compact linear collider (clic)

59
Compact Linear Collider (CLIC) Philip Burrows John Adams Institute Oxford University 1

Upload: asafrona

Post on 23-Feb-2017

225 views

Category:

Science


1 download

TRANSCRIPT

Page 1: Compact Linear Collider (CLIC)

Compact Linear Collider(CLIC)

Philip Burrows

John Adams Institute

Oxford University

1

Page 2: Compact Linear Collider (CLIC)

2

•Introduction•Linear colliders + CLIC•CLIC project status•5-year R&D programme + technical goals•Applications of CLIC technologies

Outline

Page 3: Compact Linear Collider (CLIC)

Large Hadron Collider (LHC)

3

Largest,highest-energyparticlecollider

CERN,Geneva

Page 4: Compact Linear Collider (CLIC)

CERN accelerator complex

4

Page 5: Compact Linear Collider (CLIC)

5

• A proposed LINEAR collider of electrons and positrons

• Designed to reach VERY high energies in the electron-positron annihilations: 3 TeV

= 3 000 000 000 000 eV

• Ideal for producing new heavy particles of matter, such as SUSY particles, in clean conditions

CLIC vision

Page 6: Compact Linear Collider (CLIC)

6

• A proposed LINEAR collider of electrons and positrons

• Designed to reach VERY high energies in the electron-positron annihilations: 3 TeV

= 3 000 000 000 000 eV

• Ideal for producing new heavy particles of matter, such as SUSY particles, in clean conditions

… should they be discovered at LHC!

CLIC vision

Page 7: Compact Linear Collider (CLIC)

7

CLIC Layout: 3 TeV

Drive Beam Generation Complex

Main Beam Generation Complex

Page 8: Compact Linear Collider (CLIC)

8

• An energy-staging strategy is being developed:

~ 500 GeV 1.5 TeV 3 TeV

(and realistic for implementation)

• The start-up energy would allow for a Higgs boson and top-quark factory

CLIC energy staging

Page 9: Compact Linear Collider (CLIC)

2013 Nobel Prize in Physics

9

Page 10: Compact Linear Collider (CLIC)

e+e- Higgs boson factorye+e- annihilations:

E > 91 + 125 = 216 GeV

E ~ 250 GeV

E > 91 + 250 = 341 GeV

E ~ 500 GeV

Page 11: Compact Linear Collider (CLIC)

European PP Strategy (2013)

11

High-priority large-scale scientific activities:

LHC + High Lumi-LHC

Post-LHC accelerator at CERN

International Linear Collider

Neutrinos

Page 12: Compact Linear Collider (CLIC)

International Linear Collider (ILC)

31 km

c. 250 GeV / beam

12

Page 13: Compact Linear Collider (CLIC)

Kitakami Site

13

Page 14: Compact Linear Collider (CLIC)

ILC Kitakami Site: IP region

14

Page 15: Compact Linear Collider (CLIC)

15

Global Linear Collider Collaboration

Page 16: Compact Linear Collider (CLIC)

European PP Strategy (2013)

16

CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron-positron high energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide.

Page 17: Compact Linear Collider (CLIC)

17

CLIC Layout: 3 TeV

Drive Beam Generation Complex

Main Beam Generation Complex

Page 18: Compact Linear Collider (CLIC)

18

Page 19: Compact Linear Collider (CLIC)

29 Countries – over 70 Institutes

Acceleratorcollaboration

Detectorcollaboration

Accelerator + Detector collaboration

CLIC Collaboration

Page 20: Compact Linear Collider (CLIC)

29 Countries – over 70 Institutes

Acceleratorcollaboration

Detectorcollaboration

Accelerator + Detector collaboration

CLIC CollaborationNew accelerator collaboration partners joining (2013/4):

The Hebrew University Jerusalem, Vinca Belgrade, ALBA/CELLS, Tartu University, NCBJ Warsaw, Shandong University, Ankara University Institute of Accelerator Technologies (IAT) Detector collaboration operative with 22 institutes

Page 21: Compact Linear Collider (CLIC)

CLIC Organisation

21

CERN LC project leader: Steinar Stapnes

CLIC Accelerator:Collaboration Spokesperson: PNBCLIC/CTF3 technical coordinator: Roberto CorsiniCollaboration Board Chair: Lenny Rivkin

CLIC Detector + physics:Collaboration Spokesperson: Lucie LinssenCollaboration Board Chair: Frank Simon

Page 22: Compact Linear Collider (CLIC)

22

Link: http://indico.cern.ch/conferenceDisplay.py?confId=275412

306 registered

Main elements:Open high energy frontier session session, including hadron options with FCC

