Lipton Soft Drinks Ireland Ltd. Client: Lipton Soft Drinks Ireland Ltd Engineer: RPS Consulting Engineers, Ballincollig, Cork Value: €980,000 Timeframe: 9 months Completed: 2010 Project Description: Construction of an extension to a pharmaceutical facility, including construction of new office block & internal refurbishment of existing continuously live production facility within a 'clean' environment, where we had to adhere to strict environmental control procedures to ensure no cross contamination of the product occurred. Also as this facility provided a specific product required by all the other plants in Europe no down time apart from planned shutdowns was allowed.

Upload: damian-harrington

Post on 04-Mar-2016

222 views

Category:

Documents


2 download

DESCRIPTION

This brochure lists projects complete by MMD Construction

TRANSCRIPT

Page 1: Company Brochure

Lipton Soft Drinks Ireland Ltd.

Client: Lipton Soft Drinks Ireland Ltd

Engineer: RPS Consulting Engineers,

Ballincollig, Cork

Value: €980,000

Timeframe: 9 months Completed: 2010

Project Description:

Construction of an extension to a pharmaceutical facility, including construction of new office

block & internal refurbishment of existing continuously live production facility within a 'clean'

environment, where we had to adhere to strict environmental control procedures to ensure no

cross contamination of the product occurred. Also as this facility provided a specific product

required by all the other plants in Europe no down time apart from planned shutdowns was

allowed.

Page 2: Company Brochure

Lipton Soft Drinks Ireland Ltd.

Page 3: Company Brochure

Intel Ireland

Client: M+W Group 1A Sussex Terrace, Dublin4 (working on behalf

of Intel Ireland)

Engineer: M+W Group

Value: €3.3million

Timeframe:20weeks Completed: 2012

Project Description:

Site Enabling Works for 3 extensions to the existing buildings & associated site

works in a live manufacturing facility.

Safety Milestone achieved on Site at 35,835 accident free hours.

Page 4: Company Brochure

Carrigaline Library, Carrigaline, Co. Cork.

Client: Cork County

Council

Engineer: Cork County

Council

Value: €226,117

Timeframe:3 months

Completed: 2010

Project Description:

Refurbishment and fit out works

to Carrigaline Library . This

Project was delivered on budgetProject was delivered on budget

& time. Works were carried out

in a Town centre based works

involving strict safety

management.

Page 5: Company Brochure

Mitchelstown Library, Mitchelstown, Co. Cork.

Client: Cork County

Council

Engineer: Cork County

Council

Value: €194,891

Timeframe:3 months

Completed: 2010

Project Description:

Conversion of existing

Commercial/Retail units into

new Library at Sutton Court.new Library at Sutton Court.

This Project was delivered on

budget & time. Works were

carried out in a Town centre

based works involving strict

safety management.

Page 6: Company Brochure

Ozolaid House, Camden Quay, Cork.

Client: Murray Properties

Ltd.

Quantity Surveyor: James

Sheehan &

Associates

Value: €380,000

Timeframe:4 months

Completed: 2009

Project Description:

Refurbishment & Alterations to

‘Ozolaid House’,1 Camden‘Ozolaid House’,1 Camden

Quay, Cork.(Listed Building).

The building consists of five

storeys including one retail unit

and 18 residential units. This

project consists of the strip out

of the existing mechanical and

electrical of the existing listed

building. Refurbishment of

original Sash windows. The

removal of existing internal

doors, floors walls and ceiling

finishes and the installation of

new, to achieve a fire rating for

the fire cert Compliance. City

Centre location required very

tightly managed safety and

construction procedures

Page 7: Company Brochure

Bowens Menswear, Bandon. Co. Cork

Client:

Bandon Menswear

Quantity Surveyors: Unique

Fit out

Value: €315,000

Timeframe: 7 months

Completed: 2010

Project Description:

Refurbishment, Strip Out &

Complete fit out of Bowens

Menswear including some Menswear including some

roof/structural works on Main

St. Bandon. Town Centre

location required very tightly

managed safety and construction

procedures. Traffic Management

plans fully operational during

night time works and for

deliveries

Page 8: Company Brochure

Kerry Foods, Wallingstown, Little Island, Cork

Client: Kerry Food Group

Engineer: Thomas O Brien

Architect: Wilson Architecture

Value: €2.5million

Timeframe: 16week (turnkey project)

Completed: 2008

Project Description:

Design & Build of complete Turnkey Package 25,000sqft Light Industrial Units with Substantial Civil

Elements. Phase 1 consisting of a steel structure with in-situ concrete slab floors of high tolerance.

