community drop-in...community drop-in scs works update 6th november 2019. 13/11/2019 1 construction...
TRANSCRIPT
![Page 1: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/1.jpg)
13/11/2019 1
Community drop-inSCS works update
6th November 2019
![Page 2: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/2.jpg)
13/11/2019 1
▪ Construction
▪ Planning and
consents ongoing
▪ Ground
investigations and
surveys
▪ Detailed design
starts
▪ Minor, track-level
works
▪ Test piling
• Worksite set up
• Vehicle holding area
set up
▪ Tree removal
▪ Hoarding
▪ Site offices (5-storey
cabin near Langdale /
Granby Terrace
▪ Piling
▪ Ground anchors
▪ Park Village East
lay-by
▪ Open vehicle
holding area
What’s been happening? What next?
Dec 2019to
Jan 2020
Apr 2020ongoing
Jan 2020to
Apr 2020
Dec2019
Oct 2019to
Nov 2019
▪ Ground
investigations and
surveys
▪ Prepare for main
works
Nov 2019 to
Dec 2019
▪ Ground
investigations and
surveys
▪ Mobilise to site
(share CSJV
worksite in former
DB Cargo shed)
▪ Deliveries to site
Jan 2020 onBuilding surveys prior to
heavy works. We’ll contact eligible
properties in early 2020. You don’t need to do
anything yet.
![Page 3: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/3.jpg)
13/11/2019 3
Current project status
Milestone Status Date*
Start of detailed design and construction expected Jan 2020
Upcoming milestones
• Utility surveys start (traffic management required) in progress Oct 2019
• Section 61 noise consent application for main works decision due Nov 2019
• Schedule 17 lorry routes application (Camden-wide) decision due Nov 2019
• Building surveys start (structural and pre-condition) expected Dec 2019
*Dates are subject to change.
![Page 4: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/4.jpg)
13/11/2019 4
Some of our key activities in early 2020
Granby Terrace
site officeSite hoarding
Early site
deliveries
Ground
anchors
![Page 5: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/5.jpg)
13/11/2019 5
Granby Terrace
site officeSite hoarding
Early site
deliveries
Ground
anchors
![Page 6: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/6.jpg)
13/11/2019 6
Set-up works within the site include:
• utility connections
• preparing the ground
• installing the site office and wrap
• preparatory works for an internal
haul road, if possible (design
currently being worked on)
Granby Terrace / Regent’s Park Estate site office
Location of
site offices
![Page 7: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/7.jpg)
13/11/2019 7
Granby Terrace / Regent’s Park Estate site office
Buildings being
demolished
Granby Terrace compound (5 storey)
Augustus House
Langdale House
![Page 8: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/8.jpg)
13/11/2019 8
Site office appearance
Our 5 storey office block can be “wrapped” after installation to improve its appearance for our
neighbours.
What do you think about wrapping the building? Some examples below.
![Page 9: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/9.jpg)
13/11/2019 9
Granby Terrace
site officeSite hoarding
Early site
deliveries
Ground
anchors
![Page 10: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/10.jpg)
13/11/2019 10
Changes to current hoarding around Regents Park estate
SCS has a bigger works area than CSJV. That means:
• we need to expand the size and number of worksites
• we will move and add some hoarding
HS2 has kept Hampstead Gardens and a path through to
Harrington Street open for as long as possible.
Unfortunately, once SCS works start, this area will be
closed to the public with no access.
The bus stops on Hampstead Road in this area will be
moved away from the works for safety.
SCS hoarding (to be added/moved)
CSJV hoarding (existing)
![Page 11: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/11.jpg)
13/11/2019 11
Hoarding – current designs around Regents Park Estate
We plan to decorate the hoarding in this area in a similar way to what you see now.
What do you think?
![Page 12: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/12.jpg)
13/11/2019 12
Hoarding changes on Park Village East
Current Early Works hoarding is 2.4m high.
This will be increased to 3.6m for Main Works
From: January 2020*
Proposed hoarding for Main Works.
Hoarding will stand at a height of 3.6m.
From: January 2020*
*Dates are subject to change.
![Page 13: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/13.jpg)
13/11/2019 13
Hoarding – current designs around Park Village East
We plan to keep the hoarding design the same along Park Village East.We are planting trees behind the hoarding so they will soon be seen above.
What do you think?
Trees being grown behind the hoarding to be visible above it.
Extr
a 1
.2m
![Page 14: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/14.jpg)
13/11/2019 14
Adelaide Road site hoarding
Proposed 3.6m high hoarding (planned for early 2020)
When we install the hoarding, we will need to remove trees.
All tree removal will go through the HS2 Tree Panel.
![Page 15: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/15.jpg)
13/11/2019 15
Granby Terrace
site officeSite hoarding
Early site
deliveries
Ground
anchors
![Page 16: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/16.jpg)
Click to add text
Road closedSCS lorry route ( <24/day)CSJV approved lorry routeA501 Euston RoadContinuation of proposed route to Adelaide Road worksiteSite access – entry/exit
SCS routes for early activities
Stanhope Street
Robert Street
Albany Street
Hampstead RoadDeliveries so far:
• Herras fencing
• Containers
• timber
![Page 17: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/17.jpg)
13/11/2019 17
Granby Terrace
site officeSite hoarding
Ground
anchors
Early site
deliveries
![Page 18: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/18.jpg)
13/11/2019 18
• Park Village East retaining wall is no longer being demolished for HS2
• We will strengthen the wall and undertake groundwater management before we start
tunnelling and excavating in this area
• This is to protect the wall during heavy construction and to ensure long term stability of the
wall
• Works
1. Ground anchors drilled into the wall from the track-side between Granby Terrace and
Parkway (de-stressed at end of all HS2 construction works and once the there is no
longer movement from the works)
2. Build a ‘berm’ made of earth and concrete at track-level to add support to the wall
3. Boreholes drilled in at street level to manage groundwater levels
• We have started monitoring the wall and will continue this until after the works are finished
Park Village East retaining wall
![Page 19: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/19.jpg)
13/11/2019 19
• Ground anchors are drilled into
the wall about every metre
• Anchors are tensioned to keep the
wall stable during construction
• The anchors will stay in the
ground once construction is
finished but the tension will be
released in most cases (so they
can be cut or destroyed if needed)
• A berm will be added to the front
of the wall afterwards – an earth
and concrete structure to add
extra strength to the wall
Park Village East retaining wall works
![Page 20: Community drop-in...Community drop-in SCS works update 6th November 2019. 13/11/2019 1 Construction ... Adelaide Road site hoarding Proposed 3.6m high hoarding (planned for early 2020)](https://reader033.vdocuments.mx/reader033/viewer/2022042319/5f094a3a7e708231d4261e28/html5/thumbnails/20.jpg)
13/11/2019 20
Thank you
Please note the contents are likely to change. We’ll keep you up to date. Also subscribe to the HS2inCamden website for updates.