Accelerator sessions focusing on collaboration efforts and plans 2013-2018, parallel sessions and plenary

High Gradient Applications for FELs, industry, medical

Physics and detector sessions on current and future activities Collaboration and Institute Boards

Page 23: Compact Linear Collider (CLIC)

23

Link: http://indico.cern.ch/conferenceDisplay.py?confId=275412

306 registered

Main elements:Open high energy frontier session session, including hadron options with FCC

Accelerator sessions focusing on collaboration efforts and plans 2013-2018, parallel sessions and plenary

High Gradient Applications for FELs, industry, medical

Physics and detector sessions on current and future activities Collaboration and Institute Boards

Page 24: Compact Linear Collider (CLIC)

CLIC Workshop 2014

Page 25: Compact Linear Collider (CLIC)

CLIC Workshop 2015

Page 26: Compact Linear Collider (CLIC)

CDR (2012)

26

Page 27: Compact Linear Collider (CLIC)

CDR (2012)

27

Page 28: Compact Linear Collider (CLIC)

CDR (2012)

28

Page 29: Compact Linear Collider (CLIC)

ultra low-massvertex detector

with 25 μm pixels

all-silicon tracker

fine grained (PFA) calorimetry, 1 + 7.5 Λi,

strong solenoid4 T - 5 T

return yoke withInstrumentation

for muon ID

complex forward region with final beam focusing

6.5 m

Lucie Linssen 29

CLIC detector

Page 30: Compact Linear Collider (CLIC)

CDR (2012)

30

• Pre-Higgs discovery • Optimised design for 3TeV, but not lower energies• First look at power/energy requirements• Some industrial costing, overall cost not

optimised• Some component reliability studies• X-band demonstration limited by test capacity• Initial system tests

Already a lot more has been (and will be) done!

Page 31: Compact Linear Collider (CLIC)

Beyond the CDR: next 5 years

31

Present CLIC project as a credible option for CERN in post-LHC era ( > 2035) – for consideration in next European Strategy update ~ 2018/19

•Update physics studies in light of LHC results•Complete key technical feasibility R&D •Perform more system tests + verification•More advanced industrialisation studies •Cost/energy-staging strategy with a 20-30 year perspective

Page 32: Compact Linear Collider (CLIC)

32

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 ns

Page 33: Compact Linear Collider (CLIC)

33

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 ns

Page 34: Compact Linear Collider (CLIC)

34

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 nsAccelerating gradient 100 MV/m

Page 35: Compact Linear Collider (CLIC)

35

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 nsAccelerating gradient 100 MV/mHorizontal IP beam size 40 nmVertical IP beam size 1 nm

Page 36: Compact Linear Collider (CLIC)

36

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 nsAccelerating gradient 100 MV/mHorizontal IP beam size 40 nmVertical IP beam size 1 nmTrain repetition rate 50 Hz

Page 37: Compact Linear Collider (CLIC)

37

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 nsAccelerating gradient 100 MV/mHorizontal IP beam size 40 nmVertical IP beam size 1 nmTrain repetition rate 50 HzLuminosity 6 10**34

Page 38: Compact Linear Collider (CLIC)

38

CLIC parameters (3 TeV)

Electrons or positrons / bunch 4 10**9Bunch separation 0.5 nsBunches/train 312Train length 156 nsAccelerating gradient 100 MV/mHorizontal IP beam size 40 nmVertical IP beam size 1 nmTrain repetition rate 50 HzLuminosity 6 10**34Wall-plug power 582 MW

Page 39: Compact Linear Collider (CLIC)

CLIC accelerating structures

39

12 GHz (X-band): 100 MV/m

Micron-level surface finish and stacked alignment

Page 40: Compact Linear Collider (CLIC)

High RF power X-band test station XBOX#2. bld. 150.

430 kV modulator

50 MW Klystron

RF Pulse compressor LLRF

Vacuum controllers

Page 41: Compact Linear Collider (CLIC)

Future XBOX#3: x4 klystron (6MW) cluster

Should service 4 testing slots in parallel with pulses repetition rate of 100 Hz

Page 42: Compact Linear Collider (CLIC)

CLIC Modules

42

20760 modules x 2

3 modules to be mechanically characterised + tested:

Active alignment, fiducialisation + stabilisation (PACMAN)

Page 43: Compact Linear Collider (CLIC)

Test-area (simulating the tunnel)