Office space (fit out) accounted for 7000sqft of the total space.

Page 9: Company Brochure

An Post DSU, Ballincollig, Cork

Client: An Post

Architects: Jack Coughlan & Associates

Value: €120,000

Timeframe:2 months Completed: 2011

Project Description:

Refurbishment, fit out works and construction of extension to the existing sorting

post office in Ballincollig. Ancillary site works include fit out of office space &

creation of new opens and associated works.

Page 10: Company Brochure

Woodlands Depot, Killarney, Co. Kerry.

Client: Killarney Town Council (Kerry)

Engineer: Malone O’Regan McGillicuddy

Value: €2.4million

Timeframe: 11 months Completed: 2009

Project Description:

GFA 960m2 –Construction of energy efficient offices and fit out of same(Mechanical 7% &

Electrical 9%) & loading areas on a Greenfield site for Killarney Town Council. Works also

included a 450m NRA spec link road with extensive Traffic Management works.

Page 11: Company Brochure

High Street, Killarney, Co. Kerry

Client: High Street Development s(Niall Fleming)

Architect: O Sullivan Campbell & Associates

Engineer: Malone O'Regan McGillicuddy, 4 Day Place, Tralee,Co Kerry

M&E Specialist: Martin Buckley & Associates, Tramway House, Albert Road, Cork

Value: €3.5million

Timeframe: 12 months Completed: 2008-Fit Outs are ongoing

Project Description:

A Design Build Fixed Price Project- Construction of a 4 Storey Steel Commercial & Residential

Units & Fit Out- Apartment / Duplex Apartments with extensive Mechanical(8%) & Electrical(20%)

Works. These works were completed on a part brownfield town centre site(located in the heart of

Killarney). Careful sequencing of works was vital due to access only from the site as adjacent

properties on 3sides. The fit out of the different floors has been carried out over the last number of

years as required by different longterm clients. Facilities include: Canteen/tea rooms/large scale

board room/studios. Open plan and closed plan workspace/office space. A large storage back house

facility was developed for the ground floor 'Daybreak Shop'. Installation of a lift serving all floors.

Page 12: Company Brochure

High Street, Killarney, Co. Kerry

Page 13: Company Brochure

High Street, Killarney, Co. Kerry

Page 14: Company Brochure

Television Mobiles Ltd. (TVM)

Client: Television Mobiles Ltd. Bartlemy, Co. Cork

Engineer: Malachy Walsh & Partners

Value: €1,951,847

Timeframe: 17 months Completed: 2012

Project Description:

Demolition of existing derelict cottage and construction of new centralised office building with

attached truck workshop. The office building comprises of offices- constructed to a passive standard,

meeting rooms, production rooms, editing suites(strict dust regulatory guidelines to abide by),

storage rooms, roof garden, Canteen, Kitchen, large reception area, truck workshop comprising of

3no. bays and large scale plant room (editing/production purposes) and associated works.

Page 15: Company Brochure

Television Mobiles Ltd. (TVM)

Page 16: Company Brochure

The Framemaker Artist Studios

Client: The Framemaker

Architect: Wilson Architecture

Value: €765,000

Timeframe: 5 months

Completed: 2006

Project Description:

Construction of a retail

warehouse facility which

included the provision of artist

studios and office areas. Works

included the fitting out of the included the fitting out of the

unit, artist studios and office

areas.

Page 17: Company Brochure

Killarney Areas Services Centre

Client: Kerry County Council

Engineer: Kerry County Council

Value: €148,000

Timeframe:2 months

Completed: 2010

Project Description:

Construction of internal office

development for a primarily open

plan office for local authority

functions in an existing new

building shell of approximatelybuilding shell of approximately

241m2. Installation of self

contained aero-thermal heating

system c/w heat recovery

ventilation for above office

development.

