Community Center Conceptual Design City of Burlingame 03.25.2015 6:30 pm - 8:00 pm Citizens Advisory Committee Meeting

Upload: others

Post on 10-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

Community CenterConceptual Design

City of Burlingame

03.25.20156:30 pm - 8:00 pm

Citizens Advisory Committee Meeting

Page 2: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

AGENDA1. Project and Schedule Updates

Work Plan

Participation and Outreach Schedule

Process and Outcome Goals

2. Program and Building Bubble Diagram Options

3. Design Values Exercise

4. Next Steps

Page 3: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

AGENDA1. Project and Schedule Updates

Work Plan

Participation and Outreach Schedule

Process and Outcome Goals

2. Program and Building Bubble Diagram Options

3. Design Values Exercise

4. Next Steps

Page 4: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 4

Page 5: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 5

Community Outreach (subject to change) ROUND 1

MARCH 19th: Parks & Recreation Commission Meeting, 7pm MARCH 21st: Community Open House @ Washington Park, 10am-2pm MARCH 22nd: Community Kiosk @ Farmers Market, 9am-1:30pm

ROUND 2 MAY 30th: Community Open House @ Washington Park, 10am-2pm MAY 31st: Community Kiosk @ Farmers Market, 9am-1:30pm JUNE 18th: Parks & Recreation Commission – Public Hearing/Meeting, 7pm

PARTICIPATION OPPORTUNITIES OVERVIEW

Teen/Youth Specific Outreach Week of May 4th – Lunchtime Kiosks at Burlingame High School

and Burlingame Intermediate School

Page 6: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 6

Community Outreach (subject to change) ROUND 3

TO BE SCHEDULED

Other - TO BE SCHEDULED Community Open House – Downtown Merchants Association Rotary Club Meetings Burlingame Mother’s Club Traffic and Safety Commission ?

PARTICIPATION OPPORTUNITIES OVERVIEW

Presentations and Public Hearings (2) Planning Commission

Study Session – June 22nd

Fall 2015 (2) City Council Meetings

City Council Check-in (Study Session) – June 15th

City Council Final Presentation – November 2nd

Page 7: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

PROCESS GOALS Community engagement that is transparent and signified by the

collaboration of a wide range of stakeholders and community members

Broad community input resulting in local pride and ownership in the plan recommendations

Plan recommendations that address the needs of a wide cross-section of residents, and bring the community together to focus on a common goal

Burlingame’s values are reflected in the process and development of the plan; participants’ feedback is listened to and affirmed by the plan recommendations

The recommended plan captures the goals, needs, and vision of all Burlingame residents, and successfully translates those into the end product: the new community center

7

Page 8: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

PROJECT OUTCOME GOALS Creating a community center that becomes a pillar of

community life and civic pride for Burlingame

A facility that is operationally, environmentally, and socially sustainable

The creation of a multigenerational community center that becomes a central meeting and gathering place for residents

Honoring the history and heritage of the Gunst Estate, Washington Park, Burlingame, and respecting the mature trees

Building a facility that meets the needs of today’s community, and has the flexibility to evolve to meet future needs

A community center that provides the opportunity for people to enrich themselves intellectually, emotionally, spiritually, and physically

8

Page 9: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

AGENDA1. Project and Schedule Updates

Work Plan

Participation and Outreach Schedule

Process and Outcome Goals

2. Program and Building Bubble Diagram Options

3. Design Values Exercise

4. Next Steps

Page 10: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

BUILDING PROGRAM OPTION

1 0

Page 11: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

BUILDING BUBBLE DIAGRAM ACOMMUNITY HALL: OPTION A

COMMUNITYHALL

4,000 sf

MAKERROOM1,200 sf

CREATIVEARTS/CERAMICS

1,600 sf

LOUNGE900 sf

KITCHEN1,000 sf

STAFF2,200 sf

TEENSCENE900 sf

LOBBY

ENTRY PLAZA

ARTYARD

BURLINGAME AVENUE

KILNRR

PARK STOR.

RRPARKRR

RECEPTION

RAISEDPLATFORM

600 sf

STOR.

PARK PATIO

COMM. HALLBELOW

FITNESS &WELLNESS

STUDIO 1,800 sf

DANCE &STRETCHSTUDIO1,800 sf

LRG.MTG.

ROOM1,500 sf

FINEARTS

1,400 sf

ADULTACTIVE

LOUNGE950 sf

DECK

ENRICHMENT CLASSROOM

900 sf

SERVICE

RRMUSICAL ARTS350 sf

KIDSTOWN900 sf

BCOMMUNITY HALL: OPTION B

1 1

COMMUNITYHALL

COMMUNITYHALL

RAISEDPLATFORM

RAISEDPLATFORM

KITCHEN

KITCHEN

FLEX350 sf

Page 12: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 2

LOBBY/COMMUNITY LOUNGE

LOUNGE900 sf

Page 13: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 3

FLEX SPACE

FLEX350 sf

Page 14: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 4

TEEN SCENE

TEENSCENE900 sf

Page 15: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 5

CREATIVE ARTS & CERAMICS

CREATIVEARTS/CERAMICS

1,600 sf

Page 16: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 6

MAKER ROOM

MAKERROOM1,200 sf

Page 17: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 7

ENRICHMENT CLASSROOM

ENRICHMENT CLASSROOM

900 sf

Page 18: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 8

LARGE MEETING ROOM

LRG.MTG.