AIR FLOW

Cooling coils

Heating coils

AIR CIRCULATION

• Air speed sensors installed in the middle of the room

Air speed

sensors

• Range for air temperature and speed: Tair = 20 - 40 °C vair = 0.2 - 0.8 m/s

Page 44: Compact Linear Collider (CLIC)

“Nano positioning” CLIC44

With piezo actuators, modify position

quadrupole in between beam pulses (~ 5 ms)Range ± 5 μm,

increments 10 to 50 nm, precision ± 0.25 nm

Page 45: Compact Linear Collider (CLIC)

45

Type 1

Collocated pair

X-y proto

In CLIC this transfer function reduces the luminosity loss due to ground motion from 68 % to 7%

Demonstration of mechanical absolute stability at sub nano metre level

Page 46: Compact Linear Collider (CLIC)

PACMAN = a study on Particle Accelerators Components’ Metrology and Alignment to the Nanometer scale

Metrology

Develop very high accuracy metrology & alignment tools and integrate them in a prototype alignment bench

Extrapolate the tools & methods developed to other projects

Prepare for industrialisation

Survey & alignment

Beam instrumentation

Radio Frequency

Nano-positioning

Magnetic measurements

Page 47: Compact Linear Collider (CLIC)

DMP ES

ELTOS IT

ETALON DE

METROLAB CH

SIGMAPHI FR

Cranfield University GB

ETH Zürich CH

LAPP FR

SYMME FR

University of Sannio IT

IFIC ES

University of Pisa IT

Delft University of Technology NL

Hexagon Metrology DE

National Instruments HU

TNO NL

PACMAN industrial and academic partners

Page 48: Compact Linear Collider (CLIC)

CLIC Magnets

48

124 MW power consumed by magnets in 3 TeV baseline

Eg. use of permanent or hybrid magnets for the drive beam ( ~ 50,000 magnets)

Page 49: Compact Linear Collider (CLIC)

Vacuum technology development for CLICDevelopment of vacuum windows and chambers in glassy carbon.

NEG and ion pumping

Deformable RF fingers in free position

Page 50: Compact Linear Collider (CLIC)

• test accelerator to demonstrate CLIC technology

COMBINERRING

DELAY LOOP

Frank Tecker

DRIVE BEAM LINAC

TBTS

TBL

CLEX

CLIC Test Facility (CTF3)

Page 51: Compact Linear Collider (CLIC)

CTF3

51

Page 52: Compact Linear Collider (CLIC)

CTF3

52

CLIC Diagnostics tests

Beam loading/BDR experiment

Power production, RF conditioning/testing

with DB & further decelerator tests

Two-Beam Module, Wake-field monitors, Two-beam studies

RF pulse shaping

Phase feed-forward,DB stability studies

Page 53: Compact Linear Collider (CLIC)

Drive beam phase FF prototype(Oxford, CERN, Frascati)

53

Page 54: Compact Linear Collider (CLIC)

Drive beam phase FF prototype(Oxford, CERN, Frascati)

54

Page 55: Compact Linear Collider (CLIC)

Drive beam phase FF prototype(Oxford, CERN, Frascati)

55

Page 56: Compact Linear Collider (CLIC)

Executive summary

56

• The key CLIC technologies have been prototyped + demonstrated no ‘show-stoppers’

• Currently main effort is on system tests and industrialisation of key technologies

• I only gave a flavour of some of the issues

• There is a lot to do… come and join the fun!

Page 57: Compact Linear Collider (CLIC)

2013-18 Development PhaseDevelop a Project Plan for a staged implementation in agreement with LHC findings; further technical developments with industry, performance studies for accelerator parts and systems, as well as for detectors.

2018-19 DecisionsOn the basis of LHC data

and Project Plans (for CLIC and other potential projects), take decisions about next project(s) at

the Energy Frontier.

4-5 year Preparation PhaseFinalise implementation parameters, Drive Beam Facility and other system verifications, site authorisation and preparation for industrial procurement. Prepare detailed Technical Proposals for the detector-systems.

2024-25 Construction StartReady for full construction

and main tunnel excavation.

Construction Phase Stage 1 construction of CLIC, in parallel with detector construction.Preparation for implementation of further stages.

Commissioning Becoming ready for data-

taking as the LHC programme reaches

completion.

CLIC roadmap

Page 58: Compact Linear Collider (CLIC)

Applications of CLIC high-gradient technology

Linear collider – CLIC collaboration

Single-room proton therapy for cancerTERA foundation

Australian Light source

FERMI at Trieste

Compact XFEL light sources – Horizon2020 proposal

Page 59: Compact Linear Collider (CLIC)

Horizon 2020 Design Study

59

XbFEL