Installation of electrical power,

security system, fire alarm system,

CCTV system as well as providing

conduits for IT and

communications requirements by

others.

Page 18: Company Brochure

Bandon Town Council Offices.

Client: Bandon Town Council

Engineer: Cork County Council

Value: €50,000

Timeframe:1 month

Completed: 2011

Project Description:

Refurbishment and fit out to Bandon

Town Council offices. Works

comprised of removal of existing

office fitting and re-establishment of

office space with new furniture.office space with new furniture.

Work was carried out also to remove

and replace a subsiding floor and all

associated refurbishment works.

Page 19: Company Brochure

Goleen Coast Guard Station, Cork

Client: The Office of Public

Works (OPW)

Engineer: The Office of Public

Works (OPW)

Value: €644,757

Timeframe:11 month

Completed: 2011

Project Description:

Goleen Coast Guard Station

Demolition of existing Rocket Cart

Shed; the realignment of existing slip Shed; the realignment of existing slip

road adjacent to the shed;

construction of new slip road;

construction of two storey Coast

Guard Station of 326 sq metres; and

associated landscaping and other

ancillary works

Page 20: Company Brochure

Goleen Coast Guard Station

Page 21: Company Brochure

Cascade Carrigtowhill, Cork

Client: Castlelake Partnership

Engineer: Denis O Sullivan & Associates (DOSA)

Architects: PRC Architects, Morrisons Island, Cork City

M&E Specialist:Martin Buckley & Associates, Tramway House, Albert Road, Cork

Value: €14million

Timeframe:11 month Completed: 2008

Project Description:

Cascade is Design Build(fixed price) project constructed on a greenfield development &

fit out of 95 Luxury Apartments in Carrigtwohill, Co. Cork. Phase 1. This development

was 10,000sqm in size and 4-6 floors high. It is located just on the outskirts of

Carrigtwohill town in close proximity to existing residential and commercial units.

Works included extensive piling and the construction of footbridge over a lake on the

site.

Page 22: Company Brochure

33 Oliver Plunkett St. Cork

Client: Murray Properties Ltd

Thompson

House, 55 McCurtain St.

Cork

Engineer: Dan Mulvihill &

Associates.

Value: €244,461

Timeframe:11 month Completed:

2011

Project Description:

Structural Stabilization Works and Structural Stabilization Works and

complete refurbishment/renovation

works to No. 33 Oliver Plunkett Street

located in Cork City. This 4storey

building required careful monitoring

and sequencing of works to ensure

minimal disruption to the residents,

businesses and pedestrians of the city

centre location.

Page 23: Company Brochure

Swimming Pools-Bishopstown, Churchfield, Douglas,

Cork City

Client: Cork City Council

Engineer: JODA Engineers, Model Farm Road, Cork

Value: €742,290

Timeframe: 1 month Completed: 2011

Project Description:

Douglas Swimming Pool, Bishopstown Leisureworld & Churchfield Leisureworld.-Live Operational

Public Environment

Energy upgrade and disability works including associated site works. Electrical works(35%) &

Mechanical works(31%).

Page 24: Company Brochure

OS Sheet Metals, Tramore Road, Cork City

Client: OS Sheet Metals

Engineer: Watermans Consulting Engineers

Value: €1.6million

Timeframe: 11months Completed: 2008

Project Description:

Refurbishment, alterations and fit out to Industrial Unit. Including extensive site works.

Works included a large scale Electrical element including the provision of a new

substation to supply fabrication machinery.

Page 25: Company Brochure

Nyhan Motors, Midleton, Co. Cork

Client: Nyhan Motors

Architect: Joe O’ Sullivan Architectural Design & Planning, Unit 8, Airways Technology Park,

Farmer’s Cross, Cork

Engineer: Gearoid Hayes & Associates, 13 Oliver Plunkett. St. Bandon. Co. Cork

M&E Specialist:Martin Buckley & Associates, Tramway House, Albert Road, Cork

Value: €2million

Timeframe: 2month

Completed: 2008

Project Description:

A Design Build Fixed Price Contract-Construction of a Car Showrooms with Offices and extensive

parking facilities for both stock cars and customer cars. A mechanics full fitted garage and all

associated site works including extensive tarmac works and landscaping to car show areas.