ROOM1,500 sf

Page 19: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 1 9

MUSICAL ARTS

MUSICAL ARTS350 sf

Page 20: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 0

KIDS TOWN

KIDSTOWN900 sf

Page 21: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 1

FINE ARTS

FINEARTS

1,400 sf

Page 22: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 2

PERFORMING ARTS, DANCE, & FITNESS

FITNESS &WELLNESS

STUDIO 1,800 sf

DANCE &STRETCHSTUDIO1,800 sf

Page 23: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 3

ACTIVE ADULT LOUNGE

ADULTACTIVE

LOUNGE950 sf

Page 24: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 4

LOBBY

KITCHEN

COMMUNITYHALL

RR

COMMUNITY HALL – OPTION A

STOR.

STOR.

RAISEDPLATFORM

PARK PATIO

• Feel of space:o 64’ x 64’ – square formo Divisible into two, 2,016 square foot rooms

• Raised platform: o Oriented towards active park activitieso Allows for direct connection to Gunst Estate and Park

Patio from main Community Hall spaces

Page 25: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 5

LOUNGEKITCHEN

COMMUNITYHALL

RR

COMMUNITY HALL – OPTION B

STOR.

RAISEDPLATFORM

PARK PATIO

STOR.

• Feel of space:o 50’ x 80’ – rectangular formo Divisible into three spaces: (2x) 1,500 sq. ft., (1x) 1,000 sq. ft.

• Raised platform: o Oriented towards Gunst Estate o Direct connection to Park Patio from 1/3rd of Community Hall

• Lounge adjacency can serve as pre-function space for Community Hall

Page 26: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

AGENDA1. Project and Schedule Updates

Work Plan

Participation and Outreach Schedule

Process and Outcome Goals

2. Program and Building Bubble Diagram Options

3. Design Values Exercise

4. Next Steps

Page 27: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 7

CONTEXTUAL INSPIRATION

Page 28: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 8

TRADITIONALLY INFLUENCED

Page 29: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 2 9

WARM + INVITING

Page 30: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 3 0

CIVIC

Page 31: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 3 1

RURAL + RUSTIC

Page 32: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 3 2

EASY MODERN

Page 33: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 3 3

COLORFUL

Page 34: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5 3 4

EXPRESSIVE

Page 35: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

‐5

‐5

‐5

0

0

0

‐1

0

0

0

1

2

10

17

9

10

‐10 ‐5 0 5 10 15 20

Expressive

Colorful

Easy Modern

Rural + Rustic

Civic

Warm + Inviting

Traditionally Influened

Contextural Inspiration

No VoteYes Vote

03/19/15 – Parks and Recreation Meeting

3 5

Page 36: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

‐6

‐13

‐25

‐11

‐2

0

0

‐4

14

10

2

12

35

44

42

21

‐30 ‐20 ‐10 0 10 20 30 40 50

Expressive

Colorful

Easy Modern

Rural + Rustic

Civic

Warm + Inviting

Traditionally Influened

Contextural Inspiration

No VoteYes Vote

03/21/15 – Washington Park Open House

3 6

Page 37: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

‐8

‐38

‐40

‐8

‐8

‐4

‐6

‐14

22

8

26

26

63

106

66

37

‐60 ‐40 ‐20 0 20 40 60 80 100 120

Expressive

Colorful

Easy Modern

Rural + Rustic

Civic

Warm + Inviting

Traditionally Influened

Contextural Inspiration

No VoteYes Vote

03/22/15 – Farmers Market Kiosk

3 7

Page 38: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

B U R L I N G A M E C O M M U N I T Y C E N T E R0 3 . 2 5 . 1 5

‐19

‐56

‐70

‐19

‐10

‐4

‐7

‐18

22

18

29

46

108

167

117

68

‐100 ‐50 0 50 100 150 200

Expressive

Colorful

Easy Modern

Rural + Rustic

Civic

Warm + Inviting

Traditionally Influened

Contextural Inspiration

No VoteYes Vote

OUTREACH ROUND 1: Combined Results

3 8

Page 39: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

AGENDA1. Project and Schedule Updates

Work Plan

Participation and Outreach Schedule

Process and Outcome Goals

2. Program and Building Bubble Diagram Options

3. Design Values Exercise

4. Next Steps

Page 40: Community Center Conceptual Design - Burlingame, …...SITE INTEGRATION OPTIONS AGENDA 1. Project and Schedule Updates Work Plan Participation and Outreach Schedule Process and Outcome

SITE INTEGRATION OPTIONS

NEXT STEPS

ROUND 2 MAY 30th: Community Open House,

Washington Park, 10am-2pm MAY 31st: Community Kiosk, Farmers Market,

9am-1:30pm JUNE 18th: Parks & Recreation Commission,

7pm-8pm

Community Outreach (subject to change)

TEEN/YOUTH OUTREACH Week of May 4th – Lunchtime Kiosks at

Burlingame High School and Burlingame Intermediate School