEC
Measuring Condition Type - 2 SLM Frequency Weighing: Network - A
__--'-Time Weighing: SJow ________~ ._._.__--.-J
RESULT TABLE:
~~----.---...-.-~.---.------.~
Noise Level, db (A) iSr. ILocation Max~~-~-rNo. Min MoEFIFactory Act Std I
1. Near Main Gate 68.8 75 (Ambient Air)71.8
2. Fire House 57.2 68.6 75 (Ambient Air)
3. Plant Inside 69.8 75.4 90 (Work Zone Area)
4. Plant Outside 48.3 65.2 75{Ambient Air)
5. Loading Grant point 67.3 74.1 75(Ambient Air)
6. Pump House 64.2 70.1 90 (Work Zone Area)
7. i Near Compressor 55.9 65.2 75(Ambient Air)I I
i Reference Method: IS4954: 1968 Recommendations For Noise Abatement In '____ Town Planni_n=-9___
For Envisafe Environment Consultants,
\l~ AuthonzeCi Signatory
----------------------------------End of Test Report------------------------------------------ This Report is issued under the following terms &. conditions:
1. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure, etc.
2. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose without the written consent of Laboratory Department, Envisafe Environment Consultants
3. We strictly maintain the confidentiality of all the monitoring result and not reveal to third party unless required by the statutory or legal reqUirement.
~-.-.-----
A-39
ANNEXURE – 12
Copy of effluent analysis report
REGO.OFF.: 3rd Floor, Akash Ganga Complex, 8/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. GUjarat, INDIA. Tele/Fax: +91 7926650878,26650473 E·mail : [email protected] Environment Consultants
Environmental Consultancy' & LaboratoryRef.: EEC/LAB/LIQ/16-17/240401 24 April, 2016
Page 1 of 1 TEST REPORT
Name & Address of Client MIs. Friends Oil &. Chemical Terminal Kharirohar Road, Near Booster Pump Station, Old kandla, Taluka-Kandla, Dist. Kutchh
Date & Time Of Sampling
Date of Receipt of Sample
Description Of Sample
Analysis Starting Date
Analysis Completion Date
---
17/04/2016
ETP Outlet Sample
18/04/2016
24/04/2016
Sample collected By
Mode of Sampling
Lab ID Code
Packing/Seal
Quantity/ No. of Sample
Client
---36/LB/EF
Satisfactory
1nos.-2 Itrs.
RESULT TABLE:
Sr. Parameters Reference Method Unit Result GPCB Norms No.
1. pH IS:3025 (Part 11) 1983 pH Unit 8.50 6.5-8.5
2. Temperature IS:3025 (Part 9) 1984 °c 31 40
3. Suspended Solids IS:3025 (Part 17) 1984 mg/I 85 100
4. Oil & Grease IS:3025 (Part 39) 1991 mg/I 8.9 10
5. BOD3 27oC IS:3025 (Part 44) 1993 mg/I 27 30
6. COD IS:3025 (Part 58) 2006 mg/I 93 100
7. Chloride IS:3025 (Part 32) 1988 mg/I 589 600
8. Sulphate IS:3025 (Part 24) 1986 mg/I 175 1000
9. Total Dissolved Solids IS:3025 (Part 16) 1984 mg/I 2365 2100
For Envisafe Environment Consultants,
V-V'~~AuthoriZe~ry-------------------------------------------End of Test Report------------------------------------------This Report is issued under the following terms &. conditions:
1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,
pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose
without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention periods
can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analySiS and test result of sample(s) collected by us / supplied by
customer and not reveal to third party unless required by the statutory or legal requirement.
A-40