Page 26: Company Brochure

Cobh Community Centre, Cobh, Co. Cork

Client: Cobh Community Centre

Engineer: O'Brien Thomas J Consulting Engineers Ltd, Discovery House U22Airport East

Business pk,Farmers Cross, Cork

Architect: Stephen Kowalski Architects.

M&E Specialist:Martin Buckley & Associates, Tramway House, Albert Road, Cork

Value: €2.3 million

Timeframe: 9 month

Completed: 2008

Project Description:

A Design Build Fixed Price Contract- Construction of a Community Centre in Cobh Co. Cork for

Cobh Parish to include area assigned to COPE, theatre and 3 floors of workshops, kitchen/servery

and entrance lobby & Fit out of same. Extensive piling to ground works, tarmac car park facilities,

playing court areas & perimeter boundaries

Page 27: Company Brochure

St. Patricks GRD School, Whitechurch, Co. Cork

Client: St. Patrick's NS Whitechurch / Department of Education

Architect: KOBW Architects, Heron House, Blackpool Park, Blackpool, Co. Cork ..

Value: €2.3 million

Timeframe: 11 month

Completed: 2012

Project Description:

Phased demolition of existing school building, provision of 1 no. temporary classroom and the

construction of a new 16 classroom Generic Repeat Design school of 2,268m2 including

construction of a fully equipped PE Hall, activity areas including Ball courts etc. with associated site

works.

Page 28: Company Brochure

Cork University Hospital – All Works

Client: Health Service Executive –Cork University Hospital

Architect: Health Service Executive

Value: €676,996

Timeframe: 2011-2012 (over the space of the 2years)

Completed: ongoing

Project Description:

-Ultrasound room -GI Clinic

-Concourse Room -Medical Records -Fire Door Refurbishment

-Pergola -X-Ray room -Acroyvn Wall

-Ward 2C,3A,5B -CAT Lab -Phlebotomy Unit

-Fire Door Compartmentation -Water Filtration

Page 29: Company Brochure

Cork University Hospital – All Works

Page 30: Company Brochure

Cork University Hospital – All Works

Page 31: Company Brochure

Prosys Industrial Unit, Carrigtwohill, Co. Cork

Client: Prosys Sampling Systems Ltd.

Engineer: David Kelly Partnership, Nelson House, Emmet Place, Youghal, Co. Cork

Value: €930,000

Timeframe: 11months

Completed: 2011

Project Description:

Construction of a New Light Industrial Building with ancillary office accommodation and parking

facilities including associated site works at IDA Business Park

Page 32: Company Brochure

Youghal Hospital, Youghal, Co. Cork

Client: Youghal Hospital -Live Operational Environment

Engineer: HSE South, Estates Department, Block B, St. Finbarrs Hospital,

Douglas Road, Cork

Value: €307,885

Timeframe: 2months

Completed: 2012

Project Description:

Fire upgrade works, ceilings, partitions, electrical works(15%), mechanical works

(20%) including doors and flooring etc. Works included an upgraded access roadway

& site services. Works carried out over 6phases in a very tight project programme.

Page 33: Company Brochure

Salt Barn, Ballincollig, Co. Cork

Client: Cork County Council

Engineer: Cork County Council, ref. National Roads Office, Richmond, Glanmire,

Co. Cork

Value: €235,000

Timeframe: 4months

Completed: 2012

Project Description:

Construction of a salt storage barn and a machinery storage area in Ballincollig.

Works included building works, construction of concrete aprons, installation of

services and all associated works

Page 34: Company Brochure

Salt Barn, Skibbereen, Co. Cork

Client: Cork County Council

Engineer: Cork County Council, ref. National Roads Office, Richmond, Glanmire,

Co. Cork

Value: €230,000

Timeframe: 4months

Completed: 2012

Project Description:

Construction of a salt storage barn and a machinery storage area in Skibbereen. Works

included building works, construction of concrete aprons, installation of services,

extensive piling and all associated works

Page 35: Company Brochure

AOC Iron Mountain, Carrigtwohill, Co. Cork

Client: AOC Commercials, Carrigtwohill, Co. Cork

Engineer: Denis O Sullivan & Associates (DOSA), Barrack Square, Ballincollig,

Co. Cork

Value: €2.6million

Timeframe: Phased Development over 3 years

Completed: 2008

Project Description:

Large industrial Building for Iron Mountain Paper Storage, Carrigtwohill, Co. Cork

including the provision of extensive car parking spaces and associated works

Page 36: Company Brochure

Cobh Cross, Carrigtwohill, Co. Cork

Client: James Fenton & John Cahill, Killacloyne, Carrigtwohill, Co. Cork

Engineer: Tony Dunlea

Value: €2.8million

Timeframe: 9months

Completed: 2008

Project Description:

Phase one. Six Industrial/ Warehouse Units, associated car parking spaces, machinery

storage unit with ancillary two storey offices, including Road works & other Civil

Elements

Page 37: Company Brochure

North Monastery Secondary School, Cork

Client: North Monastery Secondary School Board of Management

Engineer: O Connell Harley O Dwyers

Value: €616,584

Timeframe: 4months

Completed: 2009

Project Description:

Complete Upgrading of Electrical Works, Fire upgrading & Associated Building to 32

classrooms & Refurbishment Works including the installation of an underground,

waterproofed reinforced concrete structure.

Before After

Page 38: Company Brochure

Cork Institute of Technology – Shop & Handrails

Client: Cork Institute of Technology (CIT)

Architect: Neff Design, Liberty Bridge, Kilmurriheen, Spur Hill Cork

Engineers: Horgan Lynch Engineers, Blackrock, Cork

Value: €74,684

Timeframe: August 09-September 09 & February ‘10 – June ‘10

Completed: 2009 & 2010

Project Description:

Refurbishment & Upgrade to Cork Institute of Technology Main Campus Shop. Also

the Make up & installation of handrails & balustrades for Cork Institute of

Technology Athletic Track

Page 39: Company Brochure

Bandon Co-op Kinsale, Co. Cork

Client: Bandon Co-operative Society Ltd.

Engineers: Murphy, McCarthy Consulting Engineers. Ltd. Centre Park Road, Cork

Value: €729,876

Timeframe: 11months

Completed: 2011

Project Description:

Construction of a new detached store and yard entrance; provision of new wall and

roof sheeting to existing building; internal alterations to convert existing building

store into a retail shop area. These works were carried out in 3 phases.

Page 40: Company Brochure

Cork Institute of Technology – Block A Works

Client: Cork Institute of Technology (CIT)

Architect: Neff Design, Liberty Bridge, Kilmurriheen, Spur Hill Cork

Value: €1,078,250

Timeframe: 11months

Completed: 2012

Project Description:

Construction of an extension to the rear (North) of A Block of Cork IT. It will

comprise of a generally single storey build with part mezzanine and a new first floor

over room A183 in the existing A Block including 3 new workshops

Page 41: Company Brochure

Shanakiel Hospital, Cork City

Client: Board of Management- Shanakiel Hospital

Architect: HBK Architects, Lisburn, Co. Antrim

Value: €110,000

Timeframe: 3months

Completed: 2009

Project Description:

Refurbishment and Removal/Demolition of a section of 600mm thick structural wall

and the shuttering and pouring of an insitu concrete structural lift shaft to facilitate the

Installation of a Lift and all associated site works.

Page 42: Company Brochure

St. Stephens Hospital, Glanmire, Co. Cork

Client: Health Service Executive –Cork University Hospital

Architect: Health Service Executive

Value: €114,000

Timeframe: 2 months

Completed: 2012

Project Description:

Fire Safety Upgrading works to Unit 8, St. Stephens Hospital Glanmire- works carried

out in a live hospital environment working within strict Hospital Health & Safety

guidelines with an emphasis on Aspergillus Control.

Page 43: Company Brochure

Nurture Creche, Fairylawn, Western Road, Cork

Client: Nurture Creche Ltd.

Architect: QDM Architecture, Cork

Value: €1.6m

Timeframe: 6months

Completed: 2007

Project Description:

Renovation & Refurbishment of existing 3 storey Building(protected façade) in a city

environment. Development & Construction of an Assembly Area, Provision of a Lift

Shaft, Lift & Access Ramp & associated site works- comprising of Crèche Facility,

external specialized play areas & Apartment Duplex & associated site works including

extensive piling and hard landscaping.

Page 44: Company Brochure

Fota House, Co. Cork

Client: Irish Heritage Trust

Q. Surveyors:Bill Feehely & Associates

Value: €785,000

Timeframe: 6months

Completed: 2010

Project Description:

Development of Road Network & Extensive Car Parking facilities at Fota House,

Cobh, Co. Cork . These works included lighting, road alignment, widening and re-

surfacing and all works carried out to ensure minimum disruption to the ongoing

work/activities of Fota House

Page 45: Company Brochure

Cullen NS, Cullen, Co. Cork

Client: Cullen NS –Board of Management

Architect: Joe O Sullivan Architects

Page 46: Company Brochure

St. Marys NS, Carrigaline, Co. Cork

Construction of a single storey, including an Autism Spectrum

Disorder unit

Client: Board of Management- St. Marys

NS

Architect: Declan O Sullivan Architects

Page 47: Company Brochure

Blue Haven Hotel-Hamlets- Old Fish Market Wall

Restoration Complete restoration of original Old Fish Market Wall & internal

structure upgrading works(value of works and timeframe includes all three projects Blue Haven Hotel/Oz

Haven & Hamlets Bar)

Client: Fitzgerald & Partners

Contract Value: €515,000

Quantity Surveyors: James Sheehan & Associates

Timeframe: 6months

Page 48: Company Brochure

Blue Haven Hotel-Hamlets- Old Fish Market Wall

Restoration (value of works and timeframe includes all three projects Blue Haven Hotel/Oz

Haven & Hamlets Bar)

Client: Fitzgerald & Partners

Contract Value: €515,000

Quantity Surveyors: James Sheehan & Associates

Timeframe: 6months

Page 49: Company Brochure

Oz Haven-Blue Haven Food Company

Complete stripout & fit out of Oz Haven Café

(value of works and timeframe includes all three projects Blue Haven Hotel/Oz

Haven & Hamlets Bar)

Client: Fitzgerald & Partners

Contract Value: €515,000

Quantity Surveyors: James Sheehan & Associates

Timeframe: 6months

Page 50: Company Brochure

Cobh Cross, Carrgtwohill, Co.

Cork

Light weight Industrial/ Warehouse

Units with Ancillary Two- Storey

Offices.

Iron Mountain Development @

Carrigwohill, Co. Cork

Development consisting of a

Comerical Unit which took place

over two phases.

Client: Mr. James Fenton &

Mr. John Cahill

Architect: Tony Dunlea

Consulting Engineer

Engineer: Tony Dunlea

Consulting Engineer

Client: Iron Mountain

Engineer: Denis O’ sullivan

Page 51: Company Brochure

Christy Kearney, Little Island, Co.

Cork

Commercial retail unit located within Euro Business Park Little Island.

Client: Christy Keanrey

Architect: Concept Design

Engineer: Concept Design

Page 52: Company Brochure

OS Sheet Metals, Tramore Rd,

Cork Refurbishment & Alterations to Industrial Unit & associated site works.

Client: OS Sheet Metals Contract

Value: €1,700,000

Engineer: Waterman Consulting Engineer’s Time

Frame: 10months

Page 53: Company Brochure

Toss Bryan, Fermoy, Co. Cork

Commercial Unit located in Fermoy

Client: Toss Bryan

Engineer: Sean McCarthy Consulting

Engineers

Page 54: Company Brochure

Greenstar Recycling Ltd.

Construction of an commercial recycling unit with underground

waterproof concrete structures , in Glanmire, Co. Cork

Client: Greenstar Recycling Ltd.

Architects: O Riordan Staehli Architects